<?xml version="1.0" encoding="UTF-8"?>
<dataset name="us_power_plants" title="Operating power plants in the United States" source="https://aidb.si/d/us-power-plants">
  <row>
    <plant_id>6163</plant_id>
    <plant_name>Grand Coulee</plant_name>
    <state>WA</state>
    <county>Grant</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Hydroelectric Pumped Storage</technologies>
    <generators>33</generators>
    <nameplate_mw>6809</nameplate_mw>
    <summer_mw>7079</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1984</latest_year>
    <lat>47.957511</lat>
    <lon>-118.9773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>649</plant_id>
    <plant_name>Vogtle</plant_name>
    <state>GA</state>
    <county>Burke</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>4</generators>
    <nameplate_mw>4658</nameplate_mw>
    <summer_mw>4530</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2024</latest_year>
    <lat>33.1427</lat>
    <lon>-81.7625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56407</plant_id>
    <plant_name>West County Energy Center</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>12</generators>
    <nameplate_mw>4263</nameplate_mw>
    <summer_mw>3777</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2011</latest_year>
    <lat>26.6986</lat>
    <lon>-80.3747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6008</plant_id>
    <plant_name>Palo Verde</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>3</generators>
    <nameplate_mw>4209.6</nameplate_mw>
    <summer_mw>3937</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1988</latest_year>
    <lat>33.3881</lat>
    <lon>-112.8617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3470</plant_id>
    <plant_name>W A Parish</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>NRG Texas Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>4008.4</nameplate_mw>
    <summer_mw>3632</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1982</latest_year>
    <lat>29.4828</lat>
    <lon>-95.6311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>46</plant_id>
    <plant_name>Browns Ferry</plant_name>
    <state>AL</state>
    <county>Limestone</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>3</generators>
    <nameplate_mw>3854</nameplate_mw>
    <summer_mw>3661.7</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1977</latest_year>
    <lat>34.7042</lat>
    <lon>-87.1189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>703</plant_id>
    <plant_name>Bowen</plant_name>
    <state>GA</state>
    <county>Bartow</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>3498.6</nameplate_mw>
    <summer_mw>3200</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1975</latest_year>
    <lat>34.1256</lat>
    <lon>-84.9222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>628</plant_id>
    <plant_name>Crystal River</plant_name>
    <state>FL</state>
    <county>Citrus</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Conventional Steam Coal</technologies>
    <generators>8</generators>
    <nameplate_mw>3449</nameplate_mw>
    <summer_mw>3039</summer_mw>
    <first_year>1982</first_year>
    <latest_year>2018</latest_year>
    <lat>28.9656</lat>
    <lon>-82.6977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3</plant_id>
    <plant_name>Barry</plant_name>
    <state>AL</state>
    <county>Mobile</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Conventional Steam Coal; Natural Gas Steam Turbine</technologies>
    <generators>12</generators>
    <nameplate_mw>3343.5</nameplate_mw>
    <summer_mw>3099.7</summer_mw>
    <first_year>1954</first_year>
    <latest_year>2023</latest_year>
    <lat>31.0069</lat>
    <lon>-88.0103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6113</plant_id>
    <plant_name>Gibson</plant_name>
    <state>IN</state>
    <county>Gibson</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>5</generators>
    <nameplate_mw>3339.5</nameplate_mw>
    <summer_mw>3132</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1982</latest_year>
    <lat>38.372222</lat>
    <lon>-87.76583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1733</plant_id>
    <plant_name>Monroe (MI)</plant_name>
    <state>MI</state>
    <county>Monroe</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>3293.1</nameplate_mw>
    <summer_mw>3080</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1974</latest_year>
    <lat>41.8906</lat>
    <lon>-83.3464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>621</plant_id>
    <plant_name>Turkey Point</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear; Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>2978.4</nameplate_mw>
    <summer_mw>2935.1</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2007</latest_year>
    <lat>25.4356</lat>
    <lon>-80.3308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6042</plant_id>
    <plant_name>Manatee</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>2951.2</nameplate_mw>
    <summer_mw>2751</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2005</latest_year>
    <lat>27.6058</lat>
    <lon>-82.3456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3935</plant_id>
    <plant_name>John E Amos</plant_name>
    <state>WV</state>
    <county>Putnam</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>2932.6</nameplate_mw>
    <summer_mw>2900</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1973</latest_year>
    <lat>38.4731</lat>
    <lon>-81.8233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3166</plant_id>
    <plant_name>Peach Bottom</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2876.4</nameplate_mw>
    <summer_mw>2549.4</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>39.758936</lat>
    <lon>-76.26874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6167</plant_id>
    <plant_name>Bath County</plant_name>
    <state>VA</state>
    <county>Bath</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>6</generators>
    <nameplate_mw>2862</nameplate_mw>
    <summer_mw>2931</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>38.20889</lat>
    <lon>-79.8</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>710</plant_id>
    <plant_name>Jack McDonough</plant_name>
    <state>GA</state>
    <county>Cobb</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>2848.4</nameplate_mw>
    <summer_mw>2535</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2012</latest_year>
    <lat>33.8239</lat>
    <lon>-84.4758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6002</plant_id>
    <plant_name>James H Miller Jr</plant_name>
    <state>AL</state>
    <county>Jefferson</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>2822</nameplate_mw>
    <summer_mw>2777.5</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1991</latest_year>
    <lat>33.6319</lat>
    <lon>-87.0597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6251</plant_id>
    <plant_name>South Texas Project</plant_name>
    <state>TX</state>
    <county>Matagorda</county>
    <operator>STP Nuclear Operating Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2708.6</nameplate_mw>
    <summer_mw>2580</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1989</latest_year>
    <lat>28.795</lat>
    <lon>-96.0481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>612</plant_id>
    <plant_name>Fort Myers</plant_name>
    <state>FL</state>
    <county>Lee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>14</generators>
    <nameplate_mw>2680.9</nameplate_mw>
    <summer_mw>2735.5</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2016</latest_year>
    <lat>26.6967</lat>
    <lon>-81.7831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6257</plant_id>
    <plant_name>Scherer</plant_name>
    <state>GA</state>
    <county>Monroe</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>2673</nameplate_mw>
    <summer_mw>2580</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1987</latest_year>
    <lat>33.0606</lat>
    <lon>-83.8075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3265</plant_id>
    <plant_name>Oconee</plant_name>
    <state>SC</state>
    <county>Oconee</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>3</generators>
    <nameplate_mw>2666.7</nameplate_mw>
    <summer_mw>2599.9</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1974</latest_year>
    <lat>34.7939</lat>
    <lon>-82.8986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3399</plant_id>
    <plant_name>Cumberland (TN)</plant_name>
    <state>TN</state>
    <county>Stewart</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>2600</nameplate_mw>
    <summer_mw>2470</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>36.3903</lat>
    <lon>-87.6539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6166</plant_id>
    <plant_name>Rockport</plant_name>
    <state>IN</state>
    <county>Spencer</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>2600</nameplate_mw>
    <summer_mw>2600</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1989</latest_year>
    <lat>37.9256</lat>
    <lon>-87.0372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8102</plant_id>
    <plant_name>Gavin Power, LLC</plant_name>
    <state>OH</state>
    <county>Gallia</county>
    <operator>Gavin Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>2600</nameplate_mw>
    <summer_mw>2722</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1975</latest_year>
    <lat>38.9347</lat>
    <lon>-82.1158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6071</plant_id>
    <plant_name>Trimble County</plant_name>
    <state>KY</state>
    <county>Trimble</county>
    <operator>Louisville Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>2594.1</nameplate_mw>
    <summer_mw>2179</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2011</latest_year>
    <lat>38.5847</lat>
    <lon>-85.4117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66923</plant_id>
    <plant_name>SunZia Wind South</plant_name>
    <state>NM</state>
    <county>Lincoln</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2561.2</nameplate_mw>
    <summer_mw>2561.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.351782</lat>
    <lon>-105.5925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2712</plant_id>
    <plant_name>Roxboro</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>2558.2</nameplate_mw>
    <summer_mw>2439</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1980</latest_year>
    <lat>36.4833</lat>
    <lon>-79.0731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7722</plant_id>
    <plant_name>Watts Bar Nuclear Plant</plant_name>
    <state>TN</state>
    <county>Rhea</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2539.8</nameplate_mw>
    <summer_mw>2245</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2016</latest_year>
    <lat>35.6021</lat>
    <lon>-84.7895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6103</plant_id>
    <plant_name>TalenEnergy Susquehanna</plant_name>
    <state>PA</state>
    <county>Luzerne</county>
    <operator>TalenEnergy Susquehanna LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2532</nameplate_mw>
    <summer_mw>2494</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1985</latest_year>
    <lat>41.0919</lat>
    <lon>-76.1462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8042</plant_id>
    <plant_name>Belews Creek</plant_name>
    <state>NC</state>
    <county>Stokes</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>2491.2</nameplate_mw>
    <summer_mw>2220</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1975</latest_year>
    <lat>36.2811</lat>
    <lon>-80.0603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3921</plant_id>
    <plant_name>Chief Joseph</plant_name>
    <state>WA</state>
    <county>Douglas</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>27</generators>
    <nameplate_mw>2456.2</nameplate_mw>
    <summer_mw>2456.2</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1979</latest_year>
    <lat>47.9951</lat>
    <lon>-119.6404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>130</plant_id>
    <plant_name>Cross</plant_name>
    <state>SC</state>
    <county>Berkeley</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>2451.5</nameplate_mw>
    <summer_mw>2335</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2008</latest_year>
    <lat>33.371506</lat>
    <lon>-80.11324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6022</plant_id>
    <plant_name>Braidwood Generation Station</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2449.8</nameplate_mw>
    <summer_mw>2332.3</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>41.2435</lat>
    <lon>-88.2286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6023</plant_id>
    <plant_name>Byron Generating Station</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2449.8</nameplate_mw>
    <summer_mw>2300</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1987</latest_year>
    <lat>42.0742</lat>
    <lon>-89.2819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6043</plant_id>
    <plant_name>Martin</plant_name>
    <state>FL</state>
    <county>Martin</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>11</generators>
    <nameplate_mw>2448.5</nameplate_mw>
    <summer_mw>2209</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2005</latest_year>
    <lat>27.0536</lat>
    <lon>-80.5628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6152</plant_id>
    <plant_name>Sequoyah</plant_name>
    <state>TN</state>
    <county>Hamilton</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2441</nameplate_mw>
    <summer_mw>2277.7</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1982</latest_year>
    <lat>35.2267</lat>
    <lon>-85.0917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6038</plant_id>
    <plant_name>McGuire</plant_name>
    <state>NC</state>
    <county>Mecklenburg</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2440.6</nameplate_mw>
    <summer_mw>2315.6</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1984</latest_year>
    <lat>35.4331</lat>
    <lon>-80.9486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1403</plant_id>
    <plant_name>Nine Mile Point</plant_name>
    <state>LA</state>
    <county>Jefferson</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>2439.7</nameplate_mw>
    <summer_mw>2361.4</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2014</latest_year>
    <lat>29.9472</lat>
    <lon>-90.1458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6145</plant_id>
    <plant_name>Comanche Peak</plant_name>
    <state>TX</state>
    <county>Somervell</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2430</nameplate_mw>
    <summer_mw>2400</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1993</latest_year>
    <lat>32.298365</lat>
    <lon>-97.78552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2693</plant_id>
    <plant_name>Robert Moses Niagara</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>13</generators>
    <nameplate_mw>2429.1</nameplate_mw>
    <summer_mw>2434.9</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1962</latest_year>
    <lat>43.1427</lat>
    <lon>-79.0394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55380</plant_id>
    <plant_name>Union Power Station</plant_name>
    <state>AR</state>
    <county>Union</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>12</generators>
    <nameplate_mw>2428</nameplate_mw>
    <summer_mw>2048.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.296146</lat>
    <lon>-92.58936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6036</plant_id>
    <plant_name>Catawba</plant_name>
    <state>SC</state>
    <county>York</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2410.2</nameplate_mw>
    <summer_mw>2310.1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1986</latest_year>
    <lat>35.0514</lat>
    <lon>-81.0694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2103</plant_id>
    <plant_name>Labadie</plant_name>
    <state>MO</state>
    <county>Franklin</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>2389.4</nameplate_mw>
    <summer_mw>2372</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1973</latest_year>
    <lat>38.562244</lat>
    <lon>-90.83769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2410</plant_id>
    <plant_name>PSEG Salem Generating Station</plant_name>
    <state>NJ</state>
    <county>Salem</county>
    <operator>PSEG Nuclear LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2381.8</nameplate_mw>
    <summer_mw>2323.1</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1981</latest_year>
    <lat>39.4625</lat>
    <lon>-75.5358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6146</plant_id>
    <plant_name>Martin Lake</plant_name>
    <state>TX</state>
    <county>Rusk</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>2379.6</nameplate_mw>
    <summer_mw>2455</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1979</latest_year>
    <lat>32.2606</lat>
    <lon>-94.5706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>620</plant_id>
    <plant_name>Sanford</plant_name>
    <state>FL</state>
    <county>Volusia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>10</generators>
    <nameplate_mw>2377.8</nameplate_mw>
    <summer_mw>2352</summer_mw>
    <first_year>1969</first_year>
    <latest_year>2003</latest_year>
    <lat>28.8419</lat>
    <lon>-81.3256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6026</plant_id>
    <plant_name>LaSalle Generating Station</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2340</nameplate_mw>
    <summer_mw>2264.4</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>41.245498</lat>
    <lon>-88.66907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8066</plant_id>
    <plant_name>Jim Bridger</plant_name>
    <state>WY</state>
    <county>Sweetwater</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>2326</nameplate_mw>
    <summer_mw>2119</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1979</latest_year>
    <lat>41.7378</lat>
    <lon>-108.7875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6099</plant_id>
    <plant_name>Diablo Canyon</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2323</nameplate_mw>
    <summer_mw>2240</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1986</latest_year>
    <lat>35.211536</lat>
    <lon>-120.8555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7873</plant_id>
    <plant_name>H L Culbreath Bayside Power Station</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>13</generators>
    <nameplate_mw>2293.7</nameplate_mw>
    <summer_mw>1974</summer_mw>
    <first_year>1965</first_year>
    <latest_year>2009</latest_year>
    <lat>27.9072</lat>
    <lon>-82.4231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6000</plant_id>
    <plant_name>Donald C Cook</plant_name>
    <state>MI</state>
    <county>Berrien</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2285.3</nameplate_mw>
    <summer_mw>2177</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1978</latest_year>
    <lat>41.975604</lat>
    <lon>-86.56521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6105</plant_id>
    <plant_name>Limerick</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2277</nameplate_mw>
    <summer_mw>2241.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1990</latest_year>
    <lat>40.224303</lat>
    <lon>-75.58744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7302</plant_id>
    <plant_name>Hines Energy Complex</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>12</generators>
    <nameplate_mw>2266.3</nameplate_mw>
    <summer_mw>2144</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2007</latest_year>
    <lat>27.788215</lat>
    <lon>-81.86998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>566</plant_id>
    <plant_name>Millstone</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Dominion Energy Nuclear Conn Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2259.9</nameplate_mw>
    <summer_mw>2108.4</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1986</latest_year>
    <lat>41.3107</lat>
    <lon>-72.1677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7805</plant_id>
    <plant_name>Sherwood H Smith Jr Energy Complex</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>11</generators>
    <nameplate_mw>2244.8</nameplate_mw>
    <summer_mw>1883</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2011</latest_year>
    <lat>34.8392</lat>
    <lon>-79.7406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6073</plant_id>
    <plant_name>Victor J Daniel Jr</plant_name>
    <state>MS</state>
    <county>Jackson</county>
    <operator>Mississippi Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Conventional Steam Coal</technologies>
    <generators>8</generators>
    <nameplate_mw>2229</nameplate_mw>
    <summer_mw>2147</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2001</latest_year>
    <lat>30.5322</lat>
    <lon>-88.5553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1356</plant_id>
    <plant_name>Ghent</plant_name>
    <state>KY</state>
    <county>Carroll</county>
    <operator>Kentucky Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>2225.9</nameplate_mw>
    <summer_mw>1919</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1984</latest_year>
    <lat>38.7497</lat>
    <lon>-85.035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3082</plant_id>
    <plant_name>John Day</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>16</generators>
    <nameplate_mw>2160</nameplate_mw>
    <summer_mw>2052</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1971</latest_year>
    <lat>45.71644</lat>
    <lon>-120.6941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6045</plant_id>
    <plant_name>St Lucie</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2160</nameplate_mw>
    <summer_mw>1968</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1983</latest_year>
    <lat>27.348611</lat>
    <lon>-80.24639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6068</plant_id>
    <plant_name>Jeffrey Energy Center</plant_name>
    <state>KS</state>
    <county>Pottawatomie</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>2160</nameplate_mw>
    <summer_mw>2178.8</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1983</latest_year>
    <lat>39.286453</lat>
    <lon>-96.11723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7277</plant_id>
    <plant_name>Lincoln Combustion</plant_name>
    <state>NC</state>
    <county>Lincoln</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>17</generators>
    <nameplate_mw>2155.6</nameplate_mw>
    <summer_mw>1485</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2024</latest_year>
    <lat>35.4317</lat>
    <lon>-81.0347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2727</plant_id>
    <plant_name>Marshall (NC)</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>2119</nameplate_mw>
    <summer_mw>2058</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1970</latest_year>
    <lat>35.5975</lat>
    <lon>-80.9658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>641</plant_id>
    <plant_name>Gulf Clean Energy Center</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>2107.5</nameplate_mw>
    <summer_mw>1858.2</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2021</latest_year>
    <lat>30.5661</lat>
    <lon>-87.2244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2500</plant_id>
    <plant_name>Ravenswood</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Ravenswood Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>2095.5</nameplate_mw>
    <summer_mw>1947</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2003</latest_year>
    <lat>40.759167</lat>
    <lon>-73.94611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62949</plant_id>
    <plant_name>Guernsey Power Station</plant_name>
    <state>OH</state>
    <county>Guernsey</county>
    <operator>Guernsey Power Station LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>2055</nameplate_mw>
    <summer_mw>1788.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.9364</lat>
    <lon>-81.5354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3944</plant_id>
    <plant_name>FirstEnergy Harrison Power Station</plant_name>
    <state>WV</state>
    <county>Harrison</county>
    <operator>Monongahela Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>2052</nameplate_mw>
    <summer_mw>1954</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1974</latest_year>
    <lat>39.384167</lat>
    <lon>-80.3325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>26</plant_id>
    <plant_name>E C Gaston</plant_name>
    <state>AL</state>
    <county>Shelby</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>2034</nameplate_mw>
    <summer_mw>1868</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1974</latest_year>
    <lat>33.244211</lat>
    <lon>-86.45806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>869</plant_id>
    <plant_name>Dresden Generating Station</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2018.6</nameplate_mw>
    <summer_mw>1797</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1971</latest_year>
    <lat>41.39</lat>
    <lon>-88.27</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>880</plant_id>
    <plant_name>Quad Cities Generating Station</plant_name>
    <state>IL</state>
    <county>Rock Island</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2018.6</nameplate_mw>
    <summer_mw>1819</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>41.726111</lat>
    <lon>-90.31028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6014</plant_id>
    <plant_name>Brunswick Nuclear</plant_name>
    <state>NC</state>
    <county>Brunswick</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>2003.2</nameplate_mw>
    <summer_mw>1870</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1977</latest_year>
    <lat>33.9597</lat>
    <lon>-78.0114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7710</plant_id>
    <plant_name>H Allen Franklin Combined Cycle</plant_name>
    <state>AL</state>
    <county>Lee</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>9</generators>
    <nameplate_mw>1995.7</nameplate_mw>
    <summer_mw>1901.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2008</latest_year>
    <lat>32.6078</lat>
    <lon>-85.0975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1713</plant_id>
    <plant_name>Ludington</plant_name>
    <state>MI</state>
    <county>Mason</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>6</generators>
    <nameplate_mw>1978.8</nameplate_mw>
    <summer_mw>2179.8</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>43.8942</lat>
    <lon>-86.4447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3118</plant_id>
    <plant_name>Conemaugh</plant_name>
    <state>PA</state>
    <county>Indiana</county>
    <operator>KeyCon Operating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>1963</nameplate_mw>
    <summer_mw>1711.2</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1971</latest_year>
    <lat>40.3842</lat>
    <lon>-79.0611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6168</plant_id>
    <plant_name>North Anna</plant_name>
    <state>VA</state>
    <county>Louisa</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear; Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1960.4</nameplate_mw>
    <summer_mw>1893</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1987</latest_year>
    <lat>38.06</lat>
    <lon>-77.7897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3403</plant_id>
    <plant_name>Gallatin (TN)</plant_name>
    <state>TN</state>
    <county>Sumner</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>12</generators>
    <nameplate_mw>1918.4</nameplate_mw>
    <summer_mw>1555.6</summer_mw>
    <first_year>1956</first_year>
    <latest_year>2000</latest_year>
    <lat>36.3156</lat>
    <lon>-86.4006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6055</plant_id>
    <plant_name>Big Cajun 2</plant_name>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <operator>Louisiana Generating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1902.9</nameplate_mw>
    <summer_mw>1614.7</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1983</latest_year>
    <lat>30.7261</lat>
    <lon>-91.3692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2589</plant_id>
    <plant_name>Nine Mile Point Nuclear Station</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>1901.1</nameplate_mw>
    <summer_mw>1903.1</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1987</latest_year>
    <lat>43.5211</lat>
    <lon>-76.41</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>136</plant_id>
    <plant_name>Seminole (FL)</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>Seminole Electric Cooperative Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>1897.8</nameplate_mw>
    <summer_mw>1735.1</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2023</latest_year>
    <lat>29.733056</lat>
    <lon>-81.63278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55480</plant_id>
    <plant_name>Forney Energy Center</plant_name>
    <state>TX</state>
    <county>Kaufman</county>
    <operator>LaFrontera Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>1894.2</nameplate_mw>
    <summer_mw>1770</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.7563</lat>
    <lon>-96.4916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3136</plant_id>
    <plant_name>Keystone</plant_name>
    <state>PA</state>
    <county>Armstrong</county>
    <operator>KeyCon Operating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>1883.2</nameplate_mw>
    <summer_mw>1711.2</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>40.6604</lat>
    <lon>-79.3411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2828</plant_id>
    <plant_name>Cardinal</plant_name>
    <state>OH</state>
    <county>Jefferson</county>
    <operator>Cardinal Operating Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1880.4</nameplate_mw>
    <summer_mw>1790</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1977</latest_year>
    <lat>40.2522</lat>
    <lon>-80.6486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6204</plant_id>
    <plant_name>Laramie River Station</plant_name>
    <state>WY</state>
    <county>Platte</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1863</nameplate_mw>
    <summer_mw>1700</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1982</latest_year>
    <lat>42.108889</lat>
    <lon>-104.8825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10745</plant_id>
    <plant_name>Midland Cogeneration Venture</plant_name>
    <state>MI</state>
    <county>Midland</county>
    <operator>Midland Cogeneration Venture</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>16</generators>
    <nameplate_mw>1853.8</nameplate_mw>
    <summer_mw>1864.6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1998</latest_year>
    <lat>43.5861</lat>
    <lon>-84.2242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1378</plant_id>
    <plant_name>Paradise</plant_name>
    <state>KY</state>
    <county>Muhlenberg</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>1853.6</nameplate_mw>
    <summer_mw>1763</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2023</latest_year>
    <lat>37.2608</lat>
    <lon>-86.9783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6011</plant_id>
    <plant_name>Calvert Cliffs Nuclear Power Plant</plant_name>
    <state>MD</state>
    <county>Calvert</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>1850.4</nameplate_mw>
    <summer_mw>1745.2</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1977</latest_year>
    <lat>38.4344</lat>
    <lon>-76.4417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>298</plant_id>
    <plant_name>Limestone</plant_name>
    <state>TX</state>
    <county>Limestone</county>
    <operator>NRG Texas Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1849.8</nameplate_mw>
    <summer_mw>1688</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1986</latest_year>
    <lat>31.4219</lat>
    <lon>-96.2525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>260</plant_id>
    <plant_name>Dynegy Moss Landing Power Plant Hybrid</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Dynegy -Moss Landing LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Batteries</technologies>
    <generators>8</generators>
    <nameplate_mw>1848</nameplate_mw>
    <summer_mw>1470</summer_mw>
    <battery_mwh>1800</battery_mwh>
    <first_year>2002</first_year>
    <latest_year>2023</latest_year>
    <lat>36.804837</lat>
    <lon>-121.7822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6051</plant_id>
    <plant_name>Edwin I Hatch</plant_name>
    <state>GA</state>
    <county>Appling</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>1848</nameplate_mw>
    <summer_mw>1759</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1979</latest_year>
    <lat>31.9342</lat>
    <lon>-82.3447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6040</plant_id>
    <plant_name>Beaver Valley</plant_name>
    <state>PA</state>
    <county>Beaver</county>
    <operator>Energy Harbor Nuclear Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>1846.8</nameplate_mw>
    <summer_mw>1808</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1987</latest_year>
    <lat>40.6219</lat>
    <lon>-80.4336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8055</plant_id>
    <plant_name>Arkansas Nuclear One</plant_name>
    <state>AR</state>
    <county>Pope</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>1845</nameplate_mw>
    <summer_mw>1807</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1980</latest_year>
    <lat>35.311</lat>
    <lon>-93.2351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1571</plant_id>
    <plant_name>Chalk Point Power</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Chalk Point Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>1825</nameplate_mw>
    <summer_mw>1614.3</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1991</latest_year>
    <lat>38.5444</lat>
    <lon>-76.6861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3895</plant_id>
    <plant_name>The Dalles</plant_name>
    <state>OR</state>
    <county>Wasco</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>24</generators>
    <nameplate_mw>1819.7</nameplate_mw>
    <summer_mw>1822.7</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1973</latest_year>
    <lat>45.614</lat>
    <lon>-121.1346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3459</plant_id>
    <plant_name>Sabine</plant_name>
    <state>TX</state>
    <county>Orange</county>
    <operator>Entergy Texas Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>1811.8</nameplate_mw>
    <summer_mw>1501.4</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1979</latest_year>
    <lat>30.0242</lat>
    <lon>-93.878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2594</plant_id>
    <plant_name>Oswego Harbor Power</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Oswego Harbor Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1803.6</nameplate_mw>
    <summer_mw>1613.5</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1979</latest_year>
    <lat>43.4586</lat>
    <lon>-76.5319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6009</plant_id>
    <plant_name>White Bluff</plant_name>
    <state>AR</state>
    <county>Jefferson</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1800</nameplate_mw>
    <summer_mw>1252.9</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1981</latest_year>
    <lat>34.4228</lat>
    <lon>-92.1406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6641</plant_id>
    <plant_name>Independence Steam Electric Station</plant_name>
    <state>AR</state>
    <county>Independence</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1800</nameplate_mw>
    <summer_mw>1665.8</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1984</latest_year>
    <lat>35.678442</lat>
    <lon>-91.40876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>645</plant_id>
    <plant_name>Big Bend</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>1797</nameplate_mw>
    <summer_mw>1491</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2021</latest_year>
    <lat>27.7944</lat>
    <lon>-82.4036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6180</plant_id>
    <plant_name>Oak Grove (TX)</plant_name>
    <state>TX</state>
    <county>Robertson</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1795.4</nameplate_mw>
    <summer_mw>1710</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2011</latest_year>
    <lat>31.1803</lat>
    <lon>-96.4866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>165</plant_id>
    <plant_name>GREC</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Grand River Dam Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>1788.3</nameplate_mw>
    <summer_mw>1375.6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2026</latest_year>
    <lat>36.190278</lat>
    <lon>-95.2894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>879</plant_id>
    <plant_name>Powerton</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>Midwest Generations EME LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1785.6</nameplate_mw>
    <summer_mw>1538</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1975</latest_year>
    <lat>40.5408</lat>
    <lon>-89.6786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8223</plant_id>
    <plant_name>Springerville</plant_name>
    <state>AZ</state>
    <county>Apache</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Solar Photovoltaic</technologies>
    <generators>7</generators>
    <nameplate_mw>1779.2</nameplate_mw>
    <summer_mw>1632.8</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2014</latest_year>
    <lat>34.3186</lat>
    <lon>-109.1639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6001</plant_id>
    <plant_name>Joseph M Farley</plant_name>
    <state>AL</state>
    <county>Houston</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>1776.4</nameplate_mw>
    <summer_mw>1791</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1981</latest_year>
    <lat>31.2231</lat>
    <lon>-85.1116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59913</plant_id>
    <plant_name>Greensville County Power Station</plant_name>
    <state>VA</state>
    <county>Greensville</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1773.3</nameplate_mw>
    <summer_mw>1605.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.718236</lat>
    <lon>-77.64956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55856</plant_id>
    <plant_name>Prairie State Generating Station</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>Prairie State Generating Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1766</nameplate_mw>
    <summer_mw>1630</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.279167</lat>
    <lon>-89.66694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3149</plant_id>
    <plant_name>TalenEnergy Montour</plant_name>
    <state>PA</state>
    <county>Montour</county>
    <operator>TalenEnergy Montour LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1757.9</nameplate_mw>
    <summer_mw>1504</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1973</latest_year>
    <lat>41.0714</lat>
    <lon>-76.6672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6065</plant_id>
    <plant_name>Iatan</plant_name>
    <state>MO</state>
    <county>Platte</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1753.9</nameplate_mw>
    <summer_mw>1616.4</summer_mw>
    <first_year>1980</first_year>
    <latest_year>2010</latest_year>
    <lat>39.4472</lat>
    <lon>-94.98</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2406</plant_id>
    <plant_name>Linden Generating Station</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Linden Combined Cycle</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>1740</nameplate_mw>
    <summer_mw>1636.2</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2006</latest_year>
    <lat>40.6217</lat>
    <lon>-74.2072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>400</plant_id>
    <plant_name>Haynes</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine</technologies>
    <generators>11</generators>
    <nameplate_mw>1739.1</nameplate_mw>
    <summer_mw>1599.2</summer_mw>
    <first_year>1962</first_year>
    <latest_year>2013</latest_year>
    <lat>33.764741</lat>
    <lon>-118.0991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55091</plant_id>
    <plant_name>Midlothian Energy Facility</plant_name>
    <state>TX</state>
    <county>Ellis</county>
    <operator>Midlothian Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1734</nameplate_mw>
    <summer_mw>1620</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>32.4302</lat>
    <lon>-97.0537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60345</plant_id>
    <plant_name>Okeechobee Clean Energy Center</plant_name>
    <state>FL</state>
    <county>Okeechobee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1723.1</nameplate_mw>
    <summer_mw>1723.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.634167</lat>
    <lon>-80.79111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2952</plant_id>
    <plant_name>Muskogee</plant_name>
    <state>OK</state>
    <county>Muskogee</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1716</nameplate_mw>
    <summer_mw>1510</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1984</latest_year>
    <lat>35.76135</lat>
    <lon>-95.28732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6151</plant_id>
    <plant_name>Raccoon Mountain</plant_name>
    <state>TN</state>
    <county>Hamilton</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>4</generators>
    <nameplate_mw>1713.6</nameplate_mw>
    <summer_mw>1616.3</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1979</latest_year>
    <lat>35.055795</lat>
    <lon>-85.38793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6190</plant_id>
    <plant_name>Brame Energy Center</plant_name>
    <state>LA</state>
    <county>Rapides</county>
    <operator>Cleco Power LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke; Conventional Steam Coal; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1707.3</nameplate_mw>
    <summer_mw>1550.8</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2010</latest_year>
    <lat>31.395</lat>
    <lon>-92.71667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6090</plant_id>
    <plant_name>Sherburne County</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1704</nameplate_mw>
    <summer_mw>1556</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1987</latest_year>
    <lat>45.3808</lat>
    <lon>-93.8931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2956</plant_id>
    <plant_name>Seminole (OK)</plant_name>
    <state>OK</state>
    <county>Seminole</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1701</nameplate_mw>
    <summer_mw>1521.5</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1975</latest_year>
    <lat>34.96645</lat>
    <lon>-96.7258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3148</plant_id>
    <plant_name>TalenEnergy Martins Creek</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>TalenEnergy Martins Creek LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1701</nameplate_mw>
    <summer_mw>1700</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1977</latest_year>
    <lat>40.797762</lat>
    <lon>-75.10542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3407</plant_id>
    <plant_name>Kingston</plant_name>
    <state>TN</state>
    <county>Roane</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>9</generators>
    <nameplate_mw>1700</nameplate_mw>
    <summer_mw>1147</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1955</latest_year>
    <lat>35.8992</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3806</plant_id>
    <plant_name>Surry</plant_name>
    <state>VA</state>
    <county>Surry</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>1695</nameplate_mw>
    <summer_mw>1676</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1973</latest_year>
    <lat>37.1661</lat>
    <lon>-76.6986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6179</plant_id>
    <plant_name>Fayette Power Project</plant_name>
    <state>TX</state>
    <county>Fayette</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1690</nameplate_mw>
    <summer_mw>1615</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1988</latest_year>
    <lat>29.9172</lat>
    <lon>-96.7506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>392</plant_id>
    <plant_name>Castaic</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>1682</nameplate_mw>
    <summer_mw>1674.5</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1978</latest_year>
    <lat>34.587237</lat>
    <lon>-118.6566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3954</plant_id>
    <plant_name>Mt Storm</plant_name>
    <state>WV</state>
    <county>Grant</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1680.9</nameplate_mw>
    <summer_mw>1624.5</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1973</latest_year>
    <lat>39.2008</lat>
    <lon>-79.2636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7125</plant_id>
    <plant_name>Bad Creek</plant_name>
    <state>SC</state>
    <county>Oconee</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>4</generators>
    <nameplate_mw>1680</nameplate_mw>
    <summer_mw>1640</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>35.0075</lat>
    <lon>-82.9975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3406</plant_id>
    <plant_name>Johnsonville</plant_name>
    <state>TN</state>
    <county>Humphreys</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>24</generators>
    <nameplate_mw>1676</nameplate_mw>
    <summer_mw>1292.2</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2025</latest_year>
    <lat>36.0278</lat>
    <lon>-87.9861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6034</plant_id>
    <plant_name>Belle River</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>1664.4</nameplate_mw>
    <summer_mw>1508</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1999</latest_year>
    <lat>42.7756</lat>
    <lon>-82.495</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1082</plant_id>
    <plant_name>Walter Scott Jr Energy Center</plant_name>
    <state>IA</state>
    <county>Pottawattamie</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1648.3</nameplate_mw>
    <summer_mw>1511.7</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2007</latest_year>
    <lat>41.18</lat>
    <lon>-95.8408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6076</plant_id>
    <plant_name>Colstrip</plant_name>
    <state>MT</state>
    <county>Rosebud</county>
    <operator>Talen Montana LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1647.4</nameplate_mw>
    <summer_mw>1480</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1986</latest_year>
    <lat>45.8831</lat>
    <lon>-106.614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2442</plant_id>
    <plant_name>Four Corners</plant_name>
    <state>NM</state>
    <county>San Juan</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1636.2</nameplate_mw>
    <summer_mw>1540</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1970</latest_year>
    <lat>36.69</lat>
    <lon>-108.4814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3948</plant_id>
    <plant_name>Mitchell (WV)</plant_name>
    <state>WV</state>
    <county>Marshall</county>
    <operator>Kentucky Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1632.6</nameplate_mw>
    <summer_mw>1560</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>39.8297</lat>
    <lon>-80.8153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7845</plant_id>
    <plant_name>Lagoon Creek</plant_name>
    <state>TN</state>
    <county>Haywood</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>15</generators>
    <nameplate_mw>1625.2</nameplate_mw>
    <summer_mw>1407</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2010</latest_year>
    <lat>35.6578</lat>
    <lon>-89.3964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3140</plant_id>
    <plant_name>Brunner Island</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Brunner Island LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1616.1</nameplate_mw>
    <summer_mw>1411</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1969</latest_year>
    <lat>40.096111</lat>
    <lon>-76.6962</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>350</plant_id>
    <plant_name>Ormond Beach</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Ormond Beach Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1612</nameplate_mw>
    <summer_mw>1491</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1973</latest_year>
    <lat>34.1292</lat>
    <lon>-119.1689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6041</plant_id>
    <plant_name>H L Spurlock</plant_name>
    <state>KY</state>
    <county>Mason</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>1608.5</nameplate_mw>
    <summer_mw>1346</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2009</latest_year>
    <lat>38.7</lat>
    <lon>-83.8181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58001</plant_id>
    <plant_name>Temple Power Station</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Temple Generation Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1606.4</nameplate_mw>
    <summer_mw>1580</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2015</latest_year>
    <lat>31.055833</lat>
    <lon>-97.31722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1241</plant_id>
    <plant_name>La Cygne</plant_name>
    <state>KS</state>
    <county>Linn</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1598.9</nameplate_mw>
    <summer_mw>1437.8</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1977</latest_year>
    <lat>38.3481</lat>
    <lon>-94.6456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1379</plant_id>
    <plant_name>Shawnee</plant_name>
    <state>KY</state>
    <county>McCracken</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>9</generators>
    <nameplate_mw>1575</nameplate_mw>
    <summer_mw>1206</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1955</latest_year>
    <lat>37.1517</lat>
    <lon>-88.775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2516</plant_id>
    <plant_name>Northport</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>1564</nameplate_mw>
    <summer_mw>1604</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1977</latest_year>
    <lat>40.923565</lat>
    <lon>-73.34232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1710</plant_id>
    <plant_name>J H Campbell</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1560.8</nameplate_mw>
    <summer_mw>1330.5</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1980</latest_year>
    <lat>42.910296</lat>
    <lon>-86.20074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2721</plant_id>
    <plant_name>James E. Rogers Energy Complex</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1530.5</nameplate_mw>
    <summer_mw>1388</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2012</latest_year>
    <lat>35.22</lat>
    <lon>-81.7594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3460</plant_id>
    <plant_name>Cedar Bayou</plant_name>
    <state>TX</state>
    <county>Chambers</county>
    <operator>NRG Texas Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1530</nameplate_mw>
    <summer_mw>1495</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1972</latest_year>
    <lat>29.75</lat>
    <lon>-94.9256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60357</plant_id>
    <plant_name>Lackawanna Energy Center</plant_name>
    <state>PA</state>
    <county>Lackawanna</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1498.5</nameplate_mw>
    <summer_mw>1362</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.471389</lat>
    <lon>-75.54417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1599</plant_id>
    <plant_name>Canal</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Canal Generating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1495</nameplate_mw>
    <summer_mw>1448.8</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2019</latest_year>
    <lat>41.7694</lat>
    <lon>-70.5097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7097</plant_id>
    <plant_name>J K Spruce</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1488.5</nameplate_mw>
    <summer_mw>1345</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2010</latest_year>
    <lat>29.309722</lat>
    <lon>-98.3203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2963</plant_id>
    <plant_name>Northeastern</plant_name>
    <state>OK</state>
    <county>Rogers</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine; Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>1477.5</nameplate_mw>
    <summer_mw>1302</summer_mw>
    <first_year>1961</first_year>
    <latest_year>2001</latest_year>
    <lat>36.4317</lat>
    <lon>-95.7008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>634</plant_id>
    <plant_name>P L Bartow</plant_name>
    <state>FL</state>
    <county>Pinellas</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>1475.6</nameplate_mw>
    <summer_mw>1334</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2009</latest_year>
    <lat>27.859535</lat>
    <lon>-82.60176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6165</plant_id>
    <plant_name>Hunter</plant_name>
    <state>UT</state>
    <county>Emery</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1472.2</nameplate_mw>
    <summer_mw>1363</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1983</latest_year>
    <lat>39.1747</lat>
    <lon>-111.0289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55939</plant_id>
    <plant_name>Warren County</plant_name>
    <state>VA</state>
    <county>Warren</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1472.2</nameplate_mw>
    <summer_mw>1369.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.971667</lat>
    <lon>-78.17722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58260</plant_id>
    <plant_name>Brunswick County Power Station</plant_name>
    <state>VA</state>
    <county>Brunswick</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1472.2</nameplate_mw>
    <summer_mw>1376</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.765</lat>
    <lon>-77.71389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55322</plant_id>
    <plant_name>Chuck Lenzie Generating Station</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1465.6</nameplate_mw>
    <summer_mw>1242</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>36.383719</lat>
    <lon>-114.9218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7242</plant_id>
    <plant_name>Polk</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1458.2</nameplate_mw>
    <summer_mw>1238</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2017</latest_year>
    <lat>27.7286</lat>
    <lon>-81.9897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1355</plant_id>
    <plant_name>E W Brown</plant_name>
    <state>KY</state>
    <county>Mercer</county>
    <operator>Kentucky Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Conventional Steam Coal; Solar Photovoltaic</technologies>
    <generators>9</generators>
    <nameplate_mw>1457.6</nameplate_mw>
    <summer_mw>1328</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2016</latest_year>
    <lat>37.78831</lat>
    <lon>-84.71257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55524</plant_id>
    <plant_name>York Energy Center</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Calpine Mid-Merit LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>1449.4</nameplate_mw>
    <summer_mw>1404</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2019</latest_year>
    <lat>39.7375</lat>
    <lon>-76.30667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65978</plant_id>
    <plant_name>Dania Beach 7</plant_name>
    <state>FL</state>
    <county>Broward</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1447.7</nameplate_mw>
    <summer_mw>1246</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>26.0686</lat>
    <lon>-80.1984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6072</plant_id>
    <plant_name>Grand Gulf</plant_name>
    <state>MS</state>
    <county>Claiborne</county>
    <operator>System Energy Resources, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1440</nameplate_mw>
    <summer_mw>1396.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>32.0081</lat>
    <lon>-91.0478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1393</plant_id>
    <plant_name>R S Nelson</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine; Petroleum Coke</technologies>
    <generators>4</generators>
    <nameplate_mw>1433.6</nameplate_mw>
    <summer_mw>1128.6</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1982</latest_year>
    <lat>30.2844</lat>
    <lon>-93.2911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55358</plant_id>
    <plant_name>Cottonwood Energy Company LP</plant_name>
    <state>TX</state>
    <county>Newton</county>
    <operator>Cottonwood Energy Company LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>1433.6</nameplate_mw>
    <summer_mw>1156.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>30.2588</lat>
    <lon>-93.7353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55463</plant_id>
    <plant_name>Redbud Power Plant</plant_name>
    <state>OK</state>
    <county>Oklahoma</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>1433.6</nameplate_mw>
    <summer_mw>1214</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>35.6856</lat>
    <lon>-97.2264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55736</plant_id>
    <plant_name>Hanging Rock Energy Facility</plant_name>
    <state>OH</state>
    <county>Lawrence</county>
    <operator>Dynegy Hanging Rock Energy Facility</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1429.8</nameplate_mw>
    <summer_mw>1365</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.5731</lat>
    <lon>-82.7833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6021</plant_id>
    <plant_name>Craig (CO)</plant_name>
    <state>CO</state>
    <county>Moffat</county>
    <operator>Tri-State G &amp; T Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1427.6</nameplate_mw>
    <summer_mw>1285</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1984</latest_year>
    <lat>40.4627</lat>
    <lon>-107.5912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>667</plant_id>
    <plant_name>Northside Generating Station</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>JEA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>1407.1</nameplate_mw>
    <summer_mw>1322</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1977</latest_year>
    <lat>30.4172</lat>
    <lon>-81.5525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56068</plant_id>
    <plant_name>Elm Road Generating Station</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1402.6</nameplate_mw>
    <summer_mw>1270.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2011</latest_year>
    <lat>42.8492</lat>
    <lon>-87.8336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1702</plant_id>
    <plant_name>Dan E Karn</plant_name>
    <state>MI</state>
    <county>Bay</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1402.3</nameplate_mw>
    <summer_mw>1199.8</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1977</latest_year>
    <lat>43.644996</lat>
    <lon>-83.84007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2398</plant_id>
    <plant_name>Bergen Generating Station</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>Parkway Generation Operating, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>1400.8</nameplate_mw>
    <summer_mw>1255</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2002</latest_year>
    <lat>40.8375</lat>
    <lon>-74.0244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6096</plant_id>
    <plant_name>Nebraska City</plant_name>
    <state>NE</state>
    <county>Otoe</county>
    <operator>Omaha Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1389.6</nameplate_mw>
    <summer_mw>1337.5</summer_mw>
    <first_year>1979</first_year>
    <latest_year>2009</latest_year>
    <lat>40.6214</lat>
    <lon>-95.7764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55173</plant_id>
    <plant_name>Acadia Energy Center</plant_name>
    <state>LA</state>
    <county>Acadia</county>
    <operator>Cleco Power LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1389.2</nameplate_mw>
    <summer_mw>1072.7</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>30.428611</lat>
    <lon>-92.41306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56150</plant_id>
    <plant_name>McIntosh Combined Cycle Facility</plant_name>
    <state>GA</state>
    <county>Effingham</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1376.6</nameplate_mw>
    <summer_mw>1315.6</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>32.3478</lat>
    <lon>-81.1817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2322</plant_id>
    <plant_name>Clark (NVE)</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>19</generators>
    <nameplate_mw>1375.6</nameplate_mw>
    <summer_mw>1141</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2008</latest_year>
    <lat>36.0875</lat>
    <lon>-115.0507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>602</plant_id>
    <plant_name>Brandon Shores</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Brandon Shores LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1370.2</nameplate_mw>
    <summer_mw>1273</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1991</latest_year>
    <lat>39.182073</lat>
    <lon>-76.53715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55501</plant_id>
    <plant_name>Kiamichi Energy Facility</plant_name>
    <state>OK</state>
    <county>Pittsburg</county>
    <operator>Kiowa Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1370</nameplate_mw>
    <summer_mw>1224</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.6831</lat>
    <lon>-95.9349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6004</plant_id>
    <plant_name>Pleasants Power Station</plant_name>
    <state>WV</state>
    <county>Pleasants</county>
    <operator>Omnis Pleasants, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1368</nameplate_mw>
    <summer_mw>1278</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1980</latest_year>
    <lat>39.366667</lat>
    <lon>-81.29444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6077</plant_id>
    <plant_name>Gerald Gentleman</plant_name>
    <state>NE</state>
    <county>Lincoln</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1362.6</nameplate_mw>
    <summer_mw>1365</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1982</latest_year>
    <lat>41.0808</lat>
    <lon>-101.1408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1364</plant_id>
    <plant_name>Mill Creek (KY)</plant_name>
    <state>KY</state>
    <county>Jefferson</county>
    <operator>Louisville Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1361.7</nameplate_mw>
    <summer_mw>1165</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1982</latest_year>
    <lat>38.0525</lat>
    <lon>-85.9103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>617</plant_id>
    <plant_name>Port Everglades</plant_name>
    <state>FL</state>
    <county>Broward</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1352</nameplate_mw>
    <summer_mw>1237</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>26.0856</lat>
    <lon>-80.1253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>994</plant_id>
    <plant_name>AES Petersburg</plant_name>
    <state>IN</state>
    <county>Pike</county>
    <operator>AES Indiana</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>1349.9</nameplate_mw>
    <summer_mw>1066.2</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1986</latest_year>
    <lat>38.5281</lat>
    <lon>-87.2525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3883</plant_id>
    <plant_name>Rocky Reach</plant_name>
    <state>WA</state>
    <county>Chelan</county>
    <operator>PUD No 1 of Chelan County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>11</generators>
    <nameplate_mw>1349.2</nameplate_mw>
    <summer_mw>1253.9</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1974</latest_year>
    <lat>47.533611</lat>
    <lon>-120.2953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55298</plant_id>
    <plant_name>Fairless Energy Center</plant_name>
    <state>PA</state>
    <county>Bucks</county>
    <operator>Edgewater Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1338</nameplate_mw>
    <summer_mw>1280</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.1475</lat>
    <lon>-74.7411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8068</plant_id>
    <plant_name>Santan</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>9</generators>
    <nameplate_mw>1326</nameplate_mw>
    <summer_mw>1286</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2006</latest_year>
    <lat>33.3325</lat>
    <lon>-111.7503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>876</plant_id>
    <plant_name>Kincaid Generation LLC</plant_name>
    <state>IL</state>
    <county>Christian</county>
    <operator>Dynegy Kincaid Generation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1319</nameplate_mw>
    <summer_mw>1112</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>39.590556</lat>
    <lon>-89.49639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3491</plant_id>
    <plant_name>Handley</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1314.8</nameplate_mw>
    <summer_mw>1245</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1977</latest_year>
    <lat>32.7283</lat>
    <lon>-97.2192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52019</plant_id>
    <plant_name>Doswell Energy Center</plant_name>
    <state>VA</state>
    <county>Hanover</county>
    <operator>Doswell Ltd Partnership</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>1313</nameplate_mw>
    <summer_mw>1202.2</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2018</latest_year>
    <lat>37.820805</lat>
    <lon>-77.44625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57185</plant_id>
    <plant_name>Cricket Valley Energy</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Cricket Valley Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1312.5</nameplate_mw>
    <summer_mw>1016.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.676111</lat>
    <lon>-73.58111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>153</plant_id>
    <plant_name>Glen Canyon Dam</plant_name>
    <state>AZ</state>
    <county>Coconino</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>1312</nameplate_mw>
    <summer_mw>1312</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1966</latest_year>
    <lat>36.936614</lat>
    <lon>-111.4839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6020</plant_id>
    <plant_name>Perry</plant_name>
    <state>OH</state>
    <county>Lake</county>
    <operator>Energy Harbor Nuclear Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1311.6</nameplate_mw>
    <summer_mw>1240</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>41.8006</lat>
    <lon>-81.1439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4046</plant_id>
    <plant_name>Point Beach Nuclear Plant</plant_name>
    <state>WI</state>
    <county>Manitowoc</county>
    <operator>NextEra Energy Point Beach LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1311</nameplate_mw>
    <summer_mw>1204.5</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1972</latest_year>
    <lat>44.2806</lat>
    <lon>-87.5369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7897</plant_id>
    <plant_name>E B Harris Electric Generating Plant</plant_name>
    <state>AL</state>
    <county>Autauga</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1304</nameplate_mw>
    <summer_mw>1314.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.381352</lat>
    <lon>-86.57437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>983</plant_id>
    <plant_name>Clifty Creek</plant_name>
    <state>IN</state>
    <county>Jefferson</county>
    <operator>Indiana-Kentucky Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>6</generators>
    <nameplate_mw>1303.8</nameplate_mw>
    <summer_mw>1173</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1956</latest_year>
    <lat>38.7378</lat>
    <lon>-85.4206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2167</plant_id>
    <plant_name>New Madrid</plant_name>
    <state>MO</state>
    <county>New Madrid</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1300</nameplate_mw>
    <summer_mw>1200</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1977</latest_year>
    <lat>36.5147</lat>
    <lon>-89.5617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6264</plant_id>
    <plant_name>Mountaineer</plant_name>
    <state>WV</state>
    <county>Mason</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>1300</nameplate_mw>
    <summer_mw>1299</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>38.9794</lat>
    <lon>-81.9344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63931</plant_id>
    <plant_name>CPV Three Rivers Energy Center</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>CPV Three Rivers, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>1300</nameplate_mw>
    <summer_mw>1220.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.372222</lat>
    <lon>-88.28444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>210</plant_id>
    <plant_name>Wolf Creek Generating Station</plant_name>
    <state>KS</state>
    <county>Coffey</county>
    <operator>Wolf Creek Nuclear Optg Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1296.3</nameplate_mw>
    <summer_mw>1176.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>38.23926</lat>
    <lon>-95.68978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>609</plant_id>
    <plant_name>Cape Canaveral</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1295</nameplate_mw>
    <summer_mw>1290</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>28.4698</lat>
    <lon>-80.7644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>619</plant_id>
    <plant_name>Riviera</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1295</nameplate_mw>
    <summer_mw>1290</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>26.7653</lat>
    <lon>-80.0525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6118</plant_id>
    <plant_name>PSEG Hope Creek Generating Station</plant_name>
    <state>NJ</state>
    <county>Salem</county>
    <operator>PSEG Nuclear LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1290.7</nameplate_mw>
    <summer_mw>1174.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>39.4666</lat>
    <lon>-75.5377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3393</plant_id>
    <plant_name>Allen</plant_name>
    <state>TN</state>
    <county>Shelby</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>1290.1</nameplate_mw>
    <summer_mw>1144.9</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2018</latest_year>
    <lat>35.074087</lat>
    <lon>-90.14868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62926</plant_id>
    <plant_name>Jackson Generation, LLC</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Jackson Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>1288.6</nameplate_mw>
    <summer_mw>1185.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.438536</lat>
    <lon>-88.11063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10</plant_id>
    <plant_name>Greene County</plant_name>
    <state>AL</state>
    <county>Greene</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>11</generators>
    <nameplate_mw>1288.4</nameplate_mw>
    <summer_mw>1256.1</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1996</latest_year>
    <lat>32.6017</lat>
    <lon>-87.7811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1729</plant_id>
    <plant_name>Fermi</plant_name>
    <state>MI</state>
    <county>Monroe</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>1281</nameplate_mw>
    <summer_mw>1192</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1988</latest_year>
    <lat>41.9631</lat>
    <lon>-83.2581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55230</plant_id>
    <plant_name>Jack County</plant_name>
    <state>TX</state>
    <county>Wise</county>
    <operator>Jack County Power, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1280</nameplate_mw>
    <summer_mw>1241</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2011</latest_year>
    <lat>33.101</lat>
    <lon>-97.9574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55372</plant_id>
    <plant_name>Harquahala Generating Project</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>New Harquahala Generating Co, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1277.1</nameplate_mw>
    <summer_mw>1042.9</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>33.47596</lat>
    <lon>-113.1134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6249</plant_id>
    <plant_name>Winyah</plant_name>
    <state>SC</state>
    <county>Georgetown</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>1275.8</nameplate_mw>
    <summer_mw>1130</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1981</latest_year>
    <lat>33.33184</lat>
    <lon>-79.35724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62192</plant_id>
    <plant_name>Blue Water Energy Center</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1267.4</nameplate_mw>
    <summer_mw>1146</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.773716</lat>
    <lon>-82.47933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>564</plant_id>
    <plant_name>Stanton Energy Center</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>Orlando Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1262</nameplate_mw>
    <summer_mw>1214.7</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2010</latest_year>
    <lat>28.4822</lat>
    <lon>-81.1678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>889</plant_id>
    <plant_name>Baldwin Energy Complex</plant_name>
    <state>IL</state>
    <county>Randolph</county>
    <operator>Dynegy Midwest Generation Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1259.6</nameplate_mw>
    <summer_mw>1157</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1973</latest_year>
    <lat>38.205</lat>
    <lon>-89.8544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55131</plant_id>
    <plant_name>Kendall County Generation Facility</plant_name>
    <state>IL</state>
    <county>Kendall</county>
    <operator>Dynegy Kendall Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>1256</nameplate_mw>
    <summer_mw>1140</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.4797</lat>
    <lon>-88.2581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>470</plant_id>
    <plant_name>Comanche (CO)</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1252.8</nameplate_mw>
    <summer_mw>1085</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2010</latest_year>
    <lat>38.2081</lat>
    <lon>-104.5747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56237</plant_id>
    <plant_name>Lake Side Power Plant</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1246.5</nameplate_mw>
    <summer_mw>1176</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2014</latest_year>
    <lat>40.331667</lat>
    <lon>-111.7542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2625</plant_id>
    <plant_name>Bowline Point</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Bowline, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1242</nameplate_mw>
    <summer_mw>1159.6</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1974</latest_year>
    <lat>41.2044</lat>
    <lon>-73.9689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6115</plant_id>
    <plant_name>Seabrook</plant_name>
    <state>NH</state>
    <county>Rockingham</county>
    <operator>NextEra Energy Seabrook LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1242</nameplate_mw>
    <summer_mw>1247</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.899167</lat>
    <lon>-70.84889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8006</plant_id>
    <plant_name>Roseton Generating Facility</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Roseton Generating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1242</nameplate_mw>
    <summer_mw>1222</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>41.573783</lat>
    <lon>-73.96627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55965</plant_id>
    <plant_name>Wansley Combined Cycle</plant_name>
    <state>GA</state>
    <county>Heard</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1239</nameplate_mw>
    <summer_mw>1184.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>33.406385</lat>
    <lon>-85.03699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>286</plant_id>
    <plant_name>Geysers Unit 5-20</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Geysers Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>12</generators>
    <nameplate_mw>1236</nameplate_mw>
    <summer_mw>644</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1985</latest_year>
    <lat>38.777</lat>
    <lon>-122.745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6153</plant_id>
    <plant_name>Callaway</plant_name>
    <state>MO</state>
    <county>Callaway</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1235.8</nameplate_mw>
    <summer_mw>1190</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>38.758919</lat>
    <lon>-91.77884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55502</plant_id>
    <plant_name>Lawrenceburg Power, LLC</plant_name>
    <state>IN</state>
    <county>Dearborn</county>
    <operator>Lawrenceburg Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1232</nameplate_mw>
    <summer_mw>1206.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>39.0911</lat>
    <lon>-84.8669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59812</plant_id>
    <plant_name>Wolf Hollow II</plant_name>
    <state>TX</state>
    <county>Hood</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1231.2</nameplate_mw>
    <summer_mw>1103.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.337679</lat>
    <lon>-97.73461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60122</plant_id>
    <plant_name>Colorado Bend II</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1230.3</nameplate_mw>
    <summer_mw>1142.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.289415</lat>
    <lon>-96.0654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4040</plant_id>
    <plant_name>Port Washington Generating Station</plant_name>
    <state>WI</state>
    <county>Ozaukee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1229.6</nameplate_mw>
    <summer_mw>1236.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2008</latest_year>
    <lat>43.3842</lat>
    <lon>-87.8689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55405</plant_id>
    <plant_name>Athens Generating Plant</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>New Athens Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1221.6</nameplate_mw>
    <summer_mw>984.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2004</latest_year>
    <lat>42.2728</lat>
    <lon>-73.8492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3888</plant_id>
    <plant_name>Wanapum</plant_name>
    <state>WA</state>
    <county>Grant</county>
    <operator>PUD No 2 of Grant County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>1220</nameplate_mw>
    <summer_mw>1220</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2020</latest_year>
    <lat>46.8731</lat>
    <lon>-119.9703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>613</plant_id>
    <plant_name>Lauderdale</plant_name>
    <state>FL</state>
    <county>Broward</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>1215.9</nameplate_mw>
    <summer_mw>1223.6</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2016</latest_year>
    <lat>26.0686</lat>
    <lon>-80.1984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6030</plant_id>
    <plant_name>Coal Creek</plant_name>
    <state>ND</state>
    <county>McLean</county>
    <operator>Rainbow Energy Center</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>RC</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1215.6</nameplate_mw>
    <summer_mw>1148.2</summer_mw>
    <first_year>1979</first_year>
    <latest_year>2016</latest_year>
    <lat>47.377743</lat>
    <lon>-101.1571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55225</plant_id>
    <plant_name>Oneta Energy Center</plant_name>
    <state>OK</state>
    <county>Wagoner</county>
    <operator>Oneta Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1214</nameplate_mw>
    <summer_mw>1086.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2003</latest_year>
    <lat>36.0119</lat>
    <lon>-95.6967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60356</plant_id>
    <plant_name>South Field Energy</plant_name>
    <state>OH</state>
    <county>Columbiana</county>
    <operator>South Field Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1210.4</nameplate_mw>
    <summer_mw>1210.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.63534</lat>
    <lon>-80.67825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>117</plant_id>
    <plant_name>West Phoenix</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>1207.4</nameplate_mw>
    <summer_mw>929</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2003</latest_year>
    <lat>33.4417</lat>
    <lon>-112.1583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>371</plant_id>
    <plant_name>Columbia Generating Station</plant_name>
    <state>WA</state>
    <county>Benton</county>
    <operator>Energy Northwest- Columbia</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1200</nameplate_mw>
    <summer_mw>1151</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>46.4711</lat>
    <lon>-119.3339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4270</plant_id>
    <plant_name>Waterford 3</plant_name>
    <state>LA</state>
    <county>St Charles</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1199.8</nameplate_mw>
    <summer_mw>1086.9</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>29.995267</lat>
    <lon>-90.47158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8049</plant_id>
    <plant_name>Intercession City</plant_name>
    <state>FL</state>
    <county>Osceola</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>14</generators>
    <nameplate_mw>1197.3</nameplate_mw>
    <summer_mw>940</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2000</latest_year>
    <lat>28.262778</lat>
    <lon>-81.54861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60589</plant_id>
    <plant_name>CPV Fairview Energy Center</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>CPV Fairview, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1197</nameplate_mw>
    <summer_mw>1056.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.412</lat>
    <lon>-78.855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60368</plant_id>
    <plant_name>Hummel Station LLC</plant_name>
    <state>PA</state>
    <county>Snyder</county>
    <operator>Hummel Station, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1194.4</nameplate_mw>
    <summer_mw>1085.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.839014</lat>
    <lon>-76.82552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7826</plant_id>
    <plant_name>Rowan</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1192</nameplate_mw>
    <summer_mw>974.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2003</latest_year>
    <lat>35.7314</lat>
    <lon>-80.6019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55382</plant_id>
    <plant_name>Thomas A Smith Energy Facility</plant_name>
    <state>GA</state>
    <county>Murray</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1192</nameplate_mw>
    <summer_mw>1353</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>34.7094</lat>
    <lon>-84.9175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3469</plant_id>
    <plant_name>T H Wharton</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>NRG Texas Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>17</generators>
    <nameplate_mw>1189.9</nameplate_mw>
    <summer_mw>1002</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1975</latest_year>
    <lat>29.9417</lat>
    <lon>-95.5306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1925</plant_id>
    <plant_name>Prairie Island</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>2</generators>
    <nameplate_mw>1186.2</nameplate_mw>
    <summer_mw>1040</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>44.622</lat>
    <lon>-92.6333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1001</plant_id>
    <plant_name>Cayuga</plant_name>
    <state>IN</state>
    <county>Vermillion</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>1184.9</nameplate_mw>
    <summer_mw>1089</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1993</latest_year>
    <lat>39.9242</lat>
    <lon>-87.4244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2168</plant_id>
    <plant_name>Thomas Hill</plant_name>
    <state>MO</state>
    <county>Randolph</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>1181.7</nameplate_mw>
    <summer_mw>1130</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1982</latest_year>
    <lat>39.5522</lat>
    <lon>-92.6381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2832</plant_id>
    <plant_name>Miami Fort</plant_name>
    <state>OH</state>
    <county>Hamilton</county>
    <operator>Luminant Miami Fort</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>1180.8</nameplate_mw>
    <summer_mw>1076</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1978</latest_year>
    <lat>39.1128</lat>
    <lon>-84.8036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55297</plant_id>
    <plant_name>New Covert Generating Facility</plant_name>
    <state>MI</state>
    <county>Van Buren</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1176</nameplate_mw>
    <summer_mw>1586.3</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>42.32238</lat>
    <lon>-86.29368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55464</plant_id>
    <plant_name>Deer Park Energy Center</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Deer Park Energy Center</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1176</nameplate_mw>
    <summer_mw>1192</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2014</latest_year>
    <lat>29.713414</lat>
    <lon>-95.13451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55460</plant_id>
    <plant_name>Indeck Niles Energy Center</plant_name>
    <state>MI</state>
    <county>Cass</county>
    <operator>Indeck Niles, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1174.4</nameplate_mw>
    <summer_mw>1081.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.862114</lat>
    <lon>-86.22139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>47</plant_id>
    <plant_name>Colbert</plant_name>
    <state>AL</state>
    <county>Colbert</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>11</generators>
    <nameplate_mw>1169.6</nameplate_mw>
    <summer_mw>1026.2</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2023</latest_year>
    <lat>34.7439</lat>
    <lon>-87.8486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>547</plant_id>
    <plant_name>Northfield Mountain</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>FirstLight Power Resources, Inc. - MA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>4</generators>
    <nameplate_mw>1168</nameplate_mw>
    <summer_mw>1168</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1973</latest_year>
    <lat>42.610683</lat>
    <lon>-72.47164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3075</plant_id>
    <plant_name>Bonneville</plant_name>
    <state>OR</state>
    <county>Multnomah</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>20</generators>
    <nameplate_mw>1162</nameplate_mw>
    <summer_mw>1153.9</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1982</latest_year>
    <lat>45.6441</lat>
    <lon>-121.941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6433</plant_id>
    <plant_name>Boundary</plant_name>
    <state>WA</state>
    <county>Pend Oreille</county>
    <operator>City of Seattle - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>1159.7</nameplate_mw>
    <summer_mw>1144.9</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1986</latest_year>
    <lat>48.987111</lat>
    <lon>-117.3478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54547</plant_id>
    <plant_name>Sithe Independence Station</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Sithe/Independence LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1157.8</nameplate_mw>
    <summer_mw>996.2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>43.495</lat>
    <lon>-76.4511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55151</plant_id>
    <plant_name>La Paloma Generating Plant</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CXA La Paloma LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1156</nameplate_mw>
    <summer_mw>1010</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>35.2956</lat>
    <lon>-119.5919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7834</plant_id>
    <plant_name>John S Rainey</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>1154.3</nameplate_mw>
    <summer_mw>977</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2004</latest_year>
    <lat>34.347734</lat>
    <lon>-82.77448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55690</plant_id>
    <plant_name>Bethlehem Power Plant</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>Calpine Bethlehem LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>1153</nameplate_mw>
    <summer_mw>1136</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2003</latest_year>
    <lat>40.6175</lat>
    <lon>-75.3147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55215</plant_id>
    <plant_name>Odessa-Ector Power Plant</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>LaFrontera Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1152.8</nameplate_mw>
    <summer_mw>1061.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>31.8403</lat>
    <lon>-102.3264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3943</plant_id>
    <plant_name>FirstEnergy Fort Martin Power Station</plant_name>
    <state>WV</state>
    <county>Monongalia</county>
    <operator>Monongahela Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1152</nameplate_mw>
    <summer_mw>1098</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>39.710833</lat>
    <lon>-79.9275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55198</plant_id>
    <plant_name>Riverside Generating LLC</plant_name>
    <state>KY</state>
    <county>Lawrence</county>
    <operator>Riverside Generating Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>1150</nameplate_mw>
    <summer_mw>825</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>38.191661</lat>
    <lon>-82.60459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6112</plant_id>
    <plant_name>Fort St Vrain</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>1148.5</nameplate_mw>
    <summer_mw>1022</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2009</latest_year>
    <lat>40.2461</lat>
    <lon>-104.8742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>204</plant_id>
    <plant_name>Clinton Power Station</plant_name>
    <state>IL</state>
    <county>DeWitt</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1138.3</nameplate_mw>
    <summer_mw>1082.9</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.1719</lat>
    <lon>-88.8339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3612</plant_id>
    <plant_name>V H Braunig</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>1138</nameplate_mw>
    <summer_mw>1050</summer_mw>
    <first_year>1966</first_year>
    <latest_year>2010</latest_year>
    <lat>29.2567</lat>
    <lon>-98.3825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6095</plant_id>
    <plant_name>Sooner</plant_name>
    <state>OK</state>
    <county>Noble</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1138</nameplate_mw>
    <summer_mw>1038</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1980</latest_year>
    <lat>36.45307</lat>
    <lon>-97.05279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6194</plant_id>
    <plant_name>Tolk</plant_name>
    <state>TX</state>
    <county>Lamb</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1135.8</nameplate_mw>
    <summer_mw>1067</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1985</latest_year>
    <lat>34.186494</lat>
    <lon>-102.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60464</plant_id>
    <plant_name>Tenaska Westmoreland Generating Station</plant_name>
    <state>PA</state>
    <county>Westmoreland</county>
    <operator>Tenaska Pennsylvania Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1134</nameplate_mw>
    <summer_mw>947</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.175249</lat>
    <lon>-79.69667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55455</plant_id>
    <plant_name>Red Hawk</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1127</nameplate_mw>
    <summer_mw>1026</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>33.334562</lat>
    <lon>-112.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4940</plant_id>
    <plant_name>Riverside (OK)</plant_name>
    <state>OK</state>
    <county>Tulsa</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>1121.7</nameplate_mw>
    <summer_mw>1069.8</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2008</latest_year>
    <lat>35.9978</lat>
    <lon>-95.9567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55841</plant_id>
    <plant_name>Silverhawk</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>1120.3</nameplate_mw>
    <summer_mw>1064</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2024</latest_year>
    <lat>36.4078</lat>
    <lon>-114.9606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6139</plant_id>
    <plant_name>Welsh</plant_name>
    <state>TX</state>
    <county>Titus</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1116</nameplate_mw>
    <summer_mw>1000</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1982</latest_year>
    <lat>33.05522</lat>
    <lon>-94.83999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>315</plant_id>
    <plant_name>AES Alamitos LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Alamitos LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1115</nameplate_mw>
    <summer_mw>1142</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1964</latest_year>
    <lat>33.7688</lat>
    <lon>-118.1009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59220</plant_id>
    <plant_name>Wildcat Point Generation Facility</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1113.6</nameplate_mw>
    <summer_mw>991.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.719364</lat>
    <lon>-76.16163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55097</plant_id>
    <plant_name>Lamar Power Project</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>LaFrontera Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1112.6</nameplate_mw>
    <summer_mw>1044</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>33.6308</lat>
    <lon>-95.59</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8048</plant_id>
    <plant_name>Anclote</plant_name>
    <state>FL</state>
    <county>Pasco</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1112.4</nameplate_mw>
    <summer_mw>1005</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1978</latest_year>
    <lat>28.184444</lat>
    <lon>-82.78861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8023</plant_id>
    <plant_name>Columbia (WI)</plant_name>
    <state>WI</state>
    <county>Columbia</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1112</nameplate_mw>
    <summer_mw>1128.3</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1978</latest_year>
    <lat>43.4864</lat>
    <lon>-89.4203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3456</plant_id>
    <plant_name>Newman</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>1109.8</nameplate_mw>
    <summer_mw>905.8</summer_mw>
    <first_year>1960</first_year>
    <latest_year>2023</latest_year>
    <lat>31.983587</lat>
    <lon>-106.4318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55137</plant_id>
    <plant_name>Rio Nogales Power Project</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1108</nameplate_mw>
    <summer_mw>799.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>29.593056</lat>
    <lon>-97.97322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6085</plant_id>
    <plant_name>R M Schahfer</plant_name>
    <state>IN</state>
    <county>Jasper</county>
    <operator>Northern Indiana Pub Serv Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>1105</nameplate_mw>
    <summer_mw>877</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1986</latest_year>
    <lat>41.2164</lat>
    <lon>-87.0261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59906</plant_id>
    <plant_name>Moxie Freedom Generation Plant</plant_name>
    <state>PA</state>
    <county>Luzerne</county>
    <operator>Moxie Freedom LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>1105</nameplate_mw>
    <summer_mw>1045</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.113056</lat>
    <lon>-76.15806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2107</plant_id>
    <plant_name>Sioux</plant_name>
    <state>MO</state>
    <county>St Charles</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1099.4</nameplate_mw>
    <summer_mw>974</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>38.915479</lat>
    <lon>-90.29025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55061</plant_id>
    <plant_name>Tenaska Georgia Generation Facility</plant_name>
    <state>GA</state>
    <county>Heard</county>
    <operator>Tenaska Georgia Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>1099.2</nameplate_mw>
    <summer_mw>945</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>33.3516</lat>
    <lon>-84.9996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7153</plant_id>
    <plant_name>Hay Road</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Calpine Mid-Atlantic Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>1098.2</nameplate_mw>
    <summer_mw>1128</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2002</latest_year>
    <lat>39.7436</lat>
    <lon>-75.5072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6481</plant_id>
    <plant_name>Intermountain Power Project</plant_name>
    <state>UT</state>
    <county>Millard</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>1093.2</nameplate_mw>
    <summer_mw>940</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.509731</lat>
    <lon>-112.5802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66924</plant_id>
    <plant_name>SunZia Wind North</plant_name>
    <state>NM</state>
    <county>Torrance</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1089</nameplate_mw>
    <summer_mw>1089</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.351782</lat>
    <lon>-105.5925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55153</plant_id>
    <plant_name>Guadalupe Generating Station</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>Guadalupe Power Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1088.2</nameplate_mw>
    <summer_mw>1005</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>29.6244</lat>
    <lon>-98.1419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2876</plant_id>
    <plant_name>Kyger Creek</plant_name>
    <state>OH</state>
    <county>Gallia</county>
    <operator>Ohio Valley Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>5</generators>
    <nameplate_mw>1086.5</nameplate_mw>
    <summer_mw>962.8</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>38.9144</lat>
    <lon>-82.1289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55279</plant_id>
    <plant_name>Aurora</plant_name>
    <state>IL</state>
    <county>DuPage</county>
    <operator>Aurora Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>1086.2</nameplate_mw>
    <summer_mw>990.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>41.8151</lat>
    <lon>-88.2265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55419</plant_id>
    <plant_name>Plaquemine Cogeneration Plant</plant_name>
    <state>LA</state>
    <county>Iberville</county>
    <operator>Dow Chemical Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>1084.8</nameplate_mw>
    <summer_mw>890.8</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2024</latest_year>
    <lat>30.3217</lat>
    <lon>-91.2347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4939</plant_id>
    <plant_name>Barney M Davis</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>1082.2</nameplate_mw>
    <summer_mw>925</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2010</latest_year>
    <lat>27.6064</lat>
    <lon>-97.3117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6193</plant_id>
    <plant_name>Harrington</plant_name>
    <state>TX</state>
    <county>Potter</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1080</nameplate_mw>
    <summer_mw>1018</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1980</latest_year>
    <lat>35.29816</lat>
    <lon>-101.7472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6213</plant_id>
    <plant_name>Merom</plant_name>
    <state>IN</state>
    <county>Sullivan</county>
    <operator>Hallador Power Company, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1080</nameplate_mw>
    <summer_mw>978</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1983</latest_year>
    <lat>39.0694</lat>
    <lon>-87.5108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3164</plant_id>
    <plant_name>Muddy Run</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>8</generators>
    <nameplate_mw>1072</nameplate_mw>
    <summer_mw>1058</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>39.8076</lat>
    <lon>-76.2993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6035</plant_id>
    <plant_name>Greenwood (MI)</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>1071.3</nameplate_mw>
    <summer_mw>1009</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1999</latest_year>
    <lat>43.1056</lat>
    <lon>-82.6964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63352</plant_id>
    <plant_name>Gemini Solar Hybrid</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Gemini Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1070</nameplate_mw>
    <summer_mw>1070</summer_mw>
    <battery_mwh>380</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.4678</lat>
    <lon>-114.806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7757</plant_id>
    <plant_name>Chouteau</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1069.6</nameplate_mw>
    <summer_mw>898</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2011</latest_year>
    <lat>36.222058</lat>
    <lon>-95.27706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55927</plant_id>
    <plant_name>Jasper</plant_name>
    <state>SC</state>
    <county>Jasper</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1068.2</nameplate_mw>
    <summer_mw>895</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>32.3594</lat>
    <lon>-81.1242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58215</plant_id>
    <plant_name>Lee Combined Cycle Plant</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1068</nameplate_mw>
    <summer_mw>888</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.373611</lat>
    <lon>-78.08944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>990</plant_id>
    <plant_name>Harding Street</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>AES Indiana</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids; Batteries</technologies>
    <generators>10</generators>
    <nameplate_mw>1064.7</nameplate_mw>
    <summer_mw>966</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>1958</first_year>
    <latest_year>2016</latest_year>
    <lat>39.711319</lat>
    <lon>-86.19687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59764</plant_id>
    <plant_name>Oregon Clean Energy Center</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1061.5</nameplate_mw>
    <summer_mw>818.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.667928</lat>
    <lon>-83.44366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6100</plant_id>
    <plant_name>Helms Pumped Storage</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>3</generators>
    <nameplate_mw>1053</nameplate_mw>
    <summer_mw>1212</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>37.029304</lat>
    <lon>-118.9683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2079</plant_id>
    <plant_name>Hawthorn</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>1046.2</nameplate_mw>
    <summer_mw>960.3</summer_mw>
    <first_year>1969</first_year>
    <latest_year>2000</latest_year>
    <lat>39.1306</lat>
    <lon>-94.4778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>154</plant_id>
    <plant_name>Hoover Dam (NV)</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>9</generators>
    <nameplate_mw>1039.4</nameplate_mw>
    <summer_mw>1039.4</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1961</latest_year>
    <lat>36.01551</lat>
    <lon>-114.738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8902</plant_id>
    <plant_name>Hoover Dam (AZ)</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>1039.4</nameplate_mw>
    <summer_mw>1039.7</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1952</latest_year>
    <lat>36.01551</lat>
    <lon>-114.738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>358</plant_id>
    <plant_name>Mountainview Generating Station</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1036.8</nameplate_mw>
    <summer_mw>1018</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2006</latest_year>
    <lat>34.0818</lat>
    <lon>-117.2418</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55226</plant_id>
    <plant_name>Freestone Energy Center</plant_name>
    <state>TX</state>
    <county>Freestone</county>
    <operator>Freestone Power Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1036</nameplate_mw>
    <summer_mw>1032</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>31.8907</lat>
    <lon>-96.1131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6462</plant_id>
    <plant_name>River Bend</plant_name>
    <state>LA</state>
    <county>West Feliciana</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1035.9</nameplate_mw>
    <summer_mw>968.3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>30.757</lat>
    <lon>-91.3327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61028</plant_id>
    <plant_name>Hickory Run Energy Station</plant_name>
    <state>PA</state>
    <county>Lawrence</county>
    <operator>Hickory Run Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1033.7</nameplate_mw>
    <summer_mw>962.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.994444</lat>
    <lon>-80.43</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2336</plant_id>
    <plant_name>Tracy</plant_name>
    <state>NV</state>
    <county>Storey</county>
    <operator>Sierra Pacific Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>1032.9</nameplate_mw>
    <summer_mw>953.6</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2008</latest_year>
    <lat>39.5625</lat>
    <lon>-119.525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6127</plant_id>
    <plant_name>V C Summer</plant_name>
    <state>SC</state>
    <county>Fairfield</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>1029.6</nameplate_mw>
    <summer_mw>977.2</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>34.2983</lat>
    <lon>-81.3153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64665</plant_id>
    <plant_name>Great Prairie Wind</plant_name>
    <state>TX</state>
    <county>Hansford</county>
    <operator>Great Prairie Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1027</nameplate_mw>
    <summer_mw>1027</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.3075</lat>
    <lon>-101.5322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56948</plant_id>
    <plant_name>Coolidge Generation Station</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>18</generators>
    <nameplate_mw>1023</nameplate_mw>
    <summer_mw>772.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2026</latest_year>
    <lat>32.917399</lat>
    <lon>-111.5033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8069</plant_id>
    <plant_name>Huntington</plant_name>
    <state>UT</state>
    <county>Emery</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>1015.5</nameplate_mw>
    <summer_mw>909</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1977</latest_year>
    <lat>39.3792</lat>
    <lon>-111.0781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2706</plant_id>
    <plant_name>Asheville</plant_name>
    <state>NC</state>
    <county>Buncombe</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>1011.5</nameplate_mw>
    <summer_mw>814</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2020</latest_year>
    <lat>35.4731</lat>
    <lon>-82.5417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55439</plant_id>
    <plant_name>Tenaska Virginia Generating Station</plant_name>
    <state>VA</state>
    <county>Fluvanna</county>
    <operator>Tenaska Virginia Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>1011.4</nameplate_mw>
    <summer_mw>937.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>37.8667</lat>
    <lon>-78.3813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56611</plant_id>
    <plant_name>Sandy Creek Energy Station</plant_name>
    <state>TX</state>
    <county>McLennan</county>
    <operator>Sandy Creek Energy Associates LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>1008</nameplate_mw>
    <summer_mw>932.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>31.474378</lat>
    <lon>-96.95715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>469</plant_id>
    <plant_name>Cherokee</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>1006.4</nameplate_mw>
    <summer_mw>886</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2015</latest_year>
    <lat>39.807275</lat>
    <lon>-104.9645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55451</plant_id>
    <plant_name>Magnolia Power Plant</plant_name>
    <state>MS</state>
    <county>Benton</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>1003.5</nameplate_mw>
    <summer_mw>918</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.835</lat>
    <lon>-89.2026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1402</plant_id>
    <plant_name>Little Gypsy</plant_name>
    <state>LA</state>
    <county>St Charles</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1002.9</nameplate_mw>
    <summer_mw>916.5</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1969</latest_year>
    <lat>30.005067</lat>
    <lon>-90.46169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2691</plant_id>
    <plant_name>Blenheim Gilboa</plant_name>
    <state>NY</state>
    <county>Schoharie</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>4</generators>
    <nameplate_mw>1000</nameplate_mw>
    <summer_mw>1170.5</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>42.4423</lat>
    <lon>-74.4479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60925</plant_id>
    <plant_name>Montgomery County</plant_name>
    <state>TX</state>
    <county>Montgomery</county>
    <operator>Entergy Texas Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1000</nameplate_mw>
    <summer_mw>1000</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.44083</lat>
    <lon>-95.5275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60926</plant_id>
    <plant_name>St. Charles Power Station (LA)</plant_name>
    <state>LA</state>
    <county>St Charles</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1000</nameplate_mw>
    <summer_mw>1000</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.01</lat>
    <lon>-90.46083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60927</plant_id>
    <plant_name>Lake Charles Power</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>1000</nameplate_mw>
    <summer_mw>1000</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.27099</lat>
    <lon>-93.28861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64210</plant_id>
    <plant_name>Bellefield Solar and Energy Storage Farm</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>50LW 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1000</nameplate_mw>
    <summer_mw>1000</summer_mw>
    <battery_mwh>2000</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.062965</lat>
    <lon>-118.0878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63479</plant_id>
    <plant_name>Traverse Wind Project, LLC</plant_name>
    <state>OK</state>
    <county>Custer</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>999</nameplate_mw>
    <summer_mw>999</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.710953</lat>
    <lon>-98.83471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3405</plant_id>
    <plant_name>John Sevier</plant_name>
    <state>TN</state>
    <county>Hawkins</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>996.9</nameplate_mw>
    <summer_mw>878</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.3767</lat>
    <lon>-82.9639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55286</plant_id>
    <plant_name>Oleander Power Project LP</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Oleander Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>994.4</nameplate_mw>
    <summer_mw>815.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2007</latest_year>
    <lat>28.3661</lat>
    <lon>-80.7947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3084</plant_id>
    <plant_name>McNary</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>14</generators>
    <nameplate_mw>990.5</nameplate_mw>
    <summer_mw>966.5</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1957</latest_year>
    <lat>45.9402</lat>
    <lon>-119.2988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55144</plant_id>
    <plant_name>Hays Energy Project</plant_name>
    <state>TX</state>
    <county>Hays</county>
    <operator>Hays Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>989</nameplate_mw>
    <summer_mw>931</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>29.7806</lat>
    <lon>-97.9894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55166</plant_id>
    <plant_name>Broad River Energy Center</plant_name>
    <state>SC</state>
    <county>Cherokee</county>
    <operator>Broad River Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>985</nameplate_mw>
    <summer_mw>863.7</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>35.0786</lat>
    <lon>-81.575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8011</plant_id>
    <plant_name>Crane Clean Energy Center</plant_name>
    <state>PA</state>
    <county>Dauphin</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>980.8</nameplate_mw>
    <summer_mw>802.8</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>40.1515</lat>
    <lon>-76.7232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7538</plant_id>
    <plant_name>Wayne County Energy Complex</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>979.7</nameplate_mw>
    <summer_mw>822</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2009</latest_year>
    <lat>35.375789</lat>
    <lon>-78.09805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55116</plant_id>
    <plant_name>Rockingham County CT Station</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>977.5</nameplate_mw>
    <summer_mw>825</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>36.3297</lat>
    <lon>-79.8297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55401</plant_id>
    <plant_name>Rolling Hills Generating</plant_name>
    <state>OH</state>
    <county>Vinton</county>
    <operator>Rolling Hills Generating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>977.5</nameplate_mw>
    <summer_mw>925</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.0839</lat>
    <lon>-82.3328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66918</plant_id>
    <plant_name>Trumbull Energy Center</plant_name>
    <state>OH</state>
    <county>Trumbull</county>
    <operator>Clean Energy Future - Trumbull, LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>977.4</nameplate_mw>
    <summer_mw>900.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.1476</lat>
    <lon>-80.8525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50006</plant_id>
    <plant_name>Linden Cogen Plant</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>EFS Cogen Holdings I LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>9</generators>
    <nameplate_mw>974.1</nameplate_mw>
    <summer_mw>915.1</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2002</latest_year>
    <lat>40.6322</lat>
    <lon>-74.2156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55087</plant_id>
    <plant_name>Zeeland Generating Station</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>968.2</nameplate_mw>
    <summer_mw>842.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>42.8206</lat>
    <lon>-85.9975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60376</plant_id>
    <plant_name>Middletown- Ohio</plant_name>
    <state>OH</state>
    <county>Trumbull</county>
    <operator>Clean Energy Future-Lordstown, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>962</nameplate_mw>
    <summer_mw>856.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.14889</lat>
    <lon>-80.85162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55518</plant_id>
    <plant_name>High Desert Power Plant</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>MRP Generation Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>960</nameplate_mw>
    <summer_mw>889.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.5953</lat>
    <lon>-117.3647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8906</plant_id>
    <plant_name>Astoria Generating Station</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Astoria Generating Company, L.P.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>958</nameplate_mw>
    <summer_mw>938.9</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1967</latest_year>
    <lat>40.787674</lat>
    <lon>-73.91256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3264</plant_id>
    <plant_name>W S Lee</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>954.7</nameplate_mw>
    <summer_mw>844</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2018</latest_year>
    <lat>34.6022</lat>
    <lon>-82.435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6469</plant_id>
    <plant_name>Antelope Valley</plant_name>
    <state>ND</state>
    <county>Mercer</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>954</nameplate_mw>
    <summer_mw>900</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1986</latest_year>
    <lat>47.370542</lat>
    <lon>-101.8357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6015</plant_id>
    <plant_name>Harris (NC)</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>950.9</nameplate_mw>
    <summer_mw>964</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>35.6334</lat>
    <lon>-78.9556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3887</plant_id>
    <plant_name>Priest Rapids</plant_name>
    <state>WA</state>
    <county>Grant</county>
    <operator>PUD No 2 of Grant County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>950</nameplate_mw>
    <summer_mw>1016.5</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1961</latest_year>
    <lat>46.6451</lat>
    <lon>-119.908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4078</plant_id>
    <plant_name>Weston</plant_name>
    <state>WI</state>
    <county>Marathon</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>945.5</nameplate_mw>
    <summer_mw>887.9</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2008</latest_year>
    <lat>44.8606</lat>
    <lon>-89.6553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55333</plant_id>
    <plant_name>Delta Energy Center</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Delta Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>943.5</nameplate_mw>
    <summer_mw>842</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.0169</lat>
    <lon>-121.8439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55062</plant_id>
    <plant_name>Tenaska Frontier Generation Station</plant_name>
    <state>TX</state>
    <county>Grimes</county>
    <operator>Tenaska Frontier Partners Ltd</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>939.7</nameplate_mw>
    <summer_mw>860</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>30.5924</lat>
    <lon>-95.9178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55132</plant_id>
    <plant_name>Tenaska Gateway Generating Station</plant_name>
    <state>TX</state>
    <county>Rusk</county>
    <operator>Tenaska Gateway Partners Ltd</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>939.6</nameplate_mw>
    <summer_mw>826</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>32.017826</lat>
    <lon>-94.61974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55271</plant_id>
    <plant_name>Tenaska Lindsay Hill Generating Station</plant_name>
    <state>AL</state>
    <county>Autauga</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>939.4</nameplate_mw>
    <summer_mw>848</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>32.6514</lat>
    <lon>-86.7386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54</plant_id>
    <plant_name>J K Smith</plant_name>
    <state>KY</state>
    <county>Clark</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>938.4</nameplate_mw>
    <summer_mw>755.6</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2010</latest_year>
    <lat>37.8833</lat>
    <lon>-84.1017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10554</plant_id>
    <plant_name>Formosa Utility Venture Ltd</plant_name>
    <state>TX</state>
    <county>Calhoun</county>
    <operator>Formosa Plastics Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>13</generators>
    <nameplate_mw>933.4</nameplate_mw>
    <summer_mw>829.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2023</latest_year>
    <lat>28.6917</lat>
    <lon>-96.5417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55327</plant_id>
    <plant_name>Baytown Energy Center</plant_name>
    <state>TX</state>
    <county>Chambers</county>
    <operator>Baytown Energy Center LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>932.9</nameplate_mw>
    <summer_mw>852</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>29.7731</lat>
    <lon>-94.9019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3452</plant_id>
    <plant_name>Lake Hubbard</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>927.5</nameplate_mw>
    <summer_mw>915</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1973</latest_year>
    <lat>32.8358</lat>
    <lon>-96.5458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55440</plant_id>
    <plant_name>Central Alabama Generating Station</plant_name>
    <state>AL</state>
    <county>Autauga</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>927.1</nameplate_mw>
    <summer_mw>917</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.6497</lat>
    <lon>-86.74</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6149</plant_id>
    <plant_name>Davis Besse</plant_name>
    <state>OH</state>
    <county>Ottawa</county>
    <operator>Energy Harbor Nuclear Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>925.2</nameplate_mw>
    <summer_mw>894</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1977</latest_year>
    <lat>41.5967</lat>
    <lon>-83.0861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55299</plant_id>
    <plant_name>Channel Energy Center LLC</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Channel Energy Center LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>923.8</nameplate_mw>
    <summer_mw>760</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2014</latest_year>
    <lat>29.7189</lat>
    <lon>-95.2319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1893</plant_id>
    <plant_name>Clay Boswell</plant_name>
    <state>MN</state>
    <county>Itasca</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>923.3</nameplate_mw>
    <summer_mw>937.8</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1980</latest_year>
    <lat>47.2611</lat>
    <lon>-93.6528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1396</plant_id>
    <plant_name>Coughlin Power Station</plant_name>
    <state>LA</state>
    <county>Evangeline</county>
    <operator>Cleco Power LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>922.8</nameplate_mw>
    <summer_mw>727</summer_mw>
    <first_year>1961</first_year>
    <latest_year>2000</latest_year>
    <lat>30.8439</lat>
    <lon>-92.26111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55503</plant_id>
    <plant_name>Waterford Power, LLC</plant_name>
    <state>OH</state>
    <county>Washington</county>
    <operator>Waterford Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>921.6</nameplate_mw>
    <summer_mw>874.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.5333</lat>
    <lon>-81.7178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2049</plant_id>
    <plant_name>Jack Watson</plant_name>
    <state>MS</state>
    <county>Harrison</county>
    <operator>Mississippi Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>919.1</nameplate_mw>
    <summer_mw>754</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1973</latest_year>
    <lat>30.4392</lat>
    <lon>-89.0286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7709</plant_id>
    <plant_name>Dahlberg</plant_name>
    <state>GA</state>
    <county>Jackson</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>919</nameplate_mw>
    <summer_mw>745.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>34.042267</lat>
    <lon>-83.39772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55187</plant_id>
    <plant_name>Channelview Cogeneration Plant</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>EIF Channelview Cogeneration LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>918.3</nameplate_mw>
    <summer_mw>761</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>29.836952</lat>
    <lon>-95.12174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2694</plant_id>
    <plant_name>Robert Moses Power Dam</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>16</generators>
    <nameplate_mw>912</nameplate_mw>
    <summer_mw>856</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1959</latest_year>
    <lat>45.0038</lat>
    <lon>-74.7994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55146</plant_id>
    <plant_name>Green Country Power Station</plant_name>
    <state>OK</state>
    <county>Tulsa</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>903.9</nameplate_mw>
    <summer_mw>783</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.9833</lat>
    <lon>-95.9346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55269</plant_id>
    <plant_name>TVA Southaven Combined Cycle</plant_name>
    <state>MS</state>
    <county>Desoto</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>903.9</nameplate_mw>
    <summer_mw>780</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.9939</lat>
    <lon>-90.0378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55467</plant_id>
    <plant_name>Ouachita</plant_name>
    <state>LA</state>
    <county>Ouachita</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>903.9</nameplate_mw>
    <summer_mw>719.3</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>32.7061</lat>
    <lon>-92.0683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55292</plant_id>
    <plant_name>Decatur Energy Center</plant_name>
    <state>AL</state>
    <county>Morgan</county>
    <operator>Decatur Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>902.4</nameplate_mw>
    <summer_mw>800</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2003</latest_year>
    <lat>34.6292</lat>
    <lon>-87.0214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55293</plant_id>
    <plant_name>Morgan Energy Center</plant_name>
    <state>AL</state>
    <county>Morgan</county>
    <operator>Morgan Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>900</nameplate_mw>
    <summer_mw>782</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2004</latest_year>
    <lat>34.6397</lat>
    <lon>-87.0639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55706</plant_id>
    <plant_name>Choctaw County</plant_name>
    <state>MS</state>
    <county>Choctaw</county>
    <operator>Entergy Mississippi LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>899</nameplate_mw>
    <summer_mw>781</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.2881</lat>
    <lon>-89.4201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55976</plant_id>
    <plant_name>Hunterstown Power Plant</plant_name>
    <state>PA</state>
    <county>Adams</county>
    <operator>Hunterstown Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>898</nameplate_mw>
    <summer_mw>810</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.8725</lat>
    <lon>-77.1672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57881</plant_id>
    <plant_name>Pioneer Generation Station</plant_name>
    <state>ND</state>
    <county>Williams</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>23</generators>
    <nameplate_mw>897.3</nameplate_mw>
    <summer_mw>763</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2025</latest_year>
    <lat>48.2325</lat>
    <lon>-103.9528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55089</plant_id>
    <plant_name>Taft Cogeneration Facility</plant_name>
    <state>LA</state>
    <county>St Charles</county>
    <operator>Occidental Chemical Corporation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>894.2</nameplate_mw>
    <summer_mw>738.9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>29.9888</lat>
    <lon>-90.4599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2539</plant_id>
    <plant_name>Bethlehem Energy Center</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>GB II New York LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>893.1</nameplate_mw>
    <summer_mw>812.7</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>42.594196</lat>
    <lon>-73.76375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7839</plant_id>
    <plant_name>Ladysmith</plant_name>
    <state>VA</state>
    <county>Caroline</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>892.5</nameplate_mw>
    <summer_mw>788.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2009</latest_year>
    <lat>38.0722</lat>
    <lon>-77.5133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3611</plant_id>
    <plant_name>O W Sommers</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>892</nameplate_mw>
    <summer_mw>830</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1974</latest_year>
    <lat>29.308056</lat>
    <lon>-98.3242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55063</plant_id>
    <plant_name>Batesville Generation Facility</plant_name>
    <state>MS</state>
    <county>Panola</county>
    <operator>Cooperative Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>891</nameplate_mw>
    <summer_mw>858</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>34.3356</lat>
    <lon>-89.9275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6110</plant_id>
    <plant_name>James A Fitzpatrick</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>883.3</nameplate_mw>
    <summer_mw>844</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>43.52139</lat>
    <lon>-76.40839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3478</plant_id>
    <plant_name>Wilkes</plant_name>
    <state>TX</state>
    <county>Marion</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>882</nameplate_mw>
    <summer_mw>883</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1971</latest_year>
    <lat>32.848163</lat>
    <lon>-94.54799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2490</plant_id>
    <plant_name>Arthur Kill Generating Station</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Arthur Kill Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>877.5</nameplate_mw>
    <summer_mw>876.6</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1969</latest_year>
    <lat>40.591564</lat>
    <lon>-74.20004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>404</plant_id>
    <plant_name>Scattergood</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>876</nameplate_mw>
    <summer_mw>776.3</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2015</latest_year>
    <lat>33.918151</lat>
    <lon>-118.4276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55317</plant_id>
    <plant_name>Fore River Generating Station</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Calpine Fore River Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>872.2</nameplate_mw>
    <summer_mw>724</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>42.2422</lat>
    <lon>-70.9661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58420</plant_id>
    <plant_name>Hamilton Liberty</plant_name>
    <state>PA</state>
    <county>Bradford</county>
    <operator>Hamilton Liberty O&amp;M LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>870</nameplate_mw>
    <summer_mw>860</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.7675</lat>
    <lon>-76.39</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58426</plant_id>
    <plant_name>Hamilton Patriot Generation Plant</plant_name>
    <state>PA</state>
    <county>Lycoming</county>
    <operator>Hamilton Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>870</nameplate_mw>
    <summer_mw>825</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.180833</lat>
    <lon>-76.83917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3886</plant_id>
    <plant_name>Wells</plant_name>
    <state>WA</state>
    <county>Chelan</county>
    <operator>PUD No 1 of Douglas County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>866.8</nameplate_mw>
    <summer_mw>880</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1969</latest_year>
    <lat>47.9469</lat>
    <lon>-119.8653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1507</plant_id>
    <plant_name>William F Wyman Hybrid</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>FPL Energy Wyman LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids; Batteries</technologies>
    <generators>5</generators>
    <nameplate_mw>862.7</nameplate_mw>
    <summer_mw>827.1</summer_mw>
    <battery_mwh>10.9</battery_mwh>
    <first_year>1957</first_year>
    <latest_year>2016</latest_year>
    <lat>43.7508</lat>
    <lon>-70.1567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3161</plant_id>
    <plant_name>Eddystone Generating Station</plant_name>
    <state>PA</state>
    <county>Delaware</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>861.6</nameplate_mw>
    <summer_mw>820</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1976</latest_year>
    <lat>39.858</lat>
    <lon>-75.323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55470</plant_id>
    <plant_name>Green Power 2</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>South Houston Green Power LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>861</nameplate_mw>
    <summer_mw>624</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2009</latest_year>
    <lat>29.378097</lat>
    <lon>-94.93277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3482</plant_id>
    <plant_name>Jones</plant_name>
    <state>TX</state>
    <county>Lubbock</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>860.4</nameplate_mw>
    <summer_mw>820</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2013</latest_year>
    <lat>33.5239</lat>
    <lon>-101.7392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7380</plant_id>
    <plant_name>Midulla Generating Station</plant_name>
    <state>FL</state>
    <county>Hardee</county>
    <operator>Seminole Electric Cooperative Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>853.3</nameplate_mw>
    <summer_mw>786</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2006</latest_year>
    <lat>27.641667</lat>
    <lon>-81.9625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3453</plant_id>
    <plant_name>Mountain Creek</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Mountain Creek Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>852.2</nameplate_mw>
    <summer_mw>808</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1967</latest_year>
    <lat>32.7231</lat>
    <lon>-96.9358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58697</plant_id>
    <plant_name>L V Sutton Combined Cycle</plant_name>
    <state>NC</state>
    <county>New Hanover</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>851</nameplate_mw>
    <summer_mw>698</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2017</latest_year>
    <lat>34.283056</lat>
    <lon>-77.98528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55694</plant_id>
    <plant_name>Quantum Choctaw Power LLC</plant_name>
    <state>MS</state>
    <county>Choctaw</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>850.5</nameplate_mw>
    <summer_mw>710</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>33.3792</lat>
    <lon>-89.2089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7213</plant_id>
    <plant_name>Clover</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>848</nameplate_mw>
    <summer_mw>877.1</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1996</latest_year>
    <lat>36.869</lat>
    <lon>-78.704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6189</plant_id>
    <plant_name>Rocky Mountain Hydroelectric Plant</plant_name>
    <state>GA</state>
    <county>Floyd</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>3</generators>
    <nameplate_mw>847.8</nameplate_mw>
    <summer_mw>1035</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>34.355538</lat>
    <lon>-85.30394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56047</plant_id>
    <plant_name>CPV Towantic Energy Center</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>CPV Towantic, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>841.5</nameplate_mw>
    <summer_mw>743.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.481243</lat>
    <lon>-73.12311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55149</plant_id>
    <plant_name>Lake Road Generating Plant</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Lake Road Generating Co LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>840</nameplate_mw>
    <summer_mw>828.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.872043</lat>
    <lon>-71.8958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57037</plant_id>
    <plant_name>Ratcliffe</plant_name>
    <state>MS</state>
    <county>Kemper</county>
    <operator>Mississippi Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>840</nameplate_mw>
    <summer_mw>704</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.654722</lat>
    <lon>-88.76222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55801</plant_id>
    <plant_name>Marcus Hook Energy LP</plant_name>
    <state>PA</state>
    <county>Delaware</county>
    <operator>Marcus Hook Energy LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>836.1</nameplate_mw>
    <summer_mw>877</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>39.807038</lat>
    <lon>-75.42161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59773</plant_id>
    <plant_name>Carroll County Energy</plant_name>
    <state>OH</state>
    <county>Carroll</county>
    <operator>Carroll County Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>832.3</nameplate_mw>
    <summer_mw>714.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.60441</lat>
    <lon>-81.05918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60302</plant_id>
    <plant_name>Key</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Parkway Generation Keys Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>830.6</nameplate_mw>
    <summer_mw>766.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.695519</lat>
    <lon>-76.82779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57267</plant_id>
    <plant_name>Marsh Landing Generating Station</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Marsh Landing LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>828</nameplate_mw>
    <summer_mw>765.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.016944</lat>
    <lon>-121.765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55620</plant_id>
    <plant_name>Perryville Power Station</plant_name>
    <state>LA</state>
    <county>Ouachita</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>824.1</nameplate_mw>
    <summer_mw>727.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>32.6908</lat>
    <lon>-92.0183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6705</plant_id>
    <plant_name>Warrick</plant_name>
    <state>IN</state>
    <county>Warrick</county>
    <operator>AGC Division of APGI Inc</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>822.8</nameplate_mw>
    <summer_mw>665.1</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1970</latest_year>
    <lat>37.915</lat>
    <lon>-87.3328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55411</plant_id>
    <plant_name>Hillabee Energy Center</plant_name>
    <state>AL</state>
    <county>Tallapoosa</county>
    <operator>CER Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>822.8</nameplate_mw>
    <summer_mw>752.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>33.000669</lat>
    <lon>-85.90328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6177</plant_id>
    <plant_name>Coronado</plant_name>
    <state>AZ</state>
    <county>Apache</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>821.8</nameplate_mw>
    <summer_mw>762</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1980</latest_year>
    <lat>34.5789</lat>
    <lon>-109.2708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55320</plant_id>
    <plant_name>Wise County Power LLC</plant_name>
    <state>TX</state>
    <county>Wise</county>
    <operator>Wise County Power Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>821.7</nameplate_mw>
    <summer_mw>735</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>33.0583</lat>
    <lon>-97.9103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55239</plant_id>
    <plant_name>Red Oak Power LLC</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Red Oak Operating Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>821.1</nameplate_mw>
    <summer_mw>775.9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.448674</lat>
    <lon>-74.34888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4158</plant_id>
    <plant_name>Dave Johnston</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>816.7</nameplate_mw>
    <summer_mw>745</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1972</latest_year>
    <lat>42.8378</lat>
    <lon>-105.7769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55047</plant_id>
    <plant_name>Pasadena Cogeneration</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Pasadena Cogeneration LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>815</nameplate_mw>
    <summer_mw>746</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2000</latest_year>
    <lat>29.72475</lat>
    <lon>-95.17648</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55234</plant_id>
    <plant_name>Audrain Generating Station</plant_name>
    <state>MO</state>
    <county>Audrain</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>814.4</nameplate_mw>
    <summer_mw>600</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>39.3092</lat>
    <lon>-91.5369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1004</plant_id>
    <plant_name>Edwardsport</plant_name>
    <state>IN</state>
    <county>Knox</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Coal Integrated Gasification Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>812.7</nameplate_mw>
    <summer_mw>555</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.8067</lat>
    <lon>-87.2472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59004</plant_id>
    <plant_name>Potomac Energy Center, LLC</plant_name>
    <state>VA</state>
    <county>Loudoun</county>
    <operator>Potomac Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>812</nameplate_mw>
    <summer_mw>766</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.058056</lat>
    <lon>-77.545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6664</plant_id>
    <plant_name>Louisa</plant_name>
    <state>IA</state>
    <county>Louisa</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>811.9</nameplate_mw>
    <summer_mw>745.6</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>41.3181</lat>
    <lon>-91.0931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1715</plant_id>
    <plant_name>Palisades</plant_name>
    <state>MI</state>
    <county>Van Buren</county>
    <operator>Holtec Palisades, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>811.8</nameplate_mw>
    <summer_mw>768.5</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>42.323</lat>
    <lon>-86.3146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6124</plant_id>
    <plant_name>McIntosh</plant_name>
    <state>GA</state>
    <county>Effingham</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>810.4</nameplate_mw>
    <summer_mw>657.6</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1995</latest_year>
    <lat>32.356287</lat>
    <lon>-81.16835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3926</plant_id>
    <plant_name>Little Goose</plant_name>
    <state>WA</state>
    <county>Columbia</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>810</nameplate_mw>
    <summer_mw>810</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1978</latest_year>
    <lat>46.5838</lat>
    <lon>-118.0273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3927</plant_id>
    <plant_name>Lower Monumental</plant_name>
    <state>WA</state>
    <county>Walla Walla</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>810</nameplate_mw>
    <summer_mw>810</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1979</latest_year>
    <lat>46.5635</lat>
    <lon>-118.5397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6175</plant_id>
    <plant_name>Lower Granite</plant_name>
    <state>WA</state>
    <county>Whitman</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>810</nameplate_mw>
    <summer_mw>802</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1978</latest_year>
    <lat>46.659503</lat>
    <lon>-117.4294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56671</plant_id>
    <plant_name>Longview Power Plant</plant_name>
    <state>WV</state>
    <county>Monongalia</county>
    <operator>Longview Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>807.5</nameplate_mw>
    <summer_mw>710</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.707893</lat>
    <lon>-79.95897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>728</plant_id>
    <plant_name>Yates</plant_name>
    <state>GA</state>
    <county>Coweta</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>807.4</nameplate_mw>
    <summer_mw>714</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>33.4622</lat>
    <lon>-84.8986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1363</plant_id>
    <plant_name>Cane Run</plant_name>
    <state>KY</state>
    <county>Jefferson</county>
    <operator>Louisville Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>807</nameplate_mw>
    <summer_mw>691</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.1831</lat>
    <lon>-85.8892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55172</plant_id>
    <plant_name>Thad Hill Energy Center</plant_name>
    <state>TX</state>
    <county>Bosque</county>
    <operator>Thad Hill Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>807</nameplate_mw>
    <summer_mw>763</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2010</latest_year>
    <lat>31.8594</lat>
    <lon>-97.3586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>116</plant_id>
    <plant_name>Ocotillo</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>806.2</nameplate_mw>
    <summer_mw>615</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2019</latest_year>
    <lat>33.4225</lat>
    <lon>-111.9122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58005</plant_id>
    <plant_name>Rayburn Energy Station LLC</plant_name>
    <state>TX</state>
    <county>Grayson</county>
    <operator>Rayburn Energy Station LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>803.2</nameplate_mw>
    <summer_mw>685</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.582573</lat>
    <lon>-96.61789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8036</plant_id>
    <plant_name>Cooper Nuclear Station</plant_name>
    <state>NE</state>
    <county>Nemaha</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>801</nameplate_mw>
    <summer_mw>768.5</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>40.3628</lat>
    <lon>-95.6408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55123</plant_id>
    <plant_name>Magic Valley Generating Station</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Calpine Corp-Magic Valley</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>801</nameplate_mw>
    <summer_mw>667</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>26.3403</lat>
    <lon>-98.19</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55197</plant_id>
    <plant_name>Caledonia</plant_name>
    <state>MS</state>
    <county>Lowndes</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>801</nameplate_mw>
    <summer_mw>765</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.6464</lat>
    <lon>-88.2717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6761</plant_id>
    <plant_name>Rawhide</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>Platte River Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Conventional Steam Coal</technologies>
    <generators>6</generators>
    <nameplate_mw>800.4</nameplate_mw>
    <summer_mw>668</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2008</latest_year>
    <lat>40.860905</lat>
    <lon>-105.0212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57482</plant_id>
    <plant_name>Sentinel Energy Center, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Sentinel Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>800</nameplate_mw>
    <summer_mw>800</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.934167</lat>
    <lon>-116.5714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63093</plant_id>
    <plant_name>Vineyard Wind 1</plant_name>
    <state>MA</state>
    <county>Dukes</county>
    <operator>Vineyard Wind 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Offshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Offshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>800</nameplate_mw>
    <summer_mw>800</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.047111</lat>
    <lon>-70.48738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67501</plant_id>
    <plant_name>Green River Energy Center - Hybrid</plant_name>
    <state>UT</state>
    <county>Emery</county>
    <operator>Green River Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>800</nameplate_mw>
    <summer_mw>800</summer_mw>
    <battery_mwh>1600</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.9987</lat>
    <lon>-111.1172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7981</plant_id>
    <plant_name>Mill Creek (SC)</plant_name>
    <state>SC</state>
    <county>Cherokee</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>799.2</nameplate_mw>
    <summer_mw>563</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2003</latest_year>
    <lat>35.1597</lat>
    <lon>-81.4306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60903</plant_id>
    <plant_name>Salem Harbor Power Development LP</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Salem Harbor Power Development LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>798.2</nameplate_mw>
    <summer_mw>675</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.525486</lat>
    <lon>-70.87824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7835</plant_id>
    <plant_name>Essential Power Rock Springs LLC</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>Essential Power Operating Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>795.6</nameplate_mw>
    <summer_mw>666.7</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.71901</lat>
    <lon>-76.15976</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55332</plant_id>
    <plant_name>Washington County Power LLC</plant_name>
    <state>GA</state>
    <county>Washington</county>
    <operator>CAMS (Georgia) Washington County Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>795.6</nameplate_mw>
    <summer_mw>623.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.092239</lat>
    <lon>-82.97999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55348</plant_id>
    <plant_name>Troy Energy LLC</plant_name>
    <state>OH</state>
    <county>Wood</county>
    <operator>Troy Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>795.6</nameplate_mw>
    <summer_mw>704.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.47724</lat>
    <lon>-83.45983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55170</plant_id>
    <plant_name>Granite Ridge</plant_name>
    <state>NH</state>
    <county>Rockingham</county>
    <operator>Granite Ridge Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>790</nameplate_mw>
    <summer_mw>668</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>42.9042</lat>
    <lon>-71.4261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55139</plant_id>
    <plant_name>Wolf Hollow I LP</plant_name>
    <state>TX</state>
    <county>Hood</county>
    <operator>Wolf Hollow I Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>788.4</nameplate_mw>
    <summer_mw>756</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.33422</lat>
    <lon>-97.73169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>562</plant_id>
    <plant_name>Middletown</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>Middletown Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>786.4</nameplate_mw>
    <summer_mw>770.2</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1973</latest_year>
    <lat>41.554944</lat>
    <lon>-72.57908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3356</plant_id>
    <plant_name>Oahe</plant_name>
    <state>SD</state>
    <county>Hughes</county>
    <operator>USACE-Omaha</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>786.1</nameplate_mw>
    <summer_mw>714</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1963</latest_year>
    <lat>44.4504</lat>
    <lon>-100.3866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7846</plant_id>
    <plant_name>Brandy Branch</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>JEA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>783.1</nameplate_mw>
    <summer_mw>743.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2005</latest_year>
    <lat>30.320556</lat>
    <lon>-81.94722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55402</plant_id>
    <plant_name>Renaissance Power Plant</plant_name>
    <state>MI</state>
    <county>Montcalm</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>782</nameplate_mw>
    <summer_mw>652</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>43.1864</lat>
    <lon>-84.8429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>160</plant_id>
    <plant_name>Apache Station</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>Arizona Electric Pwr Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine; Conventional Steam Coal</technologies>
    <generators>9</generators>
    <nameplate_mw>781.7</nameplate_mw>
    <summer_mw>624.3</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2025</latest_year>
    <lat>32.0603</lat>
    <lon>-109.8931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8054</plant_id>
    <plant_name>Gerald Andrus</plant_name>
    <state>MS</state>
    <county>Washington</county>
    <operator>Entergy Mississippi LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>781.4</nameplate_mw>
    <summer_mw>701.1</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1975</latest_year>
    <lat>33.35</lat>
    <lon>-91.1167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57794</plant_id>
    <plant_name>St Joseph Energy Center</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>St Joseph Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>780</nameplate_mw>
    <summer_mw>715</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.698992</lat>
    <lon>-86.4797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55656</plant_id>
    <plant_name>Pastoria Energy Facility, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Calpine Corp - Pastoria Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>779</nameplate_mw>
    <summer_mw>757</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>34.9556</lat>
    <lon>-118.844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55337</plant_id>
    <plant_name>Ironwood LLC</plant_name>
    <state>PA</state>
    <county>Lebanon</county>
    <operator>Helix Ironwood LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>777.6</nameplate_mw>
    <summer_mw>760</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.3509</lat>
    <lon>-76.3658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56846</plant_id>
    <plant_name>CPV St Charles Energy Center</plant_name>
    <state>MD</state>
    <county>Charles</county>
    <operator>CPV Maryland LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>775.3</nameplate_mw>
    <summer_mw>733.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.5686</lat>
    <lon>-76.8919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3262</plant_id>
    <plant_name>Jocassee</plant_name>
    <state>SC</state>
    <county>Pickens</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>4</generators>
    <nameplate_mw>774</nameplate_mw>
    <summer_mw>780</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1975</latest_year>
    <lat>34.9594</lat>
    <lon>-82.9147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1554</plant_id>
    <plant_name>Herbert A Wagner</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>H.A. Wagner LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>773.7</nameplate_mw>
    <summer_mw>702</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1972</latest_year>
    <lat>39.1781</lat>
    <lon>-76.5268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57839</plant_id>
    <plant_name>Woodbridge Energy Center</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Woodbridge Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>772.9</nameplate_mw>
    <summer_mw>726.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.515</lat>
    <lon>-74.31889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6018</plant_id>
    <plant_name>East Bend</plant_name>
    <state>KY</state>
    <county>Boone</county>
    <operator>Duke Energy Kentucky Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>772</nameplate_mw>
    <summer_mw>600</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>38.9036</lat>
    <lon>-84.8514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3297</plant_id>
    <plant_name>Wateree</plant_name>
    <state>SC</state>
    <county>Richland</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>771.8</nameplate_mw>
    <summer_mw>684</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1971</latest_year>
    <lat>33.8264</lat>
    <lon>-80.6228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56940</plant_id>
    <plant_name>CPV Valley Energy Center</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>CPV Valley, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>770.5</nameplate_mw>
    <summer_mw>654.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.4122</lat>
    <lon>-74.4378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3251</plant_id>
    <plant_name>H B Robinson</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>768.6</nameplate_mw>
    <summer_mw>759</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>34.4017</lat>
    <lon>-80.1589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68466</plant_id>
    <plant_name>Centennial Flats</plant_name>
    <state>AZ</state>
    <county>La Paz</county>
    <operator>Copia Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>6</generators>
    <nameplate_mw>767.1</nameplate_mw>
    <summer_mw>767.1</summer_mw>
    <battery_mwh>267</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.588334</lat>
    <lon>-113.5283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6250</plant_id>
    <plant_name>Mayo</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>763.2</nameplate_mw>
    <summer_mw>704</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>36.5278</lat>
    <lon>-78.8917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3295</plant_id>
    <plant_name>Urquhart</plant_name>
    <state>SC</state>
    <county>Aiken</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>758.9</nameplate_mw>
    <summer_mw>640</summer_mw>
    <first_year>1953</first_year>
    <latest_year>2002</latest_year>
    <lat>33.435</lat>
    <lon>-81.9111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56963</plant_id>
    <plant_name>West Deptford Energy Station</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>West Deptford Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>754.6</nameplate_mw>
    <summer_mw>735.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.8414</lat>
    <lon>-75.2214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62494</plant_id>
    <plant_name>Skeleton Creek Energy Center Hybrid</plant_name>
    <state>OK</state>
    <county>Garfield</county>
    <operator>Skeleton Creek Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic; Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>752</nameplate_mw>
    <summer_mw>752</summer_mw>
    <battery_mwh>1008</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2025</latest_year>
    <lat>36.521428</lat>
    <lon>-98.03436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66627</plant_id>
    <plant_name>Sonoran Solar Energy</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Sonoran Solar Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>750</nameplate_mw>
    <summer_mw>520</summer_mw>
    <battery_mwh>1040</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.248767</lat>
    <lon>-112.5424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6046</plant_id>
    <plant_name>DeBary</plant_name>
    <state>FL</state>
    <county>Volusia</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>748</nameplate_mw>
    <summer_mw>524</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1992</latest_year>
    <lat>28.903863</lat>
    <lon>-81.33233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55409</plant_id>
    <plant_name>Calhoun Energy Center</plant_name>
    <state>AL</state>
    <county>Calhoun</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>748</nameplate_mw>
    <summer_mw>704</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.5883</lat>
    <lon>-85.9731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55088</plant_id>
    <plant_name>Dearborn Industrial Generation</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>Dearborn Industrial Gen Inc</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Other Gases; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>747.9</nameplate_mw>
    <summer_mw>765</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2001</latest_year>
    <lat>42.3026</lat>
    <lon>-83.154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55714</plant_id>
    <plant_name>Magnet Cove</plant_name>
    <state>AR</state>
    <county>Hot Spring</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>746</nameplate_mw>
    <summer_mw>641.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2006</latest_year>
    <lat>34.4297</lat>
    <lon>-92.8317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55129</plant_id>
    <plant_name>Desert Basin</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>745.1</nameplate_mw>
    <summer_mw>703.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2022</latest_year>
    <lat>32.9042</lat>
    <lon>-111.7889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7082</plant_id>
    <plant_name>Harry Allen</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>745</nameplate_mw>
    <summer_mw>654</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2011</latest_year>
    <lat>36.430554</lat>
    <lon>-114.9024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56104</plant_id>
    <plant_name>Mankato Energy Center</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>MEC Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>740.8</nameplate_mw>
    <summer_mw>654</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2019</latest_year>
    <lat>44.1988</lat>
    <lon>-94.003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55701</plant_id>
    <plant_name>Fremont Energy Center</plant_name>
    <state>OH</state>
    <county>Sandusky</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>739.5</nameplate_mw>
    <summer_mw>685.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.377116</lat>
    <lon>-83.16139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>141</plant_id>
    <plant_name>Agua Fria</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Batteries; Solar Photovoltaic</technologies>
    <generators>10</generators>
    <nameplate_mw>737.5</nameplate_mw>
    <summer_mw>741.2</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>1957</first_year>
    <latest_year>2022</latest_year>
    <lat>33.5561</lat>
    <lon>-112.2153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57029</plant_id>
    <plant_name>Cleveland Cnty Generating Facility</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>736</nameplate_mw>
    <summer_mw>737.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.170547</lat>
    <lon>-81.41665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56291</plant_id>
    <plant_name>Horse Hollow Wind Energy Center</plant_name>
    <state>TX</state>
    <county>Taylor</county>
    <operator>FPL Energy Horse Hollow LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>735.5</nameplate_mw>
    <summer_mw>735.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2006</latest_year>
    <lat>32.214024</lat>
    <lon>-100.0571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58079</plant_id>
    <plant_name>Newark Energy Center</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Hartree Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>735</nameplate_mw>
    <summer_mw>705</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.707222</lat>
    <lon>-74.12583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2823</plant_id>
    <plant_name>Milton R Young</plant_name>
    <state>ND</state>
    <county>Oliver</county>
    <operator>Minnkota Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>734</nameplate_mw>
    <summer_mw>684</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1977</latest_year>
    <lat>47.065854</lat>
    <lon>-101.2131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56</plant_id>
    <plant_name>Lowman Energy Center</plant_name>
    <state>AL</state>
    <county>Washington</county>
    <operator>PowerSouth Energy Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>732.7</nameplate_mw>
    <summer_mw>639</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.488019</lat>
    <lon>-87.91075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3441</plant_id>
    <plant_name>Nueces Bay</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>730.2</nameplate_mw>
    <summer_mw>633</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2010</latest_year>
    <lat>27.819412</lat>
    <lon>-97.4192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56502</plant_id>
    <plant_name>Emporia Energy Center</plant_name>
    <state>KS</state>
    <county>Lyon</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>730.2</nameplate_mw>
    <summer_mw>668.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>38.445883</lat>
    <lon>-96.06525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3845</plant_id>
    <plant_name>Transalta Centralia Generation</plant_name>
    <state>WA</state>
    <county>Lewis</county>
    <operator>TransAlta Centralia Gen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>729.9</nameplate_mw>
    <summer_mw>670</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>46.755938</lat>
    <lon>-122.8598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55193</plant_id>
    <plant_name>Ontelaunee Energy Center</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>Ontelaunee Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>728</nameplate_mw>
    <summer_mw>545.9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.4219</lat>
    <lon>-75.9356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55415</plant_id>
    <plant_name>Vandolah Power Station</plant_name>
    <state>FL</state>
    <county>Hardee</county>
    <operator>Vandolah Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>728</nameplate_mw>
    <summer_mw>661.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>27.523607</lat>
    <lon>-81.92395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64020</plant_id>
    <plant_name>West Riverside Energy Center</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>727.6</nameplate_mw>
    <summer_mw>688.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2021</latest_year>
    <lat>42.582051</lat>
    <lon>-89.04121</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7916</plant_id>
    <plant_name>Talbot County Energy</plant_name>
    <state>GA</state>
    <county>Talbot</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>726</nameplate_mw>
    <summer_mw>572.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2003</latest_year>
    <lat>32.5892</lat>
    <lon>-84.6917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55640</plant_id>
    <plant_name>University Park North</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>LSP University Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>12</generators>
    <nameplate_mw>726</nameplate_mw>
    <summer_mw>540</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.4425</lat>
    <lon>-87.7514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6254</plant_id>
    <plant_name>Ottumwa</plant_name>
    <state>IA</state>
    <county>Wapello</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>725.9</nameplate_mw>
    <summer_mw>714.1</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>41.0961</lat>
    <lon>-92.55583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67005</plant_id>
    <plant_name>Magnolia Power</plant_name>
    <state>LA</state>
    <county>Iberville</county>
    <operator>Magnolia Power Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>722.9</nameplate_mw>
    <summer_mw>678.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.252559</lat>
    <lon>-91.16444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56456</plant_id>
    <plant_name>Plum Point Energy Station</plant_name>
    <state>AR</state>
    <county>Mississippi</county>
    <operator>NRG Energy Services - Plum Point</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>720</nameplate_mw>
    <summer_mw>680</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.6644</lat>
    <lon>-89.9489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2493</plant_id>
    <plant_name>East River</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>Consolidated Edison Co-NY Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>716.2</nameplate_mw>
    <summer_mw>615.5</summer_mw>
    <first_year>1951</first_year>
    <latest_year>2005</latest_year>
    <lat>40.7281</lat>
    <lon>-73.9742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7999</plant_id>
    <plant_name>Grays Harbor Energy Facility</plant_name>
    <state>WA</state>
    <county>Grays Harbor</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>714.9</nameplate_mw>
    <summer_mw>595</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>46.9692</lat>
    <lon>-123.48</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55397</plant_id>
    <plant_name>Washington Energy Facility</plant_name>
    <state>OH</state>
    <county>Washington</county>
    <operator>Dynegy Washington Energy Facility</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>714.9</nameplate_mw>
    <summer_mw>661</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.58</lat>
    <lon>-81.6564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55516</plant_id>
    <plant_name>Fayette Energy Facility</plant_name>
    <state>PA</state>
    <county>Fayette</county>
    <operator>Fayette Power Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>714.9</nameplate_mw>
    <summer_mw>667.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.8592</lat>
    <lon>-79.9182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55418</plant_id>
    <plant_name>Hot Spring Generating Facility</plant_name>
    <state>AR</state>
    <county>Hot Spring</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>714.8</nameplate_mw>
    <summer_mw>559.2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>34.29759</lat>
    <lon>-92.86834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>445</plant_id>
    <plant_name>Shasta</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>714</nameplate_mw>
    <summer_mw>714</summer_mw>
    <first_year>1944</first_year>
    <latest_year>1949</latest_year>
    <lat>40.717455</lat>
    <lon>-122.4223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3504</plant_id>
    <plant_name>Stryker Creek</plant_name>
    <state>TX</state>
    <county>Cherokee</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>713.4</nameplate_mw>
    <summer_mw>682</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1966</latest_year>
    <lat>31.93985</lat>
    <lon>-94.98983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55282</plant_id>
    <plant_name>Arlington Valley Energy Facility</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arlington Valley LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>713</nameplate_mw>
    <summer_mw>580</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>33.3417</lat>
    <lon>-112.8897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56532</plant_id>
    <plant_name>Colusa Generating Station</plant_name>
    <state>CA</state>
    <county>Colusa</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>712.4</nameplate_mw>
    <summer_mw>640</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.3661</lat>
    <lon>-122.27</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55345</plant_id>
    <plant_name>Otay Mesa Generating Project</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Otay Mesa Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>710.7</nameplate_mw>
    <summer_mw>592.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>32.581481</lat>
    <lon>-116.915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>593</plant_id>
    <plant_name>Edge Moor</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Calpine Mid-Atlantic Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>710.3</nameplate_mw>
    <summer_mw>707</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1973</latest_year>
    <lat>39.73886</lat>
    <lon>-75.50384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3804</plant_id>
    <plant_name>Possum Point</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>709</nameplate_mw>
    <summer_mw>642.2</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2003</latest_year>
    <lat>38.5367</lat>
    <lon>-77.2806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58236</plant_id>
    <plant_name>Marshalltown Generating Station</plant_name>
    <state>IA</state>
    <county>Marshall</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Solar Photovoltaic; Batteries</technologies>
    <generators>5</generators>
    <nameplate_mw>708.8</nameplate_mw>
    <summer_mw>668.1</summer_mw>
    <battery_mwh>0.6</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2020</latest_year>
    <lat>42.043333</lat>
    <lon>-92.87278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55177</plant_id>
    <plant_name>South Point Energy Center</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>South Point Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>708</nameplate_mw>
    <summer_mw>516.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>34.8678</lat>
    <lon>-114.5317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4162</plant_id>
    <plant_name>Naughton</plant_name>
    <state>WY</state>
    <county>Lincoln</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>707.2</nameplate_mw>
    <summer_mw>604</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1971</latest_year>
    <lat>41.7581</lat>
    <lon>-110.5983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7238</plant_id>
    <plant_name>Cane Island</plant_name>
    <state>FL</state>
    <county>Osceola</county>
    <operator>Kissimmee Utility Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>706</nameplate_mw>
    <summer_mw>679</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2011</latest_year>
    <lat>28.2764</lat>
    <lon>-81.533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7838</plant_id>
    <plant_name>Remington</plant_name>
    <state>VA</state>
    <county>Fauquier</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>705.5</nameplate_mw>
    <summer_mw>613.7</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>38.5442</lat>
    <lon>-77.7714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55334</plant_id>
    <plant_name>Holland Energy Facility</plant_name>
    <state>IL</state>
    <county>Shelby</county>
    <operator>NAES Corporation - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>702.1</nameplate_mw>
    <summer_mw>602.2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.223144</lat>
    <lon>-88.75841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55267</plant_id>
    <plant_name>Edward L. Addison Generating Plant</plant_name>
    <state>GA</state>
    <county>Upson</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>701.2</nameplate_mw>
    <summer_mw>591.9</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>32.9111</lat>
    <lon>-84.3064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62116</plant_id>
    <plant_name>AES Huntington Beach Energy Project</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>AES Huntington Beach Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>699.2</nameplate_mw>
    <summer_mw>630</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.645618</lat>
    <lon>-117.9794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2720</plant_id>
    <plant_name>Buck</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>697.9</nameplate_mw>
    <summer_mw>668</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.7133</lat>
    <lon>-80.3767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2723</plant_id>
    <plant_name>Dan River</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>697.9</nameplate_mw>
    <summer_mw>666</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.4862</lat>
    <lon>-79.7208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7900</plant_id>
    <plant_name>Sand Hill</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Austin Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>696.4</nameplate_mw>
    <summer_mw>595.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2010</latest_year>
    <lat>30.2098</lat>
    <lon>-97.6129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7343</plant_id>
    <plant_name>George Neal South</plant_name>
    <state>IA</state>
    <county>Woodbury</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>695.9</nameplate_mw>
    <summer_mw>647.1</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>42.3006</lat>
    <lon>-96.3617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55522</plant_id>
    <plant_name>Sundance</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>12</generators>
    <nameplate_mw>695</nameplate_mw>
    <summer_mw>490</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2025</latest_year>
    <lat>32.9285</lat>
    <lon>-111.5899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56798</plant_id>
    <plant_name>Kleen Energy Systems</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>Kleen Energy Systems, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>693</nameplate_mw>
    <summer_mw>622</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.553227</lat>
    <lon>-72.59687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55110</plant_id>
    <plant_name>Madison</plant_name>
    <state>OH</state>
    <county>Butler</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>692</nameplate_mw>
    <summer_mw>566</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>39.4522</lat>
    <lon>-84.4647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55111</plant_id>
    <plant_name>Vermillion Energy Facility</plant_name>
    <state>IN</state>
    <county>Vermillion</county>
    <operator>Duke Energy Ohio Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>692</nameplate_mw>
    <summer_mw>576</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>39.922328</lat>
    <lon>-87.44636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55222</plant_id>
    <plant_name>Lincoln Generating Facility</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Lincoln Generating Facility LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>692</nameplate_mw>
    <summer_mw>622.9</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.393315</lat>
    <lon>-87.94361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55236</plant_id>
    <plant_name>Lee Energy Facility</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Lee County Generating Station - (IL)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>692</nameplate_mw>
    <summer_mw>676.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.8287</lat>
    <lon>-89.4054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55672</plant_id>
    <plant_name>AL Sandersville LLC</plant_name>
    <state>GA</state>
    <county>Washington</county>
    <operator>CAMS (Georgia) AL Sandersville</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>692</nameplate_mw>
    <summer_mw>576.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>33.1189</lat>
    <lon>-82.8608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55481</plant_id>
    <plant_name>Mesquite Generating Station Block 2</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Mesquite Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>691.6</nameplate_mw>
    <summer_mw>624</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.345047</lat>
    <lon>-112.8642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58557</plant_id>
    <plant_name>Mesquite Generating Station Block 1</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>691.6</nameplate_mw>
    <summer_mw>620</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.345</lat>
    <lon>-112.8642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>408</plant_id>
    <plant_name>Valley (CA)</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>690.5</nameplate_mw>
    <summer_mw>563</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2003</latest_year>
    <lat>34.244991</lat>
    <lon>-118.3913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7296</plant_id>
    <plant_name>State Line Combined Cycle</plant_name>
    <state>MO</state>
    <county>Jasper</county>
    <operator>Empire District Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>690.5</nameplate_mw>
    <summer_mw>627.3</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2001</latest_year>
    <lat>37.0659</lat>
    <lon>-94.614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55328</plant_id>
    <plant_name>Hermiston Power Partnership</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Hermiston Power Partnership</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>689.4</nameplate_mw>
    <summer_mw>629</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>45.794046</lat>
    <lon>-119.3133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55687</plant_id>
    <plant_name>Higgins Generating Station</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>688.4</nameplate_mw>
    <summer_mw>620</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>35.6139</lat>
    <lon>-115.3561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55821</plant_id>
    <plant_name>Curtis H Stanton Energy Center</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>Stanton Clean Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>688.3</nameplate_mw>
    <summer_mw>657</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>28.488246</lat>
    <lon>-81.16694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55232</plant_id>
    <plant_name>Marshall Energy Facility</plant_name>
    <state>KY</state>
    <county>Marshall</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>688</nameplate_mw>
    <summer_mw>581.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.0286</lat>
    <lon>-88.3958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55347</plant_id>
    <plant_name>Armstrong</plant_name>
    <state>PA</state>
    <county>Armstrong</county>
    <operator>Armstrong Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>688</nameplate_mw>
    <summer_mw>670.7</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.638021</lat>
    <lon>-79.35173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55182</plant_id>
    <plant_name>Sunrise Power LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Sunrise Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>685.2</nameplate_mw>
    <summer_mw>561</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2003</latest_year>
    <lat>35.2097</lat>
    <lon>-119.585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55835</plant_id>
    <plant_name>Rocky Mountain Energy Center</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>685.1</nameplate_mw>
    <summer_mw>592</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.0908</lat>
    <lon>-104.5953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1922</plant_id>
    <plant_name>Monticello Nuclear Facility</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>685</nameplate_mw>
    <summer_mw>617</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>45.3338</lat>
    <lon>-93.8493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55496</plant_id>
    <plant_name>Goose Creek Energy Center</plant_name>
    <state>IL</state>
    <county>Piatt</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>684</nameplate_mw>
    <summer_mw>432</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>40.106931</lat>
    <lon>-88.59987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56458</plant_id>
    <plant_name>Hobbs Generating Station</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>Lea Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>681.5</nameplate_mw>
    <summer_mw>578.1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.728333</lat>
    <lon>-103.3094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2847</plant_id>
    <plant_name>Tait Electric Generating Station</plant_name>
    <state>OH</state>
    <county>Montgomery</county>
    <operator>Kimura Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>680.6</nameplate_mw>
    <summer_mw>607.1</summer_mw>
    <first_year>1967</first_year>
    <latest_year>2002</latest_year>
    <lat>39.727249</lat>
    <lon>-84.21108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66494</plant_id>
    <plant_name>Menifee Power Bank</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Nova Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>5</generators>
    <nameplate_mw>680</nameplate_mw>
    <summer_mw>680</summer_mw>
    <battery_mwh>2720</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>33.739005</lat>
    <lon>-117.1698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55340</plant_id>
    <plant_name>Dell Power Station</plant_name>
    <state>AR</state>
    <county>Mississippi</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>679.1</nameplate_mw>
    <summer_mw>478</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.8619</lat>
    <lon>-90.0253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55217</plant_id>
    <plant_name>Los Medanos Energy Center</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Los Medanos Energy Center LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>678.3</nameplate_mw>
    <summer_mw>559</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.030071</lat>
    <lon>-121.873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55350</plant_id>
    <plant_name>Dresden Energy Facility</plant_name>
    <state>OH</state>
    <county>Muskingum</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>678.3</nameplate_mw>
    <summer_mw>540</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.0928</lat>
    <lon>-82.0276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62115</plant_id>
    <plant_name>AES Alamitos Energy Center</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Alamitos Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>678</nameplate_mw>
    <summer_mw>603</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.767229</lat>
    <lon>-118.1002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50625</plant_id>
    <plant_name>ExxonMobil Beaumont Refinery</plant_name>
    <state>TX</state>
    <county>Jefferson</county>
    <operator>ExxonMobil Oil Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine; Other Gases</technologies>
    <generators>10</generators>
    <nameplate_mw>677.8</nameplate_mw>
    <summer_mw>610.6</summer_mw>
    <first_year>1966</first_year>
    <latest_year>2005</latest_year>
    <lat>30.0636</lat>
    <lon>-94.0753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7063</plant_id>
    <plant_name>McIntosh (AL)</plant_name>
    <state>AL</state>
    <county>Washington</county>
    <operator>PowerSouth Energy Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas with Compressed Air Storage</technologies>
    <generators>5</generators>
    <nameplate_mw>676</nameplate_mw>
    <summer_mw>580</summer_mw>
    <battery_mwh>110</battery_mwh>
    <first_year>1991</first_year>
    <latest_year>2010</latest_year>
    <lat>31.2546</lat>
    <lon>-88.0299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55357</plant_id>
    <plant_name>Jack Fusco Energy Center</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Brazos Valley Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>675.6</nameplate_mw>
    <summer_mw>602</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>29.4731</lat>
    <lon>-95.6244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>811</plant_id>
    <plant_name>Brownlee</plant_name>
    <state>ID</state>
    <county>Washington</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>675</nameplate_mw>
    <summer_mw>702.4</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1980</latest_year>
    <lat>44.8367</lat>
    <lon>-116.8975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55641</plant_id>
    <plant_name>Riverside Energy Center</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>674.9</nameplate_mw>
    <summer_mw>534.8</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>42.583056</lat>
    <lon>-89.03583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>688</plant_id>
    <plant_name>Arvah B Hopkins</plant_name>
    <state>FL</state>
    <county>Leon</county>
    <operator>City of Tallahassee - (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>9</generators>
    <nameplate_mw>673.1</nameplate_mw>
    <summer_mw>484.5</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2020</latest_year>
    <lat>30.4522</lat>
    <lon>-84.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2511</plant_id>
    <plant_name>E F Barrett</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>13</generators>
    <nameplate_mw>669.2</nameplate_mw>
    <summer_mw>653.6</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1971</latest_year>
    <lat>40.616689</lat>
    <lon>-73.64788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55386</plant_id>
    <plant_name>Columbia Energy Center (SC)</plant_name>
    <state>SC</state>
    <county>Calhoun</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>668.5</nameplate_mw>
    <summer_mw>612</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>33.8697</lat>
    <lon>-81.0178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56808</plant_id>
    <plant_name>Virginia City Hybrid Energy Center</plant_name>
    <state>VA</state>
    <county>Wise</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>668</nameplate_mw>
    <summer_mw>610</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.916389</lat>
    <lon>-82.33806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6440</plant_id>
    <plant_name>Wilson Dam</plant_name>
    <state>AL</state>
    <county>Lauderdale</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>21</generators>
    <nameplate_mw>666.7</nameplate_mw>
    <summer_mw>667.5</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1962</latest_year>
    <lat>34.79782</lat>
    <lon>-87.62537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>676</plant_id>
    <plant_name>C D McIntosh Jr</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>City of Lakeland - (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>12</generators>
    <nameplate_mw>666.5</nameplate_mw>
    <summer_mw>613.3</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2025</latest_year>
    <lat>28.0801</lat>
    <lon>-81.9229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8005</plant_id>
    <plant_name>Bear Swamp</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Bear Swamp Power Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>2</generators>
    <nameplate_mw>666</nameplate_mw>
    <summer_mw>666</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>42.6839</lat>
    <lon>-72.9599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55364</plant_id>
    <plant_name>Sugar Creek Power</plant_name>
    <state>IN</state>
    <county>Vigo</county>
    <operator>Northern Indiana Pub Serv Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>665</nameplate_mw>
    <summer_mw>574.2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2003</latest_year>
    <lat>39.3931</lat>
    <lon>-87.5108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62565</plant_id>
    <plant_name>Hill Top Energy Center, LLC</plant_name>
    <state>PA</state>
    <county>Greene</county>
    <operator>Hill Top Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>664.7</nameplate_mw>
    <summer_mw>623.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.894212</lat>
    <lon>-79.9382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56763</plant_id>
    <plant_name>Capricorn Ridge Wind LLC</plant_name>
    <state>TX</state>
    <county>Sterling</county>
    <operator>Capricorn Ridge Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>662.5</nameplate_mw>
    <summer_mw>662.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2008</latest_year>
    <lat>31.951958</lat>
    <lon>-101.0189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>643</plant_id>
    <plant_name>Lansing Smith</plant_name>
    <state>FL</state>
    <county>Bay</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>661.5</nameplate_mw>
    <summer_mw>692</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2002</latest_year>
    <lat>30.2686</lat>
    <lon>-85.7003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3298</plant_id>
    <plant_name>Williams</plant_name>
    <state>SC</state>
    <county>Berkeley</county>
    <operator>South Carolina Genertg Co, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>659.7</nameplate_mw>
    <summer_mw>605</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>33.0158</lat>
    <lon>-79.9297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59002</plant_id>
    <plant_name>Carlsbad Energy Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>NRG California Peaker Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>659</nameplate_mw>
    <summer_mw>527.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.140507</lat>
    <lon>-117.3339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2964</plant_id>
    <plant_name>Southwestern</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>658</nameplate_mw>
    <summer_mw>600</summer_mw>
    <first_year>1952</first_year>
    <latest_year>2008</latest_year>
    <lat>35.1009</lat>
    <lon>-98.3524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2817</plant_id>
    <plant_name>Leland Olds</plant_name>
    <state>ND</state>
    <county>Mercer</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>656</nameplate_mw>
    <summer_mw>660</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1975</latest_year>
    <lat>47.280769</lat>
    <lon>-101.3212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55178</plant_id>
    <plant_name>Dogwood Energy Facility</plant_name>
    <state>MO</state>
    <county>Cass</county>
    <operator>Dogwood Power Management, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>655.2</nameplate_mw>
    <summer_mw>656.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>38.7931</lat>
    <lon>-94.3006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55124</plant_id>
    <plant_name>Griffith Energy LLC</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Griffith Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>655</nameplate_mw>
    <summer_mw>570</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.054029</lat>
    <lon>-114.1333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56467</plant_id>
    <plant_name>Russell City Energy Center</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Russell City Energy Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>655</nameplate_mw>
    <summer_mw>605</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.63466</lat>
    <lon>-122.1338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56350</plant_id>
    <plant_name>Colorado Bend Energy Center</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>CER Colorado Bend Energy Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>654.1</nameplate_mw>
    <summer_mw>608</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2023</latest_year>
    <lat>29.2878</lat>
    <lon>-96.0683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>533</plant_id>
    <plant_name>McWilliams</plant_name>
    <state>AL</state>
    <county>Covington</county>
    <operator>PowerSouth Energy Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>654</nameplate_mw>
    <summer_mw>650</summer_mw>
    <first_year>1954</first_year>
    <latest_year>2002</latest_year>
    <lat>31.400255</lat>
    <lon>-86.47645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56259</plant_id>
    <plant_name>Empire Generating Co LLC</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Empire Generating Co LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>653.7</nameplate_mw>
    <summer_mw>620</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.625239</lat>
    <lon>-73.75002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55667</plant_id>
    <plant_name>Lower Mount Bethel Energy</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>Lower Mount Bethel Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>651.6</nameplate_mw>
    <summer_mw>601.6</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.801924</lat>
    <lon>-75.10756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55343</plant_id>
    <plant_name>Luna Energy Facility</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>Public Service Co of NM</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>650</nameplate_mw>
    <summer_mw>559</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>32.299349</lat>
    <lon>-107.7834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57664</plant_id>
    <plant_name>Astoria Energy II</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Astoria Energy II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>650</nameplate_mw>
    <summer_mw>540</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.781321</lat>
    <lon>-73.89662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68839</plant_id>
    <plant_name>Hecate Energy Longhorn Solar LLC</plant_name>
    <state>TX</state>
    <county>Jack</county>
    <operator>Repsol Renewables NA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>650</nameplate_mw>
    <summer_mw>650</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.04417</lat>
    <lon>-98.34052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55270</plant_id>
    <plant_name>Jackson Generating Station</plant_name>
    <state>MI</state>
    <county>Jackson</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>9</generators>
    <nameplate_mw>649</nameplate_mw>
    <summer_mw>534.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.2488</lat>
    <lon>-84.3767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6137</plant_id>
    <plant_name>A B Brown</plant_name>
    <state>IN</state>
    <county>Posey</county>
    <operator>Southern Indiana Gas &amp; Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>647.4</nameplate_mw>
    <summer_mw>597.9</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2025</latest_year>
    <lat>37.9053</lat>
    <lon>-87.715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2291</plant_id>
    <plant_name>North Omaha</plant_name>
    <state>NE</state>
    <county>Douglas</county>
    <operator>Omaha Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>644.7</nameplate_mw>
    <summer_mw>563.9</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1968</latest_year>
    <lat>41.32909</lat>
    <lon>-95.94466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55412</plant_id>
    <plant_name>Osprey Energy Center Power Plant</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>644.2</nameplate_mw>
    <summer_mw>616</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>28.0525</lat>
    <lon>-81.8083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>437</plant_id>
    <plant_name>Edward C Hyatt</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>California Dept. of Water Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Hydroelectric Pumped Storage</technologies>
    <generators>6</generators>
    <nameplate_mw>644.1</nameplate_mw>
    <summer_mw>743.1</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1969</latest_year>
    <lat>39.542985</lat>
    <lon>-121.4922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>991</plant_id>
    <plant_name>Eagle Valley (IN)</plant_name>
    <state>IN</state>
    <county>Morgan</county>
    <operator>AES Indiana</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>644</nameplate_mw>
    <summer_mw>673</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.48517</lat>
    <lon>-86.4183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1912</plant_id>
    <plant_name>High Bridge</plant_name>
    <state>MN</state>
    <county>Ramsey</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>644</nameplate_mw>
    <summer_mw>530</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>44.9314</lat>
    <lon>-93.1117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56964</plant_id>
    <plant_name>Bayonne Energy Center</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Bayonne Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>644</nameplate_mw>
    <summer_mw>614.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2018</latest_year>
    <lat>40.652834</lat>
    <lon>-74.09155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50815</plant_id>
    <plant_name>Odyssey Energy Altura Cogen, LLC</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Odyssey Operating Services</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>643.6</nameplate_mw>
    <summer_mw>485</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1995</latest_year>
    <lat>29.8161</lat>
    <lon>-95.10773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66156</plant_id>
    <plant_name>High Banks Wind</plant_name>
    <state>KS</state>
    <county>Republic</county>
    <operator>High Banks Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>643.4</nameplate_mw>
    <summer_mw>604</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.815978</lat>
    <lon>-97.43104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4041</plant_id>
    <plant_name>South Oak Creek</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>641.6</nameplate_mw>
    <summer_mw>616</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1967</latest_year>
    <lat>42.8457</lat>
    <lon>-87.8294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6156</plant_id>
    <plant_name>New Haven Steam</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Generation Bridge II Connecticut, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>641.5</nameplate_mw>
    <summer_mw>562.2</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2012</latest_year>
    <lat>41.283997</lat>
    <lon>-72.90432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2494</plant_id>
    <plant_name>Gowanus Gas Turbines Generating</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Astoria Generating Company, L.P.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>32</generators>
    <nameplate_mw>640</nameplate_mw>
    <summer_mw>580.2</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>40.6635</lat>
    <lon>-74.0051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55112</plant_id>
    <plant_name>Sutter Energy Center</plant_name>
    <state>CA</state>
    <county>Sutter</county>
    <operator>Calpine Corp-Sutter</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>636</nameplate_mw>
    <summer_mw>528</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>39.053139</lat>
    <lon>-121.6959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55393</plant_id>
    <plant_name>Metcalf Energy Center</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Calpine Corp - Metcalf Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>635</nameplate_mw>
    <summer_mw>557</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>37.2207</lat>
    <lon>-121.7457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3490</plant_id>
    <plant_name>Graham</plant_name>
    <state>TX</state>
    <county>Young</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>634.7</nameplate_mw>
    <summer_mw>634</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1969</latest_year>
    <lat>33.1344</lat>
    <lon>-98.6117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3131</plant_id>
    <plant_name>Shawville</plant_name>
    <state>PA</state>
    <county>Clearfield</county>
    <operator>Shawville Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>632</nameplate_mw>
    <summer_mw>602</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1966</latest_year>
    <lat>41.06755</lat>
    <lon>-78.36623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6200</plant_id>
    <plant_name>Rock Island</plant_name>
    <state>WA</state>
    <county>Chelan</county>
    <operator>PUD No 1 of Chelan County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>19</generators>
    <nameplate_mw>629.4</nameplate_mw>
    <summer_mw>503.2</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1979</latest_year>
    <lat>47.346111</lat>
    <lon>-120.0917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6132</plant_id>
    <plant_name>Richard B Russell</plant_name>
    <state>GA</state>
    <county>Elbert</county>
    <operator>USCE-Savannah District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>628</nameplate_mw>
    <summer_mw>664</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2002</latest_year>
    <lat>34.0256</lat>
    <lon>-82.5953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55183</plant_id>
    <plant_name>Nelson Energy Center</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>627.5</nameplate_mw>
    <summer_mw>586</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.774444</lat>
    <lon>-89.60722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8063</plant_id>
    <plant_name>DeCordova Steam Electric Station</plant_name>
    <state>TX</state>
    <county>Hood</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Batteries</technologies>
    <generators>5</generators>
    <nameplate_mw>626.7</nameplate_mw>
    <summer_mw>534</summer_mw>
    <battery_mwh>263</battery_mwh>
    <first_year>1990</first_year>
    <latest_year>2022</latest_year>
    <lat>32.403056</lat>
    <lon>-97.70056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56565</plant_id>
    <plant_name>J Lamar Stall Unit</plant_name>
    <state>LA</state>
    <county>Caddo</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>624</nameplate_mw>
    <summer_mw>511</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>32.51947</lat>
    <lon>-93.76013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3601</plant_id>
    <plant_name>Sim Gideon</plant_name>
    <state>TX</state>
    <county>Bastrop</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>623</nameplate_mw>
    <summer_mw>607</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1972</latest_year>
    <lat>30.1456</lat>
    <lon>-97.2708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55400</plant_id>
    <plant_name>Elk Hills Power LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Elk Hills Power LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>623</nameplate_mw>
    <summer_mw>525</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>35.280318</lat>
    <lon>-119.4707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6178</plant_id>
    <plant_name>Coleto Creek</plant_name>
    <state>TX</state>
    <county>Goliad</county>
    <operator>Coleto Creek Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>622.4</nameplate_mw>
    <summer_mw>655</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>28.7128</lat>
    <lon>-97.21417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54761</plant_id>
    <plant_name>Hermiston Generating Plant</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Hermiston Generating Co LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>621.2</nameplate_mw>
    <summer_mw>464</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>45.8042</lat>
    <lon>-119.37</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56476</plant_id>
    <plant_name>Gateway Generating Station</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>619.7</nameplate_mw>
    <summer_mw>563.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.0175</lat>
    <lon>-121.7587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55306</plant_id>
    <plant_name>Gila River Power Block 4</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>619</nameplate_mw>
    <summer_mw>570</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.975</lat>
    <lon>-112.6944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59338</plant_id>
    <plant_name>Gila River Power Block 1</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>619</nameplate_mw>
    <summer_mw>570</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.975</lat>
    <lon>-112.6944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59784</plant_id>
    <plant_name>Gila River Power Block 3</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>619</nameplate_mw>
    <summer_mw>570</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.975</lat>
    <lon>-112.6944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60768</plant_id>
    <plant_name>Gila River Power Block 2</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>619</nameplate_mw>
    <summer_mw>570</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.975</lat>
    <lon>-112.6944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56031</plant_id>
    <plant_name>Fox Energy Center</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>618.8</nameplate_mw>
    <summer_mw>577.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2006</latest_year>
    <lat>44.3204</lat>
    <lon>-88.20889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55168</plant_id>
    <plant_name>Bastrop Energy Center</plant_name>
    <state>TX</state>
    <county>Bastrop</county>
    <operator>Bastrop Energy Partners, LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>618.7</nameplate_mw>
    <summer_mw>575</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>30.1458</lat>
    <lon>-97.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66420</plant_id>
    <plant_name>Five Wells Solar Center - Hybrid</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Five Wells Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>617.9</nameplate_mw>
    <summer_mw>579</summer_mw>
    <battery_mwh>250</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>30.998647</lat>
    <lon>-97.25902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6017</plant_id>
    <plant_name>Newton</plant_name>
    <state>IL</state>
    <county>Jasper</county>
    <operator>Illinois Power Generating Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>617.4</nameplate_mw>
    <summer_mw>595</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1977</latest_year>
    <lat>38.9361</lat>
    <lon>-88.2781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6122</plant_id>
    <plant_name>R E Ginna Nuclear Power Plant</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>Constellation Nuclear</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Nuclear</primary_technology>
    <primary_energy_source>NUC</primary_energy_source>
    <technologies>Nuclear</technologies>
    <generators>1</generators>
    <nameplate_mw>614</nameplate_mw>
    <summer_mw>578.8</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>43.2777</lat>
    <lon>-77.3099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55231</plant_id>
    <plant_name>Liberty Electric Power Plant</plant_name>
    <state>PA</state>
    <county>Delaware</county>
    <operator>Liberty Electric Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>614</nameplate_mw>
    <summer_mw>562</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.8614</lat>
    <lon>-75.3358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55188</plant_id>
    <plant_name>Cordova Energy</plant_name>
    <state>IL</state>
    <county>Rock Island</county>
    <operator>Cordova Energy Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>611.2</nameplate_mw>
    <summer_mw>521.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.712216</lat>
    <lon>-90.27968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8073</plant_id>
    <plant_name>Beaver</plant_name>
    <state>OR</state>
    <county>Columbia</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>610.7</nameplate_mw>
    <summer_mw>492.8</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2001</latest_year>
    <lat>46.172401</lat>
    <lon>-123.1739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>765</plant_id>
    <plant_name>Kahe</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Hawaiian Electric Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>609.7</nameplate_mw>
    <summer_mw>582.1</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1981</latest_year>
    <lat>21.356395</lat>
    <lon>-158.1289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2411</plant_id>
    <plant_name>Sewaren</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Parkway Generation Sewaren Urban Renewal Entity LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>609.5</nameplate_mw>
    <summer_mw>541</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.5558</lat>
    <lon>-74.2469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55154</plant_id>
    <plant_name>Lost Pines 1 Power Project</plant_name>
    <state>TX</state>
    <county>Bastrop</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>609</nameplate_mw>
    <summer_mw>510</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>30.1478</lat>
    <lon>-97.2714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55318</plant_id>
    <plant_name>Indian River</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Orlando Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>609</nameplate_mw>
    <summer_mw>576.4</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1974</latest_year>
    <lat>28.493176</lat>
    <lon>-80.78025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56564</plant_id>
    <plant_name>John W Turk Jr Power Plant</plant_name>
    <state>AR</state>
    <county>Hempstead</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>609</nameplate_mw>
    <summer_mw>650</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.649722</lat>
    <lon>-93.81194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55661</plant_id>
    <plant_name>Newington Energy Center</plant_name>
    <state>NH</state>
    <county>Rockingham</county>
    <operator>Essential Power Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>605.5</nameplate_mw>
    <summer_mw>560.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>43.1047</lat>
    <lon>-70.8061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2404</plant_id>
    <plant_name>Kearny Generating Station</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Parkway Generation Operating, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>605</nameplate_mw>
    <summer_mw>457.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2012</latest_year>
    <lat>40.737283</lat>
    <lon>-74.09646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63688</plant_id>
    <plant_name>Topaz Generating</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>605</nameplate_mw>
    <summer_mw>445</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.426389</lat>
    <lon>-94.97667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3628</plant_id>
    <plant_name>R W Miller</plant_name>
    <state>TX</state>
    <county>Palo Pinto</county>
    <operator>RW Miller Power LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>603.6</nameplate_mw>
    <summer_mw>587</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1994</latest_year>
    <lat>32.6581</lat>
    <lon>-98.3103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52120</plant_id>
    <plant_name>Freeport Energy</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Olin Blue Cube Operations</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>603.1</nameplate_mw>
    <summer_mw>458</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1984</latest_year>
    <lat>28.991289</lat>
    <lon>-95.40748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3925</plant_id>
    <plant_name>Ice Harbor</plant_name>
    <state>WA</state>
    <county>Walla Walla</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>603</nameplate_mw>
    <summer_mw>513</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1976</latest_year>
    <lat>46.249801</lat>
    <lon>-118.8798</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6195</plant_id>
    <plant_name>John Twitty Energy Center</plant_name>
    <state>MO</state>
    <county>Greene</county>
    <operator>City Utilities of Springfield - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>603</nameplate_mw>
    <summer_mw>563</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2011</latest_year>
    <lat>37.151706</lat>
    <lon>-93.38804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8031</plant_id>
    <plant_name>Emery Station</plant_name>
    <state>IA</state>
    <county>Cerro Gordo</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>602.8</nameplate_mw>
    <summer_mw>539.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>43.094</lat>
    <lon>-93.29222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55514</plant_id>
    <plant_name>Apex Generating Station</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Apex Generating Station</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>600.6</nameplate_mw>
    <summer_mw>524.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>36.415999</lat>
    <lon>-114.9609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55218</plant_id>
    <plant_name>Hinds Energy Facility</plant_name>
    <state>MS</state>
    <county>Hinds</county>
    <operator>Entergy Mississippi LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>600.4</nameplate_mw>
    <summer_mw>484.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2020</latest_year>
    <lat>32.378969</lat>
    <lon>-90.21991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60619</plant_id>
    <plant_name>Rush Creek Wind</plant_name>
    <state>CO</state>
    <county>Elbert</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.172111</lat>
    <lon>-103.8454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65463</plant_id>
    <plant_name>Hornet Solar (TX)</plant_name>
    <state>TX</state>
    <county>Swisher</county>
    <operator>Vesper Energy Development LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.485162</lat>
    <lon>-101.9714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66263</plant_id>
    <plant_name>Eleven Mile Solar Center</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Eleven Mile Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <battery_mwh>1200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.86097</lat>
    <lon>-111.5919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67291</plant_id>
    <plant_name>Sun Streams 4</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Sun Streams Expansion, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <battery_mwh>1200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.361282</lat>
    <lon>-112.7801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67474</plant_id>
    <plant_name>Harquahala 2</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Copia Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>600</nameplate_mw>
    <summer_mw>600</summer_mw>
    <battery_mwh>1200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.46</lat>
    <lon>-113.11</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55221</plant_id>
    <plant_name>Harry L. Oswald</plant_name>
    <state>AR</state>
    <county>Pulaski</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>9</generators>
    <nameplate_mw>599.5</nameplate_mw>
    <summer_mw>548</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>34.5923</lat>
    <lon>-92.2166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58835</plant_id>
    <plant_name>Elk Station</plant_name>
    <state>TX</state>
    <county>Hale</county>
    <operator>Golden Spread Electric Cooperative, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>599.4</nameplate_mw>
    <summer_mw>583.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>33.865</lat>
    <lon>-101.8433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1915</plant_id>
    <plant_name>Allen S King</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>598.4</nameplate_mw>
    <summer_mw>511</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>45.03</lat>
    <lon>-92.7786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69224</plant_id>
    <plant_name>Wagon Wheel Wind</plant_name>
    <state>OK</state>
    <county>Logan</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>598.4</nameplate_mw>
    <summer_mw>598.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.153333</lat>
    <lon>-97.575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7836</plant_id>
    <plant_name>Marsh Run Generation Facility</plant_name>
    <state>VA</state>
    <county>Fauquier</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>596.7</nameplate_mw>
    <summer_mw>484</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>38.5283</lat>
    <lon>-77.7681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7872</plant_id>
    <plant_name>Robert P Mone Plant</plant_name>
    <state>OH</state>
    <county>Van Wert</county>
    <operator>Buckeye Power, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>596.7</nameplate_mw>
    <summer_mw>441</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.9297</lat>
    <lon>-84.7392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55392</plant_id>
    <plant_name>Zion Energy Center</plant_name>
    <state>IL</state>
    <county>Lake</county>
    <operator>Zion Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>596.7</nameplate_mw>
    <summer_mw>478</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2003</latest_year>
    <lat>42.4776</lat>
    <lon>-87.895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55406</plant_id>
    <plant_name>Bobby C Smith Jr Energy Facility</plant_name>
    <state>GA</state>
    <county>Effingham</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>596.6</nameplate_mw>
    <summer_mw>524.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.277252</lat>
    <lon>-81.28441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>147</plant_id>
    <plant_name>Kyrene</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>596.4</nameplate_mw>
    <summer_mw>519</summer_mw>
    <first_year>1952</first_year>
    <latest_year>2002</latest_year>
    <lat>33.3556</lat>
    <lon>-111.9353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55107</plant_id>
    <plant_name>Rhode Island State Energy Center</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>RISEC Operating Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>596</nameplate_mw>
    <summer_mw>554</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.8017</lat>
    <lon>-71.5186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55375</plant_id>
    <plant_name>Astoria Energy</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Astoria Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>595</nameplate_mw>
    <summer_mw>558</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>40.7825</lat>
    <lon>-73.8964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10789</plant_id>
    <plant_name>Sabine River Operations</plant_name>
    <state>TX</state>
    <county>Orange</county>
    <operator>The Dow Chemical Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>594.9</nameplate_mw>
    <summer_mw>502</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2001</latest_year>
    <lat>30.0552</lat>
    <lon>-93.7579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7946</plant_id>
    <plant_name>Wansley Unit 9</plant_name>
    <state>GA</state>
    <county>Heard</county>
    <operator>Municipal Electric Authority - (GA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>594.1</nameplate_mw>
    <summer_mw>462.8</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>33.4083</lat>
    <lon>-85.0403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55206</plant_id>
    <plant_name>Corpus Christi Energy Center</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Corpus Christi Cogeneration LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>593.3</nameplate_mw>
    <summer_mw>506</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>27.8139</lat>
    <lon>-97.4283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55662</plant_id>
    <plant_name>Chehalis Generating Facility</plant_name>
    <state>WA</state>
    <county>Lewis</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>593.3</nameplate_mw>
    <summer_mw>477</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>46.6225</lat>
    <lon>-122.9131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66624</plant_id>
    <plant_name>Double Back Diamond</plant_name>
    <state>IL</state>
    <county>Sangamon</county>
    <operator>Double Back Diamond Solar Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>592.8</nameplate_mw>
    <summer_mw>592.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.53729</lat>
    <lon>-89.80978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55295</plant_id>
    <plant_name>Blythe Energy Inc</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>AltaGas Blythe Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>591</nameplate_mw>
    <summer_mw>514</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.6157</lat>
    <lon>-114.6865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67769</plant_id>
    <plant_name>Rock Creek Wind</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>590</nameplate_mw>
    <summer_mw>590</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.58263</lat>
    <lon>-106.0773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56777</plant_id>
    <plant_name>Fowler Ridge Wind Farm LLC</plant_name>
    <state>IN</state>
    <county>Benton</county>
    <operator>Clearlight Energy Holdings LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>588.3</nameplate_mw>
    <summer_mw>588.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2023</latest_year>
    <lat>40.583889</lat>
    <lon>-87.3336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6126</plant_id>
    <plant_name>Fairfield Pumped Storage</plant_name>
    <state>SC</state>
    <county>Fairfield</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>8</generators>
    <nameplate_mw>587.2</nameplate_mw>
    <summer_mw>604</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>34.3061</lat>
    <lon>-81.3308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>913</plant_id>
    <plant_name>Venice</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>586</nameplate_mw>
    <summer_mw>486</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2005</latest_year>
    <lat>38.6642</lat>
    <lon>-90.1764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6639</plant_id>
    <plant_name>R D Green</plant_name>
    <state>KY</state>
    <county>Webster</county>
    <operator>Big Rivers Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>586</nameplate_mw>
    <summer_mw>454</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1981</latest_year>
    <lat>37.6461</lat>
    <lon>-87.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1927</plant_id>
    <plant_name>Riverside (MN)</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>585.9</nameplate_mw>
    <summer_mw>454</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2009</latest_year>
    <lat>45.0203</lat>
    <lon>-93.2753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57695</plant_id>
    <plant_name>Topaz Solar Farm</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Topaz Solar Farms LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>585.9</nameplate_mw>
    <summer_mw>585.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2014</latest_year>
    <lat>35.405556</lat>
    <lon>-120.0686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3130</plant_id>
    <plant_name>Seward (PA)</plant_name>
    <state>PA</state>
    <county>Indiana</county>
    <operator>Seward Generating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>585</nameplate_mw>
    <summer_mw>521</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.40625</lat>
    <lon>-79.03366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1091</plant_id>
    <plant_name>George Neal North</plant_name>
    <state>IA</state>
    <county>Woodbury</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>584.1</nameplate_mw>
    <summer_mw>510</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1975</latest_year>
    <lat>42.32517</lat>
    <lon>-96.37971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2815</plant_id>
    <plant_name>Garrison</plant_name>
    <state>ND</state>
    <county>Mercer</county>
    <operator>USACE-Omaha</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>583.4</nameplate_mw>
    <summer_mw>510</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1960</latest_year>
    <lat>47.4945</lat>
    <lon>-101.4115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55164</plant_id>
    <plant_name>Bluegrass Generating Station</plant_name>
    <state>KY</state>
    <county>Oldham</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>581.4</nameplate_mw>
    <summer_mw>495</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.3902</lat>
    <lon>-85.4133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55192</plant_id>
    <plant_name>Osceola Generating Station (FL)</plant_name>
    <state>FL</state>
    <county>Osceola</county>
    <operator>Orlando Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>580</nameplate_mw>
    <summer_mw>471</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>28.1289</lat>
    <lon>-81.0978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55126</plant_id>
    <plant_name>Milford Power Project</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Milford Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>578</nameplate_mw>
    <summer_mw>510.1</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>41.224355</lat>
    <lon>-73.09973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55211</plant_id>
    <plant_name>ANP Bellingham Energy Project</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Bellingham Power Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>578</nameplate_mw>
    <summer_mw>520.2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.110577</lat>
    <lon>-71.45347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55212</plant_id>
    <plant_name>ANP Blackstone Energy Project</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>ANP Blackstone Energy Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>578</nameplate_mw>
    <summer_mw>481.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.059876</lat>
    <lon>-71.51581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67239</plant_id>
    <plant_name>Fox Squirrel Solar</plant_name>
    <state>OH</state>
    <county>Madison</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>577</nameplate_mw>
    <summer_mw>577</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.777493</lat>
    <lon>-83.36707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55259</plant_id>
    <plant_name>Whiting Clean Energy</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>BP Alternative Energy</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>576.8</nameplate_mw>
    <summer_mw>513</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.6739</lat>
    <lon>-87.4775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>568</plant_id>
    <plant_name>Bridgeport Station</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Generation Bridge II Connecticut, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>576.3</nameplate_mw>
    <summer_mw>496.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.1706</lat>
    <lon>-73.1844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7985</plant_id>
    <plant_name>Greater Des Moines</plant_name>
    <state>IA</state>
    <county>Polk</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>576.3</nameplate_mw>
    <summer_mw>503.7</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2004</latest_year>
    <lat>41.5563</lat>
    <lon>-93.5283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55199</plant_id>
    <plant_name>Elwood Energy LLC</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Elwood Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>576</nameplate_mw>
    <summer_mw>450</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.4388</lat>
    <lon>-88.1236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7512</plant_id>
    <plant_name>Arthur Von Rosenberg</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>575</nameplate_mw>
    <summer_mw>520</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>29.257046</lat>
    <lon>-98.38405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4937</plant_id>
    <plant_name>Thomas C Ferguson</plant_name>
    <state>TX</state>
    <county>Llano</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>574.6</nameplate_mw>
    <summer_mw>516</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>30.558</lat>
    <lon>-98.3721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55015</plant_id>
    <plant_name>Sweeny Cogen Facility</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Sweeny Cogeneration LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>572</nameplate_mw>
    <summer_mw>436</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2000</latest_year>
    <lat>29.0728</lat>
    <lon>-95.745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7158</plant_id>
    <plant_name>Woodsdale</plant_name>
    <state>OH</state>
    <county>Butler</county>
    <operator>Duke Energy Kentucky Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>571.8</nameplate_mw>
    <summer_mw>476</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1993</latest_year>
    <lat>39.4492</lat>
    <lon>-84.4611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7813</plant_id>
    <plant_name>Sewell Creek Energy</plant_name>
    <state>GA</state>
    <county>Polk</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>570</nameplate_mw>
    <summer_mw>445.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>33.9486</lat>
    <lon>-85.2769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55664</plant_id>
    <plant_name>Harrison County Power Project</plant_name>
    <state>TX</state>
    <county>Harrison</county>
    <operator>Northeast Texas Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>570</nameplate_mw>
    <summer_mw>514.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.3958</lat>
    <lon>-94.4367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55251</plant_id>
    <plant_name>Gleason Generating Facility</plant_name>
    <state>TN</state>
    <county>Weakley</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>567.8</nameplate_mw>
    <summer_mw>360</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>36.2454</lat>
    <lon>-88.612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8007</plant_id>
    <plant_name>Holtsville</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>567</nameplate_mw>
    <summer_mw>532.3</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1975</latest_year>
    <lat>40.817037</lat>
    <lon>-73.06627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8224</plant_id>
    <plant_name>North Valmy</plant_name>
    <state>NV</state>
    <county>Humboldt</county>
    <operator>Sierra Pacific Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>567</nameplate_mw>
    <summer_mw>522</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1985</latest_year>
    <lat>40.881317</lat>
    <lon>-117.1516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56102</plant_id>
    <plant_name>Currant Creek</plant_name>
    <state>UT</state>
    <county>Juab</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>566.9</nameplate_mw>
    <summer_mw>524</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2006</latest_year>
    <lat>39.82144</lat>
    <lon>-111.8935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2951</plant_id>
    <plant_name>Horseshoe Lake</plant_name>
    <state>OK</state>
    <county>Oklahoma</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>564</nameplate_mw>
    <summer_mw>467.8</summer_mw>
    <first_year>1969</first_year>
    <latest_year>2001</latest_year>
    <lat>35.50866</lat>
    <lon>-97.17969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55247</plant_id>
    <plant_name>Darby Power, LLC</plant_name>
    <state>OH</state>
    <county>Pickaway</county>
    <operator>Darby Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>564</nameplate_mw>
    <summer_mw>480</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>39.7139</lat>
    <lon>-83.1778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55294</plant_id>
    <plant_name>Westbrook Energy Center Power Plant</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Westbrook Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>563.9</nameplate_mw>
    <summer_mw>526.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>43.6575</lat>
    <lon>-70.375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1904</plant_id>
    <plant_name>Black Dog</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>562.8</nameplate_mw>
    <summer_mw>491</summer_mw>
    <first_year>1954</first_year>
    <latest_year>2018</latest_year>
    <lat>44.8108</lat>
    <lon>-93.2501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62562</plant_id>
    <plant_name>High Lonesome Wind Power, LLC Hybrid</plant_name>
    <state>TX</state>
    <county>Upton</county>
    <operator>High Lonesome Wind Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>562.8</nameplate_mw>
    <summer_mw>550.5</summer_mw>
    <battery_mwh>81</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.171652</lat>
    <lon>-101.8811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55391</plant_id>
    <plant_name>RockGen Energy Center</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Dairyland Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>561</nameplate_mw>
    <summer_mw>489</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.9767</lat>
    <lon>-89.0492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>715</plant_id>
    <plant_name>McManus</plant_name>
    <state>GA</state>
    <county>Glynn</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>560</nameplate_mw>
    <summer_mw>416</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1972</latest_year>
    <lat>31.213645</lat>
    <lon>-81.54617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55985</plant_id>
    <plant_name>Palomar Energy</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>559</nameplate_mw>
    <summer_mw>581.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2006</latest_year>
    <lat>33.1197</lat>
    <lon>-117.1178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56807</plant_id>
    <plant_name>Bear Garden</plant_name>
    <state>VA</state>
    <county>Buckingham</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>559</nameplate_mw>
    <summer_mw>628.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>37.695556</lat>
    <lon>-78.28528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6061</plant_id>
    <plant_name>R D Morrow</plant_name>
    <state>MS</state>
    <county>Lamar</county>
    <operator>Cooperative Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>558</nameplate_mw>
    <summer_mw>530.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.2186</lat>
    <lon>-89.394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6138</plant_id>
    <plant_name>Flint Creek</plant_name>
    <state>AR</state>
    <county>Benton</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>558</nameplate_mw>
    <summer_mw>494</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>36.2561</lat>
    <lon>-94.5241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55970</plant_id>
    <plant_name>Cosumnes Power Plant</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>556.8</nameplate_mw>
    <summer_mw>545</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>38.338475</lat>
    <lon>-121.124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55710</plant_id>
    <plant_name>Allegheny Energy Units 3 4 &amp; 5</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>Springdale Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>556</nameplate_mw>
    <summer_mw>562.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>40.545278</lat>
    <lon>-79.76861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2869</plant_id>
    <plant_name>West Lorain</plant_name>
    <state>OH</state>
    <county>Lorain</county>
    <operator>Vermillion Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>555.6</nameplate_mw>
    <summer_mw>500.5</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2001</latest_year>
    <lat>41.429444</lat>
    <lon>-82.26444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55404</plant_id>
    <plant_name>Carville Energy LLC</plant_name>
    <state>LA</state>
    <county>Iberville</county>
    <operator>Carville Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>555</nameplate_mw>
    <summer_mw>521</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>30.2294</lat>
    <lon>-91.065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55283</plant_id>
    <plant_name>Front Range Power Plant</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>City of Colorado Springs - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>554.3</nameplate_mw>
    <summer_mw>460</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.6281</lat>
    <lon>-104.7069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>170</plant_id>
    <plant_name>Lake Catherine</plant_name>
    <state>AR</state>
    <county>Hot Spring</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>552.5</nameplate_mw>
    <summer_mw>522</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>34.4341</lat>
    <lon>-92.9049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6248</plant_id>
    <plant_name>Pawnee</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>552.3</nameplate_mw>
    <summer_mw>505</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>40.2217</lat>
    <lon>-103.6803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55220</plant_id>
    <plant_name>Attala</plant_name>
    <state>MS</state>
    <county>Attala</county>
    <operator>Entergy Mississippi LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>551.3</nameplate_mw>
    <summer_mw>458.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.0147</lat>
    <lon>-89.6753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55457</plant_id>
    <plant_name>McClain Energy Facility</plant_name>
    <state>OK</state>
    <county>McClain</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>551.3</nameplate_mw>
    <summer_mw>487</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>35.29774</lat>
    <lon>-97.58985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55545</plant_id>
    <plant_name>Hidalgo Energy Center</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Calpine Corp - Hidalgo</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>551.3</nameplate_mw>
    <summer_mw>495</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>26.34172</lat>
    <lon>-98.17576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56349</plant_id>
    <plant_name>Quail Run Energy Center</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Quail Run Energy Partners, LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>550.4</nameplate_mw>
    <summer_mw>472.2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2008</latest_year>
    <lat>31.8414</lat>
    <lon>-102.315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55068</plant_id>
    <plant_name>Maine Independence Station</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Casco Bay Energy Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>550.2</nameplate_mw>
    <summer_mw>497.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>44.8242</lat>
    <lon>-68.7094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69684</plant_id>
    <plant_name>Maricopa Solar</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Maricopa Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>550</nameplate_mw>
    <summer_mw>550</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.46303</lat>
    <lon>-113.1101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>399</plant_id>
    <plant_name>Harbor</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>548.1</nameplate_mw>
    <summer_mw>428</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2002</latest_year>
    <lat>33.7706</lat>
    <lon>-118.2656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3780</plant_id>
    <plant_name>Smith Mountain</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Hydroelectric Pumped Storage</technologies>
    <generators>5</generators>
    <nameplate_mw>547.5</nameplate_mw>
    <summer_mw>586</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1980</latest_year>
    <lat>37.0413</lat>
    <lon>-79.5356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8012</plant_id>
    <plant_name>Croydon CT Generating Station</plant_name>
    <state>PA</state>
    <county>Bucks</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>546.4</nameplate_mw>
    <summer_mw>391</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>40.08</lat>
    <lon>-74.8917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7837</plant_id>
    <plant_name>Louisa Generation Facility</plant_name>
    <state>VA</state>
    <county>Louisa</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>545.7</nameplate_mw>
    <summer_mw>466</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.1181</lat>
    <lon>-78.2139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59325</plant_id>
    <plant_name>Kings Mountain Energy Center</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Carolina Power Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>543.9</nameplate_mw>
    <summer_mw>486</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.2025</lat>
    <lon>-81.36306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59326</plant_id>
    <plant_name>Middletown Energy Center</plant_name>
    <state>OH</state>
    <county>Butler</county>
    <operator>Ohio Power Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>543.9</nameplate_mw>
    <summer_mw>462.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.465</lat>
    <lon>-84.34778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3457</plant_id>
    <plant_name>Lewis Creek</plant_name>
    <state>TX</state>
    <county>Montgomery</county>
    <operator>Entergy Texas Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>542.8</nameplate_mw>
    <summer_mw>499.3</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1971</latest_year>
    <lat>30.4356</lat>
    <lon>-95.5214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6081</plant_id>
    <plant_name>Stony Brook</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Massachusetts Mun Wholes Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combined Cycle; Solar Photovoltaic</technologies>
    <generators>10</generators>
    <nameplate_mw>541.5</nameplate_mw>
    <summer_mw>446.6</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2018</latest_year>
    <lat>42.1978</lat>
    <lon>-72.5106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55414</plant_id>
    <plant_name>Shady Hills Generating Station</plant_name>
    <state>FL</state>
    <county>Pasco</county>
    <operator>Shady Hills Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>541.2</nameplate_mw>
    <summer_mw>463.2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>28.3665</lat>
    <lon>-82.55861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3006</plant_id>
    <plant_name>Anadarko Plant</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>540.3</nameplate_mw>
    <summer_mw>507</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2009</latest_year>
    <lat>35.0847</lat>
    <lon>-98.23</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>997</plant_id>
    <plant_name>Michigan City</plant_name>
    <state>IN</state>
    <county>LaPorte</county>
    <operator>Northern Indiana Pub Serv Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>540</nameplate_mw>
    <summer_mw>455</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>41.7208</lat>
    <lon>-86.9086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2081</plant_id>
    <plant_name>Northeast (MO)</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>540</nameplate_mw>
    <summer_mw>392</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1985</latest_year>
    <lat>39.1228</lat>
    <lon>-94.5606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55438</plant_id>
    <plant_name>MRP Elgin LLC</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Lincoln Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>540</nameplate_mw>
    <summer_mw>487.9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.000061</lat>
    <lon>-88.24457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64633</plant_id>
    <plant_name>Rexford Solar Farm</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>540</nameplate_mw>
    <summer_mw>540</summer_mw>
    <battery_mwh>960</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.840479</lat>
    <lon>-119.0827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7917</plant_id>
    <plant_name>Chattahoochee Energy Facility</plant_name>
    <state>GA</state>
    <county>Heard</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>539.7</nameplate_mw>
    <summer_mw>466</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.4072</lat>
    <lon>-85.0386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3375</plant_id>
    <plant_name>Big Bend Dam</plant_name>
    <state>SD</state>
    <county>Buffalo</county>
    <operator>USACE-Omaha</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>538.3</nameplate_mw>
    <summer_mw>520</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1966</latest_year>
    <lat>44.0384</lat>
    <lon>-99.4463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7925</plant_id>
    <plant_name>Lakefield Junction</plant_name>
    <state>MN</state>
    <county>Martin</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>537.8</nameplate_mw>
    <summer_mw>499.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>43.798439</lat>
    <lon>-94.84145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2480</plant_id>
    <plant_name>Danskammer Generating Station</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Danskammer Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>537.4</nameplate_mw>
    <summer_mw>502.3</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1967</latest_year>
    <lat>41.573361</lat>
    <lon>-73.96457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57901</plant_id>
    <plant_name>El Segundo Energy Center LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>NRG Energy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>537.4</nameplate_mw>
    <summer_mw>510</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.910556</lat>
    <lon>-118.425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55077</plant_id>
    <plant_name>Desert Star Energy Center</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Desert Star Energy Center SDG&amp;E</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>537.3</nameplate_mw>
    <summer_mw>450</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>35.788889</lat>
    <lon>-114.9942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3492</plant_id>
    <plant_name>Morgan Creek</plant_name>
    <state>TX</state>
    <county>Mitchell</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>536.4</nameplate_mw>
    <summer_mw>397</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>32.3358</lat>
    <lon>-100.9156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56806</plant_id>
    <plant_name>Cedar Bayou 4</plant_name>
    <state>TX</state>
    <county>Chambers</county>
    <operator>NRG Cedar Bayou Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>535.5</nameplate_mw>
    <summer_mw>504</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>29.751645</lat>
    <lon>-94.92312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1574</plant_id>
    <plant_name>Conowingo</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>11</generators>
    <nameplate_mw>530.8</nameplate_mw>
    <summer_mw>496.9</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1964</latest_year>
    <lat>39.6572</lat>
    <lon>-76.1752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68512</plant_id>
    <plant_name>McGrau Ford Battery Storage Facility</plant_name>
    <state>GA</state>
    <county>Cherokee</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>530</nameplate_mw>
    <summer_mw>530</summer_mw>
    <battery_mwh>1590</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.324977</lat>
    <lon>-84.3289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55098</plant_id>
    <plant_name>Frontera Energy Center</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Frontera Generation Limited Partnership</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>529</nameplate_mw>
    <summer_mw>535</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2000</latest_year>
    <lat>26.208</lat>
    <lon>-98.3992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>126</plant_id>
    <plant_name>H Wilson Sundt Generating Station</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Internal Combustion Engine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>14</generators>
    <nameplate_mw>528.9</nameplate_mw>
    <summer_mw>490</summer_mw>
    <first_year>1962</first_year>
    <latest_year>2020</latest_year>
    <lat>32.16</lat>
    <lon>-110.9047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56196</plant_id>
    <plant_name>Zeltmann</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>528</nameplate_mw>
    <summer_mw>474</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>40.7889</lat>
    <lon>-73.9069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64547</plant_id>
    <plant_name>Turtle Creek</plant_name>
    <state>NE</state>
    <county>Sarpy</county>
    <operator>Omaha Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>528</nameplate_mw>
    <summer_mw>442.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.092238</lat>
    <lon>-96.16831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58562</plant_id>
    <plant_name>Montana Power Station</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>527.2</nameplate_mw>
    <summer_mw>352</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>31.823889</lat>
    <lon>-106.2119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6172</plant_id>
    <plant_name>Libby</plant_name>
    <state>MT</state>
    <county>Lincoln</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>525</nameplate_mw>
    <summer_mw>525</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1984</latest_year>
    <lat>48.4098</lat>
    <lon>-115.3143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61035</plant_id>
    <plant_name>Birdsboro Power</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>Birdsboro Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>525</nameplate_mw>
    <summer_mw>485</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.268522</lat>
    <lon>-75.79967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63209</plant_id>
    <plant_name>Aviator Wind</plant_name>
    <state>TX</state>
    <county>Coke</county>
    <operator>Aviator Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>525</nameplate_mw>
    <summer_mw>525</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.79261</lat>
    <lon>-100.6973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69100</plant_id>
    <plant_name>Rocky Mountain Solar</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>525</nameplate_mw>
    <summer_mw>525</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>38.15319</lat>
    <lon>-104.5763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69748</plant_id>
    <plant_name>Faraday Solar</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Faraday Solar B LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>525</nameplate_mw>
    <summer_mw>525</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.0936</lat>
    <lon>-112.0833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63578</plant_id>
    <plant_name>Sagamore Wind</plant_name>
    <state>NM</state>
    <county>Roosevelt</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>522</nameplate_mw>
    <summer_mw>522</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.938421</lat>
    <lon>-103.1846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61322</plant_id>
    <plant_name>Long Ridge Energy Generation</plant_name>
    <state>OH</state>
    <county>Monroe</county>
    <operator>Long Ridge Energy Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>521.9</nameplate_mw>
    <summer_mw>485</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.70257</lat>
    <lon>-80.84552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55065</plant_id>
    <plant_name>Mustang Station</plant_name>
    <state>TX</state>
    <county>Yoakum</county>
    <operator>Golden Spread Electric Cooperative, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>521</nameplate_mw>
    <summer_mw>464.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2000</latest_year>
    <lat>32.9728</lat>
    <lon>-102.7417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55042</plant_id>
    <plant_name>Bridgeport Energy Project</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Bridgeport Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>520</nameplate_mw>
    <summer_mw>538</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1999</latest_year>
    <lat>41.1692</lat>
    <lon>-73.1844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55276</plant_id>
    <plant_name>Ceredo Generating Station</plant_name>
    <state>WV</state>
    <county>Wayne</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>519</nameplate_mw>
    <summer_mw>450</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.3681</lat>
    <lon>-82.5339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1250</plant_id>
    <plant_name>Lawrence Energy Center</plant_name>
    <state>KS</state>
    <county>Douglas</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>517</nameplate_mw>
    <summer_mw>491.3</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1971</latest_year>
    <lat>39.0072</lat>
    <lon>-95.26917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55313</plant_id>
    <plant_name>Ingleside Cogeneration</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>Ingleside Cogeneration LP</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>517</nameplate_mw>
    <summer_mw>460</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>27.882778</lat>
    <lon>-97.24278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3236</plant_id>
    <plant_name>Manchester Street</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Manchester Street, LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>515</nameplate_mw>
    <summer_mw>471</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>41.8167</lat>
    <lon>-71.4042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68838</plant_id>
    <plant_name>Hecate Energy Outpost Solar LLC</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Repsol Renewables NA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>515</nameplate_mw>
    <summer_mw>515</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.85923</lat>
    <lon>-99.16174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55076</plant_id>
    <plant_name>Red Hills Generating Facility</plant_name>
    <state>MS</state>
    <county>Choctaw</county>
    <operator>Choctaw Generation L.P, L.L.L.P.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>513.7</nameplate_mw>
    <summer_mw>440</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.3761</lat>
    <lon>-89.2183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2393</plant_id>
    <plant_name>Gilbert</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>Gilbert Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>512</nameplate_mw>
    <summer_mw>455.2</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1996</latest_year>
    <lat>40.565833</lat>
    <lon>-75.16389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7790</plant_id>
    <plant_name>Bonanza</plant_name>
    <state>UT</state>
    <county>Uintah</county>
    <operator>Deseret Generation &amp; Tran Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>512</nameplate_mw>
    <summer_mw>470.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2023</latest_year>
    <lat>40.0864</lat>
    <lon>-109.2844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2070</plant_id>
    <plant_name>Moselle</plant_name>
    <state>MS</state>
    <county>Jones</county>
    <operator>Cooperative Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>510.5</nameplate_mw>
    <summer_mw>477</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2012</latest_year>
    <lat>31.528</lat>
    <lon>-89.3004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6823</plant_id>
    <plant_name>D B Wilson</plant_name>
    <state>KY</state>
    <county>Ohio</county>
    <operator>Big Rivers Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>509.4</nameplate_mw>
    <summer_mw>417</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>37.4497</lat>
    <lon>-87.0806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7604</plant_id>
    <plant_name>St Francis Energy Facility</plant_name>
    <state>MO</state>
    <county>Dunklin</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>506.6</nameplate_mw>
    <summer_mw>478</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2001</latest_year>
    <lat>36.5852</lat>
    <lon>-90.1779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62516</plant_id>
    <plant_name>TB Flats</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>503.2</nameplate_mw>
    <summer_mw>503.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.177245</lat>
    <lon>-106.2341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58883</plant_id>
    <plant_name>Highland Wind Project (IA)</plant_name>
    <state>IA</state>
    <county>O'Brien</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>502</nameplate_mw>
    <summer_mw>500</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>43.080278</lat>
    <lon>-95.65611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69893</plant_id>
    <plant_name>Dusty Rose Wind</plant_name>
    <state>CO</state>
    <county>Kit Carson</county>
    <operator>Dusty Rose Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>502</nameplate_mw>
    <summer_mw>502</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.128299</lat>
    <lon>-102.5418</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55103</plant_id>
    <plant_name>Klamath Cogeneration Plant</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Klamath Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>501.5</nameplate_mw>
    <summer_mw>490</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.173889</lat>
    <lon>-121.8106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61077</plant_id>
    <plant_name>Orient Wind Farm</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>500.8</nameplate_mw>
    <summer_mw>500</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>41.202447</lat>
    <lon>-94.4172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58462</plant_id>
    <plant_name>McCoy Solar Energy Project Hybrid</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>McCoy Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>9</generators>
    <nameplate_mw>500.6</nameplate_mw>
    <summer_mw>500.6</summer_mw>
    <battery_mwh>920</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2021</latest_year>
    <lat>33.694722</lat>
    <lon>-114.7397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64710</plant_id>
    <plant_name>White Mesa Wind</plant_name>
    <state>TX</state>
    <county>Crockett</county>
    <operator>White Mesa Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>500.6</nameplate_mw>
    <summer_mw>500.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.91</lat>
    <lon>-101.263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55224</plant_id>
    <plant_name>Wheatland Generating Facility</plant_name>
    <state>IN</state>
    <county>Knox</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>500.4</nameplate_mw>
    <summer_mw>442</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>38.6716</lat>
    <lon>-87.2931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6130</plant_id>
    <plant_name>Carters</plant_name>
    <state>GA</state>
    <county>Murray</county>
    <operator>USCE-Mobile District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Hydroelectric Pumped Storage</technologies>
    <generators>4</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>560</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1977</latest_year>
    <lat>34.6121</lat>
    <lon>-84.6733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57515</plant_id>
    <plant_name>Walnut Creek Energy Park</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Walnut Creek LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.008709</lat>
    <lon>-117.9449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58503</plant_id>
    <plant_name>Carty Generating Station</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>416.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.698611</lat>
    <lon>-119.8131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64233</plant_id>
    <plant_name>Hecate Energy Frye Solar LLC</plant_name>
    <state>TX</state>
    <county>Swisher</county>
    <operator>Repsol Renewables NA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.4067</lat>
    <lon>-101.5966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64927</plant_id>
    <plant_name>Aktina Solar</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Hecate Energy Ramsey, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.122</lat>
    <lon>-96.276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65763</plant_id>
    <plant_name>Young Wind</plant_name>
    <state>TX</state>
    <county>Young</county>
    <operator>Young Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.119213</lat>
    <lon>-98.85258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68906</plant_id>
    <plant_name>Pine Forest Solar I</plant_name>
    <state>TX</state>
    <county>Hopkins</county>
    <operator>Pine Forest Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.100779</lat>
    <lon>-95.39229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69428</plant_id>
    <plant_name>Petersburg Energy Center</plant_name>
    <state>IN</state>
    <county>Pike</county>
    <operator>Petersburg Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <battery_mwh>180</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.461606</lat>
    <lon>-87.29524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69451</plant_id>
    <plant_name>West Camp Wind Farm</plant_name>
    <state>AZ</state>
    <county>Navajo</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>500</nameplate_mw>
    <summer_mw>500</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.73569</lat>
    <lon>-110.4249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62952</plant_id>
    <plant_name>Cheyenne Ridge Wind Farm</plant_name>
    <state>CO</state>
    <county>Cheyenne</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>498.4</nameplate_mw>
    <summer_mw>498.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.016944</lat>
    <lon>-102.2113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2517</plant_id>
    <plant_name>Port Jefferson</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>498</nameplate_mw>
    <summer_mw>480.6</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2002</latest_year>
    <lat>40.949696</lat>
    <lon>-73.07851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54676</plant_id>
    <plant_name>Oyster Creek Unit VIII</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Dow Chemical Company-Oyster Creek VIII</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>497.9</nameplate_mw>
    <summer_mw>379</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>28.9802</lat>
    <lon>-95.342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2364</plant_id>
    <plant_name>Merrimack</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Granite Shore Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>496.4</nameplate_mw>
    <summer_mw>472.1</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1969</latest_year>
    <lat>43.1411</lat>
    <lon>-71.4692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>546</plant_id>
    <plant_name>Montville Station</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Montville Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>495.3</nameplate_mw>
    <summer_mw>496.4</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1971</latest_year>
    <lat>41.4281</lat>
    <lon>-72.1019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55141</plant_id>
    <plant_name>Hawk Road Facility</plant_name>
    <state>GA</state>
    <county>Heard</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>495</nameplate_mw>
    <summer_mw>447.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.358472</lat>
    <lon>-84.99139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55128</plant_id>
    <plant_name>Walton County Energy Facility</plant_name>
    <state>GA</state>
    <county>Walton</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>494.1</nameplate_mw>
    <summer_mw>449.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.8148</lat>
    <lon>-83.6954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55117</plant_id>
    <plant_name>RS Cogen</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Westlake 2 US LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>493</nameplate_mw>
    <summer_mw>415.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>30.221</lat>
    <lon>-93.2826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1464</plant_id>
    <plant_name>Big Cajun 1</plant_name>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <operator>Louisiana Generating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>492.8</nameplate_mw>
    <summer_mw>374</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2001</latest_year>
    <lat>30.6739</lat>
    <lon>-91.3556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1556</plant_id>
    <plant_name>Perryman</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Constellation Power Source Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>492.3</nameplate_mw>
    <summer_mw>403.8</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2015</latest_year>
    <lat>39.442836</lat>
    <lon>-76.22176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62853</plant_id>
    <plant_name>Maverick Creek Wind</plant_name>
    <state>TX</state>
    <county>Concho</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>491.6</nameplate_mw>
    <summer_mw>491.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.262546</lat>
    <lon>-99.84396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67893</plant_id>
    <plant_name>Dunns Bridge II Solar</plant_name>
    <state>IN</state>
    <county>Starke</county>
    <operator>Dunns Bridge II Solar and Storage Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>491.3</nameplate_mw>
    <summer_mw>491.3</summer_mw>
    <battery_mwh>225</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.222135</lat>
    <lon>-86.94648</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2199</plant_id>
    <plant_name>Noxon Rapids</plant_name>
    <state>MT</state>
    <county>Sanders</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>487.8</nameplate_mw>
    <summer_mw>580.7</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1977</latest_year>
    <lat>47.96048</lat>
    <lon>-115.7336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65644</plant_id>
    <plant_name>Lumina II Solar Project</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>IPX Power USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>486.6</nameplate_mw>
    <summer_mw>480</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>32.883528</lat>
    <lon>-100.7464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65645</plant_id>
    <plant_name>Lumina Solar Project</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>IPX Power USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>486.6</nameplate_mw>
    <summer_mw>480</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>32.901081</lat>
    <lon>-100.9827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8056</plant_id>
    <plant_name>Waterford 1 &amp; 2</plant_name>
    <state>LA</state>
    <county>St Charles</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>486.5</nameplate_mw>
    <summer_mw>449.4</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2009</latest_year>
    <lat>29.998884</lat>
    <lon>-90.47684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57501</plant_id>
    <plant_name>Rolling Hills Wind Farm</plant_name>
    <state>IA</state>
    <county>Cass</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>484.2</nameplate_mw>
    <summer_mw>443.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.1973</lat>
    <lon>-94.7744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63335</plant_id>
    <plant_name>HO Clarke Generating</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>484</nameplate_mw>
    <summer_mw>356</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.64536</lat>
    <lon>-95.45169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64383</plant_id>
    <plant_name>Braes Bayou Plant</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>ProEnergy Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>484</nameplate_mw>
    <summer_mw>356</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.480277</lat>
    <lon>-95.62028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65372</plant_id>
    <plant_name>Mark One Power Station</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>484</nameplate_mw>
    <summer_mw>356.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2024</latest_year>
    <lat>29.227109</lat>
    <lon>-95.43076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65373</plant_id>
    <plant_name>Brotman Power Station</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>ProEnergy Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>484</nameplate_mw>
    <summer_mw>356.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.364128</lat>
    <lon>-95.43507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66604</plant_id>
    <plant_name>Remy Jade Power Station</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>484</nameplate_mw>
    <summer_mw>356</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.848372</lat>
    <lon>-95.0164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56609</plant_id>
    <plant_name>Dry Fork Station</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>483.7</nameplate_mw>
    <summer_mw>390</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.388889</lat>
    <lon>-105.4608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60014</plant_id>
    <plant_name>Manatee Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>483.5</nameplate_mw>
    <summer_mw>483.5</summer_mw>
    <battery_mwh>900</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2021</latest_year>
    <lat>27.607469</lat>
    <lon>-82.35528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55237</plant_id>
    <plant_name>Shelby Energy County</plant_name>
    <state>IL</state>
    <county>Shelby</county>
    <operator>Shelby County Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>483</nameplate_mw>
    <summer_mw>336</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>39.2794</lat>
    <lon>-88.4772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56227</plant_id>
    <plant_name>Port Westward</plant_name>
    <state>OR</state>
    <county>Columbia</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>483</nameplate_mw>
    <summer_mw>392.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>46.17894</lat>
    <lon>-123.172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64859</plant_id>
    <plant_name>IP Radian, LLC</plant_name>
    <state>TX</state>
    <county>Brown</county>
    <operator>IPX Power USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>480</nameplate_mw>
    <summer_mw>480</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2026</latest_year>
    <lat>31.5481</lat>
    <lon>-99.1872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69320</plant_id>
    <plant_name>Parliament Solar</plant_name>
    <state>TX</state>
    <county>Waller</county>
    <operator>Parliament Solar, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>480</nameplate_mw>
    <summer_mw>480</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.979</lat>
    <lon>-95.943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59247</plant_id>
    <plant_name>Hale Community Wind Farm</plant_name>
    <state>TX</state>
    <county>Hale</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>478</nameplate_mw>
    <summer_mw>478</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.927778</lat>
    <lon>-101.7422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3775</plant_id>
    <plant_name>Clinch River</plant_name>
    <state>VA</state>
    <county>Russell</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>475</nameplate_mw>
    <summer_mw>460</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>36.9333</lat>
    <lon>-82.1997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63848</plant_id>
    <plant_name>Solar Blue</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Westlands Solar Blue</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>475</nameplate_mw>
    <summer_mw>475</summer_mw>
    <battery_mwh>900</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.173967</lat>
    <lon>-119.9043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3484</plant_id>
    <plant_name>Nichols</plant_name>
    <state>TX</state>
    <county>Potter</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>474.7</nameplate_mw>
    <summer_mw>457</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1968</latest_year>
    <lat>35.283357</lat>
    <lon>-101.7464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56326</plant_id>
    <plant_name>Mustang Station Unit 4</plant_name>
    <state>TX</state>
    <county>Yoakum</county>
    <operator>Golden Spread Electric Cooperative, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>472.1</nameplate_mw>
    <summer_mw>459.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2013</latest_year>
    <lat>32.974554</lat>
    <lon>-102.7436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>663</plant_id>
    <plant_name>Deerhaven Generating Station</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Gainesville Regional Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>471</nameplate_mw>
    <summer_mw>414</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1996</latest_year>
    <lat>29.7592</lat>
    <lon>-82.3878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64347</plant_id>
    <plant_name>Mockingbird Solar Center</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>Mockingbird Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>471</nameplate_mw>
    <summer_mw>471</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.39167</lat>
    <lon>-95.42519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57787</plant_id>
    <plant_name>Flat Ridge 2 Wind Energy LLC</plant_name>
    <state>KS</state>
    <county>Kingman</county>
    <operator>Clearlight Energy Holdings LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>470.4</nameplate_mw>
    <summer_mw>470.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.366509</lat>
    <lon>-98.26108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64164</plant_id>
    <plant_name>Azure Sky Wind Project, LLC Hybrid</plant_name>
    <state>TX</state>
    <county>Throckmorton</county>
    <operator>Azure Sky Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>470.2</nameplate_mw>
    <summer_mw>470.2</summer_mw>
    <battery_mwh>190</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>33.169139</lat>
    <lon>-99.26601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50949</plant_id>
    <plant_name>Hardee Power Station</plant_name>
    <state>FL</state>
    <county>Hardee</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>470.1</nameplate_mw>
    <summer_mw>373</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2000</latest_year>
    <lat>27.6364</lat>
    <lon>-81.9636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67823</plant_id>
    <plant_name>Roadrunner Solar and BESS</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>Clenera LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>470</nameplate_mw>
    <summer_mw>470</summer_mw>
    <battery_mwh>411</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>32.086149</lat>
    <lon>-109.9353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55086</plant_id>
    <plant_name>Gregory Power Plant</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>Gregory Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>469.8</nameplate_mw>
    <summer_mw>366</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>27.88929</lat>
    <lon>-97.25842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7843</plant_id>
    <plant_name>Pleasant Valley (MN)</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>467.8</nameplate_mw>
    <summer_mw>424.1</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>43.799446</lat>
    <lon>-92.68287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55176</plant_id>
    <plant_name>Eastman Cogeneration Facility</plant_name>
    <state>TX</state>
    <county>Harrison</county>
    <operator>Eastman Cogeneration LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>467.7</nameplate_mw>
    <summer_mw>417.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>32.4481</lat>
    <lon>-94.6903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>525</plant_id>
    <plant_name>Hayden</plant_name>
    <state>CO</state>
    <county>Routt</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>465.4</nameplate_mw>
    <summer_mw>441</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1976</latest_year>
    <lat>40.4856</lat>
    <lon>-107.185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>840</plant_id>
    <plant_name>Dworshak</plant_name>
    <state>ID</state>
    <county>Clearwater</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>465</nameplate_mw>
    <summer_mw>465</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1975</latest_year>
    <lat>46.5143</lat>
    <lon>-116.2977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2953</plant_id>
    <plant_name>Mustang</plant_name>
    <state>OK</state>
    <county>Canadian</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Solar Photovoltaic</technologies>
    <generators>8</generators>
    <nameplate_mw>464.5</nameplate_mw>
    <summer_mw>400.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2017</latest_year>
    <lat>35.46988</lat>
    <lon>-97.67498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62561</plant_id>
    <plant_name>Roadrunner, LLC Hybrid</plant_name>
    <state>TX</state>
    <county>Upton</county>
    <operator>Roadrunner Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>463.3</nameplate_mw>
    <summer_mw>450</summer_mw>
    <battery_mwh>108.6</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2023</latest_year>
    <lat>31.219444</lat>
    <lon>-102.1922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55081</plant_id>
    <plant_name>Brownsville Peaking Power</plant_name>
    <state>TN</state>
    <county>Haywood</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>460</nameplate_mw>
    <summer_mw>456</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>35.5438</lat>
    <lon>-89.198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63255</plant_id>
    <plant_name>2W Permian Solar Project Hybrid</plant_name>
    <state>TX</state>
    <county>Andrews</county>
    <operator>2W Permian Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>460</nameplate_mw>
    <summer_mw>460</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.116388</lat>
    <lon>-102.5283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61168</plant_id>
    <plant_name>Eland Solar &amp; Storage Center, Phase 1 Hy</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>68SF 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>459.6</nameplate_mw>
    <summer_mw>350</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.2237</lat>
    <lon>-117.977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61169</plant_id>
    <plant_name>Eland Solar &amp; Storage Center, Phase 2 Hy</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>69SV 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>458</nameplate_mw>
    <summer_mw>350</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.2167</lat>
    <lon>-117.977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55417</plant_id>
    <plant_name>Raccoon Creek Energy Center</plant_name>
    <state>IL</state>
    <county>Clay</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>456</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.6996</lat>
    <lon>-88.5392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59926</plant_id>
    <plant_name>Alpine Power Plant</plant_name>
    <state>MI</state>
    <county>Otsego</county>
    <operator>Wolverine Power Supply Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>453.8</nameplate_mw>
    <summer_mw>405.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.063748</lat>
    <lon>-84.82535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6522</plant_id>
    <plant_name>Yards Creek Energy</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>Yards Creek Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>3</generators>
    <nameplate_mw>453</nameplate_mw>
    <summer_mw>418</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>41.0006</lat>
    <lon>-75.0314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6098</plant_id>
    <plant_name>Big Stone</plant_name>
    <state>SD</state>
    <county>Grant</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>451</nameplate_mw>
    <summer_mw>478.7</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1975</latest_year>
    <lat>45.303652</lat>
    <lon>-96.51007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1391</plant_id>
    <plant_name>Louisiana 1</plant_name>
    <state>LA</state>
    <county>East Baton Rouge</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Other Gases</technologies>
    <generators>5</generators>
    <nameplate_mw>450.9</nameplate_mw>
    <summer_mw>382.4</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1999</latest_year>
    <lat>30.4922</lat>
    <lon>-91.1864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2880</plant_id>
    <plant_name>Richland (OH)</plant_name>
    <state>OH</state>
    <county>Defiance</county>
    <operator>Richland-Stryker Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>369</summer_mw>
    <first_year>1965</first_year>
    <latest_year>2001</latest_year>
    <lat>41.305203</lat>
    <lon>-84.33462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6202</plant_id>
    <plant_name>Ross</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>City of Seattle - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1956</latest_year>
    <lat>48.732577</lat>
    <lon>-121.0679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8222</plant_id>
    <plant_name>Coyote</plant_name>
    <state>ND</state>
    <county>Mercer</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>425.5</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>47.221447</lat>
    <lon>-101.8157</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52088</plant_id>
    <plant_name>Texas City Power Plant</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Texas City Cogeneration LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>418</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>29.378697</lat>
    <lon>-94.94383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59871</plant_id>
    <plant_name>Desert Quartzite</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Desert Quartzite LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <battery_mwh>150</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.565</lat>
    <lon>-114.753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63172</plant_id>
    <plant_name>Arroyo Solar Energy Storage Hybrid</plant_name>
    <state>NM</state>
    <county>McKinley</county>
    <operator>Arroyo Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>35.970349</lat>
    <lon>-107.5631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63731</plant_id>
    <plant_name>Neptune Energy Center Hybrid</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Neptune Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <battery_mwh>500</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.330263</lat>
    <lon>-104.4142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66637</plant_id>
    <plant_name>McFarland B Solar and Storage</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.957479</lat>
    <lon>-113.476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68414</plant_id>
    <plant_name>Catclaw Solar</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>311SV 8me, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <battery_mwh>1000</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.580629</lat>
    <lon>-112.6867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69414</plant_id>
    <plant_name>Blevins Solar &amp; Storage</plant_name>
    <state>TX</state>
    <county>Falls</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>450</nameplate_mw>
    <summer_mw>450</summer_mw>
    <battery_mwh>360</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>31.211152</lat>
    <lon>-97.18508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56485</plant_id>
    <plant_name>Biglow Canyon Wind Farm</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>449.7</nameplate_mw>
    <summer_mw>449.7</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2010</latest_year>
    <lat>45.653745</lat>
    <lon>-120.6034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64852</plant_id>
    <plant_name>Daggett 3</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Daggett Solar Power 3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>449</nameplate_mw>
    <summer_mw>449</summer_mw>
    <battery_mwh>4.6</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.860918</lat>
    <lon>-116.8553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3494</plant_id>
    <plant_name>Permian Basin</plant_name>
    <state>TX</state>
    <county>Ward</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>447</nameplate_mw>
    <summer_mw>320</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1990</latest_year>
    <lat>31.5839</lat>
    <lon>-102.9633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3797</plant_id>
    <plant_name>Chesterfield</plant_name>
    <state>VA</state>
    <county>Chesterfield</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>446.6</nameplate_mw>
    <summer_mw>386</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1992</latest_year>
    <lat>37.3822</lat>
    <lon>-77.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6772</plant_id>
    <plant_name>Hugo</plant_name>
    <state>OK</state>
    <county>Choctaw</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>446</nameplate_mw>
    <summer_mw>440</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>34.0158</lat>
    <lon>-95.3206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10725</plant_id>
    <plant_name>Selkirk Cogen</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Selkirk Cogen Partners LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>446</nameplate_mw>
    <summer_mw>353</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1994</latest_year>
    <lat>42.5744</lat>
    <lon>-73.8592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2454</plant_id>
    <plant_name>Cunningham</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>444.2</nameplate_mw>
    <summer_mw>390</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1998</latest_year>
    <lat>32.7131</lat>
    <lon>-103.3533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67500</plant_id>
    <plant_name>Pin Oak Creek Energy Center, LLC</plant_name>
    <state>TX</state>
    <county>Freestone</county>
    <operator>Freestone Power Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>444</nameplate_mw>
    <summer_mw>424</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.893702</lat>
    <lon>-96.11058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56224</plant_id>
    <plant_name>TS Power Plant</plant_name>
    <state>NV</state>
    <county>Eureka</county>
    <operator>Nevada Gold Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>442</nameplate_mw>
    <summer_mw>418.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2024</latest_year>
    <lat>40.7461</lat>
    <lon>-116.5297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63727</plant_id>
    <plant_name>Slate Hybrid</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>9</generators>
    <nameplate_mw>440.3</nameplate_mw>
    <summer_mw>440.3</summer_mw>
    <battery_mwh>561</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>36.226955</lat>
    <lon>-119.8948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56998</plant_id>
    <plant_name>Pueblo Airport Generating Station</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Black Hills Service Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>9</generators>
    <nameplate_mw>440</nameplate_mw>
    <summer_mw>408</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2016</latest_year>
    <lat>38.320833</lat>
    <lon>-104.5264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8225</plant_id>
    <plant_name>Seneca Generation LLC</plant_name>
    <state>PA</state>
    <county>Warren</county>
    <operator>Seneca Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>437.9</nameplate_mw>
    <summer_mw>463.4</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>41.8389</lat>
    <lon>-79.0056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3648</plant_id>
    <plant_name>Gadsby</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>432.8</nameplate_mw>
    <summer_mw>353.6</summer_mw>
    <first_year>1951</first_year>
    <latest_year>2002</latest_year>
    <lat>40.7686</lat>
    <lon>-111.9289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3464</plant_id>
    <plant_name>Greens Bayou</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>NRG Texas Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>432</nameplate_mw>
    <summer_mw>327</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>29.822201</lat>
    <lon>-95.21943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56803</plant_id>
    <plant_name>Panoche Energy Center</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Panoche Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>432</nameplate_mw>
    <summer_mw>388</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.6514</lat>
    <lon>-120.5833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10308</plant_id>
    <plant_name>Sayreville Cogeneration Facility</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Sayreville Power Generation LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>430.2</nameplate_mw>
    <summer_mw>292</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>40.439</lat>
    <lon>-74.3444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64133</plant_id>
    <plant_name>Old 300 Solar Center, LLC</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Old 300 Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>430</nameplate_mw>
    <summer_mw>430</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.33355</lat>
    <lon>-95.82544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67285</plant_id>
    <plant_name>Sun Streams 3</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Sun Streams PVS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>430</nameplate_mw>
    <summer_mw>430</summer_mw>
    <battery_mwh>860</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.331667</lat>
    <lon>-112.8119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2203</plant_id>
    <plant_name>Hungry Horse</plant_name>
    <state>MT</state>
    <county>Flathead</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>428</nameplate_mw>
    <summer_mw>428</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1953</latest_year>
    <lat>48.341521</lat>
    <lon>-114.0144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3576</plant_id>
    <plant_name>Ray Olinger</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>City of Garland - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>427.7</nameplate_mw>
    <summer_mw>395</summer_mw>
    <first_year>1967</first_year>
    <latest_year>2001</latest_year>
    <lat>33.068055</lat>
    <lon>-96.45248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55079</plant_id>
    <plant_name>Millennium Power</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Millennium Power Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>427.5</nameplate_mw>
    <summer_mw>330.1</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.112291</lat>
    <lon>-72.01511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60264</plant_id>
    <plant_name>Bacliff</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>PHR Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>427.2</nameplate_mw>
    <summer_mw>324</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.49233</lat>
    <lon>-94.98483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>448</plant_id>
    <plant_name>W R Gianelli</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>California Dept. of Water Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>8</generators>
    <nameplate_mw>424</nameplate_mw>
    <summer_mw>401</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>37.0692</lat>
    <lon>-121.0772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>120</plant_id>
    <plant_name>Yucca</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>422.4</nameplate_mw>
    <summer_mw>317.4</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2008</latest_year>
    <lat>32.7214</lat>
    <lon>-114.7106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>754</plant_id>
    <plant_name>Hartwell Lake</plant_name>
    <state>GA</state>
    <county>Hart</county>
    <operator>USCE-Savannah District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>420</nameplate_mw>
    <summer_mw>405</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1983</latest_year>
    <lat>34.3564</lat>
    <lon>-82.8219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56445</plant_id>
    <plant_name>Spindle Hill Energy Center</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>420</nameplate_mw>
    <summer_mw>270</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.092192</lat>
    <lon>-104.8878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62587</plant_id>
    <plant_name>Mesquite Star</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Mesquite Star Special LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>418.9</nameplate_mw>
    <summer_mw>418.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.255978</lat>
    <lon>-100.3203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55223</plant_id>
    <plant_name>Ennis Power Company LLC</plant_name>
    <state>TX</state>
    <county>Ellis</county>
    <operator>Ennis Power Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>418</nameplate_mw>
    <summer_mw>359.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>32.32</lat>
    <lon>-96.675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3175</plant_id>
    <plant_name>Safe Harbor</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Safe Harbor</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>14</generators>
    <nameplate_mw>417.5</nameplate_mw>
    <summer_mw>417.5</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1986</latest_year>
    <lat>39.9244</lat>
    <lon>-76.39</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69025</plant_id>
    <plant_name>Pulaski Solar</plant_name>
    <state>IL</state>
    <county>Pulaski</county>
    <operator>Joppa BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>417.4</nameplate_mw>
    <summer_mw>405</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.264918</lat>
    <lon>-88.9524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7210</plant_id>
    <plant_name>Cope</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>417.3</nameplate_mw>
    <summer_mw>415</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>33.3644</lat>
    <lon>-81.03</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55433</plant_id>
    <plant_name>Bayou Cove Peaking Power</plant_name>
    <state>LA</state>
    <county>Acadia</county>
    <operator>Bayou Cove Peaking Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>416</nameplate_mw>
    <summer_mw>289.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>30.2825</lat>
    <lon>-92.5997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55109</plant_id>
    <plant_name>MRP Rocky Road LLC</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Lincoln Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>415.5</nameplate_mw>
    <summer_mw>340.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2000</latest_year>
    <lat>42.0931</lat>
    <lon>-88.2397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55381</plant_id>
    <plant_name>Commonwealth Chesapeake</plant_name>
    <state>VA</state>
    <county>Accomack</county>
    <operator>Commonwealth Chesapeake Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>414.5</nameplate_mw>
    <summer_mw>315.3</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>37.9892</lat>
    <lon>-75.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8002</plant_id>
    <plant_name>Newington</plant_name>
    <state>NH</state>
    <county>Rockingham</county>
    <operator>Granite Shore Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>414</nameplate_mw>
    <summer_mw>400.2</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>43.1</lat>
    <lon>-70.79083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4050</plant_id>
    <plant_name>Edgewater</plant_name>
    <state>WI</state>
    <county>Sheboygan</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>413.7</nameplate_mw>
    <summer_mw>402</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.715142</lat>
    <lon>-87.70586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56400</plant_id>
    <plant_name>Treasure Coast Energy Center</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Fort Pierce Utilities Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>411.4</nameplate_mw>
    <summer_mw>328</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>27.383889</lat>
    <lon>-80.3775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3013</plant_id>
    <plant_name>Hells Canyon</plant_name>
    <state>OR</state>
    <county>Wallowa</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>411.1</nameplate_mw>
    <summer_mw>453.1</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>45.2439</lat>
    <lon>-116.7008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6183</plant_id>
    <plant_name>San Miguel</plant_name>
    <state>TX</state>
    <county>Atascosa</county>
    <operator>San Miguel Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>410</nameplate_mw>
    <summer_mw>391</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>28.7044</lat>
    <lon>-98.4775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55244</plant_id>
    <plant_name>Doyle Energy Facility</plant_name>
    <state>GA</state>
    <county>Walton</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>409</nameplate_mw>
    <summer_mw>311.1</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>33.837699</lat>
    <lon>-83.69958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66774</plant_id>
    <plant_name>Ash Creek Solar</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Ash Creek</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>408.9</nameplate_mw>
    <summer_mw>408.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.900806</lat>
    <lon>-97.03373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69200</plant_id>
    <plant_name>SAHARA BESS (SOHO BESS)</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>ESTX-PLD-HOUSTON2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>408.7</nameplate_mw>
    <summer_mw>408.7</summer_mw>
    <battery_mwh>817.4</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.452067</lat>
    <lon>-95.30828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2108</plant_id>
    <plant_name>Taum Sauk</plant_name>
    <state>MO</state>
    <county>Reynolds</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>2</generators>
    <nameplate_mw>408</nameplate_mw>
    <summer_mw>440</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>37.520833</lat>
    <lon>-90.83472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7929</plant_id>
    <plant_name>West Gardner</plant_name>
    <state>KS</state>
    <county>Johnson</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>408</nameplate_mw>
    <summer_mw>342.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.7875</lat>
    <lon>-94.9861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7032</plant_id>
    <plant_name>Gravel Neck</plant_name>
    <state>VA</state>
    <county>Surry</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>407.7</nameplate_mw>
    <summer_mw>368</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1989</latest_year>
    <lat>37.1575</lat>
    <lon>-76.6911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7237</plant_id>
    <plant_name>Angus Anson</plant_name>
    <state>SD</state>
    <county>Minnehaha</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>405.7</nameplate_mw>
    <summer_mw>343</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2005</latest_year>
    <lat>43.60347</lat>
    <lon>-96.6356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50216</plant_id>
    <plant_name>Watson Cogeneration</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>ARCO Products Co-Watson</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>405</nameplate_mw>
    <summer_mw>398</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1988</latest_year>
    <lat>33.816647</lat>
    <lon>-118.2448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>49</plant_id>
    <plant_name>Wheeler Dam</plant_name>
    <state>AL</state>
    <county>Lawrence</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>11</generators>
    <nameplate_mw>404</nameplate_mw>
    <summer_mw>398.2</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1963</latest_year>
    <lat>34.8069</lat>
    <lon>-87.3819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66688</plant_id>
    <plant_name>Bright Arrow Solar, LLC</plant_name>
    <state>TX</state>
    <county>Hopkins</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>403.6</nameplate_mw>
    <summer_mw>403.6</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.22392</lat>
    <lon>-95.73077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7948</plant_id>
    <plant_name>Lawrence County Station</plant_name>
    <state>IN</state>
    <county>Lawrence</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>402</nameplate_mw>
    <summer_mw>236.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>38.8003</lat>
    <lon>-86.4511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68200</plant_id>
    <plant_name>Sequoia 1</plant_name>
    <state>TX</state>
    <county>Eastland</county>
    <operator>Sequoia 1 Solar Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>401.4</nameplate_mw>
    <summer_mw>401.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.438238</lat>
    <lon>-99.15766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58695</plant_id>
    <plant_name>Grande Prairie Wind Farm</plant_name>
    <state>NE</state>
    <county>Holt</county>
    <operator>BHE Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.608056</lat>
    <lon>-98.42833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62563</plant_id>
    <plant_name>High Prairie Wind Farm</plant_name>
    <state>MO</state>
    <county>Schuyler</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>375.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.398244</lat>
    <lon>-92.51861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65271</plant_id>
    <plant_name>Noble Solar</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <battery_mwh>125</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.261505</lat>
    <lon>-97.23806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65762</plant_id>
    <plant_name>Waco Solar</plant_name>
    <state>TX</state>
    <county>Limestone</county>
    <operator>Waco Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.710422</lat>
    <lon>-96.81868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65957</plant_id>
    <plant_name>Mammoth North Solar</plant_name>
    <state>IN</state>
    <county>Starke</county>
    <operator>Mammoth North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.19933</lat>
    <lon>-86.63379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67680</plant_id>
    <plant_name>Kola Energy Center</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Kola Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <battery_mwh>1800</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.709773</lat>
    <lon>-121.5553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67978</plant_id>
    <plant_name>Sierra Solar Hybrid</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Sierra Pacific Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>400</nameplate_mw>
    <summer_mw>400</summer_mw>
    <battery_mwh>1600</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.8536</lat>
    <lon>-119.0394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55486</plant_id>
    <plant_name>Washington Parish Energy Center</plant_name>
    <state>LA</state>
    <county>Washington</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>399.6</nameplate_mw>
    <summer_mw>369.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.791389</lat>
    <lon>-89.90917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10633</plant_id>
    <plant_name>Hopewell Cogeneration</plant_name>
    <state>VA</state>
    <county>Prince George</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>399</nameplate_mw>
    <summer_mw>378.3</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>37.291667</lat>
    <lon>-77.28111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65744</plant_id>
    <plant_name>Arica Solar</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Arica Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>399</nameplate_mw>
    <summer_mw>399</summer_mw>
    <battery_mwh>544</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.701001</lat>
    <lon>-115.3163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63389</plant_id>
    <plant_name>Jordan Creek Wind Farm, LLC</plant_name>
    <state>IN</state>
    <county>Warren</county>
    <operator>Jordan Creek Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>398.6</nameplate_mw>
    <summer_mw>398.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.381614</lat>
    <lon>-87.39982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55645</plant_id>
    <plant_name>Blue Spruce Energy Center</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>397.8</nameplate_mw>
    <summer_mw>264</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.747875</lat>
    <lon>-104.6814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55938</plant_id>
    <plant_name>NAEA Ocean Peaking Power LLC</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Essential Power Operating Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>397.8</nameplate_mw>
    <summer_mw>332.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>40.0633</lat>
    <lon>-74.1672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50707</plant_id>
    <plant_name>JM Shafer Generating Station</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Tri-State G &amp; T Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>396.9</nameplate_mw>
    <summer_mw>272</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>40.0986</lat>
    <lon>-104.7736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57555</plant_id>
    <plant_name>Pio Pico Energy Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Pio Pico Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>395.4</nameplate_mw>
    <summer_mw>318</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.573889</lat>
    <lon>-116.9178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6253</plant_id>
    <plant_name>Germantown</plant_name>
    <state>WI</state>
    <county>Washington</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>390.7</nameplate_mw>
    <summer_mw>297.6</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2000</latest_year>
    <lat>43.1952</lat>
    <lon>-88.1496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67289</plant_id>
    <plant_name>Cedar Springs Wind IV</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>Cedar Springs Wind IV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>390.4</nameplate_mw>
    <summer_mw>390.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.100801</lat>
    <lon>-105.7115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52087</plant_id>
    <plant_name>Elizabeth River Power Station</plant_name>
    <state>VA</state>
    <county>Chesapeake City</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>388.8</nameplate_mw>
    <summer_mw>325</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>36.775</lat>
    <lon>-76.3083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>389</plant_id>
    <plant_name>El Centro Hybrid</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine; Batteries</technologies>
    <generators>7</generators>
    <nameplate_mw>388.3</nameplate_mw>
    <summer_mw>323.1</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>1952</first_year>
    <latest_year>2016</latest_year>
    <lat>32.802222</lat>
    <lon>-115.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56046</plant_id>
    <plant_name>Magnolia Power Project</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Burbank Water and Power - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>387.6</nameplate_mw>
    <summer_mw>301</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>34.1786</lat>
    <lon>-118.3153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4271</plant_id>
    <plant_name>John P Madgett</plant_name>
    <state>WI</state>
    <county>Buffalo</county>
    <operator>Dairyland Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>387</nameplate_mw>
    <summer_mw>389.8</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>44.303583</lat>
    <lon>-91.91265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7764</plant_id>
    <plant_name>MPC Generating</plant_name>
    <state>GA</state>
    <county>Walton</county>
    <operator>MPC Generating, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>386.1</nameplate_mw>
    <summer_mw>302.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>33.8119</lat>
    <lon>-83.6953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10307</plant_id>
    <plant_name>Bellingham Cogeneration Facility</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Northeast Energy Associates LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>386.1</nameplate_mw>
    <summer_mw>264</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>42.0925</lat>
    <lon>-71.4833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69979</plant_id>
    <plant_name>MPH Elwood</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>MPH Elwood, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>384</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.437032</lat>
    <lon>-88.12234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67503</plant_id>
    <plant_name>Serrano</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Serrano Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>383.8</nameplate_mw>
    <summer_mw>383.8</summer_mw>
    <battery_mwh>855</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.502375</lat>
    <lon>-111.3037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63601</plant_id>
    <plant_name>Isabella Wind Park</plant_name>
    <state>MI</state>
    <county>Isabella</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>383.5</nameplate_mw>
    <summer_mw>383.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.684092</lat>
    <lon>-84.78846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55349</plant_id>
    <plant_name>Pleasants Energy LLC</plant_name>
    <state>WV</state>
    <county>Pleasants</county>
    <operator>Pleasants Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>382.8</nameplate_mw>
    <summer_mw>341.1</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.3325</lat>
    <lon>-81.3642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10692</plant_id>
    <plant_name>ExxonMobil Baytown Turbine</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Exxon Mobil Refining and Supply Co.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>381.8</nameplate_mw>
    <summer_mw>305</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2004</latest_year>
    <lat>29.759124</lat>
    <lon>-95.00965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7159</plant_id>
    <plant_name>Concord</plant_name>
    <state>WI</state>
    <county>Jefferson</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>381.6</nameplate_mw>
    <summer_mw>367.2</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1994</latest_year>
    <lat>43.1669</lat>
    <lon>-88.69</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7203</plant_id>
    <plant_name>South Fond Du Lac</plant_name>
    <state>WI</state>
    <county>Fond Du Lac</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>381.6</nameplate_mw>
    <summer_mw>326.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1996</latest_year>
    <lat>43.7353</lat>
    <lon>-88.49667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7270</plant_id>
    <plant_name>Paris (WI)</plant_name>
    <state>WI</state>
    <county>Kenosha</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>381.6</nameplate_mw>
    <summer_mw>359.8</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>42.6658</lat>
    <lon>-88.0131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56799</plant_id>
    <plant_name>Greenland Energy Center</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>JEA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>380.8</nameplate_mw>
    <summer_mw>357.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>30.159131</lat>
    <lon>-81.51842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50043</plant_id>
    <plant_name>Houston Chemical Complex Battleground</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Oxy Vinyls LP</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>380.7</nameplate_mw>
    <summer_mw>263</summer_mw>
    <first_year>1982</first_year>
    <latest_year>2005</latest_year>
    <lat>29.7314</lat>
    <lon>-95.0839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55202</plant_id>
    <plant_name>Pinckneyville</plant_name>
    <state>IL</state>
    <county>Perry</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>380</nameplate_mw>
    <summer_mw>316</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>38.1114</lat>
    <lon>-89.3467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60387</plant_id>
    <plant_name>Invenergy Nelson Expansion LLC</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>380</nameplate_mw>
    <summer_mw>314</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.774417</lat>
    <lon>-89.60653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69101</plant_id>
    <plant_name>Millers Branch Solar</plant_name>
    <state>TX</state>
    <county>Haskell</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>380</nameplate_mw>
    <summer_mw>380</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.22132</lat>
    <lon>-99.58652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6223</plant_id>
    <plant_name>Empire Energy Center</plant_name>
    <state>MO</state>
    <county>Jasper</county>
    <operator>Empire District Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>379</nameplate_mw>
    <summer_mw>244</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2003</latest_year>
    <lat>37.1385</lat>
    <lon>-94.1041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1240</plant_id>
    <plant_name>Gordon Evans Energy Center</plant_name>
    <state>KS</state>
    <county>Sedgwick</county>
    <operator>Evergy Kansas South, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>378</nameplate_mw>
    <summer_mw>344.4</summer_mw>
    <first_year>1969</first_year>
    <latest_year>2001</latest_year>
    <lat>37.7903</lat>
    <lon>-97.52167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66601</plant_id>
    <plant_name>NRG THW GT Electric Generating Station</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>NRG THW GT LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>377.4</nameplate_mw>
    <summer_mw>408</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.943892</lat>
    <lon>-95.53125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3443</plant_id>
    <plant_name>Victoria</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Victoria WLE, LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>376.9</nameplate_mw>
    <summer_mw>288</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2009</latest_year>
    <lat>28.7883</lat>
    <lon>-97.01</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>607</plant_id>
    <plant_name>Fredonia (WA)</plant_name>
    <state>WA</state>
    <county>Skagit</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>376</nameplate_mw>
    <summer_mw>280</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2001</latest_year>
    <lat>48.4558</lat>
    <lon>-122.4358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57983</plant_id>
    <plant_name>Stephens Ranch Wind Energy LLC</plant_name>
    <state>TX</state>
    <county>Borden</county>
    <operator>Stephens Ranch Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>376</nameplate_mw>
    <summer_mw>376</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2015</latest_year>
    <lat>32.926389</lat>
    <lon>-101.6478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65734</plant_id>
    <plant_name>Oberon Solar Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>IPX Power USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>375</nameplate_mw>
    <summer_mw>375</summer_mw>
    <battery_mwh>500</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.72899</lat>
    <lon>-115.3824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65735</plant_id>
    <plant_name>Oberon II Solar Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>IPX Power USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>375</nameplate_mw>
    <summer_mw>375</summer_mw>
    <battery_mwh>500</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.72899</lat>
    <lon>-115.3824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>766</plant_id>
    <plant_name>Waiau</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Hawaiian Electric Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>374.6</nameplate_mw>
    <summer_mw>361.7</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1973</latest_year>
    <lat>21.388997</lat>
    <lon>-157.9615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3050</plant_id>
    <plant_name>Round Butte</plant_name>
    <state>OR</state>
    <county>Jefferson</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>372.5</nameplate_mw>
    <summer_mw>353</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>44.605837</lat>
    <lon>-121.2773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7960</plant_id>
    <plant_name>Kemper County</plant_name>
    <state>MS</state>
    <county>Kemper</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>372</nameplate_mw>
    <summer_mw>293.2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>32.7976</lat>
    <lon>-88.606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55135</plant_id>
    <plant_name>Alliant Energy Neenah</plant_name>
    <state>WI</state>
    <county>Winnebago</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>371</nameplate_mw>
    <summer_mw>401.1</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>44.1936</lat>
    <lon>-88.5064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>666</plant_id>
    <plant_name>J D Kennedy</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>JEA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>370</nameplate_mw>
    <summer_mw>357.2</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2009</latest_year>
    <lat>30.364818</lat>
    <lon>-81.62597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1012</plant_id>
    <plant_name>F B Culley</plant_name>
    <state>IN</state>
    <county>Warrick</county>
    <operator>Southern Indiana Gas &amp; Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>368.9</nameplate_mw>
    <summer_mw>360</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1973</latest_year>
    <lat>37.9111</lat>
    <lon>-87.3275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7212</plant_id>
    <plant_name>Darbytown</plant_name>
    <state>VA</state>
    <county>Henrico</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>368.4</nameplate_mw>
    <summer_mw>340</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>37.498223</lat>
    <lon>-77.36854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66335</plant_id>
    <plant_name>Timmerman Power Plant</plant_name>
    <state>TX</state>
    <county>Caldwell</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>20</generators>
    <nameplate_mw>368</nameplate_mw>
    <summer_mw>366</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>29.875</lat>
    <lon>-97.807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64149</plant_id>
    <plant_name>Western Trail Wind, LLC</plant_name>
    <state>TX</state>
    <county>Wilbarger</county>
    <operator>Orsted Onshore North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>366.6</nameplate_mw>
    <summer_mw>366.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.85245</lat>
    <lon>-99.06509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65577</plant_id>
    <plant_name>Clearwater Wind I</plant_name>
    <state>MT</state>
    <county>Rosebud</county>
    <operator>Clearwater Energy Resources LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>365.5</nameplate_mw>
    <summer_mw>365.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>46.81771</lat>
    <lon>-106.3789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3096</plant_id>
    <plant_name>Brunot Island</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>Brunot Island Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>365.4</nameplate_mw>
    <summer_mw>261.6</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1974</latest_year>
    <lat>40.464851</lat>
    <lon>-80.04376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6064</plant_id>
    <plant_name>Nearman Creek</plant_name>
    <state>KS</state>
    <county>Wyandotte</county>
    <operator>City of Kansas City - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>365</nameplate_mw>
    <summer_mw>315</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2006</latest_year>
    <lat>39.1681</lat>
    <lon>-94.6975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64481</plant_id>
    <plant_name>Arlington Energy Center II</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Arlington Energy Center II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>365</nameplate_mw>
    <summer_mw>365</summer_mw>
    <battery_mwh>528</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2023</latest_year>
    <lat>33.69088</lat>
    <lon>-114.7749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57943</plant_id>
    <plant_name>Lonesome Creek Station</plant_name>
    <state>ND</state>
    <county>McKenzie</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>363</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2021</latest_year>
    <lat>47.796667</lat>
    <lon>-103.5786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6101</plant_id>
    <plant_name>Wyodak</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>362.1</nameplate_mw>
    <summer_mw>332</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>44.290128</lat>
    <lon>-105.3815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8027</plant_id>
    <plant_name>Blue Lake</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>362</nameplate_mw>
    <summer_mw>328.2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2025</latest_year>
    <lat>44.7855</lat>
    <lon>-93.4315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3323</plant_id>
    <plant_name>J Strom Thurmond</plant_name>
    <state>SC</state>
    <county>McCormick</county>
    <operator>USCE-Savannah District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>361.9</nameplate_mw>
    <summer_mw>336</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1954</latest_year>
    <lat>33.6602</lat>
    <lon>-82.1961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57349</plant_id>
    <plant_name>Garrison Energy Center LLC</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Garrison Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>361</nameplate_mw>
    <summer_mw>309</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.187195</lat>
    <lon>-75.4994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54538</plant_id>
    <plant_name>Hartwell Energy Facility</plant_name>
    <state>GA</state>
    <county>Hart</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>297.5</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>34.339588</lat>
    <lon>-82.81987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66157</plant_id>
    <plant_name>Red Tailed Hawk Solar LLC</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Acciona Energy USA Global, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>360</nameplate_mw>
    <summer_mw>360</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.159228</lat>
    <lon>-96.14157</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10761</plant_id>
    <plant_name>Las Vegas Generating Station</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>8</generators>
    <nameplate_mw>358.9</nameplate_mw>
    <summer_mw>282</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2003</latest_year>
    <lat>36.2319</lat>
    <lon>-115.1222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55165</plant_id>
    <plant_name>Calcasieu</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>358.8</nameplate_mw>
    <summer_mw>301.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>30.1608</lat>
    <lon>-93.345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58471</plant_id>
    <plant_name>Ector County Energy Center</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Ector County Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>358.8</nameplate_mw>
    <summer_mw>320</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>32.069167</lat>
    <lon>-102.5856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50489</plant_id>
    <plant_name>PPG Powerhouse C</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Westlake 2 US LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>357.7</nameplate_mw>
    <summer_mw>303.2</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1986</latest_year>
    <lat>30.22612</lat>
    <lon>-93.29517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55718</plant_id>
    <plant_name>Dean</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>357.6</nameplate_mw>
    <summer_mw>312</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.77412</lat>
    <lon>-82.48203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55253</plant_id>
    <plant_name>Crete Energy Venture LLC</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Crete Energy Venture LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>356</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.429444</lat>
    <lon>-87.6187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3138</plant_id>
    <plant_name>New Castle Plant</plant_name>
    <state>PA</state>
    <county>Lawrence</county>
    <operator>New Castle Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>354.4</nameplate_mw>
    <summer_mw>331.3</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1968</latest_year>
    <lat>40.937939</lat>
    <lon>-80.36901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55250</plant_id>
    <plant_name>University Park South</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>University Park Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>353.4</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.440893</lat>
    <lon>-87.75319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55284</plant_id>
    <plant_name>Big Sandy Peaker Plant</plant_name>
    <state>WV</state>
    <county>Wayne</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>353.4</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.3441</lat>
    <lon>-82.5938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61402</plant_id>
    <plant_name>Foard City Wind</plant_name>
    <state>TX</state>
    <county>Foard</county>
    <operator>Foard City Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>352.8</nameplate_mw>
    <summer_mw>350.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.915315</lat>
    <lon>-99.74028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2499</plant_id>
    <plant_name>Narrows Gas Turbines Generating</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Astoria Generating Company, L.P.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>16</generators>
    <nameplate_mw>352</nameplate_mw>
    <summer_mw>309.1</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>40.648611</lat>
    <lon>-74.02083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66270</plant_id>
    <plant_name>Proxima</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Proxima Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>352</nameplate_mw>
    <summer_mw>352</summer_mw>
    <battery_mwh>648</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.40035</lat>
    <lon>-121.1628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62837</plant_id>
    <plant_name>Frontier Windpower II</plant_name>
    <state>OK</state>
    <county>Kay</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>351.8</nameplate_mw>
    <summer_mw>351.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.82478</lat>
    <lon>-97.02978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3476</plant_id>
    <plant_name>Knox Lee</plant_name>
    <state>TX</state>
    <county>Gregg</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>351</nameplate_mw>
    <summer_mw>342</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>32.3766</lat>
    <lon>-94.6415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56151</plant_id>
    <plant_name>South Harper</plant_name>
    <state>MO</state>
    <county>Cass</county>
    <operator>Evergy Missouri West</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>351</nameplate_mw>
    <summer_mw>321.2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>38.6803</lat>
    <lon>-94.4824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2722</plant_id>
    <plant_name>Cowans Ford</plant_name>
    <state>NC</state>
    <county>Lincoln</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>324</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1967</latest_year>
    <lat>35.4346</lat>
    <lon>-80.9588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10671</plant_id>
    <plant_name>River Valley</plant_name>
    <state>OK</state>
    <county>Le Flore</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>321</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>35.1931</lat>
    <lon>-94.6458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55517</plant_id>
    <plant_name>Wallingford Energy</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Wallingford Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>318</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2018</latest_year>
    <lat>41.448694</lat>
    <lon>-72.83536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63114</plant_id>
    <plant_name>Mohave County Wind Farm</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Mohave County Wind Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.791142</lat>
    <lon>-114.5045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63981</plant_id>
    <plant_name>Red Cloud Wind LLC</plant_name>
    <state>NM</state>
    <county>Lincoln</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.274062</lat>
    <lon>-105.4229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65140</plant_id>
    <plant_name>Crimson</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>RE Crimson LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <battery_mwh>1400</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.57345</lat>
    <lon>-114.8145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66951</plant_id>
    <plant_name>Scarlet II Hybrid</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>EDPR Scarlet II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.60369</lat>
    <lon>-120.3757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68758</plant_id>
    <plant_name>Easley Solar</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>IPX Power USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>350</nameplate_mw>
    <summer_mw>350</summer_mw>
    <battery_mwh>1400</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.722655</lat>
    <lon>-115.326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7030</plant_id>
    <plant_name>Major Oak Power</plant_name>
    <state>TX</state>
    <county>Robertson</county>
    <operator>Major Oak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>349.2</nameplate_mw>
    <summer_mw>305</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1991</latest_year>
    <lat>31.091925</lat>
    <lon>-96.69503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56328</plant_id>
    <plant_name>Harry D Mattison Gas Plant</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>349</nameplate_mw>
    <summer_mw>294</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>36.1855</lat>
    <lon>-94.2841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61144</plant_id>
    <plant_name>Astoria Station</plant_name>
    <state>SD</state>
    <county>Deuel</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>349</nameplate_mw>
    <summer_mw>241.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.574965</lat>
    <lon>-96.55942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56234</plant_id>
    <plant_name>Caithness Long Island Energy Center</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Caithness Long Island, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>348.9</nameplate_mw>
    <summer_mw>317.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.8142</lat>
    <lon>-72.9403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>108</plant_id>
    <plant_name>Holcomb</plant_name>
    <state>KS</state>
    <county>Finney</county>
    <operator>Sunflower Electric Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>348.7</nameplate_mw>
    <summer_mw>358.9</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>37.9308</lat>
    <lon>-100.9725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2444</plant_id>
    <plant_name>Rio Grande</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>348.3</nameplate_mw>
    <summer_mw>265</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2013</latest_year>
    <lat>31.8047</lat>
    <lon>-106.5472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2965</plant_id>
    <plant_name>Tulsa</plant_name>
    <state>OK</state>
    <county>Tulsa</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>348.2</nameplate_mw>
    <summer_mw>330.3</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1967</latest_year>
    <lat>36.116492</lat>
    <lon>-95.99097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63776</plant_id>
    <plant_name>Thunder Wolf Energy Center Hybrid</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Thunder Wolf Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>348</nameplate_mw>
    <summer_mw>348</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.1899</lat>
    <lon>-104.398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69044</plant_id>
    <plant_name>Platinum Storage</plant_name>
    <state>TX</state>
    <county>Fannin</county>
    <operator>Platinum Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>348</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>298.3</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.610937</lat>
    <lon>-96.37181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57373</plant_id>
    <plant_name>Agua Caliente Solar Project</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Agua Caliente Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>347.7</nameplate_mw>
    <summer_mw>347.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2014</latest_year>
    <lat>32.9774</lat>
    <lon>-113.4945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6559</plant_id>
    <plant_name>George M Sullivan Generation Plant 2</plant_name>
    <state>AK</state>
    <county>Anchorage</county>
    <operator>Chugach Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>346.9</nameplate_mw>
    <summer_mw>309.3</summer_mw>
    <first_year>1979</first_year>
    <latest_year>2017</latest_year>
    <lat>61.229713</lat>
    <lon>-149.7167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56166</plant_id>
    <plant_name>Sheboygan Falls</plant_name>
    <state>WI</state>
    <county>Sheboygan</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>346.8</nameplate_mw>
    <summer_mw>396.1</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>43.751826</lat>
    <lon>-87.87806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56241</plant_id>
    <plant_name>Cannon Falls Energy Center</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>346.8</nameplate_mw>
    <summer_mw>316</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>44.536688</lat>
    <lon>-92.91553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55651</plant_id>
    <plant_name>Spring Creek Energy Center</plant_name>
    <state>OK</state>
    <county>Logan</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>346</nameplate_mw>
    <summer_mw>293.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>35.7422</lat>
    <lon>-97.655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1248</plant_id>
    <plant_name>Hutchinson Energy Center</plant_name>
    <state>KS</state>
    <county>Reno</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>345.3</nameplate_mw>
    <summer_mw>239.3</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1983</latest_year>
    <lat>38.0906</lat>
    <lon>-97.87472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55972</plant_id>
    <plant_name>Cass County</plant_name>
    <state>NE</state>
    <county>Cass</county>
    <operator>Omaha Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>345</nameplate_mw>
    <summer_mw>323.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>40.947913</lat>
    <lon>-95.96403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1384</plant_id>
    <plant_name>Cooper</plant_name>
    <state>KY</state>
    <county>Pulaski</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>344</nameplate_mw>
    <summer_mw>341</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1969</latest_year>
    <lat>36.9981</lat>
    <lon>-84.5919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56249</plant_id>
    <plant_name>Anson County Generation Facility</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>343.8</nameplate_mw>
    <summer_mw>339</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>34.968651</lat>
    <lon>-79.92174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56292</plant_id>
    <plant_name>Hamlet Generating Facility</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>343.8</nameplate_mw>
    <summer_mw>339</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2013</latest_year>
    <lat>34.842311</lat>
    <lon>-79.73609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>683</plant_id>
    <plant_name>Indian River Plant</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Orlando Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>342.8</nameplate_mw>
    <summer_mw>275.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1992</latest_year>
    <lat>28.493232</lat>
    <lon>-80.78012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57195</plant_id>
    <plant_name>Lower Snake River Wind Energy Project</plant_name>
    <state>WA</state>
    <county>Garfield</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>342.7</nameplate_mw>
    <summer_mw>342.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>46.524167</lat>
    <lon>-117.8217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>198</plant_id>
    <plant_name>Bull Shoals</plant_name>
    <state>AR</state>
    <county>Marion</county>
    <operator>USCE-Little Rock District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>340</nameplate_mw>
    <summer_mw>370</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1963</latest_year>
    <lat>36.3635</lat>
    <lon>-92.5763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7759</plant_id>
    <plant_name>Georgetown</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>AES Indiana</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>340</nameplate_mw>
    <summer_mw>316.4</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>39.902556</lat>
    <lon>-86.24405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7972</plant_id>
    <plant_name>Sumpter</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>Wolverine Power Supply Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>340</nameplate_mw>
    <summer_mw>299.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.167</lat>
    <lon>-83.5318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61079</plant_id>
    <plant_name>Beaver Creek Wind</plant_name>
    <state>IA</state>
    <county>Boone</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>340</nameplate_mw>
    <summer_mw>340</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2018</latest_year>
    <lat>42.106964</lat>
    <lon>-94.16464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62133</plant_id>
    <plant_name>North English</plant_name>
    <state>IA</state>
    <county>Poweshiek</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>340</nameplate_mw>
    <summer_mw>340</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>41.642776</lat>
    <lon>-92.49906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62809</plant_id>
    <plant_name>BMP Wind (TX)</plant_name>
    <state>TX</state>
    <county>Callahan</county>
    <operator>BMP Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>340</nameplate_mw>
    <summer_mw>340</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.28938</lat>
    <lon>-99.2916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63053</plant_id>
    <plant_name>Palo Alto Wind Farm</plant_name>
    <state>IA</state>
    <county>Palo Alto</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>340</nameplate_mw>
    <summer_mw>340</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.206691</lat>
    <lon>-94.54809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63859</plant_id>
    <plant_name>Golden Field Solar III, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Golden Fields Solar III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>339</nameplate_mw>
    <summer_mw>339</summer_mw>
    <battery_mwh>147</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2024</latest_year>
    <lat>34.847</lat>
    <lon>-118.395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2292</plant_id>
    <plant_name>Sarpy County</plant_name>
    <state>NE</state>
    <county>Sarpy</county>
    <operator>Omaha Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>338.4</nameplate_mw>
    <summer_mw>315.9</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2000</latest_year>
    <lat>41.170594</lat>
    <lon>-95.9706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62620</plant_id>
    <plant_name>Sage Draw Wind</plant_name>
    <state>TX</state>
    <county>Lynn</county>
    <operator>Sage Draw Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>338.4</nameplate_mw>
    <summer_mw>338.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.303497</lat>
    <lon>-101.6572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55933</plant_id>
    <plant_name>Tracy Combined Cycle Power Plant</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>MRP San Joaquin Energy LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>336.1</nameplate_mw>
    <summer_mw>320.1</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2012</latest_year>
    <lat>37.7107</lat>
    <lon>-121.4906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64639</plant_id>
    <plant_name>TG East</plant_name>
    <state>TX</state>
    <county>Knox</county>
    <operator>TG East Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>336</nameplate_mw>
    <summer_mw>336</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.746323</lat>
    <lon>-99.66552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65053</plant_id>
    <plant_name>Blythe Mesa Solar II</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>IPX Power USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>335.6</nameplate_mw>
    <summer_mw>335.6</summer_mw>
    <battery_mwh>448</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.640813</lat>
    <lon>-114.6803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10865</plant_id>
    <plant_name>Archer Daniels Midland Decatur</plant_name>
    <state>IL</state>
    <county>Macon</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>7</generators>
    <nameplate_mw>335</nameplate_mw>
    <summer_mw>335</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2005</latest_year>
    <lat>39.870074</lat>
    <lon>-88.89076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56164</plant_id>
    <plant_name>Faribault Energy Park</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Minnesota Municipal Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>334.5</nameplate_mw>
    <summer_mw>261</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2007</latest_year>
    <lat>44.3356</lat>
    <lon>-93.29056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67123</plant_id>
    <plant_name>Fagus Solar Park</plant_name>
    <state>TX</state>
    <county>Childress</county>
    <operator>Excel Advantage Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>331.6</nameplate_mw>
    <summer_mw>331.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.350994</lat>
    <lon>-100.0493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65403</plant_id>
    <plant_name>Boswell Wind</plant_name>
    <state>WY</state>
    <county>Albany</county>
    <operator>Boswell Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>329.8</nameplate_mw>
    <summer_mw>329.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.919</lat>
    <lon>-105.869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67762</plant_id>
    <plant_name>Stampede Solar Hybrid</plant_name>
    <state>TX</state>
    <county>Hopkins</county>
    <operator>Stampede Solar Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>328.1</nameplate_mw>
    <summer_mw>328.1</summer_mw>
    <battery_mwh>115</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>33.201315</lat>
    <lon>-95.31923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1572</plant_id>
    <plant_name>Dickerson Power</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Dickerson Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>326</nameplate_mw>
    <summer_mw>299</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>39.2097</lat>
    <lon>-77.4644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64054</plant_id>
    <plant_name>Clines Corners Wind Farm LLC</plant_name>
    <state>NM</state>
    <county>Torrance</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>325</nameplate_mw>
    <summer_mw>325</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.35655</lat>
    <lon>-105.4368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64660</plant_id>
    <plant_name>AEUG Union Solar, LLC</plant_name>
    <state>OH</state>
    <county>Union</county>
    <operator>Acciona Energy USA Global, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>325</nameplate_mw>
    <summer_mw>325</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.437526</lat>
    <lon>-83.48349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65987</plant_id>
    <plant_name>Desert Peak Energy Storage I</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Desert Peak Energy Storage I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>325</nameplate_mw>
    <summer_mw>325</summer_mw>
    <battery_mwh>1300</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.9311</lat>
    <lon>-116.5719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60</plant_id>
    <plant_name>Whelan Energy Center</plant_name>
    <state>NE</state>
    <county>Adams</county>
    <operator>City of Hastings - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>324.3</nameplate_mw>
    <summer_mw>296</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2011</latest_year>
    <lat>40.580872</lat>
    <lon>-98.31244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52193</plant_id>
    <plant_name>Delaware City Plant</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Delaware City Refining Company LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Other Gases</technologies>
    <generators>6</generators>
    <nameplate_mw>324</nameplate_mw>
    <summer_mw>265</summer_mw>
    <first_year>1956</first_year>
    <latest_year>2000</latest_year>
    <lat>39.5871</lat>
    <lon>-75.6343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56610</plant_id>
    <plant_name>Deer Creek Station</plant_name>
    <state>SD</state>
    <county>Brookings</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>324</nameplate_mw>
    <summer_mw>295</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.39624</lat>
    <lon>-96.53332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66540</plant_id>
    <plant_name>Shamrock Wind</plant_name>
    <state>TX</state>
    <county>Crockett</county>
    <operator>Shamrock Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>323.9</nameplate_mw>
    <summer_mw>323.9</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2025</latest_year>
    <lat>30.936</lat>
    <lon>-101.607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50152</plant_id>
    <plant_name>Dow St Charles Operations</plant_name>
    <state>LA</state>
    <county>St Charles</county>
    <operator>Dow Chemical Co - St Charles</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>323.6</nameplate_mw>
    <summer_mw>270</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2002</latest_year>
    <lat>29.9861</lat>
    <lon>-90.4414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55040</plant_id>
    <plant_name>Mid-Georgia Cogeneration Facility</plant_name>
    <state>GA</state>
    <county>Houston</county>
    <operator>SEPG MGA, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>323</nameplate_mw>
    <summer_mw>303</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1998</latest_year>
    <lat>32.4856</lat>
    <lon>-83.6039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54914</plant_id>
    <plant_name>Brooklyn Navy Yard Cogeneration</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Brooklyn Navy Yard Cogen PLP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>322</nameplate_mw>
    <summer_mw>260</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>40.699357</lat>
    <lon>-73.97639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7848</plant_id>
    <plant_name>Holden</plant_name>
    <state>MO</state>
    <county>Johnson</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>321.3</nameplate_mw>
    <summer_mw>261</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.7538</lat>
    <lon>-93.9983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6087</plant_id>
    <plant_name>Wallace Dam</plant_name>
    <state>GA</state>
    <county>Hancock</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>321.2</nameplate_mw>
    <summer_mw>328</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1980</latest_year>
    <lat>33.3502</lat>
    <lon>-83.1574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56290</plant_id>
    <plant_name>Maple Ridge Wind Farm</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Flat Rock Windpower, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>321.2</nameplate_mw>
    <summer_mw>322.1</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2006</latest_year>
    <lat>43.7853</lat>
    <lon>-75.5753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3373</plant_id>
    <plant_name>Fort Randall</plant_name>
    <state>SD</state>
    <county>Charles Mix</county>
    <operator>USACE-Omaha</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>320</nameplate_mw>
    <summer_mw>360</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1956</latest_year>
    <lat>43.0653</lat>
    <lon>-98.5539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55700</plant_id>
    <plant_name>Mint Farm Generating Station</plant_name>
    <state>WA</state>
    <county>Cowlitz</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>319</nameplate_mw>
    <summer_mw>270</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>46.138824</lat>
    <lon>-122.9855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57028</plant_id>
    <plant_name>Langley Gulch Power Plant</plant_name>
    <state>ID</state>
    <county>Payette</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>318.5</nameplate_mw>
    <summer_mw>303.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.904444</lat>
    <lon>-116.8197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10298</plant_id>
    <plant_name>Bayou Cogen Plant</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Air Liquide Large Industries U S LP</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>318.4</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2016</latest_year>
    <lat>29.6225</lat>
    <lon>-95.0458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55818</plant_id>
    <plant_name>Frederickson Power LP</plant_name>
    <state>WA</state>
    <county>Pierce</county>
    <operator>Frederickson Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>318.3</nameplate_mw>
    <summer_mw>246</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>47.086111</lat>
    <lon>-122.3657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59292</plant_id>
    <plant_name>Rattlesnake Creek Wind Project</plant_name>
    <state>NE</state>
    <county>Dixon</county>
    <operator>Rattlesnake Creek Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>318.1</nameplate_mw>
    <summer_mw>318.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.375</lat>
    <lon>-96.829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58388</plant_id>
    <plant_name>Solar Star 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Solar Star California XIX, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>7</generators>
    <nameplate_mw>318</nameplate_mw>
    <summer_mw>309.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2015</latest_year>
    <lat>34.8181</lat>
    <lon>-118.4036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6258</plant_id>
    <plant_name>Wilson</plant_name>
    <state>GA</state>
    <county>Burke</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>317.6</nameplate_mw>
    <summer_mw>297.5</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1973</latest_year>
    <lat>33.137711</lat>
    <lon>-81.74829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7721</plant_id>
    <plant_name>Theodore Cogen Facility</plant_name>
    <state>AL</state>
    <county>Mobile</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>317.4</nameplate_mw>
    <summer_mw>231</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>30.525445</lat>
    <lon>-88.12848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63905</plant_id>
    <plant_name>Azure Sky Solar</plant_name>
    <state>TX</state>
    <county>Haskell</county>
    <operator>Azure Sky Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>316.2</nameplate_mw>
    <summer_mw>316.2</summer_mw>
    <battery_mwh>80.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>33.021601</lat>
    <lon>-99.61463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3250</plant_id>
    <plant_name>Darlington County</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>316</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>34.4185</lat>
    <lon>-80.1657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55238</plant_id>
    <plant_name>NRG Rockford I</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Rockford Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>316</nameplate_mw>
    <summer_mw>362.2</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>42.238558</lat>
    <lon>-89.1012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7754</plant_id>
    <plant_name>Nodaway</plant_name>
    <state>MO</state>
    <county>Nodaway</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>315.6</nameplate_mw>
    <summer_mw>171</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>40.2877</lat>
    <lon>-94.7913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>454</plant_id>
    <plant_name>Colgate</plant_name>
    <state>CA</state>
    <county>Yuba</county>
    <operator>Yuba County Water Agency - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>315</nameplate_mw>
    <summer_mw>352.4</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>39.330833</lat>
    <lon>-121.1917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57993</plant_id>
    <plant_name>Desert Sunlight 300, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>NextEra Energy Desert Sunlight 300, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>11</generators>
    <nameplate_mw>313.7</nameplate_mw>
    <summer_mw>313.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2014</latest_year>
    <lat>33.823056</lat>
    <lon>-115.3939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64851</plant_id>
    <plant_name>Daggett 2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Daggett Solar Power 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>313</nameplate_mw>
    <summer_mw>313</summer_mw>
    <battery_mwh>4.6</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.860918</lat>
    <lon>-116.8553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55296</plant_id>
    <plant_name>Calumet Energy Team LLC</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>IPA Operations Inc - Calumet</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>312.8</nameplate_mw>
    <summer_mw>326.1</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.6835</lat>
    <lon>-87.5563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>96</plant_id>
    <plant_name>Beluga</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Chugach Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>312.4</nameplate_mw>
    <summer_mw>300.4</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1978</latest_year>
    <lat>61.1861</lat>
    <lon>-151.0356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56708</plant_id>
    <plant_name>CFB Power Plant</plant_name>
    <state>TX</state>
    <county>Calhoun</county>
    <operator>Formosa Plastics Corp</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>310</nameplate_mw>
    <summer_mw>286.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>28.650278</lat>
    <lon>-96.53972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62132</plant_id>
    <plant_name>Arbor Hill Wind Farm</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>310</nameplate_mw>
    <summer_mw>310</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2020</latest_year>
    <lat>41.404231</lat>
    <lon>-94.26136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63884</plant_id>
    <plant_name>Delilah Solar Energy II LLC</plant_name>
    <state>TX</state>
    <county>Red River</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>310</nameplate_mw>
    <summer_mw>310</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.481551</lat>
    <lon>-95.26925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65967</plant_id>
    <plant_name>Paris Solar</plant_name>
    <state>WI</state>
    <county>Racine</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>310</nameplate_mw>
    <summer_mw>310</summer_mw>
    <battery_mwh>440</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>42.662069</lat>
    <lon>-88.01553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66903</plant_id>
    <plant_name>BT Hickerson Solar, LLC</plant_name>
    <state>TX</state>
    <county>Bosque</county>
    <operator>BT Hickerson Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>310</nameplate_mw>
    <summer_mw>310</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.819958</lat>
    <lon>-97.51749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58933</plant_id>
    <plant_name>Shell Chemical Appalachia LLC</plant_name>
    <state>PA</state>
    <county>Beaver</county>
    <operator>Shell Chemical Appalachia LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>309.8</nameplate_mw>
    <summer_mw>256.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.671667</lat>
    <lon>-80.33639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60271</plant_id>
    <plant_name>Canyon Wind Project, LLC</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Canyon Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>308.8</nameplate_mw>
    <summer_mw>308.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.631073</lat>
    <lon>-101.0085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66801</plant_id>
    <plant_name>Fence Post Solar Hybrid Project, LLC</plant_name>
    <state>TX</state>
    <county>Navarro</county>
    <operator>Fence Post Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>308</nameplate_mw>
    <summer_mw>306</summer_mw>
    <battery_mwh>115</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.072844</lat>
    <lon>-96.22393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67722</plant_id>
    <plant_name>WPWP</plant_name>
    <state>KS</state>
    <county>Sumner</county>
    <operator>Wild Plains Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>307.2</nameplate_mw>
    <summer_mw>307.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.283916</lat>
    <lon>-97.21513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61343</plant_id>
    <plant_name>Karankawa Wind LLC</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>307.1</nameplate_mw>
    <summer_mw>307.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>28.170179</lat>
    <lon>-97.81751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54324</plant_id>
    <plant_name>Ocean State Power II</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Ocean State Power II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>306.6</nameplate_mw>
    <summer_mw>267.6</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>42.0099</lat>
    <lon>-71.6701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55395</plant_id>
    <plant_name>Crossroads Energy Center</plant_name>
    <state>MS</state>
    <county>Coahoma</county>
    <operator>Clarksdale Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>306.4</nameplate_mw>
    <summer_mw>308</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>34.183</lat>
    <lon>-90.5621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61044</plant_id>
    <plant_name>La Joya NM</plant_name>
    <state>NM</state>
    <county>Torrance</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>306.2</nameplate_mw>
    <summer_mw>306.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.81</lat>
    <lon>-105.74</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55748</plant_id>
    <plant_name>Los Esteros Critical Energy Center</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Los Esteros Critical Energy Facility LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>306.1</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2013</latest_year>
    <lat>37.425</lat>
    <lon>-121.9319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55051</plant_id>
    <plant_name>Westlake Plaquemine</plant_name>
    <state>LA</state>
    <county>Iberville</county>
    <operator>Westlake Chemicals &amp; Vinyls LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>306</nameplate_mw>
    <summer_mw>225</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>30.2586</lat>
    <lon>-91.185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67006</plant_id>
    <plant_name>Greasewood II LLC</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Greasewood II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>306</nameplate_mw>
    <summer_mw>306</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.10409</lat>
    <lon>-102.6063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63328</plant_id>
    <plant_name>Juno Solar Project</plant_name>
    <state>TX</state>
    <county>Borden</county>
    <operator>SE Juno, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>305.6</nameplate_mw>
    <summer_mw>305.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.772889</lat>
    <lon>-101.391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3008</plant_id>
    <plant_name>Mooreland</plant_name>
    <state>OK</state>
    <county>Woodward</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>305</nameplate_mw>
    <summer_mw>322</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1975</latest_year>
    <lat>36.43725</lat>
    <lon>-99.22543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1016</plant_id>
    <plant_name>Butler-Warner Generation Plant</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Fayetteville Public Works Commission</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Solar Photovoltaic; Batteries</technologies>
    <generators>11</generators>
    <nameplate_mw>304.9</nameplate_mw>
    <summer_mw>226.5</summer_mw>
    <battery_mwh>0.5</battery_mwh>
    <first_year>1976</first_year>
    <latest_year>2019</latest_year>
    <lat>35.0986</lat>
    <lon>-78.8294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66872</plant_id>
    <plant_name>Estonian Solar Project, LLC</plant_name>
    <state>TX</state>
    <county>Delta</county>
    <operator>Enel Green Power Estonian Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>304.5</nameplate_mw>
    <summer_mw>304.5</summer_mw>
    <battery_mwh>158.3</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.457143</lat>
    <lon>-95.6679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69010</plant_id>
    <plant_name>Hubbard Wind II</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Hubbard Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>304.5</nameplate_mw>
    <summer_mw>304.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.972743</lat>
    <lon>-96.91386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67737</plant_id>
    <plant_name>SMT Ironman Battery Storage Plant</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>SMT Ironman BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>304</nameplate_mw>
    <summer_mw>304</summer_mw>
    <battery_mwh>440.8</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.45566</lat>
    <lon>-95.31001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68318</plant_id>
    <plant_name>Dakota Range Wind</plant_name>
    <state>SD</state>
    <county>Grant</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>304</nameplate_mw>
    <summer_mw>304</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.223652</lat>
    <lon>-97.02314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63327</plant_id>
    <plant_name>Diamond Spring, LLC</plant_name>
    <state>OK</state>
    <county>Johnston</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>303.5</nameplate_mw>
    <summer_mw>303.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.487369</lat>
    <lon>-96.78046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64047</plant_id>
    <plant_name>Caddo Wind</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>303.2</nameplate_mw>
    <summer_mw>303.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.985072</lat>
    <lon>-98.38382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55482</plant_id>
    <plant_name>Goldendale Generating Station</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>302.8</nameplate_mw>
    <summer_mw>263.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>45.8114</lat>
    <lon>-120.833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62038</plant_id>
    <plant_name>Santa Rita East</plant_name>
    <state>TX</state>
    <county>Irion</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>302.4</nameplate_mw>
    <summer_mw>302.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.207988</lat>
    <lon>-101.1108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64165</plant_id>
    <plant_name>Priddy Wind Project</plant_name>
    <state>TX</state>
    <county>Mills</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>302.4</nameplate_mw>
    <summer_mw>302.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.5481</lat>
    <lon>-98.49491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64230</plant_id>
    <plant_name>Indiana Crossroads Wind Farm LLC</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Indiana Crossroads Wind Farms LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>302.4</nameplate_mw>
    <summer_mw>302.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.6631</lat>
    <lon>-86.8695</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57449</plant_id>
    <plant_name>Blue Creek Wind Project</plant_name>
    <state>OH</state>
    <county>Van Wert</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>302</nameplate_mw>
    <summer_mw>302</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.931515</lat>
    <lon>-84.56182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58925</plant_id>
    <plant_name>Lincoln Land Wind</plant_name>
    <state>IL</state>
    <county>Sangamon</county>
    <operator>Lincoln Land Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>302</nameplate_mw>
    <summer_mw>302</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.821944</lat>
    <lon>-89.95583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65971</plant_id>
    <plant_name>Seven Cowboy Wind Project, LLC</plant_name>
    <state>OK</state>
    <county>Washita</county>
    <operator>Seven Cowboy Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>301.7</nameplate_mw>
    <summer_mw>301.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.218328</lat>
    <lon>-99.10399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55179</plant_id>
    <plant_name>Rathdrum Power LLC</plant_name>
    <state>ID</state>
    <county>Kootenai</county>
    <operator>Rathdrum Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>301.5</nameplate_mw>
    <summer_mw>210</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>47.7858</lat>
    <lon>-116.9203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65162</plant_id>
    <plant_name>Lacy Creek Wind Energy Center</plant_name>
    <state>TX</state>
    <county>Sterling</county>
    <operator>Lacy Creek Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>301.3</nameplate_mw>
    <summer_mw>301.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.729906</lat>
    <lon>-101.2989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60342</plant_id>
    <plant_name>Ida Grove Wind</plant_name>
    <state>IA</state>
    <county>Ida</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>301.1</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.355721</lat>
    <lon>-95.42038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62481</plant_id>
    <plant_name>Neosho Ridge Wind Energy Center</plant_name>
    <state>KS</state>
    <county>Neosho</county>
    <operator>Empire District Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>301</nameplate_mw>
    <summer_mw>294.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.485357</lat>
    <lon>-95.37673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65546</plant_id>
    <plant_name>Inertia Wind Project</plant_name>
    <state>TX</state>
    <county>Haskell</county>
    <operator>Inertia Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>301</nameplate_mw>
    <summer_mw>301</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.186882</lat>
    <lon>-99.59533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65760</plant_id>
    <plant_name>El Sauz Ranch Wind, LLC</plant_name>
    <state>TX</state>
    <county>Willacy</county>
    <operator>El Sauz Ranch Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>301</nameplate_mw>
    <summer_mw>301</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.500883</lat>
    <lon>-97.59906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56078</plant_id>
    <plant_name>Walnut Energy Center</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>300.6</nameplate_mw>
    <summer_mw>269</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>37.4878</lat>
    <lon>-120.8956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64138</plant_id>
    <plant_name>Irish Creek Wind</plant_name>
    <state>KS</state>
    <county>Marshall</county>
    <operator>Irish Creek Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300.6</nameplate_mw>
    <summer_mw>300.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.699456</lat>
    <lon>-96.42514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7526</plant_id>
    <plant_name>Solano Wind</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>300.5</nameplate_mw>
    <summer_mw>298.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2024</latest_year>
    <lat>38.116415</lat>
    <lon>-121.769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56371</plant_id>
    <plant_name>Cedar Creek Wind</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>300.5</nameplate_mw>
    <summer_mw>300.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.8944</lat>
    <lon>-104.0206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54844</plant_id>
    <plant_name>Gordonsville Energy LP</plant_name>
    <state>VA</state>
    <county>Louisa</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>300.4</nameplate_mw>
    <summer_mw>218</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>38.124688</lat>
    <lon>-78.20354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>467</plant_id>
    <plant_name>Cabin Creek</plant_name>
    <state>CO</state>
    <county>Clear Creek</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>340</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>39.6551</lat>
    <lon>-105.7088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3918</plant_id>
    <plant_name>Mossyrock</plant_name>
    <state>WA</state>
    <county>Lewis</county>
    <operator>City of Tacoma - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>343</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>46.5347</lat>
    <lon>-122.4247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6158</plant_id>
    <plant_name>New Melones</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>382</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>37.946927</lat>
    <lon>-120.5282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10496</plant_id>
    <plant_name>Kern River Cogeneration</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Kern River Cogeneration Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>288</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>35.4515</lat>
    <lon>-118.9849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50134</plant_id>
    <plant_name>Sycamore Cogeneration</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Sycamore Cogeneration Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>35.452577</lat>
    <lon>-118.9853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55127</plant_id>
    <plant_name>Manchief Electric Generating Station</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.217143</lat>
    <lon>-103.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56797</plant_id>
    <plant_name>Pioneer Prairie Wind Farm</plant_name>
    <state>IA</state>
    <county>Mitchell</county>
    <operator>Pioneer Prairie Wind Farm I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.4839</lat>
    <lon>-92.6131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57094</plant_id>
    <plant_name>Streator Cayuga Ridge South</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.9969</lat>
    <lon>-88.49</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57260</plant_id>
    <plant_name>Cedro Hill Wind LLC</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Cedro Hill Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>27.576111</lat>
    <lon>-98.90528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58041</plant_id>
    <plant_name>Chisholm View Wind Project</plant_name>
    <state>OK</state>
    <county>Garfield</county>
    <operator>Chisholm View Wind Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2016</latest_year>
    <lat>36.574722</lat>
    <lon>-97.67361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60087</plant_id>
    <plant_name>South Plains II</plant_name>
    <state>TX</state>
    <county>Floyd</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.196962</lat>
    <lon>-101.3815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60655</plant_id>
    <plant_name>Rock Creek Wind Project</plant_name>
    <state>MO</state>
    <county>Atchison</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.4</lat>
    <lon>-95.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60987</plant_id>
    <plant_name>Santa Rita Wind Energy</plant_name>
    <state>TX</state>
    <county>Reagan</county>
    <operator>BHE Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.181377</lat>
    <lon>-101.3188</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61852</plant_id>
    <plant_name>Eagle Shadow Mountain Solar Farm</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>325MK 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.629761</lat>
    <lon>-114.684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61921</plant_id>
    <plant_name>Tahoka Wind</plant_name>
    <state>TX</state>
    <county>Lynn</county>
    <operator>Tahoka Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.150904</lat>
    <lon>-101.6792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61969</plant_id>
    <plant_name>Torrecillas Wind Energy, LLC</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Torrecillas Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.614411</lat>
    <lon>-98.7945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62259</plant_id>
    <plant_name>Ranchero Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Crockett</county>
    <operator>Ranchero Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.594908</lat>
    <lon>-101.453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62670</plant_id>
    <plant_name>Hecate Energy Highland LLC</plant_name>
    <state>OH</state>
    <county>Highland</county>
    <operator>Hecate Energy Highland LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.083514</lat>
    <lon>-83.80981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62755</plant_id>
    <plant_name>Prospero Solar</plant_name>
    <state>TX</state>
    <county>Andrews</county>
    <operator>Prospero Energy Project, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.287873</lat>
    <lon>-102.8404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62943</plant_id>
    <plant_name>Deuel Harvest Wind Energy LLC</plant_name>
    <state>SD</state>
    <county>Deuel</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.863583</lat>
    <lon>-96.53463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62956</plant_id>
    <plant_name>Thunderhead Wind Energy LLC</plant_name>
    <state>NE</state>
    <county>Antelope</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.062002</lat>
    <lon>-98.23896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63100</plant_id>
    <plant_name>Prairie Hill Wind Project</plant_name>
    <state>TX</state>
    <county>Limestone</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.549868</lat>
    <lon>-96.90407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63194</plant_id>
    <plant_name>Delilah Solar Energy LLC</plant_name>
    <state>TX</state>
    <county>Red River</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.284418</lat>
    <lon>-95.16356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63803</plant_id>
    <plant_name>Bronco Plains Wind, LLC</plant_name>
    <state>CO</state>
    <county>Kit Carson</county>
    <operator>Bronco Plains Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>299</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.088845</lat>
    <lon>-103.0251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64309</plant_id>
    <plant_name>Soldier Creek Wind</plant_name>
    <state>KS</state>
    <county>Nemaha</county>
    <operator>Soldier Creek Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.6572</lat>
    <lon>-96.0294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64377</plant_id>
    <plant_name>Milligan 1 Wind Farm</plant_name>
    <state>NE</state>
    <county>Saline</county>
    <operator>Milligan 1 Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2021</latest_year>
    <lat>40.478624</lat>
    <lon>-97.22057</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65007</plant_id>
    <plant_name>Grant County</plant_name>
    <state>WI</state>
    <county>Grant</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>42.718978</lat>
    <lon>-90.70104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65030</plant_id>
    <plant_name>Oxbow Solar 1</plant_name>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.667878</lat>
    <lon>-91.39171</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65048</plant_id>
    <plant_name>Hubbard Wind</plant_name>
    <state>TX</state>
    <county>Limestone</county>
    <operator>Hubbard Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.77471</lat>
    <lon>-96.8282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65889</plant_id>
    <plant_name>Nighthawk Energy Storage, LLC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Nighthawk Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>1200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.933958</lat>
    <lon>-117.038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65979</plant_id>
    <plant_name>Peregrine Solar</plant_name>
    <state>TX</state>
    <county>Goliad</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>28.4279</lat>
    <lon>-97.4544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66574</plant_id>
    <plant_name>San Juan Solar I</plant_name>
    <state>NM</state>
    <county>San Juan</county>
    <operator>San Juan Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>561.4</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.842533</lat>
    <lon>-108.3514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66636</plant_id>
    <plant_name>McFarland A Solar and Storage</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.951288</lat>
    <lon>-113.4905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66694</plant_id>
    <plant_name>Atrisco Energy Storage</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Atrisco Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>1200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.197003</lat>
    <lon>-106.9125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66779</plant_id>
    <plant_name>Papago Energy Storage</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RE Papago LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>1200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.48355</lat>
    <lon>-113.0378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66871</plant_id>
    <plant_name>GulfStar Power, LLC</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>GulfStar Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>467</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.191296</lat>
    <lon>-95.96752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67003</plant_id>
    <plant_name>Atrisco Solar LLC</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Atrisco Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.189061</lat>
    <lon>-106.8605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67175</plant_id>
    <plant_name>Rodeo Ranch Energy Storage</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>Rodeo Ranch Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.36</lat>
    <lon>-103.33</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68193</plant_id>
    <plant_name>Prosperity Wind</plant_name>
    <state>IL</state>
    <county>Piatt</county>
    <operator>Prosperity Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.187881</lat>
    <lon>-88.58944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68281</plant_id>
    <plant_name>Box Canyon (AZ)</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>BOCA bn, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.160564</lat>
    <lon>-111.3692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68322</plant_id>
    <plant_name>Atlas VII</plant_name>
    <state>AZ</state>
    <county>La Paz</county>
    <operator>Atlas VII LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>1200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.582903</lat>
    <lon>-113.5769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68513</plant_id>
    <plant_name>Cartwheel 1 - Storage, LLC</plant_name>
    <state>TX</state>
    <county>Hopkins</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.091192</lat>
    <lon>-95.6151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68847</plant_id>
    <plant_name>1000 Mile Solar</plant_name>
    <state>TX</state>
    <county>Yoakum</county>
    <operator>1000 Mile Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.02248</lat>
    <lon>-102.7089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69298</plant_id>
    <plant_name>PP Jaguar BESS LLC</plant_name>
    <state>TX</state>
    <county>McLennan</county>
    <operator>PP Jaguar BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <battery_mwh>680</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.59992</lat>
    <lon>-96.97054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69475</plant_id>
    <plant_name>Split Rail Solar Energy LLC</plant_name>
    <state>MO</state>
    <county>Warren</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>300</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.901147</lat>
    <lon>-91.20864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58900</plant_id>
    <plant_name>Balko Wind LLC</plant_name>
    <state>OK</state>
    <county>Beaver</county>
    <operator>Balko Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>299.7</nameplate_mw>
    <summer_mw>299.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.518056</lat>
    <lon>-100.8472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59621</plant_id>
    <plant_name>TX Jumbo Road Wind</plant_name>
    <state>TX</state>
    <county>Deaf Smith</county>
    <operator>TX Jumbo Road Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>299.7</nameplate_mw>
    <summer_mw>299.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.72</lat>
    <lon>-102.2533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58646</plant_id>
    <plant_name>Stateline Solar</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>7</generators>
    <nameplate_mw>299.5</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>35.6</lat>
    <lon>-115.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54646</plant_id>
    <plant_name>Kalaeloa Cogen Plant</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Kalaeloa Partners LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>299.4</nameplate_mw>
    <summer_mw>220</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1991</latest_year>
    <lat>21.302106</lat>
    <lon>-158.0963</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61270</plant_id>
    <plant_name>Red Dirt Wind Project</plant_name>
    <state>OK</state>
    <county>Kingfisher</county>
    <operator>Red Dirt Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>299.3</nameplate_mw>
    <summer_mw>299.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.051</lat>
    <lon>-97.784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61564</plant_id>
    <plant_name>Upland Prairie</plant_name>
    <state>IA</state>
    <county>Clay</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>299.3</nameplate_mw>
    <summer_mw>299.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.207406</lat>
    <lon>-95.3494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61789</plant_id>
    <plant_name>Diamond Vista Wind Project, LLC</plant_name>
    <state>KS</state>
    <county>Marion</county>
    <operator>Enel Green Power Diamond Vista Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>299.3</nameplate_mw>
    <summer_mw>299.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.551</lat>
    <lon>-97.193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65306</plant_id>
    <plant_name>Limestone Wind Project</plant_name>
    <state>TX</state>
    <county>Navarro</county>
    <operator>Limestone Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>299.2</nameplate_mw>
    <summer_mw>299.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.85346</lat>
    <lon>-96.62446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59460</plant_id>
    <plant_name>Kay Wind, LLC</plant_name>
    <state>OK</state>
    <county>Kay</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>299</nameplate_mw>
    <summer_mw>299</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.984167</lat>
    <lon>-97.13361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63574</plant_id>
    <plant_name>Atchison County Wind</plant_name>
    <state>MO</state>
    <county>Atchison</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>299</nameplate_mw>
    <summer_mw>275.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.531283</lat>
    <lon>-95.35488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63258</plant_id>
    <plant_name>Aurora Wind Project</plant_name>
    <state>ND</state>
    <county>Williams</county>
    <operator>Aurora Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>298.8</nameplate_mw>
    <summer_mw>298.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>48.5</lat>
    <lon>-103.1</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4014</plant_id>
    <plant_name>Wheaton</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>298.1</nameplate_mw>
    <summer_mw>270.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>44.885416</lat>
    <lon>-91.51583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58098</plant_id>
    <plant_name>El Cabo Wind</plant_name>
    <state>NM</state>
    <county>Torrance</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>298</nameplate_mw>
    <summer_mw>298</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.651111</lat>
    <lon>-105.4617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58902</plant_id>
    <plant_name>Kingfisher Wind LLC</plant_name>
    <state>OK</state>
    <county>Kingfisher</county>
    <operator>Kingfisher Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>298</nameplate_mw>
    <summer_mw>298</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.770278</lat>
    <lon>-97.79972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64139</plant_id>
    <plant_name>Haystack Wind Project, LLC</plant_name>
    <state>NE</state>
    <county>Wayne</county>
    <operator>Haystack Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>298</nameplate_mw>
    <summer_mw>298</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.26303</lat>
    <lon>-97.19566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61269</plant_id>
    <plant_name>Thunder Ranch Wind Project</plant_name>
    <state>OK</state>
    <county>Noble</county>
    <operator>Thunder Ranch Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>297.8</nameplate_mw>
    <summer_mw>297.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.522</lat>
    <lon>-97.145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64003</plant_id>
    <plant_name>Iron Star Wind Project</plant_name>
    <state>KS</state>
    <county>Ford</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>297.6</nameplate_mw>
    <summer_mw>297.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.64875</lat>
    <lon>-99.98094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56468</plant_id>
    <plant_name>Klondike Windpower III</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>297.5</nameplate_mw>
    <summer_mw>297.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2008</latest_year>
    <lat>45.5836</lat>
    <lon>-120.5042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3833</plant_id>
    <plant_name>John H Kerr</plant_name>
    <state>VA</state>
    <county>Mecklenburg</county>
    <operator>USCE-Wilmington District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>9</generators>
    <nameplate_mw>296.8</nameplate_mw>
    <summer_mw>296.6</summer_mw>
    <first_year>1952</first_year>
    <latest_year>2008</latest_year>
    <lat>36.59943</lat>
    <lon>-78.3005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7350</plant_id>
    <plant_name>Coyote Springs</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>296</nameplate_mw>
    <summer_mw>244.2</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>45.847998</lat>
    <lon>-119.6739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10864</plant_id>
    <plant_name>Archer Daniels Midland Cedar Rapids</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>294.6</nameplate_mw>
    <summer_mw>295</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2016</latest_year>
    <lat>41.9221</lat>
    <lon>-91.6875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55233</plant_id>
    <plant_name>Handsome Lake Energy LLC</plant_name>
    <state>PA</state>
    <county>Venango</county>
    <operator>Handsome Lake Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>294.5</nameplate_mw>
    <summer_mw>267.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.2908</lat>
    <lon>-79.8061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8059</plant_id>
    <plant_name>Comanche (OK)</plant_name>
    <state>OK</state>
    <county>Comanche</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>294</nameplate_mw>
    <summer_mw>237</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1974</latest_year>
    <lat>34.5431</lat>
    <lon>-98.3244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57987</plant_id>
    <plant_name>Canadian Hills Wind</plant_name>
    <state>OK</state>
    <county>Canadian</county>
    <operator>Canadian Hills Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>293.7</nameplate_mw>
    <summer_mw>293.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.629722</lat>
    <lon>-98.02472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3287</plant_id>
    <plant_name>McMeekin</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>293.6</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>34.0556</lat>
    <lon>-81.2172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64878</plant_id>
    <plant_name>Edwards Sanborn E1A</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>293.3</nameplate_mw>
    <summer_mw>293.3</summer_mw>
    <battery_mwh>272</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.961922</lat>
    <lon>-118.1242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1104</plant_id>
    <plant_name>Burlington (IA)</plant_name>
    <state>IA</state>
    <county>Des Moines</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>290.8</nameplate_mw>
    <summer_mw>210.2</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1996</latest_year>
    <lat>40.7412</lat>
    <lon>-91.11667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65674</plant_id>
    <plant_name>Edwards Sanborn E1B</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>290.4</nameplate_mw>
    <summer_mw>290.4</summer_mw>
    <battery_mwh>136</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2023</latest_year>
    <lat>34.964033</lat>
    <lon>-118.0941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57549</plant_id>
    <plant_name>South Hurlburt Wind LLC</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Shepherds Flat Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>290</nameplate_mw>
    <summer_mw>290</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>45.706262</lat>
    <lon>-120.08</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57550</plant_id>
    <plant_name>Horseshoe Bend Wind LLC</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Shepherds Flat Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>290</nameplate_mw>
    <summer_mw>290</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>45.58555</lat>
    <lon>-120.0082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55041</plant_id>
    <plant_name>Berkshire Power</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Berkshire Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>289</nameplate_mw>
    <summer_mw>229.2</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>42.0476</lat>
    <lon>-72.6478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57978</plant_id>
    <plant_name>Lodi Energy Center</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Northern California Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>288.9</nameplate_mw>
    <summer_mw>273</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.088056</lat>
    <lon>-121.3875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54832</plant_id>
    <plant_name>Brandywine Power Facility</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Alpha Generation Brandywine, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>288.8</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>38.6681</lat>
    <lon>-76.8678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58765</plant_id>
    <plant_name>Miami Wind Energy Center</plant_name>
    <state>TX</state>
    <county>Roberts</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>288.6</nameplate_mw>
    <summer_mw>288.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.653889</lat>
    <lon>-100.5386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54640</plant_id>
    <plant_name>NAEA Lakewood LLC</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Essential Power Operating Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>288.2</nameplate_mw>
    <summer_mw>265</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>40.0613</lat>
    <lon>-74.1686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63494</plant_id>
    <plant_name>Maverick Wind Project, LLC</plant_name>
    <state>OK</state>
    <county>Major</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>288</nameplate_mw>
    <summer_mw>288</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.293919</lat>
    <lon>-98.16467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6074</plant_id>
    <plant_name>Greenwood (MO)</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>Evergy Missouri West</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>287.8</nameplate_mw>
    <summer_mw>251.5</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2016</latest_year>
    <lat>38.8615</lat>
    <lon>-94.2982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7931</plant_id>
    <plant_name>Coyote Springs II</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>287</nameplate_mw>
    <summer_mw>290</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>45.848039</lat>
    <lon>-119.674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55210</plant_id>
    <plant_name>Afton Generating Station</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>Public Service Co of NM</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>287</nameplate_mw>
    <summer_mw>238.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2007</latest_year>
    <lat>32.114185</lat>
    <lon>-106.8465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64197</plant_id>
    <plant_name>Fifth Standard Solar PV, LLC (Hybrid)</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>287</nameplate_mw>
    <summer_mw>267</summer_mw>
    <battery_mwh>137</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.153193</lat>
    <lon>-120.1045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65711</plant_id>
    <plant_name>Vikings Energy Farm</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Vikings Energy Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>286.8</nameplate_mw>
    <summer_mw>286.8</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.803363</lat>
    <lon>-115.2717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69521</plant_id>
    <plant_name>Archtop Solar</plant_name>
    <state>IL</state>
    <county>Ford</county>
    <operator>Archtop Property Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>6</generators>
    <nameplate_mw>286.8</nameplate_mw>
    <summer_mw>286.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.469348</lat>
    <lon>-88.40313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56501</plant_id>
    <plant_name>Pomeroy Wind Farm</plant_name>
    <state>IA</state>
    <county>Pocahontas</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>286.4</nameplate_mw>
    <summer_mw>296.9</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2011</latest_year>
    <lat>42.5842</lat>
    <lon>-94.7467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54574</plant_id>
    <plant_name>Saranac Facility</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Saranac Power Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>285.6</nameplate_mw>
    <summer_mw>237.8</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>44.7132</lat>
    <lon>-73.4557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63849</plant_id>
    <plant_name>Chestnut</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Chestnut Westside LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>285.6</nameplate_mw>
    <summer_mw>285.6</summer_mw>
    <battery_mwh>540</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.160164</lat>
    <lon>-119.9049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54537</plant_id>
    <plant_name>Ferndale Generating Station</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>285.5</nameplate_mw>
    <summer_mw>270</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>48.828996</lat>
    <lon>-122.6851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55285</plant_id>
    <plant_name>Wolf Hills Energy</plant_name>
    <state>VA</state>
    <county>Washington</county>
    <operator>AEP Generation Resources Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>285</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>36.6644</lat>
    <lon>-82.1044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67898</plant_id>
    <plant_name>Escape Solar Plant</plant_name>
    <state>NV</state>
    <county>Lincoln</county>
    <operator>Escape Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>285</nameplate_mw>
    <summer_mw>285</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.894378</lat>
    <lon>-114.0885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1913</plant_id>
    <plant_name>Inver Hills</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>284.4</nameplate_mw>
    <summer_mw>275.6</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1997</latest_year>
    <lat>44.781</lat>
    <lon>-93.042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55010</plant_id>
    <plant_name>LSP-Cottage Grove LP</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Cottage Grove Operating Services LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>283.5</nameplate_mw>
    <summer_mw>251</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>44.7956</lat>
    <lon>-92.9119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55011</plant_id>
    <plant_name>Whitewater Generating Station</plant_name>
    <state>WI</state>
    <county>Jefferson</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>283.5</nameplate_mw>
    <summer_mw>261</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>42.855463</lat>
    <lon>-88.72992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56661</plant_id>
    <plant_name>Pattern Gulf Wind</plant_name>
    <state>TX</state>
    <county>Kenedy</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>283.2</nameplate_mw>
    <summer_mw>283.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>27.0011</lat>
    <lon>-97.5994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69026</plant_id>
    <plant_name>Tanzanite Storage</plant_name>
    <state>TX</state>
    <county>Henderson</county>
    <operator>Tanzanite Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>283.2</nameplate_mw>
    <summer_mw>257.8</summer_mw>
    <battery_mwh>283.2</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.230844</lat>
    <lon>-95.8376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1007</plant_id>
    <plant_name>Noblesville</plant_name>
    <state>IN</state>
    <county>Hamilton</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>283</nameplate_mw>
    <summer_mw>264</summer_mw>
    <first_year>1950</first_year>
    <latest_year>2003</latest_year>
    <lat>40.0969</lat>
    <lon>-85.9714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8219</plant_id>
    <plant_name>Ray D Nixon</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>City of Colorado Springs - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>282.6</nameplate_mw>
    <summer_mw>255</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1999</latest_year>
    <lat>38.633451</lat>
    <lon>-104.7058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54817</plant_id>
    <plant_name>Johnson County</plant_name>
    <state>TX</state>
    <county>Johnson</county>
    <operator>Johnson County Power LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>282.6</nameplate_mw>
    <summer_mw>278</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>32.3994</lat>
    <lon>-97.4078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59475</plant_id>
    <plant_name>Palo Duro Wind</plant_name>
    <state>TX</state>
    <county>Ochiltree</county>
    <operator>Palo Duro Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>282.3</nameplate_mw>
    <summer_mw>282.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.243889</lat>
    <lon>-101.0014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60689</plant_id>
    <plant_name>Western Plains Wind Farm</plant_name>
    <state>KS</state>
    <county>Ford</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>280.6</nameplate_mw>
    <summer_mw>280.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.854801</lat>
    <lon>-99.67981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1353</plant_id>
    <plant_name>Big Sandy</plant_name>
    <state>KY</state>
    <county>Lawrence</county>
    <operator>Kentucky Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>280.5</nameplate_mw>
    <summer_mw>260</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>38.1707</lat>
    <lon>-82.6176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55241</plant_id>
    <plant_name>Hog Bayou Energy Center</plant_name>
    <state>AL</state>
    <county>Mobile</county>
    <operator>Mobile Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>280</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>30.7478</lat>
    <lon>-88.0575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56812</plant_id>
    <plant_name>Solana Generating Station</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Solar One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Thermal with Energy Storage</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Thermal with Energy Storage</technologies>
    <generators>2</generators>
    <nameplate_mw>280</nameplate_mw>
    <summer_mw>295.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.922294</lat>
    <lon>-112.9559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57331</plant_id>
    <plant_name>Mojave Solar Project</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Mojave Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Thermal without Energy Storage</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Thermal without Energy Storage</technologies>
    <generators>2</generators>
    <nameplate_mw>280</nameplate_mw>
    <summer_mw>275</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.017717</lat>
    <lon>-117.3391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62745</plant_id>
    <plant_name>Wheatridge Hybrid</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Wheatridge Wind Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>280</nameplate_mw>
    <summer_mw>280</summer_mw>
    <battery_mwh>120</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2022</latest_year>
    <lat>45.55975</lat>
    <lon>-119.6338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64202</plant_id>
    <plant_name>Big Star Solar, LLC (Hybrid)</plant_name>
    <state>TX</state>
    <county>Bastrop</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>280</nameplate_mw>
    <summer_mw>280</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>29.894053</lat>
    <lon>-97.27054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58389</plant_id>
    <plant_name>Solar Star 2</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Solar Star California XX, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>6</generators>
    <nameplate_mw>279</nameplate_mw>
    <summer_mw>275</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2015</latest_year>
    <lat>34.848611</lat>
    <lon>-118.3528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67736</plant_id>
    <plant_name>Silver Peak</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Silver Peak Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>279</nameplate_mw>
    <summer_mw>279</summer_mw>
    <battery_mwh>1116</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.831084</lat>
    <lon>-114.9924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2098</plant_id>
    <plant_name>Lake Road (MO)</plant_name>
    <state>MO</state>
    <county>Buchanan</county>
    <operator>Evergy Missouri West</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>278.4</nameplate_mw>
    <summer_mw>231.9</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1990</latest_year>
    <lat>39.7246</lat>
    <lon>-94.8773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2204</plant_id>
    <plant_name>Yellowtail</plant_name>
    <state>MT</state>
    <county>Big Horn</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>278.2</nameplate_mw>
    <summer_mw>287.5</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>45.307406</lat>
    <lon>-107.9575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7699</plant_id>
    <plant_name>Tiger Bay</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>278.1</nameplate_mw>
    <summer_mw>199</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>27.746369</lat>
    <lon>-81.84945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55581</plant_id>
    <plant_name>King Mountain Wind Ranch 1</plant_name>
    <state>TX</state>
    <county>Upton</county>
    <operator>FPL Energy Upton Wind LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>278</nameplate_mw>
    <summer_mw>278</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>31.2092</lat>
    <lon>-102.2417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59061</plant_id>
    <plant_name>Radfords Run Wind Farm</plant_name>
    <state>IL</state>
    <county>Dewitt</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>278</nameplate_mw>
    <summer_mw>278</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.011111</lat>
    <lon>-89.04722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59939</plant_id>
    <plant_name>RE Tranquillity</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>277.3</nameplate_mw>
    <summer_mw>272</summer_mw>
    <battery_mwh>288</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2022</latest_year>
    <lat>36.581365</lat>
    <lon>-120.4045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50973</plant_id>
    <plant_name>Motiva Enterprises Port Arthur Refinery</plant_name>
    <state>TX</state>
    <county>Jefferson</county>
    <operator>Motiva Enterprises LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Other Gases; Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>276.8</nameplate_mw>
    <summer_mw>239.4</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2011</latest_year>
    <lat>29.888462</lat>
    <lon>-93.95098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>436</plant_id>
    <plant_name>Devil Canyon</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>California Dept. of Water Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>276.2</nameplate_mw>
    <summer_mw>262</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1994</latest_year>
    <lat>34.2056</lat>
    <lon>-117.3344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60414</plant_id>
    <plant_name>Bethel Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Castro</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>276</nameplate_mw>
    <summer_mw>276</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.575311</lat>
    <lon>-102.4747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61984</plant_id>
    <plant_name>Solomon Forks Wind Project, LLC</plant_name>
    <state>KS</state>
    <county>Thomas</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>275.6</nameplate_mw>
    <summer_mw>275.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.306</lat>
    <lon>-101.0744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1167</plant_id>
    <plant_name>Muscatine Plant #1</plant_name>
    <state>IA</state>
    <county>Muscatine</county>
    <operator>Board of Water Electric &amp; Communications</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>275.5</nameplate_mw>
    <summer_mw>248.9</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1983</latest_year>
    <lat>41.3917</lat>
    <lon>-91.0569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62248</plant_id>
    <plant_name>Arrow Canyon Solar Hybrid</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Arrow Canyon Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>275</nameplate_mw>
    <summer_mw>275</summer_mw>
    <battery_mwh>375</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.459259</lat>
    <lon>-114.8444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4042</plant_id>
    <plant_name>Valley (WI)</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>274.7</nameplate_mw>
    <summer_mw>266.6</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1969</latest_year>
    <lat>43.0303</lat>
    <lon>-87.9233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55048</plant_id>
    <plant_name>Tiverton Power Plant</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>Tiverton Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>274.5</nameplate_mw>
    <summer_mw>273</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.6422</lat>
    <lon>-71.1706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55100</plant_id>
    <plant_name>Rumford Power LLC</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Rumford Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>274.5</nameplate_mw>
    <summer_mw>253.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>44.5303</lat>
    <lon>-70.5219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55242</plant_id>
    <plant_name>Santa Rosa Energy Center</plant_name>
    <state>FL</state>
    <county>Santa Rosa</county>
    <operator>Santa Rosa Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>274.5</nameplate_mw>
    <summer_mw>235.9</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>30.5664</lat>
    <lon>-87.115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50304</plant_id>
    <plant_name>Shell Deer Park</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Deer Park Refinery Limited Partnership (DPRLP)</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; All Other</technologies>
    <generators>4</generators>
    <nameplate_mw>274</nameplate_mw>
    <summer_mw>243</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1995</latest_year>
    <lat>29.723185</lat>
    <lon>-95.12886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64832</plant_id>
    <plant_name>Yellowbud Solar, LLC</plant_name>
    <state>OH</state>
    <county>Ross</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>274</nameplate_mw>
    <summer_mw>274</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.502511</lat>
    <lon>-83.06558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69675</plant_id>
    <plant_name>Emily Solar, LLC</plant_name>
    <state>IL</state>
    <county>Cumberland</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>273.6</nameplate_mw>
    <summer_mw>273.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.372</lat>
    <lon>-88.014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10682</plant_id>
    <plant_name>Brush Generation Facility</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Brush Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>273.4</nameplate_mw>
    <summer_mw>267</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2002</latest_year>
    <lat>40.2415</lat>
    <lon>-103.631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56322</plant_id>
    <plant_name>Wild Horse</plant_name>
    <state>WA</state>
    <county>Kittitas</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>273.1</nameplate_mw>
    <summer_mw>271.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2009</latest_year>
    <lat>47.036269</lat>
    <lon>-120.2065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60233</plant_id>
    <plant_name>RE Garland</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>273.1</nameplate_mw>
    <summer_mw>268</summer_mw>
    <battery_mwh>352</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2021</latest_year>
    <lat>34.825267</lat>
    <lon>-118.525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63739</plant_id>
    <plant_name>Las Majadas Wind Farm</plant_name>
    <state>TX</state>
    <county>Willacy</county>
    <operator>Las Majadas Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>272.6</nameplate_mw>
    <summer_mw>272.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.364843</lat>
    <lon>-97.54534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64066</plant_id>
    <plant_name>Tecolote Wind LLC</plant_name>
    <state>NM</state>
    <county>Lincoln</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>272</nameplate_mw>
    <summer_mw>272</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.36</lat>
    <lon>-105.44</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7953</plant_id>
    <plant_name>Evander Andrews Power Complex</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>270.9</nameplate_mw>
    <summer_mw>272</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2008</latest_year>
    <lat>43.179176</lat>
    <lon>-115.7343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58884</plant_id>
    <plant_name>Lundgren Wind Project</plant_name>
    <state>IA</state>
    <county>Webster</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>270.9</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.334722</lat>
    <lon>-94.17083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>689</plant_id>
    <plant_name>S O Purdom</plant_name>
    <state>FL</state>
    <county>Wakulla</county>
    <operator>City of Tallahassee - (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>270.1</nameplate_mw>
    <summer_mw>222</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>30.162304</lat>
    <lon>-84.20067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1380</plant_id>
    <plant_name>Wolf Creek</plant_name>
    <state>KY</state>
    <county>Russell</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>270</nameplate_mw>
    <summer_mw>300</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1952</latest_year>
    <lat>36.8691</lat>
    <lon>-85.147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55201</plant_id>
    <plant_name>Gibson City Energy Center LLC</plant_name>
    <state>IL</state>
    <county>Ford</county>
    <operator>Gibson City Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>270</nameplate_mw>
    <summer_mw>232</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.4705</lat>
    <lon>-88.3987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55204</plant_id>
    <plant_name>Kinmundy</plant_name>
    <state>IL</state>
    <county>Marion</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>270</nameplate_mw>
    <summer_mw>208</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.7619</lat>
    <lon>-89.0128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60654</plant_id>
    <plant_name>Townsite Solar Project Hybrid</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Townsite Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>270</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>360</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.937336</lat>
    <lon>-114.884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>435</plant_id>
    <plant_name>White Rock/Slab Creek</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>268.7</nameplate_mw>
    <summer_mw>243.7</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2020</latest_year>
    <lat>38.765336</lat>
    <lon>-120.7874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63738</plant_id>
    <plant_name>Helena Wind</plant_name>
    <state>TX</state>
    <county>Bee</county>
    <operator>Helena Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>268.2</nameplate_mw>
    <summer_mw>268.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.621959</lat>
    <lon>-97.93763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1239</plant_id>
    <plant_name>Riverton</plant_name>
    <state>KS</state>
    <county>Cherokee</county>
    <operator>Empire District Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>267.6</nameplate_mw>
    <summer_mw>252.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2016</latest_year>
    <lat>37.072616</lat>
    <lon>-94.6987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58571</plant_id>
    <plant_name>Tucannon River Wind Farm</plant_name>
    <state>WA</state>
    <county>Columbia</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>266.8</nameplate_mw>
    <summer_mw>266.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>46.421111</lat>
    <lon>-118.0269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6373</plant_id>
    <plant_name>Rokeby</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Lincoln Electric System</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>266.1</nameplate_mw>
    <summer_mw>256.2</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2001</latest_year>
    <lat>40.7316</lat>
    <lon>-96.7364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>422</plant_id>
    <plant_name>Glenarm</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Pasadena - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>265.6</nameplate_mw>
    <summer_mw>222.4</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2016</latest_year>
    <lat>34.126</lat>
    <lon>-118.1494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50109</plant_id>
    <plant_name>Paris Energy Center</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>Paris Generation LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>265.6</nameplate_mw>
    <summer_mw>239</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>33.6968</lat>
    <lon>-95.5577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59246</plant_id>
    <plant_name>Goodnight</plant_name>
    <state>TX</state>
    <county>Armstrong</county>
    <operator>FGE Goodnight I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>265.5</nameplate_mw>
    <summer_mw>265.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.093889</lat>
    <lon>-101.3261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57514</plant_id>
    <plant_name>Ocotillo Express LLC</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>265.4</nameplate_mw>
    <summer_mw>265.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.752778</lat>
    <lon>-116.0447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>833</plant_id>
    <plant_name>Cabinet Gorge</plant_name>
    <state>ID</state>
    <county>Bonner</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>265.2</nameplate_mw>
    <summer_mw>254.6</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1953</latest_year>
    <lat>48.084444</lat>
    <lon>-116.0531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60468</plant_id>
    <plant_name>Friendswood Energy</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Tejas Power Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>265.2</nameplate_mw>
    <summer_mw>252</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2026</latest_year>
    <lat>29.647267</lat>
    <lon>-95.45152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57526</plant_id>
    <plant_name>North Hurlburt Wind LLC</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Shepherds Flat Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>265</nameplate_mw>
    <summer_mw>265</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>45.731611</lat>
    <lon>-120.0835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66643</plant_id>
    <plant_name>Dunns Bridge I Solar</plant_name>
    <state>IN</state>
    <county>Jasper</county>
    <operator>Dunns Bridge Solar Center LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>265</nameplate_mw>
    <summer_mw>265</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.17257</lat>
    <lon>-87.00726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69478</plant_id>
    <plant_name>Lazbuddie Wind Energy LLC</plant_name>
    <state>TX</state>
    <county>Parmer</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>265</nameplate_mw>
    <summer_mw>265</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.5589</lat>
    <lon>-102.6826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6063</plant_id>
    <plant_name>Electrifarm</plant_name>
    <state>IA</state>
    <county>Black Hawk</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>264.1</nameplate_mw>
    <summer_mw>190.3</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1978</latest_year>
    <lat>42.4407</lat>
    <lon>-92.4205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56495</plant_id>
    <plant_name>NedPower Mount Storm</plant_name>
    <state>WV</state>
    <county>Grant</county>
    <operator>Clearway Energy Operating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>264</nameplate_mw>
    <summer_mw>264</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.2175</lat>
    <lon>-79.2094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3439</plant_id>
    <plant_name>Laredo</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>263.6</nameplate_mw>
    <summer_mw>177.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>27.5667</lat>
    <lon>-99.5089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59882</plant_id>
    <plant_name>Exelon West Medway II LLC</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>263.6</nameplate_mw>
    <summer_mw>188.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.137218</lat>
    <lon>-71.4447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63259</plant_id>
    <plant_name>Delta Energy Park</plant_name>
    <state>MI</state>
    <county>Eaton</county>
    <operator>Lansing Board of Water and Light</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>263.2</nameplate_mw>
    <summer_mw>223.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.690644</lat>
    <lon>-84.65778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57159</plant_id>
    <plant_name>Windy Flats Wind Project</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Windy Flats Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>262.2</nameplate_mw>
    <summer_mw>262.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.7269</lat>
    <lon>-120.8339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64864</plant_id>
    <plant_name>Chaparral Springs</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>262</nameplate_mw>
    <summer_mw>262</summer_mw>
    <battery_mwh>352</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.870764</lat>
    <lon>-118.3195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6768</plant_id>
    <plant_name>Sikeston Power Station</plant_name>
    <state>MO</state>
    <county>Scott</county>
    <operator>City of Sikeston - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>261</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>36.8791</lat>
    <lon>-89.6209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10726</plant_id>
    <plant_name>Masspower</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Masspower</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>260.9</nameplate_mw>
    <summer_mw>245</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>42.1575</lat>
    <lon>-72.5225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58644</plant_id>
    <plant_name>Silver State Solar Power South</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Silver State Solar Power South, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>8</generators>
    <nameplate_mw>260.1</nameplate_mw>
    <summer_mw>260.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>35.63</lat>
    <lon>-115.32</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>886</plant_id>
    <plant_name>Fisk Street</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Midwest Generations EME LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>197.2</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>41.8508</lat>
    <lon>-87.6533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1573</plant_id>
    <plant_name>Morgantown Generating Plant</plant_name>
    <state>MD</state>
    <county>Charles</county>
    <operator>Lanyard Power Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>216</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>38.3592</lat>
    <lon>-76.9767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56152</plant_id>
    <plant_name>Freeport Energy Center</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Dow Hydrocarbons and Resources LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>219.4</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>28.988761</lat>
    <lon>-95.39542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63320</plant_id>
    <plant_name>Titan Solar Project</plant_name>
    <state>TX</state>
    <county>Culberson</county>
    <operator>SE Titan, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>260</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.70038</lat>
    <lon>-104.4581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66626</plant_id>
    <plant_name>Wadley Solar</plant_name>
    <state>GA</state>
    <county>Jefferson</county>
    <operator>Wadley Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>260</nameplate_mw>
    <summer_mw>260</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.820018</lat>
    <lon>-82.40879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65316</plant_id>
    <plant_name>Sapphire Sky Wind Energy LLC</plant_name>
    <state>IL</state>
    <county>DeWitt</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>259.8</nameplate_mw>
    <summer_mw>259.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.2945</lat>
    <lon>-88.58455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2982</plant_id>
    <plant_name>Salina</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Grand River Dam Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>6</generators>
    <nameplate_mw>259.2</nameplate_mw>
    <summer_mw>241.5</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1971</latest_year>
    <lat>36.264685</lat>
    <lon>-95.10356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56981</plant_id>
    <plant_name>Pyron Wind Farm LLC Hybrid</plant_name>
    <state>TX</state>
    <county>Fisher</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>258.9</nameplate_mw>
    <summer_mw>258.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2009</first_year>
    <latest_year>2018</latest_year>
    <lat>32.5886</lat>
    <lon>-100.6728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64879</plant_id>
    <plant_name>Edwards Sanborn E2</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>257.8</nameplate_mw>
    <summer_mw>257.8</summer_mw>
    <battery_mwh>250</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>34.941507</lat>
    <lon>-118.129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58766</plant_id>
    <plant_name>Wake Wind Energy Center</plant_name>
    <state>TX</state>
    <county>Crosby</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>257.3</nameplate_mw>
    <summer_mw>257</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.825</lat>
    <lon>-101.0997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64745</plant_id>
    <plant_name>Black Hollow Sun</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Contour Global</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>257</nameplate_mw>
    <summer_mw>257</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>40.616742</lat>
    <lon>-104.8489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67764</plant_id>
    <plant_name>Rosamond South 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Golden Fields Solar IV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>257</nameplate_mw>
    <summer_mw>257</summer_mw>
    <battery_mwh>472</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.842496</lat>
    <lon>-118.3785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1336</plant_id>
    <plant_name>Garden City</plant_name>
    <state>KS</state>
    <county>Finney</county>
    <operator>Sunflower Electric Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>256.3</nameplate_mw>
    <summer_mw>220.5</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1979</latest_year>
    <lat>37.9703</lat>
    <lon>-100.8956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>201</plant_id>
    <plant_name>Thomas Fitzhugh</plant_name>
    <state>AR</state>
    <county>Franklin</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>256.2</nameplate_mw>
    <summer_mw>208.5</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2026</latest_year>
    <lat>35.462382</lat>
    <lon>-93.80493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61648</plant_id>
    <plant_name>Robins Air Force Base Solar</plant_name>
    <state>GA</state>
    <county>Bibb</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>256</nameplate_mw>
    <summer_mw>256</summer_mw>
    <battery_mwh>512</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2026</latest_year>
    <lat>32.681222</lat>
    <lon>-83.61639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66902</plant_id>
    <plant_name>Roadrunner Wind Farm</plant_name>
    <state>TX</state>
    <county>Eastland</county>
    <operator>Roadrunner Crossing Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>256</nameplate_mw>
    <summer_mw>256</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.437418</lat>
    <lon>-99.10891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58915</plant_id>
    <plant_name>Copper Mountain Solar 3</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>10</generators>
    <nameplate_mw>255</nameplate_mw>
    <summer_mw>255</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2015</latest_year>
    <lat>35.889419</lat>
    <lon>-114.9579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62483</plant_id>
    <plant_name>Taygete Energy Project LLC</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Taygete Energy Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>255</nameplate_mw>
    <summer_mw>255</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.165245</lat>
    <lon>-103.1259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62804</plant_id>
    <plant_name>Greasewood Solar</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Concho Bluff LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>255</nameplate_mw>
    <summer_mw>255</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.030996</lat>
    <lon>-102.4882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>152</plant_id>
    <plant_name>Davis Dam</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>254.8</nameplate_mw>
    <summer_mw>254.8</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>35.197044</lat>
    <lon>-114.5707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2779</plant_id>
    <plant_name>Fontana Dam</plant_name>
    <state>NC</state>
    <county>Swain</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>254.7</nameplate_mw>
    <summer_mw>304.2</summer_mw>
    <first_year>1945</first_year>
    <latest_year>1954</latest_year>
    <lat>35.4507</lat>
    <lon>-83.805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>51030</plant_id>
    <plant_name>Ocean State Power</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Ocean State Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>254.2</nameplate_mw>
    <summer_mw>231.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.009722</lat>
    <lon>-71.66891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63640</plant_id>
    <plant_name>Southern Hills Wind Farm</plant_name>
    <state>IA</state>
    <county>Union</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>254.1</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.1113</lat>
    <lon>-94.4667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54555</plant_id>
    <plant_name>Collierville Powerhouse</plant_name>
    <state>CA</state>
    <county>Calaveras</county>
    <operator>Northern California Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>253</nameplate_mw>
    <summer_mw>253</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>38.144636</lat>
    <lon>-120.3805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57378</plant_id>
    <plant_name>AV Solar Ranch One</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AV Solar Ranch 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>253</nameplate_mw>
    <summer_mw>241.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.780278</lat>
    <lon>-118.4244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60902</plant_id>
    <plant_name>Dermott Wind</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Dermott Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>253</nameplate_mw>
    <summer_mw>253</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.863769</lat>
    <lon>-100.9751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63721</plant_id>
    <plant_name>Cool Springs Solar (Hybrid)</plant_name>
    <state>GA</state>
    <county>Decatur</county>
    <operator>Cool Springs Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>253</nameplate_mw>
    <summer_mw>253</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.747916</lat>
    <lon>-84.68049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63641</plant_id>
    <plant_name>Diamond Trail Wind Farm</plant_name>
    <state>IA</state>
    <county>Iowa</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>252.5</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.6744</lat>
    <lon>-92.1642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61202</plant_id>
    <plant_name>Mount Signal Solar Farm V</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Valley Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>252.3</nameplate_mw>
    <summer_mw>252.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.678805</lat>
    <lon>-115.5672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>341</plant_id>
    <plant_name>Long Beach Generation</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Long Beach Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>252</nameplate_mw>
    <summer_mw>260</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>33.7641</lat>
    <lon>-118.2248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57315</plant_id>
    <plant_name>Cedar Point Wind</plant_name>
    <state>CO</state>
    <county>Lincoln</county>
    <operator>Cedar Point LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>252</nameplate_mw>
    <summer_mw>252</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.421787</lat>
    <lon>-103.6781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63504</plant_id>
    <plant_name>Copper Mountain Solar 5, LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>252</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.776286</lat>
    <lon>-114.9737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65654</plant_id>
    <plant_name>Texas Solar Nova 1</plant_name>
    <state>TX</state>
    <county>Kent</county>
    <operator>Texas Solar Nova 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>252</nameplate_mw>
    <summer_mw>331.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.320637</lat>
    <lon>-100.9822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50561</plant_id>
    <plant_name>Eagle Point Power Generation</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Eagle Point Power Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>251.8</nameplate_mw>
    <summer_mw>244</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2016</latest_year>
    <lat>39.8746</lat>
    <lon>-75.1592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60094</plant_id>
    <plant_name>Blythe Solar III, LLC Hybrid</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Blythe Solar III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>251.8</nameplate_mw>
    <summer_mw>251.8</summer_mw>
    <battery_mwh>538.6</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2021</latest_year>
    <lat>33.656</lat>
    <lon>-114.742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62591</plant_id>
    <plant_name>Ekola Flats</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250.9</nameplate_mw>
    <summer_mw>250.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.932405</lat>
    <lon>-106.3584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64336</plant_id>
    <plant_name>Little Blue Wind Project, LLC</plant_name>
    <state>NE</state>
    <county>Webster</county>
    <operator>Little Blue Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250.7</nameplate_mw>
    <summer_mw>250.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.284421</lat>
    <lon>-98.40759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7988</plant_id>
    <plant_name>Silver Creek</plant_name>
    <state>MS</state>
    <county>Jefferson Davis</county>
    <operator>Cooperative Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>250.5</nameplate_mw>
    <summer_mw>225</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2005</latest_year>
    <lat>31.6004</lat>
    <lon>-89.9468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60326</plant_id>
    <plant_name>O'Brien Wind</plant_name>
    <state>IA</state>
    <county>O'Brien</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>250.3</nameplate_mw>
    <summer_mw>250.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.200421</lat>
    <lon>-95.62431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63103</plant_id>
    <plant_name>Triple H Wind Project</plant_name>
    <state>SD</state>
    <county>Hyde</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250.2</nameplate_mw>
    <summer_mw>250.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.40104</lat>
    <lon>-99.60384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57394</plant_id>
    <plant_name>Genesis Solar Energy Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Genesis Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Thermal without Energy Storage</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Thermal without Energy Storage</technologies>
    <generators>2</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2014</latest_year>
    <lat>33.665</lat>
    <lon>-114.9981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57617</plant_id>
    <plant_name>Hidalgo Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Hidalgo Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>26.465556</lat>
    <lon>-98.41111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57859</plant_id>
    <plant_name>Moapa Southern Paiute</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.52995</lat>
    <lon>-114.7703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58771</plant_id>
    <plant_name>Roosevelt County</plant_name>
    <state>NM</state>
    <county>Roosevelt</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.926111</lat>
    <lon>-103.5111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59974</plant_id>
    <plant_name>Golden West Power Partners LLC</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Golden West Power Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.935</lat>
    <lon>-104.212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60901</plant_id>
    <plant_name>Willow Springs Wind Farm</plant_name>
    <state>TX</state>
    <county>Haskell</county>
    <operator>Willow Springs Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.345366</lat>
    <lon>-99.62426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61346</plant_id>
    <plant_name>RE Maplewood</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.976638</lat>
    <lon>-102.2578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61906</plant_id>
    <plant_name>Phoebe Solar</plant_name>
    <state>TX</state>
    <county>Winkler</county>
    <operator>Phoebe Energy Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.843422</lat>
    <lon>-102.8683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61920</plant_id>
    <plant_name>Galloway 1 Solar Farm</plant_name>
    <state>TX</state>
    <county>Concho</county>
    <operator>225DD 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.435932</lat>
    <lon>-99.79661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62142</plant_id>
    <plant_name>Amadeus Wind Farm</plant_name>
    <state>TX</state>
    <county>Fisher</county>
    <operator>Amadeus Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.96736</lat>
    <lon>-100.5643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62364</plant_id>
    <plant_name>Nobles 2 Wind Project</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Nobles 2 Power Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.789636</lat>
    <lon>-95.85277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62547</plant_id>
    <plant_name>Aquamarine</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Aqua</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.189722</lat>
    <lon>-119.9042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63211</plant_id>
    <plant_name>Samson Solar Energy</plant_name>
    <state>TX</state>
    <county>Franklin</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.25102</lat>
    <lon>-95.19343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63300</plant_id>
    <plant_name>Athos Solar Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SE Athos I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.751283</lat>
    <lon>-115.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63834</plant_id>
    <plant_name>Gateway Energy Storage System</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Gateway Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>1000</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.570556</lat>
    <lon>-116.9106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63840</plant_id>
    <plant_name>Sparta Solar</plant_name>
    <state>TX</state>
    <county>Bee</county>
    <operator>Sparta Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>28.655277</lat>
    <lon>-98.00139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63883</plant_id>
    <plant_name>Samson Solar Energy III LLC</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.426498</lat>
    <lon>-95.35745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63913</plant_id>
    <plant_name>Dodge Flat</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Dodge Flat Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.713024</lat>
    <lon>-119.4672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63933</plant_id>
    <plant_name>Dry Lake Solar Energy Center</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>150</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.42726</lat>
    <lon>-114.8907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63988</plant_id>
    <plant_name>Blooming Grove Wind Energy Center</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.661079</lat>
    <lon>-88.39508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64325</plant_id>
    <plant_name>Prospero Solar II</plant_name>
    <state>TX</state>
    <county>Andrews</county>
    <operator>Prospero Solar II, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.275814</lat>
    <lon>-102.8448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64342</plant_id>
    <plant_name>Badger Wind, LLC</plant_name>
    <state>ND</state>
    <county>McIntosh</county>
    <operator>Badger Wind , LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>46.21691</lat>
    <lon>-99.59834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64529</plant_id>
    <plant_name>Golden Triangle</plant_name>
    <state>MS</state>
    <county>Lowndes</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.418888</lat>
    <lon>-88.61888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64534</plant_id>
    <plant_name>Darien Solar</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.62</lat>
    <lon>-88.74</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65303</plant_id>
    <plant_name>Sun Valley Solar Project</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Sun Valley Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.86976</lat>
    <lon>-97.01498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65511</plant_id>
    <plant_name>25 Mile Creek</plant_name>
    <state>OK</state>
    <county>Ellis</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.487</lat>
    <lon>-99.739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65572</plant_id>
    <plant_name>Muskegon Solar</plant_name>
    <state>MI</state>
    <county>Muskegon</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.232797</lat>
    <lon>-85.99345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65631</plant_id>
    <plant_name>Pisgah Ridge Solar, LLC</plant_name>
    <state>TX</state>
    <county>Navarro</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.896737</lat>
    <lon>-96.46733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65743</plant_id>
    <plant_name>Victory Pass</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Victory Pass I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.701001</lat>
    <lon>-115.3163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66191</plant_id>
    <plant_name>Maple Flats</plant_name>
    <state>IL</state>
    <county>Clay</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.748461</lat>
    <lon>-88.54686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66334</plant_id>
    <plant_name>Sierra Estrella Energy Storage</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Sierra Estrella Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>1000</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.410802</lat>
    <lon>-112.3138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66821</plant_id>
    <plant_name>Orion III Solar Project</plant_name>
    <state>TX</state>
    <county>Milam</county>
    <operator>Ben Milam Solar 3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.960219</lat>
    <lon>-97.12452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66941</plant_id>
    <plant_name>Orion II Solar Project</plant_name>
    <state>TX</state>
    <county>Milam</county>
    <operator>Ben Milam Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.029028</lat>
    <lon>-96.93478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67019</plant_id>
    <plant_name>Copperhead Solar, LLC</plant_name>
    <state>TX</state>
    <county>McLennan</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.45</lat>
    <lon>-96.86</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67127</plant_id>
    <plant_name>SR Toombs, LLC</plant_name>
    <state>GA</state>
    <county>Montgomery</county>
    <operator>SR Toombs I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.294555</lat>
    <lon>-82.41625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67184</plant_id>
    <plant_name>Beehive Energy Storage</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Beehive Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>1000</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.8004</lat>
    <lon>-112.2725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67424</plant_id>
    <plant_name>Hopkins Energy LLC</plant_name>
    <state>TX</state>
    <county>Hopkins</county>
    <operator>Hopkins Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.21732</lat>
    <lon>-95.4621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67735</plant_id>
    <plant_name>Sebree Solar I</plant_name>
    <state>KY</state>
    <county>Henderson</county>
    <operator>Sebree Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.693</lat>
    <lon>-87.549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68048</plant_id>
    <plant_name>Morris Solar</plant_name>
    <state>MO</state>
    <county>Adair</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.1514</lat>
    <lon>-92.5993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68365</plant_id>
    <plant_name>Old 300 Storage Center</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Old 300 Storage Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>500</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.326602</lat>
    <lon>-95.81184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68429</plant_id>
    <plant_name>Fairbanks Solar Project</plant_name>
    <state>IN</state>
    <county>Sullivan</county>
    <operator>Fairbanks Solar Energy Center LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.193317</lat>
    <lon>-87.52384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68458</plant_id>
    <plant_name>Roaring Springs, LLC</plant_name>
    <state>TX</state>
    <county>Motley</county>
    <operator>Roaring Springs, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.877514</lat>
    <lon>-100.8902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68477</plant_id>
    <plant_name>Pediment BESS I</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Pediment BESS I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>1000</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.355662</lat>
    <lon>-111.6021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68536</plant_id>
    <plant_name>Optimist</plant_name>
    <state>MS</state>
    <county>Clay</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.643544</lat>
    <lon>-88.59398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68591</plant_id>
    <plant_name>Hardin Solar III</plant_name>
    <state>OH</state>
    <county>Hardin</county>
    <operator>Hardin Solar Energy III</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.682326</lat>
    <lon>-83.79388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68777</plant_id>
    <plant_name>Sherco Solar III</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>45.4329</lat>
    <lon>-94.0081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69720</plant_id>
    <plant_name>Medway Grid</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Medway Grid LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>250</nameplate_mw>
    <summer_mw>250</summer_mw>
    <battery_mwh>500</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.14537</lat>
    <lon>-71.44737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60592</plant_id>
    <plant_name>Rush Springs Wind</plant_name>
    <state>OK</state>
    <county>Stephens</county>
    <operator>Rush Springs Wind Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>249.9</nameplate_mw>
    <summer_mw>249.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.682883</lat>
    <lon>-97.82928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57439</plant_id>
    <plant_name>California Valley Solar Ranch</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Clearway Energy Operating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>249.8</nameplate_mw>
    <summer_mw>249.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2013</latest_year>
    <lat>35.323739</lat>
    <lon>-119.9166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58474</plant_id>
    <plant_name>Buffalo Dunes Wind Project</plant_name>
    <state>KS</state>
    <county>Haskell</county>
    <operator>Buffalo Dunes Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>249.8</nameplate_mw>
    <summer_mw>249.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.620833</lat>
    <lon>-101.0761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58780</plant_id>
    <plant_name>Scioto Ridge Wind Farm</plant_name>
    <state>OH</state>
    <county>Logan</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>249.8</nameplate_mw>
    <summer_mw>249.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.561389</lat>
    <lon>-83.73639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63502</plant_id>
    <plant_name>Oso Grande Wind Farm</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>249.8</nameplate_mw>
    <summer_mw>249.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.9323</lat>
    <lon>-103.6664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58542</plant_id>
    <plant_name>Desert Sunlight 250, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>NextEra Energy Desert Sunlight 250, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>9</generators>
    <nameplate_mw>249.7</nameplate_mw>
    <summer_mw>249.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2014</latest_year>
    <lat>33.8055</lat>
    <lon>-115.3947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60104</plant_id>
    <plant_name>Javelina Wind Energy, LLC</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Javelina Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>249.7</nameplate_mw>
    <summer_mw>249.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>27.32</lat>
    <lon>-99</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54805</plant_id>
    <plant_name>Milford Power LP</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Milford Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>249.3</nameplate_mw>
    <summer_mw>204.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>42.129361</lat>
    <lon>-71.5115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>976</plant_id>
    <plant_name>Marion</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>Southern Illinois Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Conventional Steam Coal</technologies>
    <generators>5</generators>
    <nameplate_mw>249</nameplate_mw>
    <summer_mw>260</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2003</latest_year>
    <lat>37.619747</lat>
    <lon>-88.95311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67538</plant_id>
    <plant_name>Wever Solar (150MW)</plant_name>
    <state>IA</state>
    <county>Lee</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>249</nameplate_mw>
    <summer_mw>249</summer_mw>
    <battery_mwh>99</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2026</latest_year>
    <lat>40.734563</lat>
    <lon>-91.27675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65675</plant_id>
    <plant_name>Edwards Sanborn E4</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>248.9</nameplate_mw>
    <summer_mw>248.9</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2023</latest_year>
    <lat>34.943575</lat>
    <lon>-118.088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57210</plant_id>
    <plant_name>Cedar Creek II</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Clearlight Energy Holdings LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>248.3</nameplate_mw>
    <summer_mw>248.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.9475</lat>
    <lon>-103.7839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63104</plant_id>
    <plant_name>King Plains Wind Project</plant_name>
    <state>OK</state>
    <county>Garfield</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>248.2</nameplate_mw>
    <summer_mw>248.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.400148</lat>
    <lon>-97.47746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7605</plant_id>
    <plant_name>River Road Gen Plant</plant_name>
    <state>WA</state>
    <county>Clark</county>
    <operator>PUD No 1 of Clark County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>248</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>45.6497</lat>
    <lon>-122.7256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65019</plant_id>
    <plant_name>Beaver Creek Wind Facility</plant_name>
    <state>MT</state>
    <county>Stillwater</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>248</nameplate_mw>
    <summer_mw>67.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.956</lat>
    <lon>-109.497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3145</plant_id>
    <plant_name>Holtwood</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>BIF III Holtwood LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>14</generators>
    <nameplate_mw>247.3</nameplate_mw>
    <summer_mw>249</summer_mw>
    <first_year>1910</first_year>
    <latest_year>2013</latest_year>
    <lat>39.827198</lat>
    <lon>-76.33177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61926</plant_id>
    <plant_name>Armadillo Flats Wind Project, LLC</plant_name>
    <state>OK</state>
    <county>Garfield</county>
    <operator>Armadillo Flats Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>247.3</nameplate_mw>
    <summer_mw>247.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.300964</lat>
    <lon>-97.56704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8000</plant_id>
    <plant_name>Beatrice</plant_name>
    <state>NE</state>
    <county>Gage</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>247.1</nameplate_mw>
    <summer_mw>219.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>40.330184</lat>
    <lon>-96.80815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55084</plant_id>
    <plant_name>Crockett Cogen Project</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Crockett Cogeneration</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>247</nameplate_mw>
    <summer_mw>247</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>38.0569</lat>
    <lon>-122.2161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60092</plant_id>
    <plant_name>Blythe Solar II, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Blythe Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>5</generators>
    <nameplate_mw>246.2</nameplate_mw>
    <summer_mw>246.2</summer_mw>
    <battery_mwh>538.6</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2021</latest_year>
    <lat>33.68</lat>
    <lon>-114.73</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>492</plant_id>
    <plant_name>South Plant (CO)</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>City of Colorado Springs - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>245.1</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.824444</lat>
    <lon>-104.8333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65937</plant_id>
    <plant_name>Porter Solar, LLC (TX)</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>245</nameplate_mw>
    <summer_mw>245</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.310446</lat>
    <lon>-97.36977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67489</plant_id>
    <plant_name>Cavalry Solar Hybrid</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Cavalry Energy Center LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>245</nameplate_mw>
    <summer_mw>245</summer_mw>
    <battery_mwh>180</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.895314</lat>
    <lon>-86.81023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68592</plant_id>
    <plant_name>Rockhound A</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>245</nameplate_mw>
    <summer_mw>245</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.723088</lat>
    <lon>-102.5196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55064</plant_id>
    <plant_name>Black Hawk Station</plant_name>
    <state>TX</state>
    <county>Hutchinson</county>
    <operator>Borger Energy Associates LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>243.9</nameplate_mw>
    <summer_mw>218.3</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2005</latest_year>
    <lat>35.6957</lat>
    <lon>-101.36</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61957</plant_id>
    <plant_name>Pratt Wind, LLC</plant_name>
    <state>KS</state>
    <county>Pratt</county>
    <operator>Pratt Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>243.5</nameplate_mw>
    <summer_mw>243.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.55</lat>
    <lon>-98.8</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3507</plant_id>
    <plant_name>Trinidad (TX)</plant_name>
    <state>TX</state>
    <county>Henderson</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>243.3</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1966</latest_year>
    <lat>32.124519</lat>
    <lon>-96.10128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67700</plant_id>
    <plant_name>Peyton Creek Wind Farm II</plant_name>
    <state>TX</state>
    <county>Matagorda</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>243</nameplate_mw>
    <summer_mw>243</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>28.896781</lat>
    <lon>-95.86518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62765</plant_id>
    <plant_name>El Campo Wind</plant_name>
    <state>TX</state>
    <county>Knox</county>
    <operator>El Campo Wind, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>242.8</nameplate_mw>
    <summer_mw>242.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.732181</lat>
    <lon>-99.72639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63655</plant_id>
    <plant_name>Coyote Wind LLC</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>242.5</nameplate_mw>
    <summer_mw>242.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.84879</lat>
    <lon>-100.8665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2399</plant_id>
    <plant_name>Burlington Generating Station</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Parkway Generation Operating, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>171.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.076611</lat>
    <lon>-74.87917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7829</plant_id>
    <plant_name>Smarr Energy Center</plant_name>
    <state>GA</state>
    <county>Monroe</county>
    <operator>Oglethorpe Power Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>190.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>32.9842</lat>
    <lon>-83.8464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55148</plant_id>
    <plant_name>Worthington Generation LLC</plant_name>
    <state>IN</state>
    <county>Greene</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>169.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>39.0708</lat>
    <lon>-87.0128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56674</plant_id>
    <plant_name>Winchester Power Park</plant_name>
    <state>TX</state>
    <county>Fayette</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>176</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>30.02547</lat>
    <lon>-96.9945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57068</plant_id>
    <plant_name>GenConn Middletown LLC</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>GenConn Middletown LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>187.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.554444</lat>
    <lon>-72.57667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57070</plant_id>
    <plant_name>GenConn Devon LLC</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>GenConn Devon LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>196</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.2108</lat>
    <lon>-73.1075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63025</plant_id>
    <plant_name>Clear Creek Wind</plant_name>
    <state>MO</state>
    <county>Nodaway</county>
    <operator>Clear Creek Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>242</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.369799</lat>
    <lon>-94.89201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67039</plant_id>
    <plant_name>Northern Orchard Solar PV, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>242</nameplate_mw>
    <summer_mw>242</summer_mw>
    <battery_mwh>368</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.120183</lat>
    <lon>-119.279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56337</plant_id>
    <plant_name>Sweetwater Wind 4 LLC</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>241</nameplate_mw>
    <summer_mw>241</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>32.3122</lat>
    <lon>-100.5303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64564</plant_id>
    <plant_name>Arlington Energy Center III</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Arlington Energy Center III</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>241</nameplate_mw>
    <summer_mw>241</summer_mw>
    <battery_mwh>440</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.69088</lat>
    <lon>-114.7749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2692</plant_id>
    <plant_name>Lewiston Niagara</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>12</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1962</latest_year>
    <lat>43.142973</lat>
    <lon>-79.02196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3415</plant_id>
    <plant_name>Pickwick Landing Dam</plant_name>
    <state>TN</state>
    <county>Hardin</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>244.3</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1952</latest_year>
    <lat>35.0683</lat>
    <lon>-88.2494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3850</plant_id>
    <plant_name>Swift 1</plant_name>
    <state>WA</state>
    <county>Skamania</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>263.7</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>46.060833</lat>
    <lon>-122.2017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7964</plant_id>
    <plant_name>Peno Creek</plant_name>
    <state>MO</state>
    <county>Pike</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>168</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.3531</lat>
    <lon>-91.2295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62013</plant_id>
    <plant_name>Pleinmont Solar 2</plant_name>
    <state>VA</state>
    <county>Spotsylvania</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.247123</lat>
    <lon>-77.78622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62249</plant_id>
    <plant_name>Misae Solar</plant_name>
    <state>TX</state>
    <county>Childress</county>
    <operator>Misae Lessee LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.380532</lat>
    <lon>-100.0996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63770</plant_id>
    <plant_name>Bighorn Solar 1</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.207518</lat>
    <lon>-104.5967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63985</plant_id>
    <plant_name>Fort Bend Solar LLC</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Acciona Energy USA Global, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.560311</lat>
    <lon>-95.98036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64239</plant_id>
    <plant_name>7V Solar Ranch</plant_name>
    <state>TX</state>
    <county>Fayette</county>
    <operator>7V Solar Ranch, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.806984</lat>
    <lon>-97.07408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64908</plant_id>
    <plant_name>Scarlet Solar (CA)</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>EDP Renewables North America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.597542</lat>
    <lon>-120.3623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66471</plant_id>
    <plant_name>Eiffel Solar Project</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>Paris Farm Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.599167</lat>
    <lon>-95.52506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66814</plant_id>
    <plant_name>Sky Ranch Solar</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>Sky Ranch Solar and Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.781625</lat>
    <lon>-106.7769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67740</plant_id>
    <plant_name>Anole Energy Storage</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Anole Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <battery_mwh>480</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.552083</lat>
    <lon>-96.53993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68431</plant_id>
    <plant_name>Cadence Solar Energy Center</plant_name>
    <state>OH</state>
    <county>Union</county>
    <operator>Cadence Solar Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>240</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.378008</lat>
    <lon>-83.43687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59757</plant_id>
    <plant_name>Pryor Mountain Wind</plant_name>
    <state>MT</state>
    <county>Carbon</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>239.8</nameplate_mw>
    <summer_mw>239.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.165525</lat>
    <lon>-108.6931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62855</plant_id>
    <plant_name>West Raymond Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Willacy</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>239.8</nameplate_mw>
    <summer_mw>239.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.376651</lat>
    <lon>-97.99305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50292</plant_id>
    <plant_name>Bethpage Power Plant</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Calpine Eastern Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>239.6</nameplate_mw>
    <summer_mw>173.1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2005</latest_year>
    <lat>40.7469</lat>
    <lon>-73.4994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62783</plant_id>
    <plant_name>Blackjack Creek Wind Farm</plant_name>
    <state>TX</state>
    <county>Bee</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>239.6</nameplate_mw>
    <summer_mw>239.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>28.2078</lat>
    <lon>-97.52267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57135</plant_id>
    <plant_name>Big Sky Wind LLC</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Big Sky Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>239.4</nameplate_mw>
    <summer_mw>239.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.599167</lat>
    <lon>-89.45611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65998</plant_id>
    <plant_name>True North Solar, LLC</plant_name>
    <state>TX</state>
    <county>Falls</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>238.8</nameplate_mw>
    <summer_mw>240</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.468564</lat>
    <lon>-96.79417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7146</plant_id>
    <plant_name>Wading River</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>238.5</nameplate_mw>
    <summer_mw>240.6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.956932</lat>
    <lon>-72.87741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67875</plant_id>
    <plant_name>Monte Cristo 1</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>238.5</nameplate_mw>
    <summer_mw>238.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.461461</lat>
    <lon>-98.28588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66001</plant_id>
    <plant_name>Chevelon Butte Wind Farm</plant_name>
    <state>AZ</state>
    <county>Coconino</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>238.2</nameplate_mw>
    <summer_mw>238.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.681496</lat>
    <lon>-110.8017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61865</plant_id>
    <plant_name>Rio Bravo Windpower, LLC</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Rio Bravo Windpower, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>237.6</nameplate_mw>
    <summer_mw>237.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>26.649</lat>
    <lon>-99.0387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57325</plant_id>
    <plant_name>FPL Energy Illinois Wind LLC Hybrid</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>FPL Energy Illinois Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>237.5</nameplate_mw>
    <summer_mw>237.5</summer_mw>
    <battery_mwh>8.3</battery_mwh>
    <first_year>2009</first_year>
    <latest_year>2014</latest_year>
    <lat>41.7678</lat>
    <lon>-88.8867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68776</plant_id>
    <plant_name>Sherco Solar II</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>237.1</nameplate_mw>
    <summer_mw>237.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.371517</lat>
    <lon>-93.86754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62624</plant_id>
    <plant_name>White Cloud Wind Project, LLC</plant_name>
    <state>MO</state>
    <county>Nodaway</county>
    <operator>White Cloud Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>236.5</nameplate_mw>
    <summer_mw>236.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.254993</lat>
    <lon>-94.97218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68895</plant_id>
    <plant_name>Libra Storage</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>Libra Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>236.3</nameplate_mw>
    <summer_mw>201</summer_mw>
    <battery_mwh>236.3</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.466592</lat>
    <lon>-98.00284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55228</plant_id>
    <plant_name>Greenville Electric Generating Station</plant_name>
    <state>OH</state>
    <county>Darke</county>
    <operator>Buckeye Power, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>236</nameplate_mw>
    <summer_mw>196</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.075783</lat>
    <lon>-84.61514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55229</plant_id>
    <plant_name>Montpelier Electric Generating Station</plant_name>
    <state>IN</state>
    <county>Wells</county>
    <operator>Kimura Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>236</nameplate_mw>
    <summer_mw>233.1</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.6206</lat>
    <lon>-85.3057</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55365</plant_id>
    <plant_name>Exelon LaPorte Generating Station</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>LaPorte Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>236</nameplate_mw>
    <summer_mw>144</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>29.7028</lat>
    <lon>-95.0718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59193</plant_id>
    <plant_name>Chapman Ranch Wind I</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Chapman Ranch Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>236</nameplate_mw>
    <summer_mw>249</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>27.5925</lat>
    <lon>-97.50083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63522</plant_id>
    <plant_name>Hickory Park Solar Hybrid</plant_name>
    <state>GA</state>
    <county>Mitchell</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>235.5</nameplate_mw>
    <summer_mw>235.5</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.269676</lat>
    <lon>-84.17632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56336</plant_id>
    <plant_name>Aragonne Wind LLC</plant_name>
    <state>NM</state>
    <county>Guadalupe</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>235</nameplate_mw>
    <summer_mw>235</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2022</latest_year>
    <lat>34.8147</lat>
    <lon>-105.0108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1595</plant_id>
    <plant_name>Kendall Square Station</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Kendall Green Energy, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>234.7</nameplate_mw>
    <summer_mw>224</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2002</latest_year>
    <lat>42.3633</lat>
    <lon>-71.0792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52169</plant_id>
    <plant_name>Midway Sunset Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Midway-Sunset Cogeneration Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>234</nameplate_mw>
    <summer_mw>219</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.2269</lat>
    <lon>-119.6294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56466</plant_id>
    <plant_name>Marengo Wind Plant</plant_name>
    <state>WA</state>
    <county>Columbia</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>234</nameplate_mw>
    <summer_mw>234</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2008</latest_year>
    <lat>46.3747</lat>
    <lon>-117.7772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56484</plant_id>
    <plant_name>Buffalo Gap 2 Wind Farm</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>232.5</nameplate_mw>
    <summer_mw>232.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>32.318221</lat>
    <lon>-100.177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>5083</plant_id>
    <plant_name>Cumberland (NJ)</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>Calpine New Jersey Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>231.2</nameplate_mw>
    <summer_mw>186.9</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2009</latest_year>
    <lat>39.3757</lat>
    <lon>-74.9654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58830</plant_id>
    <plant_name>Cross Winds Energy Park</plant_name>
    <state>MI</state>
    <county>Tuscola</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>230.9</nameplate_mw>
    <summer_mw>230.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2019</latest_year>
    <lat>43.610278</lat>
    <lon>-83.48556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55075</plant_id>
    <plant_name>Pine Bluff Energy Center</plant_name>
    <state>AR</state>
    <county>Jefferson</county>
    <operator>Pine Bluff Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>230.4</nameplate_mw>
    <summer_mw>179</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>34.2181</lat>
    <lon>-91.9025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59005</plant_id>
    <plant_name>Mariah del Norte</plant_name>
    <state>TX</state>
    <county>Parmer</county>
    <operator>BHE Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>230.4</nameplate_mw>
    <summer_mw>230.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.6675</lat>
    <lon>-102.5778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>963</plant_id>
    <plant_name>Dallman</plant_name>
    <state>IL</state>
    <county>Sangamon</county>
    <operator>City of Springfield - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>230.1</nameplate_mw>
    <summer_mw>209.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>39.754803</lat>
    <lon>-89.60239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2330</plant_id>
    <plant_name>Fort Churchill</plant_name>
    <state>NV</state>
    <county>Lyon</county>
    <operator>Sierra Pacific Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>226</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1971</latest_year>
    <lat>39.1281</lat>
    <lon>-119.1322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60338</plant_id>
    <plant_name>Electra Wind Farm</plant_name>
    <state>TX</state>
    <county>Wilbarger</county>
    <operator>Electra Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.102943</lat>
    <lon>-99.11875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60339</plant_id>
    <plant_name>Horse Creek Wind Farm</plant_name>
    <state>TX</state>
    <county>Haskell</county>
    <operator>Horse Creek Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.35</lat>
    <lon>-99.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62711</plant_id>
    <plant_name>Plum Creek Wind Project (NE)</plant_name>
    <state>NE</state>
    <county>Wayne</county>
    <operator>Plum Creek Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.16159</lat>
    <lon>-97.20379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65034</plant_id>
    <plant_name>Bernard Creek Solar</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Bernard Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.45527</lat>
    <lon>-96.08825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65857</plant_id>
    <plant_name>Sunlight Storage</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Sunlight Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <battery_mwh>920</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.803</lat>
    <lon>-115.402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66575</plant_id>
    <plant_name>Sunlight Storage II</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Sunlight Storage II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>230</nameplate_mw>
    <summer_mw>230</summer_mw>
    <battery_mwh>920</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.809536</lat>
    <lon>-115.7939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6504</plant_id>
    <plant_name>Maalaea</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Maui Electric Co Ltd</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>21</generators>
    <nameplate_mw>229.8</nameplate_mw>
    <summer_mw>197.9</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2006</latest_year>
    <lat>20.80117</lat>
    <lon>-156.493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3609</plant_id>
    <plant_name>Leon Creek</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>229.6</nameplate_mw>
    <summer_mw>184</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>29.3525</lat>
    <lon>-98.5761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66342</plant_id>
    <plant_name>Gaia Hybrid</plant_name>
    <state>TX</state>
    <county>Navarro</county>
    <operator>Sunraycer Assets I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>229.5</nameplate_mw>
    <summer_mw>229.5</summer_mw>
    <battery_mwh>307.2</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.160767</lat>
    <lon>-96.19527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2277</plant_id>
    <plant_name>Sheldon</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>228.7</nameplate_mw>
    <summer_mw>214</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1965</latest_year>
    <lat>40.5589</lat>
    <lon>-96.7847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68613</plant_id>
    <plant_name>Guajillo Energy Storage</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Guajillo Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>228.7</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>228.7</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.628889</lat>
    <lon>-99.26639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1417</plant_id>
    <plant_name>Lieberman</plant_name>
    <state>LA</state>
    <county>Caddo</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>228</nameplate_mw>
    <summer_mw>208</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1959</latest_year>
    <lat>32.7047</lat>
    <lon>-93.9597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55453</plant_id>
    <plant_name>Fountain Valley Power Facility</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Fountain Valley Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>228</nameplate_mw>
    <summer_mw>234</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.5569</lat>
    <lon>-104.6875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59066</plant_id>
    <plant_name>Bruennings Breeze Wind Farm</plant_name>
    <state>TX</state>
    <county>Willacy</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>228</nameplate_mw>
    <summer_mw>228</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>26.522222</lat>
    <lon>-97.69111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2188</plant_id>
    <plant_name>Selis Ksanka Qlispe</plant_name>
    <state>MT</state>
    <county>Lake</county>
    <operator>Energy Keepers Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>227.8</nameplate_mw>
    <summer_mw>227.8</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1954</latest_year>
    <lat>47.6777</lat>
    <lon>-114.2339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57332</plant_id>
    <plant_name>Crossroads Wind Farm</plant_name>
    <state>OK</state>
    <county>Dewey</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>227.5</nameplate_mw>
    <summer_mw>227.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.035</lat>
    <lon>-98.72222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62945</plant_id>
    <plant_name>Fighting Jays Solar Project</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>AP Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>227.5</nameplate_mw>
    <summer_mw>227.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.358425</lat>
    <lon>-95.74639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62462</plant_id>
    <plant_name>Muscle Shoals</plant_name>
    <state>AL</state>
    <county>Colbert</county>
    <operator>Muscle Shoals Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>227</nameplate_mw>
    <summer_mw>227</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.76973</lat>
    <lon>-87.90454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58614</plant_id>
    <plant_name>Patriot Wind Farm</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>226.1</nameplate_mw>
    <summer_mw>226.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.580489</lat>
    <lon>-97.64008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59284</plant_id>
    <plant_name>Mammoth Plains</plant_name>
    <state>OK</state>
    <county>Dewey</county>
    <operator>Mammoth Plains Wind Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>226.1</nameplate_mw>
    <summer_mw>226.1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.978889</lat>
    <lon>-98.71028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63133</plant_id>
    <plant_name>Roundhouse Wind Energy Project</plant_name>
    <state>WY</state>
    <county>Laramie</county>
    <operator>Roundhouse Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>226</nameplate_mw>
    <summer_mw>226</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.095126</lat>
    <lon>-105.1074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58266</plant_id>
    <plant_name>Port Westward Unit 2</plant_name>
    <state>OR</state>
    <county>Columbia</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>12</generators>
    <nameplate_mw>225.6</nameplate_mw>
    <summer_mw>224.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2015</latest_year>
    <lat>46.178889</lat>
    <lon>-123.1719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61643</plant_id>
    <plant_name>Denton Energy Center</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>City of Denton - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>12</generators>
    <nameplate_mw>225.6</nameplate_mw>
    <summer_mw>225.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.214869</lat>
    <lon>-97.20969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62411</plant_id>
    <plant_name>Griffin Trail Wind</plant_name>
    <state>TX</state>
    <county>Knox</county>
    <operator>Griffin Trail Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>225.6</nameplate_mw>
    <summer_mw>225.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.609313</lat>
    <lon>-99.58229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4</plant_id>
    <plant_name>Walter Bouldin Dam</plant_name>
    <state>AL</state>
    <county>Elmore</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>224.1</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>32.583889</lat>
    <lon>-86.28306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56298</plant_id>
    <plant_name>Roseville Energy Park</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>City of Roseville - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>212.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2022</latest_year>
    <lat>38.7928</lat>
    <lon>-121.3811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60574</plant_id>
    <plant_name>Great Western Wind Energy, LLC</plant_name>
    <state>OK</state>
    <county>Ellis</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.166503</lat>
    <lon>-99.59601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62845</plant_id>
    <plant_name>ENGIE Long Draw Solar LLC</plant_name>
    <state>TX</state>
    <county>Borden</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.741383</lat>
    <lon>-101.6218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65011</plant_id>
    <plant_name>Wood County</plant_name>
    <state>WI</state>
    <county>Wood</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2025</latest_year>
    <lat>44.27361</lat>
    <lon>-89.8335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65328</plant_id>
    <plant_name>Meridian Wind Park</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.461967</lat>
    <lon>-84.33982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66598</plant_id>
    <plant_name>Baldy Mesa Solar &amp; Storage</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.609183</lat>
    <lon>-117.4543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67528</plant_id>
    <plant_name>Milagro Solar I</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>Milagro Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.796</lat>
    <lon>-106.642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68483</plant_id>
    <plant_name>Diver Solar, LLC</plant_name>
    <state>TX</state>
    <county>Limestone</county>
    <operator>Diver Solar, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>225</nameplate_mw>
    <summer_mw>225</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.25</lat>
    <lon>-96.39</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59391</plant_id>
    <plant_name>Red Gate Power Plant</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>South Texas Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>12</generators>
    <nameplate_mw>224.4</nameplate_mw>
    <summer_mw>219.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>26.451111</lat>
    <lon>-98.1775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65715</plant_id>
    <plant_name>Great Pathfinder Wind</plant_name>
    <state>IA</state>
    <county>Hamilton</county>
    <operator>Great Pathfinder Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>224.4</nameplate_mw>
    <summer_mw>224.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.214126</lat>
    <lon>-93.87669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56505</plant_id>
    <plant_name>Jonesboro City Water &amp; Light Plant</plant_name>
    <state>AR</state>
    <county>Craighead</county>
    <operator>City Water and Light Plant - (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>224.3</nameplate_mw>
    <summer_mw>177</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2007</latest_year>
    <lat>35.848561</lat>
    <lon>-90.72538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7315</plant_id>
    <plant_name>Almond Power Plant</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>223.5</nameplate_mw>
    <summer_mw>199.5</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2012</latest_year>
    <lat>37.5744</lat>
    <lon>-120.985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66338</plant_id>
    <plant_name>Callisto I Energy Center</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Callisto I Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>223.4</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.646811</lat>
    <lon>-95.45054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67909</plant_id>
    <plant_name>Sherco Solar I</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>222.9</nameplate_mw>
    <summer_mw>222.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.407183</lat>
    <lon>-93.9365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>544</plant_id>
    <plant_name>Devon Station</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Devon Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>222.6</nameplate_mw>
    <summer_mw>132.4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1996</latest_year>
    <lat>41.209797</lat>
    <lon>-73.10898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54854</plant_id>
    <plant_name>Sun Peak Generating Station</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>222</nameplate_mw>
    <summer_mw>222</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>36.1375</lat>
    <lon>-115.0339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54041</plant_id>
    <plant_name>Lockport Energy Associates</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Lockport Energy Associates LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>221.3</nameplate_mw>
    <summer_mw>219</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>43.161947</lat>
    <lon>-78.74497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67284</plant_id>
    <plant_name>Ganado Solar</plant_name>
    <state>TX</state>
    <county>Jackson</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>221</nameplate_mw>
    <summer_mw>221</summer_mw>
    <battery_mwh>115</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>29.109147</lat>
    <lon>-96.52876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60317</plant_id>
    <plant_name>Grady Wind Energy Center, LLC</plant_name>
    <state>NM</state>
    <county>Curry</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>220.5</nameplate_mw>
    <summer_mw>220.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.734142</lat>
    <lon>-103.0922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2324</plant_id>
    <plant_name>Reid Gardner</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <battery_mwh>220</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.657347</lat>
    <lon>-114.6333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62247</plant_id>
    <plant_name>Prevailing Wind Park</plant_name>
    <state>SD</state>
    <county>Yankton</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.039</lat>
    <lon>-97.526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62416</plant_id>
    <plant_name>Cranell Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Refugio</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.197778</lat>
    <lon>-97.44495</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67960</plant_id>
    <plant_name>Willow Creek Wind (OK)</plant_name>
    <state>OK</state>
    <county>Noble</county>
    <operator>Willow Creek Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.244516</lat>
    <lon>-97.10122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68809</plant_id>
    <plant_name>Hidden Lakes Reliability Project</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Evelyn Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>220</nameplate_mw>
    <summer_mw>220</summer_mw>
    <battery_mwh>440</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.488956</lat>
    <lon>-95.03651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55216</plant_id>
    <plant_name>Morris Cogeneration LLC</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>Morris Cogeneration LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>218.8</nameplate_mw>
    <summer_mw>194</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2000</latest_year>
    <lat>41.411944</lat>
    <lon>-88.33278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1377</plant_id>
    <plant_name>Kentucky Dam</plant_name>
    <state>KY</state>
    <county>Marshall</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>218.6</nameplate_mw>
    <summer_mw>222.5</summer_mw>
    <first_year>1944</first_year>
    <latest_year>1948</latest_year>
    <lat>37.0131</lat>
    <lon>-88.2692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>335</plant_id>
    <plant_name>AES Huntington Beach LLC</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>AES Huntington Beach LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>218</nameplate_mw>
    <summer_mw>225.8</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>33.6439</lat>
    <lon>-117.9792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58242</plant_id>
    <plant_name>Pattern Panhandle Wind LLC</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>218</nameplate_mw>
    <summer_mw>218</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.4275</lat>
    <lon>-101.2531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64623</plant_id>
    <plant_name>Freeborn Wind Farm</plant_name>
    <state>MN</state>
    <county>Freeborn</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>218</nameplate_mw>
    <summer_mw>218</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.513056</lat>
    <lon>-93.18862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55622</plant_id>
    <plant_name>West Valley Generation Project</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Utah Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>217</nameplate_mw>
    <summer_mw>185</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>40.6667</lat>
    <lon>-112.0317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58008</plant_id>
    <plant_name>California Ridge Wind Energy LLC</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>217</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.211667</lat>
    <lon>-87.87833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56238</plant_id>
    <plant_name>Groton Generation Station</plant_name>
    <state>SD</state>
    <county>Brown</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>216.4</nameplate_mw>
    <summer_mw>170</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2008</latest_year>
    <lat>45.3735</lat>
    <lon>-98.09869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7887</plant_id>
    <plant_name>Terry Bundy Generating Station</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Lincoln Electric System</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Landfill Gas; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>216.3</nameplate_mw>
    <summer_mw>175.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2014</latest_year>
    <lat>40.909653</lat>
    <lon>-96.61309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67176</plant_id>
    <plant_name>Chevelon Butte Phase 2</plant_name>
    <state>AZ</state>
    <county>Coconino</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>216</nameplate_mw>
    <summer_mw>216</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.6821</lat>
    <lon>-110.803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56979</plant_id>
    <plant_name>Panther Creek Wind Farm Three</plant_name>
    <state>TX</state>
    <county>Sterling</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>215.5</nameplate_mw>
    <summer_mw>231.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>31.9925</lat>
    <lon>-101.1167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56857</plant_id>
    <plant_name>Marble River Wind Farm</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Marble River, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>215.3</nameplate_mw>
    <summer_mw>215.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.975833</lat>
    <lon>-73.92972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1305</plant_id>
    <plant_name>McPherson 2</plant_name>
    <state>KS</state>
    <county>McPherson</county>
    <operator>City of McPherson - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>214.8</nameplate_mw>
    <summer_mw>154.3</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1979</latest_year>
    <lat>38.363411</lat>
    <lon>-97.68335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60639</plant_id>
    <plant_name>Kingman Wind</plant_name>
    <state>KS</state>
    <county>Pratt</county>
    <operator>Kingman Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>214.8</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.586714</lat>
    <lon>-98.57926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68872</plant_id>
    <plant_name>Shenandoah Hills Wind Farm</plant_name>
    <state>IA</state>
    <county>Page</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>214.3</nameplate_mw>
    <summer_mw>214.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.634111</lat>
    <lon>-95.3707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56614</plant_id>
    <plant_name>Old Trail Wind Farm</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>Old Trail Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>213.8</nameplate_mw>
    <summer_mw>213.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.4792</lat>
    <lon>-88.7989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60069</plant_id>
    <plant_name>Cedar Bluff Wind, LLC</plant_name>
    <state>KS</state>
    <county>Ness</county>
    <operator>Cedar Bluff Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>212.8</nameplate_mw>
    <summer_mw>212.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.697606</lat>
    <lon>-99.72929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2390</plant_id>
    <plant_name>Sayreville</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Sayreville Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>212</nameplate_mw>
    <summer_mw>202.8</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1973</latest_year>
    <lat>40.476525</lat>
    <lon>-74.35234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2446</plant_id>
    <plant_name>Maddox</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>212</nameplate_mw>
    <summer_mw>188</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1976</latest_year>
    <lat>32.714224</lat>
    <lon>-103.3015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58694</plant_id>
    <plant_name>Walnut Ridge Wind Farm</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>BHE Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>212</nameplate_mw>
    <summer_mw>212</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.496667</lat>
    <lon>-89.58028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62035</plant_id>
    <plant_name>Glaciers Edge Wind Project</plant_name>
    <state>IA</state>
    <county>Cherokee</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>211.7</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.862</lat>
    <lon>-95.772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58596</plant_id>
    <plant_name>Grandview Wind Farm, LLC</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>211.2</nameplate_mw>
    <summer_mw>211.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.238333</lat>
    <lon>-101.3108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59332</plant_id>
    <plant_name>Mesquite Creek Wind</plant_name>
    <state>TX</state>
    <county>Dawson</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>211.2</nameplate_mw>
    <summer_mw>211.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>32.7</lat>
    <lon>-101.7411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56338</plant_id>
    <plant_name>High Trail Wind Farm LLC</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>High Trail Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>210.9</nameplate_mw>
    <summer_mw>210.9</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.4792</lat>
    <lon>-88.7989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>16</plant_id>
    <plant_name>Martin Dam</plant_name>
    <state>AL</state>
    <county>Elmore</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>210.6</nameplate_mw>
    <summer_mw>182.1</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1952</latest_year>
    <lat>32.680394</lat>
    <lon>-85.91144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1366</plant_id>
    <plant_name>Paddys Run</plant_name>
    <state>KY</state>
    <county>Jefferson</county>
    <operator>Louisville Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>210.6</nameplate_mw>
    <summer_mw>170</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2001</latest_year>
    <lat>38.223592</lat>
    <lon>-85.8417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63030</plant_id>
    <plant_name>Canadian Breaks, LLC</plant_name>
    <state>TX</state>
    <county>Deaf Smith</county>
    <operator>Canadian Breaks LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>210.1</nameplate_mw>
    <summer_mw>210.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.200164</lat>
    <lon>-102.3155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56941</plant_id>
    <plant_name>Grand Ridge Wind Energy Center</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>41.2269</lat>
    <lon>-88.6836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57424</plant_id>
    <plant_name>Buffalo Ridge II LLC</plant_name>
    <state>SD</state>
    <county>Brookings</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>44.5281</lat>
    <lon>-96.6267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65894</plant_id>
    <plant_name>Stillhouse Solar</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Stillhouse Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.967591</lat>
    <lon>-97.16511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65956</plant_id>
    <plant_name>Storey Solar and Storage</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Storey Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>176</summer_mw>
    <battery_mwh>264</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.8882</lat>
    <lon>-111.4978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67046</plant_id>
    <plant_name>Grimes County Solar</plant_name>
    <state>TX</state>
    <county>Grimes</county>
    <operator>Grimes County Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.651189</lat>
    <lon>-96.09134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67091</plant_id>
    <plant_name>Yellow Pine II</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Yellow Pine Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>210</nameplate_mw>
    <summer_mw>210</summer_mw>
    <battery_mwh>340</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.075505</lat>
    <lon>-115.7913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62207</plant_id>
    <plant_name>Reloj del Sol Wind Farm</plant_name>
    <state>TX</state>
    <county>Zapata</county>
    <operator>Reloj del Sol Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>209.4</nameplate_mw>
    <summer_mw>209.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.03028</lat>
    <lon>-99.38839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10436</plant_id>
    <plant_name>ExxonMobil Baytown Refinery</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Exxon Mobil Refining and Supply Co.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; All Other</technologies>
    <generators>7</generators>
    <nameplate_mw>209.3</nameplate_mw>
    <summer_mw>141.5</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1989</latest_year>
    <lat>29.753517</lat>
    <lon>-94.99728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56593</plant_id>
    <plant_name>Roscoe Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>209</nameplate_mw>
    <summer_mw>209</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.4694</lat>
    <lon>-100.6664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66323</plant_id>
    <plant_name>King Creek Wind Farm 2, LLC</plant_name>
    <state>TX</state>
    <county>Throckmorton</county>
    <operator>King Creek Wind Farm 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>209</nameplate_mw>
    <summer_mw>209</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.182414</lat>
    <lon>-99.38989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70052</plant_id>
    <plant_name>Misae Solar IV LLC</plant_name>
    <state>TX</state>
    <county>Leon</county>
    <operator>Ferrovial Energy US</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>209</nameplate_mw>
    <summer_mw>209</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.443072</lat>
    <lon>-95.75183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60620</plant_id>
    <plant_name>Ninnescah Wind Energy, LLC</plant_name>
    <state>KS</state>
    <county>Pratt</county>
    <operator>Ninnescah Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>208.3</nameplate_mw>
    <summer_mw>208.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.586714</lat>
    <lon>-98.57926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2106</plant_id>
    <plant_name>Osage Dam</plant_name>
    <state>MO</state>
    <county>Miller</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>208</nameplate_mw>
    <summer_mw>234</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1953</latest_year>
    <lat>38.2044</lat>
    <lon>-92.6239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59968</plant_id>
    <plant_name>Desert Wind Farm, LLC</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>208</nameplate_mw>
    <summer_mw>208</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.31</lat>
    <lon>-76.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66183</plant_id>
    <plant_name>Clearwater Wind East</plant_name>
    <state>MT</state>
    <county>Custer</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>207.9</nameplate_mw>
    <summer_mw>207.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.789608</lat>
    <lon>-106.0021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67237</plant_id>
    <plant_name>Ebony Energy Storage</plant_name>
    <state>TX</state>
    <county>Comal</county>
    <operator>Ebony Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>207.9</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.620088</lat>
    <lon>-98.33448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3293</plant_id>
    <plant_name>Saluda Lexington</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>207.3</nameplate_mw>
    <summer_mw>198.5</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1971</latest_year>
    <lat>34.0533</lat>
    <lon>-81.2172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6431</plant_id>
    <plant_name>Gorge</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>City of Seattle - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>207.3</nameplate_mw>
    <summer_mw>193</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1951</latest_year>
    <lat>48.698056</lat>
    <lon>-121.2086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59943</plant_id>
    <plant_name>Rattlesnake Den</plant_name>
    <state>TX</state>
    <county>Glasscock</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>207.2</nameplate_mw>
    <summer_mw>207.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>31.74325</lat>
    <lon>-101.4934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57873</plant_id>
    <plant_name>Eclipse Wind Farm</plant_name>
    <state>IA</state>
    <county>Guthrie</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>207.1</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.554651</lat>
    <lon>-94.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65390</plant_id>
    <plant_name>Ledyard Windpower, LLC</plant_name>
    <state>IA</state>
    <county>Kossuth</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>207</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.430082</lat>
    <lon>-94.10695</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67766</plant_id>
    <plant_name>Yellowstone County Generating Station</plant_name>
    <state>MT</state>
    <county>Yellowstone</county>
    <operator>NorthWestern Energy (MT wind/thermal)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>18</generators>
    <nameplate_mw>207</nameplate_mw>
    <summer_mw>165.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.65992</lat>
    <lon>-108.7608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56984</plant_id>
    <plant_name>Inadale Wind Farm LLC Hybrid</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>206.9</nameplate_mw>
    <summer_mw>206.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2009</first_year>
    <latest_year>2018</latest_year>
    <lat>32.4969</lat>
    <lon>-100.5797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58322</plant_id>
    <plant_name>Prairie Breeze</plant_name>
    <state>NE</state>
    <county>Antelope</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>206.5</nameplate_mw>
    <summer_mw>211.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.951667</lat>
    <lon>-98.07667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3548</plant_id>
    <plant_name>Decker Creek</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Austin Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>206</nameplate_mw>
    <summer_mw>208</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>30.3033</lat>
    <lon>-97.6128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65059</plant_id>
    <plant_name>Niyol Wind, LLC</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Niyol Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>205.6</nameplate_mw>
    <summer_mw>205</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.613364</lat>
    <lon>-102.9526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56617</plant_id>
    <plant_name>Fenton Wind Farm</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>205.5</nameplate_mw>
    <summer_mw>205.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>43.852778</lat>
    <lon>-96.01833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57374</plant_id>
    <plant_name>Lakefield Wind Project LLC</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>205.5</nameplate_mw>
    <summer_mw>205.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.675</lat>
    <lon>-95.15667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57623</plant_id>
    <plant_name>Bright Stalk Wind Farm I</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>Lexington Chenoa Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>205.2</nameplate_mw>
    <summer_mw>205.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.701241</lat>
    <lon>-88.70105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58872</plant_id>
    <plant_name>Bison 4 Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>205</nameplate_mw>
    <summer_mw>201.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>46.98</lat>
    <lon>-101.5547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66773</plant_id>
    <plant_name>Raceway Solar &amp; Storage</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>205</nameplate_mw>
    <summer_mw>205</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.842388</lat>
    <lon>-118.2862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56097</plant_id>
    <plant_name>New Mexico Wind Energy Center</plant_name>
    <state>NM</state>
    <county>Quay</county>
    <operator>FPL Energy New Mexico Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>204</nameplate_mw>
    <summer_mw>204</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.63566</lat>
    <lon>-104.0473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56487</plant_id>
    <plant_name>White Creek Wind Farm</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>White Creek Wind 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>204</nameplate_mw>
    <summer_mw>204</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>45.815467</lat>
    <lon>-120.3419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59034</plant_id>
    <plant_name>1370 Shannon</plant_name>
    <state>TX</state>
    <county>Clay</county>
    <operator>1370 Shannon LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>204</nameplate_mw>
    <summer_mw>204</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.509722</lat>
    <lon>-98.36083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61696</plant_id>
    <plant_name>Twiggs Solar</plant_name>
    <state>GA</state>
    <county>Twiggs</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>204</nameplate_mw>
    <summer_mw>204</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.604997</lat>
    <lon>-83.49124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67738</plant_id>
    <plant_name>Citadel Battery Storage Plant</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Citadel BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>204</nameplate_mw>
    <summer_mw>204</summer_mw>
    <battery_mwh>298</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.87404</lat>
    <lon>-95.01824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69225</plant_id>
    <plant_name>Top Hat Wind</plant_name>
    <state>IL</state>
    <county>Logan</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>204</nameplate_mw>
    <summer_mw>204</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.153624</lat>
    <lon>-89.2225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57036</plant_id>
    <plant_name>Southcentral Power Project</plant_name>
    <state>AK</state>
    <county>Anchorage</county>
    <operator>Chugach Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>203.9</nameplate_mw>
    <summer_mw>169.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>61.167417</lat>
    <lon>-149.9053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64075</plant_id>
    <plant_name>Taygete II Energy Project</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>West Texas Solar Project II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>203.8</nameplate_mw>
    <summer_mw>203.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.186</lat>
    <lon>-103.128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57079</plant_id>
    <plant_name>Milford Wind Corridor I LLC</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Milford Wind Corridor Phase I, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>203.5</nameplate_mw>
    <summer_mw>203.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.53569</lat>
    <lon>-112.935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64258</plant_id>
    <plant_name>AP Sunray LLC</plant_name>
    <state>TX</state>
    <county>Uvalde</county>
    <operator>AP Sunray LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>203.5</nameplate_mw>
    <summer_mw>203.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.291845</lat>
    <lon>-99.61237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6243</plant_id>
    <plant_name>Dansby</plant_name>
    <state>TX</state>
    <county>Brazos</county>
    <operator>City of Bryan - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>203.2</nameplate_mw>
    <summer_mw>204.2</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2010</latest_year>
    <lat>30.7217</lat>
    <lon>-96.4608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56908</plant_id>
    <plant_name>Dave Gates Generating Station</plant_name>
    <state>MT</state>
    <county>Deer Lodge</county>
    <operator>NorthWestern Energy (MT wind/thermal)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>203.1</nameplate_mw>
    <summer_mw>132.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>46.104713</lat>
    <lon>-112.8766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57802</plant_id>
    <plant_name>Magic Valley Wind Farm I LLC</plant_name>
    <state>TX</state>
    <county>Willacy</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>203</nameplate_mw>
    <summer_mw>203</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>26.475278</lat>
    <lon>-97.69111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66009</plant_id>
    <plant_name>Crossett Power Management LLC</plant_name>
    <state>TX</state>
    <county>Crane</county>
    <operator>Crossett Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>203</nameplate_mw>
    <summer_mw>203</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.191687</lat>
    <lon>-102.3172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66262</plant_id>
    <plant_name>Cutlass Solar II</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Cutlass II Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>202.8</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.39</lat>
    <lon>-95.78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64688</plant_id>
    <plant_name>Plymouth Wind</plant_name>
    <state>IA</state>
    <county>Plymouth</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>202.7</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.842969</lat>
    <lon>-95.94126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59940</plant_id>
    <plant_name>Great Valley Solar Portfolio Holdings, L</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>202.5</nameplate_mw>
    <summer_mw>202.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2018</latest_year>
    <lat>36.581182</lat>
    <lon>-120.3796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61784</plant_id>
    <plant_name>Upstream Wind Energy LLC</plant_name>
    <state>NE</state>
    <county>Antelope</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>202.5</nameplate_mw>
    <summer_mw>202.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.184336</lat>
    <lon>-97.96498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67095</plant_id>
    <plant_name>Montgomery Ranch Wind Farm, LLC</plant_name>
    <state>TX</state>
    <county>Foard</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>202.5</nameplate_mw>
    <summer_mw>202.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.841272</lat>
    <lon>-99.65781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67443</plant_id>
    <plant_name>Lane City Wind</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>202.5</nameplate_mw>
    <summer_mw>202.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.209729</lat>
    <lon>-96.0296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66668</plant_id>
    <plant_name>Chickasaw Wind Farm</plant_name>
    <state>IA</state>
    <county>Chickasaw</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>202.4</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.14014</lat>
    <lon>-92.32443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57927</plant_id>
    <plant_name>Baffin Wind</plant_name>
    <state>TX</state>
    <county>Kenedy</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>202</nameplate_mw>
    <summer_mw>202</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>27.184652</lat>
    <lon>-97.59818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58924</plant_id>
    <plant_name>Sugar Creek Wind One LLC</plant_name>
    <state>IL</state>
    <county>Logan</county>
    <operator>Sugar Creek Wind One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>202</nameplate_mw>
    <summer_mw>202</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.074167</lat>
    <lon>-89.29194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61161</plant_id>
    <plant_name>Harvest Ridge Wind Farm</plant_name>
    <state>IL</state>
    <county>Douglas</county>
    <operator>Harvest Ridge Wind Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>202</nameplate_mw>
    <summer_mw>202</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.83188</lat>
    <lon>-88.0723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63892</plant_id>
    <plant_name>Lily Solar Hybrid</plant_name>
    <state>TX</state>
    <county>Kaufman</county>
    <operator>Lily Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>201.9</nameplate_mw>
    <summer_mw>196</summer_mw>
    <battery_mwh>80.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.533273</lat>
    <lon>-96.42899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3630</plant_id>
    <plant_name>Pearsall</plant_name>
    <state>TX</state>
    <county>Frio</county>
    <operator>South Texas Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>24</generators>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>201.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>28.9275</lat>
    <lon>-99.0919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56795</plant_id>
    <plant_name>Penascal Wind Power LLC</plant_name>
    <state>TX</state>
    <county>Kenedy</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>201.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>27.022112</lat>
    <lon>-97.49848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57095</plant_id>
    <plant_name>Penascal II Wind Project LLC</plant_name>
    <state>TX</state>
    <county>Kenedy</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>201.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>27.122529</lat>
    <lon>-97.55737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57752</plant_id>
    <plant_name>Los Vientos Wind 1B</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>201.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>26.34892</lat>
    <lon>-97.6668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62258</plant_id>
    <plant_name>Mesteno</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>26.523692</lat>
    <lon>-98.74552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63101</plant_id>
    <plant_name>Las Lomas Wind Project</plant_name>
    <state>TX</state>
    <county>Zapata</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>201.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>26.69842</lat>
    <lon>-99.05745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66861</plant_id>
    <plant_name>Indiana Crossroads Wind Farm II</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Indiana Crossroads Wind Farm II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.6</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.779357</lat>
    <lon>-87.04211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64339</plant_id>
    <plant_name>Horizon Hill Wind Project</plant_name>
    <state>OK</state>
    <county>Logan</county>
    <operator>Horizon Hill Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.5</nameplate_mw>
    <summer_mw>201.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.989377</lat>
    <lon>-97.58951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64341</plant_id>
    <plant_name>White Rock East Wind Project</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>White Rock Wind East, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.5</nameplate_mw>
    <summer_mw>201.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.97427</lat>
    <lon>-98.18516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57198</plant_id>
    <plant_name>Bent Tree Wind Farm Phase 1</plant_name>
    <state>MN</state>
    <county>Freeborn</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.3</nameplate_mw>
    <summer_mw>201.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.724596</lat>
    <lon>-93.45043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62079</plant_id>
    <plant_name>Whispering Willow North</plant_name>
    <state>IA</state>
    <county>Franklin</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.3</nameplate_mw>
    <summer_mw>201.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.774955</lat>
    <lon>-93.41807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63710</plant_id>
    <plant_name>Golden Hill Wind</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201.3</nameplate_mw>
    <summer_mw>201.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.562715</lat>
    <lon>-120.7085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56252</plant_id>
    <plant_name>Century</plant_name>
    <state>IA</state>
    <county>Hamilton</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>201.2</nameplate_mw>
    <summer_mw>201.2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2007</latest_year>
    <lat>42.5644</lat>
    <lon>-93.6369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56613</plant_id>
    <plant_name>Logan Wind Energy</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Logan Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>201</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.941</lat>
    <lon>-103.259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56784</plant_id>
    <plant_name>Cloud County Wind Farm</plant_name>
    <state>KS</state>
    <county>Cloud</county>
    <operator>Cloud County Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>201</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.4375</lat>
    <lon>-97.6644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57047</plant_id>
    <plant_name>Nobles Wind Project</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>201</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>43.7036</lat>
    <lon>-95.7131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57678</plant_id>
    <plant_name>Post Rock Wind Power Project, LLC</plant_name>
    <state>KS</state>
    <county>Ellsworth</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>201</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.841667</lat>
    <lon>-98.29944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59063</plant_id>
    <plant_name>Stella Wind Farm</plant_name>
    <state>TX</state>
    <county>Kenedy</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>201</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>26.941667</lat>
    <lon>-97.6425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62795</plant_id>
    <plant_name>Ida Grove II</plant_name>
    <state>IA</state>
    <county>Ida</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>201</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.326854</lat>
    <lon>-95.45882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60672</plant_id>
    <plant_name>Osborn Wind Energy</plant_name>
    <state>MO</state>
    <county>DeKalb</county>
    <operator>Osborn Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.9</nameplate_mw>
    <summer_mw>195.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.747699</lat>
    <lon>-94.47348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59083</plant_id>
    <plant_name>Limon III Wind LLC</plant_name>
    <state>CO</state>
    <county>Lincoln</county>
    <operator>Limon</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.6</nameplate_mw>
    <summer_mw>200.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.353333</lat>
    <lon>-103.4742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63269</plant_id>
    <plant_name>Crowned Ridge Wind II Energy Center</plant_name>
    <state>SD</state>
    <county>Codington</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.6</nameplate_mw>
    <summer_mw>200.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.0054</lat>
    <lon>-96.92995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65738</plant_id>
    <plant_name>Sunflower Energy Center, LLC</plant_name>
    <state>KS</state>
    <county>Marion</county>
    <operator>Sunflower Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.6</nameplate_mw>
    <summer_mw>200.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.23161</lat>
    <lon>-97.04718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67601</plant_id>
    <plant_name>Diversion Wind Energy LLC</plant_name>
    <state>TX</state>
    <county>Baylor</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>200.6</nameplate_mw>
    <summer_mw>200.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.719262</lat>
    <lon>-99.02301</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58767</plant_id>
    <plant_name>Buckeye Wind Energy Center</plant_name>
    <state>KS</state>
    <county>Ellis</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.5</nameplate_mw>
    <summer_mw>200.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.003873</lat>
    <lon>-99.41416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64088</plant_id>
    <plant_name>Alta Farms II Wind Project, LLC</plant_name>
    <state>IL</state>
    <county>DeWitt</county>
    <operator>Alta Farms II Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.5</nameplate_mw>
    <summer_mw>200.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.1972</lat>
    <lon>-89.06766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61756</plant_id>
    <plant_name>Meadow Lake Wind Farm VI LLC</plant_name>
    <state>IN</state>
    <county>Benton</county>
    <operator>Meadow Lake Wind Farm VI LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.4</nameplate_mw>
    <summer_mw>200.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.692552</lat>
    <lon>-87.12701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66137</plant_id>
    <plant_name>Zier Solar</plant_name>
    <state>TX</state>
    <county>Kinney</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>200.4</nameplate_mw>
    <summer_mw>200.4</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.350992</lat>
    <lon>-100.562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62566</plant_id>
    <plant_name>Blue Summit III Wind</plant_name>
    <state>TX</state>
    <county>Hardeman</county>
    <operator>Blue Summit III Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.2</nameplate_mw>
    <summer_mw>200.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.170488</lat>
    <lon>-99.56344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62909</plant_id>
    <plant_name>Raymond Wind Farm, LLC</plant_name>
    <state>TX</state>
    <county>Willacy</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.2</nameplate_mw>
    <summer_mw>200.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.364153</lat>
    <lon>-97.78044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64591</plant_id>
    <plant_name>El Algodon Alto Wind Farm, LLC</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.2</nameplate_mw>
    <summer_mw>200.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.992706</lat>
    <lon>-97.74398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57212</plant_id>
    <plant_name>Papalote Creek II LLC</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.1</nameplate_mw>
    <summer_mw>200.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>27.9958</lat>
    <lon>-97.2967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59442</plant_id>
    <plant_name>Logans Gap Wind LLC</plant_name>
    <state>TX</state>
    <county>Comanche</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.1</nameplate_mw>
    <summer_mw>200.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>31.8225</lat>
    <lon>-98.69056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60503</plant_id>
    <plant_name>Crowned Ridge Wind Energy Center</plant_name>
    <state>SD</state>
    <county>Codington</county>
    <operator>Crowned Ridge Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.1</nameplate_mw>
    <summer_mw>200.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.154947</lat>
    <lon>-96.83684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60999</plant_id>
    <plant_name>Reading Wind Project</plant_name>
    <state>KS</state>
    <county>Lyon</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.1</nameplate_mw>
    <summer_mw>200.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.475</lat>
    <lon>-95.9655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69079</plant_id>
    <plant_name>Carpenter Wind Farm LLC</plant_name>
    <state>IN</state>
    <county>Jasper</county>
    <operator>Carpenter Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200.1</nameplate_mw>
    <summer_mw>200.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.76585</lat>
    <lon>-87.15371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2166</plant_id>
    <plant_name>Table Rock</plant_name>
    <state>MO</state>
    <county>Taney</county>
    <operator>USCE-Little Rock District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>216.5</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1961</latest_year>
    <lat>36.597</lat>
    <lon>-93.3086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6208</plant_id>
    <plant_name>Mount Elbert</plant_name>
    <state>CO</state>
    <county>Lake</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>2</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>230</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1984</latest_year>
    <lat>39.094197</lat>
    <lon>-106.3523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55026</plant_id>
    <plant_name>Dighton Power Plant</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Dighton Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>165.6</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>41.8312</lat>
    <lon>-71.1239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56395</plant_id>
    <plant_name>Mesquite Wind Power LLC</plant_name>
    <state>TX</state>
    <county>Shackelford</county>
    <operator>Mesquite Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>32.6256</lat>
    <lon>-99.4928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56483</plant_id>
    <plant_name>Post Oak Wind LLC</plant_name>
    <state>TX</state>
    <county>Shackelford</county>
    <operator>Mesquite Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.5144</lat>
    <lon>-99.6564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56925</plant_id>
    <plant_name>FPL Energy Crystal Lake Wind II LLC</plant_name>
    <state>IA</state>
    <county>Hancock</county>
    <operator>FPL Energy Crystal Lake Wind II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>199</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.273731</lat>
    <lon>-93.8</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57027</plant_id>
    <plant_name>Canyon Power Plant</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>City of Anaheim - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>194.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.858056</lat>
    <lon>-117.8617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57113</plant_id>
    <plant_name>Blackstone Wind Farm II LLC</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Blackstone Wind Farm II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.1406</lat>
    <lon>-88.53</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57284</plant_id>
    <plant_name>Minonk Wind Farm</plant_name>
    <state>IL</state>
    <county>Woodford</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>192.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.888611</lat>
    <lon>-88.99722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57327</plant_id>
    <plant_name>Top of the World Windpower Project</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.9258</lat>
    <lon>-105.7872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57463</plant_id>
    <plant_name>Bishop Hill Energy LLC</plant_name>
    <state>IL</state>
    <county>Henry</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.215278</lat>
    <lon>-90.12083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57644</plant_id>
    <plant_name>Prairie Rose Wind Farm</plant_name>
    <state>MN</state>
    <county>Rock</county>
    <operator>Prairie Rose Wind Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.828217</lat>
    <lon>-96.32157</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57751</plant_id>
    <plant_name>Los Vientos Wind 1A</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>26.33072</lat>
    <lon>-97.5857</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57858</plant_id>
    <plant_name>Caney River Wind Project</plant_name>
    <state>KS</state>
    <county>Elk</county>
    <operator>Caney River Wind Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.46</lat>
    <lon>-96.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57862</plant_id>
    <plant_name>Wildcat Wind Farm I, LLC</plant_name>
    <state>IN</state>
    <county>Tipton</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.349444</lat>
    <lon>-85.84306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58099</plant_id>
    <plant_name>Montague Wind Power Facility LLC</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.5857</lat>
    <lon>-120.0904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58126</plant_id>
    <plant_name>Limon Wind I</plant_name>
    <state>CO</state>
    <county>Lincoln</county>
    <operator>Limon</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.380975</lat>
    <lon>-103.5732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58127</plant_id>
    <plant_name>Limon Wind II</plant_name>
    <state>CO</state>
    <county>Lincoln</county>
    <operator>Limon</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.341389</lat>
    <lon>-103.5811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58416</plant_id>
    <plant_name>Headwaters Wind Farm LLC</plant_name>
    <state>IN</state>
    <county>Randolph</county>
    <operator>Headwaters Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.066667</lat>
    <lon>-85.01333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58657</plant_id>
    <plant_name>Odell Wind Farm</plant_name>
    <state>MN</state>
    <county>Cottonwood</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.853333</lat>
    <lon>-94.93194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58658</plant_id>
    <plant_name>Courtenay Wind Farm</plant_name>
    <state>ND</state>
    <county>Stutsman</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>47.179722</lat>
    <lon>-98.59472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58772</plant_id>
    <plant_name>Longhorn Wind</plant_name>
    <state>TX</state>
    <county>Briscoe</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.311111</lat>
    <lon>-101.2511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58773</plant_id>
    <plant_name>TX Hereford Wind</plant_name>
    <state>TX</state>
    <county>Deaf Smith</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.748056</lat>
    <lon>-102.1744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58998</plant_id>
    <plant_name>Goodwell Wind Project LLC</plant_name>
    <state>OK</state>
    <county>Texas</county>
    <operator>Goodwell Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.541389</lat>
    <lon>-101.5656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59068</plant_id>
    <plant_name>Colbeck's Corner, LLC</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.254184</lat>
    <lon>-101.1866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59201</plant_id>
    <plant_name>Pleasant Valley Wind Farm</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>43.805</lat>
    <lon>-92.76972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59320</plant_id>
    <plant_name>Los Vientos Windpower III</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>26.388611</lat>
    <lon>-98.80611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59321</plant_id>
    <plant_name>Los Vientos Windpower IV</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>26.380556</lat>
    <lon>-98.81833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59384</plant_id>
    <plant_name>South Plains Wind Phase I</plant_name>
    <state>TX</state>
    <county>Floyd</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.080556</lat>
    <lon>-101.3236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59525</plant_id>
    <plant_name>Wright Solar Park</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Wright Solar Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.009444</lat>
    <lon>-120.9572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60218</plant_id>
    <plant_name>Frontier Windpower</plant_name>
    <state>OK</state>
    <county>Kay</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.838884</lat>
    <lon>-97.18102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60504</plant_id>
    <plant_name>Blazing Star Wind Farm 1</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.544137</lat>
    <lon>-96.36824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60505</plant_id>
    <plant_name>Crocker Wind Farm</plant_name>
    <state>SD</state>
    <county>Clark</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.051544</lat>
    <lon>-97.82642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60645</plant_id>
    <plant_name>Javelina Wind Energy II, LLC</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Javelina Wind Energy II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>27.44</lat>
    <lon>-98.91</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60687</plant_id>
    <plant_name>Cimarron Bend Wind Project I, LLC</plant_name>
    <state>KS</state>
    <county>Clark</county>
    <operator>Cimarron Bend Wind Project I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.355</lat>
    <lon>-99.991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60688</plant_id>
    <plant_name>Cimarron Bend Wind Project II, LLC</plant_name>
    <state>KS</state>
    <county>Clark</county>
    <operator>Cimarron Bend Wind Project II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.355</lat>
    <lon>-99.991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61212</plant_id>
    <plant_name>Flat Top Wind I</plant_name>
    <state>TX</state>
    <county>Mills</county>
    <operator>BHE Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.684511</lat>
    <lon>-98.60336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61357</plant_id>
    <plant_name>Red Pine Wind Project</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.478</lat>
    <lon>-96.1538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61650</plant_id>
    <plant_name>Blazing Star 2 Wind Farm</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.445293</lat>
    <lon>-96.35276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61930</plant_id>
    <plant_name>Techren Solar II LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Techren Solar II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.867258</lat>
    <lon>-114.9564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61962</plant_id>
    <plant_name>Holstein 1 Solar Farm</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Holstein Solar Farm 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.104125</lat>
    <lon>-100.1624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62141</plant_id>
    <plant_name>Rambler</plant_name>
    <state>TX</state>
    <county>Tom Green</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.517</lat>
    <lon>-100.6</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62175</plant_id>
    <plant_name>Diablo Energy Storage</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Diablo Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.028792</lat>
    <lon>-121.9006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62200</plant_id>
    <plant_name>Hillcrest Solar</plant_name>
    <state>OH</state>
    <county>Brown</county>
    <operator>Hillcrest Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.076972</lat>
    <lon>-83.90605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62380</plant_id>
    <plant_name>Emmons-Logan Wind, LLC</plant_name>
    <state>ND</state>
    <county>Emmons</county>
    <operator>Emmons-Logan Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>46.373013</lat>
    <lon>-100.0511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62592</plant_id>
    <plant_name>Headwaters Wind Farm II LLC</plant_name>
    <state>IN</state>
    <county>Randolph</county>
    <operator>EDP Renewables North America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.051694</lat>
    <lon>-85.20669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62893</plant_id>
    <plant_name>Prairie Wolf Solar LLC</plant_name>
    <state>IL</state>
    <county>Coles</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.544605</lat>
    <lon>-87.97198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63590</plant_id>
    <plant_name>Ponderosa Wind Energy Center</plant_name>
    <state>OK</state>
    <county>Beaver</county>
    <operator>Ponderosa Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.555532</lat>
    <lon>-100.6689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63882</plant_id>
    <plant_name>Samson Solar Energy II LLC</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.458</lat>
    <lon>-95.349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63914</plant_id>
    <plant_name>Cedar Springs I</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>Cedar Springs Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.019714</lat>
    <lon>-105.4721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63915</plant_id>
    <plant_name>Cedar Springs II</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>198.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.969007</lat>
    <lon>-105.3656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64026</plant_id>
    <plant_name>ANSON Solar Center, LLC</plant_name>
    <state>TX</state>
    <county>Jones</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.811041</lat>
    <lon>-99.91749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64132</plant_id>
    <plant_name>Oak Hill - Dry Creek</plant_name>
    <state>TX</state>
    <county>Rusk</county>
    <operator>Vistra Zero LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.212257</lat>
    <lon>-94.73632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64290</plant_id>
    <plant_name>SE Athos II, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SE Athos II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.751283</lat>
    <lon>-115.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64447</plant_id>
    <plant_name>Brazoria West</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Brazoria West Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.191</lat>
    <lon>-95.663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64538</plant_id>
    <plant_name>Corazon Energy LLC</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Corazon Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.634677</lat>
    <lon>-99.25833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64553</plant_id>
    <plant_name>Riverstart Solar Park LLC</plant_name>
    <state>IN</state>
    <county>Randolph</county>
    <operator>Riverstart Solar Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.046244</lat>
    <lon>-85.04509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64636</plant_id>
    <plant_name>Big Rock Solar Farm</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Big Rock ESS Assets, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.733421</lat>
    <lon>-115.7137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64661</plant_id>
    <plant_name>Heartland Divide II</plant_name>
    <state>IA</state>
    <county>Audubon</county>
    <operator>Heartland Divide II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.720323</lat>
    <lon>-94.92842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64856</plant_id>
    <plant_name>Calhoun Solar</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.338532</lat>
    <lon>-85.04902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65032</plant_id>
    <plant_name>Sun Mountain Solar 1</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.180331</lat>
    <lon>-104.5185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65291</plant_id>
    <plant_name>Golden Triangle II</plant_name>
    <state>MS</state>
    <county>Lowndes</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.4155</lat>
    <lon>-88.6223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65308</plant_id>
    <plant_name>Horizon Solar</plant_name>
    <state>TX</state>
    <county>Frio</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>28.9377</lat>
    <lon>-99.10765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65333</plant_id>
    <plant_name>Shakes Solar</plant_name>
    <state>TX</state>
    <county>Dimmit</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.44208</lat>
    <lon>-99.75582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65457</plant_id>
    <plant_name>Cathode (Hinson) BESS</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.7763</lat>
    <lon>-118.2003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65489</plant_id>
    <plant_name>Dickens</plant_name>
    <state>TX</state>
    <county>Dickens</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.781077</lat>
    <lon>-100.8832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65490</plant_id>
    <plant_name>Hydra</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.992905</lat>
    <lon>-102.2895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65491</plant_id>
    <plant_name>Paleo</plant_name>
    <state>TX</state>
    <county>Hale</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.889462</lat>
    <lon>-101.8016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65660</plant_id>
    <plant_name>Texas Solar Nova 2</plant_name>
    <state>TX</state>
    <county>Kent</county>
    <operator>Texas Solar Nova 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>262.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.32056</lat>
    <lon>-100.9817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65663</plant_id>
    <plant_name>Sandrini Solar 200</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>EDPR CA Solar Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.1026</lat>
    <lon>-119.0541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65678</plant_id>
    <plant_name>Appaloosa Solar I</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>198</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.840158</lat>
    <lon>-113.1359</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65702</plant_id>
    <plant_name>Indiana Crossroads Solar Park</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Meadow Lake Solar Park</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.726344</lat>
    <lon>-86.85202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65861</plant_id>
    <plant_name>Cachi</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.65313</lat>
    <lon>-98.01516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65876</plant_id>
    <plant_name>Desna</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.063305</lat>
    <lon>-95.73543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66014</plant_id>
    <plant_name>Bronco Plains Wind II, LLC</plant_name>
    <state>CO</state>
    <county>Kit Carson</county>
    <operator>Bronco Plains Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>199</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.184</lat>
    <lon>-102.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66046</plant_id>
    <plant_name>Brazoria County Solar Project (Danciger)</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Brazoria County Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.1779</lat>
    <lon>-95.7612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66192</plant_id>
    <plant_name>Heartland Farms</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.213889</lat>
    <lon>-84.63306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66193</plant_id>
    <plant_name>Oak Ridge Solar</plant_name>
    <state>LA</state>
    <county>Richland</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.575</lat>
    <lon>-91.7884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66216</plant_id>
    <plant_name>Yaupon Solar Project (Hybrid)</plant_name>
    <state>TX</state>
    <county>Milam</county>
    <operator>Yaupon Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.0444</lat>
    <lon>-96.8514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66285</plant_id>
    <plant_name>Condor Energy Storage LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Condor Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.020478</lat>
    <lon>-117.3324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66286</plant_id>
    <plant_name>Peregrine Energy Storage LLC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Peregrine Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.692425</lat>
    <lon>-117.1366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66337</plant_id>
    <plant_name>Tidwell Prairie Storage 1</plant_name>
    <state>TX</state>
    <county>Robertson</county>
    <operator>Tidwell Prairie</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.09828</lat>
    <lon>-96.66368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66496</plant_id>
    <plant_name>Sweetland Wind Farm, LLC</plant_name>
    <state>SD</state>
    <county>Hand</county>
    <operator>Sweetland Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.386814</lat>
    <lon>-98.80108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66560</plant_id>
    <plant_name>Wheatridge East Wind</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Wheatridge East Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.542649</lat>
    <lon>-119.3822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66649</plant_id>
    <plant_name>Long Lake Solar, LLC</plant_name>
    <state>AR</state>
    <county>Phillips</county>
    <operator>Long Lake Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.468646</lat>
    <lon>-90.61511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66678</plant_id>
    <plant_name>Aramis I Solar Project</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>IPX Power USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.749678</lat>
    <lon>-121.7661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66697</plant_id>
    <plant_name>Branch Solar Project</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>Branch Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.883487</lat>
    <lon>-85.0733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66775</plant_id>
    <plant_name>Morrow Lake Solar</plant_name>
    <state>TX</state>
    <county>Frio</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>28.947973</lat>
    <lon>-99.06719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66859</plant_id>
    <plant_name>Orion I Solar Project</plant_name>
    <state>TX</state>
    <county>Milam</county>
    <operator>Ben Milam Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.996511</lat>
    <lon>-97.00151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66881</plant_id>
    <plant_name>Pike County Energy Storage</plant_name>
    <state>IN</state>
    <county>Pike</county>
    <operator>AES Pike County Energy Storage</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>877</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.523278</lat>
    <lon>-87.24945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66888</plant_id>
    <plant_name>Escalante (NM)</plant_name>
    <state>NM</state>
    <county>McKinley</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.4077</lat>
    <lon>-108.0812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67002</plant_id>
    <plant_name>North Bend Wind Project, LLC</plant_name>
    <state>SD</state>
    <county>Hyde</county>
    <operator>North Bend Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.377333</lat>
    <lon>-99.6601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67047</plant_id>
    <plant_name>Decatur Solar</plant_name>
    <state>GA</state>
    <county>Decatur</county>
    <operator>Washington County Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.854893</lat>
    <lon>-84.44543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67075</plant_id>
    <plant_name>Forgeview Solar</plant_name>
    <state>AR</state>
    <county>Mississippi</county>
    <operator>Forgeview Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.945918</lat>
    <lon>-89.86902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67076</plant_id>
    <plant_name>Flat Fork Solar</plant_name>
    <state>AR</state>
    <county>St Francis</county>
    <operator>Flat Fork Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.882829</lat>
    <lon>-91.10409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67204</plant_id>
    <plant_name>Quail Ranch Solar and BESS</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Quail Ranch Solar and Battery Energy Storage System</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>35.199081</lat>
    <lon>-106.8566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67211</plant_id>
    <plant_name>Matrix Pleasant Valley</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Pleasant Valley Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.30361</lat>
    <lon>-115.9893</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67236</plant_id>
    <plant_name>Anemoi Energy Storage</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Anemoi Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.45</lat>
    <lon>-98.48</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67511</plant_id>
    <plant_name>Hornshadow Solar II, LLC</plant_name>
    <state>UT</state>
    <county>Emery</county>
    <operator>Hornshadow Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.182429</lat>
    <lon>-110.9772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67654</plant_id>
    <plant_name>Destiny Storage</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.887194</lat>
    <lon>-95.02366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67711</plant_id>
    <plant_name>Seaside BESS</plant_name>
    <state>OR</state>
    <county>Multnomah</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.615304</lat>
    <lon>-122.7811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67734</plant_id>
    <plant_name>Silver State South Storage</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Silver State South Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.633135</lat>
    <lon>-115.3442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67761</plant_id>
    <plant_name>Bypass BESS</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Bypass BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.484448</lat>
    <lon>-95.62164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67799</plant_id>
    <plant_name>Brittlebush Solar</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Randolph Solar Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.925808</lat>
    <lon>-111.4905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67848</plant_id>
    <plant_name>Luna Valley</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Luna Valley Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.592419</lat>
    <lon>-120.4031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67855</plant_id>
    <plant_name>Westwing</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>808.4</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>33.7131</lat>
    <lon>-112.3242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67869</plant_id>
    <plant_name>Sundial (Troutdale) BESS</plant_name>
    <state>OR</state>
    <county>Multnomah</county>
    <operator>Troutdale Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.559753</lat>
    <lon>-122.4201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67905</plant_id>
    <plant_name>Roadrunner Reserve Phase 1</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.071759</lat>
    <lon>-110.8162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67930</plant_id>
    <plant_name>Crossroads Solar (IN)</plant_name>
    <state>IN</state>
    <county>Fountain</county>
    <operator>Crossroads Solar, LLC - (IN)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.128928</lat>
    <lon>-87.29279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68180</plant_id>
    <plant_name>Big Elm Solar</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Big Elm Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.141051</lat>
    <lon>-97.21698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68182</plant_id>
    <plant_name>Bowman Wind</plant_name>
    <state>ND</state>
    <county>Bowman</county>
    <operator>Bowman Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>46.137627</lat>
    <lon>-103.5995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68192</plant_id>
    <plant_name>Lotus Wind</plant_name>
    <state>IL</state>
    <county>Macoupin</county>
    <operator>Lotus Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.49844</lat>
    <lon>-89.9302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68297</plant_id>
    <plant_name>Green River Solar</plant_name>
    <state>KY</state>
    <county>Meade</county>
    <operator>Green River Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.909944</lat>
    <lon>-86.26013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68455</plant_id>
    <plant_name>Gibson Solar</plant_name>
    <state>IN</state>
    <county>Gibson</county>
    <operator>Gibson Solar, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.317957</lat>
    <lon>-87.53063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68529</plant_id>
    <plant_name>Flatland Storage</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Flatland Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.919198</lat>
    <lon>-111.4989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68581</plant_id>
    <plant_name>Mendoza Trail BESS</plant_name>
    <state>TX</state>
    <county>Crane</county>
    <operator>Lydian Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.19371</lat>
    <lon>-102.3159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68582</plant_id>
    <plant_name>Pintail BESS</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>Lydian Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>28.04268</lat>
    <lon>-97.44014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68596</plant_id>
    <plant_name>Dominguez Energy Storage</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Dominguez Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.762899</lat>
    <lon>-112.005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68644</plant_id>
    <plant_name>Huck Finn Renewable Energy Center</plant_name>
    <state>MO</state>
    <county>Audrain</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.314</lat>
    <lon>-91.543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68915</plant_id>
    <plant_name>Ferdinand Energy Center</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Ferdinand Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.34836</lat>
    <lon>-98.57653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68937</plant_id>
    <plant_name>Roadrunner Reserve Phase 2</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>800</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.073</lat>
    <lon>-110.821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69027</plant_id>
    <plant_name>Stoneridge Solar, LLC</plant_name>
    <state>TX</state>
    <county>Milam</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.569447</lat>
    <lon>-97.11043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69045</plant_id>
    <plant_name>Sealy BESS</plant_name>
    <state>TX</state>
    <county>Austin</county>
    <operator>Sealy Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.847993</lat>
    <lon>-96.19868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69063</plant_id>
    <plant_name>Appleseed Solar</plant_name>
    <state>IN</state>
    <county>Cass</county>
    <operator>Appleseed Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.70551</lat>
    <lon>-86.249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69111</plant_id>
    <plant_name>Trade Post Solar</plant_name>
    <state>IN</state>
    <county>Sullivan</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.238271</lat>
    <lon>-87.51133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69166</plant_id>
    <plant_name>New Madrid Solar, LLC</plant_name>
    <state>MO</state>
    <county>New Madrid</county>
    <operator>New Madrid Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>162</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.5004</lat>
    <lon>-89.6357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69237</plant_id>
    <plant_name>ATLAS Solar V, LLC</plant_name>
    <state>AZ</state>
    <county>La Paz</county>
    <operator>ATLAS Solar V, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.573225</lat>
    <lon>-113.5773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69254</plant_id>
    <plant_name>Wilmot Energy Center II</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Wilmot Energy Center II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.592478</lat>
    <lon>-110.5014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69255</plant_id>
    <plant_name>Vertus Energy Storage Plant</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Vertus Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.392994</lat>
    <lon>-95.03924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69319</plant_id>
    <plant_name>Kelso Solar</plant_name>
    <state>MO</state>
    <county>Scott</county>
    <operator>Kelso Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.05</lat>
    <lon>-89.52</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69585</plant_id>
    <plant_name>Kaufman Solar</plant_name>
    <state>TX</state>
    <county>Kaufman</county>
    <operator>Kaufman Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>200</nameplate_mw>
    <summer_mw>200</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.536696</lat>
    <lon>-96.22112</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56917</plant_id>
    <plant_name>Imperial Valley Solar, LLC</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Valley Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>199.9</nameplate_mw>
    <summer_mw>172.1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2014</latest_year>
    <lat>32.671099</lat>
    <lon>-115.5873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>104</plant_id>
    <plant_name>J S Eastwood</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>1</generators>
    <nameplate_mw>199.8</nameplate_mw>
    <summer_mw>199.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.147926</lat>
    <lon>-119.2567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62081</plant_id>
    <plant_name>Golden Plains</plant_name>
    <state>IA</state>
    <county>Winnebago</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.8</nameplate_mw>
    <summer_mw>199.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.430639</lat>
    <lon>-94.01641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56355</plant_id>
    <plant_name>Whispering Willow Wind Farm - East</plant_name>
    <state>IA</state>
    <county>Franklin</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.7</nameplate_mw>
    <summer_mw>199.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.630513</lat>
    <lon>-93.20639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57109</plant_id>
    <plant_name>Meadow Lake Wind Farm LLC</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Meadow Lake Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.7</nameplate_mw>
    <summer_mw>199.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.6275</lat>
    <lon>-86.935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57483</plant_id>
    <plant_name>Mariposa Energy Project</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Diamond Generating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>199.6</nameplate_mw>
    <summer_mw>199.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.789167</lat>
    <lon>-121.6019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56563</plant_id>
    <plant_name>Peetz Table Wind Energy</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>FPL Peetz Table Wind Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.5</nameplate_mw>
    <summer_mw>199.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.986</lat>
    <lon>-103.436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61782</plant_id>
    <plant_name>Live Oak Wind Project</plant_name>
    <state>TX</state>
    <county>Schleicher</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.5</nameplate_mw>
    <summer_mw>199.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.048557</lat>
    <lon>-100.6231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61100</plant_id>
    <plant_name>Burke Wind, LLC</plant_name>
    <state>ND</state>
    <county>Burke</county>
    <operator>Burke Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.4</nameplate_mw>
    <summer_mw>199.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>48.754492</lat>
    <lon>-102.6378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62488</plant_id>
    <plant_name>Prairie Queen Wind Farm</plant_name>
    <state>KS</state>
    <county>Allen</county>
    <operator>Prairie Queen Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.3</nameplate_mw>
    <summer_mw>199.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.9788</lat>
    <lon>-95.2244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57333</plant_id>
    <plant_name>Leaning Juniper Wind Power II</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.2</nameplate_mw>
    <summer_mw>199.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.651</lat>
    <lon>-120.2598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61638</plant_id>
    <plant_name>Turtle Creek Wind Farm LLC</plant_name>
    <state>IA</state>
    <county>Mitchell</county>
    <operator>Turtle Creek Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199.2</nameplate_mw>
    <summer_mw>199.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.429604</lat>
    <lon>-92.83951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7266</plant_id>
    <plant_name>Woodland</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Modesto Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Internal Combustion Engine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>177.2</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2011</latest_year>
    <lat>37.652602</lat>
    <lon>-121.0204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56361</plant_id>
    <plant_name>Big Horn Wind Project</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>199</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>45.8877</lat>
    <lon>-120.2896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57614</plant_id>
    <plant_name>Waverly Wind Farm LLC</plant_name>
    <state>KS</state>
    <county>Coffey</county>
    <operator>Waverly Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>199</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.256944</lat>
    <lon>-95.81417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59311</plant_id>
    <plant_name>Seiling Wind I</plant_name>
    <state>OK</state>
    <county>Dewey</county>
    <operator>NextEra Energy Seiling Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>199</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.1225</lat>
    <lon>-98.99222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63489</plant_id>
    <plant_name>Sundance Wind Project, LLC</plant_name>
    <state>OK</state>
    <county>Woods</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>199</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.5597</lat>
    <lon>-98.7492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66264</plant_id>
    <plant_name>Speedway Solar, LLC</plant_name>
    <state>IN</state>
    <county>Shelby</county>
    <operator>Speedway Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>199</nameplate_mw>
    <summer_mw>199</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.613744</lat>
    <lon>-85.65466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1073</plant_id>
    <plant_name>Prairie Creek</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>198.8</nameplate_mw>
    <summer_mw>141</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1967</latest_year>
    <lat>41.944039</lat>
    <lon>-91.63917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64074</plant_id>
    <plant_name>Cimarron Bend III</plant_name>
    <state>KS</state>
    <county>Clark</county>
    <operator>Enel Kansas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>198.8</nameplate_mw>
    <summer_mw>198.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.371</lat>
    <lon>-99.994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67502</plant_id>
    <plant_name>Oliver Wind IV</plant_name>
    <state>ND</state>
    <county>Oliver</county>
    <operator>Oliver Wind IV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>198.8</nameplate_mw>
    <summer_mw>198.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>47.124272</lat>
    <lon>-101.6124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>441</plant_id>
    <plant_name>Folsom</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>198.6</nameplate_mw>
    <summer_mw>215.1</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>38.70675</lat>
    <lon>-121.1584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61876</plant_id>
    <plant_name>Persimmon Creek Wind Farm 1, LLC</plant_name>
    <state>OK</state>
    <county>Woodward</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>198.6</nameplate_mw>
    <summer_mw>198.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.174278</lat>
    <lon>-99.34916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63222</plant_id>
    <plant_name>Impact Solar 1</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>198.5</nameplate_mw>
    <summer_mw>198.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.467803</lat>
    <lon>-95.37086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63624</plant_id>
    <plant_name>La Chalupa, LLC</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Acciona Energy USA Global, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>198.5</nameplate_mw>
    <summer_mw>198.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.249888</lat>
    <lon>-97.51184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57346</plant_id>
    <plant_name>Elk City LLC</plant_name>
    <state>OK</state>
    <county>Roger Mills</county>
    <operator>Elk City LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>198.1</nameplate_mw>
    <summer_mw>198.1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2010</latest_year>
    <lat>35.4642</lat>
    <lon>-99.8983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57520</plant_id>
    <plant_name>Trinity Hills</plant_name>
    <state>TX</state>
    <county>Young</county>
    <operator>Trinity Hills Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>198</nameplate_mw>
    <summer_mw>198</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.383611</lat>
    <lon>-98.71194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60256</plant_id>
    <plant_name>Bluestem</plant_name>
    <state>OK</state>
    <county>Beaver</county>
    <operator>Bluestem Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>198</nameplate_mw>
    <summer_mw>198</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.552151</lat>
    <lon>-100.5876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67710</plant_id>
    <plant_name>TAG</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>197.8</nameplate_mw>
    <summer_mw>197.8</summer_mw>
    <battery_mwh>231.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.271663</lat>
    <lon>-106.8625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>638</plant_id>
    <plant_name>Suwannee River</plant_name>
    <state>FL</state>
    <county>Suwannee</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>197.7</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>30.376389</lat>
    <lon>-83.18056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2161</plant_id>
    <plant_name>James River Power Station</plant_name>
    <state>MO</state>
    <county>Greene</county>
    <operator>City Utilities of Springfield - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>197.5</nameplate_mw>
    <summer_mw>155</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1992</latest_year>
    <lat>37.108611</lat>
    <lon>-93.26194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65129</plant_id>
    <plant_name>Jayhawk Wind Energy Center</plant_name>
    <state>KS</state>
    <county>Crawford</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>197.4</nameplate_mw>
    <summer_mw>197.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.704461</lat>
    <lon>-95.02982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65790</plant_id>
    <plant_name>Castle Gap Wind</plant_name>
    <state>TX</state>
    <county>Mills</county>
    <operator>Castle Gap Wind Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>196.8</nameplate_mw>
    <summer_mw>196.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.39376</lat>
    <lon>-98.35936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59972</plant_id>
    <plant_name>Bearkat</plant_name>
    <state>TX</state>
    <county>Glasscock</county>
    <operator>Bearkat Wind Energy 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>196.7</nameplate_mw>
    <summer_mw>196.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.727237</lat>
    <lon>-101.582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65947</plant_id>
    <plant_name>Tres Bahias</plant_name>
    <state>TX</state>
    <county>Calhoun</county>
    <operator>Tres Bahias Solar Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>196.3</nameplate_mw>
    <summer_mw>196.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>28.68851</lat>
    <lon>-96.50983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56143</plant_id>
    <plant_name>Riverside Energy Resource Center</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>City of Riverside - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>196</nameplate_mw>
    <summer_mw>196</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2011</latest_year>
    <lat>33.9636</lat>
    <lon>-117.4528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64635</plant_id>
    <plant_name>Big Plain Solar, LLC</plant_name>
    <state>OH</state>
    <county>Madison</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>196</nameplate_mw>
    <summer_mw>196</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.855658</lat>
    <lon>-83.32843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62220</plant_id>
    <plant_name>East Fork Wind Project, LLC</plant_name>
    <state>KS</state>
    <county>Thomas</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>195.8</nameplate_mw>
    <summer_mw>195.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.306</lat>
    <lon>-101.0744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2351</plant_id>
    <plant_name>S C Moore</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>195.4</nameplate_mw>
    <summer_mw>193.4</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2023</latest_year>
    <lat>44.3356</lat>
    <lon>-71.8742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65664</plant_id>
    <plant_name>Sandrini Solar 100</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>EDPR CA Solar Park II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>195.4</nameplate_mw>
    <summer_mw>195.4</summer_mw>
    <battery_mwh>368</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>35.113189</lat>
    <lon>-119.1105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67852</plant_id>
    <plant_name>Hardy Hills Solar Energy LLC</plant_name>
    <state>IN</state>
    <county>Clinton</county>
    <operator>Hardy Hills Solar LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>195</nameplate_mw>
    <summer_mw>195</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.342819</lat>
    <lon>-86.50197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68145</plant_id>
    <plant_name>Angelo Solar</plant_name>
    <state>TX</state>
    <county>Tom Green</county>
    <operator>Angelo Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>195</nameplate_mw>
    <summer_mw>195</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.51</lat>
    <lon>-100.58</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68661</plant_id>
    <plant_name>Aratina Solar Center 1A</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>64NB 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>195</nameplate_mw>
    <summer_mw>195</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.987952</lat>
    <lon>-117.5716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2038</plant_id>
    <plant_name>Cambridge CT Hybrid</plant_name>
    <state>MN</state>
    <county>Isanti</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>194.3</nameplate_mw>
    <summer_mw>173.8</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2007</latest_year>
    <lat>45.601</lat>
    <lon>-93.2081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50481</plant_id>
    <plant_name>Tennessee Eastman Operations</plant_name>
    <state>TN</state>
    <county>Sullivan</county>
    <operator>Eastman Chemical Co-TN Ops</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine</technologies>
    <generators>19</generators>
    <nameplate_mw>194.3</nameplate_mw>
    <summer_mw>194.3</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1994</latest_year>
    <lat>36.5219</lat>
    <lon>-82.5431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60471</plant_id>
    <plant_name>Green River Wind Farm</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>194.3</nameplate_mw>
    <summer_mw>194.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.620264</lat>
    <lon>-89.55703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3113</plant_id>
    <plant_name>Portland (PA)</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>Portland Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>194</nameplate_mw>
    <summer_mw>177.5</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1997</latest_year>
    <lat>40.910205</lat>
    <lon>-75.0794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55200</plant_id>
    <plant_name>Arapahoe Combustion Turbine Project</plant_name>
    <state>CO</state>
    <county>Denver</county>
    <operator>SWG Arapahoe, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>194</nameplate_mw>
    <summer_mw>122.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2002</latest_year>
    <lat>39.6692</lat>
    <lon>-105.0018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58775</plant_id>
    <plant_name>Spinning Spur Wind III</plant_name>
    <state>TX</state>
    <county>Oldham</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>194</nameplate_mw>
    <summer_mw>194</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.295</lat>
    <lon>-102.7211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7551</plant_id>
    <plant_name>Procter &amp; Gamble Power Plant</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>193.4</nameplate_mw>
    <summer_mw>176.6</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2001</latest_year>
    <lat>38.530943</lat>
    <lon>-121.4001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3631</plant_id>
    <plant_name>Sam Rayburn</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>South Texas Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>192.8</nameplate_mw>
    <summer_mw>184.8</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2003</latest_year>
    <lat>28.8947</lat>
    <lon>-97.135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54785</plant_id>
    <plant_name>Grays Ferry Cogeneration</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Grays Ferry Cogen Partnership</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>192.6</nameplate_mw>
    <summer_mw>170.6</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>39.942219</lat>
    <lon>-75.18807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55029</plant_id>
    <plant_name>De Pere Energy Center</plant_name>
    <state>WI</state>
    <county>Brown</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>192.3</nameplate_mw>
    <summer_mw>166</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.44861</lat>
    <lon>-88.07204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69680</plant_id>
    <plant_name>BHER Ravenswood Solar 1</plant_name>
    <state>WV</state>
    <county>Jackson</county>
    <operator>BHER Ravenswood Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>192.1</nameplate_mw>
    <summer_mw>192.1</summer_mw>
    <battery_mwh>300.6</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.914833</lat>
    <lon>-81.82619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54678</plant_id>
    <plant_name>Sidney A Murray Jr Hydroelectric</plant_name>
    <state>LA</state>
    <county>Concordia</county>
    <operator>First National Bank-Commerce</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>192</nameplate_mw>
    <summer_mw>192</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>31.088011</lat>
    <lon>-91.61885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57842</plant_id>
    <plant_name>Wabash Valley Power IGCC</plant_name>
    <state>IN</state>
    <county>Vigo</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>192</nameplate_mw>
    <summer_mw>154</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>39.53</lat>
    <lon>-87.4247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2039</plant_id>
    <plant_name>Elk River</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>191.3</nameplate_mw>
    <summer_mw>208</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.296797</lat>
    <lon>-93.55845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52132</plant_id>
    <plant_name>Power Station 4</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>South Houston Green Power LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>191.1</nameplate_mw>
    <summer_mw>172</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>29.378164</lat>
    <lon>-94.92195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66780</plant_id>
    <plant_name>Posey Solar</plant_name>
    <state>IN</state>
    <county>Posey</county>
    <operator>Southern Indiana Gas &amp; Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>190.8</nameplate_mw>
    <summer_mw>190.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.926667</lat>
    <lon>-87.72889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3485</plant_id>
    <plant_name>Plant X</plant_name>
    <state>TX</state>
    <county>Lamb</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>190.4</nameplate_mw>
    <summer_mw>190</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>34.1661</lat>
    <lon>-102.4114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>344</plant_id>
    <plant_name>Mammoth Pool</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>190</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1960</latest_year>
    <lat>37.220302</lat>
    <lon>-119.338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3014</plant_id>
    <plant_name>Oxbow (OR)</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>215.5</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1961</latest_year>
    <lat>44.971643</lat>
    <lon>-116.835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65410</plant_id>
    <plant_name>Cunningham Storage</plant_name>
    <state>TX</state>
    <county>Hunt</county>
    <operator>Acciona Energy USA Global, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>190</summer_mw>
    <battery_mwh>380</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.004305</lat>
    <lon>-96.07591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66357</plant_id>
    <plant_name>Yellow Pine Solar</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Yellow Pine Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>142.6</summer_mw>
    <battery_mwh>260</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.066269</lat>
    <lon>-115.7751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68868</plant_id>
    <plant_name>Shallow Basket</plant_name>
    <state>NM</state>
    <county>Rio Arriba</county>
    <operator>Shallow Basket Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>190</nameplate_mw>
    <summer_mw>190</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.252111</lat>
    <lon>-107.3107</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60123</plant_id>
    <plant_name>Castle Gap Solar Hybrid</plant_name>
    <state>TX</state>
    <county>Upton</county>
    <operator>Upton County Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>189.9</nameplate_mw>
    <summer_mw>189.9</summer_mw>
    <battery_mwh>42</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>31.255</lat>
    <lon>-102.272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1068</plant_id>
    <plant_name>Marshalltown</plant_name>
    <state>IA</state>
    <county>Marshall</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>189</nameplate_mw>
    <summer_mw>156.5</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>42.0474</lat>
    <lon>-92.85944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57484</plant_id>
    <plant_name>Manzana Wind LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>189</nameplate_mw>
    <summer_mw>189</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.9349</lat>
    <lon>-118.4612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57995</plant_id>
    <plant_name>NaturEner Rim Rock Energy</plant_name>
    <state>MT</state>
    <county>Toole</county>
    <operator>NaturEner Rim Rock Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>189</nameplate_mw>
    <summer_mw>184.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>48.820278</lat>
    <lon>-112.1033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67910</plant_id>
    <plant_name>Timbermill Wind, LLC</plant_name>
    <state>NC</state>
    <county>Chowan</county>
    <operator>Timbermill Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>189</nameplate_mw>
    <summer_mw>189</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.151863</lat>
    <lon>-76.60104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68498</plant_id>
    <plant_name>Pixley Solar Energy</plant_name>
    <state>KS</state>
    <county>Barber</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>189</nameplate_mw>
    <summer_mw>189</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.26609</lat>
    <lon>-98.50019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>377</plant_id>
    <plant_name>Grayson</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Glendale - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Batteries; Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>188.8</nameplate_mw>
    <summer_mw>178.2</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2004</first_year>
    <latest_year>2026</latest_year>
    <lat>34.1556</lat>
    <lon>-118.2782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56961</plant_id>
    <plant_name>Notrees Windpower Hybrid</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>188.5</nameplate_mw>
    <summer_mw>188.5</summer_mw>
    <battery_mwh>13.6</battery_mwh>
    <first_year>2009</first_year>
    <latest_year>2012</latest_year>
    <lat>31.995</lat>
    <lon>-102.8283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4005</plant_id>
    <plant_name>French Island</plant_name>
    <state>WI</state>
    <county>La Crosse</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Municipal Solid Waste</technologies>
    <generators>4</generators>
    <nameplate_mw>188</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1974</latest_year>
    <lat>43.8292</lat>
    <lon>-91.2597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7760</plant_id>
    <plant_name>Tilton</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>Tilton Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>188</nameplate_mw>
    <summer_mw>182</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>40.106125</lat>
    <lon>-87.65382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63329</plant_id>
    <plant_name>Aragorn Solar Project</plant_name>
    <state>TX</state>
    <county>Culberson</county>
    <operator>SE Aragorn, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>187.2</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.719983</lat>
    <lon>-104.4423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4076</plant_id>
    <plant_name>West Marinette</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>187.1</nameplate_mw>
    <summer_mw>153</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1993</latest_year>
    <lat>45.0869</lat>
    <lon>-87.6881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2878</plant_id>
    <plant_name>FirstEnergy Bay Shore</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>Walleye Power, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>187</nameplate_mw>
    <summer_mw>153.7</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1967</latest_year>
    <lat>41.6917</lat>
    <lon>-83.4378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50243</plant_id>
    <plant_name>Bucksport Generation LLC</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>Bucksport Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>186.8</nameplate_mw>
    <summer_mw>178</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.5738</lat>
    <lon>-68.8046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7975</plant_id>
    <plant_name>Pyramid</plant_name>
    <state>NM</state>
    <county>Hidalgo</county>
    <operator>Tri-State G &amp; T Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>186</nameplate_mw>
    <summer_mw>158</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.2363</lat>
    <lon>-108.5494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57531</plant_id>
    <plant_name>Bingham Wind</plant_name>
    <state>ME</state>
    <county>Piscataquis</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>186</nameplate_mw>
    <summer_mw>186</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.103333</lat>
    <lon>-69.76194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61735</plant_id>
    <plant_name>Hilltopper Wind Project</plant_name>
    <state>IL</state>
    <county>Logan</county>
    <operator>Hilltopper Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>185</nameplate_mw>
    <summer_mw>185</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.03</lat>
    <lon>-89.381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64381</plant_id>
    <plant_name>Glacier Sands Wind Power, LLC</plant_name>
    <state>IL</state>
    <county>Mason</county>
    <operator>Glacier Sands Wind Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>185</nameplate_mw>
    <summer_mw>185</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.261377</lat>
    <lon>-89.70088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66067</plant_id>
    <plant_name>Kapolei Energy Storage</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Kapolei Energy Storage I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>185</nameplate_mw>
    <summer_mw>185</summer_mw>
    <battery_mwh>565</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>21.328403</lat>
    <lon>-158.1052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67498</plant_id>
    <plant_name>McFarland C</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>185</nameplate_mw>
    <summer_mw>185</summer_mw>
    <battery_mwh>740</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.946009</lat>
    <lon>-113.4916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>118</plant_id>
    <plant_name>Saguaro</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>184.5</nameplate_mw>
    <summer_mw>169</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2002</latest_year>
    <lat>32.5517</lat>
    <lon>-111.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66000</plant_id>
    <plant_name>Delta Wind Farm (MS)</plant_name>
    <state>MS</state>
    <county>Coahoma</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>184.5</nameplate_mw>
    <summer_mw>184.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.469231</lat>
    <lon>-90.3927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60095</plant_id>
    <plant_name>Blythe Solar IV, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Blythe Solar IV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>184.4</nameplate_mw>
    <summer_mw>184.4</summer_mw>
    <battery_mwh>47</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2022</latest_year>
    <lat>33.682</lat>
    <lon>-114.768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60587</plant_id>
    <plant_name>Kelly Creek Wind Project</plant_name>
    <state>IL</state>
    <county>Ford</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>184</nameplate_mw>
    <summer_mw>184</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.9675</lat>
    <lon>-88.1975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66321</plant_id>
    <plant_name>King Creek Wind Farm 1, LLC</plant_name>
    <state>TX</state>
    <county>Haskell</county>
    <operator>King Creek Wind Farm 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>184</nameplate_mw>
    <summer_mw>184</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.268</lat>
    <lon>-99.468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7348</plant_id>
    <plant_name>Robins</plant_name>
    <state>GA</state>
    <county>Houston</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>183.8</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>32.5792</lat>
    <lon>-83.5822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62356</plant_id>
    <plant_name>Lockett Windfarm</plant_name>
    <state>TX</state>
    <county>Wilbarger</county>
    <operator>Lockett Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>183.8</nameplate_mw>
    <summer_mw>183.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.072251</lat>
    <lon>-99.26468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7307</plant_id>
    <plant_name>Redding Power</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>City of Redding - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>183.1</nameplate_mw>
    <summer_mw>171</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2011</latest_year>
    <lat>40.507292</lat>
    <lon>-122.4233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62564</plant_id>
    <plant_name>Elkhorn Battery Energy Storage System</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>182.5</nameplate_mw>
    <summer_mw>182.5</summer_mw>
    <battery_mwh>730</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.808039</lat>
    <lon>-121.7818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6432</plant_id>
    <plant_name>Diablo</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>City of Seattle - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>182.4</nameplate_mw>
    <summer_mw>182.4</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1937</latest_year>
    <lat>48.713853</lat>
    <lon>-121.1317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56111</plant_id>
    <plant_name>Brazos Wind Farm</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Shell Wind Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>182.4</nameplate_mw>
    <summer_mw>182.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.94793</lat>
    <lon>-101.1478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62836</plant_id>
    <plant_name>Maryneal Windpower</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>182.4</nameplate_mw>
    <summer_mw>182.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.199366</lat>
    <lon>-100.4919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61368</plant_id>
    <plant_name>Midway Solar - TX</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Midway Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>182</nameplate_mw>
    <summer_mw>182</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.995503</lat>
    <lon>-102.2235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58720</plant_id>
    <plant_name>Pattern Panhandle Wind 2 LLC</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>181.7</nameplate_mw>
    <summer_mw>181.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.442778</lat>
    <lon>-101.3728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60145</plant_id>
    <plant_name>Broadview Energy JN, LLC</plant_name>
    <state>NM</state>
    <county>Curry</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>181.7</nameplate_mw>
    <summer_mw>181.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.734179</lat>
    <lon>-103.108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7763</plant_id>
    <plant_name>Henry County</plant_name>
    <state>IN</state>
    <county>Henry</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>181.5</nameplate_mw>
    <summer_mw>126</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>39.9528</lat>
    <lon>-85.5039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56013</plant_id>
    <plant_name>Exira</plant_name>
    <state>IA</state>
    <county>Audubon</county>
    <operator>Western Minnesota Mun Pwr Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>181.5</nameplate_mw>
    <summer_mw>140.1</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2007</latest_year>
    <lat>41.514365</lat>
    <lon>-94.91973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59118</plant_id>
    <plant_name>Cameron Wind 1 LLC</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Cameron Wind 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>181.4</nameplate_mw>
    <summer_mw>181.4</summer_mw>
    <battery_mwh>32.8</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2024</latest_year>
    <lat>26.195278</lat>
    <lon>-97.46611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>18</plant_id>
    <plant_name>Lewis Smith Dam</plant_name>
    <state>AL</state>
    <county>Walker</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>181</nameplate_mw>
    <summer_mw>178</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1962</latest_year>
    <lat>33.9406</lat>
    <lon>-87.1077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6285</plant_id>
    <plant_name>North Pole</plant_name>
    <state>AK</state>
    <county>Fairbanks North Star</county>
    <operator>Golden Valley Elec Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>181</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2007</latest_year>
    <lat>64.7356</lat>
    <lon>-147.3481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1564</plant_id>
    <plant_name>Vienna Operations</plant_name>
    <state>MD</state>
    <county>Dorchester</county>
    <operator>NRG Vienna Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>180.6</nameplate_mw>
    <summer_mw>167.3</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1972</latest_year>
    <lat>38.4878</lat>
    <lon>-75.8208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>380</plant_id>
    <plant_name>Dion R Holm</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>City &amp; County of San Francisco - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>180.2</nameplate_mw>
    <summer_mw>180.2</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1960</latest_year>
    <lat>37.896649</lat>
    <lon>-119.9675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10213</plant_id>
    <plant_name>El Segundo Cogen</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Chevron USA Inc-El Segundo</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>180.1</nameplate_mw>
    <summer_mw>171.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2013</latest_year>
    <lat>33.9058</lat>
    <lon>-118.4031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>450</plant_id>
    <plant_name>Spring Creek</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>40.628115</lat>
    <lon>-122.4675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10860</plant_id>
    <plant_name>Archer Daniels Midland Clinton</plant_name>
    <state>IA</state>
    <county>Clinton</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.8206</lat>
    <lon>-90.2097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50555</plant_id>
    <plant_name>Rosemary Power Station</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>151.2</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>36.4517</lat>
    <lon>-77.6594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56669</plant_id>
    <plant_name>Tatanka Wind Power LLC</plant_name>
    <state>ND</state>
    <county>Dickey</county>
    <operator>Acciona Wind Energy USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>45.959325</lat>
    <lon>-98.94633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56956</plant_id>
    <plant_name>Bull Creek Wind</plant_name>
    <state>TX</state>
    <county>Borden</county>
    <operator>Bull Creek Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.929014</lat>
    <lon>-101.5786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56983</plant_id>
    <plant_name>Papalote Creek I LLC</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>27.9386</lat>
    <lon>-97.4586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61032</plant_id>
    <plant_name>Heart of Texas Wind Project</plant_name>
    <state>TX</state>
    <county>McCulloch</county>
    <operator>Scout Clean Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.242177</lat>
    <lon>-99.42127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65482</plant_id>
    <plant_name>West Memphis Solar Station</plant_name>
    <state>AR</state>
    <county>Crittenden</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.15689</lat>
    <lon>-90.31048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65483</plant_id>
    <plant_name>Big Cypress Solar, LLC</plant_name>
    <state>AR</state>
    <county>Crittenden</county>
    <operator>Big Cypress Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.3446</lat>
    <lon>-90.3075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65849</plant_id>
    <plant_name>Oriana Solar LLC</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Oriana Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>28.905346</lat>
    <lon>-96.97808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66112</plant_id>
    <plant_name>Newport Solar Project</plant_name>
    <state>AR</state>
    <county>Jackson</county>
    <operator>Newport Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.668902</lat>
    <lon>-91.18711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66198</plant_id>
    <plant_name>Madison Fields Solar Project, LLC</plant_name>
    <state>OH</state>
    <county>Madison</county>
    <operator>Madison Fields Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.097108</lat>
    <lon>-83.46869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68470</plant_id>
    <plant_name>Azalea Springs Solar Park</plant_name>
    <state>TX</state>
    <county>Angelina</county>
    <operator>Azalea Springs Solar Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>180</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.403914</lat>
    <lon>-94.8719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7145</plant_id>
    <plant_name>Pleasant Hill</plant_name>
    <state>IA</state>
    <county>Polk</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>179.8</nameplate_mw>
    <summer_mw>153.6</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1994</latest_year>
    <lat>41.5572</lat>
    <lon>-93.5242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6623</plant_id>
    <plant_name>Fort Peck</plant_name>
    <state>MT</state>
    <county>McCone</county>
    <operator>USACE-Omaha</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>179.7</nameplate_mw>
    <summer_mw>218</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1961</latest_year>
    <lat>48.0122</lat>
    <lon>-106.4123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60572</plant_id>
    <plant_name>White Wing Solar</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>179</nameplate_mw>
    <summer_mw>179</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.994056</lat>
    <lon>-113.5088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2790</plant_id>
    <plant_name>R M Heskett</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>Montana-Dakota Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>178.4</nameplate_mw>
    <summer_mw>178.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2024</latest_year>
    <lat>46.8669</lat>
    <lon>-100.8836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59888</plant_id>
    <plant_name>Bloom Wind</plant_name>
    <state>KS</state>
    <county>Ford</county>
    <operator>CP Bloom Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>178.2</nameplate_mw>
    <summer_mw>178.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.4863</lat>
    <lon>-99.9247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63628</plant_id>
    <plant_name>Tinker</plant_name>
    <state>OK</state>
    <county>Oklahoma</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>178.2</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2026</latest_year>
    <lat>35.414719</lat>
    <lon>-97.37345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61916</plant_id>
    <plant_name>Pegasus Wind</plant_name>
    <state>MI</state>
    <county>Tuscola</county>
    <operator>Pegasus Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>178</nameplate_mw>
    <summer_mw>178</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2020</latest_year>
    <lat>43.452003</lat>
    <lon>-83.50721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>99</plant_id>
    <plant_name>Frederickson</plant_name>
    <state>WA</state>
    <county>Pierce</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>177.8</nameplate_mw>
    <summer_mw>134</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>47.079722</lat>
    <lon>-122.365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2756</plant_id>
    <plant_name>Gaston</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>177.6</nameplate_mw>
    <summer_mw>220</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>36.499147</lat>
    <lon>-77.81154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3285</plant_id>
    <plant_name>Hagood</plant_name>
    <state>SC</state>
    <county>Charleston</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>177.3</nameplate_mw>
    <summer_mw>126</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2010</latest_year>
    <lat>32.8265</lat>
    <lon>-79.9634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>15</plant_id>
    <plant_name>Lay Dam</plant_name>
    <state>AL</state>
    <county>Chilton</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>177</nameplate_mw>
    <summer_mw>180</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>32.9633</lat>
    <lon>-86.5187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65445</plant_id>
    <plant_name>Ridgely Energy Farm</plant_name>
    <state>TN</state>
    <county>Lake</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>177</nameplate_mw>
    <summer_mw>177</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.306319</lat>
    <lon>-89.46202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68274</plant_id>
    <plant_name>Morris Ridge Solar</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>Morris Ridge Solar Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>177</nameplate_mw>
    <summer_mw>177</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.663093</lat>
    <lon>-77.89084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55560</plant_id>
    <plant_name>FPL Energy Vansycle LLC (WA)</plant_name>
    <state>WA</state>
    <county>Walla Walla</county>
    <operator>FPL Energy Vansycle LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>176.9</nameplate_mw>
    <summer_mw>176.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>46.06</lat>
    <lon>-118.917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>850</plant_id>
    <plant_name>Palisades Dam</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>176.4</nameplate_mw>
    <summer_mw>176.4</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1958</latest_year>
    <lat>43.334849</lat>
    <lon>-111.2058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7325</plant_id>
    <plant_name>San Jacinto Steam Electric Station</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>NRG Texas Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>176.4</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>29.694838</lat>
    <lon>-95.04062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7870</plant_id>
    <plant_name>Encogen</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>176.4</nameplate_mw>
    <summer_mw>159.4</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>48.746</lat>
    <lon>-122.486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50066</plant_id>
    <plant_name>Calistoga Power Plant</plant_name>
    <state>CA</state>
    <county>Lake</county>
    <operator>Geysers Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>176.4</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>38.7879</lat>
    <lon>-122.7434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10245</plant_id>
    <plant_name>ArcelorMittal Burns Harbor</plant_name>
    <state>IN</state>
    <county>Porter</county>
    <operator>Cleveland-Cliffs Burns Harbor LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>BFG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>176.2</nameplate_mw>
    <summer_mw>174.7</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1970</latest_year>
    <lat>41.635</lat>
    <lon>-87.1387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50002</plant_id>
    <plant_name>Pittsfield Generating LP</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Pittsfield Generating Company, LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>175.5</nameplate_mw>
    <summer_mw>157.7</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.4564</lat>
    <lon>-73.2181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56251</plant_id>
    <plant_name>Intrepid</plant_name>
    <state>IA</state>
    <county>Buena Vista</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>175.5</nameplate_mw>
    <summer_mw>175.5</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2005</latest_year>
    <lat>42.5539</lat>
    <lon>-95.3283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62715</plant_id>
    <plant_name>Wildcat Creek Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Cooke</county>
    <operator>Wildcat Creek Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>175.3</nameplate_mw>
    <summer_mw>175.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.54915</lat>
    <lon>-97.32958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1392</plant_id>
    <plant_name>Louisiana 2</plant_name>
    <state>LA</state>
    <county>East Baton Rouge</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>138</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1953</latest_year>
    <lat>30.4922</lat>
    <lon>-91.1864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58898</plant_id>
    <plant_name>Pilot Hill Wind Farm</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.999169</lat>
    <lon>-88.05625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59150</plant_id>
    <plant_name>RE Mustang LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <battery_mwh>75</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2021</latest_year>
    <lat>36.221667</lat>
    <lon>-119.9031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62675</plant_id>
    <plant_name>Skipjack Solar Center</plant_name>
    <state>VA</state>
    <county>Charles City</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.437106</lat>
    <lon>-77.15874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64212</plant_id>
    <plant_name>Pike Solar Hybrid</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.6217</lat>
    <lon>-104.5814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65492</plant_id>
    <plant_name>Pavo</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <battery_mwh>175</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.885123</lat>
    <lon>-102.4226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66185</plant_id>
    <plant_name>Crooked Lake Solar, LLC</plant_name>
    <state>AR</state>
    <county>Mississippi</county>
    <operator>Crooked Lake Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.914697</lat>
    <lon>-89.78433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66239</plant_id>
    <plant_name>Pearl River Solar Park LLC</plant_name>
    <state>MS</state>
    <county>Scott</county>
    <operator>Pearl River Solar Park, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.550998</lat>
    <lon>-89.73014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66606</plant_id>
    <plant_name>Cross Town Energy Storage</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Cross Town Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <battery_mwh>350</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.683001</lat>
    <lon>-70.39824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67022</plant_id>
    <plant_name>CPV Backbone Solar</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>CPV Backbone Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>161.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.442372</lat>
    <lon>-79.20164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69755</plant_id>
    <plant_name>King Mountain Solar</plant_name>
    <state>TX</state>
    <county>Upton</county>
    <operator>King Mountain Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>175</nameplate_mw>
    <summer_mw>175</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.235934</lat>
    <lon>-102.1229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56810</plant_id>
    <plant_name>Adair Wind Farm</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>174.8</nameplate_mw>
    <summer_mw>174.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.4236</lat>
    <lon>-94.665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58430</plant_id>
    <plant_name>Centinela Solar Energy</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Centinela Solar Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>6</generators>
    <nameplate_mw>174.8</nameplate_mw>
    <summer_mw>170</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2014</latest_year>
    <lat>32.686944</lat>
    <lon>-115.6478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3420</plant_id>
    <plant_name>Watts Bar Hydro</plant_name>
    <state>TN</state>
    <county>Rhea</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>174.6</nameplate_mw>
    <summer_mw>196.4</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1944</latest_year>
    <lat>35.619673</lat>
    <lon>-84.78553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>319</plant_id>
    <plant_name>Big Creek 3</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>174.5</nameplate_mw>
    <summer_mw>173.5</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1980</latest_year>
    <lat>37.148517</lat>
    <lon>-119.3866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57290</plant_id>
    <plant_name>Northern Colorado Wind LLC</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Northern Colorado Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>174.3</nameplate_mw>
    <summer_mw>174.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.9881</lat>
    <lon>-102.8969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60657</plant_id>
    <plant_name>Salt Fork Wind Project, LLC</plant_name>
    <state>TX</state>
    <county>Donley</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>174</nameplate_mw>
    <summer_mw>174</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.18172</lat>
    <lon>-100.9344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67083</plant_id>
    <plant_name>Longbow BESS, LLC</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Longbow BESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>174</nameplate_mw>
    <summer_mw>174</summer_mw>
    <battery_mwh>407.4</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.281605</lat>
    <lon>-95.29553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7552</plant_id>
    <plant_name>Campbell Power Plant</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>173.9</nameplate_mw>
    <summer_mw>178</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>38.511</lat>
    <lon>-121.4735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68587</plant_id>
    <plant_name>Swift Air Solar II</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>173.6</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.723088</lat>
    <lon>-102.5196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52109</plant_id>
    <plant_name>Richmond Cogen</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Chevron Products Company-Richmond</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; All Other</technologies>
    <generators>4</generators>
    <nameplate_mw>173.5</nameplate_mw>
    <summer_mw>148.3</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2019</latest_year>
    <lat>37.9418</lat>
    <lon>-122.3909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>514</plant_id>
    <plant_name>Morrow Point</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>173.2</nameplate_mw>
    <summer_mw>173.2</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1971</latest_year>
    <lat>38.451753</lat>
    <lon>-107.5393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>702</plant_id>
    <plant_name>Bartletts Ferry</plant_name>
    <state>AL</state>
    <county>Lee</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>173</nameplate_mw>
    <summer_mw>189.1</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1985</latest_year>
    <lat>32.663</lat>
    <lon>-85.0908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7818</plant_id>
    <plant_name>Alsey</plant_name>
    <state>IL</state>
    <county>Scott</county>
    <operator>Prairie Power, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>173</nameplate_mw>
    <summer_mw>164.3</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2016</latest_year>
    <lat>39.569771</lat>
    <lon>-90.43602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56604</plant_id>
    <plant_name>Hardin County Peaking Facility</plant_name>
    <state>TX</state>
    <county>Hardin</county>
    <operator>Entergy Texas Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>173</nameplate_mw>
    <summer_mw>140.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>30.3038</lat>
    <lon>-94.2526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66818</plant_id>
    <plant_name>SR Russellville</plant_name>
    <state>KY</state>
    <county>Logan</county>
    <operator>SR Russellville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>173</nameplate_mw>
    <summer_mw>173</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.795723</lat>
    <lon>-86.94326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10751</plant_id>
    <plant_name>Camden Plant Holding LLC</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Camden Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>172.9</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>39.9175</lat>
    <lon>-75.1192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55733</plant_id>
    <plant_name>Bennett Mountain</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>172.8</nameplate_mw>
    <summer_mw>185.1</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>43.147153</lat>
    <lon>-115.6666</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60093</plant_id>
    <plant_name>Blythe Solar 110, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Blythe Solar 110, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>172.8</nameplate_mw>
    <summer_mw>172.8</summer_mw>
    <battery_mwh>301.2</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2021</latest_year>
    <lat>33.68</lat>
    <lon>-114.742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65793</plant_id>
    <plant_name>Concho Valley Solar, LLC</plant_name>
    <state>TX</state>
    <county>Tom Green</county>
    <operator>Concho Valley Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>172.8</nameplate_mw>
    <summer_mw>159.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.214</lat>
    <lon>-100.255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2240</plant_id>
    <plant_name>Lon Wright</plant_name>
    <state>NE</state>
    <county>Dodge</county>
    <operator>City of Fremont - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine; Solar Photovoltaic</technologies>
    <generators>6</generators>
    <nameplate_mw>172.3</nameplate_mw>
    <summer_mw>158.8</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2018</latest_year>
    <lat>41.4281</lat>
    <lon>-96.4623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54091</plant_id>
    <plant_name>Mansfield Mill</plant_name>
    <state>LA</state>
    <county>DeSoto</county>
    <operator>IPC-Mansfield Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>172</nameplate_mw>
    <summer_mw>117.3</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2019</latest_year>
    <lat>32.1575</lat>
    <lon>-93.5562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67756</plant_id>
    <plant_name>Mission Road Solar Park</plant_name>
    <state>MI</state>
    <county>Isabella</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>172</nameplate_mw>
    <summer_mw>172</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.68358</lat>
    <lon>-84.78521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65335</plant_id>
    <plant_name>Appaloosa Run Wind</plant_name>
    <state>TX</state>
    <county>Upton</county>
    <operator>Appaloosa Run Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>171.8</nameplate_mw>
    <summer_mw>171.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.157269</lat>
    <lon>-101.8316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62840</plant_id>
    <plant_name>Mountain Breeze Wind, LLC</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>171.7</nameplate_mw>
    <summer_mw>171.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.960618</lat>
    <lon>-104.0032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10870</plant_id>
    <plant_name>Hazelton</plant_name>
    <state>PA</state>
    <county>Luzerne</county>
    <operator>Hazleton Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>171.5</nameplate_mw>
    <summer_mw>145.6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2002</latest_year>
    <lat>40.928161</lat>
    <lon>-76.04093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61565</plant_id>
    <plant_name>English Farms</plant_name>
    <state>IA</state>
    <county>Poweshiek</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>171.5</nameplate_mw>
    <summer_mw>171.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.57</lat>
    <lon>-92.40718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61785</plant_id>
    <plant_name>Camilla Solar Energy Project</plant_name>
    <state>GA</state>
    <county>Mitchell</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>171.4</nameplate_mw>
    <summer_mw>171.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.26955</lat>
    <lon>-84.22872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58989</plant_id>
    <plant_name>Eklutna Generation Station</plant_name>
    <state>AK</state>
    <county>Anchorage</county>
    <operator>Matanuska Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>10</generators>
    <nameplate_mw>171</nameplate_mw>
    <summer_mw>165</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>61.457778</lat>
    <lon>-149.3514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66093</plant_id>
    <plant_name>Moraine Sands Wind Power</plant_name>
    <state>IL</state>
    <county>Mason</county>
    <operator>Moraine Sands Wind Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>171</nameplate_mw>
    <summer_mw>165</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.170889</lat>
    <lon>-89.89511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>439</plant_id>
    <plant_name>Don Pedro</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>170.8</nameplate_mw>
    <summer_mw>203.2</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1989</latest_year>
    <lat>37.695994</lat>
    <lon>-120.4202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2047</plant_id>
    <plant_name>Chevron Oil</plant_name>
    <state>MS</state>
    <county>Jackson</county>
    <operator>Mississippi Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>170.5</nameplate_mw>
    <summer_mw>137</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1994</latest_year>
    <lat>30.34</lat>
    <lon>-88.4919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56638</plant_id>
    <plant_name>Buffalo Gap 3 Wind Farm</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>170.2</nameplate_mw>
    <summer_mw>170.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.2878</lat>
    <lon>-100.1</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>627</plant_id>
    <plant_name>Bayboro</plant_name>
    <state>FL</state>
    <county>Pinellas</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>170.1</nameplate_mw>
    <summer_mw>96.5</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>27.758056</lat>
    <lon>-82.63528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55102</plant_id>
    <plant_name>Livingston Generating Station</plant_name>
    <state>MI</state>
    <county>Otsego</county>
    <operator>CMS Generation MI Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>170.1</nameplate_mw>
    <summer_mw>132</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>45.030397</lat>
    <lon>-84.7308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>17</plant_id>
    <plant_name>Mitchell Dam</plant_name>
    <state>AL</state>
    <county>Coosa</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>163.1</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1985</latest_year>
    <lat>32.806025</lat>
    <lon>-86.44489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7314</plant_id>
    <plant_name>Richard M Flynn</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>139.5</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>40.8158</lat>
    <lon>-73.064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56603</plant_id>
    <plant_name>San Jacinto County Peaking Facility</plant_name>
    <state>TX</state>
    <county>San Jacinto</county>
    <operator>East Texas Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>146</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>30.4193</lat>
    <lon>-95.0118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57707</plant_id>
    <plant_name>Mesquite Solar 1</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>12</generators>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2012</latest_year>
    <lat>33.341833</lat>
    <lon>-112.904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66408</plant_id>
    <plant_name>Buena Vista Energy Center</plant_name>
    <state>NM</state>
    <county>Otero</county>
    <operator>Buena Vista Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.066593</lat>
    <lon>-106.2853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67454</plant_id>
    <plant_name>Scatter Wash 1</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Scatter Wash Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <battery_mwh>680</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.71264</lat>
    <lon>-112.082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68492</plant_id>
    <plant_name>Sun Pond</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Sun Pond, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>170</nameplate_mw>
    <summer_mw>170</summer_mw>
    <battery_mwh>340</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.381198</lat>
    <lon>-112.8216</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52176</plant_id>
    <plant_name>C R Wing Cogen Plant</plant_name>
    <state>TX</state>
    <county>Howard</county>
    <operator>BHER Power Resources, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>169.8</nameplate_mw>
    <summer_mw>169.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>32.273178</lat>
    <lon>-101.4224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56774</plant_id>
    <plant_name>Turkey Track Wind Energy LLC</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>169.5</nameplate_mw>
    <summer_mw>169.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.1981</lat>
    <lon>-100.2686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10444</plant_id>
    <plant_name>Lockhart Solar PV, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Terra-Gen Operating Co-Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>169.4</nameplate_mw>
    <summer_mw>154</summer_mw>
    <battery_mwh>69</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2025</latest_year>
    <lat>35.0308</lat>
    <lon>-117.3563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69327</plant_id>
    <plant_name>Salt Creek Wind</plant_name>
    <state>IA</state>
    <county>Tama</county>
    <operator>Salt Creek Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>169.4</nameplate_mw>
    <summer_mw>169</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.1647</lat>
    <lon>-92.51132</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7991</plant_id>
    <plant_name>West Campus Cogeneration Facility</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>169.3</nameplate_mw>
    <summer_mw>131.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>43.075071</lat>
    <lon>-89.4251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6120</plant_id>
    <plant_name>Whitehorn</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>169.2</nameplate_mw>
    <summer_mw>134</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>48.885636</lat>
    <lon>-122.7516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55309</plant_id>
    <plant_name>Air Products Port Arthur</plant_name>
    <state>TX</state>
    <county>Jefferson</county>
    <operator>Air Products LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>169.1</nameplate_mw>
    <summer_mw>158.9</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2012</latest_year>
    <lat>29.866497</lat>
    <lon>-93.96515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65672</plant_id>
    <plant_name>Sanborn BESS 3</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>169</nameplate_mw>
    <summer_mw>169</summer_mw>
    <battery_mwh>676</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.027031</lat>
    <lon>-118.1395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7336</plant_id>
    <plant_name>Anderson</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>168.7</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2004</latest_year>
    <lat>40.0529</lat>
    <lon>-85.7389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>249</plant_id>
    <plant_name>James B Black</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>168.6</nameplate_mw>
    <summer_mw>172</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1966</latest_year>
    <lat>40.992295</lat>
    <lon>-121.9752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62290</plant_id>
    <plant_name>Polaris Wind Park</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>168.6</nameplate_mw>
    <summer_mw>168.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.262611</lat>
    <lon>-84.49984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>761</plant_id>
    <plant_name>Walter F George</plant_name>
    <state>GA</state>
    <county>Clay</county>
    <operator>USCE-Mobile District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>168</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>31.624501</lat>
    <lon>-85.06524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50150</plant_id>
    <plant_name>Union Carbide Seadrift Cogen</plant_name>
    <state>TX</state>
    <county>Calhoun</county>
    <operator>Union Carbide Corp-Seadrift</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>153</summer_mw>
    <first_year>1964</first_year>
    <latest_year>2000</latest_year>
    <lat>28.5105</lat>
    <lon>-96.7706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55936</plant_id>
    <plant_name>NRG Rockford II Energy Center</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Rockford Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>180.7</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.2383</lat>
    <lon>-89.1011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57189</plant_id>
    <plant_name>Lost Creek Wind Energy Facility</plant_name>
    <state>MO</state>
    <county>DeKalb</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>168</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.981389</lat>
    <lon>-94.51806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57294</plant_id>
    <plant_name>Alta Wind Energy Center V</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Alta Wind V, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>168</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.008611</lat>
    <lon>-118.2422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57834</plant_id>
    <plant_name>Pinyon Pine I</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Pinyon Pines Wind I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>168</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.043411</lat>
    <lon>-118.2118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60873</plant_id>
    <plant_name>Prairie Wind Farm</plant_name>
    <state>IA</state>
    <county>Mahaska</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>169</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.4369</lat>
    <lon>-92.70382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64993</plant_id>
    <plant_name>BigBeau Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Big Beau Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>168</nameplate_mw>
    <summer_mw>168</summer_mw>
    <battery_mwh>160</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.907041</lat>
    <lon>-118.3441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57639</plant_id>
    <plant_name>Ironwood Wind</plant_name>
    <state>KS</state>
    <county>Ford</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>167.9</nameplate_mw>
    <summer_mw>167.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.81828</lat>
    <lon>-99.7754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2349</plant_id>
    <plant_name>Comerford</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>167.8</nameplate_mw>
    <summer_mw>165.9</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>44.325053</lat>
    <lon>-72.00098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55992</plant_id>
    <plant_name>Desert Sky</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Desert Sky Wind Farm LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>167.7</nameplate_mw>
    <summer_mw>167.7</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>30.9178</lat>
    <lon>-102.0867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57865</plant_id>
    <plant_name>Antelope Station</plant_name>
    <state>TX</state>
    <county>Hale</county>
    <operator>Golden Spread Electric Cooperative, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>18</generators>
    <nameplate_mw>167.4</nameplate_mw>
    <summer_mw>162</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.865</lat>
    <lon>-101.8433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>246</plant_id>
    <plant_name>Humboldt Bay</plant_name>
    <state>CA</state>
    <county>Humboldt</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>10</generators>
    <nameplate_mw>167</nameplate_mw>
    <summer_mw>163.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2011</latest_year>
    <lat>40.7415</lat>
    <lon>-124.2103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7456</plant_id>
    <plant_name>Rathdrum</plant_name>
    <state>ID</state>
    <county>Kootenai</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>166.4</nameplate_mw>
    <summer_mw>132</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>47.80427</lat>
    <lon>-116.8673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67763</plant_id>
    <plant_name>Hart Wind</plant_name>
    <state>TX</state>
    <county>Castro</county>
    <operator>Hart Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>166.4</nameplate_mw>
    <summer_mw>166.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.378546</lat>
    <lon>-102.0537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66325</plant_id>
    <plant_name>Hemmingway BESS</plant_name>
    <state>ID</state>
    <county>Owyhee</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>166</nameplate_mw>
    <summer_mw>166</summer_mw>
    <battery_mwh>664</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>43.35151</lat>
    <lon>-116.6621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2780</plant_id>
    <plant_name>Hiwassee Dam</plant_name>
    <state>NC</state>
    <county>Cherokee</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>165.6</nameplate_mw>
    <summer_mw>173.7</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1956</latest_year>
    <lat>35.150864</lat>
    <lon>-84.17753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56823</plant_id>
    <plant_name>Hackberry Wind Farm</plant_name>
    <state>TX</state>
    <county>Shackelford</county>
    <operator>Hackberry Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>165.6</nameplate_mw>
    <summer_mw>162.3</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.7683</lat>
    <lon>-99.4228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56841</plant_id>
    <plant_name>Glenrock</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>165.6</nameplate_mw>
    <summer_mw>138</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>43.0181</lat>
    <lon>-105.8353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57762</plant_id>
    <plant_name>Cimarron Wind Energy LLC</plant_name>
    <state>KS</state>
    <county>Gray</county>
    <operator>Cimarron Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>165.6</nameplate_mw>
    <summer_mw>165.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.873889</lat>
    <lon>-100.2803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66820</plant_id>
    <plant_name>River Ferry Solar 1</plant_name>
    <state>IL</state>
    <county>Clark</county>
    <operator>River Ferry Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>165.3</nameplate_mw>
    <summer_mw>172.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.25906</lat>
    <lon>-87.62817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56811</plant_id>
    <plant_name>Walnut Wind Farm</plant_name>
    <state>IA</state>
    <county>Pottawattamie</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>165.2</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.4517</lat>
    <lon>-95.2383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7907</plant_id>
    <plant_name>Pine Flat</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Kings River Conservation Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>165</nameplate_mw>
    <summer_mw>165</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>36.8326</lat>
    <lon>-119.327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62014</plant_id>
    <plant_name>Highlander Solar Energy Station 1</plant_name>
    <state>VA</state>
    <county>Spotsylvania</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>165</nameplate_mw>
    <summer_mw>165</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.247123</lat>
    <lon>-77.78622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64489</plant_id>
    <plant_name>Resurgence Solar</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Resurgence Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>165</nameplate_mw>
    <summer_mw>165</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.00656</lat>
    <lon>-117.5448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64841</plant_id>
    <plant_name>SR DeSoto I, LLC</plant_name>
    <state>GA</state>
    <county>Lee</county>
    <operator>SR DeSoto I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>165</nameplate_mw>
    <summer_mw>165</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.886486</lat>
    <lon>-84.02159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68878</plant_id>
    <plant_name>Longhorn Storage</plant_name>
    <state>TX</state>
    <county>Eastland</county>
    <operator>Longhorn Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>165</nameplate_mw>
    <summer_mw>142.1</summer_mw>
    <battery_mwh>165</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.428686</lat>
    <lon>-99.15911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58592</plant_id>
    <plant_name>Solar Gen 2 Solar Facility</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>163.2</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.08</lat>
    <lon>-115.47</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66123</plant_id>
    <plant_name>Prairie Switch Wind LLC</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Prairie Switch Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>163.2</nameplate_mw>
    <summer_mw>163.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.0919</lat>
    <lon>-96.09</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2716</plant_id>
    <plant_name>W H Weatherspoon</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>163</nameplate_mw>
    <summer_mw>124</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1971</latest_year>
    <lat>34.587538</lat>
    <lon>-78.97552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60856</plant_id>
    <plant_name>Astra Wind Farm</plant_name>
    <state>TX</state>
    <county>Randall</county>
    <operator>Astra Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>163</nameplate_mw>
    <summer_mw>163</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.769544</lat>
    <lon>-102.0524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66110</plant_id>
    <plant_name>Babbitt Ranch Energy Center</plant_name>
    <state>AZ</state>
    <county>Coconino</county>
    <operator>Babbitt Ranch Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>163</nameplate_mw>
    <summer_mw>163</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.627731</lat>
    <lon>-111.8679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61776</plant_id>
    <plant_name>Midway Wind, LLC</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>Midway Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>162.9</nameplate_mw>
    <summer_mw>162.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.954976</lat>
    <lon>-97.3002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64548</plant_id>
    <plant_name>Standing Bear Lake</plant_name>
    <state>NE</state>
    <county>Douglas</county>
    <operator>Omaha Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>9</generators>
    <nameplate_mw>162.9</nameplate_mw>
    <summer_mw>151.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.315814</lat>
    <lon>-96.09392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10025</plant_id>
    <plant_name>RED-Rochester, LLC</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>RED-Rochester, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>162.8</nameplate_mw>
    <summer_mw>156</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2025</latest_year>
    <lat>43.1989</lat>
    <lon>-77.6319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55447</plant_id>
    <plant_name>Columbia Energy Center</plant_name>
    <state>MO</state>
    <county>Boone</county>
    <operator>City of Columbia - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>162.8</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>39.0192</lat>
    <lon>-92.2629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68386</plant_id>
    <plant_name>Mountain Peak Power Station</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Mountain Peak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>162.6</nameplate_mw>
    <summer_mw>138</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.147233</lat>
    <lon>-104.5492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3917</plant_id>
    <plant_name>Mayfield</plant_name>
    <state>WA</state>
    <county>Lewis</county>
    <operator>City of Tacoma - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>164</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1983</latest_year>
    <lat>46.5035</lat>
    <lon>-122.5885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50488</plant_id>
    <plant_name>PPG Riverside</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Westlake 2 US LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>PUR</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>3</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>103</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1969</latest_year>
    <lat>30.221746</lat>
    <lon>-93.28069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56075</plant_id>
    <plant_name>High Winds LLC</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>FPLE High Winds, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>162</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.1381</lat>
    <lon>-121.8053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56173</plant_id>
    <plant_name>Colorado Green Holdings LLC</plant_name>
    <state>CO</state>
    <county>Prowers</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>162</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>37.7033</lat>
    <lon>-102.6231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56608</plant_id>
    <plant_name>Prairie Winds SD1</plant_name>
    <state>SD</state>
    <county>Jerauld</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>172</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.886389</lat>
    <lon>-98.7875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57199</plant_id>
    <plant_name>Glacier Hills</plant_name>
    <state>WI</state>
    <county>Columbia</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>162</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.563889</lat>
    <lon>-89.14806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58121</plant_id>
    <plant_name>Echo Wind Park</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>162</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2016</latest_year>
    <lat>43.8825</lat>
    <lon>-83.16139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58154</plant_id>
    <plant_name>North Sky River Energy LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>North Sky River Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>162</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.347778</lat>
    <lon>-118.1864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63441</plant_id>
    <plant_name>Montague Solar</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>162</nameplate_mw>
    <summer_mw>162</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.54</lat>
    <lon>-120.18</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7268</plant_id>
    <plant_name>491 E 48th Street</plant_name>
    <state>MI</state>
    <county>Allegan</county>
    <operator>City of Holland - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>161.7</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2000</latest_year>
    <lat>42.7553</lat>
    <lon>-86.0853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>431</plant_id>
    <plant_name>Jaybird</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>161.6</nameplate_mw>
    <summer_mw>156.2</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1962</latest_year>
    <lat>38.83405</lat>
    <lon>-120.5318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6141</plant_id>
    <plant_name>Harry Truman</plant_name>
    <state>MO</state>
    <county>Benton</county>
    <operator>USCE-Kansas City District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>6</generators>
    <nameplate_mw>161.4</nameplate_mw>
    <summer_mw>186</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1982</latest_year>
    <lat>38.2623</lat>
    <lon>-93.4062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61106</plant_id>
    <plant_name>Pine River Wind Park</plant_name>
    <state>MI</state>
    <county>Isabella</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>161.3</nameplate_mw>
    <summer_mw>161.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.524324</lat>
    <lon>-84.69678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50733</plant_id>
    <plant_name>Gary Works</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>United States Steel-Gary</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>BFG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>161</nameplate_mw>
    <summer_mw>161</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>41.622426</lat>
    <lon>-87.32894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56432</plant_id>
    <plant_name>Wildorado Wind LLC</plant_name>
    <state>TX</state>
    <county>Oldham</county>
    <operator>Wildorado Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>161</nameplate_mw>
    <summer_mw>161</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.291944</lat>
    <lon>-102.3031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57973</plant_id>
    <plant_name>Spinning Spur Wind LLC</plant_name>
    <state>TX</state>
    <county>Oldham</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>161</nameplate_mw>
    <summer_mw>161</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.2375</lat>
    <lon>-102.2031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57974</plant_id>
    <plant_name>Bobcat Bluff Wind Project LLC</plant_name>
    <state>TX</state>
    <county>Archer</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>161</nameplate_mw>
    <summer_mw>161</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.493056</lat>
    <lon>-98.58194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58774</plant_id>
    <plant_name>Spinning Spur Wind II</plant_name>
    <state>TX</state>
    <county>Oldham</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>161</nameplate_mw>
    <summer_mw>161</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.276944</lat>
    <lon>-102.6828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60698</plant_id>
    <plant_name>Stanton Energy Reliability Center Hybrid</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>161</nameplate_mw>
    <summer_mw>161</summer_mw>
    <battery_mwh>9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.806801</lat>
    <lon>-117.9858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67580</plant_id>
    <plant_name>Markum Solar Farm</plant_name>
    <state>TX</state>
    <county>Bosque</county>
    <operator>Markum Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>161</nameplate_mw>
    <summer_mw>161</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.694792</lat>
    <lon>-97.37488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50900</plant_id>
    <plant_name>Covington Facility</plant_name>
    <state>VA</state>
    <county>Alleghany</county>
    <operator>WestRock Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>160.9</nameplate_mw>
    <summer_mw>156.5</summer_mw>
    <first_year>1951</first_year>
    <latest_year>2013</latest_year>
    <lat>37.799722</lat>
    <lon>-79.9947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>199</plant_id>
    <plant_name>Dardanelle</plant_name>
    <state>AR</state>
    <county>Pope</county>
    <operator>USCE-Little Rock District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>160.8</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1966</latest_year>
    <lat>35.2503</lat>
    <lon>-93.1686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62630</plant_id>
    <plant_name>Jumbo Hill Wind Project</plant_name>
    <state>TX</state>
    <county>Andrews</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>160.7</nameplate_mw>
    <summer_mw>160.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.386</lat>
    <lon>-102.949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59994</plant_id>
    <plant_name>RE Roserock</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>157.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>30.960209</lat>
    <lon>-103.3067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60743</plant_id>
    <plant_name>Rattlesnake Power, LLC</plant_name>
    <state>TX</state>
    <county>McCulloch</county>
    <operator>Rattlesnake Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.360331</lat>
    <lon>-99.55136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60827</plant_id>
    <plant_name>Sun Streams, LLC</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>EDP Renewables North America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.34884</lat>
    <lon>-112.8348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61889</plant_id>
    <plant_name>Sholes Wind Energy Center</plant_name>
    <state>NE</state>
    <county>Wayne</county>
    <operator>Sholes Wind Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.3119</lat>
    <lon>-97.3647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63387</plant_id>
    <plant_name>Rancho Seco Solar II, LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Rancho Seco Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.346814</lat>
    <lon>-121.1198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64426</plant_id>
    <plant_name>Wilmot Energy Center LLC</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Wilmot Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>130</summer_mw>
    <battery_mwh>60</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.043502</lat>
    <lon>-110.8927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65311</plant_id>
    <plant_name>Cedar Creek Wind, LLC</plant_name>
    <state>ID</state>
    <county>Bingham</county>
    <operator>Cedar Creek Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.327609</lat>
    <lon>-112.0577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65860</plant_id>
    <plant_name>Avila</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.904629</lat>
    <lon>-102.9159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67165</plant_id>
    <plant_name>Unbridled Solar</plant_name>
    <state>KY</state>
    <county>Henderson</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.652</lat>
    <lon>-87.552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67797</plant_id>
    <plant_name>Babacomari Solar</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>Babacomari Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>160</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.656605</lat>
    <lon>-110.4134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3398</plant_id>
    <plant_name>Chickamauga</plant_name>
    <state>TN</state>
    <county>Hamilton</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>159.6</nameplate_mw>
    <summer_mw>141.6</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1952</latest_year>
    <lat>35.101791</lat>
    <lon>-85.22947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55802</plant_id>
    <plant_name>Valencia Energy Facility</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>Valencia Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>159.5</nameplate_mw>
    <summer_mw>144.3</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>34.611549</lat>
    <lon>-106.7322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2831</plant_id>
    <plant_name>Dick's Creek</plant_name>
    <state>OH</state>
    <county>Butler</county>
    <operator>Luminant Dick's Creek</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>159.1</nameplate_mw>
    <summer_mw>136.2</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1969</latest_year>
    <lat>39.465</lat>
    <lon>-84.3778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56809</plant_id>
    <plant_name>Carroll Wind Farm</plant_name>
    <state>IA</state>
    <county>Carroll</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>159.1</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>42.1622</lat>
    <lon>-94.93</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54134</plant_id>
    <plant_name>Great Lakes Hydro America - ME</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Great Lakes Hydro America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Batteries</technologies>
    <generators>33</generators>
    <nameplate_mw>158</nameplate_mw>
    <summer_mw>153.1</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>1917</first_year>
    <latest_year>2020</latest_year>
    <lat>45.647179</lat>
    <lon>-68.70437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56765</plant_id>
    <plant_name>Barton Windpower LLC</plant_name>
    <state>IA</state>
    <county>Worth</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>158</nameplate_mw>
    <summer_mw>158</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.393</lat>
    <lon>-93.091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61417</plant_id>
    <plant_name>Gopher Creek Wind Farm</plant_name>
    <state>TX</state>
    <county>Borden</county>
    <operator>Fluvanna Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>158</nameplate_mw>
    <summer_mw>158</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.875073</lat>
    <lon>-101.209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>430</plant_id>
    <plant_name>Camino</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>157.8</nameplate_mw>
    <summer_mw>155.9</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1968</latest_year>
    <lat>38.82881</lat>
    <lon>-120.5371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6517</plant_id>
    <plant_name>Keowee</plant_name>
    <state>SC</state>
    <county>Pickens</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>157.6</nameplate_mw>
    <summer_mw>152</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>34.7981</lat>
    <lon>-82.8872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8029</plant_id>
    <plant_name>Sycamore (IA)</plant_name>
    <state>IA</state>
    <county>Polk</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>157.6</nameplate_mw>
    <summer_mw>140.6</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>41.6722</lat>
    <lon>-93.6769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66324</plant_id>
    <plant_name>BPL Files Solar</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>BPL Files Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>157.5</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.18398</lat>
    <lon>-97.07141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54365</plant_id>
    <plant_name>Orange Cogeneration Facility</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Northern Star Generation Services Co LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>157.2</nameplate_mw>
    <summer_mw>110.6</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>27.87082</lat>
    <lon>-81.82506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54900</plant_id>
    <plant_name>Calderwood</plant_name>
    <state>TN</state>
    <county>Blount</county>
    <operator>Brookfield Smoky Mountain Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>156.6</nameplate_mw>
    <summer_mw>156</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1938</latest_year>
    <lat>35.4923</lat>
    <lon>-83.9806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56255</plant_id>
    <plant_name>Hopkins Ridge Wind</plant_name>
    <state>WA</state>
    <county>Columbia</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>156.6</nameplate_mw>
    <summer_mw>156.6</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2008</latest_year>
    <lat>46.4211</lat>
    <lon>-117.8331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68741</plant_id>
    <plant_name>Canyon Peak Power Station</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Canyon Peak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>156.6</nameplate_mw>
    <summer_mw>133.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.622946</lat>
    <lon>-104.4508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54104</plant_id>
    <plant_name>Ashdown</plant_name>
    <state>AR</state>
    <county>Little River</county>
    <operator>Domtar Industries Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>156.5</nameplate_mw>
    <summer_mw>128</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1991</latest_year>
    <lat>33.6417</lat>
    <lon>-94.1083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6417</plant_id>
    <plant_name>Center Hill</plant_name>
    <state>TN</state>
    <county>DeKalb</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>156</nameplate_mw>
    <summer_mw>154</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1951</latest_year>
    <lat>36.0972</lat>
    <lon>-85.8274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67420</plant_id>
    <plant_name>Cavalier Solar</plant_name>
    <state>VA</state>
    <county>Isle of Wight</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>155.6</nameplate_mw>
    <summer_mw>155.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.018</lat>
    <lon>-76.7358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58965</plant_id>
    <plant_name>Thunder Spirit Wind, LLC</plant_name>
    <state>ND</state>
    <county>Adams</county>
    <operator>Montana-Dakota Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>155.5</nameplate_mw>
    <summer_mw>155.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2018</latest_year>
    <lat>46.075</lat>
    <lon>-102.5633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59245</plant_id>
    <plant_name>Fluvanna</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>TC Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>155.4</nameplate_mw>
    <summer_mw>155.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.931944</lat>
    <lon>-101.1436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59840</plant_id>
    <plant_name>Springbok Solar Farm 2</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>63SU 8me, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>155</nameplate_mw>
    <summer_mw>155</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.250031</lat>
    <lon>-117.9768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7825</plant_id>
    <plant_name>Fulton (AR)</plant_name>
    <state>AR</state>
    <county>Hempstead</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>154.8</nameplate_mw>
    <summer_mw>153</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.6094</lat>
    <lon>-93.7924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61261</plant_id>
    <plant_name>Rock Falls Wind Farm LLC</plant_name>
    <state>OK</state>
    <county>Kay</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>154.5</nameplate_mw>
    <summer_mw>154.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.927165</lat>
    <lon>-97.4271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>442</plant_id>
    <plant_name>Judge F Carr</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>154.4</nameplate_mw>
    <summer_mw>177.4</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>40.646934</lat>
    <lon>-122.627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59637</plant_id>
    <plant_name>Adams Wind</plant_name>
    <state>IA</state>
    <county>Adams</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>154.3</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>40.92</lat>
    <lon>-94.67167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55504</plant_id>
    <plant_name>Limon Generating Station</plant_name>
    <state>CO</state>
    <county>Lincoln</county>
    <operator>Tri-State G &amp; T Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>154.2</nameplate_mw>
    <summer_mw>134</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.2038</lat>
    <lon>-103.7005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55505</plant_id>
    <plant_name>Frank Knutson</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Tri-State G &amp; T Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>154.2</nameplate_mw>
    <summer_mw>134</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.941129</lat>
    <lon>-104.682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2450</plant_id>
    <plant_name>Reeves</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Public Service Co of NM</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>154</nameplate_mw>
    <summer_mw>146</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1962</latest_year>
    <lat>35.171</lat>
    <lon>-106.6019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56026</plant_id>
    <plant_name>Donald Von Raesfeld Power Plant</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>City of Santa Clara - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>154</nameplate_mw>
    <summer_mw>147.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>37.3767</lat>
    <lon>-121.9508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58017</plant_id>
    <plant_name>Copper Mountain Solar 2</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>154</nameplate_mw>
    <summer_mw>154</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2015</latest_year>
    <lat>35.786389</lat>
    <lon>-114.9628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60044</plant_id>
    <plant_name>Buckthorn Westex</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Buckthorn Westex, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>154</nameplate_mw>
    <summer_mw>154</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.57552</lat>
    <lon>-102.5513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61046</plant_id>
    <plant_name>Tatanka Ridge</plant_name>
    <state>SD</state>
    <county>Deuel</county>
    <operator>Tatanka Ridge LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>154</nameplate_mw>
    <summer_mw>154</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.592</lat>
    <lon>-96.576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56233</plant_id>
    <plant_name>EG178 Facility</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Kinder Morgan Production Company LP</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>153.9</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>32.747058</lat>
    <lon>-100.9547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67342</plant_id>
    <plant_name>Carvers Creek Solar</plant_name>
    <state>VA</state>
    <county>Gloucester</county>
    <operator>Carvers Creek, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>153.9</nameplate_mw>
    <summer_mw>153.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>37.56189</lat>
    <lon>-76.60537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63102</plant_id>
    <plant_name>Dakota Range III Wind Project</plant_name>
    <state>SD</state>
    <county>Grant</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>153.6</nameplate_mw>
    <summer_mw>153.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.267621</lat>
    <lon>-97.10398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61353</plant_id>
    <plant_name>Mount Signal Solar Farm II</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>153.5</nameplate_mw>
    <summer_mw>153.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.6685</lat>
    <lon>-115.6292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58413</plant_id>
    <plant_name>Copper Crossing Energy and Research Cent</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>153.4</nameplate_mw>
    <summer_mw>138.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2026</latest_year>
    <lat>33.15512</lat>
    <lon>-111.4836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3402</plant_id>
    <plant_name>Fort Loudoun</plant_name>
    <state>TN</state>
    <county>Loudon</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>153.3</nameplate_mw>
    <summer_mw>168.2</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1949</latest_year>
    <lat>35.7917</lat>
    <lon>-84.2431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67177</plant_id>
    <plant_name>Felina</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>153</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.5446</lat>
    <lon>-106.0376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68590</plant_id>
    <plant_name>Flat Ridge 5</plant_name>
    <state>KS</state>
    <county>Harper</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>153</nameplate_mw>
    <summer_mw>153</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.202624</lat>
    <lon>-98.04575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50118</plant_id>
    <plant_name>Hal C Weaver Power Plant</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>University of Texas at Austin</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>152.5</nameplate_mw>
    <summer_mw>146.8</summer_mw>
    <first_year>1951</first_year>
    <latest_year>2010</latest_year>
    <lat>30.2867</lat>
    <lon>-97.7356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65031</plant_id>
    <plant_name>Bellflower Solar 1</plant_name>
    <state>IN</state>
    <county>Henry</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>152.5</nameplate_mw>
    <summer_mw>152.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.786742</lat>
    <lon>-85.41637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62103</plant_id>
    <plant_name>Kossuth</plant_name>
    <state>IA</state>
    <county>Kossuth</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>152.2</nameplate_mw>
    <summer_mw>152.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.994681</lat>
    <lon>-94.12873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55968</plant_id>
    <plant_name>Trent Wind Farm</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>152</nameplate_mw>
    <summer_mw>152</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>32.4301</lat>
    <lon>-100.2357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68088</plant_id>
    <plant_name>Twelvemile Solar 1</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>152</nameplate_mw>
    <summer_mw>152</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.331569</lat>
    <lon>-95.22931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6405</plant_id>
    <plant_name>Flaming Gorge</plant_name>
    <state>UT</state>
    <county>Daggett</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>151.8</nameplate_mw>
    <summer_mw>151.8</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1964</latest_year>
    <lat>40.914646</lat>
    <lon>-109.4217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57358</plant_id>
    <plant_name>Keenan II Renewable Energy Co LLC</plant_name>
    <state>OK</state>
    <county>Woodward</county>
    <operator>CPV Keenan II Renewable Energy Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>151.8</nameplate_mw>
    <summer_mw>151.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>36.276111</lat>
    <lon>-99.49083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60013</plant_id>
    <plant_name>Grant Wind, LLC</plant_name>
    <state>OK</state>
    <county>Grant</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>151.8</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.927071</lat>
    <lon>-97.69633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57757</plant_id>
    <plant_name>Pacific Wind LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>151.7</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.891389</lat>
    <lon>-118.4325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64974</plant_id>
    <plant_name>Daybreak Solar</plant_name>
    <state>OR</state>
    <county>Wasco</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>151.7</nameplate_mw>
    <summer_mw>151.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.131793</lat>
    <lon>-120.8807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67425</plant_id>
    <plant_name>Century Oak Wind Project, LLC</plant_name>
    <state>TX</state>
    <county>Eastland</county>
    <operator>Century Oak Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>151.5</nameplate_mw>
    <summer_mw>151.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.428686</lat>
    <lon>-99.15911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56335</plant_id>
    <plant_name>Blue Canyon Windpower II</plant_name>
    <state>OK</state>
    <county>Comanche</county>
    <operator>Blue Canyon Windpower II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>151.4</nameplate_mw>
    <summer_mw>151.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>34.8661</lat>
    <lon>-98.6056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57320</plant_id>
    <plant_name>Juniper Canyon I Wind Project</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>151.2</nameplate_mw>
    <summer_mw>148.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.9215</lat>
    <lon>-120.2355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60366</plant_id>
    <plant_name>Old Settler Wind</plant_name>
    <state>TX</state>
    <county>Floyd</county>
    <operator>Old Settler Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>151.2</nameplate_mw>
    <summer_mw>151.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.060333</lat>
    <lon>-101.1876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62417</plant_id>
    <plant_name>Peyton Creek Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Matagorda</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>151.2</nameplate_mw>
    <summer_mw>151.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.8433</lat>
    <lon>-95.8631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59879</plant_id>
    <plant_name>North Rosamond Solar LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>North Rosamond Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>151.1</nameplate_mw>
    <summer_mw>151.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.862</lat>
    <lon>-118.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3400</plant_id>
    <plant_name>Douglas Dam</plant_name>
    <state>TN</state>
    <county>Sevier</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>150.8</nameplate_mw>
    <summer_mw>177.9</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1954</latest_year>
    <lat>35.9623</lat>
    <lon>-83.5393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57493</plant_id>
    <plant_name>Settlers Trail Wind Farm LLC</plant_name>
    <state>IL</state>
    <county>Iroquois</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150.4</nameplate_mw>
    <summer_mw>150.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.694444</lat>
    <lon>-87.57083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57675</plant_id>
    <plant_name>Pioneer Trail Wind Farm, LLC</plant_name>
    <state>IL</state>
    <county>Iroquois</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150.4</nameplate_mw>
    <summer_mw>150.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.46405</lat>
    <lon>-88.02152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58683</plant_id>
    <plant_name>Osage Wind, LLC</plant_name>
    <state>OK</state>
    <county>Osage</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150.4</nameplate_mw>
    <summer_mw>150.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.706944</lat>
    <lon>-96.70028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57874</plant_id>
    <plant_name>Vienna Wind Farm</plant_name>
    <state>IA</state>
    <county>Marshall</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>150.2</nameplate_mw>
    <summer_mw>150.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2013</latest_year>
    <lat>42.159444</lat>
    <lon>-92.77611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55039</plant_id>
    <plant_name>Rio Bravo</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Public Service Co of NM</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>140.7</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>35.026</lat>
    <lon>-106.644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56303</plant_id>
    <plant_name>Elk River Wind</plant_name>
    <state>KS</state>
    <county>Butler</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>37.5797</lat>
    <lon>-96.5503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56362</plant_id>
    <plant_name>Shiloh I Wind Project</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>38.12</lat>
    <lon>-121.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56459</plant_id>
    <plant_name>MinnDakota Wind LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>44.2667</lat>
    <lon>-96.3444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56640</plant_id>
    <plant_name>Camp Grove Wind Farm</plant_name>
    <state>IL</state>
    <county>STARK</county>
    <operator>Orion Energy Group LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>41.090583</lat>
    <lon>-89.63981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56773</plant_id>
    <plant_name>McAdoo Wind Energy LLC</plant_name>
    <state>TX</state>
    <county>Dickens</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>33.752201</lat>
    <lon>-100.9674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56874</plant_id>
    <plant_name>Shiloh Wind Project 2 LLC</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.1711</lat>
    <lon>-121.8461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56923</plant_id>
    <plant_name>FPL Energy Crystal Lake Wind LLC</plant_name>
    <state>IA</state>
    <county>Hancock</county>
    <operator>FPL Energy Crystal Lake Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.2125</lat>
    <lon>-93.8311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56924</plant_id>
    <plant_name>FPL Energy Story Wind LLC</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>FPL Energy Story Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>42.1044</lat>
    <lon>-93.2722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57048</plant_id>
    <plant_name>Merricourt Wind Energy Center</plant_name>
    <state>ND</state>
    <county>McIntosh</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>46.1075</lat>
    <lon>-99.0592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57153</plant_id>
    <plant_name>Langford Wind Power</plant_name>
    <state>TX</state>
    <county>Tom Green</county>
    <operator>Langford Wind Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>31.085435</lat>
    <lon>-100.6788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57192</plant_id>
    <plant_name>Spring Valley Wind Project</plant_name>
    <state>NV</state>
    <county>White Pine</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.104167</lat>
    <lon>-114.4922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57282</plant_id>
    <plant_name>Alta Wind Energy Center I</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Alta Wind I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.033725</lat>
    <lon>-118.3534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57291</plant_id>
    <plant_name>Alta Wind Energy Center II</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Alta Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.023889</lat>
    <lon>-118.2953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57292</plant_id>
    <plant_name>Alta Wind Energy Center III</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Alta Wind III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.023889</lat>
    <lon>-118.2953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57303</plant_id>
    <plant_name>Loraine Windpark Project LLC</plant_name>
    <state>TX</state>
    <county>Mitchell</county>
    <operator>Loraine Windpower Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>148.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>32.4375</lat>
    <lon>-100.7444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57342</plant_id>
    <plant_name>White Oak Energy LLC</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>White Oak Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.590833</lat>
    <lon>-89.04667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57469</plant_id>
    <plant_name>Garden Wind LLC</plant_name>
    <state>IA</state>
    <county>Hardin</county>
    <operator>Garden Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.224436</lat>
    <lon>-93.37363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57833</plant_id>
    <plant_name>Mustang Hills LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Mustang Hills, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.030855</lat>
    <lon>-118.2932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57835</plant_id>
    <plant_name>Alta Wind VIII</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Nextera Energy Resources</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.026683</lat>
    <lon>-118.2348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57981</plant_id>
    <plant_name>Senate Wind LLC</plant_name>
    <state>TX</state>
    <county>Jack</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.205801</lat>
    <lon>-98.36507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58321</plant_id>
    <plant_name>Goldthwaite Wind Energy Facility</plant_name>
    <state>TX</state>
    <county>Mills</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>31.383333</lat>
    <lon>-98.46667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58681</plant_id>
    <plant_name>Route 66 Wind Plant</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.205278</lat>
    <lon>-101.4342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58938</plant_id>
    <plant_name>Origin Wind</plant_name>
    <state>OK</state>
    <county>Murray</county>
    <operator>Origin Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.446111</lat>
    <lon>-97.26972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59200</plant_id>
    <plant_name>Border Winds Wind Farm</plant_name>
    <state>ND</state>
    <county>Rolette</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>48.964722</lat>
    <lon>-99.61389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59547</plant_id>
    <plant_name>Fowler Ridge IV Wind Farm LLC</plant_name>
    <state>IN</state>
    <county>Benton</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.620556</lat>
    <lon>-87.37806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59684</plant_id>
    <plant_name>Lindahl Wind Project, LLC</plant_name>
    <state>ND</state>
    <county>Williams</county>
    <operator>Lindahl Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>48.533</lat>
    <lon>-102.933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59732</plant_id>
    <plant_name>Green Pastures Wind I</plant_name>
    <state>TX</state>
    <county>Baylor</county>
    <operator>Green Pastures Wind I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.628222</lat>
    <lon>-99.41117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59733</plant_id>
    <plant_name>Green Pastures Wind II</plant_name>
    <state>TX</state>
    <county>Knox</county>
    <operator>Green Pastures Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.645964</lat>
    <lon>-99.53294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59734</plant_id>
    <plant_name>Briscoe Wind Farm</plant_name>
    <state>TX</state>
    <county>Briscoe</county>
    <operator>Briscoe Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.432267</lat>
    <lon>-101.2372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59837</plant_id>
    <plant_name>Slate Creek Wind Project LLC</plant_name>
    <state>KS</state>
    <county>Sumner</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.1146</lat>
    <lon>-97.2376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59902</plant_id>
    <plant_name>Cardinal Point Wind</plant_name>
    <state>IL</state>
    <county>McDonough</county>
    <operator>Cardinal Point LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.588568</lat>
    <lon>-90.75183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59975</plant_id>
    <plant_name>Carousel Wind Farm LLC</plant_name>
    <state>CO</state>
    <county>Kit Carson</county>
    <operator>Carousel Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.334</lat>
    <lon>-102.173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60034</plant_id>
    <plant_name>CA Flats Solar 150, LLC</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.615573</lat>
    <lon>-120.4044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60308</plant_id>
    <plant_name>Mesquite Solar 3, LLC</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.347583</lat>
    <lon>-112.9368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60354</plant_id>
    <plant_name>Brady II Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Stark</county>
    <operator>Brady Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>46.611515</lat>
    <lon>-102.7882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60355</plant_id>
    <plant_name>Brady Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Stark</county>
    <operator>Brady Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>46.646471</lat>
    <lon>-102.7651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60581</plant_id>
    <plant_name>Upton County Solar</plant_name>
    <state>TX</state>
    <county>Upton</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.241808</lat>
    <lon>-102.2903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61344</plant_id>
    <plant_name>Otter Creek Wind Farm LLC</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.055385</lat>
    <lon>-88.99386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61674</plant_id>
    <plant_name>Wildcat Ranch Wind Project</plant_name>
    <state>TX</state>
    <county>Cochran</county>
    <operator>Wildcat Ranch Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.5296</lat>
    <lon>-102.9619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61747</plant_id>
    <plant_name>Foxtail Wind, LLC</plant_name>
    <state>ND</state>
    <county>Dickey</county>
    <operator>Foxtail Wind, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>46.098211</lat>
    <lon>-98.88007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62015</plant_id>
    <plant_name>Mustang Two</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>RE Mustang Two LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.216806</lat>
    <lon>-119.8964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62584</plant_id>
    <plant_name>Quitman Solar</plant_name>
    <state>GA</state>
    <county>Brooks</county>
    <operator>Quitman Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.849005</lat>
    <lon>-83.64328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62844</plant_id>
    <plant_name>Cranberry Point Energy Storage</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Cranberry Point Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.896717</lat>
    <lon>-70.78708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62933</plant_id>
    <plant_name>Oberon IA</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Oberon Solar IA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.703258</lat>
    <lon>-102.7012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62955</plant_id>
    <plant_name>Badger Hollow I</plant_name>
    <state>WI</state>
    <county>Iowa</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.94556</lat>
    <lon>-90.34942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63029</plant_id>
    <plant_name>Hardin Solar Energy LLC</plant_name>
    <state>OH</state>
    <county>Hardin</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.659506</lat>
    <lon>-83.81371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63105</plant_id>
    <plant_name>Two Creeks Solar</plant_name>
    <state>WI</state>
    <county>Manitowoc</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.249598</lat>
    <lon>-87.54534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63440</plant_id>
    <plant_name>Sun Streams 2</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Sun Streams 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.320406</lat>
    <lon>-112.8168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63509</plant_id>
    <plant_name>Lund Hill Solar</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.888</lat>
    <lon>-120.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63519</plant_id>
    <plant_name>Crane Solar Project</plant_name>
    <state>TX</state>
    <county>Crane</county>
    <operator>Crane Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.254361</lat>
    <lon>-102.3117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63686</plant_id>
    <plant_name>Crescent Wind Park</plant_name>
    <state>MI</state>
    <county>Hillsdale</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.935</lat>
    <lon>-84.477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63687</plant_id>
    <plant_name>Gratiot Farms Wind Project</plant_name>
    <state>MI</state>
    <county>Montcalm</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.1695</lat>
    <lon>-84.8653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63719</plant_id>
    <plant_name>Elora Solar</plant_name>
    <state>TN</state>
    <county>Lincoln</county>
    <operator>Elora Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.06</lat>
    <lon>-86.34</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63828</plant_id>
    <plant_name>Hardin Solar Energy II LLC</plant_name>
    <state>OH</state>
    <county>Hardin</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.632486</lat>
    <lon>-83.79238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63877</plant_id>
    <plant_name>Willowbrook Solar I, LLC</plant_name>
    <state>OH</state>
    <county>Highland</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.021755</lat>
    <lon>-83.70501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64105</plant_id>
    <plant_name>Maverick Solar 6, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Maverick Solar 6, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>33.7</lat>
    <lon>-115.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64335</plant_id>
    <plant_name>Quitman II Solar</plant_name>
    <state>GA</state>
    <county>Brooks</county>
    <operator>Quitman II Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.86205</lat>
    <lon>-83.65165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64393</plant_id>
    <plant_name>Badger Hollow II</plant_name>
    <state>WI</state>
    <county>Iowa</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.94556</lat>
    <lon>-90.34942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64624</plant_id>
    <plant_name>Hudson - High Desert Hybrid</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.6365</lat>
    <lon>-117.3724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65008</plant_id>
    <plant_name>Onion River</plant_name>
    <state>WI</state>
    <county>Sheboygan</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.6002</lat>
    <lon>-87.89659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65322</plant_id>
    <plant_name>Fort Powhatan Solar</plant_name>
    <state>VA</state>
    <county>Prince George</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.26</lat>
    <lon>-77.08</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65589</plant_id>
    <plant_name>Carina</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.81922</lat>
    <lon>-97.53546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65736</plant_id>
    <plant_name>Driver Solar</plant_name>
    <state>AR</state>
    <county>Mississippi</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.640573</lat>
    <lon>-89.96939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65936</plant_id>
    <plant_name>Honeysuckle Solar Farm</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.719</lat>
    <lon>-86.464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65997</plant_id>
    <plant_name>Powell Creek Solar</plant_name>
    <state>OH</state>
    <county>Putnam</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.092921</lat>
    <lon>-84.11612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66170</plant_id>
    <plant_name>Revolution</plant_name>
    <state>TX</state>
    <county>Crane</county>
    <operator>Crane 2 BESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>368.8</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.233457</lat>
    <lon>-102.3085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66616</plant_id>
    <plant_name>Wolf Tank Storage</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Wolf Tank Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>150</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>27.577207</lat>
    <lon>-99.27602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66670</plant_id>
    <plant_name>Harquahala Sun Solar Project</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Copia Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.44065</lat>
    <lon>-113.1352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66687</plant_id>
    <plant_name>Graceland Solar, LLC</plant_name>
    <state>TN</state>
    <county>Shelby</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.309415</lat>
    <lon>-89.86646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66696</plant_id>
    <plant_name>Winfield Solar</plant_name>
    <state>MO</state>
    <county>Lincoln</county>
    <operator>Winfield Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.019518</lat>
    <lon>-90.85517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66804</plant_id>
    <plant_name>Borden County BESS</plant_name>
    <state>TX</state>
    <county>Borden</county>
    <operator>Borden County Battery Energy Storage System LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.72233</lat>
    <lon>-101.6385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66844</plant_id>
    <plant_name>Spring Grove Solar 2</plant_name>
    <state>VA</state>
    <county>Surry</county>
    <operator>Urban Grid Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.16738</lat>
    <lon>-76.92423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66913</plant_id>
    <plant_name>Myrtle Storage</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Myrtle Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>225</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.227753</lat>
    <lon>-95.42806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66916</plant_id>
    <plant_name>Danish Fields Storage</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Danish Fields Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>225</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.013637</lat>
    <lon>-96.22054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66919</plant_id>
    <plant_name>La Casa Wind</plant_name>
    <state>TX</state>
    <county>Stephens</county>
    <operator>La Casa Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.635105</lat>
    <lon>-98.6772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66954</plant_id>
    <plant_name>Umbriel Solar</plant_name>
    <state>TX</state>
    <county>Polk</county>
    <operator>Umbriel Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.668754</lat>
    <lon>-94.78347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66990</plant_id>
    <plant_name>Washington County Solar</plant_name>
    <state>GA</state>
    <county>Washington</county>
    <operator>Washington County Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.989939</lat>
    <lon>-82.71381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67137</plant_id>
    <plant_name>Great Cove Solar II</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.9016</lat>
    <lon>-77.8682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67147</plant_id>
    <plant_name>South Cheyenne Solar</plant_name>
    <state>WY</state>
    <county>Laramie</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.027211</lat>
    <lon>-104.776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67537</plant_id>
    <plant_name>Pleasant Creek Unit 2</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.104396</lat>
    <lon>-91.78258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67549</plant_id>
    <plant_name>Kuna BESS</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Kuna BESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.49</lat>
    <lon>-116.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67598</plant_id>
    <plant_name>Desert Willow Energy Storage</plant_name>
    <state>TX</state>
    <county>Ellis</county>
    <operator>Desert Willow Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.452281</lat>
    <lon>-97.07263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67677</plant_id>
    <plant_name>Heartwood Solar</plant_name>
    <state>MI</state>
    <county>Hillsdale</county>
    <operator>Heartwood Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.934092</lat>
    <lon>-84.7343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67696</plant_id>
    <plant_name>Twin Lakes Solar LLC</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Twin Lakes Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.71542</lat>
    <lon>-86.77581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67765</plant_id>
    <plant_name>Compadre Solar</plant_name>
    <state>TX</state>
    <county>Cooke</county>
    <operator>Compadre Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.457356</lat>
    <lon>-97.28961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67872</plant_id>
    <plant_name>RATTS 1</plant_name>
    <state>IN</state>
    <county>Pike</county>
    <operator>Ratts 1 Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.52543</lat>
    <lon>-87.18622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67942</plant_id>
    <plant_name>Sauk Solar Park</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.06202</lat>
    <lon>-85.10297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67964</plant_id>
    <plant_name>Agave</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.32389</lat>
    <lon>-112.8397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67972</plant_id>
    <plant_name>Eldorado Solar I</plant_name>
    <state>IL</state>
    <county>Saline</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.85259</lat>
    <lon>-88.44912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68055</plant_id>
    <plant_name>Prospect Power BESS</plant_name>
    <state>VA</state>
    <county>Rockingham</county>
    <operator>Elevate Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>734</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.616069</lat>
    <lon>-78.68635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68183</plant_id>
    <plant_name>Coldwater River Solar</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>Coldwater River Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.89223</lat>
    <lon>-85.03205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68263</plant_id>
    <plant_name>Mondu Solar LLC</plant_name>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <operator>Mondu Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.549</lat>
    <lon>-91.579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68324</plant_id>
    <plant_name>Atlas IX</plant_name>
    <state>AZ</state>
    <county>La Paz</county>
    <operator>Atlas IX LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.582903</lat>
    <lon>-113.5769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68456</plant_id>
    <plant_name>Blue Summit II Storage</plant_name>
    <state>TX</state>
    <county>Wilbarger</county>
    <operator>Blue Summit II Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>150</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.291934</lat>
    <lon>-99.36776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68460</plant_id>
    <plant_name>Roadrunner Crossing Energy Storage</plant_name>
    <state>TX</state>
    <county>Eastland</county>
    <operator>Roadrunner Crossing Energy Storage LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>150</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.414193</lat>
    <lon>-99.10774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68474</plant_id>
    <plant_name>Peacock Energy Project</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>28.000395</lat>
    <lon>-97.3879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68499</plant_id>
    <plant_name>Crowned Heron 1 - Storage, LLC</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.482231</lat>
    <lon>-95.61892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68500</plant_id>
    <plant_name>Crowned Heron 2 - Storage, LLC</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.482673</lat>
    <lon>-95.61996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68517</plant_id>
    <plant_name>Boot Hill Solar</plant_name>
    <state>KS</state>
    <county>Ford</county>
    <operator>Boot Hill Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.693889</lat>
    <lon>-99.98639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68534</plant_id>
    <plant_name>Wheatland</plant_name>
    <state>IN</state>
    <county>Knox</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.692248</lat>
    <lon>-87.28772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68580</plant_id>
    <plant_name>Headcamp BESS</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Lydian Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.916058</lat>
    <lon>-102.8553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68770</plant_id>
    <plant_name>Boomtown Renewable Energy Center</plant_name>
    <state>IL</state>
    <county>White</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.1699</lat>
    <lon>-88.1869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68771</plant_id>
    <plant_name>Cass County Renewable Energy Center</plant_name>
    <state>IL</state>
    <county>Cass</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.9778</lat>
    <lon>-90.4711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68799</plant_id>
    <plant_name>Boise Bench BESS</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.55751</lat>
    <lon>-116.1548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68842</plant_id>
    <plant_name>Chillingham Storage</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Chillingham Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>150</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.005302</lat>
    <lon>-97.26319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68866</plant_id>
    <plant_name>Santa Teresa Solar</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>Santa Teresa Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.805525</lat>
    <lon>-106.6989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68879</plant_id>
    <plant_name>Bocanova Energy Storage</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Bocanova Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.435422</lat>
    <lon>-95.2511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68880</plant_id>
    <plant_name>Pleasantville Solar Park</plant_name>
    <state>IL</state>
    <county>Fulton</county>
    <operator>Pleasantville Solar Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.354122</lat>
    <lon>-90.34819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68894</plant_id>
    <plant_name>Riverstart Solar Park IV</plant_name>
    <state>IN</state>
    <county>Randolph</county>
    <operator>Riverstart Solar Park IV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.12115</lat>
    <lon>-85.17476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68913</plant_id>
    <plant_name>Padua 2</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Padua 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.325064</lat>
    <lon>-98.32562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69152</plant_id>
    <plant_name>Wizard Energy Storage</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Wizard Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.499434</lat>
    <lon>-95.08513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69164</plant_id>
    <plant_name>Tilden Solar</plant_name>
    <state>IL</state>
    <county>Randolph</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.190651</lat>
    <lon>-89.68408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69251</plant_id>
    <plant_name>Cottonwood Bayou Storage</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Cottonwood Bayou Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>225</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.242643</lat>
    <lon>-95.25994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69256</plant_id>
    <plant_name>Papago PV</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RE Papago PV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.485</lat>
    <lon>-113.042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69290</plant_id>
    <plant_name>Desert Bloom</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RE Desert Bloom LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.70299</lat>
    <lon>-112.3219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69423</plant_id>
    <plant_name>Bocanova Energy Storage II</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Bocanova Power II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.435422</lat>
    <lon>-95.2511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69424</plant_id>
    <plant_name>Faraday Energy Storage</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Lydian Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.082</lat>
    <lon>-112.069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69435</plant_id>
    <plant_name>Plant X Solar</plant_name>
    <state>TX</state>
    <county>Lamb</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.165603</lat>
    <lon>-102.4053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69469</plant_id>
    <plant_name>Justice Energy Storage</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Strata Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <battery_mwh>600</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.407967</lat>
    <lon>-112.4956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69578</plant_id>
    <plant_name>Casey Fork Solar, LLC</plant_name>
    <state>IL</state>
    <county>Jefferson</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.452</lat>
    <lon>-88.876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70425</plant_id>
    <plant_name>Sebree Solar II</plant_name>
    <state>KY</state>
    <county>Henderson</county>
    <operator>Sebree Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>150</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.705718</lat>
    <lon>-87.57417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55541</plant_id>
    <plant_name>Indigo Energy Facility</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Diamond Generating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>149.7</nameplate_mw>
    <summer_mw>142.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.910873</lat>
    <lon>-116.553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56754</plant_id>
    <plant_name>Goat Wind LP</plant_name>
    <state>TX</state>
    <county>Sterling</county>
    <operator>Goat Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>149.6</nameplate_mw>
    <summer_mw>149.6</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>31.951944</lat>
    <lon>-100.7914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59093</plant_id>
    <plant_name>Holland Energy Park</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>City of Holland - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>149.4</nameplate_mw>
    <summer_mw>127.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.7925</lat>
    <lon>-86.09222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62475</plant_id>
    <plant_name>Kings Point Wind Energy Center</plant_name>
    <state>MO</state>
    <county>Lawrence</county>
    <operator>Empire District Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>149.4</nameplate_mw>
    <summer_mw>145.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.269858</lat>
    <lon>-94.05271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62478</plant_id>
    <plant_name>North Fork Ridge Wind Energy Center</plant_name>
    <state>MO</state>
    <county>Barton</county>
    <operator>Empire District Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>149.4</nameplate_mw>
    <summer_mw>145.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.38999</lat>
    <lon>-94.51027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60217</plant_id>
    <plant_name>Rocksprings</plant_name>
    <state>TX</state>
    <county>Val Verde</county>
    <operator>Rocksprings Val Verde Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>149.3</nameplate_mw>
    <summer_mw>149.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.72753</lat>
    <lon>-100.7943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1233</plant_id>
    <plant_name>Fort Dodge</plant_name>
    <state>KS</state>
    <county>Ford</county>
    <operator>Sunflower Electric Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>148.7</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>37.7328</lat>
    <lon>-99.9497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6211</plant_id>
    <plant_name>Dynegy Oakland Power Plant</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Dynegy Oakland, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>JF</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>37.79675</lat>
    <lon>-122.2819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57097</plant_id>
    <plant_name>Rugby Wind Power Project</plant_name>
    <state>ND</state>
    <county>Pierce</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>48.4968</lat>
    <lon>-99.9513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60883</plant_id>
    <plant_name>Deerfield Wind Energy, LLC</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Deerfield Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.941851</lat>
    <lon>-82.89868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64637</plant_id>
    <plant_name>Big River Solar</plant_name>
    <state>IL</state>
    <county>White</county>
    <operator>Big River Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.050141</lat>
    <lon>-88.29553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65422</plant_id>
    <plant_name>FPL Chipola River Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Calhoun</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <battery_mwh>223.5</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2025</latest_year>
    <lat>30.45463</lat>
    <lon>-85.27853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65429</plant_id>
    <plant_name>FPL Shirer Branch Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Calhoun</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <battery_mwh>223.5</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2025</latest_year>
    <lat>30.3962</lat>
    <lon>-85.27966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65433</plant_id>
    <plant_name>Blackwater River Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Santa Rosa</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <battery_mwh>223.5</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2025</latest_year>
    <lat>30.64691</lat>
    <lon>-86.93821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65866</plant_id>
    <plant_name>Canoe</plant_name>
    <state>FL</state>
    <county>Okaloosa</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <battery_mwh>223.5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>30.68003</lat>
    <lon>-86.78045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65886</plant_id>
    <plant_name>Tenmile Creek</plant_name>
    <state>FL</state>
    <county>Calhoun</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <battery_mwh>223.5</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.503643</lat>
    <lon>-85.16738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65888</plant_id>
    <plant_name>Kayak</plant_name>
    <state>FL</state>
    <county>Okaloosa</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <battery_mwh>223.5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>30.415143</lat>
    <lon>-86.4233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65927</plant_id>
    <plant_name>Fourmile Creek</plant_name>
    <state>FL</state>
    <county>Calhoun</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <battery_mwh>223.5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>30.43989</lat>
    <lon>-85.27589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67008</plant_id>
    <plant_name>River Fork Solar, LLC</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>River Fork Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.281313</lat>
    <lon>-84.75561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69321</plant_id>
    <plant_name>Kelso 2 Solar</plant_name>
    <state>MO</state>
    <county>Scott</county>
    <operator>Kelso 2 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>149</nameplate_mw>
    <summer_mw>149</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.05</lat>
    <lon>-89.52</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57649</plant_id>
    <plant_name>Elm Creek Wind II LLC</plant_name>
    <state>MN</state>
    <county>Martin</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148.8</nameplate_mw>
    <summer_mw>148.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>43.6848</lat>
    <lon>-94.8799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58078</plant_id>
    <plant_name>Rocky Ridge Wind Project</plant_name>
    <state>OK</state>
    <county>Kiowa</county>
    <operator>Rocky Ridge Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148.8</nameplate_mw>
    <summer_mw>148.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.135556</lat>
    <lon>-99.00306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57491</plant_id>
    <plant_name>Imperial Solar Energy Center West</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CSOLAR IV West LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>148.7</nameplate_mw>
    <summer_mw>148.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.772225</lat>
    <lon>-115.7793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56351</plant_id>
    <plant_name>Spearville</plant_name>
    <state>KS</state>
    <county>Ford</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>148.5</nameplate_mw>
    <summer_mw>148.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2010</latest_year>
    <lat>37.8641</lat>
    <lon>-99.7528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56919</plant_id>
    <plant_name>FPL Energy Ashtabula Wind LLC</plant_name>
    <state>ND</state>
    <county>Barnes</county>
    <operator>FPL Energy Ashtabula Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148.5</nameplate_mw>
    <summer_mw>148.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>47.1294</lat>
    <lon>-97.8853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56985</plant_id>
    <plant_name>Smoky Hills Wind Project Phase II</plant_name>
    <state>KS</state>
    <county>Lincoln</county>
    <operator>Smoky Hills Wind Project II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148.5</nameplate_mw>
    <summer_mw>148.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.892653</lat>
    <lon>-98.16888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60270</plant_id>
    <plant_name>Blue Cloud Wind Energy LLC</plant_name>
    <state>TX</state>
    <county>Bailey</county>
    <operator>TC Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148.4</nameplate_mw>
    <summer_mw>148.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.03821</lat>
    <lon>-102.6652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61001</plant_id>
    <plant_name>Cactus Flats Wind Energy Project</plant_name>
    <state>TX</state>
    <county>Concho</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148.4</nameplate_mw>
    <summer_mw>148.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.112474</lat>
    <lon>-100.0281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62871</plant_id>
    <plant_name>Boiling Springs Wind Farm</plant_name>
    <state>OK</state>
    <county>Woodward</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148.4</nameplate_mw>
    <summer_mw>148.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.546545</lat>
    <lon>-99.3576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57002</plant_id>
    <plant_name>Oakfield Wind Project</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148</nameplate_mw>
    <summer_mw>148</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>46.058056</lat>
    <lon>-68.14722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59897</plant_id>
    <plant_name>Taylor County Solar</plant_name>
    <state>GA</state>
    <county>Taylor</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>148</nameplate_mw>
    <summer_mw>143</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.583056</lat>
    <lon>-84.29722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64544</plant_id>
    <plant_name>Ranchland Wind Project II</plant_name>
    <state>TX</state>
    <county>Callahan</county>
    <operator>Ranchland Wind Project II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>148</nameplate_mw>
    <summer_mw>148</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.308524</lat>
    <lon>-99.1642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68846</plant_id>
    <plant_name>Edwards Sanborn 1C</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>148</nameplate_mw>
    <summer_mw>148</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.026182</lat>
    <lon>-118.1529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66897</plant_id>
    <plant_name>Midpoint Solar, LLC</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Sunraycer Assets I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>147.5</nameplate_mw>
    <summer_mw>147.5</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.116002</lat>
    <lon>-97.34352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67224</plant_id>
    <plant_name>Pontotoc Wind</plant_name>
    <state>OK</state>
    <county>Pontotoc</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>147.5</nameplate_mw>
    <summer_mw>147.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.635769</lat>
    <lon>-96.86407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58467</plant_id>
    <plant_name>Campo Verde Solar</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>147.4</nameplate_mw>
    <summer_mw>139</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.753333</lat>
    <lon>-115.7264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60545</plant_id>
    <plant_name>Grant Plains Wind, LLC</plant_name>
    <state>OK</state>
    <county>Grant</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>147.2</nameplate_mw>
    <summer_mw>147</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.9708</lat>
    <lon>-97.7053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50458</plant_id>
    <plant_name>Indeck Corinth Energy Center</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Indeck-Corinth Ltd Partnership</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>147</nameplate_mw>
    <summer_mw>125.5</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.25</lat>
    <lon>-73.8125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56273</plant_id>
    <plant_name>Weatherford Wind Energy Center</plant_name>
    <state>OK</state>
    <county>Custer</county>
    <operator>FPL Energy Weatherford, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>147</nameplate_mw>
    <summer_mw>147</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>35.5094</lat>
    <lon>-98.7346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63026</plant_id>
    <plant_name>Yum Yum Solar LLC</plant_name>
    <state>TN</state>
    <county>Fayette</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>147</nameplate_mw>
    <summer_mw>147</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.252463</lat>
    <lon>-89.25136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63666</plant_id>
    <plant_name>Bitter Ridge Wind Farm, LLC</plant_name>
    <state>IN</state>
    <county>Jay</county>
    <operator>Bitter Ridge Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>146.6</nameplate_mw>
    <summer_mw>142.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.360533</lat>
    <lon>-85.11315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56843</plant_id>
    <plant_name>Seven Mile Hill</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>146.2</nameplate_mw>
    <summer_mw>118.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.9203</lat>
    <lon>-106.3758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67754</plant_id>
    <plant_name>Fish Creek Solar Park</plant_name>
    <state>MI</state>
    <county>Montcalm</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>146.2</nameplate_mw>
    <summer_mw>146.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.12165</lat>
    <lon>-85.01172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56767</plant_id>
    <plant_name>Farmers City Wind LLC</plant_name>
    <state>MO</state>
    <county>Atchison</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>146</nameplate_mw>
    <summer_mw>146</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.575</lat>
    <lon>-95.5228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3176</plant_id>
    <plant_name>Hunlock Power Station</plant_name>
    <state>PA</state>
    <county>Luzerne</county>
    <operator>Hunlock Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>145.9</nameplate_mw>
    <summer_mw>125.2</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2011</latest_year>
    <lat>41.200556</lat>
    <lon>-76.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3319</plant_id>
    <plant_name>Jefferies</plant_name>
    <state>SC</state>
    <county>Berkeley</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>145.2</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1942</latest_year>
    <lat>33.244404</lat>
    <lon>-79.99091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56391</plant_id>
    <plant_name>Blue Sky Green Field Wind Project</plant_name>
    <state>WI</state>
    <county>Fond Du Lac</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>145.2</nameplate_mw>
    <summer_mw>145.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.8794</lat>
    <lon>-88.2708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64872</plant_id>
    <plant_name>Panorama Wind, LLC</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>145</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.952057</lat>
    <lon>-103.9076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65480</plant_id>
    <plant_name>Axial Basin Solar</plant_name>
    <state>CO</state>
    <county>Moffat</county>
    <operator>Tri-State G &amp; T Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>145</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.327892</lat>
    <lon>-107.7533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67444</plant_id>
    <plant_name>Cherrywood Solar I</plant_name>
    <state>MD</state>
    <county>Caroline</county>
    <operator>Cherrywood Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>145</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.007849</lat>
    <lon>-75.78297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68537</plant_id>
    <plant_name>Swift Air Solar I</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>145</nameplate_mw>
    <summer_mw>145</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.7688</lat>
    <lon>-102.696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61773</plant_id>
    <plant_name>Palmas Wind, LLC</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Acciona Energy USA Global, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>144.9</nameplate_mw>
    <summer_mw>142.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>26.288889</lat>
    <lon>-97.49639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66699</plant_id>
    <plant_name>Lockhart Solar PV II</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Terra-Gen Operating Co-Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>144.1</nameplate_mw>
    <summer_mw>134.7</summer_mw>
    <battery_mwh>59.7</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2025</latest_year>
    <lat>35.04351</lat>
    <lon>-117.3489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55810</plant_id>
    <plant_name>Gilroy Peaking Energy Center</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Calpine Gilroy Cogen LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>144</nameplate_mw>
    <summer_mw>144</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>36.999</lat>
    <lon>-121.5363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56093</plant_id>
    <plant_name>TransAlta Wyoming Wind</plant_name>
    <state>WY</state>
    <county>Uinta</county>
    <operator>TransAlta Wyoming Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>144</nameplate_mw>
    <summer_mw>142.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.2874</lat>
    <lon>-110.5556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56312</plant_id>
    <plant_name>Shute Creek Facility</plant_name>
    <state>WY</state>
    <county>Lincoln</county>
    <operator>Exxon Mobil Production Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>144</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>41.8805</lat>
    <lon>-110.0904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57659</plant_id>
    <plant_name>East Blackland Solar Project 1</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>144</nameplate_mw>
    <summer_mw>144</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.4214</lat>
    <lon>-97.4614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62936</plant_id>
    <plant_name>Rattlesnake Flat</plant_name>
    <state>WA</state>
    <county>Adams</county>
    <operator>Rattlesnake Flat, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>144</nameplate_mw>
    <summer_mw>144</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>46.941015</lat>
    <lon>-118.5671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67935</plant_id>
    <plant_name>Clearview Solar 1</plant_name>
    <state>OH</state>
    <county>Champaign</county>
    <operator>Clearview Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>144</nameplate_mw>
    <summer_mw>144</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.269236</lat>
    <lon>-83.98409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67959</plant_id>
    <plant_name>Crossover Wind</plant_name>
    <state>AR</state>
    <county>Cross</county>
    <operator>Crossover Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>144</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.24601</lat>
    <lon>-90.74649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1295</plant_id>
    <plant_name>Quindaro</plant_name>
    <state>KS</state>
    <county>Wyandotte</county>
    <operator>City of Kansas City - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>143.6</nameplate_mw>
    <summer_mw>94</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1977</latest_year>
    <lat>39.1492</lat>
    <lon>-94.6381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57913</plant_id>
    <plant_name>Tule Wind LLC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>143</nameplate_mw>
    <summer_mw>143</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.663889</lat>
    <lon>-116.2897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>272</plant_id>
    <plant_name>Poe</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>142.8</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>39.722892</lat>
    <lon>-121.4698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2241</plant_id>
    <plant_name>C W Burdick</plant_name>
    <state>NE</state>
    <county>Hall</county>
    <operator>City of Grand Island - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>142.8</nameplate_mw>
    <summer_mw>81.6</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2003</latest_year>
    <lat>40.9228</lat>
    <lon>-98.3269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66111</plant_id>
    <plant_name>Elizabeth Solar Plant</plant_name>
    <state>LA</state>
    <county>Allen</county>
    <operator>Horus Louisiana 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>142.8</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.81981</lat>
    <lon>-92.97176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60152</plant_id>
    <plant_name>Broadview Energy KW, LLC</plant_name>
    <state>NM</state>
    <county>Curry</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>142.6</nameplate_mw>
    <summer_mw>142.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.727007</lat>
    <lon>-103.1668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3559</plant_id>
    <plant_name>Silas Ray</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Brownsville Public Utilities Board</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>142.5</nameplate_mw>
    <summer_mw>112</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2004</latest_year>
    <lat>25.9131</lat>
    <lon>-97.5214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56920</plant_id>
    <plant_name>Panther Creek Wind Farm I</plant_name>
    <state>TX</state>
    <county>Howard</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>142.5</nameplate_mw>
    <summer_mw>153.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.100823</lat>
    <lon>-101.4514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>151</plant_id>
    <plant_name>McClure</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Modesto Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>142.4</nameplate_mw>
    <summer_mw>107</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1981</latest_year>
    <lat>37.62936</lat>
    <lon>-120.9314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61985</plant_id>
    <plant_name>Colonial Trail West</plant_name>
    <state>VA</state>
    <county>Surry</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>142.4</nameplate_mw>
    <summer_mw>142.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.138889</lat>
    <lon>-76.90222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1728</plant_id>
    <plant_name>Delray</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>142.2</nameplate_mw>
    <summer_mw>127</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>42.2947</lat>
    <lon>-83.1019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55207</plant_id>
    <plant_name>Valmont Combustion Turbine Project</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>142.2</nameplate_mw>
    <summer_mw>76</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>40.0205</lat>
    <lon>-105.2009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>268</plant_id>
    <plant_name>Pit 5</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>141.6</nameplate_mw>
    <summer_mw>160</summer_mw>
    <first_year>1944</first_year>
    <latest_year>1944</latest_year>
    <lat>40.986197</lat>
    <lon>-121.9776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>664</plant_id>
    <plant_name>John R Kelly</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Gainesville Regional Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>141.6</nameplate_mw>
    <summer_mw>112</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2021</latest_year>
    <lat>29.6461</lat>
    <lon>-82.3208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7989</plant_id>
    <plant_name>Sylvarena</plant_name>
    <state>MS</state>
    <county>Smith</county>
    <operator>Cooperative Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>141</nameplate_mw>
    <summer_mw>129</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>31.982076</lat>
    <lon>-89.41271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10154</plant_id>
    <plant_name>Power Island</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>INEOS USA LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>141</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2020</latest_year>
    <lat>29.2293</lat>
    <lon>-95.1952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57769</plant_id>
    <plant_name>Mehoopany Wind Energy LLC</plant_name>
    <state>PA</state>
    <county>Wyoming</county>
    <operator>Clearlight Energy Holdings LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>140.8</nameplate_mw>
    <summer_mw>140.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.420556</lat>
    <lon>-76.04917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58886</plant_id>
    <plant_name>Wellsburg Wind Project</plant_name>
    <state>IA</state>
    <county>Grundy</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>140.8</nameplate_mw>
    <summer_mw>138.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.390833</lat>
    <lon>-92.96667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10361</plant_id>
    <plant_name>Savannah River Mill</plant_name>
    <state>GA</state>
    <county>Effingham</county>
    <operator>Georgia-Pacific Consr Prods LP-Savannah</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>140.4</nameplate_mw>
    <summer_mw>126.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1989</latest_year>
    <lat>32.331274</lat>
    <lon>-81.2015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66359</plant_id>
    <plant_name>Grover Hill Wind, LLC</plant_name>
    <state>OH</state>
    <county>Paulding</county>
    <operator>Appalachian Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>140.3</nameplate_mw>
    <summer_mw>140.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.04422</lat>
    <lon>-84.50981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>451</plant_id>
    <plant_name>Trinity</plant_name>
    <state>CA</state>
    <county>Trinity</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>40.797296</lat>
    <lon>-122.7626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54899</plant_id>
    <plant_name>Cheoah</plant_name>
    <state>NC</state>
    <county>Graham</county>
    <operator>Brookfield Smoky Mountain Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>143</summer_mw>
    <first_year>1949</first_year>
    <latest_year>2013</latest_year>
    <lat>35.4478</lat>
    <lon>-83.9383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56177</plant_id>
    <plant_name>Nebo Power Station</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Utah Associated Mun Power Sys</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.0614</lat>
    <lon>-111.7294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57340</plant_id>
    <plant_name>Panoche Valley Solar Farm</plant_name>
    <state>CA</state>
    <county>San Benito</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.627</lat>
    <lon>-120.879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57703</plant_id>
    <plant_name>Cheyenne Prairie Generating Station</plant_name>
    <state>WY</state>
    <county>Laramie</county>
    <operator>Black Hills Service Company LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>131</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.123611</lat>
    <lon>-104.72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62379</plant_id>
    <plant_name>Spanish Peaks Solar</plant_name>
    <state>CO</state>
    <county>Las Animas</county>
    <operator>Spanish Peaks Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.378</lat>
    <lon>-104.475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64172</plant_id>
    <plant_name>Rockhaven Wind Project, LLC</plant_name>
    <state>OK</state>
    <county>Murray</county>
    <operator>Rockhaven Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.419553</lat>
    <lon>-97.28545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64430</plant_id>
    <plant_name>American Beech Solar LLC</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.144761</lat>
    <lon>-77.50952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65892</plant_id>
    <plant_name>Timberland Solar</plant_name>
    <state>GA</state>
    <county>Oglethorpe</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.964323</lat>
    <lon>-82.81584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66531</plant_id>
    <plant_name>Pioneer Hutt Wind Energy</plant_name>
    <state>TX</state>
    <county>Midland</county>
    <operator>Pioneer Hutt Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.7983</lat>
    <lon>-101.9043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67321</plant_id>
    <plant_name>Yuma Solar + Storage</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>137</summer_mw>
    <battery_mwh>268</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.642434</lat>
    <lon>-114.4292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67678</plant_id>
    <plant_name>White Tail Solar</plant_name>
    <state>MI</state>
    <county>Washtenaw</county>
    <operator>White Tail Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.125582</lat>
    <lon>-83.65358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68056</plant_id>
    <plant_name>Wolf Run Solar</plant_name>
    <state>IL</state>
    <county>Morgan</county>
    <operator>Wolf Run Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>140</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.792296</lat>
    <lon>-90.35932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54268</plant_id>
    <plant_name>HF Sinclair Puget Sound Refining</plant_name>
    <state>WA</state>
    <county>Skagit</county>
    <operator>HF Sinclair Corporation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>139.8</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1993</latest_year>
    <lat>48.4708</lat>
    <lon>-122.56</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56639</plant_id>
    <plant_name>Midway Peaking LLC</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>CalPeak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>139.8</nameplate_mw>
    <summer_mw>111.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.654114</lat>
    <lon>-120.5797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>682</plant_id>
    <plant_name>Kerckhoff 2</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>139.5</nameplate_mw>
    <summer_mw>155</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>37.071846</lat>
    <lon>-119.558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57998</plant_id>
    <plant_name>Twin Ridges Wind Farm</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Exus Pennsylvania Wind Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>139.4</nameplate_mw>
    <summer_mw>139.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.760556</lat>
    <lon>-78.87472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66747</plant_id>
    <plant_name>Blue Bird Solar, LLC</plant_name>
    <state>MO</state>
    <county>Warren</county>
    <operator>Blue Bird Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>139</nameplate_mw>
    <summer_mw>139</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.895406</lat>
    <lon>-91.13656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7425</plant_id>
    <plant_name>Interstate</plant_name>
    <state>IL</state>
    <county>Sangamon</county>
    <operator>City of Springfield - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>138.6</nameplate_mw>
    <summer_mw>109.6</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>39.8233</lat>
    <lon>-89.5891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54915</plant_id>
    <plant_name>Michigan Power LP</plant_name>
    <state>MI</state>
    <county>Mason</county>
    <operator>Michigan Power Limited Partnership</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>138.1</nameplate_mw>
    <summer_mw>128</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.9375</lat>
    <lon>-86.425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58394</plant_id>
    <plant_name>Alta Wind X</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Alta Wind X, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>138</nameplate_mw>
    <summer_mw>138</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.06</lat>
    <lon>-118.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56702</plant_id>
    <plant_name>Washington Wind</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Washington Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>136.3</nameplate_mw>
    <summer_mw>136.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.8797</lat>
    <lon>-120.8072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>203</plant_id>
    <plant_name>McClellan (AR)</plant_name>
    <state>AR</state>
    <county>Ouachita</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>136</nameplate_mw>
    <summer_mw>134</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>33.5648</lat>
    <lon>-92.7917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3847</plant_id>
    <plant_name>Merwin</plant_name>
    <state>WA</state>
    <county>Cowlitz</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>136</nameplate_mw>
    <summer_mw>151</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1958</latest_year>
    <lat>45.9567</lat>
    <lon>-122.5544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63205</plant_id>
    <plant_name>Skookumchuck Wind Facility</plant_name>
    <state>WA</state>
    <county>Thurston</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>136</nameplate_mw>
    <summer_mw>136.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>46.85074</lat>
    <lon>-122.6644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65975</plant_id>
    <plant_name>Starr Solar Ranch</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>136</nameplate_mw>
    <summer_mw>136</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.523359</lat>
    <lon>-99.01711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10434</plant_id>
    <plant_name>Mosaic New Wales Operations</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Mosaic Fertilizer LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>4</generators>
    <nameplate_mw>135.5</nameplate_mw>
    <summer_mw>112</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2014</latest_year>
    <lat>27.833642</lat>
    <lon>-82.05194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58372</plant_id>
    <plant_name>Blue Summit Wind LLC</plant_name>
    <state>TX</state>
    <county>Wilbarger</county>
    <operator>Blue Summit Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>135.4</nameplate_mw>
    <summer_mw>135.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.292913</lat>
    <lon>-99.36773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>240</plant_id>
    <plant_name>Haas</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>144</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>36.927424</lat>
    <lon>-119.0203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1592</plant_id>
    <plant_name>Exelon Medway LLC</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>122.9</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1971</latest_year>
    <lat>42.140028</lat>
    <lon>-71.44644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3397</plant_id>
    <plant_name>Cherokee Dam</plant_name>
    <state>TN</state>
    <county>Jefferson</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>141.6</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1953</latest_year>
    <lat>36.168176</lat>
    <lon>-83.49768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6092</plant_id>
    <plant_name>Spirit Mound</plant_name>
    <state>SD</state>
    <county>Clay</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>95</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>42.897663</lat>
    <lon>-96.99049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6188</plant_id>
    <plant_name>Harris Dam</plant_name>
    <state>AL</state>
    <county>Randolph</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>133</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>33.258281</lat>
    <lon>-85.61605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56311</plant_id>
    <plant_name>Sweetwater Wind 3 LLC</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>144</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>32.290833</lat>
    <lon>-100.4219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56377</plant_id>
    <plant_name>Judith Gap Wind Energy Center</plant_name>
    <state>MT</state>
    <county>Wheatland</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>46.5725</lat>
    <lon>-109.7531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56433</plant_id>
    <plant_name>Pine Tree Wind Power Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>35.248006</lat>
    <lon>-118.1754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64536</plant_id>
    <plant_name>Prairie Solar LLC</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.010442</lat>
    <lon>-88.05794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65661</plant_id>
    <plant_name>Nebula Solar</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Rayos del Sol Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>26.090103</lat>
    <lon>-97.79845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65976</plant_id>
    <plant_name>Prairie Ronde Solar Farm</plant_name>
    <state>LA</state>
    <county>St Landry</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.61</lat>
    <lon>-92.17</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67038</plant_id>
    <plant_name>Quartz Solar, LLC</plant_name>
    <state>AR</state>
    <county>Cross</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.20851</lat>
    <lon>-90.7912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67992</plant_id>
    <plant_name>Cherry Valley PV I</plant_name>
    <state>AR</state>
    <county>Cross</county>
    <operator>Cherry Valley PV I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>135</nameplate_mw>
    <summer_mw>135</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.389</lat>
    <lon>-90.75462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67916</plant_id>
    <plant_name>Foote Creek Rim</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>134.8</nameplate_mw>
    <summer_mw>134.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.6283</lat>
    <lon>-106.2013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63764</plant_id>
    <plant_name>Elm Branch Solar 1</plant_name>
    <state>TX</state>
    <county>Ellis</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>134.7</nameplate_mw>
    <summer_mw>134.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.23256</lat>
    <lon>-96.70612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7546</plant_id>
    <plant_name>Ponca City</plant_name>
    <state>OK</state>
    <county>Kay</county>
    <operator>Oklahoma Municipal Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>134.3</nameplate_mw>
    <summer_mw>106.8</summer_mw>
    <first_year>1966</first_year>
    <latest_year>2003</latest_year>
    <lat>36.71979</lat>
    <lon>-97.08576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50888</plant_id>
    <plant_name>Northampton Generating Company LP</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>EIF Northampton GP, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>134.1</nameplate_mw>
    <summer_mw>112</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>40.6917</lat>
    <lon>-75.4792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3852</plant_id>
    <plant_name>Yale</plant_name>
    <state>WA</state>
    <county>Cowlitz</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>134</nameplate_mw>
    <summer_mw>163.6</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>45.96277</lat>
    <lon>-122.3355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68222</plant_id>
    <plant_name>Flat Ridge 4</plant_name>
    <state>KS</state>
    <county>Harper</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>134</nameplate_mw>
    <summer_mw>134</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.341118</lat>
    <lon>-98.01313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>675</plant_id>
    <plant_name>Larsen Memorial</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>City of Lakeland - (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>133.6</nameplate_mw>
    <summer_mw>163.2</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1992</latest_year>
    <lat>28.0491</lat>
    <lon>-81.9238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57073</plant_id>
    <plant_name>Ivanpah 2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>NRG Energy Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Thermal without Energy Storage</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Thermal without Energy Storage</technologies>
    <generators>1</generators>
    <nameplate_mw>133.4</nameplate_mw>
    <summer_mw>133.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.556111</lat>
    <lon>-115.4686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57075</plant_id>
    <plant_name>Ivanpah 3</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>NRG Energy Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Thermal without Energy Storage</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Thermal without Energy Storage</technologies>
    <generators>1</generators>
    <nameplate_mw>133.4</nameplate_mw>
    <summer_mw>133.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.580833</lat>
    <lon>-115.4825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10294</plant_id>
    <plant_name>King City Power Plant</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Calpine King City Cogen LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>133.2</nameplate_mw>
    <summer_mw>115</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>36.225</lat>
    <lon>-121.1278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63916</plant_id>
    <plant_name>Cedar Springs III</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>Cedar Springs Wind III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>133</nameplate_mw>
    <summer_mw>133</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.076692</lat>
    <lon>-105.5844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>382</plant_id>
    <plant_name>R C Kirkwood</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>City &amp; County of San Francisco - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>132.8</nameplate_mw>
    <summer_mw>131.7</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1987</latest_year>
    <lat>37.877667</lat>
    <lon>-119.9532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68981</plant_id>
    <plant_name>Gonzaga Ridge Wind Farm</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Gonzaga Ridge Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>132.8</nameplate_mw>
    <summer_mw>132.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.065806</lat>
    <lon>-121.1294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64204</plant_id>
    <plant_name>Elara Solar</plant_name>
    <state>TX</state>
    <county>Frio</county>
    <operator>Elara Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>132.4</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>28.883196</lat>
    <lon>-99.17861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6624</plant_id>
    <plant_name>Gavins Point</plant_name>
    <state>NE</state>
    <county>Cedar</county>
    <operator>USACE-Omaha</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>132.3</nameplate_mw>
    <summer_mw>102</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1957</latest_year>
    <lat>42.848829</lat>
    <lon>-97.48148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67867</plant_id>
    <plant_name>Liberty Hybrid Solar and Storage Project</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Liberty 1 Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>132.2</nameplate_mw>
    <summer_mw>132.2</summer_mw>
    <battery_mwh>62.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>30.009659</lat>
    <lon>-95.04083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56665</plant_id>
    <plant_name>Dempsey Ridge Wind Farm</plant_name>
    <state>OK</state>
    <county>Roger Mills</county>
    <operator>Acciona Wind Energy USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>132</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.529778</lat>
    <lon>-99.81446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56829</plant_id>
    <plant_name>Kibby Wind Facility</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Helix Maine Wind Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>132</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2010</latest_year>
    <lat>45.3853</lat>
    <lon>-70.5258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57415</plant_id>
    <plant_name>Sherbino II</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Sherbino II Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>132</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>30.772575</lat>
    <lon>-102.5058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57837</plant_id>
    <plant_name>Pinyon Pine II</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Pinyon Pines Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>132</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.026759</lat>
    <lon>-118.2233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62235</plant_id>
    <plant_name>Lone Star Solar</plant_name>
    <state>SC</state>
    <county>Calhoun</county>
    <operator>Lone Star Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>132</summer_mw>
    <battery_mwh>198</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.648767</lat>
    <lon>-80.63912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64106</plant_id>
    <plant_name>Maverick Solar 7, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Maverick Solar 7, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>132</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.7</lat>
    <lon>-115.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66208</plant_id>
    <plant_name>North Central Valley</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>North Central Valley Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>132</summer_mw>
    <battery_mwh>528</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.015291</lat>
    <lon>-121.0178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66541</plant_id>
    <plant_name>Chesapeake Solar Project</plant_name>
    <state>VA</state>
    <county>Chesapeake City</county>
    <operator>Chesapeake Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>132</nameplate_mw>
    <summer_mw>118</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.685103</lat>
    <lon>-76.29661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3168</plant_id>
    <plant_name>Richmond Generating Station</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>131.6</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>39.984469</lat>
    <lon>-75.07525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10849</plant_id>
    <plant_name>Silver Bay Power</plant_name>
    <state>MN</state>
    <county>Lake</county>
    <operator>Cleveland Cliffs Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>131.6</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1962</latest_year>
    <lat>47.286573</lat>
    <lon>-91.26053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60928</plant_id>
    <plant_name>New Orleans Power</plant_name>
    <state>LA</state>
    <county>Orleans</county>
    <operator>Entergy New Orleans, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>131.6</nameplate_mw>
    <summer_mw>131.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.0081</lat>
    <lon>-89.9372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61392</plant_id>
    <plant_name>F.D. Kuester Generating Station</plant_name>
    <state>MI</state>
    <county>Marquette</county>
    <operator>Upper Michigan Energy Resources Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>131.6</nameplate_mw>
    <summer_mw>131.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>46.512697</lat>
    <lon>-87.51074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66059</plant_id>
    <plant_name>Weston RICE</plant_name>
    <state>WI</state>
    <county>Marathon</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>131.6</nameplate_mw>
    <summer_mw>131.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.856372</lat>
    <lon>-89.65402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3411</plant_id>
    <plant_name>Norris Dam</plant_name>
    <state>TN</state>
    <county>Anderson</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>131.4</nameplate_mw>
    <summer_mw>127</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1936</latest_year>
    <lat>36.2242</lat>
    <lon>-84.0914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50558</plant_id>
    <plant_name>Frontier</plant_name>
    <state>OK</state>
    <county>Oklahoma</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>131.4</nameplate_mw>
    <summer_mw>126</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.44221</lat>
    <lon>-97.64769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>145</plant_id>
    <plant_name>Horse Mesa</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>131.3</nameplate_mw>
    <summer_mw>149</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>33.5907</lat>
    <lon>-111.344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>759</plant_id>
    <plant_name>Buford</plant_name>
    <state>GA</state>
    <county>Forsyth</county>
    <operator>USCE-Mobile District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>131.2</nameplate_mw>
    <summer_mw>126.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2005</latest_year>
    <lat>34.162279</lat>
    <lon>-84.07737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60594</plant_id>
    <plant_name>Voyager Wind I</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>131.1</nameplate_mw>
    <summer_mw>131.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.046061</lat>
    <lon>-118.2827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57663</plant_id>
    <plant_name>Cimarron Windpower II</plant_name>
    <state>KS</state>
    <county>Gray</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>131</nameplate_mw>
    <summer_mw>131</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.90133</lat>
    <lon>-100.372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65891</plant_id>
    <plant_name>Orange Grove</plant_name>
    <state>TX</state>
    <county>Jim Wells</county>
    <operator>Orange Grove</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>131</nameplate_mw>
    <summer_mw>131</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.918286</lat>
    <lon>-97.98045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65980</plant_id>
    <plant_name>CED West Side Canal Battery Storage</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>131</nameplate_mw>
    <summer_mw>131</summer_mw>
    <battery_mwh>524</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.729364</lat>
    <lon>-115.7186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62080</plant_id>
    <plant_name>Richland (IA)</plant_name>
    <state>IA</state>
    <county>Sac</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>130.9</nameplate_mw>
    <summer_mw>130.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.363152</lat>
    <lon>-95.2263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3291</plant_id>
    <plant_name>Parr GT</plant_name>
    <state>SC</state>
    <county>Fairfield</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>130.8</nameplate_mw>
    <summer_mw>84</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.2642</lat>
    <lon>-81.3308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56506</plant_id>
    <plant_name>Scurry County Wind LP</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>130.5</nameplate_mw>
    <summer_mw>130.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>32.7204</lat>
    <lon>-100.9952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56679</plant_id>
    <plant_name>Benton County Wind Farm</plant_name>
    <state>IN</state>
    <county>Benton</county>
    <operator>Orion Energy Group LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>130.5</nameplate_mw>
    <summer_mw>130.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.695</lat>
    <lon>-87.4886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64169</plant_id>
    <plant_name>Albemarle Beach Solar</plant_name>
    <state>NC</state>
    <county>Washington</county>
    <operator>Albemarle Beach Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>130.2</nameplate_mw>
    <summer_mw>140</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.928188</lat>
    <lon>-76.62045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2981</plant_id>
    <plant_name>Pensacola</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Grand River Dam Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>130.1</nameplate_mw>
    <summer_mw>120.8</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1946</latest_year>
    <lat>36.4675</lat>
    <lon>-95.04139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1371</plant_id>
    <plant_name>Barkley</plant_name>
    <state>KY</state>
    <county>Lyon</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>148</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>37.0217</lat>
    <lon>-88.2211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2290</plant_id>
    <plant_name>Jones Street</plant_name>
    <state>NE</state>
    <county>Douglas</county>
    <operator>Omaha Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>123.5</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>41.251488</lat>
    <lon>-95.92268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7504</plant_id>
    <plant_name>Neil Simpson II</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>Black Hills Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>116</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2000</latest_year>
    <lat>44.2856</lat>
    <lon>-105.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10034</plant_id>
    <plant_name>Gilroy Power Plant</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Calpine Gilroy Cogen LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>101</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.0001</lat>
    <lon>-121.5367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56041</plant_id>
    <plant_name>Malburg</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Vernon - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>139</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>33.9986</lat>
    <lon>-118.2219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57261</plant_id>
    <plant_name>Taloga Wind LLC</plant_name>
    <state>OK</state>
    <county>Dewey</county>
    <operator>Taloga Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.855556</lat>
    <lon>-98.96833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60033</plant_id>
    <plant_name>CA Flats Solar 130, LLC</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>California Flats Solar 130, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.615573</lat>
    <lon>-120.4044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60596</plant_id>
    <plant_name>Baron Winds Farm</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.375</lat>
    <lon>-77.593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61167</plant_id>
    <plant_name>Aratina Solar Center 1B</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>91MC 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.987952</lat>
    <lon>-117.5716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61836</plant_id>
    <plant_name>Minco Wind IV, LLC</plant_name>
    <state>OK</state>
    <county>Canadian</county>
    <operator>Minco Wind IV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.381047</lat>
    <lon>-98.26956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65561</plant_id>
    <plant_name>South Fork Wind</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Orsted Wind Power North America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Offshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Offshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.09</lat>
    <lon>-71.13</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66133</plant_id>
    <plant_name>Bartonsville Energy Facility, LLC</plant_name>
    <state>VA</state>
    <county>Frederick</county>
    <operator>Bartonsville Energy Facility, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.088731</lat>
    <lon>-78.2399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67230</plant_id>
    <plant_name>Carne Energy Storage, LLC</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>Carne Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <battery_mwh>260</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.31478</lat>
    <lon>-107.678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67260</plant_id>
    <plant_name>Solar PV Development NM 18 II LLC</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>Solar PV Development NM 18 II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>130</nameplate_mw>
    <summer_mw>130</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.31478</lat>
    <lon>-107.678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57299</plant_id>
    <plant_name>Dunlap</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>129.5</nameplate_mw>
    <summer_mw>111</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.043611</lat>
    <lon>-106.1603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6619</plant_id>
    <plant_name>Burlington (CO)</plant_name>
    <state>CO</state>
    <county>Kit Carson</county>
    <operator>Tri-State G &amp; T Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>129.4</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1977</latest_year>
    <lat>39.3561</lat>
    <lon>-102.2431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56942</plant_id>
    <plant_name>Forward Wind Energy Center</plant_name>
    <state>WI</state>
    <county>Dodge</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>129</nameplate_mw>
    <summer_mw>129</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>43.6161</lat>
    <lon>-88.4969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57680</plant_id>
    <plant_name>Arlington Valley Solar Energy II</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arlington Valley Solar Energy II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>129</nameplate_mw>
    <summer_mw>125.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.305</lat>
    <lon>-112.8339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54627</plant_id>
    <plant_name>Okeelanta Cogeneration</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>New Hope Power Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>128.9</nameplate_mw>
    <summer_mw>104.9</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2006</latest_year>
    <lat>26.5769</lat>
    <lon>-80.7469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57490</plant_id>
    <plant_name>Imperial Solar Energy Center South</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CSOLAR IV South LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>128.9</nameplate_mw>
    <summer_mw>128.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.663289</lat>
    <lon>-115.6583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61582</plant_id>
    <plant_name>Voyager Wind II</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>128.7</nameplate_mw>
    <summer_mw>128.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.073377</lat>
    <lon>-118.2686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50184</plant_id>
    <plant_name>GCF US Holdings LLC Columbus Mill</plant_name>
    <state>MS</state>
    <county>Lowndes</county>
    <operator>GCF - Columbus Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>128.6</nameplate_mw>
    <summer_mw>128.6</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1990</latest_year>
    <lat>33.3602</lat>
    <lon>-88.46</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2980</plant_id>
    <plant_name>Markham</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Grand River Dam Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>128.4</nameplate_mw>
    <summer_mw>127.4</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>36.2317</lat>
    <lon>-95.1822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>14</plant_id>
    <plant_name>Logan Martin Dam</plant_name>
    <state>AL</state>
    <county>Talladega</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>128.1</nameplate_mw>
    <summer_mw>129</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>33.425878</lat>
    <lon>-86.33755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1084</plant_id>
    <plant_name>River Hills</plant_name>
    <state>IA</state>
    <county>Polk</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>128</nameplate_mw>
    <summer_mw>112.8</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1968</latest_year>
    <lat>41.590218</lat>
    <lon>-93.6195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60777</plant_id>
    <plant_name>American Kings Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>128</nameplate_mw>
    <summer_mw>128</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.24</lat>
    <lon>-119.898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64407</plant_id>
    <plant_name>Flat Ridge 3</plant_name>
    <state>KS</state>
    <county>Kingman</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>128</nameplate_mw>
    <summer_mw>128</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.446969</lat>
    <lon>-98.40023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67018</plant_id>
    <plant_name>Wild Springs</plant_name>
    <state>SD</state>
    <county>Pennington</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>128</nameplate_mw>
    <summer_mw>128</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.07</lat>
    <lon>-102.84</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54426</plant_id>
    <plant_name>Mulberry Cogeneration Facility</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Florida Municipal Power Agency (FL)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>127.7</nameplate_mw>
    <summer_mw>115</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>27.8489</lat>
    <lon>-81.8775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10328</plant_id>
    <plant_name>T B Simon Power Plant</plant_name>
    <state>MI</state>
    <county>Ingham</county>
    <operator>Michigan State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Internal Combustion Engine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>127.5</nameplate_mw>
    <summer_mw>125.6</summer_mw>
    <first_year>1965</first_year>
    <latest_year>2022</latest_year>
    <lat>42.7178</lat>
    <lon>-84.4836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54271</plant_id>
    <plant_name>Saguaro Power</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Saguaro Power Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>127.2</nameplate_mw>
    <summer_mw>101</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>36.0417</lat>
    <lon>-115.0117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10397</plant_id>
    <plant_name>Indiana Harbor West</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>Cleveland Cliffs</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>127</nameplate_mw>
    <summer_mw>68</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2002</latest_year>
    <lat>41.663765</lat>
    <lon>-87.45233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57679</plant_id>
    <plant_name>Arlington Valley Solar Energy I</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>127</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.321667</lat>
    <lon>-112.8806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63769</plant_id>
    <plant_name>Briar Creek Solar 1</plant_name>
    <state>TX</state>
    <county>Navarro</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>127</nameplate_mw>
    <summer_mw>127</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.067483</lat>
    <lon>-96.58514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66050</plant_id>
    <plant_name>Lancaster Area Battery</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>127</nameplate_mw>
    <summer_mw>127</summer_mw>
    <battery_mwh>508</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.6864</lat>
    <lon>-118.3045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66314</plant_id>
    <plant_name>Bookers Mill Solar</plant_name>
    <state>VA</state>
    <county>Richmond</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>127</nameplate_mw>
    <summer_mw>127</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.86</lat>
    <lon>-76.56</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2854</plant_id>
    <plant_name>Yankee Street</plant_name>
    <state>OH</state>
    <county>Montgomery</county>
    <operator>Kimura Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Solar Photovoltaic</technologies>
    <generators>8</generators>
    <nameplate_mw>126.6</nameplate_mw>
    <summer_mw>127.8</summer_mw>
    <first_year>1969</first_year>
    <latest_year>2010</latest_year>
    <lat>39.603</lat>
    <lon>-84.2047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4266</plant_id>
    <plant_name>Spencer</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>City of Garland - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>126.5</nameplate_mw>
    <summer_mw>122</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1973</latest_year>
    <lat>33.1975</lat>
    <lon>-97.1061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6584</plant_id>
    <plant_name>Stock Island</plant_name>
    <state>FL</state>
    <county>Monroe</county>
    <operator>Utility Board of Key West City (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>126.5</nameplate_mw>
    <summer_mw>114.5</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2012</latest_year>
    <lat>24.563333</lat>
    <lon>-81.7342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56592</plant_id>
    <plant_name>Champion Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>126.5</nameplate_mw>
    <summer_mw>126.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.3983</lat>
    <lon>-100.6481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>275</plant_id>
    <plant_name>Rock Creek</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1950</latest_year>
    <lat>39.90521</lat>
    <lon>-121.3452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7367</plant_id>
    <plant_name>Bradley Lake</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Homer Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>59.77862</lat>
    <lon>-150.9402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56902</plant_id>
    <plant_name>Wethersfield</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Valcour Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.6697</lat>
    <lon>-78.2278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57074</plant_id>
    <plant_name>Ivanpah 1</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>NRG Energy Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Thermal without Energy Storage</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Thermal without Energy Storage</technologies>
    <generators>1</generators>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.533056</lat>
    <lon>-115.4525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61098</plant_id>
    <plant_name>Battle Mountain Solar Project</plant_name>
    <state>NV</state>
    <county>Humboldt</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <battery_mwh>25</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.718433</lat>
    <lon>-117.0614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65591</plant_id>
    <plant_name>AVEP BESS</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <battery_mwh>504</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.878039</lat>
    <lon>-118.347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68185</plant_id>
    <plant_name>Downeast Wind</plant_name>
    <state>ME</state>
    <county>Washington</county>
    <operator>Downeast Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>126</nameplate_mw>
    <summer_mw>126</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.757478</lat>
    <lon>-67.91748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60502</plant_id>
    <plant_name>Tyler Bluff Wind Project, LLC</plant_name>
    <state>TX</state>
    <county>Cooke</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>125.6</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.703851</lat>
    <lon>-97.37201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7527</plant_id>
    <plant_name>Carson Power Plant</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>125.5</nameplate_mw>
    <summer_mw>109</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>38.445681</lat>
    <lon>-121.4624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54476</plant_id>
    <plant_name>Sumas Power Plant</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>125.5</nameplate_mw>
    <summer_mw>125.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>48.9905</lat>
    <lon>-122.2733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62944</plant_id>
    <plant_name>Timber Road IV</plant_name>
    <state>OH</state>
    <county>Paulding</county>
    <operator>Paulding Wind Farm IV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>125.1</nameplate_mw>
    <summer_mw>125.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.121</lat>
    <lon>-84.751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1416</plant_id>
    <plant_name>Arsenal Hill</plant_name>
    <state>LA</state>
    <county>Caddo</county>
    <operator>Southwestern Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1960</latest_year>
    <lat>32.5181</lat>
    <lon>-93.7611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57275</plant_id>
    <plant_name>Crescent Dunes Solar Energy</plant_name>
    <state>NV</state>
    <county>Nye</county>
    <operator>Tonopah Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Thermal with Energy Storage</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Thermal with Energy Storage</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.238889</lat>
    <lon>-117.3636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61967</plant_id>
    <plant_name>Norton Solar Farm</plant_name>
    <state>TX</state>
    <county>Runnels</county>
    <operator>TAI Norton Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.534768</lat>
    <lon>-100.1138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62178</plant_id>
    <plant_name>Maverick Solar, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Maverick Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.7</lat>
    <lon>-115.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64148</plant_id>
    <plant_name>Fish Springs</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Fish Springs Ranch Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.074741</lat>
    <lon>-119.9742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64452</plant_id>
    <plant_name>Calhoun County Solar Project</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.254</lat>
    <lon>-84.813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64701</plant_id>
    <plant_name>LeConte Energy Storage</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>LeConte Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <battery_mwh>250</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.677208</lat>
    <lon>-115.6702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66666</plant_id>
    <plant_name>Tumbleweed Energy Storage</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Tumbleweed Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <battery_mwh>500</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.83427</lat>
    <lon>-118.339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67860</plant_id>
    <plant_name>GFTX BESS</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Giga Texas Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <battery_mwh>250</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.228276</lat>
    <lon>-97.61883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67861</plant_id>
    <plant_name>Connolly BESS</plant_name>
    <state>TX</state>
    <county>Wise</county>
    <operator>BT Connolly Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <battery_mwh>250</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.210732</lat>
    <lon>-97.41899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68045</plant_id>
    <plant_name>Desert Breeze Solar, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Terra-Gen Operating Co-Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.037778</lat>
    <lon>-117.3472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68199</plant_id>
    <plant_name>Wheatsborough Solar</plant_name>
    <state>OH</state>
    <county>Erie</county>
    <operator>Wheatsborough Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.33823</lat>
    <lon>-82.82649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68487</plant_id>
    <plant_name>Pleasant Valley Solar 2 Project</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>PVS 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.327775</lat>
    <lon>-115.9882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69286</plant_id>
    <plant_name>Project Lynx</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Project Lynx - Giga Texas Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <battery_mwh>250</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.729157</lat>
    <lon>-97.73308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69329</plant_id>
    <plant_name>TE Smith Storage</plant_name>
    <state>TX</state>
    <county>Rockwall</county>
    <operator>BT Smith Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <battery_mwh>250</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.971161</lat>
    <lon>-96.34768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69359</plant_id>
    <plant_name>Barrett Solar Project</plant_name>
    <state>TX</state>
    <county>Rains</county>
    <operator>Barrett Solar Project LLC (RE)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>117</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.951587</lat>
    <lon>-95.90306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69647</plant_id>
    <plant_name>Jackson County Solar, LLC</plant_name>
    <state>MI</state>
    <county>Jackson</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>125</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.281921</lat>
    <lon>-84.65668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1109</plant_id>
    <plant_name>Keokuk</plant_name>
    <state>IA</state>
    <county>Lee</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>15</generators>
    <nameplate_mw>124.8</nameplate_mw>
    <summer_mw>150</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1913</latest_year>
    <lat>40.3965</lat>
    <lon>-91.3719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68011</plant_id>
    <plant_name>Huckleberry Solar</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>124.7</nameplate_mw>
    <summer_mw>124.7</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.25439</lat>
    <lon>-95.39748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57211</plant_id>
    <plant_name>Goshen Phase II</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>Clearlight Energy Holdings LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>124.5</nameplate_mw>
    <summer_mw>124.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>43.467057</lat>
    <lon>-111.8364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67193</plant_id>
    <plant_name>Anticline Wind</plant_name>
    <state>WY</state>
    <county>Natrona</county>
    <operator>Anticline Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>124.3</nameplate_mw>
    <summer_mw>124.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.146077</lat>
    <lon>-106.3473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56394</plant_id>
    <plant_name>Forest Creek Wind Farm LLC</plant_name>
    <state>TX</state>
    <county>Glasscock</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>124.2</nameplate_mw>
    <summer_mw>124.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>32.039</lat>
    <lon>-101.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50658</plant_id>
    <plant_name>Covanta Fairfax Energy</plant_name>
    <state>VA</state>
    <county>Fairfax</county>
    <operator>Covanta Fairfax Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>124</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>38.695</lat>
    <lon>-77.2411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58777</plant_id>
    <plant_name>Cassadaga Wind Farm</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>124</nameplate_mw>
    <summer_mw>124</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.338333</lat>
    <lon>-79.19556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62772</plant_id>
    <plant_name>Coniglio Solar</plant_name>
    <state>TX</state>
    <county>Fannin</county>
    <operator>BT Coniglio Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>123.6</nameplate_mw>
    <summer_mw>123.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.404486</lat>
    <lon>-96.08247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57500</plant_id>
    <plant_name>Laurel Wind Farm</plant_name>
    <state>IA</state>
    <county>Marshall</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>123.4</nameplate_mw>
    <summer_mw>119.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.883333</lat>
    <lon>-92.93333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68896</plant_id>
    <plant_name>Sun Valley Storage</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Sun Valley Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>123.3</nameplate_mw>
    <summer_mw>123.3</summer_mw>
    <battery_mwh>123</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.857837</lat>
    <lon>-97.01713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56804</plant_id>
    <plant_name>Red Hills Wind Project LLC</plant_name>
    <state>OK</state>
    <county>Roger Mills</county>
    <operator>Acciona Wind Energy USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>123</nameplate_mw>
    <summer_mw>123</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>35.535</lat>
    <lon>-99.3828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55989</plant_id>
    <plant_name>FPL Energy Vansycle LLC (OR)</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>FPL Energy Vansycle LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>122.8</nameplate_mw>
    <summer_mw>122.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>46.01279</lat>
    <lon>-118.8162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50978</plant_id>
    <plant_name>Carr Street Generating Station</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Carr Street Generating Sta LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>122.6</nameplate_mw>
    <summer_mw>93</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>43.06132</lat>
    <lon>-76.08239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7697</plant_id>
    <plant_name>Washington County Cogeneration Facility</plant_name>
    <state>AL</state>
    <county>Washington</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>122.5</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>31.26423</lat>
    <lon>-88.00267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>425</plant_id>
    <plant_name>Middle Fork</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Placer County Water Agency - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>122.4</nameplate_mw>
    <summer_mw>132</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>39.024801</lat>
    <lon>-120.5964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10208</plant_id>
    <plant_name>Escanaba Mill</plant_name>
    <state>MI</state>
    <county>Delta</county>
    <operator>Billerud Escanaba LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>122.4</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1982</latest_year>
    <lat>45.8044</lat>
    <lon>-87.0891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54466</plant_id>
    <plant_name>Orlando Cogen LP</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>Florida Municipal Power Agency (FL)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>122.4</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>28.442623</lat>
    <lon>-81.41234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57040</plant_id>
    <plant_name>High Plains</plant_name>
    <state>WY</state>
    <county>Albany</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>122.1</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.675052</lat>
    <lon>-106.0111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7869</plant_id>
    <plant_name>Glenwood Landing</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>122</nameplate_mw>
    <summer_mw>97.7</summer_mw>
    <first_year>1967</first_year>
    <latest_year>2002</latest_year>
    <lat>40.8275</lat>
    <lon>-73.6478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58325</plant_id>
    <plant_name>Charles D. Lamb Energy Center</plant_name>
    <state>OK</state>
    <county>Kay</county>
    <operator>Oklahoma Municipal Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>122</nameplate_mw>
    <summer_mw>122</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.813889</lat>
    <lon>-97.12528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62470</plant_id>
    <plant_name>Cove Mountain Solar 2</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Cove Mountain Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>122</nameplate_mw>
    <summer_mw>122</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.638602</lat>
    <lon>-113.6371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66282</plant_id>
    <plant_name>Woodruff County Solar</plant_name>
    <state>AR</state>
    <county>Woodruff</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>122</nameplate_mw>
    <summer_mw>122</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.256256</lat>
    <lon>-91.34019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56783</plant_id>
    <plant_name>Elbow Creek Wind Project LLC</plant_name>
    <state>TX</state>
    <county>Howard</county>
    <operator>Elbow Creek Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>121.9</nameplate_mw>
    <summer_mw>121.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.1408</lat>
    <lon>-101.3986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1730</plant_id>
    <plant_name>Hancock</plant_name>
    <state>MI</state>
    <county>Oakland</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>121.6</nameplate_mw>
    <summer_mw>93</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1970</latest_year>
    <lat>42.5497</lat>
    <lon>-83.4425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65350</plant_id>
    <plant_name>Ford County Wind Farm LLC</plant_name>
    <state>IL</state>
    <county>Ford</county>
    <operator>Ford Ridge</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>121.3</nameplate_mw>
    <summer_mw>121.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.556285</lat>
    <lon>-88.34949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7749</plant_id>
    <plant_name>Essex</plant_name>
    <state>MO</state>
    <county>Stoddard</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>121.2</nameplate_mw>
    <summer_mw>104</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>36.868206</lat>
    <lon>-89.84017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54114</plant_id>
    <plant_name>Kennedy International Airport Cogen</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>KIAC Partners</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>121.2</nameplate_mw>
    <summer_mw>123.2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1995</latest_year>
    <lat>40.6417</lat>
    <lon>-73.7778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1682</plant_id>
    <plant_name>Cleary Flood Hybrid</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>City of Taunton - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>105.9</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>1975</first_year>
    <latest_year>2020</latest_year>
    <lat>41.8653</lat>
    <lon>-71.1061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55304</plant_id>
    <plant_name>Baconton Power Plant</plant_name>
    <state>GA</state>
    <county>Mitchell</county>
    <operator>Baconton Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>95</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>31.3869</lat>
    <lon>-84.08</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56135</plant_id>
    <plant_name>Ripon Generation Station</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Modesto Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>37.7315</lat>
    <lon>-121.116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56239</plant_id>
    <plant_name>Malaga Power LLC</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>CalPeak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>96</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>36.68957</lat>
    <lon>-119.7399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56482</plant_id>
    <plant_name>Black Mountain Generating Station</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>UNS Electric, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>35.0361</lat>
    <lon>-114.1594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56569</plant_id>
    <plant_name>Niland Gas Turbine Plant</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>86.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>33.238842</lat>
    <lon>-115.5045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60459</plant_id>
    <plant_name>Calhoun Port Comfort</plant_name>
    <state>TX</state>
    <county>Calhoun</county>
    <operator>Peaker Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>84</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>28.64807</lat>
    <lon>-96.54621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60460</plant_id>
    <plant_name>Chamon</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Peaker Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>121</nameplate_mw>
    <summer_mw>92</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.883214</lat>
    <lon>-95.11135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56240</plant_id>
    <plant_name>Buffalo Gap Wind Farm</plant_name>
    <state>TX</state>
    <county>Taylor</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120.6</nameplate_mw>
    <summer_mw>120.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>32.311556</lat>
    <lon>-100.0616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54802</plant_id>
    <plant_name>Mead Coated Board</plant_name>
    <state>AL</state>
    <county>Russell</county>
    <operator>Mead Coated Board Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>120.5</nameplate_mw>
    <summer_mw>116.5</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1998</latest_year>
    <lat>32.1761</lat>
    <lon>-85.0272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50463</plant_id>
    <plant_name>Procter &amp; Gamble Mehoopany Mill</plant_name>
    <state>PA</state>
    <county>Wyoming</county>
    <operator>Procter &amp; Gamble Ppr Prdts Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>120.2</nameplate_mw>
    <summer_mw>104.9</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2013</latest_year>
    <lat>41.574259</lat>
    <lon>-76.04323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>447</plant_id>
    <plant_name>Parker Dam</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1943</latest_year>
    <lat>34.295334</lat>
    <lon>-114.1402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3083</plant_id>
    <plant_name>Lookout Point</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>43.9153</lat>
    <lon>-122.7531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56032</plant_id>
    <plant_name>Equus Freeport Power</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Equus Power I, L.P.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>94</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.6439</lat>
    <lon>-73.5683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56304</plant_id>
    <plant_name>San Juan Mesa Wind Project LLC</plant_name>
    <state>NM</state>
    <county>Roosevelt</county>
    <operator>NRG Energy Gas &amp; Wind Holdings Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>33.9716</lat>
    <lon>-103.8604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56380</plant_id>
    <plant_name>Centennial Wind Farm</plant_name>
    <state>OK</state>
    <county>Harper</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>36.637733</lat>
    <lon>-99.60187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56556</plant_id>
    <plant_name>PPS Power Plant No 1</plant_name>
    <state>KY</state>
    <county>McCracken</county>
    <operator>Paducah Power System</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>37.03385</lat>
    <lon>-88.61586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56644</plant_id>
    <plant_name>Stanton Wind Energy LLC</plant_name>
    <state>TX</state>
    <county>Martin</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.2353</lat>
    <lon>-101.8367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56775</plant_id>
    <plant_name>Scurry County Wind II</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>32.718056</lat>
    <lon>-100.7933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56776</plant_id>
    <plant_name>Gunsight Mountain Wind Energy LLC</plant_name>
    <state>TX</state>
    <county>Howard</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.240278</lat>
    <lon>-101.4736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57121</plant_id>
    <plant_name>Ashtabula Wind II LLC</plant_name>
    <state>ND</state>
    <county>Steele</county>
    <operator>Ashtabula Wind II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>47.292437</lat>
    <lon>-97.93169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57156</plant_id>
    <plant_name>Barton Chapel Wind Farm</plant_name>
    <state>TX</state>
    <county>Jack</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>33.052226</lat>
    <lon>-98.32842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57774</plant_id>
    <plant_name>Windstar 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Nextera Energy Resources</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.054167</lat>
    <lon>-118.3547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58255</plant_id>
    <plant_name>Rubart</plant_name>
    <state>KS</state>
    <county>Grant</county>
    <operator>Sunflower Electric Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>12</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>106.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.558611</lat>
    <lon>-101.0994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58351</plant_id>
    <plant_name>Tuscola Bay Wind</plant_name>
    <state>MI</state>
    <county>Tuscola</county>
    <operator>Tuscola Bay Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.525278</lat>
    <lon>-83.65</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59656</plant_id>
    <plant_name>Comanche Solar</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.205278</lat>
    <lon>-104.5667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62375</plant_id>
    <plant_name>Dougherty County Solar, LLC</plant_name>
    <state>GA</state>
    <county>Dougherty</county>
    <operator>Dougherty County Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.512003</lat>
    <lon>-84.0445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63273</plant_id>
    <plant_name>Wagyu</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Cubico USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.242304</lat>
    <lon>-95.65814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64256</plant_id>
    <plant_name>AES Maui Kuihelani Solar Hybrid</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <battery_mwh>240</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>20.8439</lat>
    <lon>-156.485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64630</plant_id>
    <plant_name>Rabbitbrush Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.83</lat>
    <lon>-118.32</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65319</plant_id>
    <plant_name>Maplewood Solar</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.89</lat>
    <lon>-79.32</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65343</plant_id>
    <plant_name>Ross County Solar, LLC</plant_name>
    <state>OH</state>
    <county>Ross</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.325867</lat>
    <lon>-83.35276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65778</plant_id>
    <plant_name>Jackpot Solar, LLC</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Deriva Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.189</lat>
    <lon>-114.6218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65963</plant_id>
    <plant_name>Mesquite Solar 5, LLC</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <battery_mwh>240</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.3252</lat>
    <lon>-112.918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66268</plant_id>
    <plant_name>Gravel Pit Solar, LLC</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Gravel Pit Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.8889</lat>
    <lon>-72.549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66866</plant_id>
    <plant_name>North Fork Solar Project</plant_name>
    <state>OK</state>
    <county>Kiowa</county>
    <operator>North Fork Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.61781</lat>
    <lon>-98.98261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67161</plant_id>
    <plant_name>Oak Solar</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Oak Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.526492</lat>
    <lon>-77.77404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67739</plant_id>
    <plant_name>Wigeon Whistle Battery Storage Plant</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Wigeon Whistle BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <battery_mwh>174</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.030354</lat>
    <lon>-96.3572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68329</plant_id>
    <plant_name>Tower Solar, LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>45.8211</lat>
    <lon>-119.7994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68418</plant_id>
    <plant_name>Keydet Solar Center</plant_name>
    <state>VA</state>
    <county>Charles City</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.4371</lat>
    <lon>-77.1587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68998</plant_id>
    <plant_name>Long Point Solar</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.244</lat>
    <lon>-95.676</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69143</plant_id>
    <plant_name>Eldorado Solar II</plant_name>
    <state>IL</state>
    <county>Saline</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>120</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.8688</lat>
    <lon>-88.4259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58106</plant_id>
    <plant_name>Meadow Creek Project Company</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>Ridgeline Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>119.7</nameplate_mw>
    <summer_mw>115.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.524429</lat>
    <lon>-111.8039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61303</plant_id>
    <plant_name>Bluff Point Wind Facility</plant_name>
    <state>IN</state>
    <county>Jay</county>
    <operator>Bluff Point Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>119.7</nameplate_mw>
    <summer_mw>119.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.319</lat>
    <lon>-84.9769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58885</plant_id>
    <plant_name>Macksburg Wind Project</plant_name>
    <state>IA</state>
    <county>Madison</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>119.6</nameplate_mw>
    <summer_mw>119.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.209167</lat>
    <lon>-94.10361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1217</plant_id>
    <plant_name>Earl F Wisdom</plant_name>
    <state>IA</state>
    <county>Clay</county>
    <operator>Corn Belt Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>119.1</nameplate_mw>
    <summer_mw>113.5</summer_mw>
    <first_year>1960</first_year>
    <latest_year>2004</latest_year>
    <lat>43.1606</lat>
    <lon>-95.2569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61787</plant_id>
    <plant_name>Bishop Hill III</plant_name>
    <state>IL</state>
    <county>Henry</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>119</nameplate_mw>
    <summer_mw>119</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.211057</lat>
    <lon>-90.27602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1206</plant_id>
    <plant_name>Summit Lake</plant_name>
    <state>IA</state>
    <county>Union</county>
    <operator>Central Iowa Power Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>118.7</nameplate_mw>
    <summer_mw>111.8</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2021</latest_year>
    <lat>41.1136</lat>
    <lon>-94.3472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56500</plant_id>
    <plant_name>Western 102 Power Plant</plant_name>
    <state>NV</state>
    <county>Storey</county>
    <operator>Nevada Gold Mines</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Solar Photovoltaic</technologies>
    <generators>15</generators>
    <nameplate_mw>118.6</nameplate_mw>
    <summer_mw>121.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2007</latest_year>
    <lat>39.5603</lat>
    <lon>-119.5108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56605</plant_id>
    <plant_name>Langdon Renewables, LLC</plant_name>
    <state>ND</state>
    <county>Cavalier</county>
    <operator>FPL Energy Langdon Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>118.5</nameplate_mw>
    <summer_mw>118.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>48.63</lat>
    <lon>-98.315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60436</plant_id>
    <plant_name>East Pecos Solar</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>118.5</nameplate_mw>
    <summer_mw>118.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.000883</lat>
    <lon>-102.2817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65405</plant_id>
    <plant_name>Flint Hills Resources Pine Bend, LLC</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Flint Hills Resources Pine Bend, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>118.4</nameplate_mw>
    <summer_mw>94.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2023</latest_year>
    <lat>44.45483</lat>
    <lon>-93.02119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10030</plant_id>
    <plant_name>Energy Center Dover</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Cartier Energy, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>118</nameplate_mw>
    <summer_mw>103</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2001</latest_year>
    <lat>39.149549</lat>
    <lon>-75.54734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10143</plant_id>
    <plant_name>Colver Green Energy</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>Inter-Power/AhlCon Partners, L.P.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>118</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>40.55108</lat>
    <lon>-78.79794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56914</plant_id>
    <plant_name>Orange Grove Peaking Facility</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Orange Grove Energy LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>118</nameplate_mw>
    <summer_mw>98.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>33.3594</lat>
    <lon>-117.1114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59851</plant_id>
    <plant_name>Great Bay Solar 1</plant_name>
    <state>MD</state>
    <county>Somerset</county>
    <operator>Great Bay Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>118</nameplate_mw>
    <summer_mw>118</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2020</latest_year>
    <lat>38.168889</lat>
    <lon>-75.6975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65225</plant_id>
    <plant_name>Waverly Solar, LLC</plant_name>
    <state>VA</state>
    <county>Sussex</county>
    <operator>Waverly Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>118</nameplate_mw>
    <summer_mw>118</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.020784</lat>
    <lon>-77.12265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>219</plant_id>
    <plant_name>Belden</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>117.9</nameplate_mw>
    <summer_mw>125</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>40.007445</lat>
    <lon>-121.2494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>223</plant_id>
    <plant_name>Caribou 2</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>117.9</nameplate_mw>
    <summer_mw>120</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>40.085997</lat>
    <lon>-121.1494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3318</plant_id>
    <plant_name>Hilton Head</plant_name>
    <state>SC</state>
    <county>Beaufort</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>117.9</nameplate_mw>
    <summer_mw>84</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1979</latest_year>
    <lat>32.208871</lat>
    <lon>-80.69875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7903</plant_id>
    <plant_name>McCartney</plant_name>
    <state>MO</state>
    <county>Greene</county>
    <operator>City Utilities of Springfield - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>117.8</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.248431</lat>
    <lon>-93.17084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55043</plant_id>
    <plant_name>Cherokee County Cogen</plant_name>
    <state>SC</state>
    <county>Cherokee</county>
    <operator>Cherokee County Cogen Partners LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>117.7</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>35.0727</lat>
    <lon>-81.613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55544</plant_id>
    <plant_name>Klamath Expansion Project</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Klamath Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>117.6</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.172718</lat>
    <lon>-121.8144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56516</plant_id>
    <plant_name>Plains End II LLC</plant_name>
    <state>CO</state>
    <county>Jefferson</county>
    <operator>Plains End Operating Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>14</generators>
    <nameplate_mw>117.6</nameplate_mw>
    <summer_mw>111.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.8586</lat>
    <lon>-105.2256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4125</plant_id>
    <plant_name>Manitowoc</plant_name>
    <state>WI</state>
    <county>Manitowoc</county>
    <operator>Manitowoc Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke; Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>117.4</nameplate_mw>
    <summer_mw>102.4</summer_mw>
    <first_year>1955</first_year>
    <latest_year>2007</latest_year>
    <lat>44.082</lat>
    <lon>-87.6558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63723</plant_id>
    <plant_name>Ho'Ohana Solar 1</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Ho'Ohana Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>117.3</nameplate_mw>
    <summer_mw>117.3</summer_mw>
    <battery_mwh>208</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>21.418811</lat>
    <lon>-158.0329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>443</plant_id>
    <plant_name>Keswick</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>117</nameplate_mw>
    <summer_mw>117</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1950</latest_year>
    <lat>40.611858</lat>
    <lon>-122.4464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64750</plant_id>
    <plant_name>Glass Sands Wind Facility</plant_name>
    <state>OK</state>
    <county>Murray</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>117</nameplate_mw>
    <summer_mw>118.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.514165</lat>
    <lon>-96.91591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69550</plant_id>
    <plant_name>Dodson Creek Solar, LLC</plant_name>
    <state>OH</state>
    <county>Highland</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>117</nameplate_mw>
    <summer_mw>117</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.181498</lat>
    <lon>-83.76753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69875</plant_id>
    <plant_name>Sycamore Creek Solar, LLC</plant_name>
    <state>OH</state>
    <county>Crawford</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>117</nameplate_mw>
    <summer_mw>117</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.953</lat>
    <lon>-82.859</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66461</plant_id>
    <plant_name>Beaumont BESS</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Terra-Gen Operating Co-BESS 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>116.6</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.92444</lat>
    <lon>-116.9876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57241</plant_id>
    <plant_name>Deerhaven Renewable</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Gainesville Regional Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>116.1</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.7675</lat>
    <lon>-82.39639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1660</plant_id>
    <plant_name>Potter Station 2</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Town of Braintree - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>116</nameplate_mw>
    <summer_mw>105.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.235</lat>
    <lon>-70.9672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1891</plant_id>
    <plant_name>Syl Laskin</plant_name>
    <state>MN</state>
    <county>St Louis</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>116</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>47.5306</lat>
    <lon>-92.1619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56596</plant_id>
    <plant_name>Wygen III</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>Black Hills Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>116</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>44.2919</lat>
    <lon>-105.3806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56842</plant_id>
    <plant_name>Rolling Hills</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>115.8</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.0572</lat>
    <lon>-105.8543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55749</plant_id>
    <plant_name>Hardin Generator Project</plant_name>
    <state>MT</state>
    <county>Big Horn</county>
    <operator>Heorot Power Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>115.7</nameplate_mw>
    <summer_mw>107</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>45.7578</lat>
    <lon>-107.6</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7515</plant_id>
    <plant_name>McPherson 3</plant_name>
    <state>KS</state>
    <county>McPherson</county>
    <operator>City of McPherson - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>115.6</nameplate_mw>
    <summer_mw>80.2</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>38.38932</lat>
    <lon>-97.61108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50491</plant_id>
    <plant_name>Axiall Natrium Plant</plant_name>
    <state>WV</state>
    <county>Marshall</county>
    <operator>Westlake Chemical Natrium Plant</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>115.5</nameplate_mw>
    <summer_mw>115.5</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1966</latest_year>
    <lat>39.7475</lat>
    <lon>-80.8547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56607</plant_id>
    <plant_name>Prairie Winds ND1</plant_name>
    <state>ND</state>
    <county>Ward</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>115.5</nameplate_mw>
    <summer_mw>115.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>47.933621</lat>
    <lon>-101.2692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56921</plant_id>
    <plant_name>Panther Creek Wind Farm II</plant_name>
    <state>TX</state>
    <county>Glasscock</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>115.5</nameplate_mw>
    <summer_mw>124.7</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>31.9361</lat>
    <lon>-101.2983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>48</plant_id>
    <plant_name>Guntersville</plant_name>
    <state>AL</state>
    <county>Marshall</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>115.2</nameplate_mw>
    <summer_mw>122.7</summer_mw>
    <first_year>1939</first_year>
    <latest_year>1952</latest_year>
    <lat>34.421272</lat>
    <lon>-86.39393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>438</plant_id>
    <plant_name>Thermalito</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>California Dept. of Water Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>115.1</nameplate_mw>
    <summer_mw>115.1</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>39.514893</lat>
    <lon>-121.6301</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>542</plant_id>
    <plant_name>Cos Cob</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Connecticut Jet Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>115</nameplate_mw>
    <summer_mw>95.6</summer_mw>
    <first_year>1969</first_year>
    <latest_year>2008</latest_year>
    <lat>41.0289</lat>
    <lon>-73.5989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63351</plant_id>
    <plant_name>Bluebell Solar II</plant_name>
    <state>TX</state>
    <county>Sterling</county>
    <operator>Bluebell Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>115</nameplate_mw>
    <summer_mw>115</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.888</lat>
    <lon>-100.825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64433</plant_id>
    <plant_name>Black Rock Wind</plant_name>
    <state>WV</state>
    <county>Mineral</county>
    <operator>Black Rock Wind Force, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>115</nameplate_mw>
    <summer_mw>115</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.366803</lat>
    <lon>-79.10826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65676</plant_id>
    <plant_name>Edwards Sanborn E5</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>115</nameplate_mw>
    <summer_mw>115</summer_mw>
    <battery_mwh>188</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2023</latest_year>
    <lat>34.965275</lat>
    <lon>-118.0773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64551</plant_id>
    <plant_name>Ranchland Wind Project I</plant_name>
    <state>TX</state>
    <county>Callahan</county>
    <operator>Ranchland Wind Project I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>114.9</nameplate_mw>
    <summer_mw>114.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.308524</lat>
    <lon>-99.1645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54081</plant_id>
    <plant_name>Spruance Operating Services LLC</plant_name>
    <state>VA</state>
    <county>Richmond City</county>
    <operator>Veolia Energy Operating Service</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>114.8</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>37.4556</lat>
    <lon>-77.4308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61667</plant_id>
    <plant_name>Wimauma Solar and Battery Storage</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>114.8</nameplate_mw>
    <summer_mw>114.8</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2025</latest_year>
    <lat>27.730414</lat>
    <lon>-82.26351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55510</plant_id>
    <plant_name>Border Hybrid Energy Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>CalPeak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>114.6</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>54.1</battery_mwh>
    <first_year>2001</first_year>
    <latest_year>2025</latest_year>
    <lat>32.562448</lat>
    <lon>-116.9439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66128</plant_id>
    <plant_name>Lake Mabel Solar and Battery Storage</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>114.5</nameplate_mw>
    <summer_mw>114.5</summer_mw>
    <battery_mwh>103</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2025</latest_year>
    <lat>27.9788</lat>
    <lon>-81.61015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3067</plant_id>
    <plant_name>Carmen Smith</plant_name>
    <state>OR</state>
    <county>Linn</county>
    <operator>Eugene Water &amp; Electric Board</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>114.3</nameplate_mw>
    <summer_mw>103.8</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>44.285977</lat>
    <lon>-122.0414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10362</plant_id>
    <plant_name>Georgia-Pacific Muskogee</plant_name>
    <state>OK</state>
    <county>Muskogee</county>
    <operator>Georgia-Pacific Muskogee LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>114</nameplate_mw>
    <summer_mw>67.5</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1982</latest_year>
    <lat>35.7322</lat>
    <lon>-95.2939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50189</plant_id>
    <plant_name>Domtar Paper Co LLC Plymouth NC</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Domtar Paper Company LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>114</nameplate_mw>
    <summer_mw>114.8</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1978</latest_year>
    <lat>35.8628</lat>
    <lon>-76.7831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55650</plant_id>
    <plant_name>Plains End</plant_name>
    <state>CO</state>
    <county>Jefferson</county>
    <operator>Plains End Operating Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>20</generators>
    <nameplate_mw>114</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.857499</lat>
    <lon>-105.226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55708</plant_id>
    <plant_name>Nacogdoches Power</plant_name>
    <state>TX</state>
    <county>Nacogdoches</county>
    <operator>Austin Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>114</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>31.832132</lat>
    <lon>-94.90064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56270</plant_id>
    <plant_name>Callahan Divide Wind Energy Center</plant_name>
    <state>TX</state>
    <county>Taylor</county>
    <operator>FPL Energy Callahan Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>114</nameplate_mw>
    <summer_mw>114</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>32.303889</lat>
    <lon>-100.0217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56905</plant_id>
    <plant_name>Great Plains Windpark LLC</plant_name>
    <state>TX</state>
    <county>Hansford</county>
    <operator>Great Plains Windpark Legacy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>114</nameplate_mw>
    <summer_mw>114</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.4964</lat>
    <lon>-101.3917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67348</plant_id>
    <plant_name>CPV Rogue's Wind, LLC</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>CPV Rogue's Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>114</nameplate_mw>
    <summer_mw>109.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.698125</lat>
    <lon>-78.66329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54793</plant_id>
    <plant_name>Storm Lake 1</plant_name>
    <state>IA</state>
    <county>Buena Vista</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>113.9</nameplate_mw>
    <summer_mw>105.7</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>42.6878</lat>
    <lon>-95.405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1734</plant_id>
    <plant_name>Northeast (MI)</plant_name>
    <state>MI</state>
    <county>Macomb</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>113.8</nameplate_mw>
    <summer_mw>101</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1971</latest_year>
    <lat>42.45</lat>
    <lon>-83.0381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50637</plant_id>
    <plant_name>Clearwater Paper IPP Lewiston</plant_name>
    <state>ID</state>
    <county>Nez Perce</county>
    <operator>Clearwater Paper Corporation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>113.8</nameplate_mw>
    <summer_mw>54.5</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1991</latest_year>
    <lat>46.423056</lat>
    <lon>-116.9764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10342</plant_id>
    <plant_name>Marathon Bay Area Cogen</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Tesoro Marketing &amp; Refining Co. LLC (Martinez)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>113.5</nameplate_mw>
    <summer_mw>103.5</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>38.0244</lat>
    <lon>-122.0589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67931</plant_id>
    <plant_name>Daggett 1</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Daggett Solar Power 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>113.5</nameplate_mw>
    <summer_mw>113.5</summer_mw>
    <battery_mwh>454</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.860918</lat>
    <lon>-116.8553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65513</plant_id>
    <plant_name>Baron Winds II</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>113.2</nameplate_mw>
    <summer_mw>113.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.43988</lat>
    <lon>-77.52982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56329</plant_id>
    <plant_name>Campbell Industrial Park</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Hawaiian Electric Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>113</nameplate_mw>
    <summer_mw>113</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>21.3025</lat>
    <lon>-158.1017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67973</plant_id>
    <plant_name>Sierra Pinta BESS</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>113</nameplate_mw>
    <summer_mw>113</summer_mw>
    <battery_mwh>113</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.994167</lat>
    <lon>-113.5098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7288</plant_id>
    <plant_name>Sherman Avenue</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>Calpine New Jersey Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>112.8</nameplate_mw>
    <summer_mw>86.9</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>39.451</lat>
    <lon>-75.0578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56953</plant_id>
    <plant_name>High Sheldon Wind Farm</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>112.5</nameplate_mw>
    <summer_mw>112</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.7794</lat>
    <lon>-78.4269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58080</plant_id>
    <plant_name>Wolf Ridge Wind</plant_name>
    <state>TX</state>
    <county>Cooke</county>
    <operator>NextEra Wolf Ridge LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>112.5</nameplate_mw>
    <summer_mw>112.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>33.733006</lat>
    <lon>-97.42841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65456</plant_id>
    <plant_name>Separator (Etiwanda) BESS</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>112.5</nameplate_mw>
    <summer_mw>112.5</summer_mw>
    <battery_mwh>450</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.09211</lat>
    <lon>-117.534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63639</plant_id>
    <plant_name>Contrail Wind Farm</plant_name>
    <state>IA</state>
    <county>Taylor</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>112.4</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.667406</lat>
    <lon>-94.83163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4195</plant_id>
    <plant_name>Powerlane Plant</plant_name>
    <state>TX</state>
    <county>Hunt</county>
    <operator>City of Greenville - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine; Natural Gas Steam Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>112.2</nameplate_mw>
    <summer_mw>106.6</summer_mw>
    <first_year>1966</first_year>
    <latest_year>2010</latest_year>
    <lat>33.1707</lat>
    <lon>-96.1264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55734</plant_id>
    <plant_name>Gray County Wind Energy</plant_name>
    <state>KS</state>
    <county>Gray</county>
    <operator>Gray County Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>112.2</nameplate_mw>
    <summer_mw>112.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>37.613256</lat>
    <lon>-100.3782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65742</plant_id>
    <plant_name>Deerfield Wind Energy 2</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Deerfield Wind Energy 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>112.1</nameplate_mw>
    <summer_mw>112.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.928665</lat>
    <lon>-82.87351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>182</plant_id>
    <plant_name>Beaver Dam (AR)</plant_name>
    <state>AR</state>
    <county>Carroll</county>
    <operator>USCE-Little Rock District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>112</nameplate_mw>
    <summer_mw>128.8</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>36.421507</lat>
    <lon>-93.84737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>883</plant_id>
    <plant_name>Waukegan</plant_name>
    <state>IL</state>
    <county>Lake</county>
    <operator>Midwest Generations EME LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>112</nameplate_mw>
    <summer_mw>107.8</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>42.3833</lat>
    <lon>-87.8133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2527</plant_id>
    <plant_name>Greenidge Generation LLC</plant_name>
    <state>NY</state>
    <county>Yates</county>
    <operator>Greenidge Generation Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>112</nameplate_mw>
    <summer_mw>104.5</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>42.6789</lat>
    <lon>-76.9483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7588</plant_id>
    <plant_name>H M Jackson</plant_name>
    <state>WA</state>
    <county>Snohomish</county>
    <operator>PUD No 1 of Snohomish County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>111.8</nameplate_mw>
    <summer_mw>96</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>47.9084</lat>
    <lon>-121.8144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65496</plant_id>
    <plant_name>Bluestone Wind, LLC</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>Bluestone Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>111.8</nameplate_mw>
    <summer_mw>111.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.111758</lat>
    <lon>-75.45778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3320</plant_id>
    <plant_name>Myrtle Beach</plant_name>
    <state>SC</state>
    <county>Horry</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>111.5</nameplate_mw>
    <summer_mw>73</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1976</latest_year>
    <lat>33.708283</lat>
    <lon>-78.92415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62288</plant_id>
    <plant_name>Valentine Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>111.2</nameplate_mw>
    <summer_mw>111.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.90422</lat>
    <lon>-118.3843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3338</plant_id>
    <plant_name>Aberdeen CT</plant_name>
    <state>SD</state>
    <county>Brown</county>
    <operator>NorthWestern Energy - (SD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>111</nameplate_mw>
    <summer_mw>72.5</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2013</latest_year>
    <lat>45.429884</lat>
    <lon>-98.49396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66646</plant_id>
    <plant_name>Martin County Solar Project, LLC</plant_name>
    <state>KY</state>
    <county>Martin</county>
    <operator>Martin County Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>111</nameplate_mw>
    <summer_mw>111</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.765452</lat>
    <lon>-82.47413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57875</plant_id>
    <plant_name>Morning Light Wind Farm</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>110.9</nameplate_mw>
    <summer_mw>100.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.454241</lat>
    <lon>-94.57506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66310</plant_id>
    <plant_name>Cutlass Solar 1 LLC</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Cutlass Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>110.9</nameplate_mw>
    <summer_mw>110.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.409669</lat>
    <lon>-95.73405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69283</plant_id>
    <plant_name>Three W Solar</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Three W Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>110.9</nameplate_mw>
    <summer_mw>110.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.032404</lat>
    <lon>-97.21424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56360</plant_id>
    <plant_name>Leaning Juniper</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>110.4</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>45.652457</lat>
    <lon>-120.2098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58677</plant_id>
    <plant_name>Gratiot County Wind LLC</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>110.4</nameplate_mw>
    <summer_mw>110.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.408056</lat>
    <lon>-84.46222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>322</plant_id>
    <plant_name>Big Creek 2A</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>37.200062</lat>
    <lon>-119.3068</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2514</plant_id>
    <plant_name>Glenwood</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>104.1</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>40.827149</lat>
    <lon>-73.64747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2966</plant_id>
    <plant_name>Weleetka</plant_name>
    <state>OK</state>
    <county>Okfuskee</county>
    <operator>Public Service Co of Oklahoma</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1976</latest_year>
    <lat>35.3233</lat>
    <lon>-96.1352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2985</plant_id>
    <plant_name>Robert S Kerr</plant_name>
    <state>OK</state>
    <county>Sequoyah</county>
    <operator>USCE-Tulsa District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>111.6</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>35.34447</lat>
    <lon>-94.7755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3325</plant_id>
    <plant_name>Ben French</plant_name>
    <state>SD</state>
    <county>Pennington</county>
    <operator>Black Hills Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>78</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1979</latest_year>
    <lat>44.087235</lat>
    <lon>-103.261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7368</plant_id>
    <plant_name>Geothermal 1</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Northern California Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>38.752</lat>
    <lon>-122.7195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7369</plant_id>
    <plant_name>Geothermal 2</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Northern California Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1986</latest_year>
    <lat>38.7492</lat>
    <lon>-122.7117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57708</plant_id>
    <plant_name>Catalina Solar LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.938261</lat>
    <lon>-118.3345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58838</plant_id>
    <plant_name>Keechi Wind</plant_name>
    <state>TX</state>
    <county>Jack</county>
    <operator>Keechi Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.143056</lat>
    <lon>-98.16111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60059</plant_id>
    <plant_name>Los Vientos V Wind Power</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>26.411689</lat>
    <lon>-98.57155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62617</plant_id>
    <plant_name>Searcy Solar Hybrid</plant_name>
    <state>AR</state>
    <county>White</county>
    <operator>Searcy Solar, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <battery_mwh>30</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.233</lat>
    <lon>-91.69</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63343</plant_id>
    <plant_name>Galloway 2 Solar Farm</plant_name>
    <state>TX</state>
    <county>Concho</county>
    <operator>224WB 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.446237</lat>
    <lon>-99.90297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63538</plant_id>
    <plant_name>Assembly Solar II LLC</plant_name>
    <state>MI</state>
    <county>Shiawassee</county>
    <operator>Assembly Solar II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.043718</lat>
    <lon>-83.95998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64858</plant_id>
    <plant_name>Dolores Canyon Solar</plant_name>
    <state>CO</state>
    <county>Dolores</county>
    <operator>Tri-State G &amp; T Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.705</lat>
    <lon>-108.755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65764</plant_id>
    <plant_name>Walleye Wind</plant_name>
    <state>MN</state>
    <county>Rock</county>
    <operator>Walleye Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.638056</lat>
    <lon>-96.39056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66955</plant_id>
    <plant_name>Three Corners Solar</plant_name>
    <state>ME</state>
    <county>Waldo</county>
    <operator>Three Corners Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.612621</lat>
    <lon>-69.45182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67786</plant_id>
    <plant_name>Hickory Solar</plant_name>
    <state>IL</state>
    <county>Jersey</county>
    <operator>Hickory Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>110</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.133126</lat>
    <lon>-90.36602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67159</plant_id>
    <plant_name>Liberty County Solar Project</plant_name>
    <state>TX</state>
    <county>Liberty</county>
    <operator>Liberty County Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>109.9</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.95888</lat>
    <lon>-94.85048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59</plant_id>
    <plant_name>Platte</plant_name>
    <state>NE</state>
    <county>Hall</county>
    <operator>City of Grand Island - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>109.8</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>40.854765</lat>
    <lon>-98.34822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>270</plant_id>
    <plant_name>Pit 7</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>109.8</nameplate_mw>
    <summer_mw>113</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>40.847462</lat>
    <lon>-121.9908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3048</plant_id>
    <plant_name>Pelton</plant_name>
    <state>OR</state>
    <county>Jefferson</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>109.8</nameplate_mw>
    <summer_mw>110</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1958</latest_year>
    <lat>44.694374</lat>
    <lon>-121.2314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59296</plant_id>
    <plant_name>Northwest Ohio Wind</plant_name>
    <state>OH</state>
    <county>Paulding</county>
    <operator>Northwest Ohio Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>109.8</nameplate_mw>
    <summer_mw>104.8</summer_mw>
    <battery_mwh>3.4</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2021</latest_year>
    <lat>41.016944</lat>
    <lon>-84.59361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6013</plant_id>
    <plant_name>Olive</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Burbank Water and Power - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>109.7</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1964</latest_year>
    <lat>34.1764</lat>
    <lon>-118.3147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1365</plant_id>
    <plant_name>Ohio Falls</plant_name>
    <state>KY</state>
    <county>Jefferson</county>
    <operator>Louisville Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>109.6</nameplate_mw>
    <summer_mw>100.8</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>38.2832</lat>
    <lon>-85.7792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52151</plant_id>
    <plant_name>Sylvamo Corporation Eastover Facility</plant_name>
    <state>SC</state>
    <county>Richland</county>
    <operator>Sylvamo Corporation - Eastover</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>109.6</nameplate_mw>
    <summer_mw>103</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1991</latest_year>
    <lat>33.8872</lat>
    <lon>-80.6397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57964</plant_id>
    <plant_name>Shady Oaks Wind Farm</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>109.5</nameplate_mw>
    <summer_mw>109.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.666944</lat>
    <lon>-89.05972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66625</plant_id>
    <plant_name>Prairie Mist Solar</plant_name>
    <state>AR</state>
    <county>Ashley</county>
    <operator>Prairie Mist Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>109.2</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.255423</lat>
    <lon>-91.66895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1122</plant_id>
    <plant_name>Ames Electric Services Power Plant</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>City of Ames - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>108.8</nameplate_mw>
    <summer_mw>108.7</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1982</latest_year>
    <lat>42.0258</lat>
    <lon>-93.6089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2226</plant_id>
    <plant_name>Canaday</plant_name>
    <state>NE</state>
    <county>Gosper</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>108.8</nameplate_mw>
    <summer_mw>99.3</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>40.6942</lat>
    <lon>-99.7011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54894</plant_id>
    <plant_name>Narrows (NC)</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>108.8</nameplate_mw>
    <summer_mw>119</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1924</latest_year>
    <lat>35.4189</lat>
    <lon>-80.0917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66568</plant_id>
    <plant_name>Shady Oaks Wind 2</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Shady Oaks Wind 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>108.3</nameplate_mw>
    <summer_mw>108.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.666523</lat>
    <lon>-89.0598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56606</plant_id>
    <plant_name>Culbertson Generation Station</plant_name>
    <state>MT</state>
    <county>Roosevelt</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>108.2</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>48.21</lat>
    <lon>-104.3917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2715</plant_id>
    <plant_name>Walters</plant_name>
    <state>NC</state>
    <county>Haywood</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>112</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>35.6946</lat>
    <lon>-83.0503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3600</plant_id>
    <plant_name>Marshall Ford</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1941</latest_year>
    <lat>30.3899</lat>
    <lon>-97.9073</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6515</plant_id>
    <plant_name>Valencia</plant_name>
    <state>AZ</state>
    <county>Santa Cruz</county>
    <operator>UNS Electric, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>55.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2006</latest_year>
    <lat>31.363472</lat>
    <lon>-110.9313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57975</plant_id>
    <plant_name>Spearville 3 LLC</plant_name>
    <state>KS</state>
    <county>Ford</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.851111</lat>
    <lon>-99.83806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58063</plant_id>
    <plant_name>SABIC Innovative Plastics Mt. Vernon</plant_name>
    <state>IN</state>
    <county>Posey</county>
    <operator>SABIC IP Mt. Vernon, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>78.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.910278</lat>
    <lon>-87.92611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59065</plant_id>
    <plant_name>Drift Sand Wind Project LLC</plant_name>
    <state>OK</state>
    <county>Grady</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.827778</lat>
    <lon>-97.95722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59339</plant_id>
    <plant_name>Quinto Solar PV Project</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>105.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.130278</lat>
    <lon>-121.0522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63233</plant_id>
    <plant_name>Emerald Grove</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.09331</lat>
    <lon>-102.3596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69258</plant_id>
    <plant_name>Cunningham Solar I &amp; BESS</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>108</nameplate_mw>
    <summer_mw>108</summer_mw>
    <battery_mwh>36</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.784586</lat>
    <lon>-103.3374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60324</plant_id>
    <plant_name>Willow Spring Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Willow Spring Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>107.9</nameplate_mw>
    <summer_mw>107.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.826697</lat>
    <lon>-118.3352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6088</plant_id>
    <plant_name>North Loop</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>107.8</nameplate_mw>
    <summer_mw>95</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2001</latest_year>
    <lat>32.401</lat>
    <lon>-111.1262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10617</plant_id>
    <plant_name>CH Resources Beaver Falls</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Lakeside Beaver Falls LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>107.8</nameplate_mw>
    <summer_mw>79.8</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.8861</lat>
    <lon>-75.4342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65495</plant_id>
    <plant_name>Ball Hill Wind Energy, LLC</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Ball Hill Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>107.5</nameplate_mw>
    <summer_mw>107.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.265261</lat>
    <lon>-79.07252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50541</plant_id>
    <plant_name>Harbor Cogen</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Harbor Cogeneration Co.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>107.4</nameplate_mw>
    <summer_mw>101.7</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2001</latest_year>
    <lat>33.7771</lat>
    <lon>-118.2303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55208</plant_id>
    <plant_name>Lake Benton I</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>107.2</nameplate_mw>
    <summer_mw>103.5</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>44.2917</lat>
    <lon>-96.375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50406</plant_id>
    <plant_name>Somerset Plant</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Sappi Fine Paper North America-Somerset</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>107.1</nameplate_mw>
    <summer_mw>99.8</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1990</latest_year>
    <lat>44.703467</lat>
    <lon>-69.64744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65376</plant_id>
    <plant_name>SR Snipesville II</plant_name>
    <state>GA</state>
    <county>Jeff Davis</county>
    <operator>SR Snipesville II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>107</nameplate_mw>
    <summer_mw>107</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.708821</lat>
    <lon>-82.71572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65402</plant_id>
    <plant_name>Arche Energy Project, LLC</plant_name>
    <state>OH</state>
    <county>Fulton</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>107</nameplate_mw>
    <summer_mw>107</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.672106</lat>
    <lon>-84.30645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66171</plant_id>
    <plant_name>SR Snipesville III</plant_name>
    <state>GA</state>
    <county>Jeff Davis</county>
    <operator>SR Snipesville III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>107</nameplate_mw>
    <summer_mw>107</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.697152</lat>
    <lon>-82.76455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61750</plant_id>
    <plant_name>Wistaria Ranch Solar</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>106.7</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.676</lat>
    <lon>-115.619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62938</plant_id>
    <plant_name>Glen Ullin Energy Center</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>106.7</nameplate_mw>
    <summer_mw>106.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>46.964077</lat>
    <lon>-101.8165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56904</plant_id>
    <plant_name>Chateaugay</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Valcour Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>106.5</nameplate_mw>
    <summer_mw>106.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.8917</lat>
    <lon>-74.0299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57049</plant_id>
    <plant_name>NaturEner Glacier Wind Energy 1</plant_name>
    <state>MT</state>
    <county>Toole</county>
    <operator>NaturEner Glacier Wind Energy 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>106.5</nameplate_mw>
    <summer_mw>104.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>48.51</lat>
    <lon>-112.1097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56786</plant_id>
    <plant_name>Spiritwood Station</plant_name>
    <state>ND</state>
    <county>Stutsman</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>106.2</nameplate_mw>
    <summer_mw>94.1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>46.926423</lat>
    <lon>-98.49971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56232</plant_id>
    <plant_name>Miramar Energy Facility</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>106</nameplate_mw>
    <summer_mw>94</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2009</latest_year>
    <lat>32.8769</lat>
    <lon>-117.1664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56878</plant_id>
    <plant_name>Hoosier Wind Project LLC</plant_name>
    <state>IN</state>
    <county>Benton</county>
    <operator>AES Indiana</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>106</nameplate_mw>
    <summer_mw>106</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.7178</lat>
    <lon>-87.2631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57110</plant_id>
    <plant_name>Blackstone Wind Farm LLC</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Blackstone Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>106</nameplate_mw>
    <summer_mw>106</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.1508</lat>
    <lon>-88.6233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64838</plant_id>
    <plant_name>SR Clay, LLC</plant_name>
    <state>GA</state>
    <county>Clay</county>
    <operator>SR Clay, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>106</nameplate_mw>
    <summer_mw>106</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.544831</lat>
    <lon>-84.90057</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65522</plant_id>
    <plant_name>Number Three Wind Project</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>106</nameplate_mw>
    <summer_mw>106</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.839599</lat>
    <lon>-75.56989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65761</plant_id>
    <plant_name>Buffalo Ridge Wind</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>Buffalo Ridge Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>106</nameplate_mw>
    <summer_mw>101.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.423056</lat>
    <lon>-96.29722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3395</plant_id>
    <plant_name>Boone Dam</plant_name>
    <state>TN</state>
    <county>Sullivan</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>105.9</nameplate_mw>
    <summer_mw>113.4</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>36.4403</lat>
    <lon>-82.4381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57177</plant_id>
    <plant_name>Meadow Lake Wind Farm IV</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Meadow Lake Wind Farm IV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105.7</nameplate_mw>
    <summer_mw>105.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.6778</lat>
    <lon>-87.0328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67026</plant_id>
    <plant_name>Roundhouse Renewable Energy II</plant_name>
    <state>WY</state>
    <county>Laramie</county>
    <operator>Roundhouse Renewable Energy II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105.7</nameplate_mw>
    <summer_mw>105.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.054692</lat>
    <lon>-104.9954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63003</plant_id>
    <plant_name>Midland Wind</plant_name>
    <state>IL</state>
    <county>Henry</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105.5</nameplate_mw>
    <summer_mw>105.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.269197</lat>
    <lon>-89.99502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57530</plant_id>
    <plant_name>Palouse</plant_name>
    <state>WA</state>
    <county>Whitman</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105.3</nameplate_mw>
    <summer_mw>105.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>47.155833</lat>
    <lon>-117.3644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67105</plant_id>
    <plant_name>Pastoria Solar</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Pastoria Solar Energy Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>105.2</nameplate_mw>
    <summer_mw>105.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.955231</lat>
    <lon>-118.8642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56379</plant_id>
    <plant_name>Victory Wind Farm</plant_name>
    <state>IA</state>
    <county>Carroll</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>42.1169</lat>
    <lon>-95.1292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56872</plant_id>
    <plant_name>Meldahl Hydroelectric Project</plant_name>
    <state>KY</state>
    <county>Bracken</county>
    <operator>City of Hamilton - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.791431</lat>
    <lon>-84.17298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57800</plant_id>
    <plant_name>Bison 2 Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>46.98</lat>
    <lon>-101.5547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57801</plant_id>
    <plant_name>Bison 3 Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>46.98</lat>
    <lon>-101.5547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59206</plant_id>
    <plant_name>Alamo 6</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>BHE Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>116</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.993056</lat>
    <lon>-102.2708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59532</plant_id>
    <plant_name>Springbok Solar Farm 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>62SK 8me, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.249167</lat>
    <lon>-117.9553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61264</plant_id>
    <plant_name>Antelope Expansion 2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.744977</lat>
    <lon>-118.3092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62431</plant_id>
    <plant_name>Willow Creek Wind Power LLC</plant_name>
    <state>SD</state>
    <county>Butte</county>
    <operator>Willow Creek Wind Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>103.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.825883</lat>
    <lon>-103.2074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64065</plant_id>
    <plant_name>Duran Mesa LLC</plant_name>
    <state>NM</state>
    <county>Lincoln</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.390679</lat>
    <lon>-105.4921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64103</plant_id>
    <plant_name>Desert Harvest II LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Desert Harvest II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>105</nameplate_mw>
    <summer_mw>105</summer_mw>
    <battery_mwh>140</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2021</latest_year>
    <lat>33.8</lat>
    <lon>-115.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68424</plant_id>
    <plant_name>Tibbits Energy Storage</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>Tibbits Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>104.9</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.960716</lat>
    <lon>-84.97841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3861</plant_id>
    <plant_name>Upper Baker</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>104.8</nameplate_mw>
    <summer_mw>103.4</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1959</latest_year>
    <lat>48.649</lat>
    <lon>-121.6907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61763</plant_id>
    <plant_name>Sunshine Gateway Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Columbia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>104.5</nameplate_mw>
    <summer_mw>104.5</summer_mw>
    <battery_mwh>75</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2021</latest_year>
    <lat>30.29</lat>
    <lon>-82.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62490</plant_id>
    <plant_name>Echo River Solar</plant_name>
    <state>FL</state>
    <county>Suwannee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>104.5</nameplate_mw>
    <summer_mw>104.5</summer_mw>
    <battery_mwh>75</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2021</latest_year>
    <lat>30.296207</lat>
    <lon>-82.86433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6416</plant_id>
    <plant_name>Denison</plant_name>
    <state>TX</state>
    <county>Grayson</county>
    <operator>USCE-Tulsa District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>104.3</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1945</first_year>
    <latest_year>1949</latest_year>
    <lat>33.8181</lat>
    <lon>-96.5692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54096</plant_id>
    <plant_name>International Paper Riverdale Mill</plant_name>
    <state>AL</state>
    <county>Dallas</county>
    <operator>International Paper Co-Riverdl</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Wood/Wood Waste Biomass; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>104.2</nameplate_mw>
    <summer_mw>104.2</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1994</latest_year>
    <lat>32.426016</lat>
    <lon>-86.87091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54592</plant_id>
    <plant_name>Massena Energy Facility</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Power City Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>104.1</nameplate_mw>
    <summer_mw>83</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>44.9503</lat>
    <lon>-74.8928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57446</plant_id>
    <plant_name>McGinness Hills</plant_name>
    <state>NV</state>
    <county>Lander</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>6</generators>
    <nameplate_mw>104</nameplate_mw>
    <summer_mw>70.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2023</latest_year>
    <lat>39.5911</lat>
    <lon>-116.9119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58018</plant_id>
    <plant_name>Shooting Star</plant_name>
    <state>KS</state>
    <county>Kiowa</county>
    <operator>Shooting Star Power Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>104</nameplate_mw>
    <summer_mw>104</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.518889</lat>
    <lon>-99.44639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59896</plant_id>
    <plant_name>Butler Solar Project 103</plant_name>
    <state>GA</state>
    <county>Taylor</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>104</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.561944</lat>
    <lon>-84.27583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60088</plant_id>
    <plant_name>Sunflower Wind Project</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>104</nameplate_mw>
    <summer_mw>104</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>46.837569</lat>
    <lon>-102.0746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62489</plant_id>
    <plant_name>Crossing Trails Wind Power Project LLC.</plant_name>
    <state>CO</state>
    <county>Kit Carson</county>
    <operator>EDP Renewables North America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>104</nameplate_mw>
    <summer_mw>104</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.046623</lat>
    <lon>-102.8224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3409</plant_id>
    <plant_name>Nickajack</plant_name>
    <state>TN</state>
    <county>Marion</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>103.9</nameplate_mw>
    <summer_mw>105.6</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>35.0017</lat>
    <lon>-85.6218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3855</plant_id>
    <plant_name>Lower Baker</plant_name>
    <state>WA</state>
    <county>Skagit</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>103.9</nameplate_mw>
    <summer_mw>102.4</summer_mw>
    <first_year>1960</first_year>
    <latest_year>2013</latest_year>
    <lat>48.5478</lat>
    <lon>-121.7407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3426</plant_id>
    <plant_name>Old Hickory</plant_name>
    <state>TN</state>
    <county>Sumner</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>103.7</nameplate_mw>
    <summer_mw>115.7</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>36.2972</lat>
    <lon>-86.6556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>381</plant_id>
    <plant_name>Moccasin</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>City &amp; County of San Francisco - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>103.6</nameplate_mw>
    <summer_mw>103.6</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>37.809388</lat>
    <lon>-120.2993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50397</plant_id>
    <plant_name>Pixelle Specialty Solutions LLC - Spring</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Pixelle Specialty Solutions LLC - (PA)</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Wood/Wood Waste Biomass; Natural Gas Steam Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>103.6</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1994</latest_year>
    <lat>39.870935</lat>
    <lon>-76.86812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56497</plant_id>
    <plant_name>Goodman Energy Center</plant_name>
    <state>KS</state>
    <county>Ellis</county>
    <operator>Midwest Energy Inc - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>12</generators>
    <nameplate_mw>103.5</nameplate_mw>
    <summer_mw>101.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2016</latest_year>
    <lat>38.9303</lat>
    <lon>-99.3617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57050</plant_id>
    <plant_name>NaturEner Glacier Wind Energy 2</plant_name>
    <state>MT</state>
    <county>Toole</county>
    <operator>NaturEner Glacier Wind Energy 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>103.5</nameplate_mw>
    <summer_mw>101.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>48.5333</lat>
    <lon>-112.1847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57115</plant_id>
    <plant_name>Meadow Lake Wind Farm III LLC</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Meadow Lake Wind Farm III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>103.5</nameplate_mw>
    <summer_mw>103.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.5986</lat>
    <lon>-87.0194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59826</plant_id>
    <plant_name>Sunshine Valley Solar</plant_name>
    <state>NV</state>
    <county>Nye</county>
    <operator>EDP Renewables North America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>103.5</nameplate_mw>
    <summer_mw>103.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.518</lat>
    <lon>-116.497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61609</plant_id>
    <plant_name>Heartland Divide Wind Project, LLC</plant_name>
    <state>IA</state>
    <county>Audubon</county>
    <operator>Heartland Divide Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>103.5</nameplate_mw>
    <summer_mw>103.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.71138</lat>
    <lon>-94.80199</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>267</plant_id>
    <plant_name>Pit 4</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>103.4</nameplate_mw>
    <summer_mw>95</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>40.986361</lat>
    <lon>-121.8494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54789</plant_id>
    <plant_name>Georgia-Pacific Brewton Mill</plant_name>
    <state>AL</state>
    <county>Escambia</county>
    <operator>Georgia-Pacific Brewton LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>103.4</nameplate_mw>
    <summer_mw>79.8</summer_mw>
    <first_year>1964</first_year>
    <latest_year>2017</latest_year>
    <lat>31.077</lat>
    <lon>-87.1116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56666</plant_id>
    <plant_name>Goodnoe Hills</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>103.4</nameplate_mw>
    <summer_mw>94</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>45.781825</lat>
    <lon>-120.5212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55138</plant_id>
    <plant_name>Walton Discover Power Facility</plant_name>
    <state>AL</state>
    <county>LEE</county>
    <operator>Walton Discover LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>103</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>32.54098</lat>
    <lon>-85.03888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60132</plant_id>
    <plant_name>New Creek Wind</plant_name>
    <state>WV</state>
    <county>Grant</county>
    <operator>New Creek Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>103</nameplate_mw>
    <summer_mw>103</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.200639</lat>
    <lon>-79.14064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56854</plant_id>
    <plant_name>Wheat Field Wind Power Project</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Wheat Field Wind Power Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.9</nameplate_mw>
    <summer_mw>102.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.675804</lat>
    <lon>-120.3183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56855</plant_id>
    <plant_name>Arlington Wind Power Project</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Arlington Wind Power Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.9</nameplate_mw>
    <summer_mw>102.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>45.7167</lat>
    <lon>-120.2008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66184</plant_id>
    <plant_name>Clearwater Wind II</plant_name>
    <state>MT</state>
    <county>Rosebud</county>
    <operator>Clearwater Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.8</nameplate_mw>
    <summer_mw>102.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>46.818828</lat>
    <lon>-106.1946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69121</plant_id>
    <plant_name>Deer Creek Hybrid</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Deer Creek Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>102.8</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.965</lat>
    <lon>-119.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10621</plant_id>
    <plant_name>CH Resources Syracuse</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Lakeside Syracuse LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>102.7</nameplate_mw>
    <summer_mw>86.2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>43.0667</lat>
    <lon>-76.2246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7246</plant_id>
    <plant_name>Dam 2</plant_name>
    <state>AR</state>
    <county>Desha</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>102.6</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>33.986501</lat>
    <lon>-91.31579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10495</plant_id>
    <plant_name>Rumford Cogeneration</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>ND Paper, Inc.</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>102.6</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>44.5513</lat>
    <lon>-70.5414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66336</plant_id>
    <plant_name>St. Gall Energy Storage I</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>St. Gall Energy Storage I</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>102.6</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.924381</lat>
    <lon>-102.9536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67752</plant_id>
    <plant_name>Fort Duncan BESS</plant_name>
    <state>TX</state>
    <county>Maverick</county>
    <operator>Fort Duncan BESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>102.6</nameplate_mw>
    <summer_mw>102.6</summer_mw>
    <battery_mwh>205.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>28.69954</lat>
    <lon>-100.4035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>239</plant_id>
    <plant_name>Electra</plant_name>
    <state>CA</state>
    <county>Amador</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>102.5</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>38.330985</lat>
    <lon>-120.6699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57586</plant_id>
    <plant_name>Shiloh III Wind Project LLC</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.5</nameplate_mw>
    <summer_mw>102.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.169444</lat>
    <lon>-121.8469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57725</plant_id>
    <plant_name>Shiloh IV Wind Project LLC</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.5</nameplate_mw>
    <summer_mw>102.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.137488</lat>
    <lon>-121.8553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62367</plant_id>
    <plant_name>SR Arlington II</plant_name>
    <state>GA</state>
    <county>Early</county>
    <operator>SR Arlington II MT, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>102.5</nameplate_mw>
    <summer_mw>102.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.415531</lat>
    <lon>-84.83071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10790</plant_id>
    <plant_name>Victoria Texas Plant</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Invista</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.4</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>28.675088</lat>
    <lon>-96.95601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57347</plant_id>
    <plant_name>Baldwin Wind LLC</plant_name>
    <state>ND</state>
    <county>Burleigh</county>
    <operator>Baldwin Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.4</nameplate_mw>
    <summer_mw>102.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>47.1133</lat>
    <lon>-100.7086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57357</plant_id>
    <plant_name>Red Mesa Wind LLC</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Red Mesa Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.4</nameplate_mw>
    <summer_mw>102.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.2689</lat>
    <lon>-107.3828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57112</plant_id>
    <plant_name>Meadow Lake Wind Farm II LLC</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Meadow Lake Wind Farm II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.3</nameplate_mw>
    <summer_mw>102.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.6431</lat>
    <lon>-87.0242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58324</plant_id>
    <plant_name>Vansycle II Wind Energy Center</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>FPL Energy Stateline II Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102.3</nameplate_mw>
    <summer_mw>102.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.899167</lat>
    <lon>-118.5914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7928</plant_id>
    <plant_name>Osawatomie</plant_name>
    <state>KS</state>
    <county>Miami</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>76.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.532161</lat>
    <lon>-94.90263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10398</plant_id>
    <plant_name>Cleveland Works</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>Cleveland Cliffs</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>BFG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>99.3</summer_mw>
    <first_year>1965</first_year>
    <latest_year>2022</latest_year>
    <lat>41.4739</lat>
    <lon>-81.6728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10416</plant_id>
    <plant_name>Pensacola Florida Plant</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Ascend Performance Materials LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1993</latest_year>
    <lat>30.5958</lat>
    <lon>-87.2525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50011</plant_id>
    <plant_name>Hawks Nest Hydro</plant_name>
    <state>WV</state>
    <county>Fayette</county>
    <operator>Hawks Nest Hydro LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>96.8</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1936</latest_year>
    <lat>38.1478</lat>
    <lon>-81.1753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56094</plant_id>
    <plant_name>Oklahoma Wind Energy Center</plant_name>
    <state>OK</state>
    <county>Woodward</county>
    <operator>FPL Energy Oklahoma Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>102</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>36.603967</lat>
    <lon>-99.34005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56770</plant_id>
    <plant_name>Locust Ridge II LLC</plant_name>
    <state>PA</state>
    <county>Schuylkill</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>102</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.8411</lat>
    <lon>-76.1547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57107</plant_id>
    <plant_name>Milford Wind Corridor Stage II LLC</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Milford Wind Corridor Stage II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>102</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.58523</lat>
    <lon>-112.931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57293</plant_id>
    <plant_name>Alta Wind Energy Center IV</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Alta Wind IV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>102</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.008611</lat>
    <lon>-118.2422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57421</plant_id>
    <plant_name>Gratiot Wind Park</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>102</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.433889</lat>
    <lon>-84.4975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57962</plant_id>
    <plant_name>Brookfield Tehachapi 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Coram California Development, L.P.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>102</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.008333</lat>
    <lon>-118.2414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58975</plant_id>
    <plant_name>Henrietta Solar Project</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.218806</lat>
    <lon>-119.8058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60372</plant_id>
    <plant_name>Lamesa Solar</plant_name>
    <state>TX</state>
    <county>Dawson</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.715611</lat>
    <lon>-101.9265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62891</plant_id>
    <plant_name>Rosewater Wind Farm</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Rosewater Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>102</nameplate_mw>
    <summer_mw>102</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.770899</lat>
    <lon>-86.87501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50137</plant_id>
    <plant_name>Texas Gulf Sulphur</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Wharton County Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>101.9</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>29.2639</lat>
    <lon>-95.8997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68006</plant_id>
    <plant_name>Mayes County Solar</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>101.5</nameplate_mw>
    <summer_mw>101.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.290054</lat>
    <lon>-95.42654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10014</plant_id>
    <plant_name>Lucky Peak Power Plant Project</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Boise-Kuna Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>101.2</nameplate_mw>
    <summer_mw>83</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>43.528</lat>
    <lon>-116.0583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56649</plant_id>
    <plant_name>South Trent Wind Farm</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>NRG Energy Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>101.2</nameplate_mw>
    <summer_mw>101.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>32.4081</lat>
    <lon>-100.1286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56654</plant_id>
    <plant_name>Hatchet Ridge Wind Project</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>101.2</nameplate_mw>
    <summer_mw>101.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.8981</lat>
    <lon>-121.8036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57286</plant_id>
    <plant_name>OU Spirit Wind Farm</plant_name>
    <state>OK</state>
    <county>Woodward</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>101.2</nameplate_mw>
    <summer_mw>101.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.333803</lat>
    <lon>-99.48014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60064</plant_id>
    <plant_name>White Pine Solar, LLC</plant_name>
    <state>GA</state>
    <county>Taylor</county>
    <operator>White Pine Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>101.2</nameplate_mw>
    <summer_mw>101.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.506017</lat>
    <lon>-84.25698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66052</plant_id>
    <plant_name>Eight Point Wind</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Eight Point Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>101.2</nameplate_mw>
    <summer_mw>101.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.101642</lat>
    <lon>-77.70111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>38</plant_id>
    <plant_name>Millers Ferry</plant_name>
    <state>AL</state>
    <county>Wilcox</county>
    <operator>USCE-Mobile District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>101.1</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>32.100881</lat>
    <lon>-87.39977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10017</plant_id>
    <plant_name>WestRock-West Point Mill</plant_name>
    <state>VA</state>
    <county>King William</county>
    <operator>WestRock-West Point Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>5</generators>
    <nameplate_mw>101</nameplate_mw>
    <summer_mw>101</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1985</latest_year>
    <lat>37.5392</lat>
    <lon>-76.8053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66007</plant_id>
    <plant_name>Flower Valley II</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>Flower Valley II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>101</nameplate_mw>
    <summer_mw>101</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.197285</lat>
    <lon>-103.3618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66008</plant_id>
    <plant_name>Swoose II</plant_name>
    <state>TX</state>
    <county>Ward</county>
    <operator>Swoose II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>101</nameplate_mw>
    <summer_mw>101</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.45115</lat>
    <lon>-103.3618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8067</plant_id>
    <plant_name>Fort Lupton</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>88</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>40.0922</lat>
    <lon>-104.796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54518</plant_id>
    <plant_name>Formosa Plastics</plant_name>
    <state>LA</state>
    <county>East Baton Rouge</county>
    <operator>Formosa Plastics Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>82</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1996</latest_year>
    <lat>30.4992</lat>
    <lon>-91.1872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56108</plant_id>
    <plant_name>T J Labbe Electric Generating</plant_name>
    <state>LA</state>
    <county>Lafayette</county>
    <operator>Lafayette Utilities System</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>95.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>30.2554</lat>
    <lon>-92.0433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56283</plant_id>
    <plant_name>Hargis-Hebert Electric Generating</plant_name>
    <state>LA</state>
    <county>Lafayette</county>
    <operator>Lafayette Utilities System</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>95.1</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>30.1694</lat>
    <lon>-91.9923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56488</plant_id>
    <plant_name>Smoky Hills Wind Project Phase I</plant_name>
    <state>KS</state>
    <county>Lincoln</county>
    <operator>Smoky Hills Wind Farm I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>100.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>38.879936</lat>
    <lon>-98.16016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56790</plant_id>
    <plant_name>Hay Canyon Wind Power LLC</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>100.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.52</lat>
    <lon>-120.5744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57956</plant_id>
    <plant_name>Minco Wind II, LLC</plant_name>
    <state>OK</state>
    <county>Grady</county>
    <operator>FPLE Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>100.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.325278</lat>
    <lon>-98.07139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57984</plant_id>
    <plant_name>Lake Winds Energy Park</plant_name>
    <state>MI</state>
    <county>Mason</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>100.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.871944</lat>
    <lon>-86.33472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58203</plant_id>
    <plant_name>Minco Wind III, LLC</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>FPLE Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>100.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.372359</lat>
    <lon>-98.18273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60470</plant_id>
    <plant_name>Paulding Wind Farm III</plant_name>
    <state>OH</state>
    <county>Paulding</county>
    <operator>Paulding Wind Farm III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.8</nameplate_mw>
    <summer_mw>100.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.121</lat>
    <lon>-84.751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56494</plant_id>
    <plant_name>Prairie Star Wind Farm</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>High Prairie Wind Farm II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.7</nameplate_mw>
    <summer_mw>100.7</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>43.6861</lat>
    <lon>-92.6272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56623</plant_id>
    <plant_name>Elkhorn Valley Wind Farm</plant_name>
    <state>OR</state>
    <county>Union</county>
    <operator>Telocaset Wind Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.7</nameplate_mw>
    <summer_mw>100.7</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>45.085221</lat>
    <lon>-117.8163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56858</plant_id>
    <plant_name>Sagebrush Power Partners</plant_name>
    <state>WA</state>
    <county>Kittitas</county>
    <operator>Sagebrush Power Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.7</nameplate_mw>
    <summer_mw>100.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>47.1356</lat>
    <lon>-120.6872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56296</plant_id>
    <plant_name>Trimont Area Wind Farm</plant_name>
    <state>MN</state>
    <county>Martin</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>43.7938</lat>
    <lon>-94.8499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56618</plant_id>
    <plant_name>Clinton</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Valcour Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>44.8914</lat>
    <lon>-74.0061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56620</plant_id>
    <plant_name>Bliss (NY)</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Valcour Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>42.5367</lat>
    <lon>-78.3047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56805</plant_id>
    <plant_name>EcoGrove Wind LLC</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Acciona Wind Energy USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.451481</lat>
    <lon>-89.87843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56856</plant_id>
    <plant_name>Rail Splitter Wind Farm</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>Rail Splitter Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.3692</lat>
    <lon>-89.4022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56876</plant_id>
    <plant_name>Wapsipinicon Wind Project</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.8006</lat>
    <lon>-92.6822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56994</plant_id>
    <plant_name>Grand Meadow</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.7189</lat>
    <lon>-92.705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57044</plant_id>
    <plant_name>Armenia Mountain Wind Farm</plant_name>
    <state>PA</state>
    <county>Tioga</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.7619</lat>
    <lon>-76.8553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57151</plant_id>
    <plant_name>Beech Ridge Energy LLC</plant_name>
    <state>WV</state>
    <county>Greenbrier</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.0878</lat>
    <lon>-80.4925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60983</plant_id>
    <plant_name>Buckthorn Wind</plant_name>
    <state>TX</state>
    <county>Erath</county>
    <operator>Buckthorn Wind Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.5</nameplate_mw>
    <summer_mw>100.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.371306</lat>
    <lon>-98.37739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58587</plant_id>
    <plant_name>Tuscola Wind II LLC</plant_name>
    <state>MI</state>
    <county>Tuscola</county>
    <operator>Tuscola Wind II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.3</nameplate_mw>
    <summer_mw>100.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>43.526944</lat>
    <lon>-83.56694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67721</plant_id>
    <plant_name>Al Pastor Battery Storage Plant</plant_name>
    <state>TX</state>
    <county>Dawson</county>
    <operator>Al Pastor BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100.3</nameplate_mw>
    <summer_mw>100.3</summer_mw>
    <battery_mwh>145</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.7171</lat>
    <lon>-101.9378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10334</plant_id>
    <plant_name>H Power</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Covanta Honolulu Resource Recovery</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>100.2</nameplate_mw>
    <summer_mw>88.7</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2020</latest_year>
    <lat>21.300036</lat>
    <lon>-158.0986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55265</plant_id>
    <plant_name>Lake Benton II</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100.2</nameplate_mw>
    <summer_mw>100.2</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.129369</lat>
    <lon>-96.11697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66838</plant_id>
    <plant_name>Aspen Road Solar</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Urban Grid Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100.1</nameplate_mw>
    <summer_mw>100.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.150905</lat>
    <lon>-77.76381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>13</plant_id>
    <plant_name>Jordan Dam</plant_name>
    <state>AL</state>
    <county>Elmore</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>129.2</summer_mw>
    <first_year>1929</first_year>
    <latest_year>1929</latest_year>
    <lat>32.6189</lat>
    <lon>-86.2548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>320</plant_id>
    <plant_name>Big Creek 4</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>37.139</lat>
    <lon>-119.4898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2758</plant_id>
    <plant_name>Roanoke Rapids</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>97.6</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>36.4789</lat>
    <lon>-77.6722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3077</plant_id>
    <plant_name>Detroit</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>44.7224</lat>
    <lon>-122.2511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3992</plant_id>
    <plant_name>Blount Street</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>95.7</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1961</latest_year>
    <lat>43.0789</lat>
    <lon>-89.3744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6142</plant_id>
    <plant_name>Ozark</plant_name>
    <state>AR</state>
    <county>Franklin</county>
    <operator>USCE-Little Rock District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>115</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1974</latest_year>
    <lat>35.4693</lat>
    <lon>-93.8175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6415</plant_id>
    <plant_name>Broken Bow Dam</plant_name>
    <state>OK</state>
    <county>McCurtain</county>
    <operator>USCE-Tulsa District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>115</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>34.138779</lat>
    <lon>-94.6845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54912</plant_id>
    <plant_name>Martinez Refining</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Martinez Refining Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1996</latest_year>
    <lat>38.0169</lat>
    <lon>-122.1117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55786</plant_id>
    <plant_name>Edgewood Energy LLC</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>MPH Cross Island Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.7861</lat>
    <lon>-73.2931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55787</plant_id>
    <plant_name>Shoreham Energy LLC</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>MPH Cross Island Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.957053</lat>
    <lon>-72.86588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56293</plant_id>
    <plant_name>Caprock Wind Farm</plant_name>
    <state>NM</state>
    <county>Quay</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2005</latest_year>
    <lat>34.980556</lat>
    <lon>-103.3539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56945</plant_id>
    <plant_name>High Lonesome Mesa LLC</plant_name>
    <state>NM</state>
    <county>Torrance</county>
    <operator>High Lonesome Mesa, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>34.466667</lat>
    <lon>-105.9625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57111</plant_id>
    <plant_name>Lost Lakes Wind Farm LLC</plant_name>
    <state>IA</state>
    <county>Dickinson</county>
    <operator>Lost Lakes Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.3456</lat>
    <lon>-95.3233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57609</plant_id>
    <plant_name>New Harvest Wind Project LLC</plant_name>
    <state>IA</state>
    <county>Crawford</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.159722</lat>
    <lon>-95.43972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57628</plant_id>
    <plant_name>Meadow Lake Wind Farm V LLC</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Meadow Lake Wind Farm V LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.716111</lat>
    <lon>-87.02111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58690</plant_id>
    <plant_name>Apple Blossom Wind Farm</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Apple Blossom Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.815032</lat>
    <lon>-83.315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59205</plant_id>
    <plant_name>OCI Alamo 5 LLC</plant_name>
    <state>TX</state>
    <county>Uvalde</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>29.216667</lat>
    <lon>-99.71611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59207</plant_id>
    <plant_name>OCI Alamo 7 LLC</plant_name>
    <state>TX</state>
    <county>Haskell</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.04</lat>
    <lon>-99.5525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59234</plant_id>
    <plant_name>Arbuckle Mountain Wind Farm LLC</plant_name>
    <state>OK</state>
    <county>Murray</county>
    <operator>Arbuckle Mountain Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.386944</lat>
    <lon>-97.13694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59665</plant_id>
    <plant_name>Innovative Solar 37 LLC</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>97.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.838297</lat>
    <lon>-79.94389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59852</plant_id>
    <plant_name>North Star Solar Project</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>North Star Solar PV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.47</lat>
    <lon>-92.91</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59903</plant_id>
    <plant_name>New Frontier Wind</plant_name>
    <state>ND</state>
    <county>McHenry</county>
    <operator>Meadowlark Wind I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>47.861531</lat>
    <lon>-100.9477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59976</plant_id>
    <plant_name>RE Astoria</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RE Astoria LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.844226</lat>
    <lon>-118.4585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60261</plant_id>
    <plant_name>Playa Solar 2</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.408</lat>
    <lon>-114.908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60307</plant_id>
    <plant_name>Mesquite Solar 2, LLC</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.332777</lat>
    <lon>-112.9114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60352</plant_id>
    <plant_name>Boulder Solar Power, LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.834</lat>
    <lon>-114.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61204</plant_id>
    <plant_name>AES ES Alamitos, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES ES Alamitos, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.770202</lat>
    <lon>-118.0997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61241</plant_id>
    <plant_name>Tres City Power LLC</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Tres Power Victoria LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.7853</lat>
    <lon>-97.0093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61242</plant_id>
    <plant_name>Tres Port Power, LLC</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Tres Power Victoria LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>28.69637</lat>
    <lon>-96.9453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61422</plant_id>
    <plant_name>Southampton Solar, LLC</plant_name>
    <state>VA</state>
    <county>Southampton</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>103.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.614</lat>
    <lon>-77.166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61611</plant_id>
    <plant_name>Techren Solar I LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Techren Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.851336</lat>
    <lon>-114.9744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61866</plant_id>
    <plant_name>Wildhorse Mountain Wind Facility</plant_name>
    <state>OK</state>
    <county>Pushmataha</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.591031</lat>
    <lon>-95.19181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61966</plant_id>
    <plant_name>Victoria Port II</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Victoria Port Power II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.698477</lat>
    <lon>-96.94613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62004</plant_id>
    <plant_name>San Pablo Raceway</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.723748</lat>
    <lon>-118.2803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62269</plant_id>
    <plant_name>Stoneray Power Partners, LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.104377</lat>
    <lon>-96.12673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62415</plant_id>
    <plant_name>West of the Pecos Solar</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.4308</lat>
    <lon>-103.7289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62448</plant_id>
    <plant_name>Lapetus</plant_name>
    <state>TX</state>
    <county>Andrews</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.460054</lat>
    <lon>-102.6728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62548</plant_id>
    <plant_name>SJRR (LIG)</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>SJRR Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.88193</lat>
    <lon>-95.11148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62656</plant_id>
    <plant_name>Hunter Solar LLC (UT)</plant_name>
    <state>UT</state>
    <county>Emery</county>
    <operator>Hunter Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.142217</lat>
    <lon>-111.0511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62797</plant_id>
    <plant_name>Bluebird Solar LLC</plant_name>
    <state>KY</state>
    <county>Harrison</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.299894</lat>
    <lon>-84.38349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62798</plant_id>
    <plant_name>Fern Solar LLC</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>Fern Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.003272</lat>
    <lon>-77.69644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62814</plant_id>
    <plant_name>Sadler Solar</plant_name>
    <state>VA</state>
    <county>Greensville</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.6867</lat>
    <lon>-77.558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62899</plant_id>
    <plant_name>East Line Solar</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.84703</lat>
    <lon>-111.5651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63080</plant_id>
    <plant_name>Harry Allen Solar Energy LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.43395</lat>
    <lon>-114.9471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63127</plant_id>
    <plant_name>Drew Solar LLC</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Drew Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.687195</lat>
    <lon>-115.6656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63295</plant_id>
    <plant_name>Chicot Solar</plant_name>
    <state>AR</state>
    <county>Chicot</county>
    <operator>Chicot Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.479</lat>
    <lon>-91.349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63378</plant_id>
    <plant_name>Wapello Solar LLC</plant_name>
    <state>IA</state>
    <county>Louisa</county>
    <operator>Wapello Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.153697</lat>
    <lon>-91.1771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63476</plant_id>
    <plant_name>Saint Solar</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Saint Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.866276</lat>
    <lon>-111.5024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63685</plant_id>
    <plant_name>Luna Storage</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.68325</lat>
    <lon>-118.3053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63737</plant_id>
    <plant_name>Chisholm Grid Energy Storage System</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Chisholm Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>125</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.904444</lat>
    <lon>-97.38611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63757</plant_id>
    <plant_name>Madero Grid</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Madero Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.169846</lat>
    <lon>-98.32979</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63765</plant_id>
    <plant_name>Black Bear Solar 1</plant_name>
    <state>AL</state>
    <county>Montgomery</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.196971</lat>
    <lon>-86.32734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63838</plant_id>
    <plant_name>High Point Solar LLC</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Acciona Energy USA Global, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.432863</lat>
    <lon>-89.90687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63891</plant_id>
    <plant_name>Saticoy</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Ventura Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.256691000000004</lat>
    <lon>-119.1573</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64057</plant_id>
    <plant_name>Wheatridge 1</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.55975</lat>
    <lon>-119.6338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64081</plant_id>
    <plant_name>Sunflower County</plant_name>
    <state>MS</state>
    <county>Sunflower</county>
    <operator>Sunflower County Solar Project, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.757767</lat>
    <lon>-90.53647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64089</plant_id>
    <plant_name>Ignacio Grid Energy Storage System</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Ignacio Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.166944</lat>
    <lon>-98.325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64104</plant_id>
    <plant_name>Maverick Solar 4, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Maverick Solar 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.7</lat>
    <lon>-115.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64191</plant_id>
    <plant_name>SR Lumpkin</plant_name>
    <state>GA</state>
    <county>Stewart</county>
    <operator>SR Lumpkin, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.025</lat>
    <lon>-84.7325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64259</plant_id>
    <plant_name>BPL Crown Solar LLC</plant_name>
    <state>TX</state>
    <county>Falls</county>
    <operator>BPL Crown Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.346717</lat>
    <lon>-97.08277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64260</plant_id>
    <plant_name>BPL Sol Solar LLC</plant_name>
    <state>TX</state>
    <county>Falls</county>
    <operator>BPL Sol Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.346717</lat>
    <lon>-97.08277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64312</plant_id>
    <plant_name>Bat Cave</plant_name>
    <state>TX</state>
    <county>Mason</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>110</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.737745</lat>
    <lon>-99.23178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64317</plant_id>
    <plant_name>North Fork TX</plant_name>
    <state>TX</state>
    <county>Williamson</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>110</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.748955</lat>
    <lon>-97.87571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64431</plant_id>
    <plant_name>Point Beach Solar</plant_name>
    <state>WI</state>
    <county>Manitowoc</county>
    <operator>Point Beach Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.28337</lat>
    <lon>-87.55533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64507</plant_id>
    <plant_name>OETN1</plant_name>
    <state>TN</state>
    <county>Obion</county>
    <operator>OE_TN1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>108</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.38638</lat>
    <lon>-88.99194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64528</plant_id>
    <plant_name>Gambit Energy Storage - Angleton Storage</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Gambit Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.16801</lat>
    <lon>-95.44506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64566</plant_id>
    <plant_name>Central Line Solar, LLC</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.834322</lat>
    <lon>-111.568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64638</plant_id>
    <plant_name>Borderlands Wind, LLC</plant_name>
    <state>NM</state>
    <county>Catron</county>
    <operator>Borderlands Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.159842</lat>
    <lon>-108.8945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64683</plant_id>
    <plant_name>Oak Trail Solar, LLC</plant_name>
    <state>NC</state>
    <county>Currituck</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.5044</lat>
    <lon>-76.1887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64712</plant_id>
    <plant_name>Sanborn BESS 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.027264</lat>
    <lon>-118.1392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64713</plant_id>
    <plant_name>Sanborn BESS 2</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.027264</lat>
    <lon>-118.1401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64738</plant_id>
    <plant_name>Holliday Creek Solar</plant_name>
    <state>IA</state>
    <county>Webster</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.56867</lat>
    <lon>-94.10277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64853</plant_id>
    <plant_name>New Market Solar</plant_name>
    <state>OH</state>
    <county>Highland</county>
    <operator>New Market Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>39.07183</lat>
    <lon>-83.79611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64996</plant_id>
    <plant_name>Springfield Solar (WI)</plant_name>
    <state>WI</state>
    <county>Dodge</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.603967</lat>
    <lon>-88.44206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65332</plant_id>
    <plant_name>CPV Maple Hill Solar</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>CPV Maple Hill Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.350219</lat>
    <lon>-78.64597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65693</plant_id>
    <plant_name>TX10 Hummingbird Storage</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>227</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.3256</lat>
    <lon>-97.31433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65695</plant_id>
    <plant_name>TX12 Silicon Hill Storage</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>30.41217</lat>
    <lon>-97.57405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65698</plant_id>
    <plant_name>TX15 Limousin Oak Storage</plant_name>
    <state>TX</state>
    <county>Grimes</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>227</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.65991</lat>
    <lon>-95.9738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65714</plant_id>
    <plant_name>Northern Wind</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.011</lat>
    <lon>-96.0446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65820</plant_id>
    <plant_name>Ocotillo Wells</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Conductive Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.074673</lat>
    <lon>-116.0912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65981</plant_id>
    <plant_name>Second Division Solar</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.170545</lat>
    <lon>-95.74157</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66125</plant_id>
    <plant_name>West Line Solar, LLC</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Foster Clean Power A LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.7559</lat>
    <lon>-111.5548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66155</plant_id>
    <plant_name>Ponderosa Wind II</plant_name>
    <state>OK</state>
    <county>Beaver</county>
    <operator>Ponderosa Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.589452</lat>
    <lon>-100.8037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66240</plant_id>
    <plant_name>Ragsdale Solar LLC</plant_name>
    <state>MS</state>
    <county>Madison</county>
    <operator>Ragsdale Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.550998</lat>
    <lon>-90.00968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66269</plant_id>
    <plant_name>Riverstart Solar Park III</plant_name>
    <state>IN</state>
    <county>Randolph</county>
    <operator>Riverstart Solar Park III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.055556</lat>
    <lon>-85.12663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66369</plant_id>
    <plant_name>Wildflower Solar, LLC (MS)</plant_name>
    <state>MS</state>
    <county>DeSoto</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.962</lat>
    <lon>-90.184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66389</plant_id>
    <plant_name>Cereal City Solar, LLC</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>Cereal City Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.305798</lat>
    <lon>-85.03225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66400</plant_id>
    <plant_name>Bexar ESS</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Bexar ESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.271</lat>
    <lon>-98.456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66410</plant_id>
    <plant_name>Grizzly Ridge Solar</plant_name>
    <state>TX</state>
    <county>Hamilton</county>
    <operator>Grizzly Ridge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.738177</lat>
    <lon>-98.21374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66617</plant_id>
    <plant_name>Cald BESS</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Cald BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.955872</lat>
    <lon>-118.2321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66642</plant_id>
    <plant_name>Kiowa County Solar Project</plant_name>
    <state>OK</state>
    <county>Kiowa</county>
    <operator>Kiowa County Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.669592</lat>
    <lon>-98.96231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66647</plant_id>
    <plant_name>Elkhart County Solar Project</plant_name>
    <state>IN</state>
    <county>Elkhart</county>
    <operator>Elkhart County Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.498</lat>
    <lon>-85.69</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66689</plant_id>
    <plant_name>Seven Flags BESS LLC</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Seven Flags BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.456115</lat>
    <lon>-99.41734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66690</plant_id>
    <plant_name>Brazos Bend BESS, LLC</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.56318</lat>
    <lon>-95.80023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66716</plant_id>
    <plant_name>Saint Energy Storage II LLC</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Saint Energy Storage II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.86951</lat>
    <lon>-111.5142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66745</plant_id>
    <plant_name>Lake Iris Solar Project</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>Lake Iris Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.084749</lat>
    <lon>-82.68715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66759</plant_id>
    <plant_name>Delta's Edge Solar</plant_name>
    <state>MS</state>
    <county>Carroll</county>
    <operator>Cubico USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.5</lat>
    <lon>-90.1</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66811</plant_id>
    <plant_name>Clearwater Wind III</plant_name>
    <state>MT</state>
    <county>Rosebud</county>
    <operator>Clearwater Wind III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.818828</lat>
    <lon>-106.1946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66860</plant_id>
    <plant_name>Marion County Solar Project</plant_name>
    <state>OH</state>
    <county>Marion</county>
    <operator>Marion County Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.624518</lat>
    <lon>-83.13615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66905</plant_id>
    <plant_name>Ables Springs Solar &amp; Storage</plant_name>
    <state>TX</state>
    <county>Kaufman</county>
    <operator>Ables Springs Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>157.7</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.819566</lat>
    <lon>-96.18484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67088</plant_id>
    <plant_name>Amite Solar, LLC</plant_name>
    <state>LA</state>
    <county>Tangipahoa</county>
    <operator>Amite Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.797686</lat>
    <lon>-90.53944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67129</plant_id>
    <plant_name>SR Lambert I, LLC</plant_name>
    <state>SC</state>
    <county>Georgetown</county>
    <operator>SR Lambert I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.332969</lat>
    <lon>-79.56353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67190</plant_id>
    <plant_name>Franklin Solar Hybrid</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Franklin Solar Idaho</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.2042</lat>
    <lon>-114.6099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67299</plant_id>
    <plant_name>Pome BESS</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.94005</lat>
    <lon>-117.0319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67497</plant_id>
    <plant_name>Hornshadow Solar, LLC</plant_name>
    <state>UT</state>
    <county>Emery</county>
    <operator>Hornshadow Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.182429</lat>
    <lon>-110.9772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67504</plant_id>
    <plant_name>Walnut Bend Solar Station PV</plant_name>
    <state>AR</state>
    <county>Lee</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.860346</lat>
    <lon>-91.08201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67757</plant_id>
    <plant_name>Polaris Solar Park</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.207524</lat>
    <lon>-84.52912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67915</plant_id>
    <plant_name>Crossett Solar</plant_name>
    <state>AR</state>
    <county>Ashley</county>
    <operator>Cubico USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.096086</lat>
    <lon>-91.94791</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67968</plant_id>
    <plant_name>Burksol Energy Storage</plant_name>
    <state>TX</state>
    <county>Dickens</county>
    <operator>Burksol, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.781511</lat>
    <lon>-100.8775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68106</plant_id>
    <plant_name>SR Lambert II</plant_name>
    <state>SC</state>
    <county>Georgetown</county>
    <operator>SR Lambert II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.332969</lat>
    <lon>-79.56353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68146</plant_id>
    <plant_name>Angelo Storage</plant_name>
    <state>TX</state>
    <county>Tom Green</county>
    <operator>Angelo Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>249.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.513643</lat>
    <lon>-100.5836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68189</plant_id>
    <plant_name>Great Kiskadee Storage</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Great Kiskadee Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>249.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.104286</lat>
    <lon>-98.17188</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68423</plant_id>
    <plant_name>St Gall Energy Storage II</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>St Gall Energy Storage II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.924418</lat>
    <lon>-102.9531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68516</plant_id>
    <plant_name>Wildwood Solar Plant</plant_name>
    <state>MS</state>
    <county>Tallahatchie</county>
    <operator>Wildwood Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.934776</lat>
    <lon>-90.33862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68588</plant_id>
    <plant_name>Swift Air Solar III</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.723088</lat>
    <lon>-102.5196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68617</plant_id>
    <plant_name>Sky Ranch BESS II</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>Sky Ranch Bess II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>400</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.781625</lat>
    <lon>-106.7769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68748</plant_id>
    <plant_name>Tierra Seca</plant_name>
    <state>TX</state>
    <county>Val Verde</county>
    <operator>Tierra Seca BESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.349111</lat>
    <lon>-100.8734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69023</plant_id>
    <plant_name>Knightdale Battery</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.782</lat>
    <lon>-78.4535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69028</plant_id>
    <plant_name>Buckeye Solar</plant_name>
    <state>OH</state>
    <county>Pickaway</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.6</lat>
    <lon>-83.156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69029</plant_id>
    <plant_name>Pickaway Solar</plant_name>
    <state>OH</state>
    <county>Pickaway</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.56</lat>
    <lon>-83.176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69122</plant_id>
    <plant_name>Jackson Fuller Energy Storage</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Jackson Fuller Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.938287</lat>
    <lon>-104.6285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69238</plant_id>
    <plant_name>ATLAS Solar VI, LLC</plant_name>
    <state>AZ</state>
    <county>La Paz</county>
    <operator>ATLAS Solar VI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.579227</lat>
    <lon>-113.5742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69352</plant_id>
    <plant_name>Citrus Flatts Energy Center, LLC</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>East Point Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.190675</lat>
    <lon>-97.69613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69388</plant_id>
    <plant_name>Apple River Solar, LLC</plant_name>
    <state>WI</state>
    <county>Polk</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.381166</lat>
    <lon>-92.30209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69394</plant_id>
    <plant_name>Redfield Solar</plant_name>
    <state>AR</state>
    <county>Grant</county>
    <operator>Redfield PV I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.2711</lat>
    <lon>-92.23215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69471</plant_id>
    <plant_name>Cold Creek Solar Park</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.938</lat>
    <lon>-85.003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69476</plant_id>
    <plant_name>Renegade Solar Energy LLC</plant_name>
    <state>MI</state>
    <county>Delta</county>
    <operator>Upper Michigan Energy Resources Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>45.99731</lat>
    <lon>-87.22625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69676</plant_id>
    <plant_name>Lafitte Solar, LLC</plant_name>
    <state>LA</state>
    <county>Ouachita</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>100</nameplate_mw>
    <summer_mw>100</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.400791</lat>
    <lon>-92.10807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3423</plant_id>
    <plant_name>Cordell Hull</plant_name>
    <state>TN</state>
    <county>Smith</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>99.9</nameplate_mw>
    <summer_mw>106</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1974</latest_year>
    <lat>36.289539</lat>
    <lon>-85.94416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55542</plant_id>
    <plant_name>Larkspur Energy Facility</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Diamond Generating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>99.8</nameplate_mw>
    <summer_mw>91.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>32.567041</lat>
    <lon>-116.9442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57616</plant_id>
    <plant_name>Blue Canyon Windpower VI LLC</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>Blue Canyon Windpower VI LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99.8</nameplate_mw>
    <summer_mw>99.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.910361</lat>
    <lon>-98.5599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58000</plant_id>
    <plant_name>Anacacho Wind Farm, LLC</plant_name>
    <state>TX</state>
    <county>Kinney</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99.8</nameplate_mw>
    <summer_mw>99.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>29.234722</lat>
    <lon>-100.2092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68012</plant_id>
    <plant_name>Caballero</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Caballero CA Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>99.7</nameplate_mw>
    <summer_mw>99.7</summer_mw>
    <battery_mwh>398.8</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.006356</lat>
    <lon>-120.4537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7768</plant_id>
    <plant_name>Sowega Power</plant_name>
    <state>GA</state>
    <county>Mitchell</county>
    <operator>SOWEGA Power LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>99.6</nameplate_mw>
    <summer_mw>92</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>31.3869</lat>
    <lon>-84.08</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59074</plant_id>
    <plant_name>SC 1 Data Center, Phase 2</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Xeres Ventures LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>44</generators>
    <nameplate_mw>99.6</nameplate_mw>
    <summer_mw>99.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2020</latest_year>
    <lat>37.361667</lat>
    <lon>-121.9436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54427</plant_id>
    <plant_name>Gaylord Container Bogalusa</plant_name>
    <state>LA</state>
    <county>Washington</county>
    <operator>Temple-Inland Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>99.5</nameplate_mw>
    <summer_mw>91.8</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1999</latest_year>
    <lat>30.7811</lat>
    <lon>-89.8575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64340</plant_id>
    <plant_name>White Rock West Wind Project</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>White Rock Wind West, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99.5</nameplate_mw>
    <summer_mw>99.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.96684</lat>
    <lon>-98.25689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61970</plant_id>
    <plant_name>Blue Summit II Wind</plant_name>
    <state>TX</state>
    <county>Wilbarger</county>
    <operator>Blue Summit II Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99.4</nameplate_mw>
    <summer_mw>99.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.225882</lat>
    <lon>-99.47799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66660</plant_id>
    <plant_name>Lead BESS 1</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Hanford BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>99.4</nameplate_mw>
    <summer_mw>99.4</summer_mw>
    <battery_mwh>99.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.269531</lat>
    <lon>-119.6487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66661</plant_id>
    <plant_name>Electrolyte BESS</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Henrietta BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>99.4</nameplate_mw>
    <summer_mw>99.4</summer_mw>
    <battery_mwh>99.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.240156</lat>
    <lon>-119.9044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60905</plant_id>
    <plant_name>Oliver Wind III, LLC</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>Oliver Wind III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99.3</nameplate_mw>
    <summer_mw>99.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>46.9571</lat>
    <lon>-101.1681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54634</plant_id>
    <plant_name>St Nicholas Cogen Project</plant_name>
    <state>PA</state>
    <county>Schuylkill</county>
    <operator>Schuylkill Energy Resource Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>99.2</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.8222</lat>
    <lon>-76.1736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57590</plant_id>
    <plant_name>Minco Wind I, LLC</plant_name>
    <state>OK</state>
    <county>Grady</county>
    <operator>FPLE Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99.2</nameplate_mw>
    <summer_mw>99.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.280278</lat>
    <lon>-97.97556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58155</plant_id>
    <plant_name>Perrin Ranch Wind LLC</plant_name>
    <state>AZ</state>
    <county>Coconino</county>
    <operator>Perrin Ranch Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99.2</nameplate_mw>
    <summer_mw>99.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.415556</lat>
    <lon>-112.2711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61221</plant_id>
    <plant_name>Redbed Plains Wind Farm</plant_name>
    <state>OK</state>
    <county>Grady</county>
    <operator>Redbed Plains Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99.1</nameplate_mw>
    <summer_mw>99.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.290759</lat>
    <lon>-97.854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56793</plant_id>
    <plant_name>Elm Creek Wind LLC</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.7542</lat>
    <lon>-94.9497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56818</plant_id>
    <plant_name>Central Plains Wind Farm</plant_name>
    <state>KS</state>
    <county>Wichita</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.503167</lat>
    <lon>-101.1615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56831</plant_id>
    <plant_name>Crane Creek Wind Energy Center</plant_name>
    <state>IA</state>
    <county>Howard</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.397778</lat>
    <lon>-92.47361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57090</plant_id>
    <plant_name>Campbell Hill Windpower</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.01455</lat>
    <lon>-105.999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57108</plant_id>
    <plant_name>Blue Canyon Windpower V LLC</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>Blue Canyon Windpower V LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>34.8217</lat>
    <lon>-98.4525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57194</plant_id>
    <plant_name>Day County Wind LLC</plant_name>
    <state>SD</state>
    <county>Day</county>
    <operator>Day County Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>45.215</lat>
    <lon>-97.9056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57620</plant_id>
    <plant_name>Paulding Wind Farm II</plant_name>
    <state>OH</state>
    <county>Paulding</county>
    <operator>Paulding Wind Farm II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.025278</lat>
    <lon>-84.77917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57844</plant_id>
    <plant_name>Franklin County Wind Farm</plant_name>
    <state>IA</state>
    <county>Franklin</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.606737</lat>
    <lon>-93.33645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58004</plant_id>
    <plant_name>Granite Reliable Power</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>NexteraEnergy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.704444</lat>
    <lon>-71.2925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59236</plant_id>
    <plant_name>Rising Tree Wind Farm III</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Rising Tree Wind Farm III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.060556</lat>
    <lon>-118.2433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62340</plant_id>
    <plant_name>Aulander Holloman Solar, LLC</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Aulander Holloman Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.29116</lat>
    <lon>-77.06656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62377</plant_id>
    <plant_name>Moody Air Force Base Solar</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <battery_mwh>198</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2026</latest_year>
    <lat>30.9574</lat>
    <lon>-83.2229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62420</plant_id>
    <plant_name>Prairie State Solar Project</plant_name>
    <state>IL</state>
    <county>Perry</county>
    <operator>Prairie State Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.208333</lat>
    <lon>-89.57917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62812</plant_id>
    <plant_name>Milford Solar 1</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Milford Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.490667</lat>
    <lon>-113.0183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64224</plant_id>
    <plant_name>Dressor Plains Solar, LLC</plant_name>
    <state>IL</state>
    <county>Fayette</county>
    <operator>Dressor Plains Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.186321</lat>
    <lon>-89.03123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65000</plant_id>
    <plant_name>Wautoma Solar</plant_name>
    <state>WI</state>
    <county>Waushara</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.062477</lat>
    <lon>-89.30162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66623</plant_id>
    <plant_name>Harvest Gold Solar</plant_name>
    <state>MS</state>
    <county>Sunflower</county>
    <operator>Harvest Gold Solar Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.505</lat>
    <lon>-90.636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67991</plant_id>
    <plant_name>Cooks Mill PV I</plant_name>
    <state>IL</state>
    <county>Coles</county>
    <operator>Cooks Mill PV I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.5208</lat>
    <lon>-88.4201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67993</plant_id>
    <plant_name>Crooked Creek PV I</plant_name>
    <state>IL</state>
    <county>Marion</county>
    <operator>Crooked Creek PV I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>99</nameplate_mw>
    <summer_mw>99</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.6452</lat>
    <lon>-88.9998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56424</plant_id>
    <plant_name>Mower County Wind Energy Center</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.9</nameplate_mw>
    <summer_mw>98.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.61407</lat>
    <lon>-92.59882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57152</plant_id>
    <plant_name>Harvest Wind Project</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Harvest Wind Project TIC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.9</nameplate_mw>
    <summer_mw>98.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.8131</lat>
    <lon>-120.3475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58137</plant_id>
    <plant_name>Ensign Wind LLC</plant_name>
    <state>KS</state>
    <county>Gray</county>
    <operator>NextEra Energy Resources Ensign Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.9</nameplate_mw>
    <summer_mw>98.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.614473</lat>
    <lon>-100.2787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1383</plant_id>
    <plant_name>Robert A Reid</plant_name>
    <state>KY</state>
    <county>Webster</county>
    <operator>Big Rivers Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.8</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>37.6461</lat>
    <lon>-87.5019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56212</plant_id>
    <plant_name>Sweetwater Wind 2 LLC</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.8</nameplate_mw>
    <summer_mw>98.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>32.3472</lat>
    <lon>-100.3703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58994</plant_id>
    <plant_name>Breckinridge Wind Project LLC</plant_name>
    <state>OK</state>
    <county>Garfield</county>
    <operator>NextEra Energy Resources Breckinridge</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.8</nameplate_mw>
    <summer_mw>98.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.476944</lat>
    <lon>-97.68556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61912</plant_id>
    <plant_name>McGinness Hills 3</plant_name>
    <state>NV</state>
    <county>Lander</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>98.8</nameplate_mw>
    <summer_mw>74.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2021</latest_year>
    <lat>39.5963</lat>
    <lon>-116.8942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>673</plant_id>
    <plant_name>Tom G Smith</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>City of Lake Worth Beach - (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>98.7</nameplate_mw>
    <summer_mw>93.5</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1978</latest_year>
    <lat>26.612767</lat>
    <lon>-80.0677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56789</plant_id>
    <plant_name>Pebble Springs Wind LLC</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.7</nameplate_mw>
    <summer_mw>98.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.7119</lat>
    <lon>-120.125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57096</plant_id>
    <plant_name>Star Point Wind Project LLC</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.7</nameplate_mw>
    <summer_mw>98.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>45.51</lat>
    <lon>-120.48</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56018</plant_id>
    <plant_name>AMEA Peaking</plant_name>
    <state>AL</state>
    <county>Talladega</county>
    <operator>Alabama Municipal Elec Authority - (AL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>98.6</nameplate_mw>
    <summer_mw>95</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>33.1661</lat>
    <lon>-86.2825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59312</plant_id>
    <plant_name>Seiling Wind II</plant_name>
    <state>OK</state>
    <county>Dewey</county>
    <operator>NextEra Energy Seiling Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.6</nameplate_mw>
    <summer_mw>98.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.1225</lat>
    <lon>-98.99222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50290</plant_id>
    <plant_name>SEMASS Resource Recovery</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>SEMASS Partnership</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>98.5</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1993</latest_year>
    <lat>41.8022</lat>
    <lon>-70.7875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69168</plant_id>
    <plant_name>Carambola BESS</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Carambola BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>98.4</nameplate_mw>
    <summer_mw>98.4</summer_mw>
    <battery_mwh>196.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.24973</lat>
    <lon>-98.23883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56645</plant_id>
    <plant_name>Osceola Windpower LLC</plant_name>
    <state>IA</state>
    <county>Osceola</county>
    <operator>Osceola Windpower LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98.2</nameplate_mw>
    <summer_mw>98.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.4303</lat>
    <lon>-95.4167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2195</plant_id>
    <plant_name>Thompson Falls</plant_name>
    <state>MT</state>
    <county>Sanders</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>98.1</nameplate_mw>
    <summer_mw>93.5</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1917</latest_year>
    <lat>47.593155</lat>
    <lon>-115.3582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67104</plant_id>
    <plant_name>Bayou Galion Solar Project</plant_name>
    <state>LA</state>
    <county>Morehouse Parish</county>
    <operator>Bayou Galion Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>98.1</nameplate_mw>
    <summer_mw>98.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.79754</lat>
    <lon>-91.78413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55807</plant_id>
    <plant_name>Henrietta Peaker</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>MRP San Joaquin Energy LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>98</nameplate_mw>
    <summer_mw>92.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>36.2397</lat>
    <lon>-119.9044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56010</plant_id>
    <plant_name>Hancock County Wind Energy Center</plant_name>
    <state>IA</state>
    <county>Hancock</county>
    <operator>FPL Energy Hancock County Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>43.052758</lat>
    <lon>-93.62996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57116</plant_id>
    <plant_name>Quilt Block Wind Farm LLC</plant_name>
    <state>WI</state>
    <county>Lafayette</county>
    <operator>Quilt Block Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.673333</lat>
    <lon>-90.26528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57504</plant_id>
    <plant_name>TECO CHP-1</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Medical Center Central</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>98</nameplate_mw>
    <summer_mw>97</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2024</latest_year>
    <lat>29.703454</lat>
    <lon>-95.39832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58427</plant_id>
    <plant_name>Lansing BWL REO Town Plant</plant_name>
    <state>MI</state>
    <county>Ingham</county>
    <operator>Lansing Board of Water and Light</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>98</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.719722</lat>
    <lon>-84.55167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59021</plant_id>
    <plant_name>Hoopeston Wind LLC</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>Hoopeston Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>98</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.399722</lat>
    <lon>-87.79917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66890</plant_id>
    <plant_name>SF Azalea, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Idemitsu Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>98</nameplate_mw>
    <summer_mw>98</summer_mw>
    <battery_mwh>152</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.767393</lat>
    <lon>-119.8945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61986</plant_id>
    <plant_name>Spring Grove I</plant_name>
    <state>VA</state>
    <county>Surry</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>97.9</nameplate_mw>
    <summer_mw>97.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.173916</lat>
    <lon>-76.91925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57447</plant_id>
    <plant_name>Laurel Mountain Hybrid</plant_name>
    <state>WV</state>
    <county>Barbour</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>97.6</nameplate_mw>
    <summer_mw>97.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.0072</lat>
    <lon>-79.8866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56901</plant_id>
    <plant_name>Altona</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Valcour Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>97.5</nameplate_mw>
    <summer_mw>97.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.8216</lat>
    <lon>-73.6509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52026</plant_id>
    <plant_name>Dartmouth Power Associates LP</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Dartmouth Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>97.4</nameplate_mw>
    <summer_mw>81.7</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2009</latest_year>
    <lat>41.6731</lat>
    <lon>-70.9994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61047</plant_id>
    <plant_name>Coyote Ridge</plant_name>
    <state>SD</state>
    <county>Brookings</county>
    <operator>Coyote Ridge LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>97.4</nameplate_mw>
    <summer_mw>97.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.45</lat>
    <lon>-96.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>218</plant_id>
    <plant_name>Balch 2</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>97.2</nameplate_mw>
    <summer_mw>105</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>36.908907</lat>
    <lon>-119.0876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7698</plant_id>
    <plant_name>General Electric Plastic</plant_name>
    <state>AL</state>
    <county>Lowndes</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>97</nameplate_mw>
    <summer_mw>84.5</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>32.310226</lat>
    <lon>-86.52542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66659</plant_id>
    <plant_name>Acid BESS</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Malaga BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>97</nameplate_mw>
    <summer_mw>97</summer_mw>
    <battery_mwh>97</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.6905</lat>
    <lon>-119.7404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10202</plant_id>
    <plant_name>Fernandina Beach Mill</plant_name>
    <state>FL</state>
    <county>Nassau</county>
    <operator>WestRock, Fernandina Beach</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>96.9</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1988</latest_year>
    <lat>30.681823</lat>
    <lon>-81.45541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57206</plant_id>
    <plant_name>Soldotna</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Homer Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>96.5</nameplate_mw>
    <summer_mw>90.5</summer_mw>
    <battery_mwh>93</battery_mwh>
    <first_year>2014</first_year>
    <latest_year>2022</latest_year>
    <lat>60.499444</lat>
    <lon>-150.9972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2682</plant_id>
    <plant_name>S A Carlson</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Jamestown Board of Public Util</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>96.3</nameplate_mw>
    <summer_mw>87</summer_mw>
    <first_year>1951</first_year>
    <latest_year>2001</latest_year>
    <lat>42.0933</lat>
    <lon>-79.2478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54349</plant_id>
    <plant_name>Nevada Cogen Associates 2 Black Mountain</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Cogeneration Assoc # 2</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>96.3</nameplate_mw>
    <summer_mw>93.1</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>36.2253</lat>
    <lon>-114.8783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57174</plant_id>
    <plant_name>Colorado Highlands Wind</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Colorado Highlands Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>96.1</nameplate_mw>
    <summer_mw>96.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2013</latest_year>
    <lat>40.756944</lat>
    <lon>-102.7431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>188</plant_id>
    <plant_name>Greers Ferry Lake</plant_name>
    <state>AR</state>
    <county>Cleburne</county>
    <operator>USCE-Little Rock District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>96</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>35.5207</lat>
    <lon>-91.9953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7962</plant_id>
    <plant_name>Warren F Sam Beasley Generation Station</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Delaware Municipal Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>96</nameplate_mw>
    <summer_mw>98</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2012</latest_year>
    <lat>39.279179</lat>
    <lon>-75.62393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56629</plant_id>
    <plant_name>Waterbury Generation</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>96</nameplate_mw>
    <summer_mw>96</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.5444</lat>
    <lon>-73.0417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57898</plant_id>
    <plant_name>Palm Beach Renewable Energy Facility 2</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>Solid Waste Authority of Palm Beach Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>96</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>26.772439</lat>
    <lon>-80.14182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66276</plant_id>
    <plant_name>Blake Solar Plant</plant_name>
    <state>WV</state>
    <county>Jefferson</county>
    <operator>Horus West Virginia 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>96</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.263611</lat>
    <lon>-77.83341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7936</plant_id>
    <plant_name>Nine Canyon</plant_name>
    <state>WA</state>
    <county>Benton</county>
    <operator>Energy Northwest</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>95.9</nameplate_mw>
    <summer_mw>95</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>46.0958</lat>
    <lon>-119.0964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10151</plant_id>
    <plant_name>Grant Town Power Plant</plant_name>
    <state>WV</state>
    <county>Marion</county>
    <operator>American Bituminous Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>95.7</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>39.561831</lat>
    <lon>-80.16314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54087</plant_id>
    <plant_name>International Paper Georgetown Mill</plant_name>
    <state>SC</state>
    <county>Georgetown</county>
    <operator>International Paper Co-GT Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>95.6</nameplate_mw>
    <summer_mw>90.4</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1984</latest_year>
    <lat>33.360185</lat>
    <lon>-79.30257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59712</plant_id>
    <plant_name>San Roman Wind I, LLC</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Acciona Energy USA Global, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>95.3</nameplate_mw>
    <summer_mw>95.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>26.125979</lat>
    <lon>-97.3776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62113</plant_id>
    <plant_name>Strauss Wind Farm</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>Strauss Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>95.3</nameplate_mw>
    <summer_mw>95.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.579835</lat>
    <lon>-120.5643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56319</plant_id>
    <plant_name>Wygen 2</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>Black Hills Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>95</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>44.2919</lat>
    <lon>-105.3811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63766</plant_id>
    <plant_name>Happy Solar 1</plant_name>
    <state>AR</state>
    <county>White</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>95</nameplate_mw>
    <summer_mw>95</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.167715</lat>
    <lon>-91.66028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10883</plant_id>
    <plant_name>Medical Area Total Energy Plant</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>MATEP LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>94.8</nameplate_mw>
    <summer_mw>90.5</summer_mw>
    <first_year>1980</first_year>
    <latest_year>2017</latest_year>
    <lat>42.33685</lat>
    <lon>-71.10815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54350</plant_id>
    <plant_name>Nevada Cogen Assoc#1 GarnetVly</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Cogeneration Assoc # 1</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>94.8</nameplate_mw>
    <summer_mw>85.5</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>36.343229</lat>
    <lon>-114.9207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50974</plant_id>
    <plant_name>Scrubgrass Reclamation CO. LP.</plant_name>
    <state>PA</state>
    <county>Venango</county>
    <operator>Scrubgrass Reclamation CO. LP.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>94.7</nameplate_mw>
    <summer_mw>83.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>41.2691</lat>
    <lon>-79.8134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2707</plant_id>
    <plant_name>Blewett</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>94.6</nameplate_mw>
    <summer_mw>79</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1971</latest_year>
    <lat>34.9833</lat>
    <lon>-79.8775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55066</plant_id>
    <plant_name>Heat Recovery Coke Facility</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>Cokenergy Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>94.6</nameplate_mw>
    <summer_mw>88</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>41.6789</lat>
    <lon>-87.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>409</plant_id>
    <plant_name>Exchequer</plant_name>
    <state>CA</state>
    <county>Mariposa</county>
    <operator>Merced Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>94.5</nameplate_mw>
    <summer_mw>94.5</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>37.584345</lat>
    <lon>-120.2686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>518</plant_id>
    <plant_name>Flatiron</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Hydroelectric Pumped Storage</technologies>
    <generators>3</generators>
    <nameplate_mw>94.5</nameplate_mw>
    <summer_mw>94.5</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>40.364996</lat>
    <lon>-105.236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50639</plant_id>
    <plant_name>Sappi Cloquet Mill</plant_name>
    <state>MN</state>
    <county>Carlton</county>
    <operator>Sappi Cloquet LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>94.5</nameplate_mw>
    <summer_mw>76.6</summer_mw>
    <first_year>1929</first_year>
    <latest_year>2001</latest_year>
    <lat>46.7243</lat>
    <lon>-92.4298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56621</plant_id>
    <plant_name>Sleeping Bear LLC</plant_name>
    <state>OK</state>
    <county>Harper</county>
    <operator>NRG Energy Gas &amp; Wind Holdings Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>94.5</nameplate_mw>
    <summer_mw>94.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>36.640278</lat>
    <lon>-99.50056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58088</plant_id>
    <plant_name>Stony Creek Wind Farm NY</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>94.4</nameplate_mw>
    <summer_mw>94.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.767614</lat>
    <lon>-78.41584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59655</plant_id>
    <plant_name>Campbell County Wind Farm</plant_name>
    <state>SD</state>
    <county>Campbell</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>94.3</nameplate_mw>
    <summer_mw>94.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>45.753333</lat>
    <lon>-100.275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50752</plant_id>
    <plant_name>South Belridge Cogeneration Facility</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AERA Energy LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>94.2</nameplate_mw>
    <summer_mw>57</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1986</latest_year>
    <lat>35.438611</lat>
    <lon>-119.7075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7909</plant_id>
    <plant_name>Vernon Boulevard</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>94</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.7537</lat>
    <lon>-73.9508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7910</plant_id>
    <plant_name>Joseph J Seymour Power Project</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>94</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.6631</lat>
    <lon>-74</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7913</plant_id>
    <plant_name>Hell Gate</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>94</nameplate_mw>
    <summer_mw>79.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.799</lat>
    <lon>-73.9094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7914</plant_id>
    <plant_name>Harlem River Yard</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>94</nameplate_mw>
    <summer_mw>79.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.7991</lat>
    <lon>-73.9156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50776</plant_id>
    <plant_name>Panther Creek Energy Facility</plant_name>
    <state>PA</state>
    <county>Carbon</county>
    <operator>Panther Creek Power Operating, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>94</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>40.8556</lat>
    <lon>-75.8781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61890</plant_id>
    <plant_name>NRG Chalk Point CT</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>NRG Chalk Point CT</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>94</nameplate_mw>
    <summer_mw>80.2</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>38.5444</lat>
    <lon>-76.6861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65050</plant_id>
    <plant_name>Mark Center Solar Project</plant_name>
    <state>OH</state>
    <county>Defiance</county>
    <operator>Naturgy Solar Operation USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>94</nameplate_mw>
    <summer_mw>94</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.288044</lat>
    <lon>-84.61132</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1040</plant_id>
    <plant_name>Whitewater Valley</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>City of Richmond - (IN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>93.9</nameplate_mw>
    <summer_mw>99.7</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1973</latest_year>
    <lat>39.8028</lat>
    <lon>-84.8953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3394</plant_id>
    <plant_name>Apalachia</plant_name>
    <state>TN</state>
    <county>Polk</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>93.6</nameplate_mw>
    <summer_mw>82.4</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1943</latest_year>
    <lat>35.167712</lat>
    <lon>-84.2956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59814</plant_id>
    <plant_name>Copper Mountain Solar 4, LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>93.6</nameplate_mw>
    <summer_mw>93.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.78222</lat>
    <lon>-114.9754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63384</plant_id>
    <plant_name>Bennington Wind</plant_name>
    <state>IL</state>
    <county>Marshall</county>
    <operator>Minonk Stewardship Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>93</nameplate_mw>
    <summer_mw>93</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.96038</lat>
    <lon>-89.08536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50279</plant_id>
    <plant_name>Archbald Power Station</plant_name>
    <state>PA</state>
    <county>Lackawanna</county>
    <operator>PEI Power Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine; Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>92.9</nameplate_mw>
    <summer_mw>71.7</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2010</latest_year>
    <lat>41.485</lat>
    <lon>-75.5406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6288</plant_id>
    <plant_name>Healy</plant_name>
    <state>AK</state>
    <county>Denali</county>
    <operator>Golden Valley Elec Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>LIG</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>92.8</nameplate_mw>
    <summer_mw>77.8</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1998</latest_year>
    <lat>63.8542</lat>
    <lon>-148.95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10244</plant_id>
    <plant_name>Pixelle Specialty Solutions LLC - Chilli</plant_name>
    <state>OH</state>
    <county>Ross</county>
    <operator>US Paper Mill Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>92.8</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1978</latest_year>
    <lat>39.324611</lat>
    <lon>-82.97404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55311</plant_id>
    <plant_name>BASF Freeport Works</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>BASF Corporation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>92.7</nameplate_mw>
    <summer_mw>86.7</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>29.002</lat>
    <lon>-95.394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>809</plant_id>
    <plant_name>American Falls</plant_name>
    <state>ID</state>
    <county>Power</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>92.4</nameplate_mw>
    <summer_mw>86.9</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>42.7778</lat>
    <lon>-112.8764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6060</plant_id>
    <plant_name>Coachella</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>92.4</nameplate_mw>
    <summer_mw>73.9</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1976</latest_year>
    <lat>33.6758</lat>
    <lon>-116.1714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10873</plant_id>
    <plant_name>Coso Finance Partners</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Coso Operating Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>92.2</nameplate_mw>
    <summer_mw>81.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1988</latest_year>
    <lat>36.0372</lat>
    <lon>-117.7981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55698</plant_id>
    <plant_name>Hanford Energy Park Peaker</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>MRP San Joaquin Energy LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>92.2</nameplate_mw>
    <summer_mw>91.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>36.270072</lat>
    <lon>-119.6481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56695</plant_id>
    <plant_name>Summer Falls Power Plant</plant_name>
    <state>WA</state>
    <county>Grant</county>
    <operator>Columbia Basin Hydropower</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>92</nameplate_mw>
    <summer_mw>92</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>47.5025</lat>
    <lon>-119.2917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58021</plant_id>
    <plant_name>Whitetail</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Whitetail Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>92</nameplate_mw>
    <summer_mw>92.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>27.488056</lat>
    <lon>-99.00528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61369</plant_id>
    <plant_name>Sweetwater Solar</plant_name>
    <state>WY</state>
    <county>Sweetwater</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>92</nameplate_mw>
    <summer_mw>92</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.629056</lat>
    <lon>-109.6835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65282</plant_id>
    <plant_name>Red Barn Energy</plant_name>
    <state>WI</state>
    <county>Grant</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>91.6</nameplate_mw>
    <summer_mw>91.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.951448</lat>
    <lon>-90.4407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66717</plant_id>
    <plant_name>Eastover Solar</plant_name>
    <state>SC</state>
    <county>Richland</county>
    <operator>Eastover Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>91.6</nameplate_mw>
    <summer_mw>91.6</summer_mw>
    <battery_mwh>72</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.918542</lat>
    <lon>-80.6467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50806</plant_id>
    <plant_name>Florence Mill</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>WestRock-Florence</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>91.5</nameplate_mw>
    <summer_mw>86.5</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1987</latest_year>
    <lat>34.1497</lat>
    <lon>-79.5606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54689</plant_id>
    <plant_name>Heber Geothermal</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>ORCAL Geothermal, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>5</generators>
    <nameplate_mw>91.5</nameplate_mw>
    <summer_mw>63.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2023</latest_year>
    <lat>32.7146</lat>
    <lon>-115.518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60491</plant_id>
    <plant_name>Springbok 3 Solar Farm Hybrid</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>64KT 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>91.5</nameplate_mw>
    <summer_mw>91.5</summer_mw>
    <battery_mwh>1.5</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.171153</lat>
    <lon>-118.0017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>19</plant_id>
    <plant_name>Thurlow Dam</plant_name>
    <state>AL</state>
    <county>Elmore</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>91</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>32.535436</lat>
    <lon>-85.88761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4072</plant_id>
    <plant_name>Pulliam</plant_name>
    <state>WI</state>
    <county>Brown</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>91</nameplate_mw>
    <summer_mw>79.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.54</lat>
    <lon>-88.0086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61911</plant_id>
    <plant_name>Ivester Wind Farm</plant_name>
    <state>IA</state>
    <county>Grundy</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>90.8</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.33327</lat>
    <lon>-92.94644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52149</plant_id>
    <plant_name>West Point (PA)</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>Merck &amp; Co Inc-West Point</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>90.6</nameplate_mw>
    <summer_mw>81.5</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2024</latest_year>
    <lat>40.217963</lat>
    <lon>-75.29882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54076</plant_id>
    <plant_name>Indeck Olean Energy Center</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>Indeck-Olean Ltd Partnership</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>90.6</nameplate_mw>
    <summer_mw>79.2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>42.085944</lat>
    <lon>-78.45425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3270</plant_id>
    <plant_name>Wateree Hydro</plant_name>
    <state>SC</state>
    <county>Kershaw</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>90.5</nameplate_mw>
    <summer_mw>74</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1919</latest_year>
    <lat>34.3355</lat>
    <lon>-80.7021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6358</plant_id>
    <plant_name>Hutchinson Plant #2</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Hutchinson Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>90.5</nameplate_mw>
    <summer_mw>73</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2001</latest_year>
    <lat>44.888881</lat>
    <lon>-94.34935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68856</plant_id>
    <plant_name>Tyson Nick</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>Tyson Nick Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>90.5</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.644897</lat>
    <lon>-95.62704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7155</plant_id>
    <plant_name>Lime Creek</plant_name>
    <state>IA</state>
    <county>Cerro Gordo</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>90.2</nameplate_mw>
    <summer_mw>70.8</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>43.2481</lat>
    <lon>-93.205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2122</plant_id>
    <plant_name>Chillicothe</plant_name>
    <state>MO</state>
    <county>Livingston</county>
    <operator>Chillicothe Municipal Utils (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2003</latest_year>
    <lat>39.783388</lat>
    <lon>-93.56411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3891</plant_id>
    <plant_name>Box Canyon</plant_name>
    <state>WA</state>
    <county>Pend Oreille</county>
    <operator>PUD No 1 of Pend Oreille County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>48.780856</lat>
    <lon>-117.4183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6419</plant_id>
    <plant_name>Eufaula Dam</plant_name>
    <state>OK</state>
    <county>Haskell</county>
    <operator>USCE-Tulsa District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>95</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>35.3069</lat>
    <lon>-95.3572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10677</plant_id>
    <plant_name>CES Placerita Power Plant</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CES Placerita Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>69</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>34.3801</lat>
    <lon>-118.4999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10746</plant_id>
    <plant_name>Covanta Delaware Valley</plant_name>
    <state>PA</state>
    <county>Delaware</county>
    <operator>Covanta Delaware Valley LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>39.8265</lat>
    <lon>-75.3882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10874</plant_id>
    <plant_name>Coso Power Developers</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Coso Operating Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>80.3</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>36.0192</lat>
    <lon>-117.7917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10875</plant_id>
    <plant_name>Coso Energy Developers</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Coso Operating Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>67.8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1989</latest_year>
    <lat>36.0019</lat>
    <lon>-117.7886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54995</plant_id>
    <plant_name>Indiana Harbor E 5 AC Station</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>Northlake Energy</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>BFG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>41.6844</lat>
    <lon>-87.4214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55479</plant_id>
    <plant_name>Wygen 1</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>Black Hills Ontario LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.2858</lat>
    <lon>-105.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56659</plant_id>
    <plant_name>Michigan Wind 2</plant_name>
    <state>MI</state>
    <county>Sanilac</county>
    <operator>Michigan Wind 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.663056</lat>
    <lon>-82.74694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57188</plant_id>
    <plant_name>Vantage Wind Energy LLC</plant_name>
    <state>WA</state>
    <county>Kittitas</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>46.9547</lat>
    <lon>-120.1819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58395</plant_id>
    <plant_name>Alta Wind XI</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Alta Wind XI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.065</lat>
    <lon>-118.39</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60551</plant_id>
    <plant_name>Big Level Wind</plant_name>
    <state>PA</state>
    <county>Potter</county>
    <operator>Big Level Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.869326</lat>
    <lon>-77.66594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65765</plant_id>
    <plant_name>High River Energy Center, LLC</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>High River Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.901856</lat>
    <lon>-74.13273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66333</plant_id>
    <plant_name>Superstition Energy Storage</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Superstition Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>90</nameplate_mw>
    <summer_mw>90</summer_mw>
    <battery_mwh>360</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.35898</lat>
    <lon>-111.8311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52140</plant_id>
    <plant_name>International Paper Prattville Mill</plant_name>
    <state>AL</state>
    <county>Autauga</county>
    <operator>International Paper Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>89.8</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1980</latest_year>
    <lat>32.4187</lat>
    <lon>-86.4718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61407</plant_id>
    <plant_name>Cottonwood Wind Energy Center</plant_name>
    <state>NE</state>
    <county>Webster</county>
    <operator>Cottonwood Wind Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>89.7</nameplate_mw>
    <summer_mw>89.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.240168</lat>
    <lon>-98.40596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6474</plant_id>
    <plant_name>Port Allen (HI)</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Kauai Island Utility Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>89.5</nameplate_mw>
    <summer_mw>77.6</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1991</latest_year>
    <lat>21.899583</lat>
    <lon>-159.585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56479</plant_id>
    <plant_name>Sand Bluff Wind Farm</plant_name>
    <state>TX</state>
    <county>Glasscock</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>89.5</nameplate_mw>
    <summer_mw>89.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>31.991442</lat>
    <lon>-101.3026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8083</plant_id>
    <plant_name>Keahole</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hawaii Electric Light Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>89.1</nameplate_mw>
    <summer_mw>79</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2009</latest_year>
    <lat>19.7317</lat>
    <lon>-156.0283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2092</plant_id>
    <plant_name>Ralph Green</plant_name>
    <state>MO</state>
    <county>Cass</county>
    <operator>Evergy Missouri West</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>88.9</nameplate_mw>
    <summer_mw>65.8</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>38.78758</lat>
    <lon>-94.27769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50821</plant_id>
    <plant_name>Mojave 16/17/18</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>88.5</nameplate_mw>
    <summer_mw>88.5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.045</lat>
    <lon>-118.2642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>317</plant_id>
    <plant_name>Big Creek 1</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>88.4</nameplate_mw>
    <summer_mw>88.4</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1925</latest_year>
    <lat>37.2042</lat>
    <lon>-119.2396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10113</plant_id>
    <plant_name>John B Rich Memorial Power Station</plant_name>
    <state>PA</state>
    <county>Schuylkill</county>
    <operator>Gilberton Power Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>88.4</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.7903</lat>
    <lon>-76.1983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54034</plant_id>
    <plant_name>Rensselaer Cogen</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Rensselaer Generating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>88.2</nameplate_mw>
    <summer_mw>79.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>42.625325</lat>
    <lon>-73.74996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62730</plant_id>
    <plant_name>Desper Solar</plant_name>
    <state>VA</state>
    <county>Louisa</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>88.2</nameplate_mw>
    <summer_mw>88.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.015735</lat>
    <lon>-78.04313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7967</plant_id>
    <plant_name>Lordsburg Generating</plant_name>
    <state>NM</state>
    <county>Hidalgo</county>
    <operator>Public Service Co of NM</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>88</nameplate_mw>
    <summer_mw>82.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>32.35051</lat>
    <lon>-108.698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55429</plant_id>
    <plant_name>Kentucky Mills</plant_name>
    <state>KY</state>
    <county>Hancock</county>
    <operator>Domtar Paper Company LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>88</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>37.8948</lat>
    <lon>-86.6854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55738</plant_id>
    <plant_name>Buchanan Generation LLC</plant_name>
    <state>VA</state>
    <county>Buchanan</county>
    <operator>Buchanan Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>88</nameplate_mw>
    <summer_mw>84</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.175278</lat>
    <lon>-81.96139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66462</plant_id>
    <plant_name>Placerita ESS</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Terra-Gen Operating Co-BESS 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>88</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.41</lat>
    <lon>-118.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66620</plant_id>
    <plant_name>Resurgence Solar II</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Resurgence Solar II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>88</nameplate_mw>
    <summer_mw>88</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.00656</lat>
    <lon>-117.5448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57399</plant_id>
    <plant_name>Cannelton Hydroelectric Plant</plant_name>
    <state>KY</state>
    <county>Hancock</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>87.9</nameplate_mw>
    <summer_mw>87.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.899722</lat>
    <lon>-86.70583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>20</plant_id>
    <plant_name>Weiss Dam</plant_name>
    <state>AL</state>
    <county>Cherokee</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>87.6</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1962</latest_year>
    <lat>34.172142</lat>
    <lon>-85.75381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55196</plant_id>
    <plant_name>Springdale 1 &amp; 2</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>Springdale Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>87.6</nameplate_mw>
    <summer_mw>96.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>40.546667</lat>
    <lon>-79.76833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55377</plant_id>
    <plant_name>Gans</plant_name>
    <state>PA</state>
    <county>FAYETTE</county>
    <operator>Gans Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>87.6</nameplate_mw>
    <summer_mw>97.4</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>39.7475</lat>
    <lon>-79.83889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55654</plant_id>
    <plant_name>Chambersburg</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Chambersburg Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>87.6</nameplate_mw>
    <summer_mw>100.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>39.866944</lat>
    <lon>-77.68583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65741</plant_id>
    <plant_name>Sandy Ridge Wind 2, LLC</plant_name>
    <state>PA</state>
    <county>Blair</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>87.6</nameplate_mw>
    <summer_mw>87.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.745335</lat>
    <lon>-78.22231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8037</plant_id>
    <plant_name>Clifton</plant_name>
    <state>KS</state>
    <county>Washington</county>
    <operator>Sunflower Electric Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>87.5</nameplate_mw>
    <summer_mw>78.7</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>39.6125</lat>
    <lon>-97.2778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10699</plant_id>
    <plant_name>Georgia-Pacific Consr Prods LP-Naheola</plant_name>
    <state>AL</state>
    <county>Choctaw</county>
    <operator>Georgia-Pacific Consr Prods LP-Naheola</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>87.5</nameplate_mw>
    <summer_mw>66.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2019</latest_year>
    <lat>32.2268</lat>
    <lon>-88.0252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56634</plant_id>
    <plant_name>Cohocton Wind Project</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>87.5</nameplate_mw>
    <summer_mw>87.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.45</lat>
    <lon>-77.52</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59145</plant_id>
    <plant_name>Freeport LP Pretreatment Facility</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Freeport LNG Development L.P</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>87</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>28.979167</lat>
    <lon>-95.30694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>9</plant_id>
    <plant_name>Copper</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>86.9</nameplate_mw>
    <summer_mw>63</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>31.7569</lat>
    <lon>-106.375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10156</plant_id>
    <plant_name>Fresno Cogen Partners</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>86.8</nameplate_mw>
    <summer_mw>86.8</summer_mw>
    <battery_mwh>16</battery_mwh>
    <first_year>2001</first_year>
    <latest_year>2023</latest_year>
    <lat>36.617022</lat>
    <lon>-120.0998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>760</plant_id>
    <plant_name>Allatoona</plant_name>
    <state>GA</state>
    <county>Bartow</county>
    <operator>USCE-Mobile District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>86.6</nameplate_mw>
    <summer_mw>72</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1950</latest_year>
    <lat>34.1637</lat>
    <lon>-84.7282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>512</plant_id>
    <plant_name>Blue Mesa</plant_name>
    <state>CO</state>
    <county>Gunnison</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>86.4</nameplate_mw>
    <summer_mw>86.4</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>38.453191</lat>
    <lon>-107.3375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62165</plant_id>
    <plant_name>Snipesville</plant_name>
    <state>GA</state>
    <county>Jeff Davis</county>
    <operator>SR Snipesville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>86</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.715814</lat>
    <lon>-82.74946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67701</plant_id>
    <plant_name>Ashwood Solar I</plant_name>
    <state>KY</state>
    <county>Lyon</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>86</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.02343</lat>
    <lon>-88.08052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60049</plant_id>
    <plant_name>Golden Hills Wind</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Golden Hills Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>85.9</nameplate_mw>
    <summer_mw>85.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.713311</lat>
    <lon>-121.6404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55977</plant_id>
    <plant_name>Bluffview</plant_name>
    <state>NM</state>
    <county>San Juan</county>
    <operator>City of Farmington - (NM)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>85.8</nameplate_mw>
    <summer_mw>76</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2025</latest_year>
    <lat>36.716628</lat>
    <lon>-108.2153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10690</plant_id>
    <plant_name>ExxonMobil Baton Rouge Turbine Generator</plant_name>
    <state>LA</state>
    <county>East Baton Rouge</county>
    <operator>Exxon Mobil Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>85.3</nameplate_mw>
    <summer_mw>80.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>30.489722</lat>
    <lon>-91.18722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50846</plant_id>
    <plant_name>Atlantic Alumina, Gramercy Operations</plant_name>
    <state>LA</state>
    <county>St James</county>
    <operator>Atalco Gramercy LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>85.3</nameplate_mw>
    <summer_mw>76</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1974</latest_year>
    <lat>30.054</lat>
    <lon>-90.6693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>124</plant_id>
    <plant_name>Demoss Petrie</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>85</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>32.252273</lat>
    <lon>-110.9921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10627</plant_id>
    <plant_name>Pine Bluff Mill</plant_name>
    <state>AR</state>
    <county>Jefferson</county>
    <operator>Suzano Packaging LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>85</nameplate_mw>
    <summer_mw>60.9</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1962</latest_year>
    <lat>34.221213</lat>
    <lon>-91.90737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60185</plant_id>
    <plant_name>Solverde 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>85</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.655694</lat>
    <lon>-118.2982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66500</plant_id>
    <plant_name>Valley Center 85</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Terra-Gen Operating Co-BESS 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>85</nameplate_mw>
    <summer_mw>85</summer_mw>
    <battery_mwh>212</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.227236</lat>
    <lon>-117.0177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67455</plant_id>
    <plant_name>Scatter Wash 2</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Scatter Wash Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>85</nameplate_mw>
    <summer_mw>85</summer_mw>
    <battery_mwh>340</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.712234</lat>
    <lon>-112.082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68786</plant_id>
    <plant_name>Choctaw Fields Solar Project</plant_name>
    <state>OK</state>
    <county>Choctaw</county>
    <operator>Choctaw Fields Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>85</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.030703</lat>
    <lon>-95.32214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6058</plant_id>
    <plant_name>Cascade Creek</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Rochester Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>84.9</nameplate_mw>
    <summer_mw>77.4</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2002</latest_year>
    <lat>44.0322</lat>
    <lon>-92.4908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60467</plant_id>
    <plant_name>Red Rock</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>84.9</nameplate_mw>
    <summer_mw>84.9</summer_mw>
    <battery_mwh>164</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2023</latest_year>
    <lat>32.551026</lat>
    <lon>-111.2892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50969</plant_id>
    <plant_name>MU Combined Heat and Power Plant</plant_name>
    <state>MO</state>
    <county>Boone</county>
    <operator>Curators of the University of Missouri</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>84.7</nameplate_mw>
    <summer_mw>70.8</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2017</latest_year>
    <lat>38.9461</lat>
    <lon>-92.3328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54358</plant_id>
    <plant_name>Clearwater Paper Corporation - Augusta</plant_name>
    <state>GA</state>
    <county>Richmond</county>
    <operator>Clearwater Paper Corporation - Augusta</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>84.7</nameplate_mw>
    <summer_mw>79.3</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1965</latest_year>
    <lat>33.328259</lat>
    <lon>-81.95308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3915</plant_id>
    <plant_name>Cushman 2</plant_name>
    <state>WA</state>
    <county>Mason</county>
    <operator>City of Tacoma - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>84.6</nameplate_mw>
    <summer_mw>93.6</summer_mw>
    <first_year>1930</first_year>
    <latest_year>2013</latest_year>
    <lat>47.3698</lat>
    <lon>-123.1603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64929</plant_id>
    <plant_name>Edwards Sanborn S1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>84.6</nameplate_mw>
    <summer_mw>84.6</summer_mw>
    <battery_mwh>83.5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.02769</lat>
    <lon>-118.1328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2935</plant_id>
    <plant_name>Orrville</plant_name>
    <state>OH</state>
    <county>Wayne</county>
    <operator>City of Orrville - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>84.5</nameplate_mw>
    <summer_mw>78.5</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1971</latest_year>
    <lat>40.850964</lat>
    <lon>-81.76576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59993</plant_id>
    <plant_name>Babcock Solar Energy Center Hybrid</plant_name>
    <state>FL</state>
    <county>Charlotte</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>84.5</nameplate_mw>
    <summer_mw>84.5</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2018</latest_year>
    <lat>26.861592</lat>
    <lon>-81.75101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57953</plant_id>
    <plant_name>Roquette America</plant_name>
    <state>IA</state>
    <county>Lee</county>
    <operator>Roquette America</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Coke</technologies>
    <generators>3</generators>
    <nameplate_mw>84.4</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2007</latest_year>
    <lat>40.389167</lat>
    <lon>-91.39417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67421</plant_id>
    <plant_name>Cavalier Solar A2</plant_name>
    <state>VA</state>
    <county>Isle of Wight</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>84.4</nameplate_mw>
    <summer_mw>84.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.018</lat>
    <lon>-76.7358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50028</plant_id>
    <plant_name>Plant 31 Paper Mill</plant_name>
    <state>LA</state>
    <county>Ouachita</county>
    <operator>Graphic Packaging International</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>84.2</nameplate_mw>
    <summer_mw>77</summer_mw>
    <first_year>1964</first_year>
    <latest_year>2016</latest_year>
    <lat>32.486787</lat>
    <lon>-92.1496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10319</plant_id>
    <plant_name>Geismar</plant_name>
    <state>LA</state>
    <county>Ascension</county>
    <operator>BASF Corporation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>84.1</nameplate_mw>
    <summer_mw>80.1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2005</latest_year>
    <lat>30.2</lat>
    <lon>-91</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2714</plant_id>
    <plant_name>Tillery</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>85</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1960</latest_year>
    <lat>35.206741</lat>
    <lon>-80.06483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6635</plant_id>
    <plant_name>A L Pierce</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>MPH AL Pierce, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>74.1</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>41.44823</lat>
    <lon>-72.83488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6789</plant_id>
    <plant_name>St Stephen</plant_name>
    <state>SC</state>
    <county>Berkeley</county>
    <operator>US Army Corps of Engineers</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>84</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>33.4261</lat>
    <lon>-79.93</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54656</plant_id>
    <plant_name>International Paper Riegelwood Mill</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>GCF - Riegelwood Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>84.5</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2024</latest_year>
    <lat>34.3533</lat>
    <lon>-78.2137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56457</plant_id>
    <plant_name>Post Wind Farm LP</plant_name>
    <state>TX</state>
    <county>Borden</county>
    <operator>FPL Energy Red Canyon LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>84</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>32.92544</lat>
    <lon>-101.2194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66772</plant_id>
    <plant_name>Estrella Solar &amp; Storage</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>84</nameplate_mw>
    <summer_mw>84</summer_mw>
    <battery_mwh>112</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.807789</lat>
    <lon>-118.3165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56787</plant_id>
    <plant_name>Geismar Cogen</plant_name>
    <state>LA</state>
    <county>Ascension</county>
    <operator>Air Liquide Large Industries U S LP</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>83.9</nameplate_mw>
    <summer_mw>72.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>30.209</lat>
    <lon>-90.9921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52130</plant_id>
    <plant_name>Whiting Refinery</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>BP PLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>5</generators>
    <nameplate_mw>83.8</nameplate_mw>
    <summer_mw>88.6</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1980</latest_year>
    <lat>41.6703</lat>
    <lon>-87.4803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2176</plant_id>
    <plant_name>Glendive GT</plant_name>
    <state>MT</state>
    <county>Dawson</county>
    <operator>Montana-Dakota Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>83.7</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>1979</first_year>
    <latest_year>2003</latest_year>
    <lat>47.0539</lat>
    <lon>-104.74</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55122</plant_id>
    <plant_name>NAFTA Region Olefins Complex Cogen Fac</plant_name>
    <state>TX</state>
    <county>Jefferson</county>
    <operator>BASF Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>83.2</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>29.954321</lat>
    <lon>-93.88359</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7799</plant_id>
    <plant_name>West Marinette 34</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>83</nameplate_mw>
    <summer_mw>70.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>45.0869</lat>
    <lon>-87.6892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62505</plant_id>
    <plant_name>G.S.E. One LLC</plant_name>
    <state>TX</state>
    <county>Fannin</county>
    <operator>GSEone</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>83</nameplate_mw>
    <summer_mw>82.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.500378</lat>
    <lon>-96.14649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67171</plant_id>
    <plant_name>Foxhound</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Foxhound Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>83</nameplate_mw>
    <summer_mw>83</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.875897</lat>
    <lon>-78.74187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>812</plant_id>
    <plant_name>C J Strike</plant_name>
    <state>ID</state>
    <county>Owyhee</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>82.8</nameplate_mw>
    <summer_mw>95.4</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>42.944869</lat>
    <lon>-115.9779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1557</plant_id>
    <plant_name>Philadelphia</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>Constellation Power Source Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>82.8</nameplate_mw>
    <summer_mw>59.7</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>39.2986</lat>
    <lon>-76.5636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3799</plant_id>
    <plant_name>Low Moor</plant_name>
    <state>VA</state>
    <county>Alleghany</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>82.8</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>37.777</lat>
    <lon>-79.892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3800</plant_id>
    <plant_name>Northern Neck</plant_name>
    <state>VA</state>
    <county>Richmond</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>82.8</nameplate_mw>
    <summer_mw>47</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>37.95</lat>
    <lon>-76.711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7335</plant_id>
    <plant_name>Richmond</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>82.8</nameplate_mw>
    <summer_mw>68</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>39.839572</lat>
    <lon>-84.96568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50250</plant_id>
    <plant_name>International Paper Pensacola</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>International Paper Co-Pensacola</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>82.8</nameplate_mw>
    <summer_mw>76</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>30.5966</lat>
    <lon>-87.3264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55747</plant_id>
    <plant_name>NWP Indian Mesa Wind Farm</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>NWP Indian Mesa Wind Farm LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>82.5</nameplate_mw>
    <summer_mw>82.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>30.931467</lat>
    <lon>-102.2014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58378</plant_id>
    <plant_name>Petra Nova Carbon Capture Cogen</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Petra Nova Power I LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>82.2</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.475278</lat>
    <lon>-95.63417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54004</plant_id>
    <plant_name>WestRock Southeast, LLC.</plant_name>
    <state>GA</state>
    <county>Laurens</county>
    <operator>WestRock Southeast, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>82.1</nameplate_mw>
    <summer_mw>84</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>32.5036</lat>
    <lon>-82.8443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6131</plant_id>
    <plant_name>Jones Bluff</plant_name>
    <state>AL</state>
    <county>Autauga</county>
    <operator>USCE-Mobile District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>82</nameplate_mw>
    <summer_mw>82</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1975</latest_year>
    <lat>32.324242</lat>
    <lon>-86.78432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55796</plant_id>
    <plant_name>Woodward Mountain I</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Pecos Wind I LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>82</nameplate_mw>
    <summer_mw>82</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>30.9514</lat>
    <lon>-102.4141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56188</plant_id>
    <plant_name>Pinelawn Power LLC</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Pinelawn Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>82</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>40.736611</lat>
    <lon>-73.38842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67573</plant_id>
    <plant_name>Happy Valley Battery Storage</plant_name>
    <state>ID</state>
    <county>Canyon</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>82</nameplate_mw>
    <summer_mw>82</summer_mw>
    <battery_mwh>328</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.550707</lat>
    <lon>-116.5116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67579</plant_id>
    <plant_name>AES ES Alamitos 2 LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>82</nameplate_mw>
    <summer_mw>82</summer_mw>
    <battery_mwh>328</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.770287</lat>
    <lon>-118.1</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>285</plant_id>
    <plant_name>Stanislaus</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>81.9</nameplate_mw>
    <summer_mw>91</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>38.139048</lat>
    <lon>-120.3703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50633</plant_id>
    <plant_name>Mosaic Co Bartow Facility</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Mosaic Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>81.9</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1992</latest_year>
    <lat>27.908</lat>
    <lon>-81.9185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57038</plant_id>
    <plant_name>Bison I Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>81.8</nameplate_mw>
    <summer_mw>81.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2012</latest_year>
    <lat>46.98</lat>
    <lon>-101.5547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1235</plant_id>
    <plant_name>Great Bend - Sunflower</plant_name>
    <state>KS</state>
    <county>Barton</county>
    <operator>Sunflower Electric Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>81.6</nameplate_mw>
    <summer_mw>99.8</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>38.41</lat>
    <lon>-98.8689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58020</plant_id>
    <plant_name>Beebe 1A</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>Beebe Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>81.6</nameplate_mw>
    <summer_mw>81.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.256944</lat>
    <lon>-84.49972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10610</plant_id>
    <plant_name>Georgia-Pacific Monticello Paper</plant_name>
    <state>MS</state>
    <county>Lawrence</county>
    <operator>Georgia-Pacific Monticello LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>81.5</nameplate_mw>
    <summer_mw>81.5</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>31.6285</lat>
    <lon>-90.0809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6595</plant_id>
    <plant_name>Toledo Bend</plant_name>
    <state>TX</state>
    <county>Newton</county>
    <operator>Entergy Texas Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>81</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>31.173484</lat>
    <lon>-93.56588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56619</plant_id>
    <plant_name>Ellenburg</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Valcour Operating Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>81</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>44.8914</lat>
    <lon>-74.0061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56947</plant_id>
    <plant_name>Elkhorn Ridge Wind LLC</plant_name>
    <state>NE</state>
    <county>Knox</county>
    <operator>Elkhorn Ridge Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>81</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.6978</lat>
    <lon>-97.6189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58111</plant_id>
    <plant_name>Bishop Hill II Wind Farm</plant_name>
    <state>IL</state>
    <county>Henry</county>
    <operator>Bishop Hill Energy II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>81</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.2325</lat>
    <lon>-90.17417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58833</plant_id>
    <plant_name>Red Horse 2</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>Red Horse 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>81</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>32.286111</lat>
    <lon>-110.0881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61262</plant_id>
    <plant_name>Stuttgart Solar</plant_name>
    <state>AR</state>
    <county>Arkansas</county>
    <operator>Stuttgart Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>81</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.439722</lat>
    <lon>-91.44</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65334</plant_id>
    <plant_name>Platteview Solar LLC</plant_name>
    <state>NE</state>
    <county>Saunders</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>81</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.190999</lat>
    <lon>-96.37942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55966</plant_id>
    <plant_name>Nikiski Combined Cycle</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Homer Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>80.8</nameplate_mw>
    <summer_mw>75.9</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2013</latest_year>
    <lat>60.676539</lat>
    <lon>-151.3777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62544</plant_id>
    <plant_name>Wilkinson Solar LLC</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80.6</nameplate_mw>
    <summer_mw>80.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.596814</lat>
    <lon>-76.76385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56372</plant_id>
    <plant_name>Sweetwater Wind 5</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80.5</nameplate_mw>
    <summer_mw>80.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>32.236944</lat>
    <lon>-100.4833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>196</plant_id>
    <plant_name>Norfork</plant_name>
    <state>AR</state>
    <county>Baxter</county>
    <operator>USCE-Little Rock District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>80.4</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1944</first_year>
    <latest_year>1950</latest_year>
    <lat>36.2491</lat>
    <lon>-92.2401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54780</plant_id>
    <plant_name>University of Illinois Abbott Power Plt</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>University of Illinois</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>11</generators>
    <nameplate_mw>80.3</nameplate_mw>
    <summer_mw>79.3</summer_mw>
    <first_year>1940</first_year>
    <latest_year>2004</latest_year>
    <lat>40.105169</lat>
    <lon>-88.24153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55287</plant_id>
    <plant_name>Storm Lake II</plant_name>
    <state>IA</state>
    <county>Buena Vista</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80.2</nameplate_mw>
    <summer_mw>76.5</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>42.8417</lat>
    <lon>-95.405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>266</plant_id>
    <plant_name>Pit 3</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>80.1</nameplate_mw>
    <summer_mw>69.9</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>40.997448</lat>
    <lon>-121.7481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3080</plant_id>
    <plant_name>Green Peter</plant_name>
    <state>OR</state>
    <county>Linn</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>44.4494</lat>
    <lon>-122.5494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50127</plant_id>
    <plant_name>Signal Hill Generating LLC</plant_name>
    <state>TX</state>
    <county>Wichita</county>
    <operator>Signal Hill Generating LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>76.1</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>33.8625</lat>
    <lon>-98.5894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55579</plant_id>
    <plant_name>Llano Estacado Wind Ranch</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>Llano Estacado Wind Ranch</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>35.4677</lat>
    <lon>-101.2533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55804</plant_id>
    <plant_name>Old Gold Energy Center, LLC</plant_name>
    <state>IA</state>
    <county>Worth</county>
    <operator>Old Gold Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>43.3833</lat>
    <lon>-93.4167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56015</plant_id>
    <plant_name>Walton Bainbridge Power Facility</plant_name>
    <state>GA</state>
    <county>Decatur</county>
    <operator>Walton Bainbridge LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>74</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>30.910985</lat>
    <lon>-84.5473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56248</plant_id>
    <plant_name>Shell Chemical</plant_name>
    <state>LA</state>
    <county>Ascension</county>
    <operator>Shell Chemical LP - Geismar</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>69</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>30.187508</lat>
    <lon>-90.98396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56253</plant_id>
    <plant_name>Millcreek Power Generation</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>City of St George - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>73.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2010</latest_year>
    <lat>37.112092</lat>
    <lon>-113.5166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56333</plant_id>
    <plant_name>Gauley River Power Partners</plant_name>
    <state>WV</state>
    <county>Nicholas</county>
    <operator>Central Rivers Power WV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.21921</lat>
    <lon>-80.89061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56383</plant_id>
    <plant_name>Northern Iowa Windpower II</plant_name>
    <state>IA</state>
    <county>Worth</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.3608</lat>
    <lon>-93.2978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56450</plant_id>
    <plant_name>GSG LLC</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>41.643611</lat>
    <lon>-89.17306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56451</plant_id>
    <plant_name>Allegheny Ridge Wind Farm</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.383889</lat>
    <lon>-78.57944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56677</plant_id>
    <plant_name>Charles City Wind Farm</plant_name>
    <state>IA</state>
    <county>Floyd</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.0003</lat>
    <lon>-92.62</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56753</plant_id>
    <plant_name>Mountain Wind Power II LLC</plant_name>
    <state>WY</state>
    <county>Uinta</county>
    <operator>Mountain Wind Power II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.263889</lat>
    <lon>-110.5444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56832</plant_id>
    <plant_name>North Brawley Geothermal Plant</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>5</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>53.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>33.0139</lat>
    <lon>-115.5439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57976</plant_id>
    <plant_name>Pocahontas Prairie Wind Farm</plant_name>
    <state>IA</state>
    <county>Pocahontas</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.568056</lat>
    <lon>-94.65806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58660</plant_id>
    <plant_name>Utah Red Hills Renewable Energy Park</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.882778</lat>
    <lon>-112.9042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59187</plant_id>
    <plant_name>Beethoven Wind</plant_name>
    <state>SD</state>
    <county>Bon Homme</county>
    <operator>NorthWestern Energy - (SD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>43.16</lat>
    <lon>-98.08</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59244</plant_id>
    <plant_name>Lorenzo Wind</plant_name>
    <state>TX</state>
    <county>Crosby</county>
    <operator>Lorenzo Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.699167</lat>
    <lon>-101.5247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59386</plant_id>
    <plant_name>Enterprise Solar, LLC</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Clearway Renewable Operation &amp; Maintenance LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.641111</lat>
    <lon>-113.6125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59387</plant_id>
    <plant_name>Escalante Solar I, LLC</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Clearway Renewable Operation &amp; Maintenance LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.524167</lat>
    <lon>-113.0339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59388</plant_id>
    <plant_name>Escalante Solar II, LLC</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Clearway Renewable Operation &amp; Maintenance LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.500833</lat>
    <lon>-113.03</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59389</plant_id>
    <plant_name>Escalante Solar III, LLC</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Clearway Renewable Operation &amp; Maintenance LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.497778</lat>
    <lon>-112.9869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59450</plant_id>
    <plant_name>Decatur Parkway Solar Project, LLC</plant_name>
    <state>GA</state>
    <county>Decatur</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>30.991944</lat>
    <lon>-84.63389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59941</plant_id>
    <plant_name>Iron Springs Solar, LLC</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Clearway Renewable Operation &amp; Maintenance LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.7212</lat>
    <lon>-113.1516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59944</plant_id>
    <plant_name>Conetoe II Solar, LLC</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.822</lat>
    <lon>-77.481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59946</plant_id>
    <plant_name>Granite Mountain Solar East, LLC</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Clearway Renewable Operation &amp; Maintenance LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.77509</lat>
    <lon>-113.2264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60068</plant_id>
    <plant_name>Grand View Solar Two</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Grand View PV Solar Two, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.989614</lat>
    <lon>-116.0934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60127</plant_id>
    <plant_name>Eastern Shore Solar, LLC</plant_name>
    <state>VA</state>
    <county>Accomack</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.943895</lat>
    <lon>-75.56956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60259</plant_id>
    <plant_name>Pioneer Wind Park, LLC</plant_name>
    <state>WY</state>
    <county>Converse</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.728198</lat>
    <lon>-105.8668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60432</plant_id>
    <plant_name>Three Peaks Power</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.827082</lat>
    <lon>-113.1371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61991</plant_id>
    <plant_name>Pioneer Solar (CO), LLC</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Pioneer Solar (CO), LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.761569</lat>
    <lon>-104.459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62177</plant_id>
    <plant_name>Desert Harvest, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Desert Harvest, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.8</lat>
    <lon>-115.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62666</plant_id>
    <plant_name>Sigurd Solar LLC</plant_name>
    <state>UT</state>
    <county>Sevier</county>
    <operator>Sigurd Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.850544</lat>
    <lon>-112.0052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62768</plant_id>
    <plant_name>Piney Creek Solar</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.818554</lat>
    <lon>-78.77189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62813</plant_id>
    <plant_name>Grasshopper Solar</plant_name>
    <state>VA</state>
    <county>Mecklenburg</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.85</lat>
    <lon>-78.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62939</plant_id>
    <plant_name>South Peak Wind</plant_name>
    <state>MT</state>
    <county>Judith Basin</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>47.329911</lat>
    <lon>-110.6146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63061</plant_id>
    <plant_name>Clover Creek Solar Community Solar</plant_name>
    <state>UT</state>
    <county>Juab</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.840652</lat>
    <lon>-111.8877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63549</plant_id>
    <plant_name>Water Strider Solar</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.016375</lat>
    <lon>-79.02706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63745</plant_id>
    <plant_name>Greensville County Solar Project, LLC</plant_name>
    <state>VA</state>
    <county>Greensville</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.64</lat>
    <lon>-77.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63797</plant_id>
    <plant_name>Ellis Solar LLC</plant_name>
    <state>TX</state>
    <county>Ellis</county>
    <operator>174 Power Global Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.467194</lat>
    <lon>-97.05433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63843</plant_id>
    <plant_name>Johanna Energy Center, LLC</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Johanna Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>33.715016</lat>
    <lon>-117.854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63983</plant_id>
    <plant_name>Rocket Solar, LLC</plant_name>
    <state>UT</state>
    <county>Box Elder</county>
    <operator>Rocket Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.63628</lat>
    <lon>-112.4441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64019</plant_id>
    <plant_name>Altavista Solar</plant_name>
    <state>VA</state>
    <county>Campbell</county>
    <operator>Altavista Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.148199</lat>
    <lon>-79.3475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64032</plant_id>
    <plant_name>MTSUN</plant_name>
    <state>MT</state>
    <county>Yellowstone</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.856</lat>
    <lon>-108.602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64144</plant_id>
    <plant_name>Harts Mill Solar, LLC</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>Harts Mills Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.9</lat>
    <lon>-77.64</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64150</plant_id>
    <plant_name>Lancaster Solar GA</plant_name>
    <state>GA</state>
    <county>Randolph</county>
    <operator>Lancaster Solar GA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.766506</lat>
    <lon>-84.79721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64186</plant_id>
    <plant_name>Graphite Solar I</plant_name>
    <state>UT</state>
    <county>Carbon</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.54844</lat>
    <lon>-110.7121</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64189</plant_id>
    <plant_name>Apex Solar</plant_name>
    <state>MT</state>
    <county>Beaverhead</county>
    <operator>Apex Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.236</lat>
    <lon>-112.746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64469</plant_id>
    <plant_name>Wing</plant_name>
    <state>AL</state>
    <county>Covington</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.007777</lat>
    <lon>-86.59194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64662</plant_id>
    <plant_name>Sac County Wind, LLC</plant_name>
    <state>IA</state>
    <county>Sac</county>
    <operator>Sac County Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.421154</lat>
    <lon>-94.99508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64739</plant_id>
    <plant_name>Elektron Solar, LLC</plant_name>
    <state>UT</state>
    <county>Tooele</county>
    <operator>Elektron Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.868271</lat>
    <lon>-112.7034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64968</plant_id>
    <plant_name>Fall River Solar, LLC</plant_name>
    <state>SD</state>
    <county>Fall River</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.15523</lat>
    <lon>-103.3439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65215</plant_id>
    <plant_name>Nestlewood Solar</plant_name>
    <state>OH</state>
    <county>Clermont</county>
    <operator>Nestlewood Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.9255</lat>
    <lon>-84.0174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65933</plant_id>
    <plant_name>Sagebrush ESS</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-BESS 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.0477</lat>
    <lon>-118.2628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66025</plant_id>
    <plant_name>Blackwater Solar</plant_name>
    <state>GA</state>
    <county>Ware</county>
    <operator>Blackwater Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.394022</lat>
    <lon>-82.62505</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66173</plant_id>
    <plant_name>SR Ailey</plant_name>
    <state>GA</state>
    <county>Montgomery</county>
    <operator>SR Ailey, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.193594</lat>
    <lon>-82.53874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66267</plant_id>
    <plant_name>Steel Solar LLC</plant_name>
    <state>UT</state>
    <county>Box Elder</county>
    <operator>Steel Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.88605</lat>
    <lon>-112.1817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66384</plant_id>
    <plant_name>Ostrea Solar, LLC</plant_name>
    <state>WA</state>
    <county>Yakima</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>46.52884</lat>
    <lon>-119.9792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66542</plant_id>
    <plant_name>Bulldog Solar LLC</plant_name>
    <state>GA</state>
    <county>Warren</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.371</lat>
    <lon>-82.678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66634</plant_id>
    <plant_name>Adams Solar LLC PA</plant_name>
    <state>PA</state>
    <county>Adams</county>
    <operator>Adams Solar LLC (PA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.879553</lat>
    <lon>-77.19723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66757</plant_id>
    <plant_name>Bottleneck Energy Storage</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>VESI 12 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.838361</lat>
    <lon>-119.0884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67021</plant_id>
    <plant_name>CPV Stagecoach Solar</plant_name>
    <state>GA</state>
    <county>Macon</county>
    <operator>CPV Stagecoach Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.197779</lat>
    <lon>-84.06931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67261</plant_id>
    <plant_name>Goose Prairie Solar</plant_name>
    <state>WA</state>
    <county>Yakima</county>
    <operator>Goose Prairie Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.52923</lat>
    <lon>-120.2395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67510</plant_id>
    <plant_name>Lockhart Solar PV IV, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Terra-Gen Operating Co-Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.031908</lat>
    <lon>-117.3379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67941</plant_id>
    <plant_name>Pine River Solar Park</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.431156</lat>
    <lon>-84.68356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67957</plant_id>
    <plant_name>East Atmore Solar</plant_name>
    <state>AL</state>
    <county>Escambia</county>
    <operator>Nofar USA Energy Investments and Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.020358</lat>
    <lon>-87.35839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68001</plant_id>
    <plant_name>Old Hayneville Solar, LLC</plant_name>
    <state>AL</state>
    <county>Montgomery</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.317562</lat>
    <lon>-86.41123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68488</plant_id>
    <plant_name>Garnet Mesa Solar</plant_name>
    <state>CO</state>
    <county>Delta</county>
    <operator>Garnet Mesa Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.740617</lat>
    <lon>-107.9825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68494</plant_id>
    <plant_name>Shirk Energy Storage</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>VESI 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.350826</lat>
    <lon>-119.3735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68549</plant_id>
    <plant_name>Pineview Solar, LLC</plant_name>
    <state>GA</state>
    <county>Wilcox</county>
    <operator>Pineview Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.995</lat>
    <lon>-83.544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68669</plant_id>
    <plant_name>Walker Springs II</plant_name>
    <state>AL</state>
    <county>Clarke</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.435022</lat>
    <lon>-87.70473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68670</plant_id>
    <plant_name>Walker Springs I</plant_name>
    <state>AL</state>
    <county>Clarke</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.435022</lat>
    <lon>-87.70473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68774</plant_id>
    <plant_name>Fountain Creek Solar</plant_name>
    <state>VA</state>
    <county>Greensville</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.59</lat>
    <lon>-77.67</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68854</plant_id>
    <plant_name>Angela Solar Project</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Angiola East LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.865642</lat>
    <lon>-119.4559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69041</plant_id>
    <plant_name>Iron Springs BESS</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Iron Springs BESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.728942</lat>
    <lon>-113.1498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69172</plant_id>
    <plant_name>Red Bud Solar Plant</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.077414</lat>
    <lon>-78.02241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69677</plant_id>
    <plant_name>Escalante BESS I</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Escalante BESS I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.51895</lat>
    <lon>-113.0285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69678</plant_id>
    <plant_name>Enterprise Storage</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Enterprise Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.635231</lat>
    <lon>-113.6018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69679</plant_id>
    <plant_name>Granite Mountain BESS East</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Granite Mountain BESS East LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.774253</lat>
    <lon>-113.2486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69858</plant_id>
    <plant_name>Pastoria Power Bank</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Pastoria Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>80</nameplate_mw>
    <summer_mw>80</summer_mw>
    <battery_mwh>320</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.959</lat>
    <lon>-118.8559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57262</plant_id>
    <plant_name>Laredo Ridge Wind LLC</plant_name>
    <state>NE</state>
    <county>Boone</county>
    <operator>NRG Energy Gas &amp; Wind Holdings Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.9</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.880278</lat>
    <lon>-98.02389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57593</plant_id>
    <plant_name>Broken Bow Wind LLC</plant_name>
    <state>NE</state>
    <county>Custer</county>
    <operator>Broken Bow Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.9</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.454722</lat>
    <lon>-99.56806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58979</plant_id>
    <plant_name>Copenhagen Wind Farm</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.9</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.913056</lat>
    <lon>-75.69861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63076</plant_id>
    <plant_name>Gutenberg Solar</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>79.9</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.486428</lat>
    <lon>-77.53483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10611</plant_id>
    <plant_name>Georgia-Pacific Palatka Operations</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>Georgia-Pacific Consr Ops LLC-Palatka</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>79.8</nameplate_mw>
    <summer_mw>69.7</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1993</latest_year>
    <lat>29.6807</lat>
    <lon>-81.6809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56560</plant_id>
    <plant_name>Porterhouse Wind (4) LLC</plant_name>
    <state>TX</state>
    <county>Hansford</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.8</nameplate_mw>
    <summer_mw>79.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>36.4144</lat>
    <lon>-101.3864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61041</plant_id>
    <plant_name>Roaring Brook, LLC</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.7</nameplate_mw>
    <summer_mw>79.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.709597</lat>
    <lon>-75.61622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61858</plant_id>
    <plant_name>Stillwater Wind, LLC</plant_name>
    <state>MT</state>
    <county>Stillwater</county>
    <operator>Pattern Operators LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.7</nameplate_mw>
    <summer_mw>79.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.86584</lat>
    <lon>-109.4766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58363</plant_id>
    <plant_name>Majestic II Wind</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>NextEra Energy Majestic Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.6</nameplate_mw>
    <summer_mw>79.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.386038</lat>
    <lon>-101.5786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56648</plant_id>
    <plant_name>Majestic 1 Wind Farm</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>NextEra Energy Majestic Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.5</nameplate_mw>
    <summer_mw>79.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>35.3919</lat>
    <lon>-101.53</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>269</plant_id>
    <plant_name>Pit 6</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>79.2</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>40.922568</lat>
    <lon>-121.9929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>427</plant_id>
    <plant_name>Ralston</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Placer County Water Agency - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>79.2</nameplate_mw>
    <summer_mw>86</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>39.000999</lat>
    <lon>-120.7251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57621</plant_id>
    <plant_name>Rising Tree Wind Farm</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Rising Tree Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.2</nameplate_mw>
    <summer_mw>79.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.0775</lat>
    <lon>-118.2183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57766</plant_id>
    <plant_name>Rockland Wind Farm</plant_name>
    <state>ID</state>
    <county>Power</county>
    <operator>Ridgeline Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79.2</nameplate_mw>
    <summer_mw>79.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.674722</lat>
    <lon>-112.9019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60583</plant_id>
    <plant_name>LaFayette Solar Farm</plant_name>
    <state>AL</state>
    <county>Chambers</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>79.2</nameplate_mw>
    <summer_mw>79.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.876313</lat>
    <lon>-85.38821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59827</plant_id>
    <plant_name>Playa Solar 1, LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>79</nameplate_mw>
    <summer_mw>79</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.408</lat>
    <lon>-114.908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63251</plant_id>
    <plant_name>Lone Tree Wind, LLC</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>79</nameplate_mw>
    <summer_mw>79</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.203214</lat>
    <lon>-89.60187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64196</plant_id>
    <plant_name>Assembly Solar III</plant_name>
    <state>MI</state>
    <county>Shiawassee</county>
    <operator>Assembly Solar III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>79</nameplate_mw>
    <summer_mw>79</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.022705</lat>
    <lon>-83.94273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1439</plant_id>
    <plant_name>Houma</plant_name>
    <state>LA</state>
    <county>Terrebonne</county>
    <operator>Terrebonne Parish Consol Gov't</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>78.9</nameplate_mw>
    <summer_mw>67.5</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1977</latest_year>
    <lat>29.5806</lat>
    <lon>-90.7225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58108</plant_id>
    <plant_name>International Paper Red River Mill</plant_name>
    <state>LA</state>
    <county>Natchitoches</county>
    <operator>Red River Mill Intl Paper Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>78.8</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>31.905833</lat>
    <lon>-93.1725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58594</plant_id>
    <plant_name>Steele Flats Wind Project LLC</plant_name>
    <state>NE</state>
    <county>Jefferson</county>
    <operator>Steele Flats Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78.8</nameplate_mw>
    <summer_mw>78.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.048889</lat>
    <lon>-96.95222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65106</plant_id>
    <plant_name>Phobos Solar, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Nofar USA Energy Investments and Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>78.8</nameplate_mw>
    <summer_mw>78.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.882921</lat>
    <lon>-78.15496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6463</plant_id>
    <plant_name>Ames GT</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>City of Ames - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>78.7</nameplate_mw>
    <summer_mw>41.9</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2005</latest_year>
    <lat>42.0272</lat>
    <lon>-93.5828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63842</plant_id>
    <plant_name>Trent River Solar, LLC</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>78.7</nameplate_mw>
    <summer_mw>78.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.9915</lat>
    <lon>-77.2514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2679</plant_id>
    <plant_name>Plant No 2 Freeport</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Village of Freeport - (NY)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>78.6</nameplate_mw>
    <summer_mw>65.8</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2004</latest_year>
    <lat>40.6447</lat>
    <lon>-73.5683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10642</plant_id>
    <plant_name>Covanta Hempstead</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Covanta Hempstead Company</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>78.6</nameplate_mw>
    <summer_mw>71.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.7389</lat>
    <lon>-73.5906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2001</plant_id>
    <plant_name>New Ulm</plant_name>
    <state>MN</state>
    <county>Brown</county>
    <operator>New Ulm Public Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>78.5</nameplate_mw>
    <summer_mw>70.6</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2001</latest_year>
    <lat>44.3159</lat>
    <lon>-94.4581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50628</plant_id>
    <plant_name>Paulsboro Refinery</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Paulsboro Refining Company - LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Other Gases; Petroleum Coke</technologies>
    <generators>4</generators>
    <nameplate_mw>78.5</nameplate_mw>
    <summer_mw>67.6</summer_mw>
    <first_year>1982</first_year>
    <latest_year>2006</latest_year>
    <lat>39.84</lat>
    <lon>-75.2583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59671</plant_id>
    <plant_name>Innovative Solar 46</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>78.5</nameplate_mw>
    <summer_mw>78.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.918194</lat>
    <lon>-78.94355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60061</plant_id>
    <plant_name>Citrus Solar Energy Center Hybrid</plant_name>
    <state>FL</state>
    <county>DeSoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>78.5</nameplate_mw>
    <summer_mw>78.5</summer_mw>
    <battery_mwh>16</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2018</latest_year>
    <lat>27.320919</lat>
    <lon>-81.80686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66543</plant_id>
    <plant_name>Cane Creek</plant_name>
    <state>MS</state>
    <county>Clarke</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>78.5</nameplate_mw>
    <summer_mw>78.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.976997</lat>
    <lon>-88.88758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66544</plant_id>
    <plant_name>Moonshot</plant_name>
    <state>MS</state>
    <county>Hancock</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>78.5</nameplate_mw>
    <summer_mw>78.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.437172</lat>
    <lon>-89.5029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61673</plant_id>
    <plant_name>Arkwright Summit Wind Farm LLC</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Arkwright Summit Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78.4</nameplate_mw>
    <summer_mw>78.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.414911</lat>
    <lon>-79.24268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>78</plant_id>
    <plant_name>Snettisham</plant_name>
    <state>AK</state>
    <county>Juneau</county>
    <operator>Alaska Electric Light &amp; Power Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>78.2</nameplate_mw>
    <summer_mw>78</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1990</latest_year>
    <lat>58.1415</lat>
    <lon>-133.737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57700</plant_id>
    <plant_name>Vasco Winds</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Vasco Winds, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78.2</nameplate_mw>
    <summer_mw>78.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>37.790833</lat>
    <lon>-121.7181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57701</plant_id>
    <plant_name>Montezuma Wind II</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>NextEra Energy Montezuma Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78.2</nameplate_mw>
    <summer_mw>78.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.116667</lat>
    <lon>-121.8219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57866</plant_id>
    <plant_name>Golden Spread Panhandle Wnd Rch</plant_name>
    <state>TX</state>
    <county>Oldham</county>
    <operator>Golden Spread Electric Cooperative, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78.2</nameplate_mw>
    <summer_mw>78.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.243611</lat>
    <lon>-102.21</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65521</plant_id>
    <plant_name>Longbow Solar, LLC</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>78.1</nameplate_mw>
    <summer_mw>78.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.289809</lat>
    <lon>-95.29861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>510</plant_id>
    <plant_name>Sonoma California Geothermal</plant_name>
    <state>CA</state>
    <county>Lake</county>
    <operator>Geysers Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>78</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>38.7903</lat>
    <lon>-122.7559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55795</plant_id>
    <plant_name>Woodward Mountain II</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Pecos Wind II LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78</nameplate_mw>
    <summer_mw>78</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>30.9514</lat>
    <lon>-102.4141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57072</plant_id>
    <plant_name>Granite City Works</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>United States Steel Granite City Works</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>PUR</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>78</nameplate_mw>
    <summer_mw>78</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.6972</lat>
    <lon>-90.1283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57242</plant_id>
    <plant_name>Mililani South Solar Farm</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Mililani I Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>78</nameplate_mw>
    <summer_mw>78</summer_mw>
    <battery_mwh>156</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>21.427916</lat>
    <lon>-158.0199</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58692</plant_id>
    <plant_name>Black Oak Wind Farm</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Black Oak Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78</nameplate_mw>
    <summer_mw>78</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.660833</lat>
    <lon>-95.01278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59654</plant_id>
    <plant_name>Sendero</plant_name>
    <state>TX</state>
    <county>Jim Hogg</county>
    <operator>Sendero Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78</nameplate_mw>
    <summer_mw>78</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>27.18</lat>
    <lon>-98.91667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68197</plant_id>
    <plant_name>Rocky Forge Wind</plant_name>
    <state>VA</state>
    <county>Botetourt</county>
    <operator>Rocky Forge Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>78</nameplate_mw>
    <summer_mw>78</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.710827</lat>
    <lon>-79.7196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>75</plant_id>
    <plant_name>Hank Nikkels Plant 1</plant_name>
    <state>AK</state>
    <county>Anchorage</county>
    <operator>Chugach Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>77.9</nameplate_mw>
    <summer_mw>62.4</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2012</latest_year>
    <lat>61.2221</lat>
    <lon>-149.8661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1005</plant_id>
    <plant_name>Markland</plant_name>
    <state>IN</state>
    <county>Switzerland</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>77.7</nameplate_mw>
    <summer_mw>53.7</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>38.7795</lat>
    <lon>-84.964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59629</plant_id>
    <plant_name>Jericho Rise Wind Farm LLC</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Jericho Rise Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>77.7</nameplate_mw>
    <summer_mw>77.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.888889</lat>
    <lon>-74.10333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54752</plant_id>
    <plant_name>International Paper Pine Hill Mill</plant_name>
    <state>AL</state>
    <county>Wilcox</county>
    <operator>International Paper Co.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>77.4</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1982</latest_year>
    <lat>31.9698</lat>
    <lon>-87.4806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55101</plant_id>
    <plant_name>Kalamazoo River Generating Station</plant_name>
    <state>MI</state>
    <county>Kalamazoo</county>
    <operator>CMS Generation MI Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>77.4</nameplate_mw>
    <summer_mw>72</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>42.281345</lat>
    <lon>-85.49496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>535</plant_id>
    <plant_name>McClellan (CA)</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>77</nameplate_mw>
    <summer_mw>77</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>38.652731</lat>
    <lon>-121.3933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3160</plant_id>
    <plant_name>Delaware Generating Station</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>77</nameplate_mw>
    <summer_mw>56</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1970</latest_year>
    <lat>39.968021</lat>
    <lon>-75.1252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50465</plant_id>
    <plant_name>Flint River Operations</plant_name>
    <state>GA</state>
    <county>Macon</county>
    <operator>GFC - Flint River Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>77</nameplate_mw>
    <summer_mw>77</summer_mw>
    <first_year>1980</first_year>
    <latest_year>2015</latest_year>
    <lat>32.2544</lat>
    <lon>-84.0667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64337</plant_id>
    <plant_name>Farmington Solar</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Farmington Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>77</nameplate_mw>
    <summer_mw>77</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.654659</lat>
    <lon>-70.10084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67093</plant_id>
    <plant_name>Mojave 16/17/18 BESS</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-BESS 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>77</nameplate_mw>
    <summer_mw>70.6</summer_mw>
    <battery_mwh>77</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.044166</lat>
    <lon>-118.2756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67850</plant_id>
    <plant_name>Arrowleaf Solar and Storage</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>ORNI 30 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>77</nameplate_mw>
    <summer_mw>77</summer_mw>
    <battery_mwh>140</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.0157</lat>
    <lon>-115.5129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7138</plant_id>
    <plant_name>Forked River</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Forked River Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>76.8</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>39.8154</lat>
    <lon>-74.2098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6292</plant_id>
    <plant_name>Bernice Lake</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Homer Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>76.7</nameplate_mw>
    <summer_mw>62.4</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1981</latest_year>
    <lat>60.6935</lat>
    <lon>-151.3874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50884</plant_id>
    <plant_name>Pinellas County Resource Recovery</plant_name>
    <state>FL</state>
    <county>Pinellas</county>
    <operator>FCC Environmental Services</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>76.5</nameplate_mw>
    <summer_mw>58.1</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1986</latest_year>
    <lat>27.8733</lat>
    <lon>-82.6741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60082</plant_id>
    <plant_name>White Oak Solar, LLC</plant_name>
    <state>GA</state>
    <county>Burke</county>
    <operator>White Oak Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>76.5</nameplate_mw>
    <summer_mw>76.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.036789</lat>
    <lon>-82.11129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1492</plant_id>
    <plant_name>Harris Hydro</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>76.4</nameplate_mw>
    <summer_mw>87.4</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1955</latest_year>
    <lat>45.4592</lat>
    <lon>-69.8658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56160</plant_id>
    <plant_name>Mendota Hills, LLC</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>76.2</nameplate_mw>
    <summer_mw>76.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.7194</lat>
    <lon>-89.0492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57400</plant_id>
    <plant_name>Smithland Hydroelectric Plant</plant_name>
    <state>KY</state>
    <county>Livingston</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>75.9</nameplate_mw>
    <summer_mw>75.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.169636</lat>
    <lon>-88.41952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56405</plant_id>
    <plant_name>Nevada Solar One</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Acciona Solar Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Thermal without Energy Storage</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Thermal without Energy Storage</technologies>
    <generators>1</generators>
    <nameplate_mw>75.7</nameplate_mw>
    <summer_mw>68.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.799798</lat>
    <lon>-114.9817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>899</plant_id>
    <plant_name>Moline</plant_name>
    <state>IL</state>
    <county>Rock Island</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>75.6</nameplate_mw>
    <summer_mw>63.2</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1970</latest_year>
    <lat>41.509959</lat>
    <lon>-90.53402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66920</plant_id>
    <plant_name>South Tampa Resilience Project</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>75.2</nameplate_mw>
    <summer_mw>72.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.863347</lat>
    <lon>-82.51738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>197</plant_id>
    <plant_name>Blakely Mountain</plant_name>
    <state>AR</state>
    <county>Garland</county>
    <operator>USCE -Vickburg District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>34.570984</lat>
    <lon>-93.19443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>321</plant_id>
    <plant_name>Big Creek 8</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>70.8</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1929</latest_year>
    <lat>37.2096</lat>
    <lon>-119.3289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>810</plant_id>
    <plant_name>Bliss (ID)</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>79.9</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1950</latest_year>
    <lat>42.913786</lat>
    <lon>-115.071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2987</plant_id>
    <plant_name>Webbers Falls</plant_name>
    <state>OK</state>
    <county>Muskogee</county>
    <operator>USCE-Tulsa District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>35.5531</lat>
    <lon>-95.1708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52142</plant_id>
    <plant_name>Mojave 3/4/5</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>67</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>35.0506</lat>
    <lon>-118.2572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52175</plant_id>
    <plant_name>CITGO Refinery Powerhouse</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>CITGO Petroleum Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>39.6</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1969</latest_year>
    <lat>30.1826</lat>
    <lon>-93.3234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56359</plant_id>
    <plant_name>Klondike Windpower II</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>81</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>45.571</lat>
    <lon>-120.593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56460</plant_id>
    <plant_name>Twin Buttes Wind Project</plant_name>
    <state>CO</state>
    <county>Bent</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>37.6735</lat>
    <lon>-102.8622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56651</plant_id>
    <plant_name>North Allegheny Windpower Project</plant_name>
    <state>PA</state>
    <county>Blair</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.4381</lat>
    <lon>-78.5436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58054</plant_id>
    <plant_name>Burgess BioPower</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>Berlin Station, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>67.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.471944</lat>
    <lon>-71.17528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59977</plant_id>
    <plant_name>RE Astoria 2</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RE Astoria 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.836649</lat>
    <lon>-118.4802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60058</plant_id>
    <plant_name>River Bend Solar, LLC (AL)</plant_name>
    <state>AL</state>
    <county>Lauderdale</county>
    <operator>River Bend Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.831511</lat>
    <lon>-87.8422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61040</plant_id>
    <plant_name>Twin Buttes II Wind</plant_name>
    <state>CO</state>
    <county>Prowers</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.773</lat>
    <lon>-102.546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62012</plant_id>
    <plant_name>Pleinmont Solar 1</plant_name>
    <state>VA</state>
    <county>Spotsylvania</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.247123</lat>
    <lon>-77.78622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62679</plant_id>
    <plant_name>Palmetto Plains</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>Cubico USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.340179</lat>
    <lon>-80.69734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62828</plant_id>
    <plant_name>TWE Bowman Solar Project</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>73.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.316159</lat>
    <lon>-80.68244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63271</plant_id>
    <plant_name>Huntley</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>Cubico USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.335583</lat>
    <lon>-80.63417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63808</plant_id>
    <plant_name>Allora Solar, LLC</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>Nofar USA Energy Investments and Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.899338</lat>
    <lon>-81.40047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63810</plant_id>
    <plant_name>Centerfield Cooper Solar, LLC</plant_name>
    <state>SC</state>
    <county>Chesterfield</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.708762</lat>
    <lon>-80.11884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63813</plant_id>
    <plant_name>Gunsight Solar, LLC</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>Nofar USA Energy Investments and Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.761136</lat>
    <lon>-81.06671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63984</plant_id>
    <plant_name>Horseshoe Solar, LLC</plant_name>
    <state>UT</state>
    <county>Tooele</county>
    <operator>Horseshoe Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.71828</lat>
    <lon>-112.6658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64448</plant_id>
    <plant_name>Wythe County Solar</plant_name>
    <state>VA</state>
    <county>Wythe</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.876</lat>
    <lon>-80.837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65012</plant_id>
    <plant_name>Crawfish River</plant_name>
    <state>WI</state>
    <county>Jefferson</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43</lat>
    <lon>-88.8764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65231</plant_id>
    <plant_name>Hunter Solar, LLC (CO)</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Hunter Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.626617</lat>
    <lon>-104.465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65395</plant_id>
    <plant_name>Hummingbird Energy Storage LLC</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Hummingbird Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <battery_mwh>75</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.239218</lat>
    <lon>-121.7793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65988</plant_id>
    <plant_name>Desert Peak Energy Storage II</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Desert Peak Energy Storage II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.9311</lat>
    <lon>-116.5719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66837</plant_id>
    <plant_name>Alton Post Office Solar</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Urban Grid Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.568918</lat>
    <lon>-79.03292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66841</plant_id>
    <plant_name>Foxglove Solar</plant_name>
    <state>VA</state>
    <county>Frederick</county>
    <operator>Urban Grid Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.073825</lat>
    <lon>-78.28012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66885</plant_id>
    <plant_name>Baldy Mesa 2_Silver Peak Hybrid</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.609137</lat>
    <lon>-117.4537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67328</plant_id>
    <plant_name>Pluto Energy Storage</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Pluto Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.409631</lat>
    <lon>-112.4116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67712</plant_id>
    <plant_name>Constable BESS</plant_name>
    <state>OR</state>
    <county>Washington</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <battery_mwh>300</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.559046</lat>
    <lon>-122.9437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68060</plant_id>
    <plant_name>Catalina Solar (SC)</plant_name>
    <state>SC</state>
    <county>Saluda</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.902945</lat>
    <lon>-81.60149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68595</plant_id>
    <plant_name>Whistling Duck I</plant_name>
    <state>FL</state>
    <county>Levy</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.472222</lat>
    <lon>-82.43088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69407</plant_id>
    <plant_name>Dogfish BESS</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Dogfish ESS Assets, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>75</nameplate_mw>
    <summer_mw>75</summer_mw>
    <battery_mwh>75</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.918661</lat>
    <lon>-102.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60030</plant_id>
    <plant_name>Pecan Solar</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.481008</lat>
    <lon>-77.48116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61011</plant_id>
    <plant_name>Chestnut Solar</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.18</lat>
    <lon>-77.712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61790</plant_id>
    <plant_name>Shaw Creek Solar, LLC</plant_name>
    <state>SC</state>
    <county>Aiken</county>
    <operator>Shaw Creek Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.674689</lat>
    <lon>-81.75444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61807</plant_id>
    <plant_name>Hamilton Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Hamilton</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.444324</lat>
    <lon>-83.18694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61982</plant_id>
    <plant_name>Columbia Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Columbia</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.882644</lat>
    <lon>-82.69615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62543</plant_id>
    <plant_name>Trenton Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Gilchrist</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.635051</lat>
    <lon>-82.84309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63517</plant_id>
    <plant_name>Santa Fe Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Columbia</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.880408</lat>
    <lon>-82.73259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63518</plant_id>
    <plant_name>Twin Rivers Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Hamilton</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.466428</lat>
    <lon>-82.96872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63982</plant_id>
    <plant_name>Charlie Creek Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Hardee</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.639778</lat>
    <lon>-81.65437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64145</plant_id>
    <plant_name>Bay Trail Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Citrus</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.99999</lat>
    <lon>-82.67224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64146</plant_id>
    <plant_name>Sandy Creek Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Bay</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>30.103137</lat>
    <lon>-85.41039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64346</plant_id>
    <plant_name>Highland Solar South</plant_name>
    <state>FL</state>
    <county>Highlands</county>
    <operator>Placid Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.2664</lat>
    <lon>-81.4082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64533</plant_id>
    <plant_name>Fort Green Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Hardee</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.641125</lat>
    <lon>-81.94158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65170</plant_id>
    <plant_name>Hildreth Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Suwannee</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.964842</lat>
    <lon>-82.8232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65171</plant_id>
    <plant_name>Bay Ranch Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Bay</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.164754</lat>
    <lon>-85.49179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65172</plant_id>
    <plant_name>High Springs Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.810018</lat>
    <lon>-82.63984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65173</plant_id>
    <plant_name>Hardeetown Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Levy</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.48562</lat>
    <lon>-82.84346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65292</plant_id>
    <plant_name>Rice Creek</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.74118</lat>
    <lon>-81.69886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65501</plant_id>
    <plant_name>Mule Creek Renewable Energy Center</plant_name>
    <state>FL</state>
    <county>Bay</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.110543</lat>
    <lon>-85.39761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66553</plant_id>
    <plant_name>Winquepin Renewable Energy Center</plant_name>
    <state>FL</state>
    <county>Madison</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.282497</lat>
    <lon>-83.29823</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66639</plant_id>
    <plant_name>Falmouth Renewable Energy Center</plant_name>
    <state>FL</state>
    <county>Suwannee</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.3436</lat>
    <lon>-83.1562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66709</plant_id>
    <plant_name>Beulah Solar</plant_name>
    <state>SC</state>
    <county>Saluda</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.945207</lat>
    <lon>-81.57116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67049</plant_id>
    <plant_name>County Line Renewable Energy Center</plant_name>
    <state>FL</state>
    <county>Gilchrist</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.812218</lat>
    <lon>-82.67597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67692</plant_id>
    <plant_name>Sundance Renewable Energy Center</plant_name>
    <state>FL</state>
    <county>Madison</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.266826</lat>
    <lon>-83.29554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68052</plant_id>
    <plant_name>Bailey Mill Solar</plant_name>
    <state>FL</state>
    <county>Jefferson</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.409127</lat>
    <lon>-83.93336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68326</plant_id>
    <plant_name>SR Millington II</plant_name>
    <state>TN</state>
    <county>Shelby</county>
    <operator>SR Millington II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.358278</lat>
    <lon>-89.84577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68472</plant_id>
    <plant_name>Long Branch Solar</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.62574</lat>
    <lon>-82.17134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69354</plant_id>
    <plant_name>Rattler Solar Plant</plant_name>
    <state>FL</state>
    <county>Hernando</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>28.634293</lat>
    <lon>-82.2887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69355</plant_id>
    <plant_name>Half Moon Solar Plant</plant_name>
    <state>FL</state>
    <county>Sumter</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>28.955619</lat>
    <lon>-82.15959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69627</plant_id>
    <plant_name>Jumper Creek Solar Plant</plant_name>
    <state>FL</state>
    <county>Sumter</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.9</nameplate_mw>
    <summer_mw>74.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>28.954544</lat>
    <lon>-82.17652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3774</plant_id>
    <plant_name>Claytor</plant_name>
    <state>VA</state>
    <county>Pulaski</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>58.8</summer_mw>
    <first_year>1939</first_year>
    <latest_year>1939</latest_year>
    <lat>37.075</lat>
    <lon>-80.5847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57991</plant_id>
    <plant_name>Highland North Wind Farm</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>Exus Pennsylvania Wind Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.319561</lat>
    <lon>-78.68063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58580</plant_id>
    <plant_name>Pheasant Run Wind LLC</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Pheasant Run Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>43.757778</lat>
    <lon>-83.29778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58719</plant_id>
    <plant_name>Brookfield</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.757778</lat>
    <lon>-83.29778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59589</plant_id>
    <plant_name>Rutherford Farm</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.257778</lat>
    <lon>-81.83056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60785</plant_id>
    <plant_name>Tungsten Mountain</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Tungsten Mountain</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>53.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2023</latest_year>
    <lat>39.667002</lat>
    <lon>-117.6937</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60825</plant_id>
    <plant_name>Colgreen North Shore Solar Farm</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Sunpin Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.540124</lat>
    <lon>-115.9748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61610</plant_id>
    <plant_name>NC 102 Project LLC</plant_name>
    <state>NC</state>
    <county>Cabarrus</county>
    <operator>NC 102 Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.8</nameplate_mw>
    <summer_mw>74.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.2925</lat>
    <lon>-80.4975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50026</plant_id>
    <plant_name>Corpus Refinery</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Flint Hills Resources Corpus Christi LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>59.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2025</latest_year>
    <lat>27.8322</lat>
    <lon>-97.5281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54111</plant_id>
    <plant_name>Second Imperial Geothermal</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>ORCAL Geothermal, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>4</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>52.1</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2022</latest_year>
    <lat>32.7144</lat>
    <lon>-115.5356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61020</plant_id>
    <plant_name>Indian River Solar Center</plant_name>
    <state>FL</state>
    <county>Indian River</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.573256</lat>
    <lon>-80.57818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61021</plant_id>
    <plant_name>Horizon Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.665556</lat>
    <lon>-82.05833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61022</plant_id>
    <plant_name>Coral Farms Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.756944</lat>
    <lon>-81.89722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61024</plant_id>
    <plant_name>Hammock Solar</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>26.692646</lat>
    <lon>-81.32495</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61029</plant_id>
    <plant_name>Blue Cypress Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Indian River</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.609456</lat>
    <lon>-80.53719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61050</plant_id>
    <plant_name>Wildflower Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Desoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.316187</lat>
    <lon>-81.7839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61051</plant_id>
    <plant_name>Barefoot Bay Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.865833</lat>
    <lon>-80.52111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61052</plant_id>
    <plant_name>Loggerhead Solar Energy Center</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.237778</lat>
    <lon>-80.54139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61663</plant_id>
    <plant_name>Lithia Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.753272</lat>
    <lon>-82.16466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61766</plant_id>
    <plant_name>Miami Dade Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>25.64</lat>
    <lon>-80.49</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61767</plant_id>
    <plant_name>Pioneer Trail Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Volusia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.08</lat>
    <lon>-81.1</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61768</plant_id>
    <plant_name>Interstate Solar Energy Center</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.5</lat>
    <lon>-80.44</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62206</plant_id>
    <plant_name>Hibiscus Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>26.7601</lat>
    <lon>-80.3065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62394</plant_id>
    <plant_name>Sweetbay Solar Center</plant_name>
    <state>FL</state>
    <county>Martin</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>27.060112</lat>
    <lon>-80.47449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62491</plant_id>
    <plant_name>Okeechobee Solar</plant_name>
    <state>FL</state>
    <county>Okeechobee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>27.630392</lat>
    <lon>-80.79478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62493</plant_id>
    <plant_name>Southfork Solar</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>27.573193</lat>
    <lon>-82.19142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62542</plant_id>
    <plant_name>Debary Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Volusia</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.899548</lat>
    <lon>-81.33086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62631</plant_id>
    <plant_name>Blue Heron Solar</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>26.701639</lat>
    <lon>-81.12916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62632</plant_id>
    <plant_name>Cattle Ranch</plant_name>
    <state>FL</state>
    <county>DeSoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>27.321884</lat>
    <lon>-81.80908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62633</plant_id>
    <plant_name>Twin Lakes</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.612188</lat>
    <lon>-81.84453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62634</plant_id>
    <plant_name>Babcock Preserve</plant_name>
    <state>FL</state>
    <county>Charlotte</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>26.857879</lat>
    <lon>-81.75965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62645</plant_id>
    <plant_name>Northern Preserve Solar</plant_name>
    <state>FL</state>
    <county>Baker</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.2473</lat>
    <lon>-82.22691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62750</plant_id>
    <plant_name>Little Manatee River Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>27.691262</lat>
    <lon>-82.41058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62914</plant_id>
    <plant_name>Nassau Solar Center</plant_name>
    <state>FL</state>
    <county>Nassau</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.50391</lat>
    <lon>-81.88411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62915</plant_id>
    <plant_name>Magnolia Springs Solar Center</plant_name>
    <state>FL</state>
    <county>Clay</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.89857</lat>
    <lon>-81.69333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62916</plant_id>
    <plant_name>Trailside Solar Center</plant_name>
    <state>FL</state>
    <county>St Johns</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.774987</lat>
    <lon>-81.42785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62917</plant_id>
    <plant_name>Rodeo Solar Center</plant_name>
    <state>FL</state>
    <county>DeSoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.32063</lat>
    <lon>-81.81024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62919</plant_id>
    <plant_name>Orange Blossom Solar Center</plant_name>
    <state>FL</state>
    <county>Indian River</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.59686</lat>
    <lon>-80.57071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62921</plant_id>
    <plant_name>Palm Bay Solar</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.8421</lat>
    <lon>-80.63155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62922</plant_id>
    <plant_name>Lakeside Solar Center</plant_name>
    <state>FL</state>
    <county>Okeechobee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>27.21421</lat>
    <lon>-80.74458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62923</plant_id>
    <plant_name>Union Springs Solar Center</plant_name>
    <state>FL</state>
    <county>Union</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.97397</lat>
    <lon>-82.30099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62924</plant_id>
    <plant_name>Pelican Solar Center</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.522</lat>
    <lon>-80.54726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62925</plant_id>
    <plant_name>Egret Solar Center</plant_name>
    <state>FL</state>
    <county>Baker</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.28251</lat>
    <lon>-82.18378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63109</plant_id>
    <plant_name>Discovery Solar Center</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>28.528933</lat>
    <lon>-80.6789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63110</plant_id>
    <plant_name>Sabal Palm Solar Center</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.782655</lat>
    <lon>-80.35262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63582</plant_id>
    <plant_name>Harmony Solar (FL)</plant_name>
    <state>FL</state>
    <county>Osceola</county>
    <operator>Harmony Florida Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.155322</lat>
    <lon>-81.10833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63583</plant_id>
    <plant_name>Taylor Creek Solar</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>Taylor Creek Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.503469</lat>
    <lon>-81.04833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63754</plant_id>
    <plant_name>Gulf Power Blue Indigo Energy</plant_name>
    <state>FL</state>
    <county>Jackson</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.877262</lat>
    <lon>-85.40065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63978</plant_id>
    <plant_name>Duette Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.585836</lat>
    <lon>-82.06196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64300</plant_id>
    <plant_name>Fort Drum Energy Center</plant_name>
    <state>FL</state>
    <county>Okeechobee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.607892</lat>
    <lon>-80.75812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64301</plant_id>
    <plant_name>Willow Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.448142</lat>
    <lon>-82.08069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64631</plant_id>
    <plant_name>Jamison Solar (FL)</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.806645</lat>
    <lon>-81.95568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64657</plant_id>
    <plant_name>Magnolia Solar</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.917716</lat>
    <lon>-82.0487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64757</plant_id>
    <plant_name>Blue Springs</plant_name>
    <state>FL</state>
    <county>Jackson</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>30.782897</lat>
    <lon>-85.07869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65036</plant_id>
    <plant_name>Cotton Creek Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.841873</lat>
    <lon>-87.34398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65037</plant_id>
    <plant_name>Sawgrass Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>26.381386</lat>
    <lon>-81.05372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65038</plant_id>
    <plant_name>Ghost Orchid Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>26.417212</lat>
    <lon>-81.03531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65039</plant_id>
    <plant_name>Sundew</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.264113</lat>
    <lon>-80.54685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65040</plant_id>
    <plant_name>Immokalee</plant_name>
    <state>FL</state>
    <county>Collier</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>26.474576</lat>
    <lon>-81.43347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65041</plant_id>
    <plant_name>Elder Branch</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.5966</lat>
    <lon>-82.25272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65042</plant_id>
    <plant_name>Grove</plant_name>
    <state>FL</state>
    <county>Indian River</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.580883</lat>
    <lon>-80.65271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65420</plant_id>
    <plant_name>Bluefield Preserve Solar</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>27.24354</lat>
    <lon>-80.67097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65421</plant_id>
    <plant_name>Chautauqua Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Walton</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.87576</lat>
    <lon>-86.20813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65423</plant_id>
    <plant_name>Everglades Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>25.54255</lat>
    <lon>-80.55434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65424</plant_id>
    <plant_name>First City Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.91993</lat>
    <lon>-87.34002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65427</plant_id>
    <plant_name>FPL Flowers Creek Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Calhoun</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.569958</lat>
    <lon>-85.04024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65428</plant_id>
    <plant_name>Pink Trial Solar Energy Center</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>27.29783</lat>
    <lon>-80.54214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65430</plant_id>
    <plant_name>Wild Azalea Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Gadsden</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.6758</lat>
    <lon>-84.74033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65431</plant_id>
    <plant_name>Anhinga Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Clay</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.88213</lat>
    <lon>-81.67618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65432</plant_id>
    <plant_name>Apalachee</plant_name>
    <state>FL</state>
    <county>Jackson</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.76055</lat>
    <lon>-85.06952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65438</plant_id>
    <plant_name>FPL Cavendish Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Okeechobee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>27.627009</lat>
    <lon>-80.80416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65519</plant_id>
    <plant_name>Bell Ridge Solar</plant_name>
    <state>FL</state>
    <county>Gilchrist</county>
    <operator>Bell Ridge Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.718728</lat>
    <lon>-82.71078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65592</plant_id>
    <plant_name>FPL Saw Palmetto Solar Energy Center</plant_name>
    <state>FL</state>
    <county>Bay</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.419835</lat>
    <lon>-85.44149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65593</plant_id>
    <plant_name>FPL Cypress Pond Solar</plant_name>
    <state>FL</state>
    <county>Washington</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.4213</lat>
    <lon>-85.44103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65594</plant_id>
    <plant_name>FPL Etonia Creek</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.76723</lat>
    <lon>-81.77749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65862</plant_id>
    <plant_name>Big Juniper Solar</plant_name>
    <state>FL</state>
    <county>Santa Rosa</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.63933</lat>
    <lon>-86.92558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65863</plant_id>
    <plant_name>Three Creeks</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.57934</lat>
    <lon>-82.26058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65864</plant_id>
    <plant_name>Sambucus</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.44844</lat>
    <lon>-82.06377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65865</plant_id>
    <plant_name>Pineapple</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.2551</lat>
    <lon>-80.57123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65867</plant_id>
    <plant_name>Sparkleberry</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.76314</lat>
    <lon>-87.4332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65868</plant_id>
    <plant_name>Prairie Creek FL</plant_name>
    <state>FL</state>
    <county>DeSoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.074158</lat>
    <lon>-81.69657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65869</plant_id>
    <plant_name>White Tail</plant_name>
    <state>FL</state>
    <county>Martin</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.07794</lat>
    <lon>-80.37925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65871</plant_id>
    <plant_name>Caloosahatchee</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.75408</lat>
    <lon>-81.18562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65872</plant_id>
    <plant_name>Monarch</plant_name>
    <state>FL</state>
    <county>Martin</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.03074</lat>
    <lon>-80.5248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65873</plant_id>
    <plant_name>Turnpike</plant_name>
    <state>FL</state>
    <county>Indian River</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.56702</lat>
    <lon>-80.64496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65874</plant_id>
    <plant_name>Beautyberry</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.36044</lat>
    <lon>-81.02654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65875</plant_id>
    <plant_name>Woodyard</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.40932</lat>
    <lon>-81.04845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65877</plant_id>
    <plant_name>Ibis</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.848073</lat>
    <lon>-80.6955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65878</plant_id>
    <plant_name>Silver Palm</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.78768</lat>
    <lon>-80.35192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65879</plant_id>
    <plant_name>Pecan Tree</plant_name>
    <state>FL</state>
    <county>Walton</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.938167</lat>
    <lon>-86.24011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65882</plant_id>
    <plant_name>Terrill Creek</plant_name>
    <state>FL</state>
    <county>Clay</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.88143</lat>
    <lon>-81.76258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65883</plant_id>
    <plant_name>North Orange</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.51422</lat>
    <lon>-80.57074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65885</plant_id>
    <plant_name>Boardwalk</plant_name>
    <state>FL</state>
    <county>Collier</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.483507</lat>
    <lon>-81.46766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65887</plant_id>
    <plant_name>Price Creek</plant_name>
    <state>FL</state>
    <county>Columbia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.160723</lat>
    <lon>-82.55836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65905</plant_id>
    <plant_name>Mare Branch</plant_name>
    <state>FL</state>
    <county>DeSoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.30365</lat>
    <lon>-81.76741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65906</plant_id>
    <plant_name>Long Creek</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.411974</lat>
    <lon>-82.10387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65907</plant_id>
    <plant_name>Georges Lake</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.756975</lat>
    <lon>-81.75913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65908</plant_id>
    <plant_name>Norton Creek</plant_name>
    <state>FL</state>
    <county>Madison</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.390039</lat>
    <lon>-83.34395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65909</plant_id>
    <plant_name>Hendry Isles</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.749144</lat>
    <lon>-81.19209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65910</plant_id>
    <plant_name>Wild Quail</plant_name>
    <state>FL</state>
    <county>Walton</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.89805</lat>
    <lon>-86.25007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65911</plant_id>
    <plant_name>Mitchell Creek</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.92851</lat>
    <lon>-87.26414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65912</plant_id>
    <plant_name>Big Water</plant_name>
    <state>FL</state>
    <county>Okeechobee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.44193</lat>
    <lon>-80.80183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65913</plant_id>
    <plant_name>Speckled Perch</plant_name>
    <state>FL</state>
    <county>Okeechobee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.278413</lat>
    <lon>-80.80238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65914</plant_id>
    <plant_name>Redlands</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>25.542897</lat>
    <lon>-80.54673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65915</plant_id>
    <plant_name>Hog Bay</plant_name>
    <state>FL</state>
    <county>DeSoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.078175</lat>
    <lon>-81.83212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65916</plant_id>
    <plant_name>Fox Trail</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.846074</lat>
    <lon>-80.674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65917</plant_id>
    <plant_name>Thomas Creek</plant_name>
    <state>FL</state>
    <county>Nassau</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.51999</lat>
    <lon>-81.88676</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65918</plant_id>
    <plant_name>Green Pasture</plant_name>
    <state>FL</state>
    <county>Charlotte</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.023117</lat>
    <lon>-81.77712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65919</plant_id>
    <plant_name>Fawn</plant_name>
    <state>FL</state>
    <county>Martin</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.05476</lat>
    <lon>-80.37958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65920</plant_id>
    <plant_name>Buttonwood</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.550293</lat>
    <lon>-80.67111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65921</plant_id>
    <plant_name>Honeybell</plant_name>
    <state>FL</state>
    <county>Okeechobee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.50809</lat>
    <lon>-80.73638</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65922</plant_id>
    <plant_name>Holopaw</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.77617</lat>
    <lon>-80.41104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65924</plant_id>
    <plant_name>Nature Trail</plant_name>
    <state>FL</state>
    <county>Baker</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.272333</lat>
    <lon>-82.15683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65925</plant_id>
    <plant_name>Orchard</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.55776</lat>
    <lon>-80.5701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65926</plant_id>
    <plant_name>Hawthorne Creek</plant_name>
    <state>FL</state>
    <county>DeSoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.08314</lat>
    <lon>-81.84124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67182</plant_id>
    <plant_name>Tupelo Solar</plant_name>
    <state>FL</state>
    <county>Putnam</county>
    <operator>FRP Tupelo Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.603731</lat>
    <lon>-81.52725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67203</plant_id>
    <plant_name>Bullfrog Creek Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.660584</lat>
    <lon>-82.29563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67205</plant_id>
    <plant_name>Gadsden County Solar</plant_name>
    <state>FL</state>
    <county>Gadsden</county>
    <operator>FRP Gadsden County Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.656542</lat>
    <lon>-84.72439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67206</plant_id>
    <plant_name>Columbia County Solar</plant_name>
    <state>FL</state>
    <county>Columbia</county>
    <operator>FRP Columbia County Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.882422</lat>
    <lon>-82.73425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67207</plant_id>
    <plant_name>Gilchrist County Solar</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>FRP Gilchrist County Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.618349</lat>
    <lon>-82.67018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67208</plant_id>
    <plant_name>Harmony Florida Solar II</plant_name>
    <state>FL</state>
    <county>Osceola</county>
    <operator>Harmony Florida Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>28.16701</lat>
    <lon>-81.08417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67209</plant_id>
    <plant_name>Storey Bend Solar</plant_name>
    <state>FL</state>
    <county>Osceola</county>
    <operator>Storey Bend Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>28.282565</lat>
    <lon>-81.08145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67672</plant_id>
    <plant_name>Cedar Trail</plant_name>
    <state>FL</state>
    <county>Baker</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.339139</lat>
    <lon>-82.19286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67673</plant_id>
    <plant_name>Swallowtail</plant_name>
    <state>FL</state>
    <county>Walton</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.92362</lat>
    <lon>-86.23106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68276</plant_id>
    <plant_name>Swamp Cabbage</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.762014</lat>
    <lon>-81.25302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68372</plant_id>
    <plant_name>Bronson Solar</plant_name>
    <state>FL</state>
    <county>Levy</county>
    <operator>Bronson Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.464985</lat>
    <lon>-82.6239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68551</plant_id>
    <plant_name>Cottonmouth Ranch Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>27.654491</lat>
    <lon>-82.29003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68817</plant_id>
    <plant_name>Mallard</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.832062</lat>
    <lon>-80.68207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68818</plant_id>
    <plant_name>Sand Pine</plant_name>
    <state>FL</state>
    <county>Calhoun</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.44763</lat>
    <lon>-85.26373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68819</plant_id>
    <plant_name>Sea Grape</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.452435</lat>
    <lon>-80.56397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68820</plant_id>
    <plant_name>Big Brook</plant_name>
    <state>FL</state>
    <county>Calhoun</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.443398</lat>
    <lon>-85.2618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68821</plant_id>
    <plant_name>Clover FL</plant_name>
    <state>FL</state>
    <county>St Lucie</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.472021</lat>
    <lon>-80.51902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68822</plant_id>
    <plant_name>Flatford</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.389575</lat>
    <lon>-82.09888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68823</plant_id>
    <plant_name>Goldenrod</plant_name>
    <state>FL</state>
    <county>Collier</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.5</nameplate_mw>
    <summer_mw>74.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.480745</lat>
    <lon>-81.49189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3170</plant_id>
    <plant_name>Southwark</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>74.4</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>39.9144</lat>
    <lon>-75.135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61654</plant_id>
    <plant_name>Balm Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.4</nameplate_mw>
    <summer_mw>74.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.76284</lat>
    <lon>-82.23463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66237</plant_id>
    <plant_name>Misenheimer Solar LLC</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>Misenheimer Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74.4</nameplate_mw>
    <summer_mw>74.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.478126</lat>
    <lon>-80.30013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56081</plant_id>
    <plant_name>Blue Canyon Windpower</plant_name>
    <state>OK</state>
    <county>Comanche</county>
    <operator>Blue Canyon Windpower LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>74.3</nameplate_mw>
    <summer_mw>74.3</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.850781</lat>
    <lon>-98.57731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6196</plant_id>
    <plant_name>W E Warne</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>California Dept. of Water Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>74.2</nameplate_mw>
    <summer_mw>76</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1983</latest_year>
    <lat>34.6853</lat>
    <lon>-118.7881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>432</plant_id>
    <plant_name>Loon Lake</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>74.1</nameplate_mw>
    <summer_mw>74.1</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>38.982697</lat>
    <lon>-120.3245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58478</plant_id>
    <plant_name>LEPA Unit No. 1</plant_name>
    <state>LA</state>
    <county>St Mary</county>
    <operator>Louisiana Energy &amp; Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>74.1</nameplate_mw>
    <summer_mw>64</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>29.691111</lat>
    <lon>-91.19278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57287</plant_id>
    <plant_name>Hardscrabble Wind Power LLC</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>74</nameplate_mw>
    <summer_mw>74</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.112222</lat>
    <lon>-74.87889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58999</plant_id>
    <plant_name>Little Elk Wind Project LLC</plant_name>
    <state>OK</state>
    <county>Washita</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>74</nameplate_mw>
    <summer_mw>74</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.194722</lat>
    <lon>-98.90722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62058</plant_id>
    <plant_name>SR Terrell</plant_name>
    <state>GA</state>
    <county>Terrell</county>
    <operator>SR Terrell, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>74</nameplate_mw>
    <summer_mw>74</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.871387</lat>
    <lon>-84.36195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62529</plant_id>
    <plant_name>Hale Kuawehi Solar Hybrid</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hale Kuawehi Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>74</nameplate_mw>
    <summer_mw>74</summer_mw>
    <battery_mwh>30</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>19.936688</lat>
    <lon>-155.6793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>222</plant_id>
    <plant_name>Caribou 1</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>73.8</nameplate_mw>
    <summer_mw>75</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1924</latest_year>
    <lat>40.085476</lat>
    <lon>-121.1482</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>231</plant_id>
    <plant_name>Cresta</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>73.8</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1950</latest_year>
    <lat>39.825907</lat>
    <lon>-121.4097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54637</plant_id>
    <plant_name>JCO Oxides Olefins Plant</plant_name>
    <state>TX</state>
    <county>Jefferson</county>
    <operator>Indorama Ventures</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>73.8</nameplate_mw>
    <summer_mw>61</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>29.963502</lat>
    <lon>-93.92974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59084</plant_id>
    <plant_name>Marshall Wind Farm</plant_name>
    <state>KS</state>
    <county>Marshall</county>
    <operator>BHE Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>73.8</nameplate_mw>
    <summer_mw>72</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.701111</lat>
    <lon>-96.36083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60262</plant_id>
    <plant_name>Prairie Breeze II</plant_name>
    <state>NE</state>
    <county>Antelope</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>73.4</nameplate_mw>
    <summer_mw>73.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.987656</lat>
    <lon>-98.2104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6133</plant_id>
    <plant_name>West Point (GA)</plant_name>
    <state>GA</state>
    <county>Troup</county>
    <operator>USCE-Mobile District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>73.3</nameplate_mw>
    <summer_mw>87</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1975</latest_year>
    <lat>32.918674</lat>
    <lon>-85.1887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66006</plant_id>
    <plant_name>House Mountain</plant_name>
    <state>TX</state>
    <county>Brewster</county>
    <operator>House Mountain</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>73.2</nameplate_mw>
    <summer_mw>63</summer_mw>
    <battery_mwh>120</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.495668</lat>
    <lon>-103.451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58981</plant_id>
    <plant_name>Broken Bow Wind II, LLC</plant_name>
    <state>NE</state>
    <county>Custer</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>73.1</nameplate_mw>
    <summer_mw>73.1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.323889</lat>
    <lon>-99.32306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57997</plant_id>
    <plant_name>Foothills Solar Plant Hybrid</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>73</nameplate_mw>
    <summer_mw>73</summer_mw>
    <battery_mwh>105</battery_mwh>
    <first_year>2013</first_year>
    <latest_year>2023</latest_year>
    <lat>32.64856</lat>
    <lon>-114.4287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58235</plant_id>
    <plant_name>Clayville</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>City of Vineland - (NJ)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>73</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.424444</lat>
    <lon>-75.02</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64545</plant_id>
    <plant_name>Ranchland Wind Storage</plant_name>
    <state>TX</state>
    <county>Callahan</county>
    <operator>Ranchland Wind Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>73</nameplate_mw>
    <summer_mw>73</summer_mw>
    <battery_mwh>108.6</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.308524</lat>
    <lon>-99.1642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68007</plant_id>
    <plant_name>Saltbranch Solar 1</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>73</nameplate_mw>
    <summer_mw>73</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.331569</lat>
    <lon>-95.22931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68009</plant_id>
    <plant_name>Saltbranch 2</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>73</nameplate_mw>
    <summer_mw>73</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.331569</lat>
    <lon>-95.22931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>11</plant_id>
    <plant_name>H Neely Henry Dam</plant_name>
    <state>AL</state>
    <county>Calhoun</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>72.9</nameplate_mw>
    <summer_mw>71.1</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>33.7845</lat>
    <lon>-86.0524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1897</plant_id>
    <plant_name>M L Hibbard</plant_name>
    <state>MN</state>
    <county>St Louis</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>72.8</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1951</latest_year>
    <lat>46.735331</lat>
    <lon>-92.15171</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10823</plant_id>
    <plant_name>Deer Island Treatment Plant</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>Massachusetts Wtr Rauth-Deer I</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Other Waste Biomass; Conventional Hydroelectric; Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>8</generators>
    <nameplate_mw>72.8</nameplate_mw>
    <summer_mw>56.3</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2009</latest_year>
    <lat>42.353333</lat>
    <lon>-70.96278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62815</plant_id>
    <plant_name>Fairbanks Wind Park</plant_name>
    <state>MI</state>
    <county>Delta</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>72.8</nameplate_mw>
    <summer_mw>72.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.683618</lat>
    <lon>-86.64574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1901</plant_id>
    <plant_name>Thomson</plant_name>
    <state>MN</state>
    <county>Carlton</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>72.6</nameplate_mw>
    <summer_mw>76.2</summer_mw>
    <first_year>1907</first_year>
    <latest_year>1949</latest_year>
    <lat>46.655</lat>
    <lon>-92.3333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63132</plant_id>
    <plant_name>Weaver Wind</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>72.6</nameplate_mw>
    <summer_mw>72.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.722519</lat>
    <lon>-68.16361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50296</plant_id>
    <plant_name>Packaging Corp of America</plant_name>
    <state>TN</state>
    <county>Hardin</county>
    <operator>Packaging Corp of America</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>72.5</nameplate_mw>
    <summer_mw>72.5</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2010</latest_year>
    <lat>35.0471</lat>
    <lon>-88.2661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61701</plant_id>
    <plant_name>Seabrook Solar</plant_name>
    <state>SC</state>
    <county>Beaufort</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>72.5</nameplate_mw>
    <summer_mw>72.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.56445</lat>
    <lon>-80.74205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65941</plant_id>
    <plant_name>Rocking R Solar, LLC</plant_name>
    <state>LA</state>
    <county>Caddo</county>
    <operator>Rocking R Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>72.5</nameplate_mw>
    <summer_mw>72.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.883965</lat>
    <lon>-93.8833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10204</plant_id>
    <plant_name>Mosaic Co Tampa Facility</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Mosaic Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>72.4</nameplate_mw>
    <summer_mw>68</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1999</latest_year>
    <lat>27.8605</lat>
    <lon>-82.3903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50804</plant_id>
    <plant_name>Port Wentworth Mill</plant_name>
    <state>GA</state>
    <county>Chatham</county>
    <operator>GFC - Wentworth Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>72.3</nameplate_mw>
    <summer_mw>72.3</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2004</latest_year>
    <lat>32.1561</lat>
    <lon>-81.1586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10605</plant_id>
    <plant_name>Brunswick Cellulose</plant_name>
    <state>GA</state>
    <county>Glynn</county>
    <operator>Brunswick Cellulose LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>72.2</nameplate_mw>
    <summer_mw>72.2</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1996</latest_year>
    <lat>31.173147</lat>
    <lon>-81.51925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63839</plant_id>
    <plant_name>Midlands</plant_name>
    <state>SC</state>
    <county>Calhoun</county>
    <operator>Cubico USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>72.1</nameplate_mw>
    <summer_mw>72.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.648979</lat>
    <lon>-80.94282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>415</plant_id>
    <plant_name>Donnells</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Oakdale&amp;South San Joaquin Irrigation D.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>72</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>38.246656</lat>
    <lon>-120.0341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>723</plant_id>
    <plant_name>Tallulah Falls</plant_name>
    <state>GA</state>
    <county>Habersham</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>72.9</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1920</latest_year>
    <lat>34.7388</lat>
    <lon>-83.3956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1079</plant_id>
    <plant_name>Coralville GT</plant_name>
    <state>IA</state>
    <county>Johnson</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>63.4</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>41.671877</lat>
    <lon>-91.564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1511</plant_id>
    <plant_name>Wyman Hydro</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>88.5</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1940</latest_year>
    <lat>45.0703</lat>
    <lon>-69.9064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3408</plant_id>
    <plant_name>Melton Hill</plant_name>
    <state>TN</state>
    <county>Loudon</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>79.2</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>35.8853</lat>
    <lon>-84.3003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6265</plant_id>
    <plant_name>Swift 2</plant_name>
    <state>WA</state>
    <county>Cowlitz</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1959</latest_year>
    <lat>46.0594</lat>
    <lon>-122.2594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10190</plant_id>
    <plant_name>Castleton Power</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Castleton Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>67</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.5375</lat>
    <lon>-73.7433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56622</plant_id>
    <plant_name>Providence Heights Wind LLC</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>72</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.2294</lat>
    <lon>-89.5572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56952</plant_id>
    <plant_name>Willow Creek Energy Center</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>72</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.6533</lat>
    <lon>-119.9914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65058</plant_id>
    <plant_name>Waiawa Solar Power Hybrid</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Waiawa Solar Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>82.1</summer_mw>
    <battery_mwh>4.6</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>21.420069</lat>
    <lon>-157.9707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66404</plant_id>
    <plant_name>Red Mesa Solar Project</plant_name>
    <state>UT</state>
    <county>San Juan</county>
    <operator>NTUA Generation - Utah, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>72</nameplate_mw>
    <summer_mw>72</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.120814</lat>
    <lon>-109.4115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2518</plant_id>
    <plant_name>Shoreham</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>71.5</nameplate_mw>
    <summer_mw>65.7</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1971</latest_year>
    <lat>40.96159</lat>
    <lon>-72.86498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57046</plant_id>
    <plant_name>Archer Daniels Midland Columbus</plant_name>
    <state>NE</state>
    <county>Platte</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>71.4</nameplate_mw>
    <summer_mw>61</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.416442</lat>
    <lon>-97.28633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60658</plant_id>
    <plant_name>Moffett Solar Project</plant_name>
    <state>SC</state>
    <county>Jasper</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>71.4</nameplate_mw>
    <summer_mw>71.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.620653</lat>
    <lon>-80.99599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67023</plant_id>
    <plant_name>Dileo Solar</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Elawan Dileo Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>71.4</nameplate_mw>
    <summer_mw>71.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.78</lat>
    <lon>-97.51</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50398</plant_id>
    <plant_name>International Paper Savanna Mill</plant_name>
    <state>GA</state>
    <county>Chatham</county>
    <operator>International Paper Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>71.2</nameplate_mw>
    <summer_mw>71.2</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>32.100354</lat>
    <lon>-81.12425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10771</plant_id>
    <plant_name>Hopewell Power Station</plant_name>
    <state>VA</state>
    <county>Hopewell City</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>71.1</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>37.297834</lat>
    <lon>-77.28298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10773</plant_id>
    <plant_name>Altavista Power Station</plant_name>
    <state>VA</state>
    <county>Campbell</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>71.1</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>37.118674</lat>
    <lon>-79.27355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10774</plant_id>
    <plant_name>Southampton Power Station</plant_name>
    <state>VA</state>
    <county>Southampton</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>71.1</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>36.6525</lat>
    <lon>-76.9953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7863</plant_id>
    <plant_name>Elk Mound</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Dairyland Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>71</nameplate_mw>
    <summer_mw>64.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.902814</lat>
    <lon>-91.5681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10567</plant_id>
    <plant_name>Algonquin Windsor Locks</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Ahlstrom Power Windsor Locks LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>71</nameplate_mw>
    <summer_mw>64</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2012</latest_year>
    <lat>41.9227</lat>
    <lon>-72.6255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60539</plant_id>
    <plant_name>Innovative Solar 42</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>71</nameplate_mw>
    <summer_mw>71</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.847627</lat>
    <lon>-78.87736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52015</plant_id>
    <plant_name>Dixie Valley</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>70.9</nameplate_mw>
    <summer_mw>58.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2012</latest_year>
    <lat>39.9663</lat>
    <lon>-117.8557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55719</plant_id>
    <plant_name>Mountain View I &amp; II</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>70.9</nameplate_mw>
    <summer_mw>70.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.9211</lat>
    <lon>-116.5642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64928</plant_id>
    <plant_name>Edwards Sanborn S3</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>70.7</nameplate_mw>
    <summer_mw>70.7</summer_mw>
    <battery_mwh>70</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.01644</lat>
    <lon>-118.1225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10426</plant_id>
    <plant_name>Inland Paperboard Packaging Rome</plant_name>
    <state>GA</state>
    <county>Floyd</county>
    <operator>Inland Paperboard - Rome Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>70.4</nameplate_mw>
    <summer_mw>61</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1989</latest_year>
    <lat>34.2528</lat>
    <lon>-85.3275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68148</plant_id>
    <plant_name>Baldwin Solar BESS</plant_name>
    <state>IL</state>
    <county>Randolph</county>
    <operator>Vistra Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>70.4</nameplate_mw>
    <summer_mw>70.4</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.203536</lat>
    <lon>-89.85394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61665</plant_id>
    <plant_name>Payne Creek Solar</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70.3</nameplate_mw>
    <summer_mw>70.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.664583</lat>
    <lon>-81.96422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4258</plant_id>
    <plant_name>Greenup Hydro</plant_name>
    <state>OH</state>
    <county>Scioto</county>
    <operator>City of Hamilton - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>70.2</nameplate_mw>
    <summer_mw>70.2</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>38.6472</lat>
    <lon>-82.8594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7932</plant_id>
    <plant_name>Gaylord - Wolverine</plant_name>
    <state>MI</state>
    <county>Otsego</county>
    <operator>Wolverine Power Supply Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>70.2</nameplate_mw>
    <summer_mw>57.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>45.0046</lat>
    <lon>-84.7218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65107</plant_id>
    <plant_name>Cabin Creek Solar, LLC</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Nofar USA Energy Investments and Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70.2</nameplate_mw>
    <summer_mw>70.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.33604</lat>
    <lon>-79.7417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62678</plant_id>
    <plant_name>Crooked Run</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>Cubico USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70.1</nameplate_mw>
    <summer_mw>70.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.67704</lat>
    <lon>-77.9775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63976</plant_id>
    <plant_name>Bay Tree</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70.1</nameplate_mw>
    <summer_mw>70.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.70414</lat>
    <lon>-78.39336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>187</plant_id>
    <plant_name>Degray</plant_name>
    <state>AR</state>
    <county>Clark</county>
    <operator>USCE -Vickburg District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Hydroelectric Pumped Storage</technologies>
    <generators>2</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>34.211913</lat>
    <lon>-93.11096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2984</plant_id>
    <plant_name>Keystone Dam</plant_name>
    <state>OK</state>
    <county>Tulsa</county>
    <operator>USCE-Tulsa District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>80</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>36.1508</lat>
    <lon>-96.2517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3867</plant_id>
    <plant_name>Long Lake</plant_name>
    <state>WA</state>
    <county>Lincoln</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>89.5</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1924</latest_year>
    <lat>47.834444</lat>
    <lon>-117.8361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6171</plant_id>
    <plant_name>Laurel Dam</plant_name>
    <state>KY</state>
    <county>Laurel</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>61</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1977</latest_year>
    <lat>36.9614</lat>
    <lon>-84.27</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7427</plant_id>
    <plant_name>Cowlitz Falls</plant_name>
    <state>WA</state>
    <county>Lewis</county>
    <operator>PUD No 1 of Lewis County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>46.4661</lat>
    <lon>-122.1097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50835</plant_id>
    <plant_name>TES Filer City Station</plant_name>
    <state>MI</state>
    <county>Manistee</county>
    <operator>TES Filer City Station LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>44.217299</lat>
    <lon>-86.28905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57300</plant_id>
    <plant_name>Criterion</plant_name>
    <state>MD</state>
    <county>GARRETT</county>
    <operator>Criterion Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.4047</lat>
    <lon>-79.29</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60405</plant_id>
    <plant_name>Chaves Solar, LLC</plant_name>
    <state>NM</state>
    <county>Chaves</county>
    <operator>Chaves Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.45</lat>
    <lon>-104.456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60406</plant_id>
    <plant_name>Roswell Solar, LLC</plant_name>
    <state>NM</state>
    <county>Chaves</county>
    <operator>Roswell Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.45293</lat>
    <lon>-104.4611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63050</plant_id>
    <plant_name>Millican Solar Energy LLC</plant_name>
    <state>OR</state>
    <county>Crook</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>71.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.154107</lat>
    <lon>-120.5341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63548</plant_id>
    <plant_name>Lily Solar</plant_name>
    <state>SC</state>
    <county>Allendale</county>
    <operator>X-Elio North America Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.094931</lat>
    <lon>-81.43484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63932</plant_id>
    <plant_name>Titan Solar 1 (CA)</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Titan Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.125786</lat>
    <lon>-115.9111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64840</plant_id>
    <plant_name>SR Cedar Springs, LLC</plant_name>
    <state>GA</state>
    <county>Early</county>
    <operator>SR Cedar Springs, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.2453</lat>
    <lon>-85.08698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65305</plant_id>
    <plant_name>Powells Creek Solar - Hybrid</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Powells Creek Farm Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.55467</lat>
    <lon>-79.0286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65323</plant_id>
    <plant_name>Bedford Solar (Dominion)</plant_name>
    <state>VA</state>
    <county>Chesapeake City</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.7</lat>
    <lon>-76.1647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65349</plant_id>
    <plant_name>Mulligan Solar, LLC</plant_name>
    <state>IL</state>
    <county>Logan</county>
    <operator>Mulligan Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.09393</lat>
    <lon>-89.4204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65588</plant_id>
    <plant_name>Antlia</plant_name>
    <state>TX</state>
    <county>Val Verde</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <battery_mwh>140</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.806021</lat>
    <lon>-100.8045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65629</plant_id>
    <plant_name>SR McKellar</plant_name>
    <state>TN</state>
    <county>Madison</county>
    <operator>SR McKellar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.574169</lat>
    <lon>-88.92661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65683</plant_id>
    <plant_name>Juniper Solar (FL)</plant_name>
    <state>FL</state>
    <county>Pasco</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>28.181569</lat>
    <lon>-82.15533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65725</plant_id>
    <plant_name>Kossuth County Wind</plant_name>
    <state>IA</state>
    <county>Kossuth</county>
    <operator>Kossuth County Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.986667</lat>
    <lon>-94.13361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65999</plant_id>
    <plant_name>Great Cove Solar</plant_name>
    <state>PA</state>
    <county>Fulton</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.923887</lat>
    <lon>-78.04122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66026</plant_id>
    <plant_name>Hobnail Solar</plant_name>
    <state>GA</state>
    <county>Burke</county>
    <operator>Hobnail Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.262</lat>
    <lon>-82.178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66163</plant_id>
    <plant_name>Jicarilla Solar 1 LLC</plant_name>
    <state>NM</state>
    <county>Rio Arriba</county>
    <operator>Repsol Renewables NA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.316748</lat>
    <lon>-107.2776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66726</plant_id>
    <plant_name>Inland Empire Energy Storage</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>70</nameplate_mw>
    <summer_mw>70</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.137674</lat>
    <lon>-117.416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60084</plant_id>
    <plant_name>PCA-Valdosta Mill</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>PCA-Valdosta Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>69.9</nameplate_mw>
    <summer_mw>69.9</summer_mw>
    <first_year>1954</first_year>
    <latest_year>2011</latest_year>
    <lat>30.694444</lat>
    <lon>-83.30306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10350</plant_id>
    <plant_name>Greenleaf 1</plant_name>
    <state>CA</state>
    <county>Sutter</county>
    <operator>Calpine Greenleaf Holding, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>69.8</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.052922</lat>
    <lon>-121.6961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10643</plant_id>
    <plant_name>Covanta Essex Company</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Covanta Essex Company</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>69.8</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.7376</lat>
    <lon>-74.1255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50447</plant_id>
    <plant_name>S D Warren Westbrook</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Conventional Hydroelectric</technologies>
    <generators>16</generators>
    <nameplate_mw>69.7</nameplate_mw>
    <summer_mw>63.5</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1985</latest_year>
    <lat>43.684857</lat>
    <lon>-70.35315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56189</plant_id>
    <plant_name>Waterside Power, LLC</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Waterside Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>69.6</nameplate_mw>
    <summer_mw>69.9</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2006</latest_year>
    <lat>41.0372</lat>
    <lon>-73.5564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10560</plant_id>
    <plant_name>Jesup Plant</plant_name>
    <state>GA</state>
    <county>Wayne</county>
    <operator>Rayonier Advanced Materials</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>69.5</nameplate_mw>
    <summer_mw>64.7</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1982</latest_year>
    <lat>31.6593</lat>
    <lon>-81.8439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62668</plant_id>
    <plant_name>Maiden Creek Solar Power Plant</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>69.3</nameplate_mw>
    <summer_mw>69.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.593</lat>
    <lon>-81.167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>265</plant_id>
    <plant_name>Pit 1</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>69.2</nameplate_mw>
    <summer_mw>61</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>40.99084</lat>
    <lon>-121.4982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50121</plant_id>
    <plant_name>Valero Refinery Corpus Christi West</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Valero Refining Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke; All Other</technologies>
    <generators>3</generators>
    <nameplate_mw>69.2</nameplate_mw>
    <summer_mw>65.2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>27.8175</lat>
    <lon>-97.4814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50410</plant_id>
    <plant_name>Chester Operations</plant_name>
    <state>PA</state>
    <county>Delaware</county>
    <operator>Kimberly-Clark Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>69.2</nameplate_mw>
    <summer_mw>56.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.843743</lat>
    <lon>-75.3588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50765</plant_id>
    <plant_name>Stillwater Facility</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Ormat Stillwater LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>69.2</nameplate_mw>
    <summer_mw>62.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2012</latest_year>
    <lat>39.547537</lat>
    <lon>-118.5556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10176</plant_id>
    <plant_name>M Street Jet</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>Massachusetts Bay Trans Auth</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>69</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>42.339387</lat>
    <lon>-71.03141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54429</plant_id>
    <plant_name>Alabama Pine Pulp</plant_name>
    <state>AL</state>
    <county>Monroe</county>
    <operator>Alabama River Cellulose LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>69</nameplate_mw>
    <summer_mw>68.7</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>31.5825</lat>
    <lon>-87.4889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56416</plant_id>
    <plant_name>Michigan Wind 1</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Michigan Wind 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>69</nameplate_mw>
    <summer_mw>69</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.7092</lat>
    <lon>-82.9633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57529</plant_id>
    <plant_name>Kawailoa Wind</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Kawailoa Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>69</nameplate_mw>
    <summer_mw>69</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>21.610278</lat>
    <lon>-158.0408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57744</plant_id>
    <plant_name>Laurel Hill Wind</plant_name>
    <state>PA</state>
    <county>Lycoming</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>69</nameplate_mw>
    <summer_mw>69</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.5323</lat>
    <lon>-77.0296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65295</plant_id>
    <plant_name>Bob Glanzer Generating Station</plant_name>
    <state>SD</state>
    <county>Beadle</county>
    <operator>NorthWestern Energy - (SD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>69</nameplate_mw>
    <summer_mw>55.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.369507</lat>
    <lon>-98.17223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10743</plant_id>
    <plant_name>Morgantown Energy Facility</plant_name>
    <state>WV</state>
    <county>Monongalia</county>
    <operator>Morgantown Energy Associates</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>68.9</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>39.6397</lat>
    <lon>-79.96056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66423</plant_id>
    <plant_name>Stanton Battery Energy Storage</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>68.8</nameplate_mw>
    <summer_mw>68.8</summer_mw>
    <battery_mwh>275.2</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.806779</lat>
    <lon>-117.9886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50464</plant_id>
    <plant_name>Oxnard</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Procter&amp;Gamble Paper Products Co-Oxnard</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>68.7</nameplate_mw>
    <summer_mw>70.9</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1989</latest_year>
    <lat>34.196</lat>
    <lon>-119.1667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54464</plant_id>
    <plant_name>Graphic Packaging Intl Macon Mill</plant_name>
    <state>GA</state>
    <county>Bibb</county>
    <operator>Riverwood Intl USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>68.7</nameplate_mw>
    <summer_mw>72.3</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2013</latest_year>
    <lat>32.7714</lat>
    <lon>-83.6281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2082</plant_id>
    <plant_name>Fairgrounds</plant_name>
    <state>MO</state>
    <county>Cole</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>68.3</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>38.5935</lat>
    <lon>-92.2206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10613</plant_id>
    <plant_name>Woodland Pulp, LLC</plant_name>
    <state>ME</state>
    <county>Washington</county>
    <operator>Woodland Pulp LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Conventional Hydroelectric</technologies>
    <generators>12</generators>
    <nameplate_mw>68.3</nameplate_mw>
    <summer_mw>63.7</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1970</latest_year>
    <lat>45.1554</lat>
    <lon>-67.4012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2434</plant_id>
    <plant_name>Howard Down</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>City of Vineland - (NJ)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>68.2</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.4889</lat>
    <lon>-75.0347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50192</plant_id>
    <plant_name>International Paper Valliant OK</plant_name>
    <state>OK</state>
    <county>McCurtain</county>
    <operator>International Paper - Valliant</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>68</nameplate_mw>
    <summer_mw>57.8</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>33.9961</lat>
    <lon>-95.1114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50931</plant_id>
    <plant_name>Yellowstone Energy LP</plant_name>
    <state>MT</state>
    <county>Yellowstone</county>
    <operator>Yellowstone Energy LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke</technologies>
    <generators>1</generators>
    <nameplate_mw>68</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>45.8117</lat>
    <lon>-108.4278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59020</plant_id>
    <plant_name>Gila Bend Hybrid</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>68</nameplate_mw>
    <summer_mw>68</summer_mw>
    <battery_mwh>96</battery_mwh>
    <first_year>2014</first_year>
    <latest_year>2023</latest_year>
    <lat>32.940833</lat>
    <lon>-112.8814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64151</plant_id>
    <plant_name>SR Perry</plant_name>
    <state>GA</state>
    <county>Houston</county>
    <operator>SR Perry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>68</nameplate_mw>
    <summer_mw>68</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.39597</lat>
    <lon>-83.7629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50657</plant_id>
    <plant_name>Montgomery County Resource Recovery</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Covanta Montgomery, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>67.8</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>39.2006</lat>
    <lon>-77.4556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56347</plant_id>
    <plant_name>Cedar Ridge</plant_name>
    <state>WI</state>
    <county>Fond Du Lac</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>67.7</nameplate_mw>
    <summer_mw>67.7</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.692647</lat>
    <lon>-88.32974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59238</plant_id>
    <plant_name>Windthorst-2</plant_name>
    <state>TX</state>
    <county>Archer</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>67.6</nameplate_mw>
    <summer_mw>67.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.495278</lat>
    <lon>-98.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7247</plant_id>
    <plant_name>Watertown Power Plant</plant_name>
    <state>SD</state>
    <county>Codington</county>
    <operator>Missouri Basin Muni Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>67.5</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>44.901667</lat>
    <lon>-97.10833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54593</plant_id>
    <plant_name>Batavia Power Plant</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Seneca Power Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>67.3</nameplate_mw>
    <summer_mw>49.8</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.9828</lat>
    <lon>-78.1592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>419</plant_id>
    <plant_name>Woodleaf</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>South Feather Water and Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>67.2</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>39.553811</lat>
    <lon>-121.2041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7784</plant_id>
    <plant_name>Allegany Cogen</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>Allegany Generating Station, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>67</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>42.5027</lat>
    <lon>-78.0686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50883</plant_id>
    <plant_name>Wheelabrator Bridgeport</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>67</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>41.1625</lat>
    <lon>-73.2083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56848</plant_id>
    <plant_name>Haverhill North Cogeneration Facility</plant_name>
    <state>OH</state>
    <county>Scioto</county>
    <operator>SunCoke Energy, Inc.</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>67</nameplate_mw>
    <summer_mw>34</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>38.596657</lat>
    <lon>-82.82864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57822</plant_id>
    <plant_name>Middletown Coke Company, LLC</plant_name>
    <state>OH</state>
    <county>Butler</county>
    <operator>SunCoke Energy, Inc.</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>67</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.472222</lat>
    <lon>-84.40139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4176</plant_id>
    <plant_name>Fremont Canyon</plant_name>
    <state>WY</state>
    <county>Natrona</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>66.8</nameplate_mw>
    <summer_mw>66.8</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1961</latest_year>
    <lat>42.4766</lat>
    <lon>-106.7959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>318</plant_id>
    <plant_name>Big Creek 2</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>66.6</nameplate_mw>
    <summer_mw>66.6</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1925</latest_year>
    <lat>37.2</lat>
    <lon>-119.3069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55558</plant_id>
    <plant_name>Combined Locks Energy Center</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>McKinley Paper</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>66.5</nameplate_mw>
    <summer_mw>51.9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>44.2717</lat>
    <lon>-88.3011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50810</plant_id>
    <plant_name>Westrock Hodge (LA)</plant_name>
    <state>LA</state>
    <county>Jackson</county>
    <operator>Westrock (LA)</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>66.4</nameplate_mw>
    <summer_mw>66.4</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1972</latest_year>
    <lat>32.2752</lat>
    <lon>-92.7277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57137</plant_id>
    <plant_name>Eurus Combine Hills Turbine Ranch 2</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Eurus Combine Hills II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>66.1</nameplate_mw>
    <summer_mw>62</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>45.943</lat>
    <lon>-118.591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>220</plant_id>
    <plant_name>Bucks Creek</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>39.91062</lat>
    <lon>-121.3277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6128</plant_id>
    <plant_name>Amistad Dam &amp; Power</plant_name>
    <state>TX</state>
    <county>Val Verde</county>
    <operator>International Bound &amp; Wtr Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>29.449827</lat>
    <lon>-101.0601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7452</plant_id>
    <plant_name>Roseville Power Plant #2</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>City of Roseville - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>42.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>38.810677</lat>
    <lon>-121.3238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50887</plant_id>
    <plant_name>Wheelabrator South Broward</plant_name>
    <state>FL</state>
    <county>Broward</county>
    <operator>FCC Environmental Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>26.0687</lat>
    <lon>-80.1986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55369</plant_id>
    <plant_name>Hamakua Energy Plant</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hamakua Energy LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>WO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>60.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>20.0939</lat>
    <lon>-155.4711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55986</plant_id>
    <plant_name>Mountaineer Wind Energy Center</plant_name>
    <state>WV</state>
    <county>Tucker</county>
    <operator>Sequitur Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>66</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.1828</lat>
    <lon>-79.5372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56489</plant_id>
    <plant_name>Elkins Generating Center</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2013</latest_year>
    <lat>35.9714</lat>
    <lon>-94.0014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57295</plant_id>
    <plant_name>Alpine Solar</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Alpine BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>66</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.7892</lat>
    <lon>-118.5047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57468</plant_id>
    <plant_name>Crystal Lake 3 LLC</plant_name>
    <state>IA</state>
    <county>Winnebago</county>
    <operator>Crystal Lake 3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>66</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.3192</lat>
    <lon>-93.8836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61070</plant_id>
    <plant_name>Saratoga Wind Farm</plant_name>
    <state>IA</state>
    <county>Howard</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>66</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.448855</lat>
    <lon>-92.28073</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61330</plant_id>
    <plant_name>Hog Creek Wind Project</plant_name>
    <state>OH</state>
    <county>Hardin</county>
    <operator>Hog Creek Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>66</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.793073</lat>
    <lon>-83.72871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66635</plant_id>
    <plant_name>Caden Energix Axton LLC</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>Caden Energix Axton LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>66</nameplate_mw>
    <summer_mw>66</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.667889</lat>
    <lon>-79.75501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54131</plant_id>
    <plant_name>World Generation X</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>North American Energy Services</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>65.7</nameplate_mw>
    <summer_mw>55.7</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>43.0483</lat>
    <lon>-78.8539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6479</plant_id>
    <plant_name>San Francisquito 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>65.5</nameplate_mw>
    <summer_mw>77</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1987</latest_year>
    <lat>34.590183</lat>
    <lon>-118.4547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66600</plant_id>
    <plant_name>Bushy Park Combustion Turbine Facility</plant_name>
    <state>SC</state>
    <county>Berkeley</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>65.4</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.014915</lat>
    <lon>-79.93005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50744</plant_id>
    <plant_name>Sterling Power Plant</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Sterling Power Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>65.3</nameplate_mw>
    <summer_mw>55.9</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>43.080338</lat>
    <lon>-75.60096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69173</plant_id>
    <plant_name>Air Products Texas City</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Air Products &amp; Chemicals Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>65.2</nameplate_mw>
    <summer_mw>65.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.3822</lat>
    <lon>-94.9</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6558</plant_id>
    <plant_name>D G Hunter</plant_name>
    <state>LA</state>
    <county>Rapides</county>
    <operator>City of Alexandria - (LA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>65.1</nameplate_mw>
    <summer_mw>60.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>31.3207</lat>
    <lon>-92.4613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57379</plant_id>
    <plant_name>Poseidon Wind, LLC</plant_name>
    <state>AZ</state>
    <county>Navajo</county>
    <operator>Axium Arizona Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>65.1</nameplate_mw>
    <summer_mw>65.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>34.6062</lat>
    <lon>-110.1734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1230</plant_id>
    <plant_name>Cimarron River</plant_name>
    <state>KS</state>
    <county>Seward</county>
    <operator>Sunflower Electric Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65.8</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1968</latest_year>
    <lat>37.1611</lat>
    <lon>-100.7619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54097</plant_id>
    <plant_name>International Paper Texarkana Mill</plant_name>
    <state>TX</state>
    <county>Cass</county>
    <operator>Graphic Packaging International - Texarkana</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1977</latest_year>
    <lat>33.2553</lat>
    <lon>-94.0696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57979</plant_id>
    <plant_name>Kingdom Community Wind</plant_name>
    <state>VT</state>
    <county>Orleans</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.748333</lat>
    <lon>-72.42528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58848</plant_id>
    <plant_name>Warsaw Farm</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.005556</lat>
    <lon>-78.12583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60380</plant_id>
    <plant_name>Shoe Creek Solar, LLC</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.84492</lat>
    <lon>-79.38472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61446</plant_id>
    <plant_name>RE Gaskell West 2 LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RE Gaskell West LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.834944</lat>
    <lon>-118.5512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62606</plant_id>
    <plant_name>Whitney Hill Wind Power LLC</plant_name>
    <state>IL</state>
    <county>Logan</county>
    <operator>Whitney Hill Wind Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.929</lat>
    <lon>-89.19</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62951</plant_id>
    <plant_name>Hawtree Solar</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>Hawtree Creek Farm Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.533</lat>
    <lon>-78.105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63559</plant_id>
    <plant_name>MMWEC Simple Cycle Gas Turbine</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Massachusetts Mun Wholes Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>63</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.54342</lat>
    <lon>-70.92797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64998</plant_id>
    <plant_name>Paddock Solar</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.555577</lat>
    <lon>-89.08865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65018</plant_id>
    <plant_name>Mossy Branch Battery Facility</plant_name>
    <state>GA</state>
    <county>Talbot</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <battery_mwh>260</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.803569</lat>
    <lon>-84.66039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65657</plant_id>
    <plant_name>San Jacinto Grid, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>San Jacinto Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.92295</lat>
    <lon>-116.8735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66172</plant_id>
    <plant_name>SR DeSoto II</plant_name>
    <state>GA</state>
    <county>Lee</county>
    <operator>SR DeSoto II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.87042</lat>
    <lon>-84.03574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67675</plant_id>
    <plant_name>Northumberland Solar</plant_name>
    <state>PA</state>
    <county>Northumberland</county>
    <operator>Northumberland Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.987206</lat>
    <lon>-76.83401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68576</plant_id>
    <plant_name>Breckinridge Energy Storage</plant_name>
    <state>OK</state>
    <county>Garfield</county>
    <operator>Breckinridge Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <battery_mwh>260</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.4465</lat>
    <lon>-97.6945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68802</plant_id>
    <plant_name>Minco II Energy Storage</plant_name>
    <state>OK</state>
    <county>Grady</county>
    <operator>Minco II Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>65</nameplate_mw>
    <summer_mw>65</summer_mw>
    <battery_mwh>65</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.305292</lat>
    <lon>-97.89123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10867</plant_id>
    <plant_name>Primient Decatur Plant Cogen</plant_name>
    <state>IL</state>
    <county>Macon</county>
    <operator>Primary Products Ingredients Americas, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>64.8</nameplate_mw>
    <summer_mw>62</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>39.84919</lat>
    <lon>-88.93194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66839</plant_id>
    <plant_name>Crystal Hill Solar</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Urban Grid Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>64.7</nameplate_mw>
    <summer_mw>64.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.839909</lat>
    <lon>-78.9382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7231</plant_id>
    <plant_name>Gianera</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>City of Santa Clara - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>64.6</nameplate_mw>
    <summer_mw>49.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1987</latest_year>
    <lat>37.401</lat>
    <lon>-121.9687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10629</plant_id>
    <plant_name>Wheelabrator Baltimore Refuse</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>64.5</nameplate_mw>
    <summer_mw>61.3</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2001</latest_year>
    <lat>39.266041</lat>
    <lon>-76.62965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56001</plant_id>
    <plant_name>Waymart Wind</plant_name>
    <state>PA</state>
    <county>Wayne</county>
    <operator>Sequitur Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>64.5</nameplate_mw>
    <summer_mw>64.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.5533</lat>
    <lon>-75.4542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56301</plant_id>
    <plant_name>Wolverine Creek</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>64.5</nameplate_mw>
    <summer_mw>64.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.4195</lat>
    <lon>-111.8294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63482</plant_id>
    <plant_name>Point Wind</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>64.5</nameplate_mw>
    <summer_mw>64.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.080833</lat>
    <lon>-118.3614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1268</plant_id>
    <plant_name>Chanute 2</plant_name>
    <state>KS</state>
    <county>Neosho</county>
    <operator>City of Chanute (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>64</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1965</first_year>
    <latest_year>2002</latest_year>
    <lat>37.6953</lat>
    <lon>-95.4586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1744</plant_id>
    <plant_name>Superior</plant_name>
    <state>MI</state>
    <county>Washtenaw</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>64</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>42.2639</lat>
    <lon>-83.6422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3916</plant_id>
    <plant_name>LaGrande</plant_name>
    <state>WA</state>
    <county>Pierce</county>
    <operator>City of Tacoma - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>64</nameplate_mw>
    <summer_mw>64</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1945</latest_year>
    <lat>46.8328</lat>
    <lon>-122.3196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57851</plant_id>
    <plant_name>Sigel Wind Park</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>64</nameplate_mw>
    <summer_mw>64</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.850833</lat>
    <lon>-82.78361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66842</plant_id>
    <plant_name>Jones Farm Solar</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>Urban Grid Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>64</nameplate_mw>
    <summer_mw>64</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.232046</lat>
    <lon>-75.77228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3162</plant_id>
    <plant_name>Falls</plant_name>
    <state>PA</state>
    <county>Bucks</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>63.6</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>40.176486</lat>
    <lon>-74.78998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3163</plant_id>
    <plant_name>Moser Generating Station</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>63.6</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>40.2352</lat>
    <lon>-75.6193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>148</plant_id>
    <plant_name>Mormon Flat</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>63.5</nameplate_mw>
    <summer_mw>68.8</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1971</latest_year>
    <lat>33.5536</lat>
    <lon>-111.4431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2191</plant_id>
    <plant_name>Morony</plant_name>
    <state>MT</state>
    <county>Cascade</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>63</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>47.581737</lat>
    <lon>-111.0609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57098</plant_id>
    <plant_name>Dry Lake Wind LLC</plant_name>
    <state>AZ</state>
    <county>Navajo</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>63</nameplate_mw>
    <summer_mw>63</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>34.6596</lat>
    <lon>-110.2842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10620</plant_id>
    <plant_name>Carthage Energy LLC</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Carthage Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>62.9</nameplate_mw>
    <summer_mw>61.1</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>43.9842</lat>
    <lon>-75.6225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54694</plant_id>
    <plant_name>Yuma Cogeneration Associates</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Falcon Power Operating Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>62.6</nameplate_mw>
    <summer_mw>52.2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>32.728822</lat>
    <lon>-114.6541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58769</plant_id>
    <plant_name>Spring Canyon Expansion Wind Energy Ctr</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Spring Canyon Expansion LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>62.6</nameplate_mw>
    <summer_mw>62.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.964167</lat>
    <lon>-103.0772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10684</plant_id>
    <plant_name>Argus Cogen Plant</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Searles Valley Minerals Operations Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>62.5</nameplate_mw>
    <summer_mw>57</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1978</latest_year>
    <lat>35.765</lat>
    <lon>-117.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57139</plant_id>
    <plant_name>Cambria Wind LLC</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>Exus Pennsylvania Wind Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>62.5</nameplate_mw>
    <summer_mw>62.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.3042</lat>
    <lon>-78.6908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65962</plant_id>
    <plant_name>Mesquite Solar 4, LLC</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>62.5</nameplate_mw>
    <summer_mw>62.5</summer_mw>
    <battery_mwh>47.7</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.326467</lat>
    <lon>-112.919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66316</plant_id>
    <plant_name>Madison Solar (VA)</plant_name>
    <state>VA</state>
    <county>Orange</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>62.5</nameplate_mw>
    <summer_mw>62.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.28775</lat>
    <lon>-77.84005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50187</plant_id>
    <plant_name>Nippon Dynawave Packaging Longview WA</plant_name>
    <state>WA</state>
    <county>Cowlitz</county>
    <operator>Nippon Dynawave Packaging Co.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>62.4</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1976</latest_year>
    <lat>46.1236</lat>
    <lon>-122.9728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57387</plant_id>
    <plant_name>Ashtabula Wind III LLC</plant_name>
    <state>ND</state>
    <county>Barnes</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>62.4</nameplate_mw>
    <summer_mw>62.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>47.1242</lat>
    <lon>-97.8956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60611</plant_id>
    <plant_name>Summit Farms Solar</plant_name>
    <state>NC</state>
    <county>Currituck</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>62.4</nameplate_mw>
    <summer_mw>62.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.4765</lat>
    <lon>-76.136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50071</plant_id>
    <plant_name>Palm Beach Renewable Energy Facility 1</plant_name>
    <state>FL</state>
    <county>Palm Beach</county>
    <operator>Solid Waste Authority of Palm Beach Co</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>62.3</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>26.771389</lat>
    <lon>-80.14194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59875</plant_id>
    <plant_name>Marshall Solar Energy Project</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Marshall Solar Energy Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>62.3</nameplate_mw>
    <summer_mw>62.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.475314</lat>
    <lon>-95.66901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62541</plant_id>
    <plant_name>Lake Placid Solar Power Plant</plant_name>
    <state>FL</state>
    <county>Highlands</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>62.3</nameplate_mw>
    <summer_mw>62.3</summer_mw>
    <battery_mwh>36</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2023</latest_year>
    <lat>27.331136</lat>
    <lon>-81.36402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59965</plant_id>
    <plant_name>Latigo Wind Park</plant_name>
    <state>UT</state>
    <county>San Juan</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>62.1</nameplate_mw>
    <summer_mw>62.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.886706</lat>
    <lon>-109.3684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1629</plant_id>
    <plant_name>Cabot</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>FirstLight Power Resources, Inc. - MA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>61.8</nameplate_mw>
    <summer_mw>61.8</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1917</latest_year>
    <lat>42.5875</lat>
    <lon>-72.5793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6210</plant_id>
    <plant_name>Northeast (WA)</plant_name>
    <state>WA</state>
    <county>Spokane</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>61.8</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>47.73511</lat>
    <lon>-117.3705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64854</plant_id>
    <plant_name>Primient</plant_name>
    <state>IN</state>
    <county>Tippecanoe</county>
    <operator>Primary Products Ingredients Americas, LLC d/b/a Primient</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>61.8</nameplate_mw>
    <summer_mw>57.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.376319</lat>
    <lon>-86.8437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64</plant_id>
    <plant_name>Lemon Creek</plant_name>
    <state>AK</state>
    <county>Juneau</county>
    <operator>Alaska Electric Light &amp; Power Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>61.7</nameplate_mw>
    <summer_mw>57.5</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1985</latest_year>
    <lat>58.3536</lat>
    <lon>-134.4953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10234</plant_id>
    <plant_name>Biron Mill</plant_name>
    <state>WI</state>
    <county>Wood</county>
    <operator>ND Paper, Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>61.6</nameplate_mw>
    <summer_mw>55.3</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1987</latest_year>
    <lat>44.43</lat>
    <lon>-89.78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58713</plant_id>
    <plant_name>North Star Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>61.6</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.73</lat>
    <lon>-120.41</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10488</plant_id>
    <plant_name>DeRidder Mill</plant_name>
    <state>LA</state>
    <county>Beauregard</county>
    <operator>Packaging Corporation of America</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>61.5</nameplate_mw>
    <summer_mw>61.5</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>30.8606</lat>
    <lon>-93.3756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56012</plant_id>
    <plant_name>Whitewater Hill Wind Partners</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Shell Wind Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>61.5</nameplate_mw>
    <summer_mw>61.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>33.925</lat>
    <lon>-116.6178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56099</plant_id>
    <plant_name>FPL Energy North Dakota Wind I/II</plant_name>
    <state>ND</state>
    <county>LaMoure</county>
    <operator>FPL Energy North Dakota Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>61.5</nameplate_mw>
    <summer_mw>61.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>46.327169</lat>
    <lon>-98.89836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57564</plant_id>
    <plant_name>Algonquin Power Sanger LLC</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Clearlight Energy Sanger LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>61.5</nameplate_mw>
    <summer_mw>61.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2012</latest_year>
    <lat>36.6842</lat>
    <lon>-119.5522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63632</plant_id>
    <plant_name>Primient Loudon Plant</plant_name>
    <state>TN</state>
    <county>Loudon</county>
    <operator>PRIMIENT, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>61.4</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.735092</lat>
    <lon>-84.3193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6824</plant_id>
    <plant_name>St Bonifacius</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>61.2</nameplate_mw>
    <summer_mw>59</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>44.905026</lat>
    <lon>-93.82076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58162</plant_id>
    <plant_name>Cirrus Wind 1 LLC</plant_name>
    <state>TX</state>
    <county>Lynn</county>
    <operator>Cirrus Wind 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>61.2</nameplate_mw>
    <summer_mw>61.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.033056</lat>
    <lon>-101.6875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64323</plant_id>
    <plant_name>Coachella Hills Wind</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>61.2</nameplate_mw>
    <summer_mw>61.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.9077</lat>
    <lon>-116.5797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65684</plant_id>
    <plant_name>Laurel Oaks Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>61.2</nameplate_mw>
    <summer_mw>61.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.926882</lat>
    <lon>-82.06767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66942</plant_id>
    <plant_name>Skysol</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Skysol Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>61.2</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.047765</lat>
    <lon>-121.4921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2123</plant_id>
    <plant_name>Columbia (MO)</plant_name>
    <state>MO</state>
    <county>Boone</county>
    <operator>City of Columbia - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids; Landfill Gas</technologies>
    <generators>12</generators>
    <nameplate_mw>61.1</nameplate_mw>
    <summer_mw>61.1</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2013</latest_year>
    <lat>38.964646</lat>
    <lon>-92.31677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61656</plant_id>
    <plant_name>Grange Hall Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>61.1</nameplate_mw>
    <summer_mw>61.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.681278</lat>
    <lon>-82.16466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55096</plant_id>
    <plant_name>Portside Energy</plant_name>
    <state>IN</state>
    <county>Porter</county>
    <operator>Primary Energy Recycling Holdings, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>61</nameplate_mw>
    <summer_mw>53</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>41.6317</lat>
    <lon>-87.1728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56752</plant_id>
    <plant_name>Mountain Wind Power LLC</plant_name>
    <state>WY</state>
    <county>Uinta</county>
    <operator>Mountain Wind Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>61</nameplate_mw>
    <summer_mw>61</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.288056</lat>
    <lon>-110.4807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68593</plant_id>
    <plant_name>Rockhound C</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>61</nameplate_mw>
    <summer_mw>61</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.723088</lat>
    <lon>-102.5196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6652</plant_id>
    <plant_name>Moreau</plant_name>
    <state>MO</state>
    <county>Cole</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>60.8</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>38.555713</lat>
    <lon>-92.10232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60143</plant_id>
    <plant_name>Peak View Wind Farm</plant_name>
    <state>CO</state>
    <county>Huerfano</county>
    <operator>Black Hills Colorado Electric, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.8</nameplate_mw>
    <summer_mw>60.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.710444</lat>
    <lon>-104.5055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6650</plant_id>
    <plant_name>Mexico</plant_name>
    <state>MO</state>
    <county>Audrain</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>60.7</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>39.1481</lat>
    <lon>-91.8306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6651</plant_id>
    <plant_name>Moberly</plant_name>
    <state>MO</state>
    <county>Randolph</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>60.6</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>39.4244</lat>
    <lon>-92.4837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7984</plant_id>
    <plant_name>Kalkaska CT #1</plant_name>
    <state>MI</state>
    <county>Kalkaska</county>
    <operator>Michigan Public Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>48.3</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>44.6889</lat>
    <lon>-85.2019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7987</plant_id>
    <plant_name>Lake One</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Burbank Water and Power - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>34.1772</lat>
    <lon>-118.3147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55499</plant_id>
    <plant_name>CalPeak Power Vaca Dixon Peaker Plant</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>CalPeak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.398867</lat>
    <lon>-121.924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55508</plant_id>
    <plant_name>CalPeak Power Panoche Peaker Plant</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>CalPeak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>36.652905</lat>
    <lon>-120.5806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55699</plant_id>
    <plant_name>Bayswater Peaking Facility LLC</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Bayswater Peaking Facility LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>75.7</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.610654</lat>
    <lon>-73.76222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55836</plant_id>
    <plant_name>Island Street Peaking Plant</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>WPPI Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>54.6</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>44.2761</lat>
    <lon>-88.2658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55951</plant_id>
    <plant_name>Agua Mansa Power Plant</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>E I Colton LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.0414</lat>
    <lon>-117.3603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56141</plant_id>
    <plant_name>Jamaica Bay Peaking</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Jamaica Bay Peaking Facility, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>47.3</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>40.6097</lat>
    <lon>-73.7622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57001</plant_id>
    <plant_name>El Cajon Energy Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>60.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>32.796106</lat>
    <lon>-116.9721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58122</plant_id>
    <plant_name>Delano Energy Center</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.5</nameplate_mw>
    <summer_mw>60.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.790864</lat>
    <lon>-119.2945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56480</plant_id>
    <plant_name>Marshfield Utilities Gas Plant</plant_name>
    <state>WI</state>
    <county>Wood</county>
    <operator>City of Marshfield - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.4</nameplate_mw>
    <summer_mw>53.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.634722</lat>
    <lon>-90.13444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56302</plant_id>
    <plant_name>Oasis Wind</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.3</nameplate_mw>
    <summer_mw>60.3</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>35.06094</lat>
    <lon>-118.2924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50536</plant_id>
    <plant_name>Sky River Wind Energy Center</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Sky River Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60.2</nameplate_mw>
    <summer_mw>60.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.2608</lat>
    <lon>-118.2469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>720</plant_id>
    <plant_name>Oliver Dam</plant_name>
    <state>GA</state>
    <county>Muscogee</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>59</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1959</latest_year>
    <lat>32.5155</lat>
    <lon>-85.0004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>816</plant_id>
    <plant_name>Lower Salmon</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>74.2</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>42.841608</lat>
    <lon>-114.9036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2728</plant_id>
    <plant_name>Mountain Island</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>68</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>35.3339</lat>
    <lon>-80.9867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3110</plant_id>
    <plant_name>Hunterstown</plant_name>
    <state>PA</state>
    <county>Adams</county>
    <operator>Hunterstown Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>64</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>39.8662</lat>
    <lon>-77.1648</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3271</plant_id>
    <plant_name>Wylie</plant_name>
    <state>SC</state>
    <county>York</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>35.0218</lat>
    <lon>-81.0078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50431</plant_id>
    <plant_name>University of Michigan</plant_name>
    <state>MI</state>
    <county>Washtenaw</county>
    <operator>University of Michigan</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>6</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>57</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2022</latest_year>
    <lat>42.281167</lat>
    <lon>-83.73462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56320</plant_id>
    <plant_name>Spring Canyon</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>40.983</lat>
    <lon>-102.9647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56990</plant_id>
    <plant_name>Rollins Wind Project</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.34598</lat>
    <lon>-68.3802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57131</plant_id>
    <plant_name>Stoney Corners Wind Farm</plant_name>
    <state>MI</state>
    <county>Missaukee</county>
    <operator>DTE Sustainable Generation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>59</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.19</lat>
    <lon>-85.2983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57283</plant_id>
    <plant_name>Flat Water Wind Farm LLC</plant_name>
    <state>NE</state>
    <county>Richardson</county>
    <operator>Flat Water Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.0011</lat>
    <lon>-95.9289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57650</plant_id>
    <plant_name>Regulus Solar Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Regulus Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.3</lat>
    <lon>-118.8519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57909</plant_id>
    <plant_name>Piedmont Green Power</plant_name>
    <state>GA</state>
    <county>Lamar</county>
    <operator>Piedmont Green Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.045278</lat>
    <lon>-84.12556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59523</plant_id>
    <plant_name>Five Points Solar Park</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.386944</lat>
    <lon>-120.2367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60389</plant_id>
    <plant_name>RE Barren Ridge 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RE Barren Ridge 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.20473</lat>
    <lon>-118.0688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61653</plant_id>
    <plant_name>Alafia Solar</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>27.723197</lat>
    <lon>-82.02561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61813</plant_id>
    <plant_name>Ranchland Solar, LLC</plant_name>
    <state>NC</state>
    <county>Currituck</county>
    <operator>Ranchland Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.472591</lat>
    <lon>-76.15409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62495</plant_id>
    <plant_name>Palmer Solar</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.6299</lat>
    <lon>-104.6526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63495</plant_id>
    <plant_name>Durrance</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.78</lat>
    <lon>-81.98</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63507</plant_id>
    <plant_name>Bakeoven Solar</plant_name>
    <state>OR</state>
    <county>Wasco</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.131793</lat>
    <lon>-120.8807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63807</plant_id>
    <plant_name>Sugar Solar, LLC</plant_name>
    <state>NC</state>
    <county>Yadkin</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.1607</lat>
    <lon>-80.6574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63900</plant_id>
    <plant_name>AES Waikoloa Solar Hybrid</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>120</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>19.902</lat>
    <lon>-155.764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63906</plant_id>
    <plant_name>Turquoise Nevada, LLC</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.57395</lat>
    <lon>-119.5242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63909</plant_id>
    <plant_name>Otter Creek Solar</plant_name>
    <state>VA</state>
    <county>Mecklenburg</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.807131</lat>
    <lon>-78.50977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63930</plant_id>
    <plant_name>Cal Flats BESS</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>242</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.866665</lat>
    <lon>-120.3294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63943</plant_id>
    <plant_name>Coso Battery Storage</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Arevon Asset Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>240</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.006945</lat>
    <lon>-117.8106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65677</plant_id>
    <plant_name>Edwards Sanborn S4</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>18.8</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2023</latest_year>
    <lat>35.012467</lat>
    <lon>-118.1193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66394</plant_id>
    <plant_name>Goleta Energy Storage, LLC</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>Goleta Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>160</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.432367</lat>
    <lon>-119.8681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66825</plant_id>
    <plant_name>SR DeSoto III</plant_name>
    <state>GA</state>
    <county>Lee</county>
    <operator>SR DeSoto III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.868033</lat>
    <lon>-84.00777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67183</plant_id>
    <plant_name>Franklin Battery Storage</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>240</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.192956</lat>
    <lon>-114.6101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67873</plant_id>
    <plant_name>Heirloom Solar</plant_name>
    <state>IN</state>
    <county>Pike</county>
    <operator>Heirloom Solar (Ratts 1 Phase 2 Solar, LLC)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.514913</lat>
    <lon>-87.19207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68210</plant_id>
    <plant_name>Sandia Energy Center</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>240</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.0571</lat>
    <lon>-106.5277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68496</plant_id>
    <plant_name>Lower Rio Energy Storage</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>VESI 38 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <battery_mwh>120</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.206944</lat>
    <lon>-98.05889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69452</plant_id>
    <plant_name>Jasper County Solar Project</plant_name>
    <state>IN</state>
    <county>Jasper</county>
    <operator>Biscayne Falls SPV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>60</nameplate_mw>
    <summer_mw>60</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.155953</lat>
    <lon>-87.11156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50451</plant_id>
    <plant_name>Indeck Yerkes Energy Center</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Indeck-Yerkes Ltd Partnership</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>59.9</nameplate_mw>
    <summer_mw>46.5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>42.9671</lat>
    <lon>-78.9182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54044</plant_id>
    <plant_name>University of Illinois Cogen Facility</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>University of Illinois</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>59.9</nameplate_mw>
    <summer_mw>55.7</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2002</latest_year>
    <lat>41.8675</lat>
    <lon>-87.6524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4008</plant_id>
    <plant_name>Jim Falls</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>59.8</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>45.051</lat>
    <lon>-91.274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56472</plant_id>
    <plant_name>Grapeland Hybrid</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>59.8</nameplate_mw>
    <summer_mw>56</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2007</first_year>
    <latest_year>2016</latest_year>
    <lat>34.0903</lat>
    <lon>-117.5343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56475</plant_id>
    <plant_name>Center Hybrid</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>59.8</nameplate_mw>
    <summer_mw>57</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2007</first_year>
    <latest_year>2016</latest_year>
    <lat>33.9296</lat>
    <lon>-118.1046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56673</plant_id>
    <plant_name>Whirlwind Energy Center</plant_name>
    <state>TX</state>
    <county>Floyd</county>
    <operator>Whirlwind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>59.8</nameplate_mw>
    <summer_mw>57</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>34.105</lat>
    <lon>-101.0986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58209</plant_id>
    <plant_name>NextEra-Blackwell Wind, LLC</plant_name>
    <state>OK</state>
    <county>Kay</county>
    <operator>Blackwell Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>59.8</nameplate_mw>
    <summer_mw>59.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.846667</lat>
    <lon>-97.4175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10586</plant_id>
    <plant_name>Cameron Ridge LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>59.6</nameplate_mw>
    <summer_mw>59.6</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>35.075</lat>
    <lon>-118.3158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62758</plant_id>
    <plant_name>Meherrin Solar</plant_name>
    <state>VA</state>
    <county>Greensville</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>59.6</nameplate_mw>
    <summer_mw>59.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.59</lat>
    <lon>-77.65</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>589</plant_id>
    <plant_name>J C McNeil</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>City of Burlington Electric - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>59.5</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>44.4917</lat>
    <lon>-73.20806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7190</plant_id>
    <plant_name>Milner Hydro</plant_name>
    <state>ID</state>
    <county>Cassia</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>59.5</nameplate_mw>
    <summer_mw>45.4</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.526786</lat>
    <lon>-114.0369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50882</plant_id>
    <plant_name>Wheelabrator Westchester</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>59.5</nameplate_mw>
    <summer_mw>53.3</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>41.277129</lat>
    <lon>-73.94234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2182</plant_id>
    <plant_name>Cochrane</plant_name>
    <state>MT</state>
    <county>Cascade</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>59.4</nameplate_mw>
    <summer_mw>62</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>47.5375</lat>
    <lon>-111.195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3401</plant_id>
    <plant_name>Fort Patrick Henry</plant_name>
    <state>TN</state>
    <county>Sullivan</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>59.4</nameplate_mw>
    <summer_mw>40.7</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1954</latest_year>
    <lat>36.4982</lat>
    <lon>-82.5086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56162</plant_id>
    <plant_name>Ainsworth Wind</plant_name>
    <state>NE</state>
    <county>Brown</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>59.4</nameplate_mw>
    <summer_mw>59.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>42.4489</lat>
    <lon>-99.8917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57888</plant_id>
    <plant_name>Harvest 2</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Harvest II Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>59.4</nameplate_mw>
    <summer_mw>59.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.8556</lat>
    <lon>-83.1669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62445</plant_id>
    <plant_name>Busch Ranch II Wind Farm</plant_name>
    <state>CO</state>
    <county>Huerfano</county>
    <operator>Black Hills Electric Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>59.4</nameplate_mw>
    <summer_mw>59.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.766416</lat>
    <lon>-104.4295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>477</plant_id>
    <plant_name>Valmont</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>59.3</nameplate_mw>
    <summer_mw>43</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>40.0195</lat>
    <lon>-105.202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1404</plant_id>
    <plant_name>Sterlington</plant_name>
    <state>LA</state>
    <county>Ouachita</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>59.3</nameplate_mw>
    <summer_mw>45.5</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>32.7047</lat>
    <lon>-92.0792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6424</plant_id>
    <plant_name>Chelan</plant_name>
    <state>WA</state>
    <county>Chelan</county>
    <operator>PUD No 1 of Chelan County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>59.2</nameplate_mw>
    <summer_mw>62.1</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1928</latest_year>
    <lat>47.8347</lat>
    <lon>-120.0133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2193</plant_id>
    <plant_name>Rainbow (MT)</plant_name>
    <state>MT</state>
    <county>Cascade</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>59</nameplate_mw>
    <summer_mw>64</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>47.5344</lat>
    <lon>-111.2045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52010</plant_id>
    <plant_name>Lee County Solid Waste Energy</plant_name>
    <state>FL</state>
    <county>Lee</county>
    <operator>Lee County Board-Commissioners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>59</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2007</latest_year>
    <lat>26.631549</lat>
    <lon>-81.76066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54580</plant_id>
    <plant_name>Curtis Palmer Hydroelectric</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Palmer Hydroelectric</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>59</nameplate_mw>
    <summer_mw>59.6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1986</latest_year>
    <lat>43.2469</lat>
    <lon>-73.8281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62773</plant_id>
    <plant_name>BT Cooke Solar, LLC</plant_name>
    <state>TX</state>
    <county>Cooke</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>59</nameplate_mw>
    <summer_mw>59</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.5493</lat>
    <lon>-97.1798</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62774</plant_id>
    <plant_name>Kellam Solar</plant_name>
    <state>TX</state>
    <county>Van Zandt</county>
    <operator>Kellam Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>59</nameplate_mw>
    <summer_mw>59</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.4744</lat>
    <lon>-95.7156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66950</plant_id>
    <plant_name>Sagebrush Solar 2 ESS 59</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-BESS 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>59</nameplate_mw>
    <summer_mw>59</summer_mw>
    <battery_mwh>236</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.0477</lat>
    <lon>-118.2628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55513</plant_id>
    <plant_name>CalPeak Power Enterprise Peaker Plant</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>CalPeak Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>58.9</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.121943</lat>
    <lon>-117.1174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56959</plant_id>
    <plant_name>Ocotillo Windpower</plant_name>
    <state>TX</state>
    <county>Howard</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>58.8</nameplate_mw>
    <summer_mw>58.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.1217</lat>
    <lon>-101.3853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67847</plant_id>
    <plant_name>Moscow</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>58.8</nameplate_mw>
    <summer_mw>58.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.146586</lat>
    <lon>-69.86814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58319</plant_id>
    <plant_name>Patua Acquisition Project, LLC</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Patua Acquisition Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>58.6</nameplate_mw>
    <summer_mw>40.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2017</latest_year>
    <lat>39.585833</lat>
    <lon>-119.0731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54451</plant_id>
    <plant_name>Los Angeles Refinery Wilmington</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Phillips 66 - Los Angeles</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>58.5</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>33.7686</lat>
    <lon>-118.2867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55983</plant_id>
    <plant_name>Salton Sea Power LLC - Unit 5</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>58.3</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>33.1533</lat>
    <lon>-115.6384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69244</plant_id>
    <plant_name>Cross Trails Energy Storage Project</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Energy Vault, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>58.3</nameplate_mw>
    <summer_mw>57</summer_mw>
    <battery_mwh>114</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.745</lat>
    <lon>-100.757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50951</plant_id>
    <plant_name>Sunnyside Cogen Associates</plant_name>
    <state>UT</state>
    <county>Carbon</county>
    <operator>Sunnyside Cogeneration Assoc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>58.1</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>39.5472</lat>
    <lon>-110.3917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6140</plant_id>
    <plant_name>Clarence Cannon</plant_name>
    <state>MO</state>
    <county>Ralls</county>
    <operator>USCE-St Louis District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage; Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>58</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>39.524791</lat>
    <lon>-91.64397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8076</plant_id>
    <plant_name>Ellwood</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>Ellwood Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>58</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>34.431419</lat>
    <lon>-119.9001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60550</plant_id>
    <plant_name>GRP Franklin Renewable Energy Facility</plant_name>
    <state>GA</state>
    <county>Franklin</county>
    <operator>GRP Franklin Renewable Energy Facility, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>58</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.376111</lat>
    <lon>-83.33056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61213</plant_id>
    <plant_name>GRP Madison Renewable Energy Facility</plant_name>
    <state>GA</state>
    <county>Madison</county>
    <operator>GRP Madison Renewable Energy Facility, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>58</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.040559</lat>
    <lon>-83.1929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62469</plant_id>
    <plant_name>Cove Mountain Solar</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Cove Mountain Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>58</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.623123</lat>
    <lon>-113.6192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>550</plant_id>
    <plant_name>Kettle Falls Generating Station</plant_name>
    <state>WA</state>
    <county>Stevens</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>57.9</nameplate_mw>
    <summer_mw>56.2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>2002</latest_year>
    <lat>48.620336</lat>
    <lon>-118.1111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50880</plant_id>
    <plant_name>Wheelabrator Saugus</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>57.8</nameplate_mw>
    <summer_mw>32.8</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.447</lat>
    <lon>-70.9804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50101</plant_id>
    <plant_name>WestRock (TX)</plant_name>
    <state>TX</state>
    <county>Jasper</county>
    <operator>WestRock (TX)</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>57.7</nameplate_mw>
    <summer_mw>59.5</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1986</latest_year>
    <lat>30.3419</lat>
    <lon>-94.0656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3418</plant_id>
    <plant_name>Watauga</plant_name>
    <state>TN</state>
    <county>Carter</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>57.6</nameplate_mw>
    <summer_mw>67</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>36.3413</lat>
    <lon>-82.1264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3991</plant_id>
    <plant_name>Fitchburg</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>57.6</nameplate_mw>
    <summer_mw>33.9</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>43.0147</lat>
    <lon>-89.4603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6400</plant_id>
    <plant_name>Canyon Ferry</plant_name>
    <state>MT</state>
    <county>Lewis and Clark</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>57.6</nameplate_mw>
    <summer_mw>57.6</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1954</latest_year>
    <lat>46.649026</lat>
    <lon>-111.7279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10603</plant_id>
    <plant_name>Ebensburg Power</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>Ebensburg Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>57.6</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.455</lat>
    <lon>-78.7472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57890</plant_id>
    <plant_name>Horse Butte Wind I, LLC</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>Utah Associated Mun Power Sys</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>57.6</nameplate_mw>
    <summer_mw>57.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.386389</lat>
    <lon>-111.7264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62399</plant_id>
    <plant_name>Sage Solar I-III</plant_name>
    <state>UT</state>
    <county>Rich</county>
    <operator>CI III VK I TE Partnership LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>57.6</nameplate_mw>
    <summer_mw>57.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.77</lat>
    <lon>-111.06</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58124</plant_id>
    <plant_name>Rothschild Biomass Cogen Facility</plant_name>
    <state>WI</state>
    <county>Marathon</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>57.5</nameplate_mw>
    <summer_mw>46.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.887778</lat>
    <lon>-89.62972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63350</plant_id>
    <plant_name>OE_GA3</plant_name>
    <state>GA</state>
    <county>Mitchell</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>57.5</nameplate_mw>
    <summer_mw>57.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.196185</lat>
    <lon>-84.14754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64326</plant_id>
    <plant_name>Summit Winds</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>57.5</nameplate_mw>
    <summer_mw>56.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.761151</lat>
    <lon>-121.6907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50450</plant_id>
    <plant_name>Indeck Oswego Energy Center</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Indeck-Oswego Ltd Partnership</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>57.4</nameplate_mw>
    <summer_mw>51.6</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>43.471745</lat>
    <lon>-76.49347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56051</plant_id>
    <plant_name>THUMS</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>THUMS Long Beach Company</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>57.4</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.7684</lat>
    <lon>-118.2141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10840</plant_id>
    <plant_name>Covanta Delano Energy</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Clean Energy Systems Delano</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1993</latest_year>
    <lat>35.7144</lat>
    <lon>-119.2337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56989</plant_id>
    <plant_name>Stetson Wind I</plant_name>
    <state>ME</state>
    <county>Washington</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.4822</lat>
    <lon>-67.9944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60316</plant_id>
    <plant_name>Scott Solar Farm</plant_name>
    <state>VA</state>
    <county>Powhatan</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>57</nameplate_mw>
    <summer_mw>57</summer_mw>
    <battery_mwh>48</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2022</latest_year>
    <lat>37.523</lat>
    <lon>-77.934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2265</plant_id>
    <plant_name>Hallam</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>56.7</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>40.558652</lat>
    <lon>-96.78618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2266</plant_id>
    <plant_name>Hebron</plant_name>
    <state>NE</state>
    <county>Thayer</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>56.7</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>40.187928</lat>
    <lon>-97.57786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2271</plant_id>
    <plant_name>McCook</plant_name>
    <state>NE</state>
    <county>Red Willow</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>56.7</nameplate_mw>
    <summer_mw>40.9</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>40.2214</lat>
    <lon>-100.6508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55874</plant_id>
    <plant_name>Wellhead Power Panoche</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>56.7</nameplate_mw>
    <summer_mw>56.7</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>36.6535</lat>
    <lon>-120.5783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56555</plant_id>
    <plant_name>Bluegrass Ridge</plant_name>
    <state>MO</state>
    <county>Gentry</county>
    <operator>Wind Capital Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>56.7</nameplate_mw>
    <summer_mw>56.7</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.1006</lat>
    <lon>-94.4869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50449</plant_id>
    <plant_name>Indeck Silver Springs Energy Center</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Indeck-Energy Serv Silver Spg</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>56.6</nameplate_mw>
    <summer_mw>52.3</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>42.6544</lat>
    <lon>-78.0772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59647</plant_id>
    <plant_name>Stillwater Energy Center</plant_name>
    <state>OK</state>
    <county>Payne</county>
    <operator>Stillwater Utilities Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>56.4</nameplate_mw>
    <summer_mw>55.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.161944</lat>
    <lon>-97.03694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61391</plant_id>
    <plant_name>A.J. Mihm Generating Station</plant_name>
    <state>MI</state>
    <county>Baraga</county>
    <operator>Upper Michigan Energy Resources Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>56.4</nameplate_mw>
    <summer_mw>56.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>46.792669</lat>
    <lon>-88.61401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61048</plant_id>
    <plant_name>Solar Star Oregon II</plant_name>
    <state>OR</state>
    <county>Crook</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>56.3</nameplate_mw>
    <summer_mw>56</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.1843</lat>
    <lon>-120.918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62482</plant_id>
    <plant_name>Beech Ridge II Wind Energy Center</plant_name>
    <state>WV</state>
    <county>Greenbrier</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>56.2</nameplate_mw>
    <summer_mw>56.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.112222</lat>
    <lon>-80.61306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59726</plant_id>
    <plant_name>CML&amp;P Generating Facility No. 2</plant_name>
    <state>KS</state>
    <county>Montgomery</county>
    <operator>City of Coffeyville - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>56.1</nameplate_mw>
    <summer_mw>56.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.092977</lat>
    <lon>-95.58515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>166</plant_id>
    <plant_name>Carpenter</plant_name>
    <state>AR</state>
    <county>Garland</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>56</nameplate_mw>
    <summer_mw>60.4</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1932</latest_year>
    <lat>34.4425</lat>
    <lon>-93.0262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2612</plant_id>
    <plant_name>Spier Falls</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>56</nameplate_mw>
    <summer_mw>54.5</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1930</latest_year>
    <lat>43.2339</lat>
    <lon>-73.7556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50251</plant_id>
    <plant_name>Billerud Quinnesec Mill</plant_name>
    <state>MI</state>
    <county>Dickinson</county>
    <operator>Billerud Quinnesec Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>56</nameplate_mw>
    <summer_mw>59</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2011</latest_year>
    <lat>45.7956</lat>
    <lon>-87.9556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59315</plant_id>
    <plant_name>Hecate Energy Beacon Solar 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>56</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.269444</lat>
    <lon>-118.0144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59316</plant_id>
    <plant_name>Hecate Energy Beacon Solar 3</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>56</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.253056</lat>
    <lon>-118.0147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69360</plant_id>
    <plant_name>Bynum Solar Project</plant_name>
    <state>TX</state>
    <county>Coryell</county>
    <operator>Bynum Solar Project LLC (RE)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>56</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.585103</lat>
    <lon>-97.66466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3157</plant_id>
    <plant_name>Chester Generating Station</plant_name>
    <state>PA</state>
    <county>Chester</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>55.8</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>39.8301</lat>
    <lon>-75.3837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10169</plant_id>
    <plant_name>Carson Cogeneration</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Carson Cogeneration Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>55.8</nameplate_mw>
    <summer_mw>49.3</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1990</latest_year>
    <lat>33.8759</lat>
    <lon>-118.2491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64909</plant_id>
    <plant_name>Luciana</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Tulare Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55.8</nameplate_mw>
    <summer_mw>55.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.823716</lat>
    <lon>-119.0623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66843</plant_id>
    <plant_name>Morgnec Solar</plant_name>
    <state>MD</state>
    <county>Kent</county>
    <operator>Urban Grid Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55.8</nameplate_mw>
    <summer_mw>55.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.2299</lat>
    <lon>-76.0525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2936</plant_id>
    <plant_name>Painesville</plant_name>
    <state>OH</state>
    <county>Lake</county>
    <operator>City of Painesville - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>55.5</nameplate_mw>
    <summer_mw>48.8</summer_mw>
    <first_year>1949</first_year>
    <latest_year>2010</latest_year>
    <lat>41.7265</lat>
    <lon>-81.254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57867</plant_id>
    <plant_name>Howard Wind Farm</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>55.4</nameplate_mw>
    <summer_mw>55.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2012</latest_year>
    <lat>42.315278</lat>
    <lon>-77.53833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61666</plant_id>
    <plant_name>Peace Creek Solar</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55.4</nameplate_mw>
    <summer_mw>55.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.913306</lat>
    <lon>-81.81011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64183</plant_id>
    <plant_name>Independence Wind Farm</plant_name>
    <state>IA</state>
    <county>Delaware</county>
    <operator>Independence Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>55.4</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.431604</lat>
    <lon>-91.56864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61268</plant_id>
    <plant_name>Kayenta Solar Project</plant_name>
    <state>AZ</state>
    <county>Navajo</county>
    <operator>NGI-Kayenta Solar Lessor I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>55.3</nameplate_mw>
    <summer_mw>55.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2019</latest_year>
    <lat>36.771944</lat>
    <lon>-110.2639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2059</plant_id>
    <plant_name>L L Wilkins</plant_name>
    <state>MS</state>
    <county>Coahoma</county>
    <operator>Clarksdale Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>55.2</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1996</latest_year>
    <lat>34.1845</lat>
    <lon>-90.56266</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2194</plant_id>
    <plant_name>Ryan</plant_name>
    <state>MT</state>
    <county>Cascade</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>55.2</nameplate_mw>
    <summer_mw>71.5</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1916</latest_year>
    <lat>47.569939</lat>
    <lon>-111.1225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58434</plant_id>
    <plant_name>Red Rock Hydro Plant</plant_name>
    <state>IA</state>
    <county>Marion</county>
    <operator>Western Minnesota Mun Pwr Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>55.2</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.369722</lat>
    <lon>-92.98083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65687</plant_id>
    <plant_name>Riverside Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55.2</nameplate_mw>
    <summer_mw>55.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.68368</lat>
    <lon>-82.47243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>591</plant_id>
    <plant_name>Christiana</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Calpine Mid-Atlantic Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>39.7302</lat>
    <lon>-75.5371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>902</plant_id>
    <plant_name>Bottle Rock Power</plant_name>
    <state>CA</state>
    <county>Lake</county>
    <operator>Mayacma Geothermal</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>38.8348</lat>
    <lon>-122.7677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57475</plant_id>
    <plant_name>John L. Featherstone Plant</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Hudson Ranch Power I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.204635</lat>
    <lon>-115.5733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59010</plant_id>
    <plant_name>Macho Springs</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>52.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.57</lat>
    <lon>-107.48</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61272</plant_id>
    <plant_name>Gray Hawk Solar</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Gray Hawk Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.3635</lat>
    <lon>-113.8978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63860</plant_id>
    <plant_name>Encino Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.354</lat>
    <lon>-106.858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65955</plant_id>
    <plant_name>Landrace Holdings, LLC</plant_name>
    <state>SC</state>
    <county>Horry</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.723937</lat>
    <lon>-79.092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66047</plant_id>
    <plant_name>Glover Creek Solar, LLC</plant_name>
    <state>KY</state>
    <county>Metcalfe</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>55</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.901441</lat>
    <lon>-85.71203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3595</plant_id>
    <plant_name>Buchanan Dam (TX)</plant_name>
    <state>TX</state>
    <county>Llano</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>54.9</nameplate_mw>
    <summer_mw>54.9</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1950</latest_year>
    <lat>30.7507</lat>
    <lon>-98.4176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50119</plant_id>
    <plant_name>Phillips 66 Rodeo Refinery</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Phillips 66 Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>54.9</nameplate_mw>
    <summer_mw>45.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>38.0417</lat>
    <lon>-122.2583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50881</plant_id>
    <plant_name>Wheelabrator Shasta</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Shasta Sustainable Resource Management, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>54.9</nameplate_mw>
    <summer_mw>56.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.428329</lat>
    <lon>-122.2792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55866</plant_id>
    <plant_name>Basin Creek Plant</plant_name>
    <state>MT</state>
    <county>Silver Bow</county>
    <operator>Basin Creek Power Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>9</generators>
    <nameplate_mw>54.9</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>45.9293</lat>
    <lon>-112.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67962</plant_id>
    <plant_name>Dans Mountain</plant_name>
    <state>MD</state>
    <county>Allegany</county>
    <operator>Dans Mountain Wind Force, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>54.9</nameplate_mw>
    <summer_mw>54.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.599992</lat>
    <lon>-78.89067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7450</plant_id>
    <plant_name>Alameda</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Northern California Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>54.8</nameplate_mw>
    <summer_mw>49.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>37.7886</lat>
    <lon>-122.2889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2186</plant_id>
    <plant_name>Holter</plant_name>
    <state>MT</state>
    <county>Cascade</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>54.6</nameplate_mw>
    <summer_mw>57</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1918</latest_year>
    <lat>46.9915</lat>
    <lon>-112.0047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54556</plant_id>
    <plant_name>Ingredion Incorporated</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Ingredion Inc - Illinois</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>54.6</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1996</latest_year>
    <lat>41.7775</lat>
    <lon>-87.8233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60383</plant_id>
    <plant_name>Monroe Solar Facility</plant_name>
    <state>NC</state>
    <county>Union</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>54.6</nameplate_mw>
    <summer_mw>54.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.929945</lat>
    <lon>-80.62562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61664</plant_id>
    <plant_name>Mountain View Solar (FL)</plant_name>
    <state>FL</state>
    <county>Pasco</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>54.6</nameplate_mw>
    <summer_mw>54.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.39799</lat>
    <lon>-82.22043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60340</plant_id>
    <plant_name>Albany Green Energy</plant_name>
    <state>GA</state>
    <county>Dougherty</county>
    <operator>Albany Green Energy, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>54.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.5559</lat>
    <lon>-84.1103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63907</plant_id>
    <plant_name>Panther Creek Wind Project</plant_name>
    <state>IL</state>
    <county>Pike</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>54.4</nameplate_mw>
    <summer_mw>54.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.62055</lat>
    <lon>-90.87612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58207</plant_id>
    <plant_name>Central Utility Plant at White Oak</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>GSA Metropolitan Service Center</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>12</generators>
    <nameplate_mw>54.3</nameplate_mw>
    <summer_mw>54.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2014</latest_year>
    <lat>39.039444</lat>
    <lon>-76.9825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7345</plant_id>
    <plant_name>University of Florida</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>54.2</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>29.640278</lat>
    <lon>-82.34861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3111</plant_id>
    <plant_name>Mountain</plant_name>
    <state>PA</state>
    <county>Cumberland</county>
    <operator>Mountain Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>40.1</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>40.12282</lat>
    <lon>-77.1716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3116</plant_id>
    <plant_name>Tolna</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Tolna Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>41.2</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>39.760634</lat>
    <lon>-76.63534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3424</plant_id>
    <plant_name>Dale Hollow</plant_name>
    <state>TN</state>
    <county>Clay</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>62.1</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1953</latest_year>
    <lat>36.5378</lat>
    <lon>-85.4517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3597</plant_id>
    <plant_name>Granite Shoals</plant_name>
    <state>TX</state>
    <county>Burnet</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>30.556</lat>
    <lon>-98.3384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50509</plant_id>
    <plant_name>PCS Phosphate</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>PCS Phosphate</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>35.376266</lat>
    <lon>-76.77986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54238</plant_id>
    <plant_name>Stockton Biomass</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>DTE Stockton LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.943633</lat>
    <lon>-121.3304</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54638</plant_id>
    <plant_name>Johnsonburg Mill</plant_name>
    <state>PA</state>
    <county>Elk</county>
    <operator>Domtar LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>41.491466</lat>
    <lon>-78.67576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54667</plant_id>
    <plant_name>Chino Mines</plant_name>
    <state>NM</state>
    <county>Grant</county>
    <operator>FreePort-McMoRan-Corp-Chino Mines</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2001</latest_year>
    <lat>32.6956</lat>
    <lon>-108.1225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55538</plant_id>
    <plant_name>Escondido Energy Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.1261</lat>
    <lon>-117.1172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55969</plant_id>
    <plant_name>Hawkeye Energy Greenport LLC</plant_name>
    <state>NY</state>
    <county>SUFFOLK</county>
    <operator>Hawkeye Energy Greenport LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>54.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.10603</lat>
    <lon>-72.37616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56070</plant_id>
    <plant_name>Diesel Generators</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>53.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>43.0802</lat>
    <lon>-89.3747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56647</plant_id>
    <plant_name>Butler Ridge</plant_name>
    <state>WI</state>
    <county>Dodge</county>
    <operator>Butler Ridge Wind Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.400278</lat>
    <lon>-88.48111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60590</plant_id>
    <plant_name>Golden Fields Solar I, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.839012</lat>
    <lon>-118.3868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60591</plant_id>
    <plant_name>Solar Star California, XLI, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.839012</lat>
    <lon>-118.3868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66502</plant_id>
    <plant_name>Valley Center 54</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Terra-Gen Operating Co-BESS 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>54</nameplate_mw>
    <summer_mw>54</summer_mw>
    <battery_mwh>216</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.227236</lat>
    <lon>-117.0177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2</plant_id>
    <plant_name>Bankhead Dam</plant_name>
    <state>AL</state>
    <county>Tuscaloosa</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>53.9</nameplate_mw>
    <summer_mw>53</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>33.458665</lat>
    <lon>-87.35682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10759</plant_id>
    <plant_name>Salton Sea Power Gen Co - Unit 3</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>53.9</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>33.158153</lat>
    <lon>-115.6387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65401</plant_id>
    <plant_name>Newton Solar BESS LLC</plant_name>
    <state>IL</state>
    <county>Jasper</county>
    <operator>Vistra Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>53.8</nameplate_mw>
    <summer_mw>53.8</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.9361</lat>
    <lon>-88.2781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57595</plant_id>
    <plant_name>Pinnacle Wind Force LLC</plant_name>
    <state>WV</state>
    <county>Mineral</county>
    <operator>Pinnacle Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>53.7</nameplate_mw>
    <summer_mw>52.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.445</lat>
    <lon>-79.03</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54746</plant_id>
    <plant_name>Wheelabrator Falls</plant_name>
    <state>PA</state>
    <county>Bucks</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>53.3</nameplate_mw>
    <summer_mw>43.9</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>40.162633</lat>
    <lon>-74.76816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>464</plant_id>
    <plant_name>Alamosa</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>53.2</nameplate_mw>
    <summer_mw>27</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1977</latest_year>
    <lat>37.4594</lat>
    <lon>-105.8947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6563</plant_id>
    <plant_name>Unionville</plant_name>
    <state>MO</state>
    <county>Putnam</county>
    <operator>Associated Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>53.2</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>40.459344</lat>
    <lon>-93.02183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>236</plant_id>
    <plant_name>Drum 2</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>53.1</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>39.257388</lat>
    <lon>-120.767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3132</plant_id>
    <plant_name>Warren</plant_name>
    <state>PA</state>
    <county>Warren</county>
    <operator>Warren Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>53.1</nameplate_mw>
    <summer_mw>62</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>41.835947</lat>
    <lon>-79.18867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56297</plant_id>
    <plant_name>Crescent Ridge</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>53</nameplate_mw>
    <summer_mw>53</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>41.25</lat>
    <lon>-89.5708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60560</plant_id>
    <plant_name>Millington Solar Farm</plant_name>
    <state>TN</state>
    <county>Shelby</county>
    <operator>SR Millington, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>53</nameplate_mw>
    <summer_mw>53</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.351533</lat>
    <lon>-89.85473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56635</plant_id>
    <plant_name>Harvest</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Harvest Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>52.8</nameplate_mw>
    <summer_mw>51.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.83</lat>
    <lon>-83.2064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56771</plant_id>
    <plant_name>Silver Star I Wind Power Project</plant_name>
    <state>TX</state>
    <county>Erath</county>
    <operator>Silver Star I Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>52.8</nameplate_mw>
    <summer_mw>52.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.338659</lat>
    <lon>-98.47605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>821</plant_id>
    <plant_name>Twin Falls (ID)</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>52.7</nameplate_mw>
    <summer_mw>52.3</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1995</latest_year>
    <lat>42.5892</lat>
    <lon>-114.3553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3152</plant_id>
    <plant_name>Sunbury Generation LP</plant_name>
    <state>PA</state>
    <county>Snyder</county>
    <operator>Sunbury Generation LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>52.7</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1971</latest_year>
    <lat>40.8361</lat>
    <lon>-76.825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10493</plant_id>
    <plant_name>Rumford Falls Hydro Facility</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Brookfield Power New England</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Batteries</technologies>
    <generators>7</generators>
    <nameplate_mw>52.5</nameplate_mw>
    <summer_mw>52.5</summer_mw>
    <battery_mwh>16</battery_mwh>
    <first_year>1918</first_year>
    <latest_year>2023</latest_year>
    <lat>44.5486</lat>
    <lon>-70.6283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50487</plant_id>
    <plant_name>PPG Powerhouse A</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Westlake 2 US LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>PUR</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>5</generators>
    <nameplate_mw>52.5</nameplate_mw>
    <summer_mw>52.5</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1957</latest_year>
    <lat>30.225054</lat>
    <lon>-93.28128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50732</plant_id>
    <plant_name>Mon Valley Works</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>United States Steel-Mon Valley</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>BFG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>52.5</nameplate_mw>
    <summer_mw>61.9</summer_mw>
    <first_year>1943</first_year>
    <latest_year>2002</latest_year>
    <lat>40.3925</lat>
    <lon>-79.8564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54316</plant_id>
    <plant_name>Archer Daniels Midland Southport</plant_name>
    <state>NC</state>
    <county>Brunswick</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>52.5</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1995</latest_year>
    <lat>33.9397</lat>
    <lon>-77.9905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56980</plant_id>
    <plant_name>Stony Creek Wind Farm LLC</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>52.5</nameplate_mw>
    <summer_mw>52.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.0311</lat>
    <lon>-78.8153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60554</plant_id>
    <plant_name>Hazlehurst II</plant_name>
    <state>GA</state>
    <county>Jeff Davis</county>
    <operator>SR South Loving, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52.5</nameplate_mw>
    <summer_mw>52.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>31.819444</lat>
    <lon>-82.60222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62163</plant_id>
    <plant_name>Meridian III</plant_name>
    <state>MS</state>
    <county>Lauderdale</county>
    <operator>SR Meridian III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52.5</nameplate_mw>
    <summer_mw>52.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.453955</lat>
    <lon>-88.54948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63436</plant_id>
    <plant_name>Corriedale Wind Energy</plant_name>
    <state>WY</state>
    <county>Laramie</county>
    <operator>Black Hills Service Company LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>52.5</nameplate_mw>
    <summer_mw>52.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.1133</lat>
    <lon>-104.984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2521</plant_id>
    <plant_name>West Babylon</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>52.4</nameplate_mw>
    <summer_mw>49.7</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>40.695485</lat>
    <lon>-73.34857</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10486</plant_id>
    <plant_name>Boise Cascade International Falls</plant_name>
    <state>MN</state>
    <county>Koochiching</county>
    <operator>Boise White Paper LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>52.3</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>48.6067</lat>
    <lon>-93.4066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>287</plant_id>
    <plant_name>Tiger Creek</plant_name>
    <state>CA</state>
    <county>Amador</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>52.2</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>38.449291</lat>
    <lon>-120.4926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69538</plant_id>
    <plant_name>Twelvemile Solar 2</plant_name>
    <state>OK</state>
    <county>Mayes</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52.2</nameplate_mw>
    <summer_mw>52.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.331569</lat>
    <lon>-95.22931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10418</plant_id>
    <plant_name>Ascend Performance Materials Texas Inc.</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Ascend Performance Materials</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>52.1</nameplate_mw>
    <summer_mw>47.7</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2000</latest_year>
    <lat>29.2558</lat>
    <lon>-95.2103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61693</plant_id>
    <plant_name>Buckleberry Solar</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>John Laing US Solar Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52.1</nameplate_mw>
    <summer_mw>52.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.380683</lat>
    <lon>-77.40599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2124</plant_id>
    <plant_name>Stockton Hydro</plant_name>
    <state>MO</state>
    <county>Cedar</county>
    <operator>USCE-Kansas City District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>37.6936</lat>
    <lon>-93.7691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6413</plant_id>
    <plant_name>Sam Rayburn Dam</plant_name>
    <state>TX</state>
    <county>Jasper</county>
    <operator>USACE-Fort Worth District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>31.060893</lat>
    <lon>-94.1062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57442</plant_id>
    <plant_name>Silver State Solar Power North</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Silver State Solar Power North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.793056</lat>
    <lon>-115.3503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60008</plant_id>
    <plant_name>Hooper Solar</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>Solar Star Colorado III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.691863</lat>
    <lon>-105.9908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60303</plant_id>
    <plant_name>Sumrall II Solar Farm</plant_name>
    <state>MS</state>
    <county>Lamar</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.397089</lat>
    <lon>-89.48588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60306</plant_id>
    <plant_name>Sumrall I Solar Farm</plant_name>
    <state>MS</state>
    <county>Lamar</county>
    <operator>MS Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.403531</lat>
    <lon>-89.49764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61988</plant_id>
    <plant_name>Citrus Ridge Solar</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>FL Solar 5, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>52</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>28.40078</lat>
    <lon>-81.61632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61925</plant_id>
    <plant_name>Casa Mesa Wind Energy Center Hybrid</plant_name>
    <state>NM</state>
    <county>Quay</county>
    <operator>Casa Mesa Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>51.9</nameplate_mw>
    <summer_mw>51.9</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.604989</lat>
    <lon>-103.9661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58836</plant_id>
    <plant_name>Lakeswind Power Partners</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>Lakeswind Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>51.8</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>46.718056</lat>
    <lon>-96.21194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65028</plant_id>
    <plant_name>Roseland Solar Project, LLC</plant_name>
    <state>TX</state>
    <county>Falls</county>
    <operator>Enel Green Power Roseland Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>51.8</nameplate_mw>
    <summer_mw>51.8</summer_mw>
    <battery_mwh>84.5</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.461242</lat>
    <lon>-96.82493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68980</plant_id>
    <plant_name>Gonzaga Ridge Battery Facility</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Gonzaga Ridge Battery Facility, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>51.8</nameplate_mw>
    <summer_mw>51.8</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.065806</lat>
    <lon>-121.1929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2131</plant_id>
    <plant_name>Higginsville</plant_name>
    <state>MO</state>
    <county>Lafayette</county>
    <operator>City of Higginsville - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>51.6</nameplate_mw>
    <summer_mw>47.2</summer_mw>
    <first_year>1945</first_year>
    <latest_year>2004</latest_year>
    <lat>39.073315</lat>
    <lon>-93.71475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4182</plant_id>
    <plant_name>Seminoe</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>51.6</nameplate_mw>
    <summer_mw>51.6</summer_mw>
    <first_year>1939</first_year>
    <latest_year>1939</latest_year>
    <lat>42.156127</lat>
    <lon>-106.9085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64672</plant_id>
    <plant_name>Blue Jay Solar I, LLC</plant_name>
    <state>TX</state>
    <county>Grimes</county>
    <operator>Blue Jay Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>51.6</nameplate_mw>
    <summer_mw>51.6</summer_mw>
    <battery_mwh>84.5</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.705329</lat>
    <lon>-96.06983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1131</plant_id>
    <plant_name>Streeter Station</plant_name>
    <state>IA</state>
    <county>Black Hawk</county>
    <operator>Cedar Falls Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>51.5</nameplate_mw>
    <summer_mw>54.6</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1973</latest_year>
    <lat>42.5267</lat>
    <lon>-92.4394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50396</plant_id>
    <plant_name>Dillard Complex</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>Roseburg Forest Products Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>6</generators>
    <nameplate_mw>51.5</nameplate_mw>
    <summer_mw>51.5</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>43.0895</lat>
    <lon>-123.4156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54749</plant_id>
    <plant_name>Goal Line LP</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Goal Line LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>51.4</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>33.1185</lat>
    <lon>-117.0995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57470</plant_id>
    <plant_name>Marlboro Mill</plant_name>
    <state>SC</state>
    <county>Marlboro</county>
    <operator>Domtar Paper Company Bennettsville</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>51.4</nameplate_mw>
    <summer_mw>34.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>34.605</lat>
    <lon>-79.785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7947</plant_id>
    <plant_name>Solway CT</plant_name>
    <state>MN</state>
    <county>Beltrami</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>51.3</nameplate_mw>
    <summer_mw>41.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2005</latest_year>
    <lat>47.544582</lat>
    <lon>-95.12965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60559</plant_id>
    <plant_name>Marquette Energy Center</plant_name>
    <state>MI</state>
    <county>Marquette</county>
    <operator>City of Marquette - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>51.3</nameplate_mw>
    <summer_mw>50.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>46.56597</lat>
    <lon>-87.43725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6636</plant_id>
    <plant_name>Lake Lynn Hydro Station</plant_name>
    <state>PA</state>
    <county>Fayette</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>51.2</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1929</latest_year>
    <lat>39.720278</lat>
    <lon>-79.85611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3803</plant_id>
    <plant_name>Chesapeake</plant_name>
    <state>VA</state>
    <county>Chesapeake</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>51.1</nameplate_mw>
    <summer_mw>38.9</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1969</latest_year>
    <lat>36.7711</lat>
    <lon>-76.3019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66840</plant_id>
    <plant_name>Egypt Road Solar</plant_name>
    <state>MD</state>
    <county>Dorchester</county>
    <operator>Urban Grid Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>51.1</nameplate_mw>
    <summer_mw>51.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.530674</lat>
    <lon>-76.10036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1877</plant_id>
    <plant_name>George Johnson</plant_name>
    <state>MI</state>
    <county>Osceola</county>
    <operator>Wolverine Power Supply Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>51.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2000</latest_year>
    <lat>43.8393</lat>
    <lon>-85.426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3913</plant_id>
    <plant_name>Alder</plant_name>
    <state>WA</state>
    <county>Pierce</county>
    <operator>City of Tacoma - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1945</first_year>
    <latest_year>1947</latest_year>
    <lat>46.8016</lat>
    <lon>-122.3102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6505</plant_id>
    <plant_name>Oak Grove</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1931</latest_year>
    <lat>45.122009</lat>
    <lon>-122.0699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52028</plant_id>
    <plant_name>Puna Geothermal Venture I</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Puna Geothermal Venture</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>12</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>43</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2012</latest_year>
    <lat>19.478976</lat>
    <lon>-154.8884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56174</plant_id>
    <plant_name>Moraine Wind LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.0667</lat>
    <lon>-96.0667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56650</plant_id>
    <plant_name>Wessington Springs</plant_name>
    <state>SD</state>
    <county>Jerauld</county>
    <operator>Wessington Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.0025</lat>
    <lon>-98.59083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57244</plant_id>
    <plant_name>Kit Carson Windpower</plant_name>
    <state>CO</state>
    <county>Kit Carson</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.3383</lat>
    <lon>-102.3533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58686</plant_id>
    <plant_name>Hancock Wind Plant</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.760833</lat>
    <lon>-68.14694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59938</plant_id>
    <plant_name>Sky Global Power One</plant_name>
    <state>TX</state>
    <county>Colorado</county>
    <operator>Sky Global Power One Pledgor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>49.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>29.550278</lat>
    <lon>-96.53778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60063</plant_id>
    <plant_name>Live Oak Solar, LLC</plant_name>
    <state>GA</state>
    <county>Candler</county>
    <operator>Live Oak Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.423798</lat>
    <lon>-82.10282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65307</plant_id>
    <plant_name>Sunnybrook Solar Project - Hybrid</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Sunnybrook Farm Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>51</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.798717</lat>
    <lon>-78.83961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60610</plant_id>
    <plant_name>St. Mary Clean Energy Center</plant_name>
    <state>LA</state>
    <county>St Mary</county>
    <operator>Cleco Power LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>50.9</nameplate_mw>
    <summer_mw>41.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.68455</lat>
    <lon>-91.47062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60149</plant_id>
    <plant_name>Innovative Solar 43, LLC</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50.8</nameplate_mw>
    <summer_mw>50.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.529956</lat>
    <lon>-78.30481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58666</plant_id>
    <plant_name>Alexander Wind Farm LLC</plant_name>
    <state>KS</state>
    <county>Rush</county>
    <operator>SRIV Partnership LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.7</nameplate_mw>
    <summer_mw>50.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.424722</lat>
    <lon>-99.5075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63223</plant_id>
    <plant_name>Brightside</plant_name>
    <state>TX</state>
    <county>Bee</county>
    <operator>Luminant Generation Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50.7</nameplate_mw>
    <summer_mw>50.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.430988</lat>
    <lon>-97.88956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56392</plant_id>
    <plant_name>FPL Energy Oliver Wind I LLC</plant_name>
    <state>ND</state>
    <county>Oliver</county>
    <operator>FPL Energy Oliver County Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.6</nameplate_mw>
    <summer_mw>50.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>47.152847</lat>
    <lon>-101.1977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57568</plant_id>
    <plant_name>Record Hill Wind</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Record Hill Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.6</nameplate_mw>
    <summer_mw>50.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.633611</lat>
    <lon>-70.62778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>21</plant_id>
    <plant_name>Yates Dam</plant_name>
    <state>AL</state>
    <county>Elmore</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>50.5</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>32.5743</lat>
    <lon>-85.8901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54100</plant_id>
    <plant_name>International Paper Vicksburg Mill</plant_name>
    <state>MS</state>
    <county>Warren</county>
    <operator>International Paper Co-Vicksbg</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>50.5</nameplate_mw>
    <summer_mw>38.5</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>32.5292</lat>
    <lon>-90.7742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3914</plant_id>
    <plant_name>Cushman 1</plant_name>
    <state>WA</state>
    <county>Mason</county>
    <operator>City of Tacoma - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>53.4</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>47.4181</lat>
    <lon>-123.2252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10233</plant_id>
    <plant_name>Leaf River Cellulose LLC</plant_name>
    <state>MS</state>
    <county>Perry</county>
    <operator>Leaf River Cellulose LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>52.2</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>31.2434</lat>
    <lon>-89.0456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56536</plant_id>
    <plant_name>Cow Branch</plant_name>
    <state>MO</state>
    <county>Atchison</county>
    <operator>Cow Branch Wind Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.4535</lat>
    <lon>-95.4683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56537</plant_id>
    <plant_name>Conception</plant_name>
    <state>MO</state>
    <county>Nodaway</county>
    <operator>CR Clearing, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.2572</lat>
    <lon>-94.6722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56792</plant_id>
    <plant_name>Buffalo Ridge I LLC</plant_name>
    <state>SD</state>
    <county>Brookings</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.4328</lat>
    <lon>-96.4779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56796</plant_id>
    <plant_name>South Chestnut LLC</plant_name>
    <state>PA</state>
    <county>Fayette</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.7513</lat>
    <lon>-79.7271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57947</plant_id>
    <plant_name>Macho Springs Power I</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>Capital Power Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.55434</lat>
    <lon>-107.5093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58908</plant_id>
    <plant_name>Beebe 1B</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>Beebe 1B Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.256944</lat>
    <lon>-84.49972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59945</plant_id>
    <plant_name>Granite Mountain Solar West, LLC</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Clearway Renewable Operation &amp; Maintenance LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.7989</lat>
    <lon>-113.322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60210</plant_id>
    <plant_name>Cotton Plains Wind Farm</plant_name>
    <state>TX</state>
    <county>Floyd</county>
    <operator>Cotton Plains Wind I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.060333</lat>
    <lon>-101.1876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60328</plant_id>
    <plant_name>Schofield Generating Station</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Hawaiian Electric Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBL</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>6</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>21.4785</lat>
    <lon>-158.0581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62618</plant_id>
    <plant_name>Hidalgo Wind Farm II</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Hidalgo Wind Farm II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>26.492862</lat>
    <lon>-98.44827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63929</plant_id>
    <plant_name>Troy Solar</plant_name>
    <state>IN</state>
    <county>Spencer</county>
    <operator>Southern Indiana Gas &amp; Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50.4</nameplate_mw>
    <summer_mw>50.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.015372</lat>
    <lon>-86.79159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60623</plant_id>
    <plant_name>Brantley Solar</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>John Laing US Solar Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>50.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.890485</lat>
    <lon>-78.15515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60624</plant_id>
    <plant_name>Fox Creek Solar</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>John Laing US Solar Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50.2</nameplate_mw>
    <summer_mw>50.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.126912</lat>
    <lon>-78.27311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>785</plant_id>
    <plant_name>Kingsley</plant_name>
    <state>NE</state>
    <county>Keith</county>
    <operator>Central Nebraska Pub P&amp;I Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>41.2114</lat>
    <lon>-101.6681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7449</plant_id>
    <plant_name>Combustion Turbine Project No 2</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Northern California Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>49.3</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>38.088138</lat>
    <lon>-121.3869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7997</plant_id>
    <plant_name>Winston</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>City of Lakeland - (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>20</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>28.0274</lat>
    <lon>-82.0164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10252</plant_id>
    <plant_name>Domtar Kingsport Mill</plant_name>
    <state>TN</state>
    <county>Sullivan</county>
    <operator>Domtar Paper Co LLC Kingsport Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>46.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>36.5489</lat>
    <lon>-82.5667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10472</plant_id>
    <plant_name>Puente Hills Energy Recovery</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles County Sanitation</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>34.0233</lat>
    <lon>-118.0241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10525</plant_id>
    <plant_name>Craven County Wood Energy LP</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>CMS Generation Operating Co II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>47</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>35.130193</lat>
    <lon>-77.16788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50472</plant_id>
    <plant_name>Reworld Niagara I</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Reworld Niagara I, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>36</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>43.0839</lat>
    <lon>-79.0056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56295</plant_id>
    <plant_name>Kumeyaay Wind</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>32.705556</lat>
    <lon>-116.3425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56750</plant_id>
    <plant_name>Jeffers Wind 20 LLC</plant_name>
    <state>MN</state>
    <county>Cottonwood</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>44.057778</lat>
    <lon>-95.2525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56819</plant_id>
    <plant_name>Flat Ridge Wind Farm</plant_name>
    <state>KS</state>
    <county>Barber</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>37.369167</lat>
    <lon>-98.46028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57285</plant_id>
    <plant_name>Sandy Ridge Wind Farm</plant_name>
    <state>PA</state>
    <county>Blair</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>48.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.729207</lat>
    <lon>-78.28735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57319</plant_id>
    <plant_name>Big Horn Wind II</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.9192</lat>
    <lon>-120.3039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57635</plant_id>
    <plant_name>Linden Wind Energy Project</plant_name>
    <state>WA</state>
    <county>Klickitat</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>45.744171</lat>
    <lon>-120.7836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57830</plant_id>
    <plant_name>Rippey Wind Farm</plant_name>
    <state>IA</state>
    <county>Greene</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.006111</lat>
    <lon>-94.23778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58003</plant_id>
    <plant_name>Alpaugh 50</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.898333</lat>
    <lon>-119.4353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59317</plant_id>
    <plant_name>Hecate Energy Beacon Solar 4</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>47</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.253611</lat>
    <lon>-118.0269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59531</plant_id>
    <plant_name>Borden Solar Farm</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>41MB 8me, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.941111</lat>
    <lon>-119.96</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59669</plant_id>
    <plant_name>Innovative Solar 54</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>John Laing US Solar Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.213697</lat>
    <lon>-77.71241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59691</plant_id>
    <plant_name>Gulf Coast Solar Center III</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.470351</lat>
    <lon>-87.33519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59702</plant_id>
    <plant_name>Pavant Solar, LLC</plant_name>
    <state>UT</state>
    <county>Millard</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.960519</lat>
    <lon>-112.3633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59838</plant_id>
    <plant_name>Milo Wind Project LLC</plant_name>
    <state>NM</state>
    <county>Roosevelt</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.901781</lat>
    <lon>-103.3468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60186</plant_id>
    <plant_name>Antelope DSR 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.655556</lat>
    <lon>-118.2807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60336</plant_id>
    <plant_name>Midway Solar Farm 1</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>83WI 8ME, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.176627</lat>
    <lon>-115.5728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60413</plant_id>
    <plant_name>Bonnybrooke PV</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.05391</lat>
    <lon>-111.3409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60449</plant_id>
    <plant_name>Pavant Solar II LLC</plant_name>
    <state>UT</state>
    <county>Millard</county>
    <operator>Pavant Solar II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.1625</lat>
    <lon>-112.343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60552</plant_id>
    <plant_name>Hattiesburg Solar Farm</plant_name>
    <state>MS</state>
    <county>Forrest</county>
    <operator>Hattiesburg Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.275828</lat>
    <lon>-89.30116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60682</plant_id>
    <plant_name>Pearl Solar</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>BHE Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.98784</lat>
    <lon>-102.2683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60885</plant_id>
    <plant_name>Boulder Solar II, LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.85</lat>
    <lon>-114.944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60989</plant_id>
    <plant_name>SolaireHolman Solar Project</plant_name>
    <state>TX</state>
    <county>Brewster</county>
    <operator>SolaireHolman 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.45512</lat>
    <lon>-103.4747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61084</plant_id>
    <plant_name>Luning Energy</plant_name>
    <state>NV</state>
    <county>Mineral</county>
    <operator>Liberty Utilities (CalPeco Electric) LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.546947</lat>
    <lon>-118.1916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61512</plant_id>
    <plant_name>Bullock Solar, LLC</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.475369</lat>
    <lon>-78.31508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61561</plant_id>
    <plant_name>Bladen Solar</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.823522</lat>
    <lon>-78.62345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61646</plant_id>
    <plant_name>LA3 West Baton Rouge Solar Facility</plant_name>
    <state>LA</state>
    <county>West Baton Rouge</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.465105</lat>
    <lon>-91.33186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61697</plant_id>
    <plant_name>Lamesa II</plant_name>
    <state>TX</state>
    <county>Dawson</county>
    <operator>Lamesa Solar II, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.713326</lat>
    <lon>-101.8852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61811</plant_id>
    <plant_name>Titan Solar</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Titan Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.68646</lat>
    <lon>-104.014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62422</plant_id>
    <plant_name>Assembly Solar Project</plant_name>
    <state>MI</state>
    <county>Shiawassee</county>
    <operator>Assembly Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.02268</lat>
    <lon>-83.94527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62440</plant_id>
    <plant_name>Techren Solar V</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Techren Solar V LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.899694</lat>
    <lon>-114.9263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62449</plant_id>
    <plant_name>Kimberly Clark Mobile - CHP Plant</plant_name>
    <state>AL</state>
    <county>Mobile</county>
    <operator>Kimberly Clark - Mobile Alabama</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>43.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.737741</lat>
    <lon>-88.04977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62464</plant_id>
    <plant_name>Little Bear 4</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Little Bear Solar 4, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.716</lat>
    <lon>-120.415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62465</plant_id>
    <plant_name>Little Bear 5</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Little Bear Solar 5, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.716</lat>
    <lon>-120.415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62822</plant_id>
    <plant_name>Broad River Solar, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.188</lat>
    <lon>-81.751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62959</plant_id>
    <plant_name>Whitehorn Solar</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Whitehorn Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.931378</lat>
    <lon>-79.35874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62964</plant_id>
    <plant_name>El Sol BESS</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.568</lat>
    <lon>-112.3059</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63128</plant_id>
    <plant_name>Iris Solar LLC</plant_name>
    <state>LA</state>
    <county>Washington</county>
    <operator>Iris Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>30.78184</lat>
    <lon>-90.19536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63579</plant_id>
    <plant_name>Britton Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Torrance</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.016</lat>
    <lon>-106.098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63811</plant_id>
    <plant_name>Lick Creek Solar, LLC</plant_name>
    <state>NC</state>
    <county>Stokes</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.283056</lat>
    <lon>-80.12827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63827</plant_id>
    <plant_name>Partin Solar</plant_name>
    <state>NC</state>
    <county>Surry</county>
    <operator>Partin Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.26801</lat>
    <lon>-80.82194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64702</plant_id>
    <plant_name>Stanly Solar, LLC</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.289722</lat>
    <lon>-80.23556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64842</plant_id>
    <plant_name>SR Turkey Creek, LLC</plant_name>
    <state>KY</state>
    <county>Garrard</county>
    <operator>SR Turkey Creek, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.592994</lat>
    <lon>-84.56797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64995</plant_id>
    <plant_name>Cassville Solar</plant_name>
    <state>WI</state>
    <county>Grant</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.753761</lat>
    <lon>-90.92744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64997</plant_id>
    <plant_name>Albany Solar (WI)</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.665848</lat>
    <lon>-89.37184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65001</plant_id>
    <plant_name>Beaver Dam Solar</plant_name>
    <state>WI</state>
    <county>Dodge</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.493942</lat>
    <lon>-88.78389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65009</plant_id>
    <plant_name>Bear Creek (WI)</plant_name>
    <state>WI</state>
    <county>Richland</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.198512</lat>
    <lon>-90.23282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65010</plant_id>
    <plant_name>North Rock</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.810873</lat>
    <lon>-89.10154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65103</plant_id>
    <plant_name>Jicarilla Solar 2</plant_name>
    <state>NM</state>
    <county>Rio Arriba</county>
    <operator>Repsol Renewables NA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.141053</lat>
    <lon>-107.1712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65259</plant_id>
    <plant_name>Byrd Ranch Storage</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Byrd Ranch Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.056</lat>
    <lon>-95.686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65304</plant_id>
    <plant_name>ENGIE Solidago Solar Project - Hybrid</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>ENGIE Solidago Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.395187</lat>
    <lon>-75.7535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65493</plant_id>
    <plant_name>Tortolas</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.432362</lat>
    <lon>-95.2507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65694</plant_id>
    <plant_name>TX11 Republic Road Storage</plant_name>
    <state>TX</state>
    <county>Robertson</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>30.881424</lat>
    <lon>-96.62542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65696</plant_id>
    <plant_name>TX13 Endurance Park Storage</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.85583</lat>
    <lon>-100.9917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65699</plant_id>
    <plant_name>TX19 River Valley Storage 1</plant_name>
    <state>TX</state>
    <county>Williamson</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>111</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.41477</lat>
    <lon>-97.35701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65700</plant_id>
    <plant_name>TX21 River Valley Storage 2</plant_name>
    <state>TX</state>
    <county>Williamson</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>107</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.41432</lat>
    <lon>-97.35518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65701</plant_id>
    <plant_name>TX23 Roughneck Storage</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.15923</lat>
    <lon>-95.6626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65805</plant_id>
    <plant_name>East Point Energy Center</plant_name>
    <state>NY</state>
    <county>Schoharie</county>
    <operator>East Point Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.461371</lat>
    <lon>-74.33509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65807</plant_id>
    <plant_name>SloughHouse Solar, LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>SloughHouse Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.467619</lat>
    <lon>-121.1845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66287</plant_id>
    <plant_name>NMRD Data Center III, LLC</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.3709</lat>
    <lon>-106.854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66629</plant_id>
    <plant_name>Envoy Solar, LLC</plant_name>
    <state>MO</state>
    <county>Audrain</county>
    <operator>Birch Creek Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.156733</lat>
    <lon>-91.84798</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66632</plant_id>
    <plant_name>Kimmel Road Solar, LLC</plant_name>
    <state>IL</state>
    <county>Perry</county>
    <operator>Birch Creek Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.050106</lat>
    <lon>-89.21268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66633</plant_id>
    <plant_name>Salt Creek Township Solar, LLC</plant_name>
    <state>IL</state>
    <county>Mason</county>
    <operator>Birch Creek Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.182668</lat>
    <lon>-89.72027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67071</plant_id>
    <plant_name>Sunlight Road Solar</plant_name>
    <state>LA</state>
    <county>Washington</county>
    <operator>Sunlight Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.781803</lat>
    <lon>-90.21736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67140</plant_id>
    <plant_name>Pleasant Creek Unit 1</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.104396</lat>
    <lon>-91.78258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67167</plant_id>
    <plant_name>Louise Solar</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.562</lat>
    <lon>-92.683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67536</plant_id>
    <plant_name>Creston Solar (50 MW)</plant_name>
    <state>IA</state>
    <county>Union</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.070705</lat>
    <lon>-94.31849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67849</plant_id>
    <plant_name>BT Signal Ranch</plant_name>
    <state>TX</state>
    <county>Hunt</county>
    <operator>BT Signal Ranch, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.986</lat>
    <lon>-96.086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67878</plant_id>
    <plant_name>Chula Vista Energy Center 2</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>219</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.59507</lat>
    <lon>-117.0586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68244</plant_id>
    <plant_name>Gransolar Texas One, LLC</plant_name>
    <state>TX</state>
    <county>Milam</county>
    <operator>Nofar USA Energy Investments and Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.599817</lat>
    <lon>-97.15475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68509</plant_id>
    <plant_name>Ventasso Energy Storage, LLC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.79669</lat>
    <lon>-116.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68801</plant_id>
    <plant_name>Kingman Energy Storage</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Kingman Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.08412</lat>
    <lon>-114.0509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68912</plant_id>
    <plant_name>Padua 1</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Padua 1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.325064</lat>
    <lon>-98.32562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69030</plant_id>
    <plant_name>North Johnson Energy Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>219</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.796106</lat>
    <lon>-116.9721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69171</plant_id>
    <plant_name>Allen 1 Battery Energy Storage System</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <battery_mwh>200</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.189949</lat>
    <lon>-81.02748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69236</plant_id>
    <plant_name>Vandalia Renewable Energy Center</plant_name>
    <state>MO</state>
    <county>Audrain</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.27</lat>
    <lon>-91.506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70041</plant_id>
    <plant_name>Bowling Green Renewable Energy Center</plant_name>
    <state>MO</state>
    <county>Pike</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.36</lat>
    <lon>-91.23</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70426</plant_id>
    <plant_name>Richfield Solar Energy LLC</plant_name>
    <state>MD</state>
    <county>Dorchester</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>50</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.603692</lat>
    <lon>-75.86579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52186</plant_id>
    <plant_name>Yuba City Cogen Partners</plant_name>
    <state>CA</state>
    <county>Sutter</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>39.13667</lat>
    <lon>-121.6398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55851</plant_id>
    <plant_name>Valero Refinery Cogeneration Unit 1</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Valero Refining Co California</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>45.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.0736</lat>
    <lon>-122.1411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58560</plant_id>
    <plant_name>Halifax County Biomass</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>South Boston Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>45.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.701389</lat>
    <lon>-78.87333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58944</plant_id>
    <plant_name>Woodville Renewable Power Project</plant_name>
    <state>TX</state>
    <county>Tyler</county>
    <operator>East Texas Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>46.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>30.748333</lat>
    <lon>-94.4375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62950</plant_id>
    <plant_name>Bluestone Solar</plant_name>
    <state>VA</state>
    <county>Mecklenburg</county>
    <operator>Bluestone Farm Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.811533</lat>
    <lon>-78.48391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65066</plant_id>
    <plant_name>Hoot Lake Solar</plant_name>
    <state>MN</state>
    <county>Otter Tail</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>46.290641</lat>
    <lon>-96.04325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65302</plant_id>
    <plant_name>Salt City Solar Project - Hybrid</plant_name>
    <state>OH</state>
    <county>Ross</county>
    <operator>Salt City Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.41473</lat>
    <lon>-82.96285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66249</plant_id>
    <plant_name>Blue Harvest Solar Park</plant_name>
    <state>OH</state>
    <county>Putnam</county>
    <operator>Blue Harvest Solar Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.091714</lat>
    <lon>-84.27437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66250</plant_id>
    <plant_name>Timber Road Solar Park</plant_name>
    <state>OH</state>
    <county>Paulding</county>
    <operator>Timber Road Solar Park</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.092297</lat>
    <lon>-84.7257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68482</plant_id>
    <plant_name>Clinton Solar (OH)</plant_name>
    <state>OH</state>
    <county>Clinton</county>
    <operator>Clinton Solar (OH) LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.9</nameplate_mw>
    <summer_mw>49.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.34098</lat>
    <lon>-83.76907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4256</plant_id>
    <plant_name>Walnut</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>47</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>37.4903</lat>
    <lon>-120.9044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7824</plant_id>
    <plant_name>Rockwood</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>42.3</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1980</latest_year>
    <lat>32.9553</lat>
    <lon>-115.5364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50493</plant_id>
    <plant_name>Double C Generation Limited Partnership</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>WCAC Operating Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.5005</lat>
    <lon>-119.046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50494</plant_id>
    <plant_name>Kern Front Limited</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>WCAC Operating Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.51647</lat>
    <lon>-119.0401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50495</plant_id>
    <plant_name>High Sierra Limited</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>WCAC Operating Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.509041</lat>
    <lon>-119.0305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54901</plant_id>
    <plant_name>Chilhowee</plant_name>
    <state>TN</state>
    <county>Blount</county>
    <operator>Brookfield Smoky Mountain Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>35.5453</lat>
    <lon>-84.0503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55739</plant_id>
    <plant_name>Condon Windpower LLC</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>49.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>45.2766</lat>
    <lon>-120.2794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56471</plant_id>
    <plant_name>McGrath Peaker</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.205556</lat>
    <lon>-119.2469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56473</plant_id>
    <plant_name>Mira Loma Peaker</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>34.0053</lat>
    <lon>-117.5604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56474</plant_id>
    <plant_name>Barre Peaker</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.8</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>33.8073</lat>
    <lon>-117.9832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2914</plant_id>
    <plant_name>Dover (OH)</plant_name>
    <state>OH</state>
    <county>Tuscarawas</county>
    <operator>City of Dover - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>49.6</nameplate_mw>
    <summer_mw>40.9</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1992</latest_year>
    <lat>40.520066</lat>
    <lon>-81.46815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56185</plant_id>
    <plant_name>Chowchilla II</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>California Power Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>16</generators>
    <nameplate_mw>49.6</nameplate_mw>
    <summer_mw>49.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>37.1073</lat>
    <lon>-120.2485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56913</plant_id>
    <plant_name>Osceola Windpower II</plant_name>
    <state>IA</state>
    <county>Osceola</county>
    <operator>Osceola Windpower II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.6</nameplate_mw>
    <summer_mw>49.6</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.4303</lat>
    <lon>-95.4167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67024</plant_id>
    <plant_name>Pitts Dudik Solar</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Elawan Pitts Dudik Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.6</nameplate_mw>
    <summer_mw>49.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.8932</lat>
    <lon>-96.8751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10349</plant_id>
    <plant_name>Greenleaf 2 Power Plant</plant_name>
    <state>CA</state>
    <county>Sutter</county>
    <operator>Greenleaf Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>39.1365</lat>
    <lon>-121.6397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50299</plant_id>
    <plant_name>AltaGas Ripon Energy Inc.</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>AltaGas Ripon Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>46.1</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>37.732533</lat>
    <lon>-121.116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54454</plant_id>
    <plant_name>San Gorgonio Windplant WPP1993</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>FPL Energy Operating Services, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.918395</lat>
    <lon>-116.5739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55262</plant_id>
    <plant_name>Bowling Green Generating Station</plant_name>
    <state>OH</state>
    <county>Wood</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.397369</lat>
    <lon>-83.64124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55263</plant_id>
    <plant_name>Galion Generating Station</plant_name>
    <state>OH</state>
    <county>Crawford</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.7167</lat>
    <lon>-82.789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55264</plant_id>
    <plant_name>Napoleon Peaking Station</plant_name>
    <state>OH</state>
    <county>Henry</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.4079</lat>
    <lon>-84.1095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56357</plant_id>
    <plant_name>FPL Energy Burleigh County Wind</plant_name>
    <state>ND</state>
    <county>Burleigh</county>
    <operator>FPL Energy Burleigh County Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2006</latest_year>
    <lat>47.1167</lat>
    <lon>-100.7333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56794</plant_id>
    <plant_name>Moraine II Wind LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.1238</lat>
    <lon>-96.0784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57031</plant_id>
    <plant_name>Luverne Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Steele</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>47.3272</lat>
    <lon>-97.8975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57120</plant_id>
    <plant_name>Wilton Wind II LLC</plant_name>
    <state>ND</state>
    <county>Burleigh</county>
    <operator>Wilton Wind II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>47.1333</lat>
    <lon>-100.7011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57326</plant_id>
    <plant_name>Sunray Wind I</plant_name>
    <state>TX</state>
    <county>Moore</county>
    <operator>Diamond Shamrock Refining Company LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>35.9454</lat>
    <lon>-101.9005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61657</plant_id>
    <plant_name>Lake Hancock Solar</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.719139</lat>
    <lon>-82.03389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64076</plant_id>
    <plant_name>Route 66 Energy Center, LLC</plant_name>
    <state>NM</state>
    <county>Cibola</county>
    <operator>Route 66 Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.098417</lat>
    <lon>-107.6146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68616</plant_id>
    <plant_name>Route 66 Energy Storage</plant_name>
    <state>NM</state>
    <county>Cibola</county>
    <operator>Route 66 Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>49.5</nameplate_mw>
    <summer_mw>49.5</summer_mw>
    <battery_mwh>198</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.059366</lat>
    <lon>-107.7092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63667</plant_id>
    <plant_name>Sanford Solar</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Sanford Airport Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.4</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.4569</lat>
    <lon>-70.7803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64387</plant_id>
    <plant_name>Quinebaug Solar</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Quinebaug Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49.4</nameplate_mw>
    <summer_mw>49.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.749867</lat>
    <lon>-71.93248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50270</plant_id>
    <plant_name>Santa Ynez Facility</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>Sable Offshore Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>49.3</nameplate_mw>
    <summer_mw>49.1</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>34.464819</lat>
    <lon>-120.0444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50624</plant_id>
    <plant_name>Torrance Refining Company, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Torrance Refining Company, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other; Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>49.3</nameplate_mw>
    <summer_mw>49.3</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1988</latest_year>
    <lat>33.85336</lat>
    <lon>-118.33</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>235</plant_id>
    <plant_name>Drum 1</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>49.2</nameplate_mw>
    <summer_mw>54</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1928</latest_year>
    <lat>39.256873</lat>
    <lon>-120.7674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6174</plant_id>
    <plant_name>Lost Creek</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1977</latest_year>
    <lat>42.6717</lat>
    <lon>-122.6772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7844</plant_id>
    <plant_name>Minnesota River</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Minnesota Municipal Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.795231</lat>
    <lon>-93.58101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50482</plant_id>
    <plant_name>Clewiston Sugar House</plant_name>
    <state>FL</state>
    <county>Hendry</county>
    <operator>United States Sugar Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>44.6</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2007</latest_year>
    <lat>26.7351</lat>
    <lon>-80.9377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56356</plant_id>
    <plant_name>Clearwater Power Plant</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>City of Riverside - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>33.8912</lat>
    <lon>-117.6085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57459</plant_id>
    <plant_name>Mountain View IV</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.8816</lat>
    <lon>-116.5527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60125</plant_id>
    <plant_name>Kawailoa Solar</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Kawailoa Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>21.624</lat>
    <lon>-158.055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66681</plant_id>
    <plant_name>Sterlington Solar</plant_name>
    <state>LA</state>
    <county>Ouachita</county>
    <operator>Entergy Louisiana LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.6926</lat>
    <lon>-92.06645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68062</plant_id>
    <plant_name>Montpelier Solar Project</plant_name>
    <state>OH</state>
    <county>Williams</county>
    <operator>Montpelier Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>49</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.59</lat>
    <lon>-84.56</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52107</plant_id>
    <plant_name>Kern River Eastridge Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>48.8</nameplate_mw>
    <summer_mw>41.6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>35.4406</lat>
    <lon>-118.9617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55512</plant_id>
    <plant_name>Cuyamaca Peak Energy Plant</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48.7</nameplate_mw>
    <summer_mw>48.7</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>32.796491</lat>
    <lon>-116.9721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63812</plant_id>
    <plant_name>Highest Power Solar, LLC</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>48.7</nameplate_mw>
    <summer_mw>48.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.12</lat>
    <lon>-78.25</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>254</plant_id>
    <plant_name>Kings River PH</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>48.6</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1962</latest_year>
    <lat>36.888166</lat>
    <lon>-119.1588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10776</plant_id>
    <plant_name>E F Oxnard Energy Facility</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>EF Oxnard, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48.5</nameplate_mw>
    <summer_mw>48.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>34.1958</lat>
    <lon>-119.1664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2801</plant_id>
    <plant_name>Jamestown</plant_name>
    <state>ND</state>
    <county>Stutsman</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>48.2</nameplate_mw>
    <summer_mw>41.4</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1978</latest_year>
    <lat>46.905665</lat>
    <lon>-98.66218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50115</plant_id>
    <plant_name>US Borax</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>U S Borax Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48.2</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>35.0329</lat>
    <lon>-117.701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7954</plant_id>
    <plant_name>Field Street</plant_name>
    <state>FL</state>
    <county>Volusia</county>
    <operator>New Smyrna Beach Utilities Commission</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>29.0213</lat>
    <lon>-80.9949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10216</plant_id>
    <plant_name>Alabama River Pulp</plant_name>
    <state>AL</state>
    <county>Monroe</county>
    <operator>Alabama River Cellulose LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>43.5</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>31.5825</lat>
    <lon>-87.4889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10425</plant_id>
    <plant_name>USG Paper, LLC - Orange Mill</plant_name>
    <state>TX</state>
    <county>Orange</county>
    <operator>USG Paper LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>33.2</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>30.2178</lat>
    <lon>-93.7422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55625</plant_id>
    <plant_name>Creed Energy Center</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Creed Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.242158</lat>
    <lon>-121.8547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55627</plant_id>
    <plant_name>Goose Haven Energy Center</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Goose Haven Energy Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.226752</lat>
    <lon>-121.8433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55855</plant_id>
    <plant_name>Wolfskill Energy Center</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Gilroy Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>47</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.228522</lat>
    <lon>-122.0753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56573</plant_id>
    <plant_name>FPL Energy Oliver Wind II LLC</plant_name>
    <state>ND</state>
    <county>Oliver</county>
    <operator>FPL Energy Oliver County Wind II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>47.152847</lat>
    <lon>-101.1977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57032</plant_id>
    <plant_name>Ashtabula Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Barnes</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>47.1244</lat>
    <lon>-97.8961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57205</plant_id>
    <plant_name>CM48</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.7814</lat>
    <lon>-114.9933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57563</plant_id>
    <plant_name>Hyder Solar Hybrid</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>47</summer_mw>
    <battery_mwh>48</battery_mwh>
    <first_year>2011</first_year>
    <latest_year>2023</latest_year>
    <lat>33.02566</lat>
    <lon>-113.344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58141</plant_id>
    <plant_name>Groton Wind LLC</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.7681</lat>
    <lon>-71.8189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66638</plant_id>
    <plant_name>Enchanted Rock Lodi</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Enchanted Rock</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.147724</lat>
    <lon>-121.2997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67380</plant_id>
    <plant_name>ERock MID Claribel Generation Station</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Enchanted Rock</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.710268</lat>
    <lon>-120.9685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67834</plant_id>
    <plant_name>Great Bend Solar Project</plant_name>
    <state>OH</state>
    <county>Meigs</county>
    <operator>Great Bend Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>48</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.003333</lat>
    <lon>-81.77111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59778</plant_id>
    <plant_name>Eden Solar LLC</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>47.7</nameplate_mw>
    <summer_mw>47.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.148503</lat>
    <lon>-79.63637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10360</plant_id>
    <plant_name>Consumer Operations LLC</plant_name>
    <state>WI</state>
    <county>Brown</county>
    <operator>Georgia-Pacific Consumer Oper. Green Bay LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>47.6</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1969</latest_year>
    <lat>44.4936</lat>
    <lon>-88.0303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50813</plant_id>
    <plant_name>Hopewell Mill</plant_name>
    <state>VA</state>
    <county>Hopewell City</county>
    <operator>RockTenn-Hopewell</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>47.6</nameplate_mw>
    <summer_mw>40.7</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>37.2914</lat>
    <lon>-77.2816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50878</plant_id>
    <plant_name>Wheelabrator Millbury Facility</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>47.6</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>42.2214</lat>
    <lon>-71.7669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54996</plant_id>
    <plant_name>Salton Sea Power Gen Co - Unit 4</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>47.5</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>33.157</lat>
    <lon>-115.6386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6006</plant_id>
    <plant_name>Racine</plant_name>
    <state>OH</state>
    <county>Meigs</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>47.4</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1983</latest_year>
    <lat>38.9153</lat>
    <lon>-81.9081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54763</plant_id>
    <plant_name>WestRock Demopolis Mill</plant_name>
    <state>AL</state>
    <county>Marengo</county>
    <operator>WestRock Mill Company, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>47.4</nameplate_mw>
    <summer_mw>43.5</summer_mw>
    <first_year>1982</first_year>
    <latest_year>2014</latest_year>
    <lat>32.4541</lat>
    <lon>-87.9759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59664</plant_id>
    <plant_name>City of West Plains Power Station</plant_name>
    <state>MO</state>
    <county>Howell</county>
    <operator>City of West Plains - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>47.4</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>36.748611</lat>
    <lon>-91.86861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10343</plant_id>
    <plant_name>Foster Wheeler Mt Carmel Cogen</plant_name>
    <state>PA</state>
    <county>Northumberland</county>
    <operator>Mount Carmel Cogen Inc</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>47.3</nameplate_mw>
    <summer_mw>43</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.811189</lat>
    <lon>-76.45295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55811</plant_id>
    <plant_name>King City Peaking</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Calpine Corp-King City</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47.3</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>36.224758</lat>
    <lon>-121.1246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55813</plant_id>
    <plant_name>Yuba City Energy Center</plant_name>
    <state>CA</state>
    <county>Sutter</county>
    <operator>Calpine Corp-Yuba City</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47.3</nameplate_mw>
    <summer_mw>47</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.1392</lat>
    <lon>-121.6387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59309</plant_id>
    <plant_name>Beacon Solar Plant Site 2</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Sune Beacon Site 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>47.3</nameplate_mw>
    <summer_mw>47.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.265833</lat>
    <lon>-117.9992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62560</plant_id>
    <plant_name>Airport Solar</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>Airport Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>47.3</nameplate_mw>
    <summer_mw>47.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.170176</lat>
    <lon>-120.4023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3982</plant_id>
    <plant_name>Bay Front</plant_name>
    <state>WI</state>
    <county>Ashland</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>47.2</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1957</latest_year>
    <lat>46.587222</lat>
    <lon>-90.9017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50305</plant_id>
    <plant_name>Alpena Cement Plant</plant_name>
    <state>MI</state>
    <county>Alpena</county>
    <operator>Amrize Cement Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke</technologies>
    <generators>5</generators>
    <nameplate_mw>47.2</nameplate_mw>
    <summer_mw>47.2</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1999</latest_year>
    <lat>45.069929</lat>
    <lon>-83.40818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57908</plant_id>
    <plant_name>Central Utility Plant Cincinnati</plant_name>
    <state>OH</state>
    <county>Hamilton</county>
    <operator>University of Cincinnati</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>47.2</nameplate_mw>
    <summer_mw>48.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>39.134533</lat>
    <lon>-84.50942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63203</plant_id>
    <plant_name>VPPSA Project 10</plant_name>
    <state>VT</state>
    <county>Franklin</county>
    <operator>Vermont Public Power Supply Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>47.2</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>44.916666</lat>
    <lon>-73.1</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7912</plant_id>
    <plant_name>Brentwood</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.787062</lat>
    <lon>-73.29341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7915</plant_id>
    <plant_name>North 1st</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.7171</lat>
    <lon>-73.9664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8053</plant_id>
    <plant_name>Pouch</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>44.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.6182</lat>
    <lon>-74.06849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50650</plant_id>
    <plant_name>ReEnergy Stratton LLC</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>ReEnergy Stratton LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>46.1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>45.140614</lat>
    <lon>-70.42558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50858</plant_id>
    <plant_name>Hillsborough County Resource Recovery</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Hillsborough County - (FL)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2009</latest_year>
    <lat>27.954901</lat>
    <lon>-82.34047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54149</plant_id>
    <plant_name>Stony Brook Cogen Plant</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Nissequoque Cogen Partners</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>44.5</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>40.916833</lat>
    <lon>-73.12906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55626</plant_id>
    <plant_name>Lambie Energy Center</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Gilroy Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.221577</lat>
    <lon>-121.8683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55847</plant_id>
    <plant_name>Feather River Energy Center</plant_name>
    <state>CA</state>
    <county>Sutter</county>
    <operator>Calpine Corp-Yuba City</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.109344</lat>
    <lon>-121.6093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55963</plant_id>
    <plant_name>Riverview Energy Center</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Gilroy Energy Center for Riverview</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>47</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.014423</lat>
    <lon>-121.7907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65673</plant_id>
    <plant_name>Sanborn BESS 4</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>47</nameplate_mw>
    <summer_mw>47</summer_mw>
    <battery_mwh>188</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.958108</lat>
    <lon>-118.1078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>12</plant_id>
    <plant_name>Holt Dam</plant_name>
    <state>AL</state>
    <county>Tuscaloosa</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>46.9</nameplate_mw>
    <summer_mw>48</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>33.2553</lat>
    <lon>-87.4495</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50533</plant_id>
    <plant_name>Painted Hills Wind Park</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46.8</nameplate_mw>
    <summer_mw>46.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.9369</lat>
    <lon>-116.6183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50971</plant_id>
    <plant_name>Tropicana Products Bradenton</plant_name>
    <state>FL</state>
    <county>Manatee</county>
    <operator>Tropicana Products Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46.8</nameplate_mw>
    <summer_mw>31</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>27.483358</lat>
    <lon>-82.54834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52073</plant_id>
    <plant_name>UCLA So Campus Cogen Project</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>University of California-LA</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>46.8</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2025</latest_year>
    <lat>34.0692</lat>
    <lon>-118.4439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54931</plant_id>
    <plant_name>Ridgetop</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46.8</nameplate_mw>
    <summer_mw>46.9</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>35.074</lat>
    <lon>-118.3153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66680</plant_id>
    <plant_name>Enchanted Rock Turlock Irrigation Distri</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Enchanted Rock</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>46.8</nameplate_mw>
    <summer_mw>46.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.435853</lat>
    <lon>-121.131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>455</plant_id>
    <plant_name>Narrows 2</plant_name>
    <state>CA</state>
    <county>Yuba</county>
    <operator>Yuba County Water Agency - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>46.7</nameplate_mw>
    <summer_mw>55</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>39.238996</lat>
    <lon>-121.2704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55950</plant_id>
    <plant_name>Elk Hills Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>California Resources Elk Hills LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>46.6</nameplate_mw>
    <summer_mw>46.6</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>35.479146</lat>
    <lon>-119.7375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2628</plant_id>
    <plant_name>Hillburn</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Alliance NYGT, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46.5</nameplate_mw>
    <summer_mw>33.1</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>41.1269</lat>
    <lon>-74.1653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57872</plant_id>
    <plant_name>LCEC Generation LLVC</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>46.5</nameplate_mw>
    <summer_mw>43.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.978056</lat>
    <lon>-103.3239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60564</plant_id>
    <plant_name>Westside Energy Station</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Rochester Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>46.5</nameplate_mw>
    <summer_mw>46.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.039023</lat>
    <lon>-92.55187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60647</plant_id>
    <plant_name>Shakopee Energy Park</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>Minnesota Municipal Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>46.5</nameplate_mw>
    <summer_mw>46.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.783611</lat>
    <lon>-93.48111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56184</plant_id>
    <plant_name>Red Bluff</plant_name>
    <state>CA</state>
    <county>Tehama</county>
    <operator>California Power Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>16</generators>
    <nameplate_mw>46.4</nameplate_mw>
    <summer_mw>44.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.1501</lat>
    <lon>-122.2124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62676</plant_id>
    <plant_name>Epic Verona</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Epic Hosting, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Solar Photovoltaic</technologies>
    <generators>20</generators>
    <nameplate_mw>46.4</nameplate_mw>
    <summer_mw>45.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2021</latest_year>
    <lat>42.996838</lat>
    <lon>-89.56875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68147</plant_id>
    <plant_name>Coffeen Solar BESS</plant_name>
    <state>IL</state>
    <county>Montgomery</county>
    <operator>Vistra Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>46.2</nameplate_mw>
    <summer_mw>46.2</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.068994</lat>
    <lon>-89.39336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10784</plant_id>
    <plant_name>Colstrip Energy LP</plant_name>
    <state>MT</state>
    <county>Rosebud</county>
    <operator>Colstrip Energy LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>46.1</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>45.9752</lat>
    <lon>-106.6547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6480</plant_id>
    <plant_name>San Francisquito 2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>44.9</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1932</latest_year>
    <lat>34.534337</lat>
    <lon>-118.5251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10649</plant_id>
    <plant_name>Bear Mountain Limited</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>WCAC Operating Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>35.419181</lat>
    <lon>-118.9266</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10650</plant_id>
    <plant_name>Badger Creek Limited</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>WCAC Operating Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>35.483736</lat>
    <lon>-119.0299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50003</plant_id>
    <plant_name>Chalk Cliff Limited</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>WCAC Operating Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>35.0968</lat>
    <lon>-119.4299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50612</plant_id>
    <plant_name>McKittrick Limited</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>WCAC Operating Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>35.319503</lat>
    <lon>-119.662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50661</plant_id>
    <plant_name>Covanta Haverhill</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Ogden Projects Inc-Haverhill</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>42.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>42.765</lat>
    <lon>-71.1242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54677</plant_id>
    <plant_name>CII Carbon LLC</plant_name>
    <state>LA</state>
    <county>St Bernard</county>
    <operator>CII Carbon LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>29.9327</lat>
    <lon>-89.9782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54768</plant_id>
    <plant_name>Live Oak Limited</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>WCAC Operating Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>35.4837</lat>
    <lon>-119.0298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61222</plant_id>
    <plant_name>Golden Hills North Wind Energy Center</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Golden Hills Interconnection Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>46</nameplate_mw>
    <summer_mw>46</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.769189</lat>
    <lon>-121.6302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60024</plant_id>
    <plant_name>Waipio Solar</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Waipio PV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>45.9</nameplate_mw>
    <summer_mw>45.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>21.456</lat>
    <lon>-157.982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64641</plant_id>
    <plant_name>Big Bend II Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>45.8</nameplate_mw>
    <summer_mw>45.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.781988</lat>
    <lon>-82.39045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3417</plant_id>
    <plant_name>Tims Ford</plant_name>
    <state>TN</state>
    <county>Franklin</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>45.7</nameplate_mw>
    <summer_mw>40.2</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1987</latest_year>
    <lat>35.1967</lat>
    <lon>-86.2783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2260</plant_id>
    <plant_name>Columbus</plant_name>
    <state>NE</state>
    <county>Platte</county>
    <operator>Loup River Public Power Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>45.6</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1936</latest_year>
    <lat>41.4639</lat>
    <lon>-97.3283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10763</plant_id>
    <plant_name>Ormesa III</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>45.6</nameplate_mw>
    <summer_mw>30.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2020</latest_year>
    <lat>32.7757</lat>
    <lon>-115.2637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10631</plant_id>
    <plant_name>CE Leathers</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>45.5</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>33.1779</lat>
    <lon>-115.565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10632</plant_id>
    <plant_name>Del Ranch Company</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>45.5</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>33.1646</lat>
    <lon>-115.616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10634</plant_id>
    <plant_name>Elmore Company</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>45.5</nameplate_mw>
    <summer_mw>49</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>33.1777</lat>
    <lon>-115.6033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7166</plant_id>
    <plant_name>Murray</plant_name>
    <state>AR</state>
    <county>Pulaski</county>
    <operator>City of North Little Rock - (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>45.4</nameplate_mw>
    <summer_mw>42.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>34.7956</lat>
    <lon>-92.3569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7318</plant_id>
    <plant_name>Van Sant Station</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>NAES Corporation - (DE)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>45.1</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>39.145036</lat>
    <lon>-75.54817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58151</plant_id>
    <plant_name>Central Utility Plant - Texas A&amp;M</plant_name>
    <state>TX</state>
    <county>Brazos</county>
    <operator>Texas A&amp;M, Utilities &amp; Energy Services</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>45.1</nameplate_mw>
    <summer_mw>43.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>30.617778</lat>
    <lon>-96.34333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>513</plant_id>
    <plant_name>Estes</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>51.6</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1950</latest_year>
    <lat>40.376771</lat>
    <lon>-105.5097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>722</plant_id>
    <plant_name>Sinclair Dam</plant_name>
    <state>GA</state>
    <county>Baldwin</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>43.8</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>33.1405</lat>
    <lon>-83.2018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2475</plant_id>
    <plant_name>Algodones</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Public Service Co of NM</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1959</latest_year>
    <lat>35.384444</lat>
    <lon>-106.4642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3255</plant_id>
    <plant_name>Cedar Creek (SC)</plant_name>
    <state>SC</state>
    <county>Lancaster</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>34.5414</lat>
    <lon>-80.8756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3256</plant_id>
    <plant_name>Dearborn</plant_name>
    <state>SC</state>
    <county>Chester</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>34.5583</lat>
    <lon>-80.8914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50960</plant_id>
    <plant_name>Union County Resource Recovery</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Reworld Union (NJ), LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>37.5</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>40.601264</lat>
    <lon>-74.26637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54562</plant_id>
    <plant_name>Longview Fibre</plant_name>
    <state>WA</state>
    <county>Cowlitz</county>
    <operator>Longview Fibre Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>47</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1966</latest_year>
    <lat>46.103887</lat>
    <lon>-122.9184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54898</plant_id>
    <plant_name>Santeetlah</plant_name>
    <state>NC</state>
    <county>Graham</county>
    <operator>Brookfield Smoky Mountain Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>35.4475</lat>
    <lon>-83.86389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56791</plant_id>
    <plant_name>Dillon Wind LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>33.9393</lat>
    <lon>-116.5527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56982</plant_id>
    <plant_name>NGP Blue Mountain I LLC</plant_name>
    <state>NV</state>
    <county>Humboldt</county>
    <operator>NGP Blue Mountain I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.9961</lat>
    <lon>-118.1414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58983</plant_id>
    <plant_name>RE Camelot LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.026667</lat>
    <lon>-118.1856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59634</plant_id>
    <plant_name>Sandstone Solar</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>43</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.035556</lat>
    <lon>-111.4303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65662</plant_id>
    <plant_name>Vancourt Solar Interconnections</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Rayos del Sol Solar Project, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>26.090103</lat>
    <lon>-97.79845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66946</plant_id>
    <plant_name>Lockhart ESS, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Terra-Gen Operating Co-Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <battery_mwh>180</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.032461</lat>
    <lon>-117.3567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67166</plant_id>
    <plant_name>Fayette Solar</plant_name>
    <state>OH</state>
    <county>Ross</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.383</lat>
    <lon>-83.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67168</plant_id>
    <plant_name>Fillmore County Solar Project</plant_name>
    <state>MN</state>
    <county>Fillmore</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>45</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.552</lat>
    <lon>-92.357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>725</plant_id>
    <plant_name>Tugalo</plant_name>
    <state>GA</state>
    <county>Habersham</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>44.8</nameplate_mw>
    <summer_mw>52</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1924</latest_year>
    <lat>34.714</lat>
    <lon>-83.3522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3003</plant_id>
    <plant_name>Fort Gibson</plant_name>
    <state>OK</state>
    <county>Cherokee</county>
    <operator>USCE-Tulsa District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>44.8</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>35.8693</lat>
    <lon>-95.2269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55934</plant_id>
    <plant_name>Century Generating Facility</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Colton Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>44.8</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>34.0606</lat>
    <lon>-117.3533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55935</plant_id>
    <plant_name>Drews Generating Facility</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Colton Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>44.8</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>34.0609</lat>
    <lon>-117.3532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54098</plant_id>
    <plant_name>Kaukauna Paper Mill</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>Thilmany LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>44.6</nameplate_mw>
    <summer_mw>44.6</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1977</latest_year>
    <lat>44.2826</lat>
    <lon>-88.2534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62291</plant_id>
    <plant_name>Palmer's Creek Wind Farm, LLC</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Palmer's Creek Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>44.6</nameplate_mw>
    <summer_mw>44.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.857694</lat>
    <lon>-95.56889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>77</plant_id>
    <plant_name>Eklutna Hydro Project</plant_name>
    <state>AK</state>
    <county>Matanuska Susitna</county>
    <operator>Chugach Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>44.4</nameplate_mw>
    <summer_mw>44.4</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>61.475211</lat>
    <lon>-149.1501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55044</plant_id>
    <plant_name>Packaging Corp. of America Jackson Mill</plant_name>
    <state>AL</state>
    <county>Clarke</county>
    <operator>Boise White Paper LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>44.4</nameplate_mw>
    <summer_mw>42.1</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2023</latest_year>
    <lat>31.4894</lat>
    <lon>-87.8989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63490</plant_id>
    <plant_name>CD4</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>CD4</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>44.4</nameplate_mw>
    <summer_mw>29.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.646053</lat>
    <lon>-118.9158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54639</plant_id>
    <plant_name>Berlin Gorham</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>Great Lakes Hydro America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Batteries</technologies>
    <generators>22</generators>
    <nameplate_mw>44.3</nameplate_mw>
    <summer_mw>44.4</summer_mw>
    <battery_mwh>14</battery_mwh>
    <first_year>1914</first_year>
    <latest_year>2023</latest_year>
    <lat>44.3889</lat>
    <lon>-71.1645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10243</plant_id>
    <plant_name>Ticona Polymers Inc</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Ticona Polymers Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>44.2</nameplate_mw>
    <summer_mw>32.5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>27.5697</lat>
    <lon>-97.8228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>412</plant_id>
    <plant_name>Chicago Park</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Nevada Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>39.177903</lat>
    <lon>-120.8909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1271</plant_id>
    <plant_name>Coffeyville</plant_name>
    <state>KS</state>
    <county>Montgomery</county>
    <operator>City of Coffeyville - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2007</latest_year>
    <lat>37.037344</lat>
    <lon>-95.61269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54415</plant_id>
    <plant_name>Cadillac Renewable Energy</plant_name>
    <state>MI</state>
    <county>Wexford</county>
    <operator>Cadillac Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.26169</lat>
    <lon>-85.43522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54953</plant_id>
    <plant_name>Hudson Falls Hydroelectric Project</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Boralex Hydro Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.2958</lat>
    <lon>-73.5956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56397</plant_id>
    <plant_name>Hunlock Unit 4</plant_name>
    <state>PA</state>
    <county>LUZERNE</county>
    <operator>Hunlock Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>44.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.2025</lat>
    <lon>-76.06833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56879</plant_id>
    <plant_name>Flat Ridge Wind Energy LLC</plant_name>
    <state>KS</state>
    <county>Barber</county>
    <operator>Clearlight Energy Holdings LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>37.3764</lat>
    <lon>-98.4583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57401</plant_id>
    <plant_name>Willow Island Hydroelectric Plant</plant_name>
    <state>WV</state>
    <county>Pleasants</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.35776</lat>
    <lon>-81.31795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57432</plant_id>
    <plant_name>Oak Glen Wind Farm</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>Minnesota Municipal Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.920556</lat>
    <lon>-93.14056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63508</plant_id>
    <plant_name>Camino Solar Hybrid</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.93031</lat>
    <lon>-118.4432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69781</plant_id>
    <plant_name>Cartwright Solar I</plant_name>
    <state>OR</state>
    <county>Crook</county>
    <operator>Cartwright Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>44</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.246532</lat>
    <lon>-120.9465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6421</plant_id>
    <plant_name>Lemolo 2</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>43.7</nameplate_mw>
    <summer_mw>38.5</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1956</latest_year>
    <lat>43.280611</lat>
    <lon>-122.4025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1678</plant_id>
    <plant_name>Waters River</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>City of Peabody - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>43.6</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.542949</lat>
    <lon>-70.92831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2641</plant_id>
    <plant_name>Rochester 5</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Rochester Gas &amp; Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>43.6</nameplate_mw>
    <summer_mw>43.8</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1927</latest_year>
    <lat>43.1803</lat>
    <lon>-77.6278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>690</plant_id>
    <plant_name>J Woodruff</plant_name>
    <state>FL</state>
    <county>Gadsden</county>
    <operator>USCE-Mobile District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>43.5</nameplate_mw>
    <summer_mw>43.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2003</latest_year>
    <lat>30.708571</lat>
    <lon>-84.86387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52168</plant_id>
    <plant_name>Riverbay</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Riverbay Corp</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>43.5</nameplate_mw>
    <summer_mw>42.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.869972</lat>
    <lon>-73.82444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56172</plant_id>
    <plant_name>Flying Cloud Power Partners LLC</plant_name>
    <state>IA</state>
    <county>Dickinson</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>43.5</nameplate_mw>
    <summer_mw>43.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.3897</lat>
    <lon>-95.2997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1130</plant_id>
    <plant_name>Gas Turbine (IA)</plant_name>
    <state>IA</state>
    <county>Black Hawk</county>
    <operator>Cedar Falls Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>43.4</nameplate_mw>
    <summer_mw>40.3</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2000</latest_year>
    <lat>42.512</lat>
    <lon>-92.476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50627</plant_id>
    <plant_name>ExxonMobil Oil Joliet Refinery</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>ExxonMobil Oil Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>43.4</nameplate_mw>
    <summer_mw>36.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1987</latest_year>
    <lat>41.4167</lat>
    <lon>-88.1833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50690</plant_id>
    <plant_name>San Gorgonio Westwinds II LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>43.4</nameplate_mw>
    <summer_mw>43.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>33.934</lat>
    <lon>-116.5781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54907</plant_id>
    <plant_name>Mass Inst Tech Cntrl Utilities/Cogen Plt</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Massachusetts Inst of Tech</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>43.4</nameplate_mw>
    <summer_mw>35.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.360986</lat>
    <lon>-71.09388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50240</plant_id>
    <plant_name>Purdue University</plant_name>
    <state>IN</state>
    <county>Tippecanoe</county>
    <operator>Purdue University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>43.3</nameplate_mw>
    <summer_mw>39.6</summer_mw>
    <first_year>1969</first_year>
    <latest_year>2000</latest_year>
    <lat>40.4172</lat>
    <lon>-86.9122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2747</plant_id>
    <plant_name>Nantahala</plant_name>
    <state>NC</state>
    <county>Macon</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>43.2</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1942</latest_year>
    <lat>35.2715</lat>
    <lon>-83.6762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3866</plant_id>
    <plant_name>Little Falls (WA)</plant_name>
    <state>WA</state>
    <county>Lincoln</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>43.2</nameplate_mw>
    <summer_mw>43.2</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1911</latest_year>
    <lat>47.821667</lat>
    <lon>-117.9167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61583</plant_id>
    <plant_name>Voyager Wind III</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>43.2</nameplate_mw>
    <summer_mw>43.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.060768</lat>
    <lon>-118.2647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2135</plant_id>
    <plant_name>Station H</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>City of Independence - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>43</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1974</latest_year>
    <lat>39.1067</lat>
    <lon>-94.3804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56054</plant_id>
    <plant_name>G McNeilus Wind Farm Dodge Center</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Justin McNeilus</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>43</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2004</latest_year>
    <lat>43.978486</lat>
    <lon>-92.85108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56195</plant_id>
    <plant_name>Combine Hills I</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Eurus Combine Hills I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>43</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>45.943</lat>
    <lon>-118.591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56847</plant_id>
    <plant_name>Plainfield Renewable Energy LLC</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Plainfield Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>43</nameplate_mw>
    <summer_mw>37.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.664376</lat>
    <lon>-71.92418</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68068</plant_id>
    <plant_name>Cape Generating Station</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Cape HoldCo LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>43</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.506706</lat>
    <lon>-112.9175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59222</plant_id>
    <plant_name>Passadumkeag Windpark LLC</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>42.9</nameplate_mw>
    <summer_mw>39.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.07</lat>
    <lon>-68.21</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52096</plant_id>
    <plant_name>Berry Placerita Cogen</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Shadow Wolf Energy</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>42.8</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>34.38407</lat>
    <lon>-118.4949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1586</plant_id>
    <plant_name>Exelon Framingham LLC</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>42.6</nameplate_mw>
    <summer_mw>30.6</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1970</latest_year>
    <lat>42.2672</lat>
    <lon>-71.3983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3040</plant_id>
    <plant_name>Toketee Falls</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>42.6</nameplate_mw>
    <summer_mw>45</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1950</latest_year>
    <lat>43.272729</lat>
    <lon>-122.4475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3257</plant_id>
    <plant_name>Fishing Creek</plant_name>
    <state>SC</state>
    <county>Chester</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>42.3</nameplate_mw>
    <summer_mw>51</summer_mw>
    <first_year>1916</first_year>
    <latest_year>1916</latest_year>
    <lat>34.6</lat>
    <lon>-80.8928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58284</plant_id>
    <plant_name>La Luz Energy Center</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>Public Service Co of NM</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>42.3</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.616111</lat>
    <lon>-106.815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1400</plant_id>
    <plant_name>Teche</plant_name>
    <state>LA</state>
    <county>St Mary</county>
    <operator>Cleco Power LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>42.2</nameplate_mw>
    <summer_mw>33.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>29.822222</lat>
    <lon>-91.5425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6286</plant_id>
    <plant_name>Fairbanks</plant_name>
    <state>AK</state>
    <county>Fairbanks North Star</county>
    <operator>Golden Valley Elec Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>42.2</nameplate_mw>
    <summer_mw>36.1</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1972</latest_year>
    <lat>64.854171</lat>
    <lon>-147.7194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54099</plant_id>
    <plant_name>Ticonderoga Mill</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>Sylvamo North America LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>42.1</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>43.891437</lat>
    <lon>-73.397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>279</plant_id>
    <plant_name>Salt Springs</plant_name>
    <state>CA</state>
    <county>Amador</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1953</latest_year>
    <lat>38.497914</lat>
    <lon>-120.2181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>851</plant_id>
    <plant_name>Albeni Falls</plant_name>
    <state>ID</state>
    <county>Bonner</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>48.180245</lat>
    <lon>-116.9986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7594</plant_id>
    <plant_name>Belleville Dam</plant_name>
    <state>WV</state>
    <county>Wood</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>39.1192</lat>
    <lon>-81.7375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8010</plant_id>
    <plant_name>Murray Turbine</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>City of Murray - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>36</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>40.67</lat>
    <lon>-111.89</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10562</plant_id>
    <plant_name>Fernandina Plant</plant_name>
    <state>FL</state>
    <county>Nassau</county>
    <operator>Rayonier Advanced Materials</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDL</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1950</first_year>
    <latest_year>2012</latest_year>
    <lat>30.6612</lat>
    <lon>-81.473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54897</plant_id>
    <plant_name>Tuckertown Hydro</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1962</latest_year>
    <lat>35.4856</lat>
    <lon>-80.1758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55816</plant_id>
    <plant_name>Hawkeye Power Partners LLC</plant_name>
    <state>IA</state>
    <county>Cerro Gordo</county>
    <operator>Hawkeye Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>43.047222</lat>
    <lon>-93.4775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56448</plant_id>
    <plant_name>Mars Hill Wind Farm Project</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>46.54422</lat>
    <lon>-67.8111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57091</plant_id>
    <plant_name>Silver Sage Windpower</plant_name>
    <state>WY</state>
    <county>Laramie</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.12968</lat>
    <lon>-105.024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63187</plant_id>
    <plant_name>FL Solar 4, LLC</plant_name>
    <state>FL</state>
    <county>Leon</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.2354</lat>
    <lon>-84.2233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63287</plant_id>
    <plant_name>Cerro Gordo Wind Farm</plant_name>
    <state>IA</state>
    <county>Cerro Gordo</county>
    <operator>Cerro Gordo Wind Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.061204</lat>
    <lon>-93.45364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64136</plant_id>
    <plant_name>Sycamore Solar</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>42</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.942634</lat>
    <lon>-79.1928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>417</plant_id>
    <plant_name>Forbestown</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>South Feather Water and Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>41.9</nameplate_mw>
    <summer_mw>37.5</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>39.551012</lat>
    <lon>-121.2788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2048</plant_id>
    <plant_name>Sweatt</plant_name>
    <state>MS</state>
    <county>Lauderdale</county>
    <operator>Mississippi Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>41.9</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>32.2925</lat>
    <lon>-88.7461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2632</plant_id>
    <plant_name>Shoemaker</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Alliance NYGT, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>41.9</nameplate_mw>
    <summer_mw>33</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>41.4278</lat>
    <lon>-74.4186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1751</plant_id>
    <plant_name>Edison Sault</plant_name>
    <state>MI</state>
    <county>Chippewa</county>
    <operator>Cloverland Electric Co-op</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>73</generators>
    <nameplate_mw>41.8</nameplate_mw>
    <summer_mw>29.2</summer_mw>
    <first_year>1901</first_year>
    <latest_year>1963</latest_year>
    <lat>46.4974</lat>
    <lon>-84.332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2121</plant_id>
    <plant_name>Carthage</plant_name>
    <state>MO</state>
    <county>Jasper</county>
    <operator>City of Carthage - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>9</generators>
    <nameplate_mw>41.8</nameplate_mw>
    <summer_mw>35.7</summer_mw>
    <first_year>1946</first_year>
    <latest_year>1976</latest_year>
    <lat>37.176646</lat>
    <lon>-94.29943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3734</plant_id>
    <plant_name>Berlin 5</plant_name>
    <state>VT</state>
    <county>Washington</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>41.8</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>44.251</lat>
    <lon>-72.6027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6414</plant_id>
    <plant_name>Whitney</plant_name>
    <state>TX</state>
    <county>Bosque</county>
    <operator>USACE-Fort Worth District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>41.8</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>31.8694</lat>
    <lon>-97.3667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59793</plant_id>
    <plant_name>Industrial Plant</plant_name>
    <state>AK</state>
    <county>Juneau</county>
    <operator>Alaska Electric Light &amp; Power Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>41.7</nameplate_mw>
    <summer_mw>23.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>58.367635</lat>
    <lon>-134.608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3993</plant_id>
    <plant_name>Sycamore (WI)</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>41.6</nameplate_mw>
    <summer_mw>30.3</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1971</latest_year>
    <lat>43.1133</lat>
    <lon>-89.3128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1358</plant_id>
    <plant_name>Haefling</plant_name>
    <state>KY</state>
    <county>Fayette</county>
    <operator>Kentucky Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>41.4</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>38.0794</lat>
    <lon>-84.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6409</plant_id>
    <plant_name>Alcova</plant_name>
    <state>WY</state>
    <county>Natrona</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>41.4</nameplate_mw>
    <summer_mw>41.4</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>42.548412</lat>
    <lon>-106.7175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50475</plant_id>
    <plant_name>Corpus Christi</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Equistar Chemicals LP</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>41</nameplate_mw>
    <summer_mw>33</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>27.811083</lat>
    <lon>-97.59581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56011</plant_id>
    <plant_name>Cabazon Wind Partners</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Shell Wind Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>41</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>33.9172</lat>
    <lon>-116.735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57915</plant_id>
    <plant_name>WE Soda Alkalai LLC</plant_name>
    <state>WY</state>
    <county>Sweetwater</county>
    <operator>WE Soda Alkali</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>6</generators>
    <nameplate_mw>41</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1975</latest_year>
    <lat>41.621667</lat>
    <lon>-109.8119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1150</plant_id>
    <plant_name>Indianola</plant_name>
    <state>IA</state>
    <county>Warren</county>
    <operator>Indianola Municipal Utilities - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>40.9</nameplate_mw>
    <summer_mw>42.2</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2000</latest_year>
    <lat>41.359491</lat>
    <lon>-93.56327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3047</plant_id>
    <plant_name>North Fork</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>40.8</nameplate_mw>
    <summer_mw>58</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>45.243287</lat>
    <lon>-122.28</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3745</plant_id>
    <plant_name>Bellows Falls</plant_name>
    <state>VT</state>
    <county>Windham</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>40.8</nameplate_mw>
    <summer_mw>47.1</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>43.1375</lat>
    <lon>-72.4464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57417</plant_id>
    <plant_name>Elk Wind Farm</plant_name>
    <state>IA</state>
    <county>Delaware</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40.8</nameplate_mw>
    <summer_mw>40.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.583889</lat>
    <lon>-91.37083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66756</plant_id>
    <plant_name>Genesee Solar Project</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>Genesee Solar Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40.8</nameplate_mw>
    <summer_mw>40.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.086377</lat>
    <lon>-83.66512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68223</plant_id>
    <plant_name>Beaverdam Renewable Energy Center</plant_name>
    <state>SC</state>
    <county>Laurens</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40.8</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.64611</lat>
    <lon>-82.03086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58537</plant_id>
    <plant_name>OCI Alamo Solar I Hybrid</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>OCI Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40.7</nameplate_mw>
    <summer_mw>40.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.271667</lat>
    <lon>-98.44472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66855</plant_id>
    <plant_name>Robin Hollow Solar</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>Robin Hollow Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40.7</nameplate_mw>
    <summer_mw>40.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.640197</lat>
    <lon>-71.6295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54775</plant_id>
    <plant_name>University of Iowa Main Power Plant</plant_name>
    <state>IA</state>
    <county>Johnson</county>
    <operator>University of Iowa</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>40.5</nameplate_mw>
    <summer_mw>40.5</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2022</latest_year>
    <lat>41.6572</lat>
    <lon>-91.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56092</plant_id>
    <plant_name>South Dakota Wind Energy Cente</plant_name>
    <state>SD</state>
    <county>Hyde</county>
    <operator>FPL Energy South Dakota Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40.5</nameplate_mw>
    <summer_mw>40.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.5492</lat>
    <lon>-99.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56912</plant_id>
    <plant_name>Langdon Wind II LLC</plant_name>
    <state>ND</state>
    <county>Cavalier</county>
    <operator>FPL Energy Langdon Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40.5</nameplate_mw>
    <summer_mw>40.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>48.6292</lat>
    <lon>-98.3164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57033</plant_id>
    <plant_name>Langdon Wind Energy Center</plant_name>
    <state>ND</state>
    <county>Cavalier</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40.5</nameplate_mw>
    <summer_mw>40.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>48.6303</lat>
    <lon>-98.3169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57755</plant_id>
    <plant_name>TPW Petersburg</plant_name>
    <state>NE</state>
    <county>Boone</county>
    <operator>TPW Petersburg LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40.5</nameplate_mw>
    <summer_mw>40.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.864583</lat>
    <lon>-97.96119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57919</plant_id>
    <plant_name>Sonoco Products Co</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Sonoco Products Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>40.5</nameplate_mw>
    <summer_mw>40.5</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1957</latest_year>
    <lat>34.385278</lat>
    <lon>-80.06778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>339</plant_id>
    <plant_name>Kern River 3</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>40.3</nameplate_mw>
    <summer_mw>40.2</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>35.776185</lat>
    <lon>-118.4362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50877</plant_id>
    <plant_name>Wheelabrator North Andover</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>40.3</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.7262</lat>
    <lon>-71.1219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>221</plant_id>
    <plant_name>Butt Valley</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>41</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>40.175656</lat>
    <lon>-121.1907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3153</plant_id>
    <plant_name>Wallenpaupack</plant_name>
    <state>PA</state>
    <county>Wayne</county>
    <operator>Wallenpuapack Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>44</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>41.467858</lat>
    <lon>-75.1309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3777</plant_id>
    <plant_name>Leesville</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>50</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>37.0933</lat>
    <lon>-79.4025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6395</plant_id>
    <plant_name>Anderson Ranch</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1951</latest_year>
    <lat>43.357066</lat>
    <lon>-115.4515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7164</plant_id>
    <plant_name>Waddell</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Central Arizona Water Conservation Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>4</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>33.8447</lat>
    <lon>-112.2714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10855</plant_id>
    <plant_name>Cargill Corn Milling Division</plant_name>
    <state>IA</state>
    <county>Monroe</county>
    <operator>Cargill Inc North America Sweetners</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>36.7</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>41.1386</lat>
    <lon>-92.6467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10869</plant_id>
    <plant_name>Biomass One LP</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>Biomass One LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>36.5</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2009</latest_year>
    <lat>42.436111</lat>
    <lon>-122.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50300</plant_id>
    <plant_name>VESI Pomona</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>VESI Pomona Energy Storage, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2023</latest_year>
    <lat>34.059444</lat>
    <lon>-117.7742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55477</plant_id>
    <plant_name>Neil Simpson Gas Turbine #2</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>Black Hills Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>34</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.285</lat>
    <lon>-105.3786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55478</plant_id>
    <plant_name>Lange Generating Station</plant_name>
    <state>SD</state>
    <county>Pennington</county>
    <operator>Black Hills Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>34</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>44.1218</lat>
    <lon>-103.2641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56144</plant_id>
    <plant_name>Springs Generating Station</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>City of Riverside - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>33.9308</lat>
    <lon>-117.2933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57080</plant_id>
    <plant_name>Sheffield Wind</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.67598</lat>
    <lon>-72.1013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57239</plant_id>
    <plant_name>Roth Rock Wind Farm LLC</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Roth Rock Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.254444</lat>
    <lon>-79.46722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57278</plant_id>
    <plant_name>Crofton Bluffs Wind LLC</plant_name>
    <state>NE</state>
    <county>Knox</county>
    <operator>Crofton Bluffs Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.698333</lat>
    <lon>-97.58</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57583</plant_id>
    <plant_name>Battery Energy Storage System</plant_name>
    <state>AK</state>
    <county>Fairbanks North Star</county>
    <operator>Golden Valley Elec Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>11</battery_mwh>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>64.8167</lat>
    <lon>-147.725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58019</plant_id>
    <plant_name>High Mesa</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>High Mesa Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>39.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.88</lat>
    <lon>-115.0367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58218</plant_id>
    <plant_name>Spion Kop Wind Farm</plant_name>
    <state>MT</state>
    <county>Judith Basin</county>
    <operator>NorthWestern Energy (MT wind/thermal)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>47.333333</lat>
    <lon>-110.6392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58904</plant_id>
    <plant_name>Fourmile Ridge</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Fourmile Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.641111</lat>
    <lon>-79.01111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59164</plant_id>
    <plant_name>Elm City Solar Facility</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.781111</lat>
    <lon>-77.84694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59690</plant_id>
    <plant_name>Gulf Coast Solar Center II</plant_name>
    <state>FL</state>
    <county>Santa Rosa</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.430766</lat>
    <lon>-86.8952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59870</plant_id>
    <plant_name>Little Bear Solar 1, LLC</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Little Bear Solar 1, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.716</lat>
    <lon>-120.415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59964</plant_id>
    <plant_name>Elevation Solar C</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.730263</lat>
    <lon>-118.3043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60043</plant_id>
    <plant_name>Cuyama Solar, LLC</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>Cuyama Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.901</lat>
    <lon>-119.596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60445</plant_id>
    <plant_name>ID Solar</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.444</lat>
    <lon>-116.333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60964</plant_id>
    <plant_name>Apache Solar I</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>Arizona Electric Pwr Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2024</latest_year>
    <lat>32.068141</lat>
    <lon>-109.8904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61068</plant_id>
    <plant_name>AES Lawai Solar Hybrid</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>21.90823</lat>
    <lon>-159.492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61365</plant_id>
    <plant_name>Fallbrook Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.384244</lat>
    <lon>-117.2353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61661</plant_id>
    <plant_name>Vista Energy Storage System</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Vista Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>38</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.203977</lat>
    <lon>-117.2539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62057</plant_id>
    <plant_name>Hazlehurst III</plant_name>
    <state>GA</state>
    <county>Jeff Davis</county>
    <operator>SR Hazlehurst III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.832474</lat>
    <lon>-82.60214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62771</plant_id>
    <plant_name>Dry Bridge Solar (Brown University)</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.55742</lat>
    <lon>-71.50726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63049</plant_id>
    <plant_name>Prineville Solar Energy LLC</plant_name>
    <state>OR</state>
    <county>Crook</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>46.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.163296</lat>
    <lon>-120.5241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63850</plant_id>
    <plant_name>Cherry</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Westlands Cherry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>160</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.122457</lat>
    <lon>-119.9232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63940</plant_id>
    <plant_name>Central 40</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Central 40, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.246</lat>
    <lon>-121.104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64740</plant_id>
    <plant_name>Castle Solar, LLC</plant_name>
    <state>UT</state>
    <county>Emery</county>
    <operator>Castle Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.334418</lat>
    <lon>-110.9907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66024</plant_id>
    <plant_name>Bird Dog Solar</plant_name>
    <state>GA</state>
    <county>Burke</county>
    <operator>Bird Dog Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.126562</lat>
    <lon>-81.99937</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66129</plant_id>
    <plant_name>Dover Solar and Battery Storage</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>30</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>27.955865</lat>
    <lon>-82.20138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66326</plant_id>
    <plant_name>Black Mesa BESS</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>160</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.908446</lat>
    <lon>-115.1813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66418</plant_id>
    <plant_name>Sonny Solar LLC</plant_name>
    <state>GA</state>
    <county>Elbert</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.052037</lat>
    <lon>-82.7222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66569</plant_id>
    <plant_name>Black Mesa Solar, LLC</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Black Mesa Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.90741</lat>
    <lon>-115.1815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66925</plant_id>
    <plant_name>SR McNeal</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>SR McNeal, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.5551</lat>
    <lon>-109.7013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66949</plant_id>
    <plant_name>Sagebrush Solar 2 ESS 40</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-BESS 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>160</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.0477</lat>
    <lon>-118.2628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68246</plant_id>
    <plant_name>BT Jungmann</plant_name>
    <state>TX</state>
    <county>Milam</county>
    <operator>Nofar USA Energy Investments and Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.903764</lat>
    <lon>-97.05778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68577</plant_id>
    <plant_name>Woodward Energy Storage</plant_name>
    <state>OK</state>
    <county>Woodward</county>
    <operator>Woodward Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>160</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.57279</lat>
    <lon>-99.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68611</plant_id>
    <plant_name>International Battery Substation (IBSS)</plant_name>
    <state>AK</state>
    <county>Anchorage</county>
    <operator>Chugach Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>61.169886</lat>
    <lon>-149.9131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70211</plant_id>
    <plant_name>Bluegrass Solar 2</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>40</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.169877</lat>
    <lon>-75.95877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60329</plant_id>
    <plant_name>Ringer Hill Wind Farm, LLC</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Ringer Hill Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>39.9</nameplate_mw>
    <summer_mw>38.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.744722</lat>
    <lon>-79.18806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3169</plant_id>
    <plant_name>Schuylkill Generating Station</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Constellation Power, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>39.8</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1971</latest_year>
    <lat>39.9419</lat>
    <lon>-75.1883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54201</plant_id>
    <plant_name>Iowa State University</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Iowa State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>39.8</nameplate_mw>
    <summer_mw>39.9</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2005</latest_year>
    <lat>42.0275</lat>
    <lon>-93.6394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3599</plant_id>
    <plant_name>Marble Falls</plant_name>
    <state>TX</state>
    <county>Burnet</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>39.6</nameplate_mw>
    <summer_mw>39.6</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>30.555288</lat>
    <lon>-98.25759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10354</plant_id>
    <plant_name>ReEnergy Livermore Falls</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>ReEnergy Livermore Falls</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>39.6</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>44.431667</lat>
    <lon>-70.1619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50210</plant_id>
    <plant_name>Vulcan-BN Geothermal Power Company</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>39.6</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>33.1633</lat>
    <lon>-115.6167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50366</plant_id>
    <plant_name>University of Notre Dame</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>University of Notre Dame</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>12</generators>
    <nameplate_mw>39.6</nameplate_mw>
    <summer_mw>39.4</summer_mw>
    <first_year>1952</first_year>
    <latest_year>2019</latest_year>
    <lat>41.7094</lat>
    <lon>-86.2367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50711</plant_id>
    <plant_name>University of Alaska Fairbanks</plant_name>
    <state>AK</state>
    <county>Fairbanks North Star</county>
    <operator>University of Alaska</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>39.6</nameplate_mw>
    <summer_mw>35.7</summer_mw>
    <first_year>1964</first_year>
    <latest_year>2020</latest_year>
    <lat>64.854171</lat>
    <lon>-147.8221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58717</plant_id>
    <plant_name>OCI Alamo 4, LLC</plant_name>
    <state>TX</state>
    <county>Kinney</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>39.6</nameplate_mw>
    <summer_mw>39.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>29.33</lat>
    <lon>-100.39</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63910</plant_id>
    <plant_name>Bluegrass Solar</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>39.6</nameplate_mw>
    <summer_mw>39.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.178761</lat>
    <lon>-75.96091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1975</plant_id>
    <plant_name>Glencoe</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Glencoe Light &amp; Power Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>39.5</nameplate_mw>
    <summer_mw>35.7</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2006</latest_year>
    <lat>44.7709</lat>
    <lon>-94.1582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10013</plant_id>
    <plant_name>Covanta Hennepin Energy</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>Covanta Energy Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>39.5</nameplate_mw>
    <summer_mw>33.7</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>44.9833</lat>
    <lon>-93.28038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50368</plant_id>
    <plant_name>Cornell University Central Heat</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Cornell University - CHP</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>39.5</nameplate_mw>
    <summer_mw>32.7</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2009</latest_year>
    <lat>42.4428</lat>
    <lon>-76.4764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50662</plant_id>
    <plant_name>Onondaga County Resource Recovery</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Covanta Onondega LP</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>39.5</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>43.0047</lat>
    <lon>-76.1149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54751</plant_id>
    <plant_name>Genesee Power Station LP</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>NorthStar Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>39.5</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.08511</lat>
    <lon>-83.66939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4015</plant_id>
    <plant_name>Wissota</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>39.4</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>44.9378</lat>
    <lon>-91.3406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2903</plant_id>
    <plant_name>Bryan (OH)</plant_name>
    <state>OH</state>
    <county>Williams</county>
    <operator>City of Bryan - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>39.3</nameplate_mw>
    <summer_mw>31.5</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1988</latest_year>
    <lat>41.471822</lat>
    <lon>-84.54315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7281</plant_id>
    <plant_name>Gardner Energy Center</plant_name>
    <state>KS</state>
    <county>Johnson</county>
    <operator>City of Gardner - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>39.2</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>38.830833</lat>
    <lon>-94.89028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7130</plant_id>
    <plant_name>Puna</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hawaii Electric Light Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>39.1</nameplate_mw>
    <summer_mw>34</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1992</latest_year>
    <lat>19.6316</lat>
    <lon>-155.0313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10501</plant_id>
    <plant_name>Mid-Set Cogeneration</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Mid Set Cogeneration Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>39.1</nameplate_mw>
    <summer_mw>36</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.19456</lat>
    <lon>-119.571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56258</plant_id>
    <plant_name>Kapaia Power Station</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Kauai Island Utility Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>OTH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>39.1</nameplate_mw>
    <summer_mw>27.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>21.996451</lat>
    <lon>-159.3758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1973</plant_id>
    <plant_name>Fairmont (MN)</plant_name>
    <state>MN</state>
    <county>Martin</county>
    <operator>Southern Minnesota Mun P Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>39</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2014</latest_year>
    <lat>43.6579</lat>
    <lon>-94.4647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2244</plant_id>
    <plant_name>North Denver</plant_name>
    <state>NE</state>
    <county>Adams</county>
    <operator>City of Hastings - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>39</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1967</latest_year>
    <lat>40.598839</lat>
    <lon>-98.38863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3004</plant_id>
    <plant_name>Tenkiller Ferry</plant_name>
    <state>OK</state>
    <county>Sequoyah</county>
    <operator>USCE-Tulsa District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>39</nameplate_mw>
    <summer_mw>42</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>35.595</lat>
    <lon>-95.0511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50395</plant_id>
    <plant_name>Georgia-Pacific Corp - Nekoosa Mill</plant_name>
    <state>WI</state>
    <county>Wood</county>
    <operator>Domtar Industries Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Wood/Wood Waste Biomass; Conventional Hydroelectric</technologies>
    <generators>9</generators>
    <nameplate_mw>39</nameplate_mw>
    <summer_mw>35.1</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1991</latest_year>
    <lat>44.3142</lat>
    <lon>-89.8964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61482</plant_id>
    <plant_name>CoreSite Real Estate 3032 Coronado, L.P.</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>CoreSite Real Estate 3032 Coronado, L.P.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>13</generators>
    <nameplate_mw>39</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.376181</lat>
    <lon>-121.9731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61976</plant_id>
    <plant_name>Peony Solar</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>39</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.502</lat>
    <lon>-81.254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50552</plant_id>
    <plant_name>Salka Cabazon Wind</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Salka Cabazon Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38.9</nameplate_mw>
    <summer_mw>38.9</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>33.914986</lat>
    <lon>-116.7103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50865</plant_id>
    <plant_name>Salinas River Cogeneration</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Salinas River Cogeneration Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38.9</nameplate_mw>
    <summer_mw>33</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>35.9515</lat>
    <lon>-120.8679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58075</plant_id>
    <plant_name>El Dorado Refinery</plant_name>
    <state>KS</state>
    <county>Butler</county>
    <operator>Frontier El Dorado Refinery LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38.9</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>37.792778</lat>
    <lon>-96.87722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2605</plant_id>
    <plant_name>School Street</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>38.8</nameplate_mw>
    <summer_mw>36.9</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1924</latest_year>
    <lat>42.78498</lat>
    <lon>-73.70798</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4257</plant_id>
    <plant_name>Easton 2</plant_name>
    <state>MD</state>
    <county>Talbot</county>
    <operator>Easton Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>38.8</nameplate_mw>
    <summer_mw>37</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2004</latest_year>
    <lat>38.795</lat>
    <lon>-76.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50404</plant_id>
    <plant_name>BP Chemicals Green Lake Plant</plant_name>
    <state>TX</state>
    <county>Calhoun</county>
    <operator>INEOS Nitriles Greenlake</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>38.8</nameplate_mw>
    <summer_mw>38.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1997</latest_year>
    <lat>28.5707</lat>
    <lon>-96.8333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60254</plant_id>
    <plant_name>Owatonna Energy Station</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>Southern Minnesota Mun P Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>38.8</nameplate_mw>
    <summer_mw>38.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.085225</lat>
    <lon>-93.26271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7867</plant_id>
    <plant_name>Snoqualmie 2</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>38.7</nameplate_mw>
    <summer_mw>33.6</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2013</latest_year>
    <lat>47.5445</lat>
    <lon>-121.8414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50170</plant_id>
    <plant_name>Berry Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Berry Petroleum Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38.7</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>35.093046</lat>
    <lon>-119.4436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66952</plant_id>
    <plant_name>Prescott Wind Farm</plant_name>
    <state>IA</state>
    <county>Adams</county>
    <operator>Prescott Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38.7</nameplate_mw>
    <summer_mw>55.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.121034</lat>
    <lon>-94.60513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>707</plant_id>
    <plant_name>Goat Rock</plant_name>
    <state>AL</state>
    <county>Lee</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>38.6</nameplate_mw>
    <summer_mw>38.6</summer_mw>
    <first_year>1915</first_year>
    <latest_year>2005</latest_year>
    <lat>32.6096</lat>
    <lon>-85.0795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6612</plant_id>
    <plant_name>Union Valley</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>38.6</nameplate_mw>
    <summer_mw>38.6</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>38.86429</lat>
    <lon>-120.4443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10822</plant_id>
    <plant_name>Grayling Generating Station</plant_name>
    <state>MI</state>
    <county>Crawford</county>
    <operator>NorthStar Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>38.6</nameplate_mw>
    <summer_mw>38.6</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>44.604921</lat>
    <lon>-84.69058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2614</plant_id>
    <plant_name>Stewarts Bridge</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>38.5</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1952</first_year>
    <latest_year>2013</latest_year>
    <lat>43.2978</lat>
    <lon>-73.8853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3416</plant_id>
    <plant_name>South Holston</plant_name>
    <state>TN</state>
    <county>Sullivan</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>38.5</nameplate_mw>
    <summer_mw>44.4</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>36.523174</lat>
    <lon>-82.09021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10091</plant_id>
    <plant_name>Total Energy Facilities</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles County Sanitation</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>38.4</nameplate_mw>
    <summer_mw>31.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2003</latest_year>
    <lat>33.7683</lat>
    <lon>-118.2836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10568</plant_id>
    <plant_name>Port Arthur Texas Refinery</plant_name>
    <state>TX</state>
    <county>Jefferson</county>
    <operator>Total Petrochemicals USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38.4</nameplate_mw>
    <summer_mw>30.3</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>29.964938</lat>
    <lon>-93.89128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50131</plant_id>
    <plant_name>Coalinga Cogeneration</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Coalinga Cogeneration Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38.4</nameplate_mw>
    <summer_mw>36</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>36.1807</lat>
    <lon>-120.3885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>519</plant_id>
    <plant_name>Pole Hill</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>38.2</nameplate_mw>
    <summer_mw>38.2</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>40.365056</lat>
    <lon>-105.3251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>971</plant_id>
    <plant_name>Waterloo</plant_name>
    <state>IL</state>
    <county>Monroe</county>
    <operator>City of Waterloo - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>14</generators>
    <nameplate_mw>38.2</nameplate_mw>
    <summer_mw>35.8</summer_mw>
    <first_year>1946</first_year>
    <latest_year>2026</latest_year>
    <lat>38.334786</lat>
    <lon>-90.15894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50864</plant_id>
    <plant_name>Sargent Canyon Cogeneration</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Sargent Canyon Cogeneration Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38.2</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>35.9359</lat>
    <lon>-120.8408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56163</plant_id>
    <plant_name>Kennecott Power Plant</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Kennecott Utah Copper</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>38.2</nameplate_mw>
    <summer_mw>37.7</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2010</latest_year>
    <lat>40.7119</lat>
    <lon>-112.1225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>299</plant_id>
    <plant_name>Blundell</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>38.1</nameplate_mw>
    <summer_mw>31.7</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2007</latest_year>
    <lat>38.4889</lat>
    <lon>-112.8533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50188</plant_id>
    <plant_name>International Paper Co. - New Bern Mill</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>GFC - New Bern Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>38.1</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.212</lat>
    <lon>-77.1144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54249</plant_id>
    <plant_name>Smith Falls Hydro Project</plant_name>
    <state>ID</state>
    <county>Boundary</county>
    <operator>Smith Creek Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>38.1</nameplate_mw>
    <summer_mw>20.1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1990</latest_year>
    <lat>48.959547</lat>
    <lon>-116.5574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64877</plant_id>
    <plant_name>Edwards Sanborn E3</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>38.1</nameplate_mw>
    <summer_mw>38.1</summer_mw>
    <battery_mwh>31.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.946324</lat>
    <lon>-118.1265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2136</plant_id>
    <plant_name>Station I</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>City of Independence - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>39.055954</lat>
    <lon>-94.39296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4177</plant_id>
    <plant_name>Glendo</plant_name>
    <state>WY</state>
    <county>Platte</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1959</latest_year>
    <lat>42.467254</lat>
    <lon>-104.9555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10004</plant_id>
    <plant_name>Mosaic South Pierce Operations</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Mosaic Fertilizer LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>33</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>27.76522</lat>
    <lon>-81.93879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56446</plant_id>
    <plant_name>Buena Vista Energy LLC</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>37.805</lat>
    <lon>-121.6672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57268</plant_id>
    <plant_name>Chestnut Flats Wind Farm</plant_name>
    <state>PA</state>
    <county>Blair</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.522846</lat>
    <lon>-78.47692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57560</plant_id>
    <plant_name>Chino Valley Solar</plant_name>
    <state>AZ</state>
    <county>Yavapai</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>38</summer_mw>
    <battery_mwh>76</battery_mwh>
    <first_year>2012</first_year>
    <latest_year>2024</latest_year>
    <lat>34.71843</lat>
    <lon>-112.429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66027</plant_id>
    <plant_name>Wolfskin Solar</plant_name>
    <state>GA</state>
    <county>Oglethorpe</county>
    <operator>Wolfskin Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>38</nameplate_mw>
    <summer_mw>38</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.881462</lat>
    <lon>-83.24668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>957</plant_id>
    <plant_name>Princeton (IL)</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>City of Princeton - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>37.9</nameplate_mw>
    <summer_mw>37.7</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1976</latest_year>
    <lat>41.375528</lat>
    <lon>-89.46487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56700</plant_id>
    <plant_name>Lookout Windpower LLC</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Lookout Windpower, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>37.8</nameplate_mw>
    <summer_mw>37.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.8794</lat>
    <lon>-78.9183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59308</plant_id>
    <plant_name>Beacon Solar Plant Site 5</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Sune Beacon Site 5, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>37.8</nameplate_mw>
    <summer_mw>37.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.248889</lat>
    <lon>-118.0344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3869</plant_id>
    <plant_name>Nine Mile</plant_name>
    <state>WA</state>
    <county>Spokane</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>37.6</nameplate_mw>
    <summer_mw>37.6</summer_mw>
    <first_year>1908</first_year>
    <latest_year>1994</latest_year>
    <lat>47.769722</lat>
    <lon>-117.5372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>393</plant_id>
    <plant_name>Control Gorge</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>37.5</nameplate_mw>
    <summer_mw>37.5</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>37.437921</lat>
    <lon>-118.557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>401</plant_id>
    <plant_name>Middle Gorge</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>37.5</nameplate_mw>
    <summer_mw>37.5</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>37.51</lat>
    <lon>-118.5692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>407</plant_id>
    <plant_name>Upper Gorge</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>37.5</nameplate_mw>
    <summer_mw>36.5</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>37.546036</lat>
    <lon>-118.59</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50393</plant_id>
    <plant_name>Friant Hydro Facility</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Friant Power Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>37.5</nameplate_mw>
    <summer_mw>39.4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2017</latest_year>
    <lat>36.997694</lat>
    <lon>-119.7035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54236</plant_id>
    <plant_name>Pfizer Groton Plant</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Pfizer Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>37.5</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>1952</first_year>
    <latest_year>2009</latest_year>
    <lat>41.3315</lat>
    <lon>-72.0786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56211</plant_id>
    <plant_name>Sweetwater Wind 1 LLC</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>37.5</nameplate_mw>
    <summer_mw>37.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.3606</lat>
    <lon>-100.3389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56633</plant_id>
    <plant_name>Dutch Hill Wind Project</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>37.5</nameplate_mw>
    <summer_mw>37.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.5456</lat>
    <lon>-77.4967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61655</plant_id>
    <plant_name>Bonnie Mine Solar</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>37.5</nameplate_mw>
    <summer_mw>37.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.89008</lat>
    <lon>-81.98717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50036</plant_id>
    <plant_name>New Martinsville Hannibal Hydro</plant_name>
    <state>WV</state>
    <county>Wetzel</county>
    <operator>New Martinsville Hannibal Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>37.4</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>39.6672</lat>
    <lon>-80.8642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>552</plant_id>
    <plant_name>Shepaug</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>FirstLight Power Resources Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>37.2</nameplate_mw>
    <summer_mw>41.5</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>41.44842</lat>
    <lon>-73.29532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3045</plant_id>
    <plant_name>Faraday</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>37.2</nameplate_mw>
    <summer_mw>41.9</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2023</latest_year>
    <lat>45.268045</lat>
    <lon>-122.3201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50654</plant_id>
    <plant_name>Steamboat Hills LP</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>37.2</nameplate_mw>
    <summer_mw>26.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2024</latest_year>
    <lat>39.37</lat>
    <lon>-119.7669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55540</plant_id>
    <plant_name>Chula Vista Energy Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>37.2</nameplate_mw>
    <summer_mw>37.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>32.591667</lat>
    <lon>-117.0586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>772</plant_id>
    <plant_name>W H Hill</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hawaii Electric Light Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>37.1</nameplate_mw>
    <summer_mw>35.5</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1974</latest_year>
    <lat>19.7041</lat>
    <lon>-155.0607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2504</plant_id>
    <plant_name>74th Street</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>Consolidated Edison Co-NY Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>37</nameplate_mw>
    <summer_mw>37.8</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>40.768</lat>
    <lon>-73.9515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7545</plant_id>
    <plant_name>Kaw Hydro</plant_name>
    <state>OK</state>
    <county>Kay</county>
    <operator>Oklahoma Municipal Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>37</nameplate_mw>
    <summer_mw>29.6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>36.6994</lat>
    <lon>-96.9278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56643</plant_id>
    <plant_name>St Paul Cogeneration</plant_name>
    <state>MN</state>
    <county>Ramsey</county>
    <operator>St Paul Cogeneration LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>37</nameplate_mw>
    <summer_mw>33</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.942889</lat>
    <lon>-93.09656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63491</plant_id>
    <plant_name>North Valley</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>North Valley</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>37</nameplate_mw>
    <summer_mw>26.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>40.37294</lat>
    <lon>-119.4625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62657</plant_id>
    <plant_name>DWW Solar ll</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>DWW Solar ll LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>36.9</nameplate_mw>
    <summer_mw>36.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.541596</lat>
    <lon>-72.47502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57201</plant_id>
    <plant_name>FPL Energy Montezuma Winds LLC</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>FPL Energy Montezuma Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>36.8</nameplate_mw>
    <summer_mw>36.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.163581</lat>
    <lon>-121.7966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50215</plant_id>
    <plant_name>York County Resource Recovery</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>York County Solid W &amp; R Auth - (PA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>36.5</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.0017</lat>
    <lon>-76.7183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58310</plant_id>
    <plant_name>Lake Charles Plant</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Rain CII Carbon LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>36.4</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>30.148889</lat>
    <lon>-93.33556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2609</plant_id>
    <plant_name>Sherman Island</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>36.3</nameplate_mw>
    <summer_mw>36.9</summer_mw>
    <first_year>1923</first_year>
    <latest_year>2009</latest_year>
    <lat>43.2797</lat>
    <lon>-73.7094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2937</plant_id>
    <plant_name>Piqua Power Plant</plant_name>
    <state>OH</state>
    <county>Miami</county>
    <operator>City of Piqua - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>36.3</nameplate_mw>
    <summer_mw>36.5</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1989</latest_year>
    <lat>40.133848</lat>
    <lon>-84.23726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58084</plant_id>
    <plant_name>Kimberly Clark-Unit 1,2,3</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>Kimberly-Clark Corporation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>36.3</nameplate_mw>
    <summer_mw>33.1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.558333</lat>
    <lon>-73.41361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7250</plant_id>
    <plant_name>Auke Bay</plant_name>
    <state>AK</state>
    <county>Juneau</county>
    <operator>Alaska Electric Light &amp; Power Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>36.2</nameplate_mw>
    <summer_mw>28.3</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1994</latest_year>
    <lat>58.3875</lat>
    <lon>-134.6446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10405</plant_id>
    <plant_name>Kingsburg Cogen</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>KES Kingsburg LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>36.2</nameplate_mw>
    <summer_mw>33.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>36.5397</lat>
    <lon>-119.5794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10777</plant_id>
    <plant_name>HL Power</plant_name>
    <state>CA</state>
    <county>Lassen</county>
    <operator>HL Power Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>36.2</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.368338</lat>
    <lon>-120.2648</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52152</plant_id>
    <plant_name>International Paper Franklin Mill</plant_name>
    <state>VA</state>
    <county>Isle of Wight</county>
    <operator>GFC - Franklin</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>36.1</nameplate_mw>
    <summer_mw>36.1</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1977</latest_year>
    <lat>36.6803</lat>
    <lon>-76.9128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>149</plant_id>
    <plant_name>Roosevelt</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>34</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>33.671104</lat>
    <lon>-111.1618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1097</plant_id>
    <plant_name>Merl Parr</plant_name>
    <state>IA</state>
    <county>Floyd</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>32.4</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>43.0563</lat>
    <lon>-92.6932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2134</plant_id>
    <plant_name>Jackson Square</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>City of Independence - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>39.094574</lat>
    <lon>-94.41152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2545</plant_id>
    <plant_name>Bennetts Bridge</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>30.3</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1966</latest_year>
    <lat>43.5317</lat>
    <lon>-75.9531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2729</plant_id>
    <plant_name>Oxford Dam</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>35.8214</lat>
    <lon>-81.1922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3115</plant_id>
    <plant_name>Titus</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>Titus Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>31.1</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1970</latest_year>
    <lat>40.3056</lat>
    <lon>-75.9081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4180</plant_id>
    <plant_name>Kortes</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>36.6</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1951</latest_year>
    <lat>42.174301</lat>
    <lon>-106.8805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6418</plant_id>
    <plant_name>Cheatham</plant_name>
    <state>TN</state>
    <county>Dickson</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>41.4</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>36.3208</lat>
    <lon>-87.2219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50392</plant_id>
    <plant_name>Eielson AFB Central Heat &amp; Power Plant</plant_name>
    <state>AK</state>
    <county>Fairbanks North Star</county>
    <operator>U S Air Force-Eielson AFB</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>33.6</summer_mw>
    <first_year>1955</first_year>
    <latest_year>2025</latest_year>
    <lat>64.67141</lat>
    <lon>-147.076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50611</plant_id>
    <plant_name>Westwood Generation LLC</plant_name>
    <state>PA</state>
    <county>Schuylkill</county>
    <operator>Rausch Creek Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>WC</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.6191</lat>
    <lon>-76.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57289</plant_id>
    <plant_name>Big Blue</plant_name>
    <state>MN</state>
    <county>Faribault</county>
    <operator>Big Blue Wind Farm LLC (MN)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>36</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.612222</lat>
    <lon>-94.19194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59957</plant_id>
    <plant_name>Grand Ridge Battery Projects</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>36</nameplate_mw>
    <summer_mw>36</summer_mw>
    <battery_mwh>13.5</battery_mwh>
    <first_year>2013</first_year>
    <latest_year>2015</latest_year>
    <lat>41.2269</lat>
    <lon>-88.6836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1979</plant_id>
    <plant_name>Hibbing</plant_name>
    <state>MN</state>
    <county>St Louis</county>
    <operator>Hibbing Public Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>35.9</nameplate_mw>
    <summer_mw>35.2</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1996</latest_year>
    <lat>47.4294</lat>
    <lon>-92.935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2352</plant_id>
    <plant_name>Vernon Dam</plant_name>
    <state>VT</state>
    <county>Windham</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>35.9</nameplate_mw>
    <summer_mw>33.8</summer_mw>
    <first_year>1909</first_year>
    <latest_year>2008</latest_year>
    <lat>42.77165</lat>
    <lon>-72.5146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60314</plant_id>
    <plant_name>Prairie Breeze III</plant_name>
    <state>NE</state>
    <county>Antelope</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>35.8</nameplate_mw>
    <summer_mw>35.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.987656</lat>
    <lon>-98.2104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>665</plant_id>
    <plant_name>G W Ivey</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>City of Homestead - (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>35.7</nameplate_mw>
    <summer_mw>32.7</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2013</latest_year>
    <lat>25.4756</lat>
    <lon>-80.47</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50859</plant_id>
    <plant_name>Lancaster County Resource Recovery</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Covanta Lancaster Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>35.7</nameplate_mw>
    <summer_mw>32.4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.0711</lat>
    <lon>-76.6436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58007</plant_id>
    <plant_name>Brea Expansion Plant</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Brea Power II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>35.7</nameplate_mw>
    <summer_mw>37.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.932022</lat>
    <lon>-117.8402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59254</plant_id>
    <plant_name>Johnston LFG Turbine Plant</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Rhode Island LFG Genco</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>35.7</nameplate_mw>
    <summer_mw>30.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.803333</lat>
    <lon>-71.52333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2353</plant_id>
    <plant_name>Wilder</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>35.6</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1987</latest_year>
    <lat>43.667927</lat>
    <lon>-72.30364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68058</plant_id>
    <plant_name>Prairie Center Energy LLC</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Whetstone Power Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>35.4</nameplate_mw>
    <summer_mw>33.7</summer_mw>
    <battery_mwh>235</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.930281</lat>
    <lon>-104.7943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6086</plant_id>
    <plant_name>Cornell</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>35.3</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1977</latest_year>
    <lat>45.164024</lat>
    <lon>-91.15743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50112</plant_id>
    <plant_name>Sierra Pacific Quincy Facility</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>35.2</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.941165</lat>
    <lon>-120.9092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57039</plant_id>
    <plant_name>McFadden Ridge</plant_name>
    <state>WY</state>
    <county>Albany</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>35.2</nameplate_mw>
    <summer_mw>28.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.7244</lat>
    <lon>-105.9906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1484</plant_id>
    <plant_name>Cape Gas Turbine</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>FPL Energy Cape LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>43.6436</lat>
    <lon>-70.2544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10003</plant_id>
    <plant_name>Colorado Energy Nations Company</plant_name>
    <state>CO</state>
    <county>Jefferson</county>
    <operator>Molson Coors USA LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>40</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1983</latest_year>
    <lat>39.7606</lat>
    <lon>-105.215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10287</plant_id>
    <plant_name>Beowawe</plant_name>
    <state>NV</state>
    <county>Lander</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>25.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>40.5547</lat>
    <lon>-116.6175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10435</plant_id>
    <plant_name>Camden Resource Recovery Facility</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Covanta Camden Energy Recovery Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>33</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>39.9092</lat>
    <lon>-75.1169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50229</plant_id>
    <plant_name>Texas Petrochemicals</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>TPC Group, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>29.6981</lat>
    <lon>-95.2547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57317</plant_id>
    <plant_name>San Luis Valley Solar Ranch</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>37.694535</lat>
    <lon>-105.9276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57832</plant_id>
    <plant_name>Hawkeye Wind Farm</plant_name>
    <state>IA</state>
    <county>Bremer</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>34</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.948889</lat>
    <lon>-92.06222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57996</plant_id>
    <plant_name>Auwahi Wind Energy Hybrid</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Auwahi Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <battery_mwh>4.4</battery_mwh>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>20.596</lat>
    <lon>-156.318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60540</plant_id>
    <plant_name>Innovative Solar 31</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.539425</lat>
    <lon>-78.75539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62289</plant_id>
    <plant_name>Dearborn Energy Center</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>26.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.2969</lat>
    <lon>-83.23125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62376</plant_id>
    <plant_name>Grazing Yak Solar</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Grazing Yak Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.977759</lat>
    <lon>-104.2527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65630</plant_id>
    <plant_name>SR Bell Buckle</plant_name>
    <state>TN</state>
    <county>Bedford</county>
    <operator>SR Bell Buckle, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.57</lat>
    <lon>-86.46</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66358</plant_id>
    <plant_name>Virginia Line Solar, LLC</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.523774</lat>
    <lon>-78.28536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66630</plant_id>
    <plant_name>Richland Township Solar, LLC</plant_name>
    <state>IL</state>
    <county>Marshall</county>
    <operator>Birch Creek Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.935947</lat>
    <lon>-89.28789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66631</plant_id>
    <plant_name>Earp Solar, LLC</plant_name>
    <state>IL</state>
    <county>Warren</county>
    <operator>Birch Creek Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.891816</lat>
    <lon>-90.66881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67092</plant_id>
    <plant_name>Paulsell</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Crow Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <battery_mwh>60</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.374065</lat>
    <lon>-121.1352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67876</plant_id>
    <plant_name>Potter Solar</plant_name>
    <state>PA</state>
    <county>Potter</county>
    <operator>Potter Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>35</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.837559</lat>
    <lon>-78.04845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7018</plant_id>
    <plant_name>Chanute 3</plant_name>
    <state>KS</state>
    <county>Neosho</county>
    <operator>City of Chanute (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>34.8</nameplate_mw>
    <summer_mw>32.1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1991</latest_year>
    <lat>37.6376</lat>
    <lon>-95.4704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54321</plant_id>
    <plant_name>Chickadee G-3</plant_name>
    <state>TX</state>
    <county>Jefferson</county>
    <operator>Chickadee 3-G Purchaser LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>34.8</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1999</latest_year>
    <lat>29.9728</lat>
    <lon>-94.2142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10382</plant_id>
    <plant_name>Lumberton</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>NC Renewable Power - Lumberton LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>34.7</nameplate_mw>
    <summer_mw>34.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>34.59</lat>
    <lon>-78.9968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50754</plant_id>
    <plant_name>Oak Creek Energy Systems I</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>34.5</nameplate_mw>
    <summer_mw>34.5</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1999</latest_year>
    <lat>35.043889</lat>
    <lon>-118.2764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56369</plant_id>
    <plant_name>Casselman Wind Power Project</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>34.5</nameplate_mw>
    <summer_mw>34.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>39.85</lat>
    <lon>-79.138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56594</plant_id>
    <plant_name>Munnsville Wind Farm LLC</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>34.5</nameplate_mw>
    <summer_mw>34.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>42.9086</lat>
    <lon>-75.5697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57083</plant_id>
    <plant_name>Bull Hill Wind Project</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>34.5</nameplate_mw>
    <summer_mw>34.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.723056</lat>
    <lon>-68.2425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54979</plant_id>
    <plant_name>Big Spring Wind Power Facility</plant_name>
    <state>TX</state>
    <county>Howard</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>34.3</nameplate_mw>
    <summer_mw>34.3</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>32.2075</lat>
    <lon>-101.3883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56309</plant_id>
    <plant_name>Trigen St. Louis</plant_name>
    <state>MO</state>
    <county>St Louis</county>
    <operator>Centerstream STL, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Steam Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>34.2</nameplate_mw>
    <summer_mw>33.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2000</latest_year>
    <lat>38.6359</lat>
    <lon>-90.1809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58608</plant_id>
    <plant_name>Saddleback Ridge Wind Farm</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>CPV Saddleback Ridge Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>34.2</nameplate_mw>
    <summer_mw>34.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2015</latest_year>
    <lat>44.593333</lat>
    <lon>-70.38111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7392</plant_id>
    <plant_name>Poplar Bluff Generating Station</plant_name>
    <state>MO</state>
    <county>Butler</county>
    <operator>City of Poplar Bluff - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>34.1</nameplate_mw>
    <summer_mw>32.8</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2002</latest_year>
    <lat>36.7597</lat>
    <lon>-90.3903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6056</plant_id>
    <plant_name>Kahului</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Maui Electric Co Ltd</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>34</nameplate_mw>
    <summer_mw>32.4</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1966</latest_year>
    <lat>20.896884</lat>
    <lon>-156.4627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54224</plant_id>
    <plant_name>Franklin Heating Station</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Franklin Heating Station</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine; All Other</technologies>
    <generators>11</generators>
    <nameplate_mw>34</nameplate_mw>
    <summer_mw>29.1</summer_mw>
    <first_year>1951</first_year>
    <latest_year>2021</latest_year>
    <lat>44.020576</lat>
    <lon>-92.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57561</plant_id>
    <plant_name>Cotton Center Solar Hybrid</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>34</nameplate_mw>
    <summer_mw>34</summer_mw>
    <battery_mwh>51</battery_mwh>
    <first_year>2011</first_year>
    <latest_year>2023</latest_year>
    <lat>33.034722</lat>
    <lon>-112.6617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57562</plant_id>
    <plant_name>Paloma Solar Hybrid</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>34</nameplate_mw>
    <summer_mw>34</summer_mw>
    <battery_mwh>51</battery_mwh>
    <first_year>2011</first_year>
    <latest_year>2023</latest_year>
    <lat>33.021111</lat>
    <lon>-112.6614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61488</plant_id>
    <plant_name>NYU LANGONE HEALTH</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>NYU LANGONE HEALTH</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>13</generators>
    <nameplate_mw>34</nameplate_mw>
    <summer_mw>26.6</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2018</latest_year>
    <lat>40.746778</lat>
    <lon>-73.97223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4007</plant_id>
    <plant_name>Holcombe</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>33.9</nameplate_mw>
    <summer_mw>21.9</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1950</latest_year>
    <lat>45.223611</lat>
    <lon>-91.12722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59666</plant_id>
    <plant_name>Innovative Solar 47</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>33.8</nameplate_mw>
    <summer_mw>33.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.801933</lat>
    <lon>-79.33245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3404</plant_id>
    <plant_name>Great Falls (TN)</plant_name>
    <state>TN</state>
    <county>Warren</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>33.7</nameplate_mw>
    <summer_mw>35.4</summer_mw>
    <first_year>1916</first_year>
    <latest_year>1924</latest_year>
    <lat>35.806732</lat>
    <lon>-85.63406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>71</plant_id>
    <plant_name>Terror Lake Microgrid</plant_name>
    <state>AK</state>
    <county>Kodiak Island</county>
    <operator>Kodiak Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>33.6</nameplate_mw>
    <summer_mw>33.6</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2014</latest_year>
    <lat>57.6861</lat>
    <lon>-152.895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>944</plant_id>
    <plant_name>Geneseo</plant_name>
    <state>IL</state>
    <county>Henry</county>
    <operator>City of Geneseo - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids; Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>11</generators>
    <nameplate_mw>33.6</nameplate_mw>
    <summer_mw>27.2</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2015</latest_year>
    <lat>41.451494</lat>
    <lon>-90.14855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3746</plant_id>
    <plant_name>Harriman</plant_name>
    <state>VT</state>
    <county>Windham</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>33.6</nameplate_mw>
    <summer_mw>40.8</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>42.7936</lat>
    <lon>-72.9144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63285</plant_id>
    <plant_name>Valero Wilmington Cogeneration Plant</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Valero Wilmington</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>33.5</nameplate_mw>
    <summer_mw>32.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.778655</lat>
    <lon>-118.2385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>972</plant_id>
    <plant_name>Winnetka</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Village of Winnetka - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>33.4</nameplate_mw>
    <summer_mw>33.4</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1979</latest_year>
    <lat>42.115589</lat>
    <lon>-87.73103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1605</plant_id>
    <plant_name>Hadley Falls</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>City of Holyoke Gas and Elec Dept - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>33.4</nameplate_mw>
    <summer_mw>33.1</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1983</latest_year>
    <lat>42.2119</lat>
    <lon>-72.6036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4056</plant_id>
    <plant_name>Prairie Du Sac</plant_name>
    <state>WI</state>
    <county>Sauk</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>33.4</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1940</latest_year>
    <lat>43.309932</lat>
    <lon>-89.72778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59678</plant_id>
    <plant_name>Innovative Solar 67</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>John Laing US Solar Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>33.3</nameplate_mw>
    <summer_mw>33.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.623309</lat>
    <lon>-78.00538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2126</plant_id>
    <plant_name>Fulton (MO)</plant_name>
    <state>MO</state>
    <county>Callaway</county>
    <operator>City of Fulton - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>33.2</nameplate_mw>
    <summer_mw>25.3</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1975</latest_year>
    <lat>38.868095</lat>
    <lon>-91.94778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10819</plant_id>
    <plant_name>Ada Cogeneration LP</plant_name>
    <state>MI</state>
    <county>Kent</county>
    <operator>Ada Cogeneration LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>33.1</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.962672</lat>
    <lon>-85.49407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>388</plant_id>
    <plant_name>Pilot Knob</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>32.736642</lat>
    <lon>-114.7139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>827</plant_id>
    <plant_name>Grace</plant_name>
    <state>ID</state>
    <county>Caribou</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>33</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>42.53675</lat>
    <lon>-111.794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1630</plant_id>
    <plant_name>Cobble Mountain</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>City of Holyoke Gas and Elec Dept - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>32.6</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>42.117112</lat>
    <lon>-72.86466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10427</plant_id>
    <plant_name>New-Indy Ontario Mill</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>New-Indy Ontario LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>29.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.045361</lat>
    <lon>-117.5402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54372</plant_id>
    <plant_name>University of Colorado</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>University of Colorado</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>31</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>40.00759</lat>
    <lon>-105.2692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54896</plant_id>
    <plant_name>High Rock Hydro</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>39</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>35.6008</lat>
    <lon>-80.2339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57584</plant_id>
    <plant_name>University of California San Diego Hybri</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>University of California San Diego</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>32.8747</lat>
    <lon>-117.2392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58022</plant_id>
    <plant_name>Neal Hot Springs Geothermal Project</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>US Geothermal Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>17.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.023056</lat>
    <lon>-117.4681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60960</plant_id>
    <plant_name>Hyperion Treatment Plant CHP Plant</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Constellation New Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>33</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.9254</lat>
    <lon>-118.4298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7072</plant_id>
    <plant_name>Mojave Siphon</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>California Dept. of Water Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>32.7</nameplate_mw>
    <summer_mw>32.4</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>34.307444</lat>
    <lon>-117.3235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50191</plant_id>
    <plant_name>IP Springfield Oregon</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>International Paper Corporation - Springfield</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>32.7</nameplate_mw>
    <summer_mw>33</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>44.0569</lat>
    <lon>-122.9555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2848</plant_id>
    <plant_name>O H Hutchings</plant_name>
    <state>OH</state>
    <county>Montgomery</county>
    <operator>Kimura Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>32.6</nameplate_mw>
    <summer_mw>25.2</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>39.6088</lat>
    <lon>-84.2921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50512</plant_id>
    <plant_name>Glen Park Hydroelectric Project</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>32.6</nameplate_mw>
    <summer_mw>32.6</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.000608</lat>
    <lon>-75.96116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67178</plant_id>
    <plant_name>Mohave Energy - Hybrid</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Mohave Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>32.6</nameplate_mw>
    <summer_mw>32.6</summer_mw>
    <battery_mwh>60</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.99333</lat>
    <lon>-114.5484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50049</plant_id>
    <plant_name>Humboldt Sawmill Company</plant_name>
    <state>CA</state>
    <county>Humboldt</county>
    <operator>Mendocino Forest Products</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>32.5</nameplate_mw>
    <summer_mw>33.5</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1988</latest_year>
    <lat>40.4728</lat>
    <lon>-124.1014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63349</plant_id>
    <plant_name>OE_AZ1</plant_name>
    <state>AZ</state>
    <county>La Paz</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>32.5</nameplate_mw>
    <summer_mw>32.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.776667</lat>
    <lon>-113.6561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7040</plant_id>
    <plant_name>Ellis Hydro</plant_name>
    <state>AR</state>
    <county>Crawford</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>32.4</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>35.351361</lat>
    <lon>-94.29435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7135</plant_id>
    <plant_name>Whillock</plant_name>
    <state>AR</state>
    <county>Conway</county>
    <operator>Arkansas Electric Coop Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>32.4</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>35.127591</lat>
    <lon>-92.79027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67488</plant_id>
    <plant_name>TAI Huntsville Solar Hybrid</plant_name>
    <state>AL</state>
    <county>Madison</county>
    <operator>TAI Huntsville Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>32.4</nameplate_mw>
    <summer_mw>32.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.829551</lat>
    <lon>-86.63035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69187</plant_id>
    <plant_name>Big Bend 1 Solar and Battery Storage</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>32.4</nameplate_mw>
    <summer_mw>29.8</summer_mw>
    <battery_mwh>25.2</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2019</latest_year>
    <lat>27.78529</lat>
    <lon>-82.38471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54625</plant_id>
    <plant_name>Reworld Plymouth LLC</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>Reworld Waste LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>32.1</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>40.0967</lat>
    <lon>-75.3103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58584</plant_id>
    <plant_name>Princeton University Cogeneration</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Trustees of Princeton University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>32.1</nameplate_mw>
    <summer_mw>32.1</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2022</latest_year>
    <lat>40.341389</lat>
    <lon>-74.65722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2909</plant_id>
    <plant_name>West 41st Street</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>City of Cleveland - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>41.474</lat>
    <lon>-81.7145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3029</plant_id>
    <plant_name>Lemolo 1</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>43.3558</lat>
    <lon>-122.2494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3033</plant_id>
    <plant_name>Prospect 2</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>36</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>42.731237</lat>
    <lon>-122.514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7782</plant_id>
    <plant_name>Hamilton Peaking</plant_name>
    <state>OH</state>
    <county>Butler</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>39.3528</lat>
    <lon>-84.5183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7783</plant_id>
    <plant_name>Bowling Green Peaking</plant_name>
    <state>OH</state>
    <county>Wood</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.3884</lat>
    <lon>-83.6402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50748</plant_id>
    <plant_name>Agnews Power Plant</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>OLS Energy-Agnews Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>37.4058</lat>
    <lon>-121.9272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54276</plant_id>
    <plant_name>Univ of NC Chapel Hill Cogen Facility</plant_name>
    <state>NC</state>
    <county>Orange</county>
    <operator>University of North Carolina</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32.3</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2007</latest_year>
    <lat>35.9069</lat>
    <lon>-79.0617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57451</plant_id>
    <plant_name>Tuscarora Geothermal Power Plant</plant_name>
    <state>NV</state>
    <county>Elko</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>21.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.4828</lat>
    <lon>-116.1511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57852</plant_id>
    <plant_name>Minden Wind Park</plant_name>
    <state>MI</state>
    <county>Sanilac</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.67</lat>
    <lon>-82.75861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58711</plant_id>
    <plant_name>Lost Hills/Blackwell</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.62</lat>
    <lon>-119.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63084</plant_id>
    <plant_name>Caden Energix Hickory LLC</plant_name>
    <state>VA</state>
    <county>Chesapeake City</county>
    <operator>Caden Energix Hickory LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.624113</lat>
    <lon>-76.19427</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66662</plant_id>
    <plant_name>Lead BESS 2</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Hanford BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>32</nameplate_mw>
    <summer_mw>32</summer_mw>
    <battery_mwh>32</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.269531</lat>
    <lon>-119.6487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55557</plant_id>
    <plant_name>Wilmington Hydrogen Plant</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Air Products &amp; Chemicals Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>31.9</nameplate_mw>
    <summer_mw>28.1</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>33.7803</lat>
    <lon>-118.24</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56541</plant_id>
    <plant_name>Galena 3 Geothermal Power Plant</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>31.6</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.388722</lat>
    <lon>-119.7489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62423</plant_id>
    <plant_name>Regeneron Pharmaceuticals Inc.</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Regeneron Pharmaceuticals Inc.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Solar Photovoltaic; Natural Gas Internal Combustion Engine</technologies>
    <generators>20</generators>
    <nameplate_mw>31.6</nameplate_mw>
    <summer_mw>30.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2025</latest_year>
    <lat>41.07875</lat>
    <lon>-73.82227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1707</plant_id>
    <plant_name>Hardy</plant_name>
    <state>MI</state>
    <county>Newaygo</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>31.5</nameplate_mw>
    <summer_mw>33.6</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>43.486618</lat>
    <lon>-85.62987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6410</plant_id>
    <plant_name>Falcon Dam &amp; Power</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>International Bound &amp; Wtr Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>31.5</nameplate_mw>
    <summer_mw>30.5</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>26.5575</lat>
    <lon>-99.1642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57589</plant_id>
    <plant_name>Long Island Solar Farm LLC</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Long Island Solar Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>31.5</nameplate_mw>
    <summer_mw>31.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.861111</lat>
    <lon>-72.84778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60390</plant_id>
    <plant_name>Beech Ridge Energy Storage</plant_name>
    <state>WV</state>
    <county>Greenbrier</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>31.5</nameplate_mw>
    <summer_mw>31.5</summer_mw>
    <battery_mwh>12.5</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.0878</lat>
    <lon>-80.4925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69363</plant_id>
    <plant_name>CoreSite Real Estate SV9, L.P.</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>CoreSite Real Estate SV9, L.P.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>31.5</nameplate_mw>
    <summer_mw>31.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>37.3749</lat>
    <lon>-121.9692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2139</plant_id>
    <plant_name>Kennett</plant_name>
    <state>MO</state>
    <county>Dunklin</county>
    <operator>City of Kennett - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>31.4</nameplate_mw>
    <summer_mw>28.2</summer_mw>
    <first_year>1965</first_year>
    <latest_year>2001</latest_year>
    <lat>36.2338</lat>
    <lon>-90.0521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54895</plant_id>
    <plant_name>Falls Hydro</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>31.4</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1922</latest_year>
    <lat>35.3944</lat>
    <lon>-80.0753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65219</plant_id>
    <plant_name>Caden Energix Endless Caverns, LLC</plant_name>
    <state>VA</state>
    <county>Rockingham</county>
    <operator>Caden Energix Endless Caverns, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>31.4</nameplate_mw>
    <summer_mw>31.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.613601</lat>
    <lon>-78.67707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2237</plant_id>
    <plant_name>Falls City</plant_name>
    <state>NE</state>
    <county>Richardson</county>
    <operator>City of Falls City - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>31.3</nameplate_mw>
    <summer_mw>29.2</summer_mw>
    <first_year>1930</first_year>
    <latest_year>2018</latest_year>
    <lat>40.055</lat>
    <lon>-95.6083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54851</plant_id>
    <plant_name>MMSD Jones Island Wastewater</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>Milwaukee Metro Sewerage Dist</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>31.3</nameplate_mw>
    <summer_mw>26.8</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2013</latest_year>
    <lat>43.0214</lat>
    <lon>-87.9014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50666</plant_id>
    <plant_name>Pasco Cnty Solid Waste Resource Recovery</plant_name>
    <state>FL</state>
    <county>Pasco</county>
    <operator>Pasco County - (FL)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>31.2</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>28.3681</lat>
    <lon>-82.5583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1580</plant_id>
    <plant_name>Easton</plant_name>
    <state>MD</state>
    <county>Talbot</county>
    <operator>Easton Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>31.1</nameplate_mw>
    <summer_mw>29.9</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1995</latest_year>
    <lat>38.7786</lat>
    <lon>-76.0769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50851</plant_id>
    <plant_name>CSUCI Site Authority</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>CSUCI Site Authority</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>31.1</nameplate_mw>
    <summer_mw>28.3</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>34.161951</lat>
    <lon>-119.0479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57884</plant_id>
    <plant_name>Lake Charles Polymers</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Equistar Chemicals LP</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>31.1</nameplate_mw>
    <summer_mw>30.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>30.196571</lat>
    <lon>-93.32197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>217</plant_id>
    <plant_name>Balch 1</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>31</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>36.909137</lat>
    <lon>-119.0877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>539</plant_id>
    <plant_name>Rocky River (CT)</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>FirstLight Power Resources Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>3</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>29.4</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1929</latest_year>
    <lat>41.5826</lat>
    <lon>-73.4349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10652</plant_id>
    <plant_name>Burney Forest Products</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Burney Forest Products, A Joint Venture</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>31</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.879719</lat>
    <lon>-121.7203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50148</plant_id>
    <plant_name>Linde Wilmington</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Linde Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>27</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>33.78856</lat>
    <lon>-118.2294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50281</plant_id>
    <plant_name>San Gorgonio Farms Wind Farm</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>San Gorgonio Farms Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>31</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>33.926111</lat>
    <lon>-116.615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50729</plant_id>
    <plant_name>Clairton Works</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>United States Steel- Clairton</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>2</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>40.3097</lat>
    <lon>-79.8819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57082</plant_id>
    <plant_name>Kaheawa Wind Power II LLC</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>31</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>20.79467</lat>
    <lon>-156.536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59876</plant_id>
    <plant_name>Marine Corps Logistics Base Solar</plant_name>
    <state>GA</state>
    <county>Dougherty</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>31.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.560729</lat>
    <lon>-84.09326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66175</plant_id>
    <plant_name>Ivanhoe Generation Facility</plant_name>
    <state>LA</state>
    <county>St Mary</county>
    <operator>Orion Engineered Carbons</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>31</nameplate_mw>
    <summer_mw>26.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.777</lat>
    <lon>-91.736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2144</plant_id>
    <plant_name>Marshall (MO)</plant_name>
    <state>MO</state>
    <county>Saline</county>
    <operator>City of Marshall - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>30.8</nameplate_mw>
    <summer_mw>29.3</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1994</latest_year>
    <lat>39.1228</lat>
    <lon>-93.2064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50751</plant_id>
    <plant_name>Southeast Kern River Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>30.8</nameplate_mw>
    <summer_mw>26.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.4206</lat>
    <lon>-118.9644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50850</plant_id>
    <plant_name>CamChino Leasing LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>CamChino Leasing LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>30.8</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>33.989626</lat>
    <lon>-117.6809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57243</plant_id>
    <plant_name>Cimarron Solar Facility</plant_name>
    <state>NM</state>
    <county>Colfax</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30.6</nameplate_mw>
    <summer_mw>30.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>36.468078</lat>
    <lon>-104.6357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70512</plant_id>
    <plant_name>Viejas Microgrid</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Indian Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>30.6</nameplate_mw>
    <summer_mw>29.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.842</lat>
    <lon>-116.704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>553</plant_id>
    <plant_name>Stevenson</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>FirstLight Power Resources Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>30.5</nameplate_mw>
    <summer_mw>28.9</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1936</latest_year>
    <lat>41.3833</lat>
    <lon>-73.1714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59894</plant_id>
    <plant_name>Pawpaw Solar Plant</plant_name>
    <state>GA</state>
    <county>Taylor</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30.5</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.572875</lat>
    <lon>-84.25678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69404</plant_id>
    <plant_name>Craggy Energy Storage</plant_name>
    <state>NC</state>
    <county>Buncombe</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>30.5</nameplate_mw>
    <summer_mw>30.5</summer_mw>
    <battery_mwh>61</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.641793</lat>
    <lon>-82.60868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3665</plant_id>
    <plant_name>Bountiful City</plant_name>
    <state>UT</state>
    <county>Davis</county>
    <operator>City of Bountiful - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>30.4</nameplate_mw>
    <summer_mw>24.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2012</latest_year>
    <lat>40.886867</lat>
    <lon>-111.8853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56509</plant_id>
    <plant_name>Tesoro SLC Cogeneration Plant</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Tesoro Refng Marketing Co Mntn Region</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>30.4</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.7931</lat>
    <lon>-111.9038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69674</plant_id>
    <plant_name>Pitts Dudik Solar II</plant_name>
    <state>TX</state>
    <county>Hill</county>
    <operator>Elawan Pitts Dudik Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30.4</nameplate_mw>
    <summer_mw>30.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.891711</lat>
    <lon>-96.87922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55596</plant_id>
    <plant_name>GRS Arbor Hills</plant_name>
    <state>MI</state>
    <county>Washtenaw</county>
    <operator>Gas Recovery Systems Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>30.3</nameplate_mw>
    <summer_mw>23.8</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2005</latest_year>
    <lat>42.395335</lat>
    <lon>-83.558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58490</plant_id>
    <plant_name>Spectrum Solar PV Power Project</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30.2</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.23</lat>
    <lon>-114.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58710</plant_id>
    <plant_name>Barilla Solar</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30.2</nameplate_mw>
    <summer_mw>30.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>30.96</lat>
    <lon>-103.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59658</plant_id>
    <plant_name>SPI Anderson 2</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>30.2</nameplate_mw>
    <summer_mw>27.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.472283</lat>
    <lon>-122.3242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62227</plant_id>
    <plant_name>Seymour Hills Wind Project, LLC</plant_name>
    <state>TX</state>
    <county>Baylor</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30.2</nameplate_mw>
    <summer_mw>30.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.57824</lat>
    <lon>-99.1921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68890</plant_id>
    <plant_name>P66 Rodeo Solar</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>P66 Rodeo Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30.2</nameplate_mw>
    <summer_mw>30.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.035</lat>
    <lon>-122.247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>584</plant_id>
    <plant_name>Navajo Dam</plant_name>
    <state>NM</state>
    <county>San Juan</county>
    <operator>City of Farmington - (NM)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>36.8061</lat>
    <lon>-107.6131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>829</plant_id>
    <plant_name>Oneida</plant_name>
    <state>ID</state>
    <county>Franklin</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>27.9</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1920</latest_year>
    <lat>42.267774</lat>
    <lon>-111.7485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2551</plant_id>
    <plant_name>Colton</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>29.7</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1928</latest_year>
    <lat>44.5839</lat>
    <lon>-74.9583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3081</plant_id>
    <plant_name>Hills Creek</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1962</latest_year>
    <lat>43.7107</lat>
    <lon>-122.4238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3124</plant_id>
    <plant_name>Piney</plant_name>
    <state>PA</state>
    <county>Clarion</county>
    <operator>BP Piney &amp; Deep Creek LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>33.2</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1928</latest_year>
    <lat>41.192088</lat>
    <lon>-79.4335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3646</plant_id>
    <plant_name>Cutler Hydro</plant_name>
    <state>UT</state>
    <county>Box Elder</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>41.834702</lat>
    <lon>-112.0521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6430</plant_id>
    <plant_name>Cedar Falls (WA)</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>City of Seattle - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1929</latest_year>
    <lat>47.4193</lat>
    <lon>-121.7819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7436</plant_id>
    <plant_name>Vernon</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Vernon - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1933</first_year>
    <latest_year>1933</latest_year>
    <lat>33.9986</lat>
    <lon>-118.2219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50067</plant_id>
    <plant_name>Borger Plant</plant_name>
    <state>TX</state>
    <county>Hutchinson</county>
    <operator>Sid Richardson Carbon Ltd</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>BFG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>35.6647</lat>
    <lon>-101.4354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50535</plant_id>
    <plant_name>Mesa Wind Power LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Mesa Wind Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.9461</lat>
    <lon>-116.6769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50803</plant_id>
    <plant_name>Seminole Mill</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>WestRock Seminole</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>30.4178</lat>
    <lon>-81.5978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54239</plant_id>
    <plant_name>Naval Submarine Base Kings Bay</plant_name>
    <state>GA</state>
    <county>Camden</county>
    <operator>Kings Bay Naval Base</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>12</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1989</latest_year>
    <lat>30.7917</lat>
    <lon>-81.5333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54318</plant_id>
    <plant_name>General Chemical</plant_name>
    <state>WY</state>
    <county>Sweetwater</county>
    <operator>Tata Chemicals Partners</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1977</latest_year>
    <lat>41.5933</lat>
    <lon>-109.7542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55742</plant_id>
    <plant_name>Montfort Wind Energy Center</plant_name>
    <state>WI</state>
    <county>Iowa</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.9625</lat>
    <lon>-90.38667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55790</plant_id>
    <plant_name>Fenner Wind</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>CHI Energy Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.988989</lat>
    <lon>-75.76254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56052</plant_id>
    <plant_name>Meyersdale Windpower, LLC</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Sequitur Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.790739</lat>
    <lon>-79.00205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56106</plant_id>
    <plant_name>Kimball Wind</plant_name>
    <state>NE</state>
    <county>Kimball</county>
    <operator>Aspenall Energies (Delaware), LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.2736</lat>
    <lon>-103.6983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56192</plant_id>
    <plant_name>Georgia-Pacific Wauna Mill</plant_name>
    <state>OR</state>
    <county>Clatsop</county>
    <operator>Georgia-Pacific Wauna LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>46.153955</lat>
    <lon>-123.4066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56449</plant_id>
    <plant_name>Kaheawa Pastures Wind Farm Hybrid</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>20.81421</lat>
    <lon>-156.551</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56782</plant_id>
    <plant_name>Diamond Willow Wind Facility</plant_name>
    <state>MT</state>
    <county>Fallon</county>
    <operator>Montana-Dakota Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>46.2753</lat>
    <lon>-104.1836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56833</plant_id>
    <plant_name>OREG 1 Inc</plant_name>
    <state>MT</state>
    <county>Roosevelt</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>4</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>48.2139</lat>
    <lon>-104.3975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56880</plant_id>
    <plant_name>OREG 2 Inc</plant_name>
    <state>MT</state>
    <county>Roosevelt</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>4</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>48.2142</lat>
    <lon>-104.3975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57087</plant_id>
    <plant_name>Kahuku Wind Power LLC</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>21.68097</lat>
    <lon>-157.975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57368</plant_id>
    <plant_name>Alamosa Solar</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>Solar of Alamosa LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.598579</lat>
    <lon>-105.9558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57385</plant_id>
    <plant_name>Community Wind North LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.245556</lat>
    <lon>-96.40639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57505</plant_id>
    <plant_name>Monroe Generating Station</plant_name>
    <state>NC</state>
    <county>Union</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>34.985814</lat>
    <lon>-80.50604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57699</plant_id>
    <plant_name>Webberville Solar Project</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>FRV AE Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>30.238492</lat>
    <lon>-97.50881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57999</plant_id>
    <plant_name>Patton Wind Farm</plant_name>
    <state>PA</state>
    <county>Cambria</county>
    <operator>Exus Pennsylvania Wind Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.63067</lat>
    <lon>-78.69608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58035</plant_id>
    <plant_name>Block Island Wind Farm</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Deepwater Wind Block Island LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Offshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Offshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>29.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.114722</lat>
    <lon>-71.52111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58045</plant_id>
    <plant_name>Community Wind South</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.713611</lat>
    <lon>-95.80278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58048</plant_id>
    <plant_name>Mozart Wind Farm</plant_name>
    <state>TX</state>
    <county>Kent &amp; Stonewall</county>
    <operator>Mozart Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.969722</lat>
    <lon>-100.5242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58628</plant_id>
    <plant_name>Simon Solar Farm LLC</plant_name>
    <state>GA</state>
    <county>Walton</county>
    <operator>Simon Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.678056</lat>
    <lon>-83.67583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59147</plant_id>
    <plant_name>Fair Wind</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Fair Wind Power Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.404564</lat>
    <lon>-79.29114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59689</plant_id>
    <plant_name>Gulf Coast Solar Center I</plant_name>
    <state>FL</state>
    <county>Okaloosa</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.515448</lat>
    <lon>-86.51841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59723</plant_id>
    <plant_name>Seville 2</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.1101</lat>
    <lon>-116.0059</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59862</plant_id>
    <plant_name>Fort Benning Solar Facility</plant_name>
    <state>AL</state>
    <county>Russell</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>32.30404</lat>
    <lon>-84.98993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59863</plant_id>
    <plant_name>Fort Gordon Solar Facility</plant_name>
    <state>GA</state>
    <county>Richmond</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.386625</lat>
    <lon>-82.14012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59864</plant_id>
    <plant_name>Kings Bay Solar Facility</plant_name>
    <state>GA</state>
    <county>Camden</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>30.827627</lat>
    <lon>-81.55624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59865</plant_id>
    <plant_name>Fort Stewart Solar Facility</plant_name>
    <state>GA</state>
    <county>Liberty</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>31.90474</lat>
    <lon>-81.59537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60237</plant_id>
    <plant_name>Midway Solar Farm II</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.162056</lat>
    <lon>-115.5317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60285</plant_id>
    <plant_name>Red Horse III</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>Red Horse III</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.13597</lat>
    <lon>-110.0513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60304</plant_id>
    <plant_name>San Isabel Solar, LLC</plant_name>
    <state>CO</state>
    <county>Las Animas</county>
    <operator>San Isabel Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.372</lat>
    <lon>-104.843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60351</plant_id>
    <plant_name>Bison Solar LLC</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>Bison Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.863809</lat>
    <lon>-105.0111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60570</plant_id>
    <plant_name>Escondido Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <battery_mwh>120</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.124446</lat>
    <lon>-117.1143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60690</plant_id>
    <plant_name>Blue Summit Storage, LLC</plant_name>
    <state>TX</state>
    <county>Wilbarger</county>
    <operator>Blue Summit Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <battery_mwh>12.6</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.299</lat>
    <lon>-99.399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60789</plant_id>
    <plant_name>Bluebell Solar</plant_name>
    <state>TX</state>
    <county>Sterling</county>
    <operator>Bluebell Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.87</lat>
    <lon>-100.828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61039</plant_id>
    <plant_name>Deerfield Wind LLC</plant_name>
    <state>VT</state>
    <county>Bennington</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.877215</lat>
    <lon>-72.99372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61366</plant_id>
    <plant_name>Top Gun Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <battery_mwh>120</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.876198</lat>
    <lon>-117.1678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61678</plant_id>
    <plant_name>Pinal Central Energy Center Hybrid</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Pinal Central Energy Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.875697</lat>
    <lon>-111.5511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62052</plant_id>
    <plant_name>Citizens Imperial Solar</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.191661</lat>
    <lon>-115.4338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62932</plant_id>
    <plant_name>Oberon IB</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Oberon Solar IB</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.692358</lat>
    <lon>-102.6974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63545</plant_id>
    <plant_name>Chevron - Lost Hills Hybrid</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.62</lat>
    <lon>-119.69</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64427</plant_id>
    <plant_name>Copperton Solar Plant No. 1</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Kennecott Utah Copper</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>29.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>40.57664</lat>
    <lon>-112.0846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65397</plant_id>
    <plant_name>Santa Paula Energy Storage LLC</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Santa Paula Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <battery_mwh>30</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.35716</lat>
    <lon>-119.055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66405</plant_id>
    <plant_name>Chaves County Solar II</plant_name>
    <state>NM</state>
    <county>Chaves</county>
    <operator>Chaves County Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.434335</lat>
    <lon>-104.4476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66628</plant_id>
    <plant_name>Altona Solar, LLC</plant_name>
    <state>MO</state>
    <county>Audrain</county>
    <operator>Birch Creek Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.28345</lat>
    <lon>-92.14203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66826</plant_id>
    <plant_name>Prairie Creek Solar</plant_name>
    <state>IL</state>
    <county>Morgan</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.806053</lat>
    <lon>-90.22443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67695</plant_id>
    <plant_name>Holtville</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <battery_mwh>127</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.813389</lat>
    <lon>-115.3887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68262</plant_id>
    <plant_name>Fairview Farms</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.516944</lat>
    <lon>-76.27361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69279</plant_id>
    <plant_name>NEWPP</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>30</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.933747</lat>
    <lon>-95.19986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>416</plant_id>
    <plant_name>Tulloch</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Oakdale&amp;South San Joaquin Irrigation D.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>29.9</nameplate_mw>
    <summer_mw>25.5</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2012</latest_year>
    <lat>37.876111</lat>
    <lon>-120.605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1270</plant_id>
    <plant_name>Clay Center</plant_name>
    <state>KS</state>
    <county>Clay</county>
    <operator>City of Clay Center - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>29.9</nameplate_mw>
    <summer_mw>29.7</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2005</latest_year>
    <lat>39.373966</lat>
    <lon>-97.12721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10458</plant_id>
    <plant_name>Muck Valley Hydroelectric</plant_name>
    <state>CA</state>
    <county>Lassen</county>
    <operator>Malacha Hydro Limited Partnership</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>29.9</nameplate_mw>
    <summer_mw>29.9</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.976389</lat>
    <lon>-121.2558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60991</plant_id>
    <plant_name>Sterling I Wind Farm</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>AEM Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>29.9</nameplate_mw>
    <summer_mw>29.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.3596</lat>
    <lon>-103.2506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7942</plant_id>
    <plant_name>Diamond Valley Lake</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>9</generators>
    <nameplate_mw>29.7</nameplate_mw>
    <summer_mw>29.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.6808</lat>
    <lon>-117.0698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56386</plant_id>
    <plant_name>Top of Iowa Windfarm III</plant_name>
    <state>IA</state>
    <county>Worth</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>29.7</nameplate_mw>
    <summer_mw>29.7</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.3597</lat>
    <lon>-93.3208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>719</plant_id>
    <plant_name>North Highlands</plant_name>
    <state>GA</state>
    <county>Muscogee</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>29.6</nameplate_mw>
    <summer_mw>34.4</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>32.4994</lat>
    <lon>-84.9965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55991</plant_id>
    <plant_name>Brady</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>29.5</nameplate_mw>
    <summer_mw>22.3</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2023</latest_year>
    <lat>39.796032</lat>
    <lon>-119.01</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56462</plant_id>
    <plant_name>Geneva Generation Facility</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>City of Geneva - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>29.5</nameplate_mw>
    <summer_mw>27</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>41.8911</lat>
    <lon>-88.2711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2695</plant_id>
    <plant_name>Charles P Keller</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Village of Rockville Centre - (NY)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>29.4</nameplate_mw>
    <summer_mw>28.8</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1994</latest_year>
    <lat>40.658333</lat>
    <lon>-73.64056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56699</plant_id>
    <plant_name>Forward Windpower LLC</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Forward Windpower, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>29.4</nameplate_mw>
    <summer_mw>29.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.0853</lat>
    <lon>-78.8633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56960</plant_id>
    <plant_name>Happy Jack Windpower Project</plant_name>
    <state>WY</state>
    <county>Laramie</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>29.4</nameplate_mw>
    <summer_mw>29.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.139722</lat>
    <lon>-104.9978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65143</plant_id>
    <plant_name>Big Turtle Wind Farm 2</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>29.4</nameplate_mw>
    <summer_mw>29.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.919558</lat>
    <lon>-82.79443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1291</plant_id>
    <plant_name>Iola</plant_name>
    <state>KS</state>
    <county>Allen</county>
    <operator>City of Iola - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>10</generators>
    <nameplate_mw>29.3</nameplate_mw>
    <summer_mw>30.3</summer_mw>
    <first_year>1969</first_year>
    <latest_year>2021</latest_year>
    <lat>37.923076</lat>
    <lon>-95.42557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52147</plant_id>
    <plant_name>CP Kelco San Diego Plant</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>CP Kelco US Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>29.2</nameplate_mw>
    <summer_mw>27.8</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>32.6947</lat>
    <lon>-117.1436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50293</plant_id>
    <plant_name>Wadham Energy</plant_name>
    <state>CA</state>
    <county>Colusa</county>
    <operator>Wadham Energy LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>29.1</nameplate_mw>
    <summer_mw>26.5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>39.1062</lat>
    <lon>-122.1096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10186</plant_id>
    <plant_name>Anson Abenaki Hydros</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>13</generators>
    <nameplate_mw>29</nameplate_mw>
    <summer_mw>25.1</summer_mw>
    <first_year>1950</first_year>
    <latest_year>2008</latest_year>
    <lat>44.7975</lat>
    <lon>-69.8867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10511</plant_id>
    <plant_name>Finch Paper</plant_name>
    <state>NY</state>
    <county>Warren</county>
    <operator>Finch Paper LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDL</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>29</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.3084</lat>
    <lon>-73.6376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10597</plant_id>
    <plant_name>Ridgetop Energy LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>29</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>35.0697</lat>
    <lon>-118.3167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50663</plant_id>
    <plant_name>Covanta Alexandria/Arlington Energy</plant_name>
    <state>VA</state>
    <county>Alexandria City</county>
    <operator>Covanta Alexandria/Arlington</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>29</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>38.8014</lat>
    <lon>-77.1288</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57585</plant_id>
    <plant_name>Oxnard Paper Mill</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>New-Indy, Oxnard LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>29</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>34.1414</lat>
    <lon>-119.1831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57980</plant_id>
    <plant_name>Busch Ranch Wind Energy</plant_name>
    <state>CO</state>
    <county>Huerfano</county>
    <operator>Black Hills Colorado Electric, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>29</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.801111</lat>
    <lon>-104.4919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59168</plant_id>
    <plant_name>Avalon Solar</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>29</nameplate_mw>
    <summer_mw>29</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.001389</lat>
    <lon>-110.9606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67997</plant_id>
    <plant_name>Apex NC Solar</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Apex NC Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>28.9</nameplate_mw>
    <summer_mw>28.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.415022</lat>
    <lon>-81.47812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3414</plant_id>
    <plant_name>Ocoee 3</plant_name>
    <state>TN</state>
    <county>Polk</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>28.8</nameplate_mw>
    <summer_mw>28.6</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1943</latest_year>
    <lat>35.075</lat>
    <lon>-84.4833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10805</plant_id>
    <plant_name>Kenilworth Energy Facility</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>E F Kenilworth LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>28.8</nameplate_mw>
    <summer_mw>24.5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.6781</lat>
    <lon>-74.2744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59953</plant_id>
    <plant_name>Antrim Wind</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>Antrim Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>28.8</nameplate_mw>
    <summer_mw>28.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.06435</lat>
    <lon>-72.00635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54647</plant_id>
    <plant_name>TPC Windfarms LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>28.7</nameplate_mw>
    <summer_mw>28.7</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>35.05</lat>
    <lon>-118.2572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68023</plant_id>
    <plant_name>BCE Seal Beach</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>BCE Seal Beach</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>28.7</nameplate_mw>
    <summer_mw>28.2</summer_mw>
    <battery_mwh>64</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.732761</lat>
    <lon>-118.0445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10700</plant_id>
    <plant_name>Red Shield Envir Old Town Facility</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>ND Paper, Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>28.5</nameplate_mw>
    <summer_mw>21.5</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1987</latest_year>
    <lat>44.918063</lat>
    <lon>-68.63554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50849</plant_id>
    <plant_name>PE Berkeley</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Berkeley Cogeneration Facility</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>28.5</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.870331</lat>
    <lon>-122.2634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54823</plant_id>
    <plant_name>Smithfield Farmland Corp Bladen</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Smithfield Fresh Meats Corp.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>19</generators>
    <nameplate_mw>28.5</nameplate_mw>
    <summer_mw>28.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1998</latest_year>
    <lat>34.74625</lat>
    <lon>-78.80729</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57380</plant_id>
    <plant_name>New England Wind LLC</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>28.5</nameplate_mw>
    <summer_mw>28.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.7297</lat>
    <lon>-73.0236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>805</plant_id>
    <plant_name>Charles E Monty</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>28.4</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>44.099461</lat>
    <lon>-70.22085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1980</plant_id>
    <plant_name>Hutchinson Plant #1</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Hutchinson Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>28.4</nameplate_mw>
    <summer_mw>28.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2019</latest_year>
    <lat>44.895741</lat>
    <lon>-94.36843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2068</plant_id>
    <plant_name>Benndale</plant_name>
    <state>MS</state>
    <county>George</county>
    <operator>Cooperative Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>28.4</nameplate_mw>
    <summer_mw>22.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.8889</lat>
    <lon>-88.8054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10686</plant_id>
    <plant_name>Rapids Energy Center</plant_name>
    <state>MN</state>
    <county>Itasca</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>28.4</nameplate_mw>
    <summer_mw>23.4</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1980</latest_year>
    <lat>47.234825</lat>
    <lon>-93.53717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60346</plant_id>
    <plant_name>Demille Solar Farm</plant_name>
    <state>MI</state>
    <county>Lapeer</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>28.4</nameplate_mw>
    <summer_mw>28.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.040011</lat>
    <lon>-83.33325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50254</plant_id>
    <plant_name>KapStone Kraft Paper Corp</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Westrock Kraft Paper, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>28.3</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>36.4769</lat>
    <lon>-77.6414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61172</plant_id>
    <plant_name>EE Waianae Solar Project</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>EE Waianae Solar Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>28.3</nameplate_mw>
    <summer_mw>27.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>21.452002</lat>
    <lon>-158.1879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1354</plant_id>
    <plant_name>Dix Dam</plant_name>
    <state>KY</state>
    <county>Mercer</county>
    <operator>Kentucky Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>28.2</nameplate_mw>
    <summer_mw>31.5</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>37.7864</lat>
    <lon>-84.7028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7013</plant_id>
    <plant_name>East 12th Street</plant_name>
    <state>KS</state>
    <county>Cowley</county>
    <operator>City of Winfield - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>28.1</nameplate_mw>
    <summer_mw>27.4</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2002</latest_year>
    <lat>37.2367</lat>
    <lon>-96.9625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60258</plant_id>
    <plant_name>Alta Luna</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>TPE Alta Luna, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>28.1</nameplate_mw>
    <summer_mw>28.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.572022</lat>
    <lon>-107.4865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3428</plant_id>
    <plant_name>J P Priest</plant_name>
    <state>TN</state>
    <county>Davidson</county>
    <operator>USCE-Nashville District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>30</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>36.1564</lat>
    <lon>-86.6186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6159</plant_id>
    <plant_name>Crystal</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>35</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>38.510573</lat>
    <lon>-107.6253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7971</plant_id>
    <plant_name>Pella Peaking</plant_name>
    <state>IA</state>
    <county>Marion</county>
    <operator>City of Pella - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>14</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>25.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.4106</lat>
    <lon>-92.9378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10836</plant_id>
    <plant_name>Woodland Biomass Power Ltd</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>DTE Energy Services-Woodland</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>38.6905</lat>
    <lon>-121.7371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10837</plant_id>
    <plant_name>Covanta Mendota</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Clean Energy Systems Mendota</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>36.755896</lat>
    <lon>-120.3654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50638</plant_id>
    <plant_name>Clearwater Paper APP CB</plant_name>
    <state>AR</state>
    <county>Desha</county>
    <operator>Clearwater Paper Corporation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1977</latest_year>
    <lat>33.7061</lat>
    <lon>-91.2371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50656</plant_id>
    <plant_name>Huntington Resource Recovery Facility</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Huntington Resource Recovery</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>24.5</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>40.8814</lat>
    <lon>-73.2906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56406</plant_id>
    <plant_name>Sierra Pacific Burlington Facility</plant_name>
    <state>WA</state>
    <county>Skagit</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>24.6</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>48.4481</lat>
    <lon>-122.4331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56668</plant_id>
    <plant_name>NIH Cogeneration Facility</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>National Institutes of Health</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>27.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39</lat>
    <lon>-77.0939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58103</plant_id>
    <plant_name>Heritage Garden Wind Farm I LLC</plant_name>
    <state>MI</state>
    <county>Delta</county>
    <operator>DTE Sustainable Generation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>45.795556</lat>
    <lon>-86.53389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58383</plant_id>
    <plant_name>Hyder II Hybrid</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>28</summer_mw>
    <battery_mwh>42</battery_mwh>
    <first_year>2013</first_year>
    <latest_year>2023</latest_year>
    <lat>33.027</lat>
    <lon>-113.3489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60546</plant_id>
    <plant_name>KIUC Kapaia PV and BA Storage Project Hy</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>26</summer_mw>
    <battery_mwh>52</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>21.997272</lat>
    <lon>-159.3792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63280</plant_id>
    <plant_name>AES Kekaha Solar, LLC Hybrid</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>28</summer_mw>
    <battery_mwh>70</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2021</latest_year>
    <lat>22.0006</lat>
    <lon>-159.7621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68594</plant_id>
    <plant_name>Rockhound D</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>28</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.6859</lat>
    <lon>-102.518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6402</plant_id>
    <plant_name>Elephant Butte</plant_name>
    <state>NM</state>
    <county>Sierra</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>27.9</nameplate_mw>
    <summer_mw>27.9</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1940</latest_year>
    <lat>33.153358</lat>
    <lon>-107.192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10772</plant_id>
    <plant_name>Rio Bravo Rocklin</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Rio Bravo Rocklin</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>27.9</nameplate_mw>
    <summer_mw>24.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>38.8319</lat>
    <lon>-121.3137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2719</plant_id>
    <plant_name>Bridgewater</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>27.7</nameplate_mw>
    <summer_mw>31.5</summer_mw>
    <first_year>1919</first_year>
    <latest_year>2011</latest_year>
    <lat>35.7428</lat>
    <lon>-81.8372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6398</plant_id>
    <plant_name>Minidoka</plant_name>
    <state>ID</state>
    <county>Minidoka</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>27.7</nameplate_mw>
    <summer_mw>27.7</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1997</latest_year>
    <lat>42.669899</lat>
    <lon>-113.4832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54410</plant_id>
    <plant_name>Western Power &amp; Steam Inc</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Western Power and Steam II LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>27.7</nameplate_mw>
    <summer_mw>19.6</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>35.440539</lat>
    <lon>-119.0129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57946</plant_id>
    <plant_name>Fredericktown Energy Center</plant_name>
    <state>MO</state>
    <county>Madison</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>27.6</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.571672</lat>
    <lon>-90.31725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58837</plant_id>
    <plant_name>Na Pua Makani Wind Project</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Na Pua Makani Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>27.6</nameplate_mw>
    <summer_mw>27.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>21.666944</lat>
    <lon>-157.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59045</plant_id>
    <plant_name>Jameson Energy Center</plant_name>
    <state>KS</state>
    <county>Finney</county>
    <operator>Kansas Municipal Energy Agency - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>27.6</nameplate_mw>
    <summer_mw>27</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.954722</lat>
    <lon>-100.8306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>79</plant_id>
    <plant_name>Chena Power Plant</plant_name>
    <state>AK</state>
    <county>Fairbanks North Star</county>
    <operator>Aurora Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>3</generators>
    <nameplate_mw>27.5</nameplate_mw>
    <summer_mw>25.7</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1975</latest_year>
    <lat>64.847743</lat>
    <lon>-147.7351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3929</plant_id>
    <plant_name>Packwood</plant_name>
    <state>WA</state>
    <county>Lewis</county>
    <operator>Energy Northwest - Packwood</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>27.5</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>46.595833</lat>
    <lon>-121.5694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10765</plant_id>
    <plant_name>NE Renewable Power Jonesboro</plant_name>
    <state>ME</state>
    <county>Washington</county>
    <operator>Stored Solar J&amp;WE</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>27.5</nameplate_mw>
    <summer_mw>20.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.6781</lat>
    <lon>-67.5477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10766</plant_id>
    <plant_name>NE Renewable Power West Enfield</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Stored Solar J&amp;WE</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>27.5</nameplate_mw>
    <summer_mw>20.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>45.2537</lat>
    <lon>-68.62792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63728</plant_id>
    <plant_name>Taos Mesa Energy Facility Hybrid</plant_name>
    <state>NM</state>
    <county>Taos</county>
    <operator>Taos Mesa Energy Facility, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>27.5</nameplate_mw>
    <summer_mw>27.5</summer_mw>
    <battery_mwh>25</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.44</lat>
    <lon>-105.62</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66203</plant_id>
    <plant_name>Ripley</plant_name>
    <state>MD</state>
    <county>Charles</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>27.5</nameplate_mw>
    <summer_mw>27.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.535</lat>
    <lon>-77.097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7451</plant_id>
    <plant_name>Lodi</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Northern California Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>27.4</nameplate_mw>
    <summer_mw>25.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>38.146571</lat>
    <lon>-121.3005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>413</plant_id>
    <plant_name>Dutch Flat 2</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Nevada Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>27.3</nameplate_mw>
    <summer_mw>27.3</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>39.2184</lat>
    <lon>-120.8352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2512</plant_id>
    <plant_name>East Hampton</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>27.3</nameplate_mw>
    <summer_mw>25.2</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1970</latest_year>
    <lat>40.961706</lat>
    <lon>-72.21028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57887</plant_id>
    <plant_name>Wildcat Wind</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>Wildcat Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>27.3</nameplate_mw>
    <summer_mw>27.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.952778</lat>
    <lon>-103.2853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>819</plant_id>
    <plant_name>Swan Falls</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>27.2</nameplate_mw>
    <summer_mw>28.6</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>43.2435</lat>
    <lon>-116.3791</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52089</plant_id>
    <plant_name>Celanese Acetate LLC</plant_name>
    <state>VA</state>
    <county>Giles</county>
    <operator>Celanese Acetate LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>27.2</nameplate_mw>
    <summer_mw>27.2</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1966</latest_year>
    <lat>37.3439</lat>
    <lon>-80.765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56616</plant_id>
    <plant_name>Novo BioPower Plant</plant_name>
    <state>AZ</state>
    <county>Navajo</county>
    <operator>Novo Biopower LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>27.2</nameplate_mw>
    <summer_mw>22.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>34.503158</lat>
    <lon>-110.335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54686</plant_id>
    <plant_name>Difwind Farms Ltd VI</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>27.1</nameplate_mw>
    <summer_mw>25.3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>35.0506</lat>
    <lon>-118.1714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1969</plant_id>
    <plant_name>Delano</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Delano Municipal Utilities (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>25.5</summer_mw>
    <first_year>1946</first_year>
    <latest_year>2022</latest_year>
    <lat>45.041378</lat>
    <lon>-93.79052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2250</plant_id>
    <plant_name>J Street</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Lincoln Electric System</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>30.1</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>40.80788</lat>
    <lon>-96.71067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2861</plant_id>
    <plant_name>Niles Power Plant</plant_name>
    <state>OH</state>
    <county>Trumbull</county>
    <operator>Niles Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>26.1</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>41.166928</lat>
    <lon>-80.74769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3112</plant_id>
    <plant_name>Orrtanna</plant_name>
    <state>PA</state>
    <county>Adams</county>
    <operator>Orrtanna Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>20.2</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>39.8442</lat>
    <lon>-77.3508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3785</plant_id>
    <plant_name>Tasley</plant_name>
    <state>VA</state>
    <county>Accomack</county>
    <operator>Calpine Mid-Atlantic Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>29.9</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>37.7061</lat>
    <lon>-75.7031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58125</plant_id>
    <plant_name>Quay County</plant_name>
    <state>NM</state>
    <county>Quay</county>
    <operator>Southwestern Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.182778</lat>
    <lon>-103.7311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58408</plant_id>
    <plant_name>Maryland Solar</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>20.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.563056</lat>
    <lon>-77.72028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59009</plant_id>
    <plant_name>Hayworth Solar</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.325278</lat>
    <lon>-118.8786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66167</plant_id>
    <plant_name>AM Wind Repower</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>AM Wind Repower LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>27</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.943741</lat>
    <lon>-116.6615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68889</plant_id>
    <plant_name>CoreSite Real Estate 3045 Stender, LP</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>CoreSite Real Estate 3045 Stender, LP</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>27</nameplate_mw>
    <summer_mw>27</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2023</latest_year>
    <lat>37.3772</lat>
    <lon>-121.9717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10803</plant_id>
    <plant_name>Ogdensburg Power</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>AG Energy LP</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>26.9</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>44.7258</lat>
    <lon>-75.4417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56698</plant_id>
    <plant_name>Main Canal Headworks</plant_name>
    <state>WA</state>
    <county>Grant</county>
    <operator>Columbia Basin Hydropower</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>26.8</nameplate_mw>
    <summer_mw>26.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>47.6164</lat>
    <lon>-119.2992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2181</plant_id>
    <plant_name>Black Eagle</plant_name>
    <state>MT</state>
    <county>Cascade</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>26.7</nameplate_mw>
    <summer_mw>26.7</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>47.521331</lat>
    <lon>-111.2614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55308</plant_id>
    <plant_name>Calvert City</plant_name>
    <state>KY</state>
    <county>Marshall</county>
    <operator>DTE Calvert City LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>26.7</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>37.048333</lat>
    <lon>-88.35389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58645</plant_id>
    <plant_name>RC Thomas Hydroelectric Project</plant_name>
    <state>TX</state>
    <county>Polk</county>
    <operator>East Texas Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>26.7</nameplate_mw>
    <summer_mw>24.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.632222</lat>
    <lon>-95.01</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>471</plant_id>
    <plant_name>Fruita</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>26.6</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>39.1364</lat>
    <lon>-108.7347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7233</plant_id>
    <plant_name>Tesla</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>City of Colorado Springs - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>26.6</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>38.973655</lat>
    <lon>-104.9011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8016</plant_id>
    <plant_name>Factory</plant_name>
    <state>IL</state>
    <county>Sangamon</county>
    <operator>City of Springfield - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>26.6</nameplate_mw>
    <summer_mw>16.6</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>39.825934</lat>
    <lon>-89.63728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1168</plant_id>
    <plant_name>New Hampton</plant_name>
    <state>IA</state>
    <county>Chickasaw</county>
    <operator>City of New Hampton - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>26.5</nameplate_mw>
    <summer_mw>24.1</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1999</latest_year>
    <lat>43.0689</lat>
    <lon>-92.3201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7028</plant_id>
    <plant_name>Whitehead</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>City of Springville - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>26.5</nameplate_mw>
    <summer_mw>24.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2024</latest_year>
    <lat>40.1817</lat>
    <lon>-111.6203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>340</plant_id>
    <plant_name>Kern River 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>26.4</nameplate_mw>
    <summer_mw>26.4</summer_mw>
    <first_year>1907</first_year>
    <latest_year>1907</latest_year>
    <lat>35.460303</lat>
    <lon>-118.7796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2137</plant_id>
    <plant_name>Jackson (MO)</plant_name>
    <state>MO</state>
    <county>Cape Girardeau</county>
    <operator>City of Jackson - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>26.3</nameplate_mw>
    <summer_mw>25.3</summer_mw>
    <first_year>1936</first_year>
    <latest_year>2006</latest_year>
    <lat>37.3847</lat>
    <lon>-89.6606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2274</plant_id>
    <plant_name>North Platte</plant_name>
    <state>NE</state>
    <county>Lincoln</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>26.2</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1935</latest_year>
    <lat>41.0864</lat>
    <lon>-100.7594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>114</plant_id>
    <plant_name>Douglas</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>26.1</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>31.364122</lat>
    <lon>-109.5538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2255</plant_id>
    <plant_name>Nebraska City # 1</plant_name>
    <state>NE</state>
    <county>Otoe</county>
    <operator>City of Nebraska City - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>26.1</nameplate_mw>
    <summer_mw>22.6</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1979</latest_year>
    <lat>40.6806</lat>
    <lon>-95.8475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10430</plant_id>
    <plant_name>Anheuser-Busch St Louis</plant_name>
    <state>MO</state>
    <county>St Louis City</county>
    <operator>Anheuser-Busch Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>26.1</nameplate_mw>
    <summer_mw>26.1</summer_mw>
    <first_year>1939</first_year>
    <latest_year>1948</latest_year>
    <lat>38.597755</lat>
    <lon>-90.21067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50532</plant_id>
    <plant_name>Victory Garden (Tehachapi)</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wind Stream Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>26.1</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2000</latest_year>
    <lat>35.0686</lat>
    <lon>-118.3833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54665</plant_id>
    <plant_name>Steamboat II</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Steamboat Development Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>26.1</nameplate_mw>
    <summer_mw>19.3</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2023</latest_year>
    <lat>39.395603</lat>
    <lon>-119.7468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54666</plant_id>
    <plant_name>Steamboat III</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Steamboat Development Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>26.1</nameplate_mw>
    <summer_mw>19.3</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2023</latest_year>
    <lat>39.394444</lat>
    <lon>-119.7475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55990</plant_id>
    <plant_name>Ashtabula</plant_name>
    <state>OH</state>
    <county>Ashtabula</county>
    <operator>DTE Ashtabula, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>7</generators>
    <nameplate_mw>26.1</nameplate_mw>
    <summer_mw>23.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.890026</lat>
    <lon>-80.7612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>516</plant_id>
    <plant_name>Green Mountain</plant_name>
    <state>CO</state>
    <county>Summit</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1943</latest_year>
    <lat>39.878805</lat>
    <lon>-106.3327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2613</plant_id>
    <plant_name>Stark</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>23.3</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>44.4553</lat>
    <lon>-74.7614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3021</plant_id>
    <plant_name>Clearwater 2</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>31</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>43.266894</lat>
    <lon>-122.4098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3076</plant_id>
    <plant_name>Cougar</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>44.1307</lat>
    <lon>-122.2439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10018</plant_id>
    <plant_name>Desert Peak Power Plant</plant_name>
    <state>NV</state>
    <county>Lyon</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>17.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>39.753999</lat>
    <lon>-118.9535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10198</plant_id>
    <plant_name>Mosaic Phosphates Uncle Sam</plant_name>
    <state>LA</state>
    <county>St James</county>
    <operator>Mosaic Phosphates Co.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2016</latest_year>
    <lat>30.038649</lat>
    <lon>-90.82831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50886</plant_id>
    <plant_name>Spokane Waste to Energy</plant_name>
    <state>WA</state>
    <county>Spokane</county>
    <operator>City of Spokane - (WA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>22.7</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>47.626327</lat>
    <lon>-117.5042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56321</plant_id>
    <plant_name>Richard Burdette Geothermal</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>39.390843</lat>
    <lon>-119.7546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56470</plant_id>
    <plant_name>Locust Ridge</plant_name>
    <state>PA</state>
    <county>Schuylkill</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.855</lat>
    <lon>-76.1292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57455</plant_id>
    <plant_name>Solar Borrego I</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>NRG Solar Borrego I</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.298889</lat>
    <lon>-116.3508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63365</plant_id>
    <plant_name>Soda Lake 3</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>AMOR IX, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.5545</lat>
    <lon>-118.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68899</plant_id>
    <plant_name>Mississippi State University</plant_name>
    <state>MS</state>
    <county>Oktibbeha</county>
    <operator>Mississippi State University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>26</nameplate_mw>
    <summer_mw>26</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>33.452279</lat>
    <lon>-88.80154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>85</plant_id>
    <plant_name>S W Bailey</plant_name>
    <state>AK</state>
    <county>Ketchikan Gateway</county>
    <operator>Ketchikan Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>25.9</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1998</latest_year>
    <lat>55.357397</lat>
    <lon>-131.697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54216</plant_id>
    <plant_name>U S Alliance Coosa Pines</plant_name>
    <state>AL</state>
    <county>Talladega</county>
    <operator>Bowater Newport Coosa Pines Op</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>25.9</nameplate_mw>
    <summer_mw>24.9</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>33.328107</lat>
    <lon>-86.35683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63554</plant_id>
    <plant_name>Mohave Electric Cooperative at Joy Lane</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Mohave Electric Cooperative, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>25.9</nameplate_mw>
    <summer_mw>25.9</summer_mw>
    <battery_mwh>60</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2024</latest_year>
    <lat>34.9843</lat>
    <lon>-114.5565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2726</plant_id>
    <plant_name>Lookout Shoals</plant_name>
    <state>NC</state>
    <county>Iredell</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>25.8</nameplate_mw>
    <summer_mw>27</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1915</latest_year>
    <lat>35.7575</lat>
    <lon>-81.0894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50153</plant_id>
    <plant_name>Texas City Plant Union Carbide</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Union Carbide Corp-Texas City</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>PUR</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>25.8</nameplate_mw>
    <summer_mw>25.8</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>29.37612</lat>
    <lon>-94.94648</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54605</plant_id>
    <plant_name>Pratt &amp; Whitney</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>United Technologies</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25.8</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>41.748327</lat>
    <lon>-72.63669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57045</plant_id>
    <plant_name>Rolling Thunder Wind Farm Hybrid</plant_name>
    <state>SD</state>
    <county>Hand</county>
    <operator>Clearlight Energy Holdings LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>25.8</nameplate_mw>
    <summer_mw>25.8</summer_mw>
    <battery_mwh>0.8</battery_mwh>
    <first_year>2009</first_year>
    <latest_year>2018</latest_year>
    <lat>44.477778</lat>
    <lon>-99.13389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58159</plant_id>
    <plant_name>UCONN Cogen Facility</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>University of Connecticut</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>25.7</nameplate_mw>
    <summer_mw>24.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>41.809167</lat>
    <lon>-72.25417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58278</plant_id>
    <plant_name>TNSG North Plant</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>TDX North Slope Generating Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>25.7</nameplate_mw>
    <summer_mw>23.1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2014</latest_year>
    <lat>70.235278</lat>
    <lon>-148.3836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6801</plant_id>
    <plant_name>Jarvis Street</plant_name>
    <state>AK</state>
    <county>Sitka</county>
    <operator>City &amp; Borough of Sitka - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>25.6</nameplate_mw>
    <summer_mw>25.1</summer_mw>
    <first_year>1979</first_year>
    <latest_year>2014</latest_year>
    <lat>57.0497</lat>
    <lon>-135.3128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>195</plant_id>
    <plant_name>Narrows (AR)</plant_name>
    <state>AR</state>
    <county>Pike</county>
    <operator>USCE -Vickburg District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>25.5</nameplate_mw>
    <summer_mw>29.1</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1969</latest_year>
    <lat>34.148427</lat>
    <lon>-93.71517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>433</plant_id>
    <plant_name>Robbs Peak</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>25.5</nameplate_mw>
    <summer_mw>25.5</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>38.896511</lat>
    <lon>-120.3783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2730</plant_id>
    <plant_name>Rhodhiss</plant_name>
    <state>NC</state>
    <county>Caldwell</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>25.5</nameplate_mw>
    <summer_mw>33.4</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>35.774234</lat>
    <lon>-81.43777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3754</plant_id>
    <plant_name>Burlington GT</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>City of Burlington Electric - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>25.5</nameplate_mw>
    <summer_mw>19.7</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>44.4814</lat>
    <lon>-73.2239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56991</plant_id>
    <plant_name>Stetson Wind II</plant_name>
    <state>ME</state>
    <county>Washington</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25.5</nameplate_mw>
    <summer_mw>25.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>45.61498</lat>
    <lon>-67.971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58157</plant_id>
    <plant_name>University of Rochester</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>University of Rochester</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>25.4</nameplate_mw>
    <summer_mw>24.2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>43.123889</lat>
    <lon>-77.62889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50051</plant_id>
    <plant_name>Eagle Point Energy Center</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Eagle Point Energy Center, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>25.3</nameplate_mw>
    <summer_mw>21.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.7383</lat>
    <lon>-68.8258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57386</plant_id>
    <plant_name>Ridgewind</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Ridgewind Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25.3</nameplate_mw>
    <summer_mw>25.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.018889</lat>
    <lon>-96.06528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61463</plant_id>
    <plant_name>Vandenberg Solar Project</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25.3</nameplate_mw>
    <summer_mw>25.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.749708</lat>
    <lon>-120.51</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>446</plant_id>
    <plant_name>ONeill</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Hydroelectric Pumped Storage</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Hydroelectric Pumped Storage</technologies>
    <generators>6</generators>
    <nameplate_mw>25.2</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1968</latest_year>
    <lat>37.098671</lat>
    <lon>-121.0477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10494</plant_id>
    <plant_name>Sheldon Springs Hydroelectric</plant_name>
    <state>VT</state>
    <county>Franklin</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>25.2</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>44.9108</lat>
    <lon>-72.9736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52163</plant_id>
    <plant_name>85 B</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wind Wall 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25.2</nameplate_mw>
    <summer_mw>25.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.102577</lat>
    <lon>-118.3325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6554</plant_id>
    <plant_name>Waverly Municipal Electric North Plant</plant_name>
    <state>IA</state>
    <county>Bremer</county>
    <operator>Waverly Municipal Elec Utility - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>25.1</nameplate_mw>
    <summer_mw>25.1</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2015</latest_year>
    <lat>42.7317</lat>
    <lon>-92.4711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1934</plant_id>
    <plant_name>Wilmarth</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1951</latest_year>
    <lat>44.1967</lat>
    <lon>-94.0009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2042</plant_id>
    <plant_name>Maple Lake</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>20.6</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>45.229073</lat>
    <lon>-94.00967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2483</plant_id>
    <plant_name>Neversink</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>41.8194</lat>
    <lon>-74.6358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2600</plant_id>
    <plant_name>Rainbow Falls Hydro</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1956</latest_year>
    <lat>44.5178</lat>
    <lon>-74.8228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2942</plant_id>
    <plant_name>St Marys</plant_name>
    <state>OH</state>
    <county>Auglaize</county>
    <operator>City of St Marys - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>22.4</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1999</latest_year>
    <lat>40.5458</lat>
    <lon>-84.3889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6741</plant_id>
    <plant_name>Rock Lake CT</plant_name>
    <state>MN</state>
    <county>Pine</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>21.5</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>45.805443</lat>
    <lon>-92.97176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10195</plant_id>
    <plant_name>CF Industries Yazoo City Complex</plant_name>
    <state>MS</state>
    <county>Yazoo</county>
    <operator>CF Industries Nitrogen LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>32.90411</lat>
    <lon>-90.3781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10606</plant_id>
    <plant_name>Georgia-Pacific Crossett LLC</plant_name>
    <state>AR</state>
    <county>Ashley</county>
    <operator>Georgia-Pacific Crossett LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>28</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1962</latest_year>
    <lat>33.1421</lat>
    <lon>-91.975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50560</plant_id>
    <plant_name>Pacific-Ultrapower Chinese Station</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>IHI Power Services Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>37.874056</lat>
    <lon>-120.4776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50739</plant_id>
    <plant_name>NE Renewable Tamworth, LLC</plant_name>
    <state>NH</state>
    <county>Carroll</county>
    <operator>NE Renewable Tamworth, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.835833</lat>
    <lon>-71.1967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52158</plant_id>
    <plant_name>Aidlin Geothermal Power Plant</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Geysers Power Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>38.8339</lat>
    <lon>-122.881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55125</plant_id>
    <plant_name>Vansycle</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>ESI Vansycle Partners LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>45.936157</lat>
    <lon>-118.66</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56630</plant_id>
    <plant_name>Taconite Ridge 1 Wind Energy Center</plant_name>
    <state>MN</state>
    <county>St Louis</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>47.5747</lat>
    <lon>-92.5917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56929</plant_id>
    <plant_name>DeSoto Next Generation Solar Energy</plant_name>
    <state>FL</state>
    <county>DeSoto</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>27.3232</lat>
    <lon>-81.8019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57657</plant_id>
    <plant_name>Avra Valley Solar</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Solar Avra Valley LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.371667</lat>
    <lon>-111.2828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58039</plant_id>
    <plant_name>Axium Modesto Solar</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Axium US Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.734167</lat>
    <lon>-120.9956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58570</plant_id>
    <plant_name>Cove Fort</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Ormat Cove Fort LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.560278</lat>
    <lon>-112.5811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59251</plant_id>
    <plant_name>Caprock Solar 1 LLC</plant_name>
    <state>NM</state>
    <county>Quay</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>24.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.982778</lat>
    <lon>-103.3783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60486</plant_id>
    <plant_name>Greenfield Wind - MT</plant_name>
    <state>MT</state>
    <county>Teton</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>47.723</lat>
    <lon>-111.963</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61155</plant_id>
    <plant_name>Big Timber Wind Farm</plant_name>
    <state>MT</state>
    <county>Sweet Grass</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.855428</lat>
    <lon>-109.6492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61801</plant_id>
    <plant_name>Cascade Energy Storage, LLC</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.920124</lat>
    <lon>-121.2392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61931</plant_id>
    <plant_name>Techren Solar III LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Techren Solar III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.844106</lat>
    <lon>-114.9713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61932</plant_id>
    <plant_name>Techren Solar IV LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Techren Solar IV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.892658</lat>
    <lon>-114.9365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62604</plant_id>
    <plant_name>Outer Cape Community Battery</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Eversource</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <battery_mwh>38</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.060267</lat>
    <lon>-70.19419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62669</plant_id>
    <plant_name>Gaston Solar Power Plant</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.3224</lat>
    <lon>-81.1343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64158</plant_id>
    <plant_name>Mechanicsville Solar</plant_name>
    <state>VA</state>
    <county>Hanover</county>
    <operator>Mechanicsville Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.665975</lat>
    <lon>-77.20773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64211</plant_id>
    <plant_name>Baxley</plant_name>
    <state>GA</state>
    <county>Appling</county>
    <operator>SR Baxley, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.877717</lat>
    <lon>-82.33389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64656</plant_id>
    <plant_name>AES West Oahu Solar Hybrid</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <battery_mwh>50</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>21.372</lat>
    <lon>-158.062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64755</plant_id>
    <plant_name>Arbor Hill Solar</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.4669</lat>
    <lon>-94.26271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66669</plant_id>
    <plant_name>West Ford Flat</plant_name>
    <state>CA</state>
    <county>Lake</county>
    <operator>West Ford Flat Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.788111</lat>
    <lon>-122.7218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67828</plant_id>
    <plant_name>Mordor ES1</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Mordor ES1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <battery_mwh>100</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.008507</lat>
    <lon>-117.8141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68224</plant_id>
    <plant_name>SR Adamsville</plant_name>
    <state>TN</state>
    <county>McNairy</county>
    <operator>SR Adamsville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.256025</lat>
    <lon>-88.36971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68376</plant_id>
    <plant_name>Centrahoma East</plant_name>
    <state>OK</state>
    <county>Coal</county>
    <operator>Peoples Electric Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>10</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>24.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.588788</lat>
    <lon>-96.2877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68377</plant_id>
    <plant_name>Centrahoma West</plant_name>
    <state>OK</state>
    <county>Coal</county>
    <operator>Peoples Electric Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>10</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.593196</lat>
    <lon>-96.29594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68927</plant_id>
    <plant_name>Adelite Solar, LLC</plant_name>
    <state>MO</state>
    <county>Caldwell</county>
    <operator>Birch Creek Development</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>25</nameplate_mw>
    <summer_mw>25</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.75533</lat>
    <lon>-94.01234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58433</plant_id>
    <plant_name>Red Lion Energy Center</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Diamond State Generation Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>24.9</nameplate_mw>
    <summer_mw>24.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2013</latest_year>
    <lat>39.610083</lat>
    <lon>-75.62974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60045</plant_id>
    <plant_name>Shoreham Solar Commons</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>24.9</nameplate_mw>
    <summer_mw>24.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.934411</lat>
    <lon>-72.88851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1880</plant_id>
    <plant_name>Claude Vandyke</plant_name>
    <state>MI</state>
    <county>Allegan</county>
    <operator>Wolverine Power Supply Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>24.8</nameplate_mw>
    <summer_mw>20.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.731</lat>
    <lon>-85.8551</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64811</plant_id>
    <plant_name>Upton County BESS</plant_name>
    <state>TX</state>
    <county>Upton</county>
    <operator>VESI Upton County BESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>24.8</nameplate_mw>
    <summer_mw>24.8</summer_mw>
    <battery_mwh>25</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.23924</lat>
    <lon>-102.3217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66880</plant_id>
    <plant_name>Hayhurst Texas Solar</plant_name>
    <state>TX</state>
    <county>Culberson</county>
    <operator>Hayhurst Texas Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>24.8</nameplate_mw>
    <summer_mw>24.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.815992</lat>
    <lon>-104.0853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64686</plant_id>
    <plant_name>Orangeville Storage</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>24.7</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.738686</lat>
    <lon>-78.23973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2975</plant_id>
    <plant_name>Cushing</plant_name>
    <state>OK</state>
    <county>Payne</county>
    <operator>City of Cushing - (OK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>11</generators>
    <nameplate_mw>24.6</nameplate_mw>
    <summer_mw>21.2</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1988</latest_year>
    <lat>35.982597</lat>
    <lon>-96.77568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8022</plant_id>
    <plant_name>Boulder Park</plant_name>
    <state>WA</state>
    <county>Spokane</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>24.6</nameplate_mw>
    <summer_mw>24.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>47.697222</lat>
    <lon>-117.1472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57935</plant_id>
    <plant_name>Eva Creek Wind</plant_name>
    <state>AK</state>
    <county>Denali</county>
    <operator>Golden Valley Elec Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>24.6</nameplate_mw>
    <summer_mw>24.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>64.058333</lat>
    <lon>-148.9</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6562</plant_id>
    <plant_name>Winfield</plant_name>
    <state>WV</state>
    <county>Putnam</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>24.5</nameplate_mw>
    <summer_mw>18.7</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1938</latest_year>
    <lat>38.5274</lat>
    <lon>-81.91392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7795</plant_id>
    <plant_name>Custer Energy Center</plant_name>
    <state>WI</state>
    <county>Manitowoc</county>
    <operator>Manitowoc Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>24.5</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.085437</lat>
    <lon>-87.7261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55871</plant_id>
    <plant_name>Klondike Wind Power</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>24.5</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>45.5563</lat>
    <lon>-120.5507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1162</plant_id>
    <plant_name>Maquoketa 1</plant_name>
    <state>IA</state>
    <county>Jackson</county>
    <operator>City of Maquoketa - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>24.4</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>1956</first_year>
    <latest_year>2004</latest_year>
    <lat>42.035556</lat>
    <lon>-90.665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10129</plant_id>
    <plant_name>Indiana University of Pennsylvania</plant_name>
    <state>PA</state>
    <county>Indiana</county>
    <operator>Indiana University of Penn</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>24.4</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.6144</lat>
    <lon>-79.1594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1328</plant_id>
    <plant_name>Wamego</plant_name>
    <state>KS</state>
    <county>Pottawatomie</county>
    <operator>City of Wamego - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>12</generators>
    <nameplate_mw>24.2</nameplate_mw>
    <summer_mw>24.2</summer_mw>
    <first_year>1956</first_year>
    <latest_year>2026</latest_year>
    <lat>39.1992</lat>
    <lon>-96.3086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3352</plant_id>
    <plant_name>Lake Preston</plant_name>
    <state>SD</state>
    <county>Kingsbury</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>24.1</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>44.364871</lat>
    <lon>-97.38106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10118</plant_id>
    <plant_name>Harrisburg Facility</plant_name>
    <state>PA</state>
    <county>Dauphin</county>
    <operator>Harrisburg Authority</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>24.1</nameplate_mw>
    <summer_mw>16.7</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>40.244242</lat>
    <lon>-76.85387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1166</plant_id>
    <plant_name>Mt Pleasant</plant_name>
    <state>IA</state>
    <county>Henry</county>
    <operator>City of Mt Pleasant - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>12</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.971826</lat>
    <lon>-91.55122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1330</plant_id>
    <plant_name>Wellington 1</plant_name>
    <state>KS</state>
    <county>Sumner</county>
    <operator>City of Wellington - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>23.5</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2004</latest_year>
    <lat>37.261372</lat>
    <lon>-97.4057</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1840</plant_id>
    <plant_name>Plant Four</plant_name>
    <state>MI</state>
    <county>Marquette</county>
    <operator>City of Marquette - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>46.575965</lat>
    <lon>-87.40358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2562</plant_id>
    <plant_name>Five Falls</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>22.4</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>44.527491</lat>
    <lon>-74.84918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3120</plant_id>
    <plant_name>Blossburg</plant_name>
    <state>PA</state>
    <county>Tioga</county>
    <operator>Blossburg Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>20.9</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>41.706475</lat>
    <lon>-77.08184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6238</plant_id>
    <plant_name>Pearl Station</plant_name>
    <state>IL</state>
    <county>Pike</county>
    <operator>Prairie Power, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>20.1</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>39.449185</lat>
    <lon>-90.61412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50827</plant_id>
    <plant_name>Twin Falls Hydro</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>22.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>47.444554</lat>
    <lon>-121.6878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54724</plant_id>
    <plant_name>Ormesa II</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2007</latest_year>
    <lat>32.7881</lat>
    <lon>-115.2481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55928</plant_id>
    <plant_name>McMinnville</plant_name>
    <state>TN</state>
    <county>Warren</county>
    <operator>McMinnville Electric System</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Other Waste Biomass</technologies>
    <generators>12</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>21.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2005</latest_year>
    <lat>35.705</lat>
    <lon>-85.7439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55997</plant_id>
    <plant_name>Orchard Park</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Borough of Chambersburg - (PA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>23.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.9109</lat>
    <lon>-77.6667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56004</plant_id>
    <plant_name>Mount Clinton</plant_name>
    <state>VA</state>
    <county>Rockingham</county>
    <operator>City of Harrisonburg - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2009</latest_year>
    <lat>38.4681</lat>
    <lon>-78.865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56299</plant_id>
    <plant_name>Wind Park Bear Creek</plant_name>
    <state>PA</state>
    <county>Luzerne</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>41.235278</lat>
    <lon>-75.75306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56399</plant_id>
    <plant_name>Lempster Wind LLC</plant_name>
    <state>NH</state>
    <county>Sullivan</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.233</lat>
    <lon>-72.1455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63668</plant_id>
    <plant_name>University Solar, LLC</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>24</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.6133</lat>
    <lon>-71.6593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>745</plant_id>
    <plant_name>Etiwanda</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>23.9</nameplate_mw>
    <summer_mw>23.9</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>34.10345</lat>
    <lon>-117.5257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1186</plant_id>
    <plant_name>Spencer Gas Turbine</plant_name>
    <state>IA</state>
    <county>Clay</county>
    <operator>City of Spencer - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>23.8</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>43.144585</lat>
    <lon>-95.14426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59461</plant_id>
    <plant_name>Bowerman Power LFG, LLC</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Bowerman Power LFG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>7</generators>
    <nameplate_mw>23.8</nameplate_mw>
    <summer_mw>23.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.718889</lat>
    <lon>-117.7022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>969</plant_id>
    <plant_name>Sullivan (IL)</plant_name>
    <state>IL</state>
    <county>Moultrie</county>
    <operator>City of Sullivan - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>23.7</nameplate_mw>
    <summer_mw>24.1</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2012</latest_year>
    <lat>39.596667</lat>
    <lon>-88.61194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1865</plant_id>
    <plant_name>Saint Marys Falls</plant_name>
    <state>MI</state>
    <county>Chippewa</county>
    <operator>USACE-Detroit District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>23.7</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1954</latest_year>
    <lat>46.50625</lat>
    <lon>-84.34927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1881</plant_id>
    <plant_name>Vestaburg</plant_name>
    <state>MI</state>
    <county>Montcalm</county>
    <operator>Wolverine Power Supply Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23.7</nameplate_mw>
    <summer_mw>18.4</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>43.4016</lat>
    <lon>-84.9141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4213</plant_id>
    <plant_name>PHP 1</plant_name>
    <state>OR</state>
    <county>Multnomah</county>
    <operator>City of Portland (OR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>23.7</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>45.481708</lat>
    <lon>-122.0832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69042</plant_id>
    <plant_name>Kit Carson Co-Op</plant_name>
    <state>NM</state>
    <county>Taos</county>
    <operator>Solar DG NM Amalia, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>23.7</nameplate_mw>
    <summer_mw>23.7</summer_mw>
    <battery_mwh>25.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.969882</lat>
    <lon>-105.4369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>376</plant_id>
    <plant_name>Pardee</plant_name>
    <state>CA</state>
    <county>Calaveras</county>
    <operator>East Bay Municipal Util Dist - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>23.6</nameplate_mw>
    <summer_mw>27.7</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1983</latest_year>
    <lat>38.2569</lat>
    <lon>-120.8507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57213</plant_id>
    <plant_name>Salt Wells</plant_name>
    <state>NV</state>
    <county>CHURCHILL</county>
    <operator>Ormat Salt Wells LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>23.6</nameplate_mw>
    <summer_mw>20.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>39.2944</lat>
    <lon>-118.5725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>757</plant_id>
    <plant_name>Blue Ridge</plant_name>
    <state>GA</state>
    <county>Fannin</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>23.5</nameplate_mw>
    <summer_mw>17.3</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1994</latest_year>
    <lat>34.883889</lat>
    <lon>-84.28222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55857</plant_id>
    <plant_name>Oak Point Cogen</plant_name>
    <state>LA</state>
    <county>Plaquemines</county>
    <operator>Chevron Oronite Co LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>23.5</nameplate_mw>
    <summer_mw>22.2</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>29.811956</lat>
    <lon>-90.00843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57376</plant_id>
    <plant_name>Jersey Valley Geothermal Power Plant</plant_name>
    <state>NV</state>
    <county>Pershing</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>23.5</nameplate_mw>
    <summer_mw>15.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.1808</lat>
    <lon>-117.4739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68844</plant_id>
    <plant_name>CalPortland Company Mojave Wind</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CalPortland Company</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23.5</nameplate_mw>
    <summer_mw>23.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.035989</lat>
    <lon>-118.34</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>790</plant_id>
    <plant_name>Gem State</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>City of Idaho Falls - (ID)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>23.4</nameplate_mw>
    <summer_mw>23.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>43.420221</lat>
    <lon>-112.1019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10521</plant_id>
    <plant_name>Lederle Laboratories</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Veolia NA - Municipal &amp; Commercial Business</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>5</generators>
    <nameplate_mw>23.4</nameplate_mw>
    <summer_mw>21.7</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1998</latest_year>
    <lat>41.0772</lat>
    <lon>-74.0181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50614</plant_id>
    <plant_name>Mosinee Mill</plant_name>
    <state>WI</state>
    <county>Marathon</county>
    <operator>Ahlstrom-Munksjo NA Specialty Solutions, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>23.4</nameplate_mw>
    <summer_mw>21.9</summer_mw>
    <first_year>1916</first_year>
    <latest_year>1976</latest_year>
    <lat>44.7881</lat>
    <lon>-89.6917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52122</plant_id>
    <plant_name>Wasson CO2 Removal Plant</plant_name>
    <state>TX</state>
    <county>Yoakum</county>
    <operator>Occidental Permian Ltd</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23.4</nameplate_mw>
    <summer_mw>18.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>33.009944</lat>
    <lon>-102.7569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57119</plant_id>
    <plant_name>Koda Biomass Plant</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>Koda Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>23.4</nameplate_mw>
    <summer_mw>20.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.7956</lat>
    <lon>-93.5386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63789</plant_id>
    <plant_name>East Nash PV2</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>23.4</nameplate_mw>
    <summer_mw>23.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.955653</lat>
    <lon>-78.09362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2177</plant_id>
    <plant_name>Miles City GT</plant_name>
    <state>MT</state>
    <county>Custer</county>
    <operator>Montana-Dakota Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23.3</nameplate_mw>
    <summer_mw>23.6</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>46.4112</lat>
    <lon>-105.7953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56307</plant_id>
    <plant_name>Adams Wind Farm</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>Justin McNeilus</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>23.3</nameplate_mw>
    <summer_mw>23.3</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2004</latest_year>
    <lat>43.554778</lat>
    <lon>-92.72414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4011</plant_id>
    <plant_name>St Croix Falls</plant_name>
    <state>WI</state>
    <county>Polk</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>23.2</nameplate_mw>
    <summer_mw>15.2</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1923</latest_year>
    <lat>45.41167</lat>
    <lon>-92.6469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56325</plant_id>
    <plant_name>Delta Power</plant_name>
    <state>AK</state>
    <county>Southeast Fairbanks</county>
    <operator>Golden Valley Elec Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>23.1</nameplate_mw>
    <summer_mw>23.1</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>64.028056</lat>
    <lon>-145.7194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59117</plant_id>
    <plant_name>DD Fayetteville Solar NC LLC</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>23.1</nameplate_mw>
    <summer_mw>23.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.834444</lat>
    <lon>-78.84361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1926</plant_id>
    <plant_name>Red Wing</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>44.5692</lat>
    <lon>-92.51691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3413</plant_id>
    <plant_name>Ocoee 2</plant_name>
    <state>TN</state>
    <county>Polk</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23.4</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1913</latest_year>
    <lat>35.082271</lat>
    <lon>-84.49115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57427</plant_id>
    <plant_name>Ryegrass Windfarm</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Mountain Air Projects, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.037147</lat>
    <lon>-115.4397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57428</plant_id>
    <plant_name>Hammett Hill Windfarm</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Mountain Air Projects, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.006133</lat>
    <lon>-115.4633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57429</plant_id>
    <plant_name>Mainline Windfarm</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Mountain Air Projects, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.04835</lat>
    <lon>-115.4129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57430</plant_id>
    <plant_name>Desert Meadow Windfarm</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Mountain Air Projects, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.056622</lat>
    <lon>-115.452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57431</plant_id>
    <plant_name>Cold Springs Windfarm</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Mountain Air Projects, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.028056</lat>
    <lon>-115.4005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57444</plant_id>
    <plant_name>Two Ponds Windfarm</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Mountain Air Projects, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.033781</lat>
    <lon>-115.4826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58062</plant_id>
    <plant_name>Imperial Valley Solar Company 1 LLC</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.245833</lat>
    <lon>-115.4967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58429</plant_id>
    <plant_name>Sunshine Gas Producers</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Sunshine Gas Producers LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.335678</lat>
    <lon>-118.5192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63722</plant_id>
    <plant_name>Rawhide Prairie Solar Hybrid</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.857978</lat>
    <lon>-105.0156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66921</plant_id>
    <plant_name>English Creek Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>23</nameplate_mw>
    <summer_mw>23</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.945756</lat>
    <lon>-82.06723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10556</plant_id>
    <plant_name>Boott Hydropower</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Boott Hydro, LLC - Hybrid</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>22.9</nameplate_mw>
    <summer_mw>21.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.652454</lat>
    <lon>-71.32238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61238</plant_id>
    <plant_name>New York Presbyterian Hospital- 68th Street</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>NY - PRESBYTERIAN HOSPITAL- 68TH ST</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>10</generators>
    <nameplate_mw>22.9</nameplate_mw>
    <summer_mw>22.9</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2017</latest_year>
    <lat>40.764396</lat>
    <lon>-73.95393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65679</plant_id>
    <plant_name>Calverton Solar Energy Center</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>LI Solar Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>22.9</nameplate_mw>
    <summer_mw>22.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.91367</lat>
    <lon>-72.75036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3854</plant_id>
    <plant_name>Electron</plant_name>
    <state>WA</state>
    <county>Pierce</county>
    <operator>Electron Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>22.8</nameplate_mw>
    <summer_mw>25.8</summer_mw>
    <first_year>1904</first_year>
    <latest_year>1929</latest_year>
    <lat>46.990967</lat>
    <lon>-122.1749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58620</plant_id>
    <plant_name>Canton Mountain Wind</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>CPV Canton Mountain Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22.8</nameplate_mw>
    <summer_mw>22.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.514722</lat>
    <lon>-70.30306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70</plant_id>
    <plant_name>Swan Lake</plant_name>
    <state>AK</state>
    <county>Ketchikan Gateway</county>
    <operator>Southeast Alaska Power Agency</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>22.6</nameplate_mw>
    <summer_mw>22.6</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>55.615208</lat>
    <lon>-131.3561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>250</plant_id>
    <plant_name>Kerckhoff</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>22.6</nameplate_mw>
    <summer_mw>25.2</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>37.092486</lat>
    <lon>-119.5528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7119</plant_id>
    <plant_name>Gladstone</plant_name>
    <state>MI</state>
    <county>Delta</county>
    <operator>Upper Peninsula Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>22.6</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1975</latest_year>
    <lat>45.8475</lat>
    <lon>-87.0036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61166</plant_id>
    <plant_name>Tyee Lake Hydroelectric Facility</plant_name>
    <state>AK</state>
    <county>Wrangell Petersburg</county>
    <operator>Southeast Alaska Power Agency</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>22.6</nameplate_mw>
    <summer_mw>22.6</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>56.216403</lat>
    <lon>-131.5043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62820</plant_id>
    <plant_name>Stony Knoll Solar, LLC</plant_name>
    <state>NC</state>
    <county>Surry</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>22.6</nameplate_mw>
    <summer_mw>22.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.288</lat>
    <lon>-80.656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62821</plant_id>
    <plant_name>Speedway Solar NC, LLC</plant_name>
    <state>NC</state>
    <county>Cabarrus</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>22.6</nameplate_mw>
    <summer_mw>22.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.218</lat>
    <lon>-80.536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>729</plant_id>
    <plant_name>Yonah</plant_name>
    <state>GA</state>
    <county>Stephens</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>28.5</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>34.6821</lat>
    <lon>-83.3418</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>753</plant_id>
    <plant_name>Crisp Plant</plant_name>
    <state>GA</state>
    <county>Worth</county>
    <operator>Crisp County Power Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>1957</first_year>
    <latest_year>2023</latest_year>
    <lat>31.844708</lat>
    <lon>-83.94073</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2229</plant_id>
    <plant_name>Johnson 2</plant_name>
    <state>NE</state>
    <county>Gosper</county>
    <operator>Central Nebraska Pub P&amp;I Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>22.5</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1941</latest_year>
    <lat>40.6839</lat>
    <lon>-99.7447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8026</plant_id>
    <plant_name>Hartzog</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>43.8294</lat>
    <lon>-105.5322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8030</plant_id>
    <plant_name>Barber Creek</plant_name>
    <state>WY</state>
    <county>Campbell</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>43.7219</lat>
    <lon>-105.7689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56119</plant_id>
    <plant_name>Middlesex County Utilities Authority</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Middlesex County Utilities Authority - (NJ)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <first_year>1961</first_year>
    <latest_year>2001</latest_year>
    <lat>40.4903</lat>
    <lon>-74.3156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56626</plant_id>
    <plant_name>Ewington Energy Systems, LLC</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>Aspenall Energies (Delaware), LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.6181</lat>
    <lon>-95.4172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57125</plant_id>
    <plant_name>Camp Reed</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>22.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.811944</lat>
    <lon>-115.0489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57760</plant_id>
    <plant_name>Power County Wind Park South</plant_name>
    <state>ID</state>
    <county>Power</county>
    <operator>Power County Wind Park South LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>22.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.703333</lat>
    <lon>-112.7578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57761</plant_id>
    <plant_name>Power County Wind Park North</plant_name>
    <state>ID</state>
    <county>Power</county>
    <operator>Power County Wind Park North LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>22.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.738889</lat>
    <lon>-112.7486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58472</plant_id>
    <plant_name>Buena Vista Biomass Power</plant_name>
    <state>CA</state>
    <county>Amador</county>
    <operator>Buena Vista Biomass LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.277778</lat>
    <lon>-120.9136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58706</plant_id>
    <plant_name>Allendale Biomass</plant_name>
    <state>SC</state>
    <county>Allendale</county>
    <operator>Allendale Biomass LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.995</lat>
    <lon>-81.28194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58707</plant_id>
    <plant_name>Dorchester Biomass</plant_name>
    <state>SC</state>
    <county>Dorchester</county>
    <operator>Dorchester Biomass LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>22.5</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.238611</lat>
    <lon>-80.45028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1615</plant_id>
    <plant_name>Nantucket Hybrid</plant_name>
    <state>MA</state>
    <county>Nantucket</county>
    <operator>Nantucket Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>22.4</nameplate_mw>
    <summer_mw>20.5</summer_mw>
    <battery_mwh>48</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.2583</lat>
    <lon>-70.0517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56112</plant_id>
    <plant_name>Mountain View III</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22.4</nameplate_mw>
    <summer_mw>22.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>33.9141</lat>
    <lon>-116.5914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57749</plant_id>
    <plant_name>Sawtooth Wind Project</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Idaho Winds LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22.4</nameplate_mw>
    <summer_mw>22.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.982222</lat>
    <lon>-115.3933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67322</plant_id>
    <plant_name>Mamm Creek</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>22.4</nameplate_mw>
    <summer_mw>26.3</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.5266</lat>
    <lon>-107.698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67323</plant_id>
    <plant_name>High Mesa CO</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>22.4</nameplate_mw>
    <summer_mw>26.3</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.3959</lat>
    <lon>-108.0733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1867</plant_id>
    <plant_name>Zeeland</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>City of Zeeland - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>22.3</nameplate_mw>
    <summer_mw>22.2</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1980</latest_year>
    <lat>42.8067</lat>
    <lon>-86.0558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50875</plant_id>
    <plant_name>McKay Bay Facility</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>City of Tampa (FL)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>22.1</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>27.949528</lat>
    <lon>-82.42118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64590</plant_id>
    <plant_name>O'Brien Solar Fields</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>22.1</nameplate_mw>
    <summer_mw>22.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.997665</lat>
    <lon>-89.45895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>237</plant_id>
    <plant_name>Dutch Flat</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1943</latest_year>
    <lat>39.216985</lat>
    <lon>-120.8356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1138</plant_id>
    <plant_name>Forest City Light Plant</plant_name>
    <state>IA</state>
    <county>Winnebago</county>
    <operator>City of Forest City- (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>21.2</summer_mw>
    <first_year>1950</first_year>
    <latest_year>2000</latest_year>
    <lat>43.263235</lat>
    <lon>-93.63538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1772</plant_id>
    <plant_name>John H Warden</plant_name>
    <state>MI</state>
    <county>Baraga</county>
    <operator>L'Anse Warden Electric Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>17.7</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1959</latest_year>
    <lat>46.7553</lat>
    <lon>-88.4558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2243</plant_id>
    <plant_name>Don Henry</plant_name>
    <state>NE</state>
    <county>Adams</county>
    <operator>City of Hastings - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>40.583155</lat>
    <lon>-98.42006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3561</plant_id>
    <plant_name>Bryan (TX)</plant_name>
    <state>TX</state>
    <county>Brazos</county>
    <operator>City of Bryan - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1975</latest_year>
    <lat>30.64741</lat>
    <lon>-96.37232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6527</plant_id>
    <plant_name>E J West</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>20.6</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>43.318906</lat>
    <lon>-73.92079</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7338</plant_id>
    <plant_name>Grizzly</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>City of Santa Clara - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>17.7</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>39.889287</lat>
    <lon>-121.2792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7883</plant_id>
    <plant_name>Powell Valley</plant_name>
    <state>TN</state>
    <county>Hancock</county>
    <operator>Powell Valley Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>36.5748</lat>
    <lon>-83.0321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58146</plant_id>
    <plant_name>Twin Rivers Paper Co LLC</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Twin Rivers Paper Co LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>PUR</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>47.358139</lat>
    <lon>-68.33086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58714</plant_id>
    <plant_name>Oxbow Creek</plant_name>
    <state>PA</state>
    <county>Wyoming</county>
    <operator>Oxbow Creek Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.608611</lat>
    <lon>-75.87056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58715</plant_id>
    <plant_name>Roundtop</plant_name>
    <state>PA</state>
    <county>Susquehanna</county>
    <operator>Roundtop Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.657778</lat>
    <lon>-76.04917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58811</plant_id>
    <plant_name>Beaver Dam (PA)</plant_name>
    <state>PA</state>
    <county>Bradford</county>
    <operator>Beaver Dam Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.611389</lat>
    <lon>-76.84306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59891</plant_id>
    <plant_name>Butler Solar Farm 20</plant_name>
    <state>GA</state>
    <county>Taylor</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.575542</lat>
    <lon>-84.31655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61263</plant_id>
    <plant_name>Wolf Run Energy</plant_name>
    <state>PA</state>
    <county>Bradford</county>
    <operator>Wolf Run Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.610981</lat>
    <lon>-76.29936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62594</plant_id>
    <plant_name>Ruff Solar LLC</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.32062</lat>
    <lon>-81.7634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64873</plant_id>
    <plant_name>Pittsburgh Airport Gas Plant</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>IMG Energy Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.495</lat>
    <lon>-80.233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67969</plant_id>
    <plant_name>Two Hearted Solar</plant_name>
    <state>NC</state>
    <county>Yadkin</county>
    <operator>Two Hearted Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>22</nameplate_mw>
    <summer_mw>22</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.235367</lat>
    <lon>-80.56279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1989</plant_id>
    <plant_name>Litchfield</plant_name>
    <state>MN</state>
    <county>Meeker</county>
    <operator>Litchfield Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>21.9</nameplate_mw>
    <summer_mw>21.9</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2021</latest_year>
    <lat>45.128164</lat>
    <lon>-94.53515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2619</plant_id>
    <plant_name>Trenton Falls</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>21.9</nameplate_mw>
    <summer_mw>25.9</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1919</latest_year>
    <lat>43.2758</lat>
    <lon>-75.1567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7502</plant_id>
    <plant_name>Dutch Harbor</plant_name>
    <state>AK</state>
    <county>Aleutians West</county>
    <operator>City of Unalaska - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>21.9</nameplate_mw>
    <summer_mw>18.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2015</latest_year>
    <lat>53.892459</lat>
    <lon>-166.5382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65773</plant_id>
    <plant_name>Star Peak Geothermal Plant</plant_name>
    <state>NV</state>
    <county>Pershing</county>
    <operator>Star Peak Geothermal LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>5</generators>
    <nameplate_mw>21.9</nameplate_mw>
    <summer_mw>21.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.532133</lat>
    <lon>-118.272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>540</plant_id>
    <plant_name>Branford</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Connecticut Jet Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>21.8</nameplate_mw>
    <summer_mw>17.4</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>41.2925</lat>
    <lon>-72.7942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>561</plant_id>
    <plant_name>Franklin Drive</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>Connecticut Jet Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>21.8</nameplate_mw>
    <summer_mw>16.1</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>41.798943</lat>
    <lon>-73.11627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>565</plant_id>
    <plant_name>Torrington</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>Connecticut Jet Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>KER</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>21.8</nameplate_mw>
    <summer_mw>17.4</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>41.776109</lat>
    <lon>-73.12089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1320</plant_id>
    <plant_name>Sabetha Power Plant</plant_name>
    <state>KS</state>
    <county>Nemaha</county>
    <operator>City of Sabetha - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>11</generators>
    <nameplate_mw>21.8</nameplate_mw>
    <summer_mw>18.7</summer_mw>
    <first_year>1947</first_year>
    <latest_year>2001</latest_year>
    <lat>39.904922</lat>
    <lon>-95.80337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2312</plant_id>
    <plant_name>Wayne IC</plant_name>
    <state>NE</state>
    <county>Wayne</county>
    <operator>City of Wayne (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>21.8</nameplate_mw>
    <summer_mw>20.2</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1998</latest_year>
    <lat>42.2278</lat>
    <lon>-97.0183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7128</plant_id>
    <plant_name>William F Matson Generating Station</plant_name>
    <state>PA</state>
    <county>Huntingdon</county>
    <operator>Allegheny Electric Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>21.7</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.432915</lat>
    <lon>-78.00289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61552</plant_id>
    <plant_name>Fort Detrick Solar PV</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>Montevue Lane Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>21.7</nameplate_mw>
    <summer_mw>21.7</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2024</latest_year>
    <lat>39.44</lat>
    <lon>-77.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2090</plant_id>
    <plant_name>Nevada</plant_name>
    <state>MO</state>
    <county>Vernon</county>
    <operator>Evergy Missouri West</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>17.3</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>37.8503</lat>
    <lon>-94.3444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2227</plant_id>
    <plant_name>Jeffrey</plant_name>
    <state>NE</state>
    <county>Lincoln</county>
    <operator>Central Nebraska Pub P&amp;I Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1941</latest_year>
    <lat>40.959405</lat>
    <lon>-100.3979</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2228</plant_id>
    <plant_name>Johnson 1</plant_name>
    <state>NE</state>
    <county>Gosper</county>
    <operator>Central Nebraska Pub P&amp;I Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>20.5</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1941</latest_year>
    <lat>40.6936</lat>
    <lon>-99.8178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2750</plant_id>
    <plant_name>Thorpe</plant_name>
    <state>NC</state>
    <county>Jackson</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>19.7</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1941</latest_year>
    <lat>35.233988</lat>
    <lon>-83.1254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3773</plant_id>
    <plant_name>Byllesby 2</plant_name>
    <state>VA</state>
    <county>Carroll</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>31.6</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>36.7858</lat>
    <lon>-80.9333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4000</plant_id>
    <plant_name>Chippewa Falls</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>12.1</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>44.9308</lat>
    <lon>-91.3889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54038</plant_id>
    <plant_name>Geo East Mesa II</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>32.7757</lat>
    <lon>-115.2637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60025</plant_id>
    <plant_name>Eight Flags Energy</plant_name>
    <state>FL</state>
    <county>Nassau</county>
    <operator>Eight Flags Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>21.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>30.6608</lat>
    <lon>-81.4706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61584</plant_id>
    <plant_name>Voyager Wind IV</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>21.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.077872</lat>
    <lon>-118.2497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61850</plant_id>
    <plant_name>Amana Society Service Company</plant_name>
    <state>IA</state>
    <county>Iowa</county>
    <operator>Amana Society Service Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>12</generators>
    <nameplate_mw>21.6</nameplate_mw>
    <summer_mw>21.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.79323</lat>
    <lon>-91.89179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1287</plant_id>
    <plant_name>Holton</plant_name>
    <state>KS</state>
    <county>Jackson</county>
    <operator>City of Holton - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>21.5</nameplate_mw>
    <summer_mw>19.4</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2001</latest_year>
    <lat>39.4735</lat>
    <lon>-95.73155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>51026</plant_id>
    <plant_name>Ryegate Associates, LLC</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>Ryegate Associates, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>21.5</nameplate_mw>
    <summer_mw>19.7</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>44.2131</lat>
    <lon>-72.0572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1198</plant_id>
    <plant_name>Webster City</plant_name>
    <state>IA</state>
    <county>Hamilton</county>
    <operator>City of Webster City - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>21.3</nameplate_mw>
    <summer_mw>20.7</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>42.471022</lat>
    <lon>-93.81499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1873</plant_id>
    <plant_name>Tower</plant_name>
    <state>MI</state>
    <county>Cheboygan</county>
    <operator>Wolverine Power Supply Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>21.3</nameplate_mw>
    <summer_mw>17.3</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>45.36282</lat>
    <lon>-84.29497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2487</plant_id>
    <plant_name>Coxsackie</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>Central Hudson Gas &amp; Elec Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21.3</nameplate_mw>
    <summer_mw>19.4</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>42.350889</lat>
    <lon>-73.8158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50933</plant_id>
    <plant_name>Rhinelander Mill</plant_name>
    <state>WI</state>
    <county>Oneida</county>
    <operator>Ahlstrom-Munksjo</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Conventional Steam Coal; Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>21.3</nameplate_mw>
    <summer_mw>12.3</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1958</latest_year>
    <lat>45.6394</lat>
    <lon>-89.4205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52162</plant_id>
    <plant_name>85 A</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wind Wall 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21.3</nameplate_mw>
    <summer_mw>21.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.095797</lat>
    <lon>-118.3248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56434</plant_id>
    <plant_name>Burley Butte Windpark</plant_name>
    <state>ID</state>
    <county>Cassia</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21.3</nameplate_mw>
    <summer_mw>21.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.490341</lat>
    <lon>-113.9266</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60678</plant_id>
    <plant_name>San Joaquin Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>GASNA 6P, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>21.3</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>36.527246</lat>
    <lon>-120.1479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64327</plant_id>
    <plant_name>EDF Ph1 Toms River</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>21.3</nameplate_mw>
    <summer_mw>21.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.984</lat>
    <lon>-74.238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2367</plant_id>
    <plant_name>Schiller</plant_name>
    <state>NH</state>
    <county>Rockingham</county>
    <operator>Granite Shore Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>JF</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>21.2</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>43.0978</lat>
    <lon>-70.7842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4112</plant_id>
    <plant_name>Cumberland (WI)</plant_name>
    <state>WI</state>
    <county>Barron</county>
    <operator>City of Cumberland - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>21.2</nameplate_mw>
    <summer_mw>20.7</summer_mw>
    <first_year>1939</first_year>
    <latest_year>2001</latest_year>
    <lat>45.5336</lat>
    <lon>-92.0224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55799</plant_id>
    <plant_name>Otsego Mill Power Plant</plant_name>
    <state>MI</state>
    <county>Allegan</county>
    <operator>Otsego Paper Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>21.2</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>42.4628</lat>
    <lon>-85.6961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66126</plant_id>
    <plant_name>Hecate Energy Albany 2 LLC</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>21.1</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.507913</lat>
    <lon>-73.83651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>769</plant_id>
    <plant_name>Kanoelehua</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hawaii Electric Light Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1973</latest_year>
    <lat>19.7052</lat>
    <lon>-155.0625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2611</plant_id>
    <plant_name>South Colton</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>44.5133</lat>
    <lon>-74.8831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50363</plant_id>
    <plant_name>Mesquite Lake Energy Park Plant 2</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Mesquite Lake Energy Park</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>15.5</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>32.903826</lat>
    <lon>-115.5119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56378</plant_id>
    <plant_name>Pakini Nui Wind Farm</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Apollo Energy Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>18.9742</lat>
    <lon>-155.6914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56441</plant_id>
    <plant_name>Salmon Falls Wind Park</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.681944</lat>
    <lon>-114.9892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56636</plant_id>
    <plant_name>Mountain Home</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Hot Springs Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.0272</lat>
    <lon>-115.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56637</plant_id>
    <plant_name>Bennett Creek Windfarm LLC - Mountain Home</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Bennett Creek Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.0536</lat>
    <lon>-115.4803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56781</plant_id>
    <plant_name>Evergreen BioPower LLC</plant_name>
    <state>OR</state>
    <county>Linn</county>
    <operator>Invenergy Services LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>44.770792</lat>
    <lon>-122.612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56859</plant_id>
    <plant_name>Crosswind Energy Project</plant_name>
    <state>IA</state>
    <county>Palo Alto</county>
    <operator>Crosswind Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>43.0475</lat>
    <lon>-94.9228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56939</plant_id>
    <plant_name>Solar Blythe LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>NRG Solar Blythe</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>33.5917</lat>
    <lon>-114.7444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57124</plant_id>
    <plant_name>Payne's Ferry</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.825278</lat>
    <lon>-115.0108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57126</plant_id>
    <plant_name>Yahoo Creek</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.770833</lat>
    <lon>-114.9886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57274</plant_id>
    <plant_name>Grant County Wind LLC</plant_name>
    <state>MN</state>
    <county>Grant</county>
    <operator>Aspenall Energies (Delaware), LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>45.8033</lat>
    <lon>-95.8844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57994</plant_id>
    <plant_name>Apple Data Center PV</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Apple, Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.588135</lat>
    <lon>-81.25198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58813</plant_id>
    <plant_name>Alpaca</plant_name>
    <state>PA</state>
    <county>Bradford</county>
    <operator>Alpaca Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>20.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.663056</lat>
    <lon>-76.80556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58818</plant_id>
    <plant_name>Milan</plant_name>
    <state>PA</state>
    <county>Bradford</county>
    <operator>Milan Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>20.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.894444</lat>
    <lon>-76.58278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59197</plant_id>
    <plant_name>Univ Minnesota CHP Plant</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>University of Minnesota Central Utilities</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>21</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.978611</lat>
    <lon>-93.24083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68798</plant_id>
    <plant_name>Lockheed Martin Palmdale Solar PV</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Lockheed Martin Corporation</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>20.9</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2022</latest_year>
    <lat>34.608</lat>
    <lon>-118.109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10224</plant_id>
    <plant_name>Merck Rahway Power Plant</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Merck &amp; Co Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>20.8</nameplate_mw>
    <summer_mw>21.3</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2017</latest_year>
    <lat>40.615616</lat>
    <lon>-74.26529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57138</plant_id>
    <plant_name>Savannah River Site Biomass Cogen</plant_name>
    <state>SC</state>
    <county>Aiken</county>
    <operator>Ameresco</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>20.8</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.283333</lat>
    <lon>-81.66667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57938</plant_id>
    <plant_name>Arq Solutions Red River</plant_name>
    <state>LA</state>
    <county>Red River</county>
    <operator>Arq Solutions (Red River), LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>20.8</nameplate_mw>
    <summer_mw>20.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.003889</lat>
    <lon>-93.39111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1272</plant_id>
    <plant_name>Colby City of</plant_name>
    <state>KS</state>
    <county>Thomas</county>
    <operator>City of Colby - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>20.7</nameplate_mw>
    <summer_mw>19.2</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2024</latest_year>
    <lat>39.394414</lat>
    <lon>-101.0584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6791</plant_id>
    <plant_name>Augusta Electric Plant No 2</plant_name>
    <state>KS</state>
    <county>Butler</county>
    <operator>City of Augusta - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>20.7</nameplate_mw>
    <summer_mw>20.1</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2005</latest_year>
    <lat>37.686085</lat>
    <lon>-96.96498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10261</plant_id>
    <plant_name>Enterprise Products Operating</plant_name>
    <state>TX</state>
    <county>Chambers</county>
    <operator>Enterprise Products Optg LP</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>20.7</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1996</latest_year>
    <lat>29.8247</lat>
    <lon>-94.9197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59071</plant_id>
    <plant_name>Carroll Area Wind Farm</plant_name>
    <state>IA</state>
    <county>Carroll</county>
    <operator>SRIV Partnership LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20.7</nameplate_mw>
    <summer_mw>20.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.94143</lat>
    <lon>-94.8861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2120</plant_id>
    <plant_name>Carrollton</plant_name>
    <state>MO</state>
    <county>Carroll</county>
    <operator>Carrollton Board of Public Wks</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>20.6</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>1947</first_year>
    <latest_year>2001</latest_year>
    <lat>39.3515</lat>
    <lon>-93.5016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54950</plant_id>
    <plant_name>Univ of Oregon Central Power Station</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>University of Oregon</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>20.6</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2026</latest_year>
    <lat>44.048333</lat>
    <lon>-123.0739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>557</plant_id>
    <plant_name>Tunnel</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>FirstLight Power Resources Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>JF</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>20.5</nameplate_mw>
    <summer_mw>18.1</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1969</latest_year>
    <lat>41.555425</lat>
    <lon>-72.04183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56005</plant_id>
    <plant_name>Pleasant Valley (VA)</plant_name>
    <state>VA</state>
    <county>Rockingham</county>
    <operator>City of Harrisonburg - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>20.5</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2006</latest_year>
    <lat>38.4006</lat>
    <lon>-78.8983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67320</plant_id>
    <plant_name>Russell</plant_name>
    <state>KS</state>
    <county>Russell</county>
    <operator>Sunflower Electric Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20.4</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.893806</lat>
    <lon>-98.79419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68493</plant_id>
    <plant_name>Central Heating Plant</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>University of Massachusetts Amherst</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine; Batteries</technologies>
    <generators>5</generators>
    <nameplate_mw>20.4</nameplate_mw>
    <summer_mw>19.4</summer_mw>
    <battery_mwh>3.3</battery_mwh>
    <first_year>2007</first_year>
    <latest_year>2022</latest_year>
    <lat>42.390084</lat>
    <lon>-72.53714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57338</plant_id>
    <plant_name>Roadrunner Solar</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>NRG Solar Roadrunner</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20.2</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>31.792778</lat>
    <lon>-106.6733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58366</plant_id>
    <plant_name>Atwell Island</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>SPS Atwell Island LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20.2</nameplate_mw>
    <summer_mw>17.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.895</lat>
    <lon>-119.5108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60386</plant_id>
    <plant_name>RE Garland A</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20.2</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.821453</lat>
    <lon>-118.4974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1698</plant_id>
    <plant_name>C W Tippy</plant_name>
    <state>MI</state>
    <county>Manistee</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>20.1</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1918</latest_year>
    <lat>44.259135</lat>
    <lon>-85.93957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54343</plant_id>
    <plant_name>Terminus Hydroelectric Project</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>20.1</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>36.4156</lat>
    <lon>-119.0069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54909</plant_id>
    <plant_name>Tehachapi Wind Resource II</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CalWind Resources Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>20.1</nameplate_mw>
    <summer_mw>20.1</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2025</latest_year>
    <lat>35.1061</lat>
    <lon>-118.3114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>238</plant_id>
    <plant_name>El Dorado</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>El Dorado Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20.8</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>38.793574</lat>
    <lon>-120.6192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1567</plant_id>
    <plant_name>Deep Creek</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>BP Piney &amp; Deep Creek LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>39.523</lat>
    <lon>-79.413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2543</plant_id>
    <plant_name>Beardslee</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>16.6</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>43.019113</lat>
    <lon>-74.74135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3114</plant_id>
    <plant_name>Shawnee (PA)</plant_name>
    <state>PA</state>
    <county>Monroe</county>
    <operator>Shawnee Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20.6</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>41.061194</lat>
    <lon>-75.05824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4080</plant_id>
    <plant_name>Petenwell</plant_name>
    <state>WI</state>
    <county>Juneau</county>
    <operator>Wisconsin River Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1950</latest_year>
    <lat>44.0572</lat>
    <lon>-90.0217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6552</plant_id>
    <plant_name>Foster</plant_name>
    <state>OR</state>
    <county>Linn</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>44.4146</lat>
    <lon>-122.6712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7339</plant_id>
    <plant_name>Wellington 2</plant_name>
    <state>KS</state>
    <county>Sumner</county>
    <operator>City of Wellington - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>37.2678</lat>
    <lon>-97.3497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7766</plant_id>
    <plant_name>Erie Energy Center</plant_name>
    <state>KS</state>
    <county>Neosho</county>
    <operator>City of Erie - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>37.574167</lat>
    <lon>-95.23722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7850</plant_id>
    <plant_name>Shenandoah</plant_name>
    <state>IA</state>
    <county>Page</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.77069</lat>
    <lon>-95.37683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7973</plant_id>
    <plant_name>Sharpe</plant_name>
    <state>KS</state>
    <county>Coffey</county>
    <operator>Kansas Electric Power Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.275</lat>
    <lon>-95.6839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10072</plant_id>
    <plant_name>Engineered Carbons Borger Cogen</plant_name>
    <state>TX</state>
    <county>Hutchinson</county>
    <operator>Orion Engineered Carbons</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>35.66704</lat>
    <lon>-101.432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10093</plant_id>
    <plant_name>Tesoro Hawaii</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>PAR Petroleum</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>WO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>21.303229</lat>
    <lon>-158.0914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10290</plant_id>
    <plant_name>Bridgewater Power LP</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Bridgewater Power Co LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.7155</lat>
    <lon>-71.6585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10437</plant_id>
    <plant_name>Sunray 2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Sunray Energy 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.863356</lat>
    <lon>-116.8276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10475</plant_id>
    <plant_name>Expander Turbine</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>Cleveland Cliffs</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>BFG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>41.6836</lat>
    <lon>-87.4233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10685</plant_id>
    <plant_name>Westend Facility</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Searles Valley Minerals Operations Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>35.7075</lat>
    <lon>-117.3956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10838</plant_id>
    <plant_name>NE Renewable Springfield, LLC</plant_name>
    <state>NH</state>
    <county>Sullivan</county>
    <operator>NE Renewable Springfield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>16.1</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.442871</lat>
    <lon>-72.056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10879</plant_id>
    <plant_name>Salton Sea Power Gen Co - Unit 2</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>23.1</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>33.1589</lat>
    <lon>-115.6455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50110</plant_id>
    <plant_name>Sierra Pacific Burney Facility</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18.9</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>40.8767</lat>
    <lon>-121.7016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50308</plant_id>
    <plant_name>FWA Central Heat and Power Plant</plant_name>
    <state>AK</state>
    <county>Fairbanks North Star</county>
    <operator>Doyon Utilities - Ft. Wainwright</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>4</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18.5</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1989</latest_year>
    <lat>64.825601</lat>
    <lon>-147.6486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50553</plant_id>
    <plant_name>Edom Hills Project 1 LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Edom Hills Project 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>33.881667</lat>
    <lon>-116.4603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50770</plant_id>
    <plant_name>National Energy of McBain</plant_name>
    <state>MI</state>
    <county>Missaukee</county>
    <operator>National Salvage &amp; Service Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>44.204</lat>
    <lon>-85.2206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50772</plant_id>
    <plant_name>National Energy of Lincoln</plant_name>
    <state>MI</state>
    <county>Alcona</county>
    <operator>National Salvage &amp; Service Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>44.68</lat>
    <lon>-83.4167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56575</plant_id>
    <plant_name>Steel Winds Wind Farm</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>42.8167</lat>
    <lon>-78.8675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56755</plant_id>
    <plant_name>Odin Wind Farm LLC</plant_name>
    <state>MN</state>
    <county>Cottonwood</county>
    <operator>Aspenall Energies (Delaware), LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.8953</lat>
    <lon>-94.9142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56764</plant_id>
    <plant_name>Winnebago Wind Power Project</plant_name>
    <state>IA</state>
    <county>Winnebago</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.315</lat>
    <lon>-93.77</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57318</plant_id>
    <plant_name>Poseidon Solar, LLC</plant_name>
    <state>AZ</state>
    <county>GILA</county>
    <operator>Axium Arizona Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.160601</lat>
    <lon>-111.484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57360</plant_id>
    <plant_name>Sun City Project LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Avenal Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.983056</lat>
    <lon>-120.1103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57375</plant_id>
    <plant_name>Adams Wind Generations LLC</plant_name>
    <state>MN</state>
    <county>Meeker</county>
    <operator>BEAM US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.916944</lat>
    <lon>-94.73556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57396</plant_id>
    <plant_name>Danielson Wind Farms LLC</plant_name>
    <state>MN</state>
    <county>Meeker</county>
    <operator>BEAM US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.071667</lat>
    <lon>-94.75222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57497</plant_id>
    <plant_name>Stroud Solar Station</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.531389</lat>
    <lon>-120.1069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57522</plant_id>
    <plant_name>Cantua Solar Station</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.425085</lat>
    <lon>-120.3435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57523</plant_id>
    <plant_name>Huron Solar Station</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.181389</lat>
    <lon>-120.0306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57553</plant_id>
    <plant_name>Shirley Wind</plant_name>
    <state>WI</state>
    <county>Brown</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>44.3481</lat>
    <lon>-87.9278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57651</plant_id>
    <plant_name>Adobe Solar</plant_name>
    <state>CA</state>
    <county>KERN</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.102778</lat>
    <lon>-118.9544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57710</plant_id>
    <plant_name>Stephentown Spindle</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Convergent Energy and Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Flywheels</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Flywheels</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.556501</lat>
    <lon>-73.37748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57716</plant_id>
    <plant_name>Hazle Spindle</plant_name>
    <state>PA</state>
    <county>Luzerne</county>
    <operator>Convergent Energy and Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Flywheels</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Flywheels</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.949536</lat>
    <lon>-76.04739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57891</plant_id>
    <plant_name>Guernsey Solar Station</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.163889</lat>
    <lon>-119.6506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57892</plant_id>
    <plant_name>Gates Solar Station</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.176389</lat>
    <lon>-120.1142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57912</plant_id>
    <plant_name>Grand Ridge Solar Farm</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.143421</lat>
    <lon>-88.75834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58002</plant_id>
    <plant_name>Alpaugh North</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.9025</lat>
    <lon>-119.4428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58026</plant_id>
    <plant_name>Spruce Mountain WInd</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>CPV Spruce Mountain Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.415587</lat>
    <lon>-70.55981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58148</plant_id>
    <plant_name>RE Kansas South LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>RE Kansas South LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.226111</lat>
    <lon>-119.8342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58149</plant_id>
    <plant_name>TA-High Desert LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>TA-High Desert LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.708889</lat>
    <lon>-118.3047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58202</plant_id>
    <plant_name>RE Victor Phelan Solar One LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.51231</lat>
    <lon>-117.4775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58373</plant_id>
    <plant_name>White River Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.871389</lat>
    <lon>-119.4625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58374</plant_id>
    <plant_name>Corcoran Solar</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.138333</lat>
    <lon>-119.5733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58486</plant_id>
    <plant_name>Picture Rocks Solar, LLC</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.369722</lat>
    <lon>-111.2428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58489</plant_id>
    <plant_name>Apex Solar PV Power Project</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.39</lat>
    <lon>-114.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58498</plant_id>
    <plant_name>RE Rosamond One LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.9</lat>
    <lon>-118.2469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58499</plant_id>
    <plant_name>RE Rosamond Two LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.900278</lat>
    <lon>-118.2383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58533</plant_id>
    <plant_name>Don A Campbell 1 Geothermal</plant_name>
    <state>NV</state>
    <county>Mineral</county>
    <operator>ORNI 47, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>13.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.836667</lat>
    <lon>-118.3239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58544</plant_id>
    <plant_name>Mountain View Solar</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>NextEra Energy Mountain View Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.390556</lat>
    <lon>-114.9644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58621</plant_id>
    <plant_name>Sol Orchard El Centro PV</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Sol Orchard Imperial 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.803333</lat>
    <lon>-115.5464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58623</plant_id>
    <plant_name>Holstein Plant</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.774167</lat>
    <lon>-79.34083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58626</plant_id>
    <plant_name>Western Antelope Blue Sky Ranch A</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.681667</lat>
    <lon>-118.3247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58649</plant_id>
    <plant_name>Montgomery Solar LLC</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.344444</lat>
    <lon>-79.76833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58701</plant_id>
    <plant_name>Apple Data Center - PV2</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Apple, Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.738889</lat>
    <lon>-81.20778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58844</plant_id>
    <plant_name>Dogwood Solar, LLC</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.125</lat>
    <lon>-77.40917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58876</plant_id>
    <plant_name>Fusion Solar Center LLC</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Fusion Solar Centre, L.L.C</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.623889</lat>
    <lon>-72.04306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58891</plant_id>
    <plant_name>Big Turtle Wind Farm, LLC</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>DTE Sustainable Generation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.850833</lat>
    <lon>-82.7825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58943</plant_id>
    <plant_name>Halifax (NC)</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.441944</lat>
    <lon>-77.71139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58985</plant_id>
    <plant_name>RE Kansas Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.247778</lat>
    <lon>-119.8339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58986</plant_id>
    <plant_name>RE Old River One, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.223333</lat>
    <lon>-119.0889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58991</plant_id>
    <plant_name>RE Kent South, LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.226111</lat>
    <lon>-119.9053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59088</plant_id>
    <plant_name>Calipatria Solar Farm</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.165833</lat>
    <lon>-115.5322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59153</plant_id>
    <plant_name>Watson Seed Farm PV1</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.129722</lat>
    <lon>-77.72139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59155</plant_id>
    <plant_name>Shawboro PV1</plant_name>
    <state>NC</state>
    <county>Currituck</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.433333</lat>
    <lon>-76.08722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59183</plant_id>
    <plant_name>CID Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.138056</lat>
    <lon>-119.5647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59237</plant_id>
    <plant_name>Lone Valley Solar Park II LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Lone Valley Solar Park II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.408333</lat>
    <lon>-116.8625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59249</plant_id>
    <plant_name>Rio Bravo Solar 1 LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.416111</lat>
    <lon>-119.6825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59250</plant_id>
    <plant_name>Rio Bravo Solar II LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.4225</lat>
    <lon>-119.6292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59322</plant_id>
    <plant_name>Pumpjack Solar I</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.305556</lat>
    <lon>-119.6225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59408</plant_id>
    <plant_name>Shafter Solar LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Shafter Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.393333</lat>
    <lon>-119.1278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59412</plant_id>
    <plant_name>Algonquin SKIC20 Solar LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.126111</lat>
    <lon>-119.2433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59414</plant_id>
    <plant_name>Atwell Island West Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.815</lat>
    <lon>-119.4597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59417</plant_id>
    <plant_name>Pleasant Hill Wind Energy Project</plant_name>
    <state>TX</state>
    <county>Crosby</county>
    <operator>Pleasant Hill Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.738889</lat>
    <lon>-101.485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59431</plant_id>
    <plant_name>Sierra Solar Greenworks</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.703611</lat>
    <lon>-118.3342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59441</plant_id>
    <plant_name>Adelanto Solar, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Adelanto Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.557222</lat>
    <lon>-117.3775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59443</plant_id>
    <plant_name>TA-Acacia, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.689167</lat>
    <lon>-118.3247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59444</plant_id>
    <plant_name>Desert Star Hybrid</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>30</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2023</latest_year>
    <lat>33.145</lat>
    <lon>-112.66</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59449</plant_id>
    <plant_name>Decatur County Solar Project</plant_name>
    <state>GA</state>
    <county>Decatur</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>30.965</lat>
    <lon>-84.62611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59469</plant_id>
    <plant_name>Alamo Solar</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.682222</lat>
    <lon>-117.3475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59513</plant_id>
    <plant_name>Meadows PV 1</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Fresh Air Energy XVIII, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.836944</lat>
    <lon>-77.12694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59518</plant_id>
    <plant_name>Grandy PV 1</plant_name>
    <state>NC</state>
    <county>Currituck</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.233611</lat>
    <lon>-75.88083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59522</plant_id>
    <plant_name>Giffen Solar Park</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Giffen Solar Park, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.544722</lat>
    <lon>-120.3161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59524</plant_id>
    <plant_name>Blackwell Solar Park</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.612</lat>
    <lon>-119.845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59527</plant_id>
    <plant_name>Kelford (Duke)</plant_name>
    <state>NC</state>
    <county>Bertie</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.148056</lat>
    <lon>-77.21194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59528</plant_id>
    <plant_name>Solar Oasis LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Solar Oasis, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.648889</lat>
    <lon>-118.0767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59530</plant_id>
    <plant_name>Pasquotank</plant_name>
    <state>NC</state>
    <county>Pasquotank</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.264722</lat>
    <lon>-76.30611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59535</plant_id>
    <plant_name>SR Hazlehurst</plant_name>
    <state>GA</state>
    <county>Jeff Davis</county>
    <operator>SR Hazlehurst, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>31.810278</lat>
    <lon>-82.575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59555</plant_id>
    <plant_name>Vega Solar</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Vega Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.925833</lat>
    <lon>-120.82</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59600</plant_id>
    <plant_name>Nicolis Solar PV Plant</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.835833</lat>
    <lon>-119.0561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59607</plant_id>
    <plant_name>Maricopa West Solar PV, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.115278</lat>
    <lon>-119.3178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59610</plant_id>
    <plant_name>AP North Lake I, LP</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>AP North Lake I, LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.74</lat>
    <lon>-117.0106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59633</plant_id>
    <plant_name>Kettleman Solar -Centaurus</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.050833</lat>
    <lon>-119.9475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59638</plant_id>
    <plant_name>Coronal Lost Hills</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.726667</lat>
    <lon>-119.9058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59657</plant_id>
    <plant_name>Imperial Valley Solar Co (IVSC) 2, LLC</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.252222</lat>
    <lon>-115.4975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59685</plant_id>
    <plant_name>Remington Solar Facility</plant_name>
    <state>VA</state>
    <county>Fauquier</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.548333</lat>
    <lon>-77.77639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59695</plant_id>
    <plant_name>Mt. Home Solar 1, LLC</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.129</lat>
    <lon>-115.752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59722</plant_id>
    <plant_name>Seville 1</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.1125</lat>
    <lon>-116.0139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59740</plant_id>
    <plant_name>SEPV Mojave West</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.022903</lat>
    <lon>-118.2827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59868</plant_id>
    <plant_name>Kingbird A Solar LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.819</lat>
    <lon>-118.432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59874</plant_id>
    <plant_name>Richland Solar Center</plant_name>
    <state>GA</state>
    <county>Twiggs</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>32.638034</lat>
    <lon>-83.37892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59878</plant_id>
    <plant_name>Windhub Solar A LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>EDP Renewables North America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.0199</lat>
    <lon>-118.2879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59900</plant_id>
    <plant_name>Corcoran Solar 3</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.15042</lat>
    <lon>-119.5854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59915</plant_id>
    <plant_name>Oro Loma</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.876847</lat>
    <lon>-120.6676</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59951</plant_id>
    <plant_name>Five Forks Solar</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>Five Forks Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.515544</lat>
    <lon>-78.0337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59961</plant_id>
    <plant_name>Western Antelope Blue Sky B</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.73206</lat>
    <lon>-118.3136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59962</plant_id>
    <plant_name>North Lancaster Ranch</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.719538</lat>
    <lon>-118.313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59963</plant_id>
    <plant_name>Central Antelope Dry Ranch C</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.720499</lat>
    <lon>-118.3005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60001</plant_id>
    <plant_name>Vaughn Creek PV1</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.451012</lat>
    <lon>-77.1206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60009</plant_id>
    <plant_name>Murphy Flat Solar</plant_name>
    <state>ID</state>
    <county>Owyhee</county>
    <operator>Murphy Flat Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.211126</lat>
    <lon>-116.4391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60010</plant_id>
    <plant_name>Orchard Ranch Solar</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Orchard Ranch Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.468228</lat>
    <lon>-116.2896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60011</plant_id>
    <plant_name>American Falls Solar</plant_name>
    <state>ID</state>
    <county>Power</county>
    <operator>American Falls Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.824446</lat>
    <lon>-112.7383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60012</plant_id>
    <plant_name>American Falls Solar II</plant_name>
    <state>ID</state>
    <county>Power</county>
    <operator>American Falls Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.825269</lat>
    <lon>-112.7487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60027</plant_id>
    <plant_name>Adera Solar</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.120586</lat>
    <lon>-120.3249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60039</plant_id>
    <plant_name>Frontier Solar LLC</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.379919</lat>
    <lon>-121.1307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60078</plant_id>
    <plant_name>CED Ducor 1</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.856278</lat>
    <lon>-119.0684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60079</plant_id>
    <plant_name>CED Ducor 2</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.844167</lat>
    <lon>-119.0681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60081</plant_id>
    <plant_name>CED Ducor 4</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.850403</lat>
    <lon>-119.027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60091</plant_id>
    <plant_name>Kingbird B Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.824206</lat>
    <lon>-118.4385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60279</plant_id>
    <plant_name>Antelope Big Sky Ranch</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.694839</lat>
    <lon>-118.2877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60280</plant_id>
    <plant_name>Summer Solar LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.714703</lat>
    <lon>-118.311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60310</plant_id>
    <plant_name>Portal Ridge Solar B, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Portal Ridge Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.71647</lat>
    <lon>-118.2821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60315</plant_id>
    <plant_name>Midway Solar Farm III</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.154761</lat>
    <lon>-115.5449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60319</plant_id>
    <plant_name>Whitehouse Solar Farm</plant_name>
    <state>VA</state>
    <county>Louisa</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.023</lat>
    <lon>-77.972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60381</plant_id>
    <plant_name>Sulphur Springs</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.0628</lat>
    <lon>-109.9193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60419</plant_id>
    <plant_name>Don A Campbell 2 Geothermal</plant_name>
    <state>NV</state>
    <county>Mineral</county>
    <operator>ORNI 37 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>13.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.835836</lat>
    <lon>-118.3253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60422</plant_id>
    <plant_name>Morgan's Corner</plant_name>
    <state>NC</state>
    <county>Pasquotank</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.421064</lat>
    <lon>-76.36424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60474</plant_id>
    <plant_name>Bayshore Solar B, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.678305</lat>
    <lon>-118.3026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60475</plant_id>
    <plant_name>Bayshore Solar C, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.681338</lat>
    <lon>-118.3141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60481</plant_id>
    <plant_name>Bayshore Solar A, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.667817</lat>
    <lon>-118.2981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60485</plant_id>
    <plant_name>Longboat Solar, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.541</lat>
    <lon>-117.061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60490</plant_id>
    <plant_name>Redwood 4 Solar Farm</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>54 KR 8me LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.314198</lat>
    <lon>-118.8119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60558</plant_id>
    <plant_name>Solar Blythe 2</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>NRG Solar Blythe II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.618678</lat>
    <lon>-114.6962</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60582</plant_id>
    <plant_name>CoTAL Solar Farm</plant_name>
    <state>FL</state>
    <county>Leon</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.37926</lat>
    <lon>-84.35394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60622</plant_id>
    <plant_name>DG AMP Solar Bowling Green</plant_name>
    <state>OH</state>
    <county>Wood</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.396</lat>
    <lon>-83.582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60637</plant_id>
    <plant_name>Cork Oak Solar</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Cork Oak Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.371</lat>
    <lon>-77.571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60656</plant_id>
    <plant_name>McHenry Battery Storage</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>McHenry Battery Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>7.8</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.331411</lat>
    <lon>-88.27435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60661</plant_id>
    <plant_name>Mira Loma Energy Storage Facility</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.006125</lat>
    <lon>-117.5609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60748</plant_id>
    <plant_name>Simcoe Solar</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Simcoe Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.325938</lat>
    <lon>-115.9411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60886</plant_id>
    <plant_name>Pavant Solar III</plant_name>
    <state>UT</state>
    <county>Millard</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.154474</lat>
    <lon>-112.3598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60915</plant_id>
    <plant_name>Correctional Solar LLC</plant_name>
    <state>VA</state>
    <county>New Kent</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.471464</lat>
    <lon>-76.84461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60916</plant_id>
    <plant_name>Sussex Drive, LLC</plant_name>
    <state>VA</state>
    <county>Sussex</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.940529</lat>
    <lon>-77.41776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60947</plant_id>
    <plant_name>Jacumba Solar Farm</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.6212</lat>
    <lon>-116.129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60968</plant_id>
    <plant_name>Scott-II Solar LLC</plant_name>
    <state>VA</state>
    <county>Powhatan</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.526244</lat>
    <lon>-77.94464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60975</plant_id>
    <plant_name>Whitney Point Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Whitney Point Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.376889</lat>
    <lon>-120.1385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60981</plant_id>
    <plant_name>NextEra Westside PV</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Westside Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.381775</lat>
    <lon>-120.1345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61265</plant_id>
    <plant_name>Antelope DSR 3</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.736859</lat>
    <lon>-118.3041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61375</plant_id>
    <plant_name>Hecate Energy Cherrydale LLC</plant_name>
    <state>VA</state>
    <county>Northampton</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.37</lat>
    <lon>-75.91717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61406</plant_id>
    <plant_name>Essex Solar Center</plant_name>
    <state>VA</state>
    <county>Essex</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.834094</lat>
    <lon>-76.79997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61431</plant_id>
    <plant_name>Beacon BESS 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.256526</lat>
    <lon>-118.0275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61445</plant_id>
    <plant_name>Gaskell West 1 Solar Facility</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.832786</lat>
    <lon>-118.5636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61447</plant_id>
    <plant_name>RE Gaskell West 3 LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RE Gaskell West LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.834944</lat>
    <lon>-118.5512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61448</plant_id>
    <plant_name>RE Gaskell West 4 LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RE Gaskell West LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.827873</lat>
    <lon>-118.5682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61449</plant_id>
    <plant_name>RE Gaskell West 5 LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>RE Gaskell West LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.834944</lat>
    <lon>-118.5512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61489</plant_id>
    <plant_name>Cameron Solar</plant_name>
    <state>SC</state>
    <county>Calhoun</county>
    <operator>Cameron Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.574</lat>
    <lon>-80.707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61490</plant_id>
    <plant_name>Estill Solar</plant_name>
    <state>SC</state>
    <county>Hampton</county>
    <operator>Estill Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.763843</lat>
    <lon>-81.24215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61498</plant_id>
    <plant_name>Hampton Solar 2</plant_name>
    <state>SC</state>
    <county>Hampton</county>
    <operator>Hampton Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.881</lat>
    <lon>-81.136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61736</plant_id>
    <plant_name>Woods Hill Solar</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Woods Hill Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.83184</lat>
    <lon>-71.91987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61745</plant_id>
    <plant_name>Aurora County Wind</plant_name>
    <state>SD</state>
    <county>Aurora</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.730833</lat>
    <lon>-98.76417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61746</plant_id>
    <plant_name>Brule County Wind</plant_name>
    <state>SD</state>
    <county>Brule</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.717</lat>
    <lon>-98.922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61778</plant_id>
    <plant_name>North 301 Solar</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>North 301 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.213</lat>
    <lon>-77.624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61796</plant_id>
    <plant_name>LeGore Bridge Solar Center</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>LeGore Bridge Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.572402</lat>
    <lon>-77.30787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61809</plant_id>
    <plant_name>Stillwater Solar PV II</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Ormat Stillwater Solar PV II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.542041</lat>
    <lon>-118.5601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61857</plant_id>
    <plant_name>Toray Plastic America's CHP Plant</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Toray Plastics America</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>19.3</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2014</latest_year>
    <lat>41.593802</lat>
    <lon>-71.42761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61973</plant_id>
    <plant_name>Blackville Solar II</plant_name>
    <state>SC</state>
    <county>Barnwell</county>
    <operator>DP-C2 Episode 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.344319</lat>
    <lon>-81.26177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61987</plant_id>
    <plant_name>West Loch Solar One</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Hawaiian Electric Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>21.340339</lat>
    <lon>-158.0151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62011</plant_id>
    <plant_name>Richmond Spider Solar</plant_name>
    <state>VA</state>
    <county>Spotsylvania</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.247123</lat>
    <lon>-77.78622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62017</plant_id>
    <plant_name>Riverhead Solar Farm</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.922992</lat>
    <lon>-72.7645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62147</plant_id>
    <plant_name>KCE NY 1</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>KCE NY 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>8.4</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.962412</lat>
    <lon>-73.74651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62436</plant_id>
    <plant_name>SR Arlington I</plant_name>
    <state>GA</state>
    <county>Early</county>
    <operator>SR Arlington, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.402919</lat>
    <lon>-84.83681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62463</plant_id>
    <plant_name>Little Bear 3</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Little Bear Solar 3, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.716</lat>
    <lon>-120.415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62854</plant_id>
    <plant_name>St. James Solar (LA)</plant_name>
    <state>LA</state>
    <county>St James</county>
    <operator>St. James Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.9734</lat>
    <lon>-90.7335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62856</plant_id>
    <plant_name>Marengo Battery Storage LLC</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Marengo Battery Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.252733</lat>
    <lon>-88.63998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62889</plant_id>
    <plant_name>Hecate Energy Johanna Facility</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Hecate Energy Johanna Facility LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.714672</lat>
    <lon>-117.8531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62990</plant_id>
    <plant_name>Whitetail Solar 2</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.904211</lat>
    <lon>-77.81422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62991</plant_id>
    <plant_name>Whitetail Solar 3</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.87817</lat>
    <lon>-77.76914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62993</plant_id>
    <plant_name>Johnson Corner Solar 1</plant_name>
    <state>KS</state>
    <county>Stanton</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.547002</lat>
    <lon>-101.7992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63238</plant_id>
    <plant_name>Willis Battery Storage</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.887905</lat>
    <lon>-74.11828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63321</plant_id>
    <plant_name>Bingham Solar, LLC</plant_name>
    <state>MI</state>
    <county>Clinton</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.012</lat>
    <lon>-84.528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63322</plant_id>
    <plant_name>Temperance Solar, LLC</plant_name>
    <state>MI</state>
    <county>Monroe</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.753</lat>
    <lon>-83.524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63487</plant_id>
    <plant_name>Wister Solar</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Wister Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.269426</lat>
    <lon>-115.503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63773</plant_id>
    <plant_name>Elk Hill Solar 1</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.849241</lat>
    <lon>-77.92915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63777</plant_id>
    <plant_name>Pinson Solar Farm</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.72</lat>
    <lon>-82.06</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63786</plant_id>
    <plant_name>Ben Moreell Solar Farm</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.28</lat>
    <lon>-74.1</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63787</plant_id>
    <plant_name>Pleasant Hill PV1</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.53115</lat>
    <lon>-77.55038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63801</plant_id>
    <plant_name>St. Joseph Solar</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.7311</lat>
    <lon>-86.1083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63814</plant_id>
    <plant_name>SR Odom</plant_name>
    <state>GA</state>
    <county>Colquitt</county>
    <operator>Odom Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.06987</lat>
    <lon>-83.59618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63845</plant_id>
    <plant_name>DePue Holdings, LLC</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>DePue Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.33821</lat>
    <lon>-89.30123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63894</plant_id>
    <plant_name>Milo PV - BD Solar 1 LLC</plant_name>
    <state>ME</state>
    <county>Piscataquis</county>
    <operator>BD Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.267</lat>
    <lon>-68.991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64012</plant_id>
    <plant_name>Energix Nokesville, LLC</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>Energix Nokesville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.672</lat>
    <lon>-77.593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64015</plant_id>
    <plant_name>Energix Buckingham, LLC</plant_name>
    <state>VA</state>
    <county>Buckingham</county>
    <operator>Energix Buckingham, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.5064</lat>
    <lon>-78.381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64077</plant_id>
    <plant_name>Hecate Energy Albany County 1</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.515459</lat>
    <lon>-73.83345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64086</plant_id>
    <plant_name>Norge Solar Farm</plant_name>
    <state>VA</state>
    <county>James City</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.365615</lat>
    <lon>-76.77512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64093</plant_id>
    <plant_name>Montross Solar</plant_name>
    <state>VA</state>
    <county>Westmoreland</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.077</lat>
    <lon>-76.786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64135</plant_id>
    <plant_name>Grassfield Solar</plant_name>
    <state>VA</state>
    <county>Chesapeake City</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.65</lat>
    <lon>-76.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64307</plant_id>
    <plant_name>New Orleans Solar Station</plant_name>
    <state>LA</state>
    <county>Orleans</county>
    <operator>Entergy New Orleans, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.015</lat>
    <lon>-89.92</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64535</plant_id>
    <plant_name>Camden Solar LLC</plant_name>
    <state>NC</state>
    <county>Camden</county>
    <operator>Camden Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.30786</lat>
    <lon>-76.14449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64567</plant_id>
    <plant_name>Cement City Solar, LLC</plant_name>
    <state>MI</state>
    <county>Lenawee</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.084451</lat>
    <lon>-84.13528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64581</plant_id>
    <plant_name>Pullman Solar, LLC</plant_name>
    <state>MI</state>
    <county>Allegan</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.471622</lat>
    <lon>-86.09686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64690</plant_id>
    <plant_name>Todd Solar</plant_name>
    <state>MD</state>
    <county>Dorchester</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.613328</lat>
    <lon>-75.83521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64709</plant_id>
    <plant_name>CL-Viaduct LLC</plant_name>
    <state>PA</state>
    <county>Clearfield</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.050201</lat>
    <lon>-78.6519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64711</plant_id>
    <plant_name>UN-School House LLC</plant_name>
    <state>PA</state>
    <county>Clearfield</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.963184</lat>
    <lon>-78.17915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64817</plant_id>
    <plant_name>Energix Leatherwood, LLC</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>Energix Leatherwood, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.687071</lat>
    <lon>-79.70947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65022</plant_id>
    <plant_name>Briel Solar Farm</plant_name>
    <state>VA</state>
    <county>Henrico</county>
    <operator>Briel Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.52364</lat>
    <lon>-77.26358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65044</plant_id>
    <plant_name>Dry Bridge Storage</plant_name>
    <state>VA</state>
    <county>Chesterfield</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.5</lat>
    <lon>-77.7</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65076</plant_id>
    <plant_name>Cottontail Solar 1</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.901749</lat>
    <lon>-76.82332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65077</plant_id>
    <plant_name>Cottontail Solar 2</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.93727</lat>
    <lon>-76.77097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65079</plant_id>
    <plant_name>Cottontail Solar 4</plant_name>
    <state>PA</state>
    <county>Northumberland</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.988822</lat>
    <lon>-76.79292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65080</plant_id>
    <plant_name>Cottontail Solar 5</plant_name>
    <state>PA</state>
    <county>Juniata</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.5608</lat>
    <lon>-77.3785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65081</plant_id>
    <plant_name>Cottontail Solar 6</plant_name>
    <state>PA</state>
    <county>Snyder</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.792458</lat>
    <lon>-76.90506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65082</plant_id>
    <plant_name>Cottontail Solar 8</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.925412</lat>
    <lon>-76.78384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65121</plant_id>
    <plant_name>NY8 - Grissom Solar</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.973</lat>
    <lon>-74.321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65122</plant_id>
    <plant_name>NY8 - Branscomb Solar</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.962972</lat>
    <lon>-73.58674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65123</plant_id>
    <plant_name>NY8 - Janis Solar</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.453939</lat>
    <lon>-75.93103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65124</plant_id>
    <plant_name>NY8 - Regan Solar</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.95474</lat>
    <lon>-74.31312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65125</plant_id>
    <plant_name>NY8 - Puckett Solar</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.252664</lat>
    <lon>-75.83408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65214</plant_id>
    <plant_name>Gaucho Solar</plant_name>
    <state>PA</state>
    <county>Beaver</county>
    <operator>Gaucho Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.511559</lat>
    <lon>-80.3134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65220</plant_id>
    <plant_name>Pleasant Hill Solar</plant_name>
    <state>VA</state>
    <county>Suffolk City</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.692197</lat>
    <lon>-76.57856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65221</plant_id>
    <plant_name>Watlington Solar</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.681547</lat>
    <lon>-78.88596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65314</plant_id>
    <plant_name>Caden Energix Wytheville LLC</plant_name>
    <state>VA</state>
    <county>Wythe</county>
    <operator>Caden Energix Wytheville LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.964279</lat>
    <lon>-81.04986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65346</plant_id>
    <plant_name>Macbeth Solar</plant_name>
    <state>MI</state>
    <county>Muskegon</county>
    <operator>Macbeth Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.437</lat>
    <lon>-86.353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65347</plant_id>
    <plant_name>Lyons Road</plant_name>
    <state>MI</state>
    <county>Shiawassee</county>
    <operator>Lyons Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.965793</lat>
    <lon>-84.14286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65656</plant_id>
    <plant_name>Ortega Grid, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Ortega Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.68354</lat>
    <lon>-117.3284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65692</plant_id>
    <plant_name>NY6 Battery</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>42</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.804294</lat>
    <lon>-78.82762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65713</plant_id>
    <plant_name>Rock Aetna Power Partners</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.022721</lat>
    <lon>-96.05232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65839</plant_id>
    <plant_name>NY8 - Darby Solar</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.970331</lat>
    <lon>-73.57326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65840</plant_id>
    <plant_name>NY8 - Teichos Pattersonville</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.8808</lat>
    <lon>-74.0951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65841</plant_id>
    <plant_name>NY8 - ELP Stillwater Solar</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.926231</lat>
    <lon>-73.71147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65952</plant_id>
    <plant_name>Andover Energy Storage Project</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>VESI 25 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.980781</lat>
    <lon>-74.76095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66019</plant_id>
    <plant_name>Lyons Solar</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>Lyons Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.472</lat>
    <lon>-75.785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66102</plant_id>
    <plant_name>Blue Elk IV Solar, LLC</plant_name>
    <state>MI</state>
    <county>Lenawee</county>
    <operator>Blue Elk IV Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.941</lat>
    <lon>-84.035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66103</plant_id>
    <plant_name>Blue Elk III Solar, LLC</plant_name>
    <state>MI</state>
    <county>Ingham</county>
    <operator>Blue Elk III Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.516</lat>
    <lon>-84.593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66105</plant_id>
    <plant_name>Blue Elk II Solar, LLC</plant_name>
    <state>MI</state>
    <county>Ingham</county>
    <operator>Blue Elk II Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.504888</lat>
    <lon>-84.477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66107</plant_id>
    <plant_name>Blue Elk I Solar, LLC</plant_name>
    <state>MI</state>
    <county>Lenawee</county>
    <operator>Blue Elk I Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.919</lat>
    <lon>-83.996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66108</plant_id>
    <plant_name>Midcontinent Solar, LLC</plant_name>
    <state>MI</state>
    <county>Shiawassee</county>
    <operator>Midcontinent Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.970949</lat>
    <lon>-84.158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66109</plant_id>
    <plant_name>Greenstone Solar, LLC</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>Greenstone Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.942</lat>
    <lon>-85.122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66281</plant_id>
    <plant_name>Melrose BESS</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.207233</lat>
    <lon>-117.2528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66283</plant_id>
    <plant_name>Silver Maple</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>WEB Silver Maple Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.7821</lat>
    <lon>-68.5201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66364</plant_id>
    <plant_name>Cobalt Solar, LLC</plant_name>
    <state>PA</state>
    <county>Forest</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.39915</lat>
    <lon>-79.39588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66365</plant_id>
    <plant_name>Erie Solar, LLC</plant_name>
    <state>PA</state>
    <county>Erie</county>
    <operator>Erie Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.0131</lat>
    <lon>-80.30728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66412</plant_id>
    <plant_name>Hayhurst New Mexico Solar</plant_name>
    <state>NM</state>
    <county>Eddy</county>
    <operator>Hayhurst New Mexico Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.070736</lat>
    <lon>-104.1616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66532</plant_id>
    <plant_name>BCE Los Alamitos 2</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Bright Canyon Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.7841</lat>
    <lon>-118.0509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66533</plant_id>
    <plant_name>BCE Los Alamitos 1</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Bright Canyon Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.7899</lat>
    <lon>-118.0639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66758</plant_id>
    <plant_name>Justin Court Energy Storage</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>VESI 23 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>18.3</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.526261</lat>
    <lon>-74.84409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66999</plant_id>
    <plant_name>Solidago Solar</plant_name>
    <state>VA</state>
    <county>Isle of Wight</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.89</lat>
    <lon>-76.71</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67007</plant_id>
    <plant_name>Cardinal Solar, LLC</plant_name>
    <state>PA</state>
    <county>Venango</county>
    <operator>Cardinal Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.34002</lat>
    <lon>-79.72372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67102</plant_id>
    <plant_name>Shipsterns Solar, LLC</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>Shipsterns Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.299566</lat>
    <lon>-84.75698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67103</plant_id>
    <plant_name>Willford Solar, LLC</plant_name>
    <state>MI</state>
    <county>Gladwin</county>
    <operator>Willford Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.988483</lat>
    <lon>-84.52226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67116</plant_id>
    <plant_name>GD West Greenwich Nooseneck I, LLC</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>GD West Greenwich Nooseneck I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.606</lat>
    <lon>-71.647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67217</plant_id>
    <plant_name>Sunny Rock Solar, LLC</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>Sunny Rock Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.608705</lat>
    <lon>-79.87988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67218</plant_id>
    <plant_name>River Trail Solar, LLC</plant_name>
    <state>VA</state>
    <county>Carroll</county>
    <operator>River Trail Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.709453</lat>
    <lon>-80.88508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67219</plant_id>
    <plant_name>Prairie Solar (VA)</plant_name>
    <state>VA</state>
    <county>Isle of Wight</county>
    <operator>Prairie Solar, LLC (VA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.880181</lat>
    <lon>-76.60931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67694</plant_id>
    <plant_name>Capon Bridge Solar LLC</plant_name>
    <state>WV</state>
    <county>Hampshire</county>
    <operator>Capon Bridge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.28724</lat>
    <lon>-78.64196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67829</plant_id>
    <plant_name>Mordor ES2</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Mordor ES2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.0088</lat>
    <lon>-117.8148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67851</plant_id>
    <plant_name>Montague Energy Storage</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>VESI 34 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.2785</lat>
    <lon>-74.79835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68077</plant_id>
    <plant_name>North Ridge Solar</plant_name>
    <state>VA</state>
    <county>Powhatan</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.535275</lat>
    <lon>-77.82396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68454</plant_id>
    <plant_name>Walden Solar Maine V</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Walden Solar Maine V LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.34475</lat>
    <lon>-70.12961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68775</plant_id>
    <plant_name>Winterberry Solar</plant_name>
    <state>VA</state>
    <county>Gloucester</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.36</lat>
    <lon>-76.53</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69165</plant_id>
    <plant_name>Bayside Battery Storage</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.90752</lat>
    <lon>-82.41128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69235</plant_id>
    <plant_name>Blairs Valley Solar Project</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>CleanChoice Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.8034</lat>
    <lon>-77.9216</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69444</plant_id>
    <plant_name>Elm City BESS</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <battery_mwh>80</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.789717</lat>
    <lon>-77.85501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69499</plant_id>
    <plant_name>Mousam River Solar</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Walden Renewables Development LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.432236</lat>
    <lon>-70.72726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69666</plant_id>
    <plant_name>FR_Williamsport LLC</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Birch Creek Development</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.77088</lat>
    <lon>-77.4328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70432</plant_id>
    <plant_name>Bishopville Solar, LLC</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.203</lat>
    <lon>-80.231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70459</plant_id>
    <plant_name>Green Acres PA</plant_name>
    <state>PA</state>
    <county>Clearfield</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>20</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.818868</lat>
    <lon>-78.41396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10839</plant_id>
    <plant_name>NE Renewable Whitefield, LLC</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>NE Renewable Whitefield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>19.9</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>44.358047</lat>
    <lon>-71.5449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59472</plant_id>
    <plant_name>Ft. Churchill PV</plant_name>
    <state>NV</state>
    <county>Lyon</county>
    <operator>Sierra Pacific Power Co</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.9</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.128056</lat>
    <lon>-119.14</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62546</plant_id>
    <plant_name>Almond</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Westlands Almond LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.9</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.21222</lat>
    <lon>-119.91</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63031</plant_id>
    <plant_name>Gloucester Solar</plant_name>
    <state>VA</state>
    <county>Gloucester</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.9</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.45</lat>
    <lon>-76.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63696</plant_id>
    <plant_name>Westmoreland County Solar Project</plant_name>
    <state>VA</state>
    <county>Westmoreland</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.9</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.007488</lat>
    <lon>-76.74403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65321</plant_id>
    <plant_name>Rochambeau Solar</plant_name>
    <state>VA</state>
    <county>James City</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.9</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.35</lat>
    <lon>-76.76</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67533</plant_id>
    <plant_name>RB Inyokern Solar WDAT 1203 (CSG)</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.9</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.655806</lat>
    <lon>-117.8103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69604</plant_id>
    <plant_name>CZ Solar Warren, LLC</plant_name>
    <state>OH</state>
    <county>Warren</county>
    <operator>CZ Solar Warren, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.9</nameplate_mw>
    <summer_mw>19.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.410999</lat>
    <lon>-84.32</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57457</plant_id>
    <plant_name>Seneca Sustainable Energy LLC</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>Seneca Sustainable Energy LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.116306</lat>
    <lon>-123.179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58973</plant_id>
    <plant_name>White River Solar 2</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.874722</lat>
    <lon>-119.0461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59235</plant_id>
    <plant_name>Rising Tree Wind Farm II</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Rising Tree Wind Farm II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.088889</lat>
    <lon>-118.2064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59413</plant_id>
    <plant_name>Corcoran Solar 2</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.141944</lat>
    <lon>-119.5817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60917</plant_id>
    <plant_name>Buckingham Solar LLC</plant_name>
    <state>VA</state>
    <county>Buckingham</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.502944</lat>
    <lon>-78.37924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61891</plant_id>
    <plant_name>Stryker 22, L.L.C.</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>Stryker 22, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.66538</lat>
    <lon>-75.14447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61892</plant_id>
    <plant_name>Plumsted 537 LLC</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Plumsted 537 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.1094</lat>
    <lon>-74.49778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64161</plant_id>
    <plant_name>SR Litchfield</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>SR Litchfield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.793735</lat>
    <lon>-73.16701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64318</plant_id>
    <plant_name>Pueblo BA</plant_name>
    <state>TX</state>
    <county>Maverick</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.678935</lat>
    <lon>-100.4637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64322</plant_id>
    <plant_name>Zapata</plant_name>
    <state>TX</state>
    <county>Zapata</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>26.932675</lat>
    <lon>-99.23371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65348</plant_id>
    <plant_name>Mount Olive Solar Farm</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.881</lat>
    <lon>-74.699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65832</plant_id>
    <plant_name>Olney</plant_name>
    <state>TX</state>
    <county>Young</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2026</latest_year>
    <lat>33.371086</lat>
    <lon>-98.72047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67214</plant_id>
    <plant_name>Jade Meadow LLC</plant_name>
    <state>MD</state>
    <county>Allegany</county>
    <operator>Jade Meadow LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.8</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.598</lat>
    <lon>-78.951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60741</plant_id>
    <plant_name>Old Midville Solar</plant_name>
    <state>GA</state>
    <county>Jenkins</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.7</nameplate_mw>
    <summer_mw>19.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.820676</lat>
    <lon>-81.98176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63087</plant_id>
    <plant_name>Caden Energix Rives Road LLC</plant_name>
    <state>VA</state>
    <county>Prince George</county>
    <operator>Caden Energix Rives Road LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.7</nameplate_mw>
    <summer_mw>19.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.177825</lat>
    <lon>-77.33765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>387</plant_id>
    <plant_name>Drop 4</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1950</latest_year>
    <lat>32.705341</lat>
    <lon>-115.2191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>905</plant_id>
    <plant_name>Alamo</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>California Dept. of Water Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>34.8158</lat>
    <lon>-118.6867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1483</plant_id>
    <plant_name>Brunswick Hydro</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1983</latest_year>
    <lat>43.920486</lat>
    <lon>-69.96782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2024</plant_id>
    <plant_name>Worthington</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>City of Worthington - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Onshore Wind Turbine</technologies>
    <generators>13</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>19.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2003</latest_year>
    <lat>43.63349</lat>
    <lon>-95.60923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3109</plant_id>
    <plant_name>Hamilton (PA)</plant_name>
    <state>PA</state>
    <county>Adams</county>
    <operator>Hamilton Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>20.4</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>39.908732</lat>
    <lon>-76.98845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3117</plant_id>
    <plant_name>York Haven</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>1905</first_year>
    <latest_year>1905</latest_year>
    <lat>40.113625</lat>
    <lon>-76.71195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7408</plant_id>
    <plant_name>Payson</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Payson City Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2026</latest_year>
    <lat>40.06084</lat>
    <lon>-111.7302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54628</plant_id>
    <plant_name>Phelps Dodge Refining</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>Phelps Dodge Refining Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>14.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1992</latest_year>
    <lat>31.764458</lat>
    <lon>-106.3913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54721</plant_id>
    <plant_name>Warm Springs Power Enterprises</plant_name>
    <state>OR</state>
    <county>Jefferson</county>
    <operator>Warm Springs Power Enterprises</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>18.5</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>44.724242</lat>
    <lon>-121.2477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57721</plant_id>
    <plant_name>Berkshire Wind Power Project</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Massachusetts Mun Wholes Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>19.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2019</latest_year>
    <lat>42.586667</lat>
    <lon>-73.275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58428</plant_id>
    <plant_name>LSU Cogen</plant_name>
    <state>LA</state>
    <county>East Baton Rouge</county>
    <operator>LSU and A&amp;M College</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>20.6</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>30.410556</lat>
    <lon>-91.18139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60347</plant_id>
    <plant_name>Turrill Solar Farm</plant_name>
    <state>MI</state>
    <county>Lapeer</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>19.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.034739</lat>
    <lon>-83.30889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61959</plant_id>
    <plant_name>Coolidge Solar 1, LLC</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Coolidge Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>19.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.424817</lat>
    <lon>-72.66534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63592</plant_id>
    <plant_name>Nutmeg Solar</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Nutmeg Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.6</nameplate_mw>
    <summer_mw>19.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.974794</lat>
    <lon>-72.51083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7179</plant_id>
    <plant_name>Headgate Rock</plant_name>
    <state>AZ</state>
    <county>La Paz</county>
    <operator>Colorado River Indian Irr Proj</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>19.5</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>34.168264</lat>
    <lon>-114.2774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56437</plant_id>
    <plant_name>Milner Dam Wind Park LLC</plant_name>
    <state>ID</state>
    <county>Cassia</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>19.5</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.460629</lat>
    <lon>-114.0173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57171</plant_id>
    <plant_name>Cedar Hills Wind Farm</plant_name>
    <state>ND</state>
    <county>Bowman</county>
    <operator>Montana-Dakota Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>19.5</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>46.245556</lat>
    <lon>-103.7672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58066</plant_id>
    <plant_name>PCA, Filer City Mill</plant_name>
    <state>MI</state>
    <county>Manistee</county>
    <operator>PCA, Filer City Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>19.5</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1950</latest_year>
    <lat>44.213333</lat>
    <lon>-86.28667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59380</plant_id>
    <plant_name>Wildwood Solar I, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.5</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.615833</lat>
    <lon>-119.5783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59435</plant_id>
    <plant_name>Oak Tree Energy</plant_name>
    <state>SD</state>
    <county>Clark</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>19.5</nameplate_mw>
    <summer_mw>19.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.933333</lat>
    <lon>-97.74139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6291</plant_id>
    <plant_name>Cooper Lake</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Chugach Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>19.4</nameplate_mw>
    <summer_mw>19.4</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1961</latest_year>
    <lat>60.392331</lat>
    <lon>-149.6656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50278</plant_id>
    <plant_name>Worumbo Hydro Station</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>19.4</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>43.994729</lat>
    <lon>-70.06192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58792</plant_id>
    <plant_name>Ayrshire</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.4</nameplate_mw>
    <summer_mw>19.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.2848</lat>
    <lon>-81.61566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1264</plant_id>
    <plant_name>Beloit</plant_name>
    <state>KS</state>
    <county>Mitchell</county>
    <operator>City of Beloit - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>19.3</nameplate_mw>
    <summer_mw>16.6</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1980</latest_year>
    <lat>39.4578</lat>
    <lon>-98.1122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69358</plant_id>
    <plant_name>Calistoga Resilency Center</plant_name>
    <state>CA</state>
    <county>Napa</county>
    <operator>Calistoga Resiliency Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>19.3</nameplate_mw>
    <summer_mw>19.3</summer_mw>
    <battery_mwh>11.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.577</lat>
    <lon>-122.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1316</plant_id>
    <plant_name>Ottawa</plant_name>
    <state>KS</state>
    <county>Franklin</county>
    <operator>City of Ottawa - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1981</latest_year>
    <lat>38.615579</lat>
    <lon>-95.27974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1491</plant_id>
    <plant_name>Gulf Island</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>23.2</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>44.152854</lat>
    <lon>-70.20938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7011</plant_id>
    <plant_name>Hugoton 2</plant_name>
    <state>KS</state>
    <county>Stevens</county>
    <operator>City of Hugoton - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>17.3</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1998</latest_year>
    <lat>37.16424</lat>
    <lon>-101.3401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7797</plant_id>
    <plant_name>Dominion/Lo Mar</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>City of Manassas - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>38.7443</lat>
    <lon>-77.4974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8015</plant_id>
    <plant_name>Paragould Reciprocating</plant_name>
    <state>AR</state>
    <county>Greene</county>
    <operator>Paragould Municipal Utilities (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>36.0242</lat>
    <lon>-90.5094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10144</plant_id>
    <plant_name>Sierra Pacific Lincoln Facility</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>38.9032</lat>
    <lon>-121.3097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58629</plant_id>
    <plant_name>Lightning Dock Geothermal</plant_name>
    <state>NM</state>
    <county>Hidalgo</county>
    <operator>Lightning Dock Geothermal HI-01, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>5</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2018</latest_year>
    <lat>32.144722</lat>
    <lon>-108.8383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59979</plant_id>
    <plant_name>Columbia Solar Energy, LLC</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Columbia Solar Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>19.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.019671</lat>
    <lon>-121.8651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61933</plant_id>
    <plant_name>Adams Nielson Solar</plant_name>
    <state>WA</state>
    <county>Adams</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19.2</nameplate_mw>
    <summer_mw>19.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>46.95528</lat>
    <lon>-118.6212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1296</plant_id>
    <plant_name>Kingman Municipal Power and Light Plant</plant_name>
    <state>KS</state>
    <county>Kingman</county>
    <operator>City of Kingman - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>19.1</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1993</latest_year>
    <lat>37.38311</lat>
    <lon>-98.07036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4142</plant_id>
    <plant_name>Flambeau Hydroelectric Station</plant_name>
    <state>WI</state>
    <county>Rusk</county>
    <operator>Dairyland Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>19.1</nameplate_mw>
    <summer_mw>19.1</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>45.491826</lat>
    <lon>-91.04721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1172</plant_id>
    <plant_name>Osage (IA)</plant_name>
    <state>IA</state>
    <county>Mitchell</county>
    <operator>City of Osage - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids; Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>6</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2016</latest_year>
    <lat>43.279722</lat>
    <lon>-92.81056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2003</plant_id>
    <plant_name>Owatonna</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>City of Owatonna - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>16.6</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>44.0833</lat>
    <lon>-93.23</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2599</plant_id>
    <plant_name>Prospect</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>18.3</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1959</latest_year>
    <lat>43.291861</lat>
    <lon>-75.14773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2881</plant_id>
    <plant_name>Stryker</plant_name>
    <state>OH</state>
    <county>Williams</county>
    <operator>Richland-Stryker Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>41.5014</lat>
    <lon>-84.4283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3412</plant_id>
    <plant_name>Ocoee 1</plant_name>
    <state>TN</state>
    <county>Polk</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>24</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1914</latest_year>
    <lat>35.0947</lat>
    <lon>-84.6478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10795</plant_id>
    <plant_name>Camden South Carolina</plant_name>
    <state>SC</state>
    <county>Kershaw</county>
    <operator>Invista</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>34.2338</lat>
    <lon>-80.6558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50766</plant_id>
    <plant_name>Ormesa I</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>12.7</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2025</latest_year>
    <lat>32.8156</lat>
    <lon>-115.2568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57122</plant_id>
    <plant_name>UCI Facilities Management Central Plant</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>University of California Irvine</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>33.6481</lat>
    <lon>-117.8467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57361</plant_id>
    <plant_name>Sand Drag LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Avenal Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.982778</lat>
    <lon>-120.1103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57377</plant_id>
    <plant_name>Greater Sandhill I</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>Greater Sandhill I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>37.685467</lat>
    <lon>-105.8909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57883</plant_id>
    <plant_name>Queen Creek Solar Farm</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Siete Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.2675</lat>
    <lon>-111.6122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58984</plant_id>
    <plant_name>RE Adams East, LLC</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.6175</lat>
    <lon>-120.2908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60318</plant_id>
    <plant_name>Woodland Solar Farm</plant_name>
    <state>VA</state>
    <county>Isle of Wight</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>19</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.89</lat>
    <lon>-76.611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56751</plant_id>
    <plant_name>Spanish Fork Wind Park 2 LLC</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Spanish Fork Wind Park 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.071389</lat>
    <lon>-111.5822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56935</plant_id>
    <plant_name>Cassia Gulch</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Cassia Gulch Wind Park, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.8744</lat>
    <lon>-115.0172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56946</plant_id>
    <plant_name>Buffalo Bear LLC</plant_name>
    <state>OK</state>
    <county>Harper</county>
    <operator>Buffalo Bear, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>36.7767</lat>
    <lon>-99.6353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66898</plant_id>
    <plant_name>Fort Martin Solar</plant_name>
    <state>WV</state>
    <county>Monongalia</county>
    <operator>Monongahela Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18.9</nameplate_mw>
    <summer_mw>18.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.707825</lat>
    <lon>-79.94884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3049</plant_id>
    <plant_name>River Mill</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>24.7</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1952</latest_year>
    <lat>45.299991</lat>
    <lon>-122.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10052</plant_id>
    <plant_name>Fairhaven Power</plant_name>
    <state>CA</state>
    <county>Humboldt</county>
    <operator>DG Fairhaven Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>40.7995</lat>
    <lon>-124.2028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50474</plant_id>
    <plant_name>Swift Creek Chemical Complex</plant_name>
    <state>FL</state>
    <county>Hamilton</county>
    <operator>White Springs Agrici Chem Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>OTH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>30.4522</lat>
    <lon>-82.8644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58109</plant_id>
    <plant_name>Georgia-Pacific Toledo Mill</plant_name>
    <state>OR</state>
    <county>Lincoln</county>
    <operator>Georgia-Pacific Toledo LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>13.4</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>44.611944</lat>
    <lon>-123.9319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67216</plant_id>
    <plant_name>Shifting Sands Solar, LLC</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>Shifting Sands Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18.8</nameplate_mw>
    <summer_mw>18.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.616243</lat>
    <lon>-79.84936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1280</plant_id>
    <plant_name>Goodland</plant_name>
    <state>KS</state>
    <county>Sherman</county>
    <operator>City of Goodland - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>18.7</nameplate_mw>
    <summer_mw>16.1</summer_mw>
    <first_year>1939</first_year>
    <latest_year>1999</latest_year>
    <lat>39.341622</lat>
    <lon>-101.7052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2215</plant_id>
    <plant_name>Auburn</plant_name>
    <state>NE</state>
    <county>Nemaha</county>
    <operator>Auburn Board of Public Works</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>18.7</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1993</latest_year>
    <lat>40.3883</lat>
    <lon>-95.8464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50476</plant_id>
    <plant_name>Packaging of America Tomahawk Mill</plant_name>
    <state>WI</state>
    <county>Lincoln</county>
    <operator>PCA-Tomahawk Mill</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass; Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>18.7</nameplate_mw>
    <summer_mw>14.7</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1978</latest_year>
    <lat>45.4431</lat>
    <lon>-89.7342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52048</plant_id>
    <plant_name>Vanderbilt University Power Plant</plant_name>
    <state>TN</state>
    <county>Davidson</county>
    <operator>Vanderbilt University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>18.7</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2017</latest_year>
    <lat>36.145896</lat>
    <lon>-86.80383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58507</plant_id>
    <plant_name>Montefieor Medical Center Moses Division</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Montefiore Medical Center Moses Division</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>15</generators>
    <nameplate_mw>18.7</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2016</latest_year>
    <lat>40.881389</lat>
    <lon>-73.88028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>313</plant_id>
    <plant_name>Green Lake</plant_name>
    <state>AK</state>
    <county>Sitka</county>
    <operator>City &amp; Borough of Sitka - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>18.6</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>56.986284</lat>
    <lon>-135.1228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>594</plant_id>
    <plant_name>Indian River Generating Station</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Indian River Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>18.6</nameplate_mw>
    <summer_mw>16.1</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>38.5857</lat>
    <lon>-75.2341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2369</plant_id>
    <plant_name>White Lake</plant_name>
    <state>NH</state>
    <county>Carroll</county>
    <operator>Granite Shore Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>JF</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>18.6</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>43.8478</lat>
    <lon>-71.2069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6089</plant_id>
    <plant_name>Lewis &amp; Clark</plant_name>
    <state>MT</state>
    <county>Richland</county>
    <operator>Montana-Dakota Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>18.6</nameplate_mw>
    <summer_mw>18.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>47.6785</lat>
    <lon>-104.1567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50307</plant_id>
    <plant_name>University of Oklahoma</plant_name>
    <state>OK</state>
    <county>Cleveland</county>
    <operator>University of Oklahoma</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>18.6</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <first_year>1949</first_year>
    <latest_year>2001</latest_year>
    <lat>35.2089</lat>
    <lon>-97.4424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61080</plant_id>
    <plant_name>Sub 12</plant_name>
    <state>FL</state>
    <county>Leon</county>
    <operator>City of Tallahassee - (FL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>18.6</nameplate_mw>
    <summer_mw>18.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.459813</lat>
    <lon>-84.26003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65224</plant_id>
    <plant_name>Apple Grove Solar, LLC</plant_name>
    <state>VA</state>
    <county>Louisa</county>
    <operator>Apple Grove Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18.6</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.919497</lat>
    <lon>-77.86202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>592</plant_id>
    <plant_name>Delaware City 10</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Calpine Mid-Atlantic Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>18.5</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>39.600408</lat>
    <lon>-75.62681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1743</plant_id>
    <plant_name>St Clair</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>18.5</nameplate_mw>
    <summer_mw>19</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>42.7642</lat>
    <lon>-82.4719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2933</plant_id>
    <plant_name>Oberlin (OH)</plant_name>
    <state>OH</state>
    <county>Lorain</county>
    <operator>City of Oberlin - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>18.5</nameplate_mw>
    <summer_mw>18.4</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2001</latest_year>
    <lat>41.2836</lat>
    <lon>-82.2194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58590</plant_id>
    <plant_name>Cascade Solar</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Cascade Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18.5</nameplate_mw>
    <summer_mw>18.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.157222</lat>
    <lon>-116.2344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>90</plant_id>
    <plant_name>Snake River</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Nome Joint Utility Systems</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Onshore Wind Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>18.4</nameplate_mw>
    <summer_mw>18.2</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2013</latest_year>
    <lat>64.505331</lat>
    <lon>-165.4298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>232</plant_id>
    <plant_name>De Sabla</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>18.4</nameplate_mw>
    <summer_mw>18.5</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>39.869265</lat>
    <lon>-121.6318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60702</plant_id>
    <plant_name>Rincon Solar I</plant_name>
    <state>GA</state>
    <county>Effingham</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18.4</nameplate_mw>
    <summer_mw>18.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.292879</lat>
    <lon>-81.2844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6281</plant_id>
    <plant_name>Kodiak Microgrid</plant_name>
    <state>AK</state>
    <county>Kodiak Island</county>
    <operator>Kodiak Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>18.3</nameplate_mw>
    <summer_mw>18.3</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2005</latest_year>
    <lat>57.789956</lat>
    <lon>-152.397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10646</plant_id>
    <plant_name>Covanta Southeastern Connecticut Company</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Covanta Southeastern Connecticut Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>18.3</nameplate_mw>
    <summer_mw>16.3</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>41.475</lat>
    <lon>-72.0688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>822</plant_id>
    <plant_name>Upper Salmon A</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>1937</first_year>
    <latest_year>1937</latest_year>
    <lat>42.767422</lat>
    <lon>-114.9247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1892</plant_id>
    <plant_name>Blanchard</plant_name>
    <state>MN</state>
    <county>Morrison</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>16.2</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1988</latest_year>
    <lat>45.8614</lat>
    <lon>-94.3592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1993</plant_id>
    <plant_name>Marshall (MN)</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>City of Marshall - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>14.1</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>44.446585</lat>
    <lon>-95.79212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2362</plant_id>
    <plant_name>Lost Nation</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>Granite Shore Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>44.595117</lat>
    <lon>-71.4944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2627</plant_id>
    <plant_name>Grahamsville</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1956</latest_year>
    <lat>41.8592</lat>
    <lon>-74.5106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3036</plant_id>
    <plant_name>Slide Creek</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>43.2939</lat>
    <lon>-122.4728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3074</plant_id>
    <plant_name>Big Cliff</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>21</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>44.7514</lat>
    <lon>-122.2832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3275</plant_id>
    <plant_name>Lockhart</plant_name>
    <state>SC</state>
    <county>Union</county>
    <operator>Lockhart Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>34.7792</lat>
    <lon>-81.4561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3594</plant_id>
    <plant_name>Austin</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1940</latest_year>
    <lat>30.293424</lat>
    <lon>-97.78441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3735</plant_id>
    <plant_name>Colchester 16</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>44.4906</lat>
    <lon>-73.1703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4118</plant_id>
    <plant_name>Kaukauna Gas Turbine</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>City of Kaukauna (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>44.276199</lat>
    <lon>-88.26545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7317</plant_id>
    <plant_name>Buffalo Bill</plant_name>
    <state>WY</state>
    <county>Park</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>44.508169</lat>
    <lon>-109.1707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7851</plant_id>
    <plant_name>Waterloo Lundquist</plant_name>
    <state>IA</state>
    <county>Black Hawk</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>42.506156</lat>
    <lon>-92.34558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10866</plant_id>
    <plant_name>Archer Daniels Midland Peoria</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>BioUrja Renewables LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.677188</lat>
    <lon>-89.60491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50622</plant_id>
    <plant_name>Berry Cogen Tanne Hills 18</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Berry Petroleum Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>35.089829</lat>
    <lon>-119.4409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50860</plant_id>
    <plant_name>Kent County Waste to Energy Facility</plant_name>
    <state>MI</state>
    <county>Kent</county>
    <operator>Kent County - (MI)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>15.7</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>42.949575</lat>
    <lon>-85.69321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52072</plant_id>
    <plant_name>Radford Army Ammunition Plant</plant_name>
    <state>VA</state>
    <county>Montgomery</county>
    <operator>U.S. Army - Radford</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>16.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>37.180441</lat>
    <lon>-80.54277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54620</plant_id>
    <plant_name>NE Renewable Fitchburg, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>NE Renewable Fitchburg, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>14.9</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.5428</lat>
    <lon>-71.8528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55882</plant_id>
    <plant_name>Sierra Pacific Aberdeen</plant_name>
    <state>WA</state>
    <county>Grays Harbor</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>17.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>46.9728</lat>
    <lon>-123.7739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56271</plant_id>
    <plant_name>Diablo Winds LLC</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Sequitur Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>37.763653</lat>
    <lon>-121.6144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57069</plant_id>
    <plant_name>Twin Cities Hydro LLC</plant_name>
    <state>MN</state>
    <county>Ramsey</county>
    <operator>Twin Cities Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>44.9156</lat>
    <lon>-93.1994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57448</plant_id>
    <plant_name>Pilesgrove</plant_name>
    <state>NJ</state>
    <county>Salem</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>17.7</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.613028</lat>
    <lon>-75.30948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58425</plant_id>
    <plant_name>Fire Island Wind</plant_name>
    <state>AK</state>
    <county>Anchorage</county>
    <operator>Fire Island Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>61.13</lat>
    <lon>-150.2436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58616</plant_id>
    <plant_name>Westlands Solar PV Farm</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.138056</lat>
    <lon>-120.0758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59334</plant_id>
    <plant_name>Catalina Solar 2, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.812222</lat>
    <lon>-118.3528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60469</plant_id>
    <plant_name>Solar Glynn</plant_name>
    <state>GA</state>
    <county>Glynn</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>31.25</lat>
    <lon>-81.433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62413</plant_id>
    <plant_name>Ellis Solar</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.444628</lat>
    <lon>-76.43324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62444</plant_id>
    <plant_name>Meyersdale Battery</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>GlidePath Power Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <battery_mwh>12.1</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.828173</lat>
    <lon>-79.01977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65318</plant_id>
    <plant_name>Quillwort Solar</plant_name>
    <state>VA</state>
    <county>Powhatan</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.567</lat>
    <lon>-77.9271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65320</plant_id>
    <plant_name>Sebera Solar</plant_name>
    <state>VA</state>
    <county>Prince George</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.25</lat>
    <lon>-77.25</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70013</plant_id>
    <plant_name>Arrowhead Emergency Generating Station</plant_name>
    <state>MN</state>
    <county>Cook</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>18</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>47.80862</lat>
    <lon>-90.1041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50898</plant_id>
    <plant_name>Allegheny Hydro No 9</plant_name>
    <state>PA</state>
    <county>Armstrong</county>
    <operator>Allegheny Hydro LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>17.8</nameplate_mw>
    <summer_mw>17.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.955961</lat>
    <lon>-79.55068</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1154</plant_id>
    <plant_name>Lake Mills</plant_name>
    <state>IA</state>
    <county>Winnebago</county>
    <operator>City of Lake Mills - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>17.7</nameplate_mw>
    <summer_mw>17.7</summer_mw>
    <first_year>1962</first_year>
    <latest_year>2022</latest_year>
    <lat>43.4172</lat>
    <lon>-93.5322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57748</plant_id>
    <plant_name>Gordon Butte Wind LLC</plant_name>
    <state>MT</state>
    <county>Meagher</county>
    <operator>Gordon Butte Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>17.7</nameplate_mw>
    <summer_mw>17.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2018</latest_year>
    <lat>46.411944</lat>
    <lon>-110.3378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58972</plant_id>
    <plant_name>Fort Huachuca Solar PV Project</plant_name>
    <state>AZ</state>
    <county>Cochise</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>17.7</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2017</latest_year>
    <lat>31.555278</lat>
    <lon>-110.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>736</plant_id>
    <plant_name>Stevens Creek</plant_name>
    <state>GA</state>
    <county>Columbia</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>17.6</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1926</latest_year>
    <lat>33.562644</lat>
    <lon>-82.05124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1203</plant_id>
    <plant_name>Winterset</plant_name>
    <state>IA</state>
    <county>Madison</county>
    <operator>City of Winterset - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>17.6</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>1956</first_year>
    <latest_year>2022</latest_year>
    <lat>41.3372</lat>
    <lon>-94.0126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50380</plant_id>
    <plant_name>Upriver Dam Hydro Plant</plant_name>
    <state>WA</state>
    <county>Spokane</county>
    <operator>City of Spokane - (WA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>17.6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1984</latest_year>
    <lat>47.6822</lat>
    <lon>-117.3319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54782</plant_id>
    <plant_name>Seneca Energy</plant_name>
    <state>NY</state>
    <county>Seneca</county>
    <operator>Seneca Energy II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>18</generators>
    <nameplate_mw>17.6</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2007</latest_year>
    <lat>42.9281</lat>
    <lon>-76.8408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60584</plant_id>
    <plant_name>Oceana Solar</plant_name>
    <state>VA</state>
    <county>Virginia Beach City</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17.6</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.789753</lat>
    <lon>-76.05142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61416</plant_id>
    <plant_name>The Mount Sinai Hospital</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>Mount Sinai Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>14</generators>
    <nameplate_mw>17.6</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2022</latest_year>
    <lat>40.78999</lat>
    <lon>-73.95369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>965</plant_id>
    <plant_name>Reynolds</plant_name>
    <state>IL</state>
    <county>Sangamon</county>
    <operator>City of Springfield - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>39.806868</lat>
    <lon>-89.64165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1194</plant_id>
    <plant_name>Vinton</plant_name>
    <state>IA</state>
    <county>Benton</county>
    <operator>City of Vinton - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>17.2</summer_mw>
    <first_year>1946</first_year>
    <latest_year>2009</latest_year>
    <lat>42.1697</lat>
    <lon>-92.0222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1620</plant_id>
    <plant_name>Deerfield 5</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>13.9</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>42.69118</lat>
    <lon>-72.9561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7111</plant_id>
    <plant_name>Heber City</plant_name>
    <state>UT</state>
    <county>Wasatch</county>
    <operator>Heber Light &amp; Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>9</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2024</latest_year>
    <lat>40.50368</lat>
    <lon>-111.4252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50087</plant_id>
    <plant_name>Univ of Massachusetts Medical Center</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>University of Massachusetts Medical</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2013</latest_year>
    <lat>42.279015</lat>
    <lon>-71.75977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50208</plant_id>
    <plant_name>NE Renewable Bethlehem, LLC</plant_name>
    <state>NH</state>
    <county>GRAFTON</county>
    <operator>NE Renewable Bethlehem, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.3274</lat>
    <lon>-71.68</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54422</plant_id>
    <plant_name>Unisea G 2</plant_name>
    <state>AK</state>
    <county>Aleutians West</county>
    <operator>Unisea Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>15.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2012</latest_year>
    <lat>53.8796</lat>
    <lon>-166.5532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54795</plant_id>
    <plant_name>Domino Sugar Baltimore</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>American Sugar Refining, Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>1955</first_year>
    <latest_year>2001</latest_year>
    <lat>39.2744</lat>
    <lon>-76.5956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59404</plant_id>
    <plant_name>Searchlight Solar</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.479722</lat>
    <lon>-114.9361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59474</plant_id>
    <plant_name>Apple Data Center PV3</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Apple, Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.715</lat>
    <lon>-81.15</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68021</plant_id>
    <plant_name>IFP Peaking Plant</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>City of Idaho Falls - (ID)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>17.5</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.3144</lat>
    <lon>-111.5934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>960</plant_id>
    <plant_name>North Ninth Street</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>Rochelle Municipal Utilities - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids; Solar Photovoltaic</technologies>
    <generators>9</generators>
    <nameplate_mw>17.4</nameplate_mw>
    <summer_mw>14.6</summer_mw>
    <first_year>1940</first_year>
    <latest_year>2014</latest_year>
    <lat>41.9093</lat>
    <lon>-89.0498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10005</plant_id>
    <plant_name>Dinosaur Point</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>International Turbine Res Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>17.4</nameplate_mw>
    <summer_mw>17.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>37.0478</lat>
    <lon>-121.1708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7173</plant_id>
    <plant_name>Barrow</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>Barrow Utils &amp; Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>17.3</nameplate_mw>
    <summer_mw>17.3</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2001</latest_year>
    <lat>71.292</lat>
    <lon>-156.7786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66419</plant_id>
    <plant_name>Dane County Solar LLC</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Dane County Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17.3</nameplate_mw>
    <summer_mw>17.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.0466</lat>
    <lon>-89.23931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69429</plant_id>
    <plant_name>Asheville BESS</plant_name>
    <state>NC</state>
    <county>Buncombe</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>17.3</nameplate_mw>
    <summer_mw>17.3</summer_mw>
    <battery_mwh>69</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.472139</lat>
    <lon>-82.54163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>752</plant_id>
    <plant_name>Lake Blackshear Project</plant_name>
    <state>GA</state>
    <county>Worth</county>
    <operator>Crisp County Power Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>17.2</nameplate_mw>
    <summer_mw>15.2</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>31.847697</lat>
    <lon>-83.942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4063</plant_id>
    <plant_name>Grandfather Falls</plant_name>
    <state>WI</state>
    <county>Lincoln</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>17.2</nameplate_mw>
    <summer_mw>17.2</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1938</latest_year>
    <lat>45.3019</lat>
    <lon>-89.7917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6403</plant_id>
    <plant_name>Green Springs</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>17.2</nameplate_mw>
    <summer_mw>17.2</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1960</latest_year>
    <lat>42.121168</lat>
    <lon>-122.5479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54858</plant_id>
    <plant_name>Southwestern Bell Telephone</plant_name>
    <state>MO</state>
    <county>St Louis City</county>
    <operator>AT&amp;T</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>17.2</nameplate_mw>
    <summer_mw>17.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2011</latest_year>
    <lat>38.627566</lat>
    <lon>-90.19338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>792</plant_id>
    <plant_name>Palaau Power Hybrid</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Maui Electric Co Ltd</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Batteries</technologies>
    <generators>11</generators>
    <nameplate_mw>17.1</nameplate_mw>
    <summer_mw>16</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>1982</first_year>
    <latest_year>2017</latest_year>
    <lat>21.106</lat>
    <lon>-157.0647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2503</plant_id>
    <plant_name>59th Street</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>Consolidated Edison Co-NY Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>17.1</nameplate_mw>
    <summer_mw>14.5</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>40.771285</lat>
    <lon>-73.99115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58199</plant_id>
    <plant_name>Arizona State University CHP</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Energy Center Phoenix LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>17.1</nameplate_mw>
    <summer_mw>17.1</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2019</latest_year>
    <lat>33.417222</lat>
    <lon>-111.9283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65278</plant_id>
    <plant_name>Wonderful Lost Hills</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17.1</nameplate_mw>
    <summer_mw>16.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.66934</lat>
    <lon>-119.8766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66943</plant_id>
    <plant_name>Pine 1 Solar</plant_name>
    <state>PA</state>
    <county>Beaver</county>
    <operator>BE-Pine1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17.1</nameplate_mw>
    <summer_mw>17.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.61655</lat>
    <lon>-80.45815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66944</plant_id>
    <plant_name>Pine 2 Solar</plant_name>
    <state>PA</state>
    <county>Beaver</county>
    <operator>BE-Pine2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17.1</nameplate_mw>
    <summer_mw>17.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.61575</lat>
    <lon>-80.471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1708</plant_id>
    <plant_name>Hodenpyl</plant_name>
    <state>MI</state>
    <county>Wexford</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>44.36286</lat>
    <lon>-85.81997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50649</plant_id>
    <plant_name>Reworld Babylon Inc</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Reworld Babylon Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.7348</lat>
    <lon>-73.3868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57093</plant_id>
    <plant_name>Casper Wind Farm</plant_name>
    <state>WY</state>
    <county>Natrona</county>
    <operator>Chevron USA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.884703</lat>
    <lon>-106.2214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57669</plant_id>
    <plant_name>SMUD at Grundman</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento PV Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>18</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.364722</lat>
    <lon>-121.4128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59910</plant_id>
    <plant_name>KDC Solar PR1, LLC</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.136696</lat>
    <lon>-74.43967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60435</plant_id>
    <plant_name>Crane Solar Facility</plant_name>
    <state>IN</state>
    <county>Martin</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.8164</lat>
    <lon>-86.8842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61023</plant_id>
    <plant_name>Hollyfield</plant_name>
    <state>VA</state>
    <county>King William</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.672005</lat>
    <lon>-77.17044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61956</plant_id>
    <plant_name>MCRD Parris Island PV Hybrid</plant_name>
    <state>SC</state>
    <county>Beaufort</county>
    <operator>Ameresco Federal Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries; Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>32.329402</lat>
    <lon>-80.69472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62320</plant_id>
    <plant_name>Antelope Expansion 1B</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.71611</lat>
    <lon>-118.2592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67172</plant_id>
    <plant_name>Colice Hall Solar</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Colice Hall Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.323266</lat>
    <lon>-77.01007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67698</plant_id>
    <plant_name>Coffee Creek BESS</plant_name>
    <state>OR</state>
    <county>Washington</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>17</nameplate_mw>
    <summer_mw>17</summer_mw>
    <battery_mwh>34</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.341676</lat>
    <lon>-122.7815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>934</plant_id>
    <plant_name>Breese</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>City of Breese - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>16.9</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1953</first_year>
    <latest_year>2014</latest_year>
    <lat>38.607456</lat>
    <lon>-89.52451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>949</plant_id>
    <plant_name>Marshall (IL)</plant_name>
    <state>IL</state>
    <county>Clark</county>
    <operator>City of Marshall - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>16.9</nameplate_mw>
    <summer_mw>16.9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2007</latest_year>
    <lat>39.392138</lat>
    <lon>-87.68513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1999</plant_id>
    <plant_name>New Prague</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>New Prague Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>16.9</nameplate_mw>
    <summer_mw>16.8</summer_mw>
    <first_year>1944</first_year>
    <latest_year>1982</latest_year>
    <lat>44.5431</lat>
    <lon>-93.5731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4100</plant_id>
    <plant_name>Arcadia Electric</plant_name>
    <state>WI</state>
    <county>Trempealeau</county>
    <operator>City of Arcadia - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>10</generators>
    <nameplate_mw>16.9</nameplate_mw>
    <summer_mw>16.9</summer_mw>
    <first_year>1930</first_year>
    <latest_year>2007</latest_year>
    <lat>44.2524</lat>
    <lon>-91.5034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>622</plant_id>
    <plant_name>South Fork Tolt</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>City of Seattle - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>16.8</nameplate_mw>
    <summer_mw>16.8</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>47.699167</lat>
    <lon>-121.7833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>717</plant_id>
    <plant_name>Morgan Falls</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>16.8</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1903</latest_year>
    <lat>33.9681</lat>
    <lon>-84.3841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1505</plant_id>
    <plant_name>Skelton</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16.8</nameplate_mw>
    <summer_mw>21.6</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>43.5708</lat>
    <lon>-70.5583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2185</plant_id>
    <plant_name>Hauser</plant_name>
    <state>MT</state>
    <county>Lewis and Clark</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>16.8</nameplate_mw>
    <summer_mw>16.8</summer_mw>
    <first_year>1911</first_year>
    <latest_year>2025</latest_year>
    <lat>46.765941</lat>
    <lon>-111.8873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50660</plant_id>
    <plant_name>Reworld Tulsa</plant_name>
    <state>OK</state>
    <county>Tulsa</county>
    <operator>Reworld Tulsa LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>16.8</nameplate_mw>
    <summer_mw>15.6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>36.1319</lat>
    <lon>-96.0181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57136</plant_id>
    <plant_name>Tuana Springs</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Tuana Springs Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>16.8</nameplate_mw>
    <summer_mw>16.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.8925</lat>
    <lon>-115.0164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63388</plant_id>
    <plant_name>Oxy Renewable Energy - Goldsmith</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Oxy Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16.8</nameplate_mw>
    <summer_mw>16.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.0015</lat>
    <lon>-102.6337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58161</plant_id>
    <plant_name>Western Michigan University Power Plant</plant_name>
    <state>MI</state>
    <county>Kalamazoo</county>
    <operator>Western Michigan University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>16.7</nameplate_mw>
    <summer_mw>15.1</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2021</latest_year>
    <lat>42.28</lat>
    <lon>-85.60639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58551</plant_id>
    <plant_name>Bridgeport Fuel Cell, LLC</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Bridgeport Fuel Cell, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>16.6</nameplate_mw>
    <summer_mw>13.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.168056</lat>
    <lon>-73.21111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58831</plant_id>
    <plant_name>Redcrest Solar Farm</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16.6</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.321944</lat>
    <lon>-118.8128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6301</plant_id>
    <plant_name>Naknek</plant_name>
    <state>AK</state>
    <county>Bristol Bay</county>
    <operator>Naknek Electric Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>12</generators>
    <nameplate_mw>16.5</nameplate_mw>
    <summer_mw>15.9</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2019</latest_year>
    <lat>58.730417</lat>
    <lon>-157.0072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6304</plant_id>
    <plant_name>Kotzebue Hybrid</plant_name>
    <state>AK</state>
    <county>NORTHWEST ARCTIC</county>
    <operator>Kotzebue Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Onshore Wind Turbine; Solar Photovoltaic; Batteries</technologies>
    <generators>26</generators>
    <nameplate_mw>16.5</nameplate_mw>
    <summer_mw>16.5</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>1987</first_year>
    <latest_year>2023</latest_year>
    <lat>66.837778</lat>
    <lon>-162.5569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7079</plant_id>
    <plant_name>Upper Salmon B</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16.5</nameplate_mw>
    <summer_mw>18.6</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1947</latest_year>
    <lat>42.766397</lat>
    <lon>-114.9082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56540</plant_id>
    <plant_name>Galena 2 Geothermal Power Plant</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>16.5</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2022</latest_year>
    <lat>39.373189</lat>
    <lon>-119.7645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58184</plant_id>
    <plant_name>Rand Whitney CHP Plant</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Rand Whitney Containerboard L.P.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>16.5</nameplate_mw>
    <summer_mw>16.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>41.452778</lat>
    <lon>-72.13611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63423</plant_id>
    <plant_name>BYU Central Heating Plant</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Brigham Young University (BYU)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>16.5</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.24724</lat>
    <lon>-111.6462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69072</plant_id>
    <plant_name>Fresno-Clovis RWRF</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>16.5</nameplate_mw>
    <summer_mw>16.5</summer_mw>
    <battery_mwh>2.3</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.70318</lat>
    <lon>-119.8921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>292</plant_id>
    <plant_name>Wise</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16.4</nameplate_mw>
    <summer_mw>17.2</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1986</latest_year>
    <lat>38.889862</lat>
    <lon>-121.0985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>625</plant_id>
    <plant_name>Upper Mechanicville</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>New York State Elec &amp; Gas Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16.4</nameplate_mw>
    <summer_mw>18.4</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>42.9126</lat>
    <lon>-73.6805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1299</plant_id>
    <plant_name>Larned</plant_name>
    <state>KS</state>
    <county>Pawnee</county>
    <operator>City of Larned - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>16.4</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2004</latest_year>
    <lat>38.176167</lat>
    <lon>-99.09998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6422</plant_id>
    <plant_name>Madison Dam</plant_name>
    <state>MT</state>
    <county>Madison</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>16.4</nameplate_mw>
    <summer_mw>16.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>45.487869</lat>
    <lon>-111.6338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58914</plant_id>
    <plant_name>MCAGCC Cogen Plant</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>DOD USMC Marine Air Ground Combat</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>16.4</nameplate_mw>
    <summer_mw>16.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2014</latest_year>
    <lat>34.237222</lat>
    <lon>-116.0542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2917</plant_id>
    <plant_name>Hamilton (OH)</plant_name>
    <state>OH</state>
    <county>Butler</county>
    <operator>City of Hamilton - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>16.3</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>39.4098</lat>
    <lon>-84.5543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50648</plant_id>
    <plant_name>Covanta Bristol Energy</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Covanta Bristol Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>16.3</nameplate_mw>
    <summer_mw>13.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>41.6492</lat>
    <lon>-72.9153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54262</plant_id>
    <plant_name>Saint Marys Hospital Power Plant</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>St Mary's Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>16.3</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2020</latest_year>
    <lat>44.09785</lat>
    <lon>-92.47982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68752</plant_id>
    <plant_name>City of Peru Water Street Generating Sta</plant_name>
    <state>IL</state>
    <county>Lasalle</county>
    <operator>City of Peru - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>JF</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>16.3</nameplate_mw>
    <summer_mw>14.1</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1972</latest_year>
    <lat>41.324298</lat>
    <lon>-89.1241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>597</plant_id>
    <plant_name>West Station (DE)</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Calpine Mid-Atlantic Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>16.2</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>39.7283</lat>
    <lon>-75.6289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>9674</plant_id>
    <plant_name>Nine Springs</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>16.2</nameplate_mw>
    <summer_mw>13.9</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>43.0386</lat>
    <lon>-89.3586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50400</plant_id>
    <plant_name>Sand Bar Power Plant</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Tri-Dam Power Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>16.2</nameplate_mw>
    <summer_mw>15.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>38.1861</lat>
    <lon>-120.15</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57666</plant_id>
    <plant_name>Foxwoods CoGen</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Foxwoods Resort Casino</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>16.2</nameplate_mw>
    <summer_mw>14.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2016</latest_year>
    <lat>41.4731</lat>
    <lon>-71.9606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58768</plant_id>
    <plant_name>Marsh Hill Wind Farm</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>16.2</nameplate_mw>
    <summer_mw>16.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.163889</lat>
    <lon>-77.52889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60510</plant_id>
    <plant_name>Two Mile Desert Project</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16.2</nameplate_mw>
    <summer_mw>16.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.22</lat>
    <lon>-76.46</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64108</plant_id>
    <plant_name>Gold Meadow Farms</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>Captona Lippitt Ave Cranston LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16.2</nameplate_mw>
    <summer_mw>16.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.734903</lat>
    <lon>-71.52818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1120</plant_id>
    <plant_name>Algona</plant_name>
    <state>IA</state>
    <county>Kossuth</county>
    <operator>City of Algona - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>16.1</nameplate_mw>
    <summer_mw>16.1</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1994</latest_year>
    <lat>43.0733</lat>
    <lon>-94.2392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64559</plant_id>
    <plant_name>Wallingford Solar</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Wallingford Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16.1</nameplate_mw>
    <summer_mw>16.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.44175</lat>
    <lon>-72.83737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>724</plant_id>
    <plant_name>Terrora</plant_name>
    <state>GA</state>
    <county>Rabun</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>17.6</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>34.7653</lat>
    <lon>-83.4162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1225</plant_id>
    <plant_name>Colby</plant_name>
    <state>KS</state>
    <county>Thomas</county>
    <operator>Midwest Energy Inc - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>39.403001</lat>
    <lon>-101.0382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2354</plant_id>
    <plant_name>Amoskeag</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16.8</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1924</latest_year>
    <lat>43.00223</lat>
    <lon>-71.47208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2548</plant_id>
    <plant_name>Browns Falls</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>44.211407</lat>
    <lon>-75.05944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2606</plant_id>
    <plant_name>Schaghticoke</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>15.9</summer_mw>
    <first_year>1908</first_year>
    <latest_year>1908</latest_year>
    <lat>42.8992</lat>
    <lon>-73.5989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2610</plant_id>
    <plant_name>Soft Maple</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>43.9206</lat>
    <lon>-75.2433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2906</plant_id>
    <plant_name>Collinwood</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>City of Cleveland - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>41.556867</lat>
    <lon>-81.58796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3737</plant_id>
    <plant_name>Essex Junction 19</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>15.2</summer_mw>
    <first_year>1917</first_year>
    <latest_year>2008</latest_year>
    <lat>44.4821</lat>
    <lon>-73.1164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6280</plant_id>
    <plant_name>Ozark Beach</plant_name>
    <state>MO</state>
    <county>Taney</county>
    <operator>Empire District Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>36.658995</lat>
    <lon>-93.1235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7447</plant_id>
    <plant_name>Pratt 2</plant_name>
    <state>KS</state>
    <county>Pratt</county>
    <operator>City of Pratt- (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>15.2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2004</latest_year>
    <lat>37.6356</lat>
    <lon>-98.745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7820</plant_id>
    <plant_name>Big Quinnesec 92</plant_name>
    <state>MI</state>
    <county>Dickinson</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>45.7881</lat>
    <lon>-88.0408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7849</plant_id>
    <plant_name>Knoxville Industrial</plant_name>
    <state>IA</state>
    <county>Marion</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.315962</lat>
    <lon>-93.06097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10903</plant_id>
    <plant_name>Lockport Powerhouse</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Metro Wtr Recl Dist Grtr Chi</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2001</latest_year>
    <lat>41.5697</lat>
    <lon>-88.0789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52099</plant_id>
    <plant_name>Plant No 2 Orange County</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Orange County Sanitation Dist - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass; All Other</technologies>
    <generators>6</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>33.6433</lat>
    <lon>-117.9556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54717</plant_id>
    <plant_name>Alliant SBD 9106 Rockwell CR</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.0356</lat>
    <lon>-91.6458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56317</plant_id>
    <plant_name>Raft River Geothermal Power Plant</plant_name>
    <state>ID</state>
    <county>Cassia</county>
    <operator>US Geothermal Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>10.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.099417</lat>
    <lon>-113.3825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56701</plant_id>
    <plant_name>Haworth Water Treatment Plant</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2018</latest_year>
    <lat>40.959257</lat>
    <lon>-74.01511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58483</plant_id>
    <plant_name>Tinton Falls Solar Farm</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>Tinton Falls Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.263889</lat>
    <lon>-74.08417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58892</plant_id>
    <plant_name>Camilla Solar Plant</plant_name>
    <state>GA</state>
    <county>Mitchell</county>
    <operator>Axium US Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>31.183889</lat>
    <lon>-84.13194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58897</plant_id>
    <plant_name>Temple SEGF</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Temple University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>10</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>39.98</lat>
    <lon>-75.15056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59516</plant_id>
    <plant_name>American Legion PV 1</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.418333</lat>
    <lon>-77.65583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59996</plant_id>
    <plant_name>Boykin PV1</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.113386</lat>
    <lon>-78.75042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59997</plant_id>
    <plant_name>High Shoals PV1</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.396478</lat>
    <lon>-81.21914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60062</plant_id>
    <plant_name>Avalon Solar II</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Avalon Solar Partners II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.000854</lat>
    <lon>-110.9584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60337</plant_id>
    <plant_name>Providence Solar</plant_name>
    <state>TN</state>
    <county>Madison</county>
    <operator>Providence Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.578333</lat>
    <lon>-89.04778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60555</plant_id>
    <plant_name>Selmer I</plant_name>
    <state>TN</state>
    <county>McNairy</county>
    <operator>Selmer North Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.140556</lat>
    <lon>-88.55111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60638</plant_id>
    <plant_name>Sunflower Solar</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Sunflower Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.395</lat>
    <lon>-77.593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60998</plant_id>
    <plant_name>Underwood PV2</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.419353</lat>
    <lon>-77.04954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61462</plant_id>
    <plant_name>SR Platte Solar Farm</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Platte, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.181742</lat>
    <lon>-104.6921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62389</plant_id>
    <plant_name>Pasto Solar</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.210028</lat>
    <lon>-76.52376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63861</plant_id>
    <plant_name>Logansport Solar</plant_name>
    <state>IN</state>
    <county>Cass</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.760083</lat>
    <lon>-86.38829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67298</plant_id>
    <plant_name>SR Canadaville, LLC</plant_name>
    <state>TN</state>
    <county>Fayette</county>
    <operator>SR Canadaville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>16</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.09961</lat>
    <lon>-89.59874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>93</plant_id>
    <plant_name>Blue Lake Hydro</plant_name>
    <state>AK</state>
    <county>Sitka</county>
    <operator>City &amp; Borough of Sitka - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>15.9</nameplate_mw>
    <summer_mw>15.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>57.0516</lat>
    <lon>-135.2297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>758</plant_id>
    <plant_name>Nottely</plant_name>
    <state>GA</state>
    <county>Union</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>15.9</nameplate_mw>
    <summer_mw>20.1</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1993</latest_year>
    <lat>34.959153</lat>
    <lon>-84.08765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2142</plant_id>
    <plant_name>Malden</plant_name>
    <state>MO</state>
    <county>Dunklin</county>
    <operator>City of Malden - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>15.9</nameplate_mw>
    <summer_mw>14.7</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1996</latest_year>
    <lat>36.5531</lat>
    <lon>-89.9682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4251</plant_id>
    <plant_name>Logan City</plant_name>
    <state>UT</state>
    <county>Cache</county>
    <operator>City of Logan - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>15.9</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>41.725833</lat>
    <lon>-111.8433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50274</plant_id>
    <plant_name>Simplot Leasing Don Plant</plant_name>
    <state>ID</state>
    <county>Bannock</county>
    <operator>Simplot Leasing Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>15.9</nameplate_mw>
    <summer_mw>14.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>42.908412</lat>
    <lon>-112.5294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61955</plant_id>
    <plant_name>Delta Solar Power II</plant_name>
    <state>MI</state>
    <county>Eaton</county>
    <operator>Delta Solar Power II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.9</nameplate_mw>
    <summer_mw>15.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.707</lat>
    <lon>-84.7</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>943</plant_id>
    <plant_name>Freeburg</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>Village of Freeburg - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>15.8</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2007</latest_year>
    <lat>38.425556</lat>
    <lon>-89.91444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>961</plant_id>
    <plant_name>South Main Street</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>Rochelle Municipal Utilities - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>15.8</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1967</first_year>
    <latest_year>2016</latest_year>
    <lat>41.9092</lat>
    <lon>-89.0504</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59184</plant_id>
    <plant_name>Mulberry Farm LLC</plant_name>
    <state>TN</state>
    <county>McNairy</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.8</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.131944</lat>
    <lon>-88.58667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59188</plant_id>
    <plant_name>Selmer Farm LLC</plant_name>
    <state>TN</state>
    <county>McNairy</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.8</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.149722</lat>
    <lon>-88.55528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60077</plant_id>
    <plant_name>CED Avenal</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.8</nameplate_mw>
    <summer_mw>15.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.996324</lat>
    <lon>-120.1515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1319</plant_id>
    <plant_name>Russell Downtown</plant_name>
    <state>KS</state>
    <county>Russell</county>
    <operator>City of Russell - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>15.7</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1994</latest_year>
    <lat>38.893333</lat>
    <lon>-98.85694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61318</plant_id>
    <plant_name>Mt. Jackson Solar</plant_name>
    <state>VA</state>
    <county>Shenandoah</county>
    <operator>Energix Mt. Jackson, LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.7</nameplate_mw>
    <summer_mw>15.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.739621</lat>
    <lon>-78.66016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63083</plant_id>
    <plant_name>Caden Energix Pamplin LLC</plant_name>
    <state>VA</state>
    <county>Appomattox</county>
    <operator>Caden Energix Pamplin LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.7</nameplate_mw>
    <summer_mw>15.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.32936</lat>
    <lon>-78.76591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>92</plant_id>
    <plant_name>Seward (AK)</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>City of Seward - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>15.6</nameplate_mw>
    <summer_mw>15.6</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2010</latest_year>
    <lat>60.130922</lat>
    <lon>-149.435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1137</plant_id>
    <plant_name>Estherville</plant_name>
    <state>IA</state>
    <county>Emmet</county>
    <operator>City of Estherville - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>15.6</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <first_year>1946</first_year>
    <latest_year>1969</latest_year>
    <lat>43.4028</lat>
    <lon>-94.8433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7789</plant_id>
    <plant_name>Abiquiu Dam</plant_name>
    <state>NM</state>
    <county>Rio Arriba</county>
    <operator>Los Alamos County - (NM)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>15.6</nameplate_mw>
    <summer_mw>16.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2011</latest_year>
    <lat>36.239886</lat>
    <lon>-106.423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56544</plant_id>
    <plant_name>Windom Wind Project</plant_name>
    <state>MN</state>
    <county>Cottonwood</county>
    <operator>Midwest Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>15.6</nameplate_mw>
    <summer_mw>15.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.9578</lat>
    <lon>-95.1306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1317</plant_id>
    <plant_name>Pratt</plant_name>
    <state>KS</state>
    <county>Pratt</county>
    <operator>City of Pratt- (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>15.5</nameplate_mw>
    <summer_mw>14.5</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1965</latest_year>
    <lat>37.6359</lat>
    <lon>-98.7433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50629</plant_id>
    <plant_name>Covanta Lake County Energy</plant_name>
    <state>FL</state>
    <county>Lake</county>
    <operator>Covanta Lake Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>15.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>28.740206</lat>
    <lon>-81.88919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54453</plant_id>
    <plant_name>EDF Renewable Windfarm V Inc</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>15.5</nameplate_mw>
    <summer_mw>15.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>38.1167</lat>
    <lon>-121.8333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3053</plant_id>
    <plant_name>Sullivan</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>13</generators>
    <nameplate_mw>15.4</nameplate_mw>
    <summer_mw>18.3</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1952</latest_year>
    <lat>45.354004</lat>
    <lon>-122.619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7399</plant_id>
    <plant_name>Henry Station</plant_name>
    <state>MI</state>
    <county>Bay</county>
    <operator>City of Bay City - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>15.4</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>43.595101</lat>
    <lon>-83.89986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54148</plant_id>
    <plant_name>Hydro Kennebec Project</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Hydro Kennebec LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>15.4</nameplate_mw>
    <summer_mw>15.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>44.563031</lat>
    <lon>-69.61916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58870</plant_id>
    <plant_name>Rentech Nitrogen Pasadena Cogeneration</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>PCI Nitrogen LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>15.4</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>29.739444</lat>
    <lon>-95.19472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59570</plant_id>
    <plant_name>Mocksville Solar</plant_name>
    <state>NC</state>
    <county>Davie</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.4</nameplate_mw>
    <summer_mw>15.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.833889</lat>
    <lon>-80.57444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60774</plant_id>
    <plant_name>Phantom Solar</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Phantom Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.4</nameplate_mw>
    <summer_mw>15.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.114983</lat>
    <lon>-97.84511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67252</plant_id>
    <plant_name>Foul Rift Solar Farm</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.4</nameplate_mw>
    <summer_mw>15.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.8</lat>
    <lon>-75.09</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68681</plant_id>
    <plant_name>Parker Road Solar</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.4</nameplate_mw>
    <summer_mw>15.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.768</lat>
    <lon>-74.735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>424</plant_id>
    <plant_name>French Meadows</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Placer County Water Agency - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>15.3</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>39.077971</lat>
    <lon>-120.4061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62857</plant_id>
    <plant_name>RoxWind</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>RoxWind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>15.3</nameplate_mw>
    <summer_mw>15.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.6148</lat>
    <lon>-70.6176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1482</plant_id>
    <plant_name>Bonny Eagle</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>15.2</nameplate_mw>
    <summer_mw>17</summer_mw>
    <battery_mwh>16</battery_mwh>
    <first_year>1910</first_year>
    <latest_year>2023</latest_year>
    <lat>43.687688</lat>
    <lon>-70.61155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55766</plant_id>
    <plant_name>Kiefer Landfill</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento County of Dpt Waste</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>15.2</nameplate_mw>
    <summer_mw>14.6</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2012</latest_year>
    <lat>38.5136</lat>
    <lon>-121.1944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66683</plant_id>
    <plant_name>Sylvan Solar</plant_name>
    <state>MN</state>
    <county>Cass</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15.2</nameplate_mw>
    <summer_mw>15.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>46.324097</lat>
    <lon>-94.38786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1313</plant_id>
    <plant_name>Osage City</plant_name>
    <state>KS</state>
    <county>Osage</county>
    <operator>City of Osage City - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>15.1</nameplate_mw>
    <summer_mw>13.9</summer_mw>
    <first_year>1955</first_year>
    <latest_year>2026</latest_year>
    <lat>38.633183</lat>
    <lon>-95.82766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50061</plant_id>
    <plant_name>San Diego State University</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Solar Photovoltaic</technologies>
    <generators>7</generators>
    <nameplate_mw>15.1</nameplate_mw>
    <summer_mw>11.9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2014</latest_year>
    <lat>32.778225</lat>
    <lon>-117.0701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57899</plant_id>
    <plant_name>Hurricane City Power</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>Hurricane City Power - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>15.1</nameplate_mw>
    <summer_mw>14.3</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2007</latest_year>
    <lat>37.185556</lat>
    <lon>-113.2975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>505</plant_id>
    <plant_name>Boysen</plant_name>
    <state>WY</state>
    <county>Fremont</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>17.2</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>43.417872</lat>
    <lon>-108.1775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>959</plant_id>
    <plant_name>Red Bud</plant_name>
    <state>IL</state>
    <county>Randolph</county>
    <operator>City of Red Bud - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>14.3</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2002</latest_year>
    <lat>38.2165</lat>
    <lon>-89.9992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2368</plant_id>
    <plant_name>Smith (NH)</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>11.7</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>44.469463</lat>
    <lon>-71.17806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2530</plant_id>
    <plant_name>High Falls - Saranac NY</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>New York State Elec &amp; Gas Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1956</latest_year>
    <lat>44.6389</lat>
    <lon>-73.7492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2547</plant_id>
    <plant_name>Blake</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>14.2</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>44.506474</lat>
    <lon>-74.75344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2783</plant_id>
    <plant_name>Buxton</plant_name>
    <state>NC</state>
    <county>Dare</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>35.267222</lat>
    <lon>-75.53472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3020</plant_id>
    <plant_name>Clearwater 1</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>17.9</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>43.251244</lat>
    <lon>-122.3379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3078</plant_id>
    <plant_name>Dexter</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>USACE Northwestern Division</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>43.9242</lat>
    <lon>-122.8055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3290</plant_id>
    <plant_name>Parr Hydro</plant_name>
    <state>SC</state>
    <county>Fairfield</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1921</latest_year>
    <lat>34.26132</lat>
    <lon>-81.33085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3598</plant_id>
    <plant_name>Inks</plant_name>
    <state>TX</state>
    <county>Burnet</county>
    <operator>Lower Colorado River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>13.8</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1938</latest_year>
    <lat>30.731599</lat>
    <lon>-98.38542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4079</plant_id>
    <plant_name>Castle Rock</plant_name>
    <state>WI</state>
    <county>Adams</county>
    <operator>Wisconsin River Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1951</latest_year>
    <lat>43.8656</lat>
    <lon>-89.9514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6518</plant_id>
    <plant_name>Kings Beach</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Liberty Utilities (CalPeco Electric) LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.245833</lat>
    <lon>-120.0272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7930</plant_id>
    <plant_name>Russell Energy Center</plant_name>
    <state>KS</state>
    <county>Russell</county>
    <operator>City of Russell - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.899722</lat>
    <lon>-98.83944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8028</plant_id>
    <plant_name>Arvada</plant_name>
    <state>WY</state>
    <county>Sheridan</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>44.69</lat>
    <lon>-106.1092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10180</plant_id>
    <plant_name>Metro Wastewater Reclamation District</plant_name>
    <state>CO</state>
    <county>Denver</county>
    <operator>ENGIE Denver Metro LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>6</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2000</latest_year>
    <lat>39.8078</lat>
    <lon>-104.9542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10479</plant_id>
    <plant_name>Mammoth G3</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>37.6455</lat>
    <lon>-118.9096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10481</plant_id>
    <plant_name>Mammoth G2</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>3</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>37.6464</lat>
    <lon>-118.9092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50185</plant_id>
    <plant_name>Cosmo Specialty Fibers Plant</plant_name>
    <state>WA</state>
    <county>Grays Harbor</county>
    <operator>Cosmo Specialty Fibers</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDL</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>17</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>46.954071</lat>
    <lon>-123.7611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52173</plant_id>
    <plant_name>Conemaugh Hydro Plant</plant_name>
    <state>PA</state>
    <county>Westmoreland</county>
    <operator>Pennsylvania Renewable Resources</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.46439</lat>
    <lon>-79.3657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54809</plant_id>
    <plant_name>University of Washington Power Plant</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>University of Washington</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>7</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2023</latest_year>
    <lat>47.6539</lat>
    <lon>-122.3036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55054</plant_id>
    <plant_name>Livingston Generating Facility</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2000</latest_year>
    <lat>40.9314</lat>
    <lon>-88.6548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55805</plant_id>
    <plant_name>Mill Run Windpower LLC</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Sequitur Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>39.913408</lat>
    <lon>-79.39364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56997</plant_id>
    <plant_name>Arrowrock Hydroelectric Project</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Boise-Kuna Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>43.595</lat>
    <lon>-115.9233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57078</plant_id>
    <plant_name>Steel Winds II</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.8072</lat>
    <lon>-78.8617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57322</plant_id>
    <plant_name>Mont Belvieu Cogeneration Unit</plant_name>
    <state>TX</state>
    <county>Chambers</county>
    <operator>Targa Co-Generation LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>12.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>29.838138</lat>
    <lon>-94.90066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57498</plant_id>
    <plant_name>Five Points Solar Station</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.400278</lat>
    <lon>-120.1033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57499</plant_id>
    <plant_name>Westside Solar Station</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.378726</lat>
    <lon>-120.1249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58213</plant_id>
    <plant_name>Saddle Mountain Solar I</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>SunE AZ2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.378333</lat>
    <lon>-113.1808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58501</plant_id>
    <plant_name>RE Gillespie 1 LLC</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.026389</lat>
    <lon>-112.6658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58990</plant_id>
    <plant_name>RE Columbia Two, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.026667</lat>
    <lon>-118.1856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59008</plant_id>
    <plant_name>Woodmere Solar Farm</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.323056</lat>
    <lon>-118.8214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59253</plant_id>
    <plant_name>Wildwood Solar II</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>14.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.63</lat>
    <lon>-119.5739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59860</plant_id>
    <plant_name>HP Hood CT</plant_name>
    <state>VA</state>
    <county>Frederick</county>
    <operator>HP Hood LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.132519</lat>
    <lon>-78.18747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59887</plant_id>
    <plant_name>Beaufort Solar, LLC</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Capital Power Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.456</lat>
    <lon>-77.134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59919</plant_id>
    <plant_name>Nellis Solar PV II</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.206672</lat>
    <lon>-115.0477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60007</plant_id>
    <plant_name>Morelos del Sol</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.731362</lat>
    <lon>-119.8187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60080</plant_id>
    <plant_name>CED Ducor 3</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.845378</lat>
    <lon>-119.057</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60787</plant_id>
    <plant_name>Williamston Speight Solar, LLC</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Williamston Speight Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.887545</lat>
    <lon>-77.1642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61321</plant_id>
    <plant_name>Biggs Ford Solar Center</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>Biggs Ford Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.4829</lat>
    <lon>-77.3757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61412</plant_id>
    <plant_name>Latitude Solar Center</plant_name>
    <state>TN</state>
    <county>Hardeman</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.306387</lat>
    <lon>-89.16754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61691</plant_id>
    <plant_name>Depot Solar Center, LLC</plant_name>
    <state>VA</state>
    <county>Campbell</county>
    <operator>Emerald Hills Holding I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.276278</lat>
    <lon>-79.11651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61854</plant_id>
    <plant_name>Baker City Solar</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.702418</lat>
    <lon>-117.7635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61908</plant_id>
    <plant_name>Stratford Solar Center, LLC</plant_name>
    <state>VA</state>
    <county>Suffolk City</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.660483</lat>
    <lon>-76.56093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62140</plant_id>
    <plant_name>Puller Solar</plant_name>
    <state>VA</state>
    <county>Middlesex</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.57245</lat>
    <lon>-76.46734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62318</plant_id>
    <plant_name>North Stonington Solar Center, LLC</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.418331</lat>
    <lon>-71.83673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62673</plant_id>
    <plant_name>Antelope Expansion 3A</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.728902</lat>
    <lon>-118.3221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62775</plant_id>
    <plant_name>Wildberry</plant_name>
    <state>TN</state>
    <county>Fayette</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.058165</lat>
    <lon>-89.36862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63746</plant_id>
    <plant_name>TWE Myrtle Solar Farm, LLC</plant_name>
    <state>VA</state>
    <county>Suffolk City</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.79</lat>
    <lon>-76.67</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63768</plant_id>
    <plant_name>Elk Hill Solar 2</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.799589</lat>
    <lon>-77.81156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64097</plant_id>
    <plant_name>Electric City Solar</plant_name>
    <state>MI</state>
    <county>St Joseph</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.75</lat>
    <lon>-85.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64450</plant_id>
    <plant_name>Grissom Solar, LLC</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.23891</lat>
    <lon>-77.89755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64568</plant_id>
    <plant_name>Letts Creek Solar, LLC</plant_name>
    <state>MI</state>
    <county>Jackson</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.274575</lat>
    <lon>-84.13528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65396</plant_id>
    <plant_name>Black Walnut Energy Storage LLC</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Black Walnut Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.35758</lat>
    <lon>-119.0573</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65929</plant_id>
    <plant_name>Listonburg Solar</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Listonburg Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.76472</lat>
    <lon>-79.30339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67041</plant_id>
    <plant_name>McLauchin</plant_name>
    <state>NC</state>
    <county>Hoke</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <battery_mwh>30</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.996432</lat>
    <lon>-79.10712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67545</plant_id>
    <plant_name>Marshall Solar Plus LLC</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Western Minnesota Mun Pwr Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <battery_mwh>30.6</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.469889</lat>
    <lon>-95.7792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69951</plant_id>
    <plant_name>Vineland Solar LLC</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>15</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.471</lat>
    <lon>-75.061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57790</plant_id>
    <plant_name>RE Bagdad Solar I LLC</plant_name>
    <state>AZ</state>
    <county>Yavapai</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14.9</nameplate_mw>
    <summer_mw>14.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.585833</lat>
    <lon>-113.1772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65380</plant_id>
    <plant_name>Solomon Generating Facility</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>Deseret Generation &amp; Tran Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>14.9</nameplate_mw>
    <summer_mw>14.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.030051</lat>
    <lon>-113.5634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>9095</plant_id>
    <plant_name>Monroe Street</plant_name>
    <state>WA</state>
    <county>Spokane</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>14.8</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>47.653611</lat>
    <lon>-117.4206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50545</plant_id>
    <plant_name>Lawrence Hydroelectric Associates</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>14.8</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>42.6994</lat>
    <lon>-71.1653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50906</plant_id>
    <plant_name>Ford Utilities Center</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>University of New Mexico</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; All Other</technologies>
    <generators>3</generators>
    <nameplate_mw>14.8</nameplate_mw>
    <summer_mw>12.9</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2014</latest_year>
    <lat>35.084078</lat>
    <lon>-106.6252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58262</plant_id>
    <plant_name>Badger 1</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Desert Sky Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14.8</nameplate_mw>
    <summer_mw>14.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.498003</lat>
    <lon>-112.8135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69505</plant_id>
    <plant_name>NSF Union</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>14.8</nameplate_mw>
    <summer_mw>14.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.13</lat>
    <lon>-76.076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>91</plant_id>
    <plant_name>Petersburg</plant_name>
    <state>AK</state>
    <county>Wrangell Petersburg</county>
    <operator>Petersburg Borough - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>14.7</nameplate_mw>
    <summer_mw>12.6</summer_mw>
    <first_year>1965</first_year>
    <latest_year>2023</latest_year>
    <lat>56.81104</lat>
    <lon>-132.9571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>818</plant_id>
    <plant_name>Shoshone Falls</plant_name>
    <state>ID</state>
    <county>Jerome</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>14.7</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1921</first_year>
    <latest_year>2020</latest_year>
    <lat>42.5975</lat>
    <lon>-114.4033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56860</plant_id>
    <plant_name>Hardin Hilltop Wind LLC</plant_name>
    <state>IA</state>
    <county>Greene</county>
    <operator>Hardin Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>14.7</nameplate_mw>
    <summer_mw>14.7</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>42.0822</lat>
    <lon>-94.365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58281</plant_id>
    <plant_name>Lanikuhana Solar LLC</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Lanikuhana Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14.7</nameplate_mw>
    <summer_mw>14.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>21.4287</lat>
    <lon>-158.0236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60391</plant_id>
    <plant_name>SJA Solar LLC-Solterra Monastery CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>SJA Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14.7</nameplate_mw>
    <summer_mw>14.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.283439</lat>
    <lon>-72.00847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61924</plant_id>
    <plant_name>Cumblerland Land Holdings, LLC</plant_name>
    <state>AL</state>
    <county>Limestone</county>
    <operator>Cumberland Land Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14.7</nameplate_mw>
    <summer_mw>14.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.94974</lat>
    <lon>-86.86805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>831</plant_id>
    <plant_name>Soda</plant_name>
    <state>ID</state>
    <county>Caribou</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>14.6</nameplate_mw>
    <summer_mw>15.2</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>42.64455</lat>
    <lon>-111.6967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54758</plant_id>
    <plant_name>Wheelabrator Lisbon</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>14.6</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>41.584429</lat>
    <lon>-72.04163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>835</plant_id>
    <plant_name>Post Falls</plant_name>
    <state>ID</state>
    <county>Kootenai</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>14.5</nameplate_mw>
    <summer_mw>17.5</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1980</latest_year>
    <lat>47.703333</lat>
    <lon>-116.9539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50350</plant_id>
    <plant_name>Forks of Butte Hydro Project</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Hypower Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>14.5</nameplate_mw>
    <summer_mw>14.5</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>39.869284</lat>
    <lon>-121.6319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>476</plant_id>
    <plant_name>Shoshone (CO)</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>15</summer_mw>
    <first_year>1909</first_year>
    <latest_year>1909</latest_year>
    <lat>39.57013</lat>
    <lon>-107.2269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>712</plant_id>
    <plant_name>Lloyd Shoals</plant_name>
    <state>GA</state>
    <county>Jasper</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>22.8</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1917</latest_year>
    <lat>33.3207</lat>
    <lon>-83.8414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>958</plant_id>
    <plant_name>Rantoul</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Village of Rantoul - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>40.312222</lat>
    <lon>-88.15944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2486</plant_id>
    <plant_name>Sturgeon</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Central Hudson Gas &amp; Elec Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>41.848191</lat>
    <lon>-74.04668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6560</plant_id>
    <plant_name>London</plant_name>
    <state>WV</state>
    <county>Kanawha</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1935</latest_year>
    <lat>38.1944</lat>
    <lon>-81.3706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6561</plant_id>
    <plant_name>Marmet</plant_name>
    <state>WV</state>
    <county>Kanawha</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1935</latest_year>
    <lat>38.2526</lat>
    <lon>-81.5695</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10503</plant_id>
    <plant_name>Wheelabrator Hudson Falls</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>43.3056</lat>
    <lon>-73.59145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56681</plant_id>
    <plant_name>Amelia</plant_name>
    <state>VA</state>
    <county>Amelia</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>48</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>37.3097</lat>
    <lon>-78.0589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56683</plant_id>
    <plant_name>Charles City</plant_name>
    <state>VA</state>
    <county>Charles City</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>48</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>37.438889</lat>
    <lon>-77.12861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56684</plant_id>
    <plant_name>Chesterfield Landfill Gas</plant_name>
    <state>VA</state>
    <county>Chesterfield</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>48</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>37.3517</lat>
    <lon>-77.4969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56687</plant_id>
    <plant_name>Mountain View</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>48</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.8014</lat>
    <lon>-77.7883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57853</plant_id>
    <plant_name>McKinley Wind Park</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.871944</lat>
    <lon>-83.24139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59473</plant_id>
    <plant_name>Apple Campus 2 PV</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Apple, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>12.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.33</lat>
    <lon>-122.01</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59747</plant_id>
    <plant_name>River Mountains Solar</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>River Mountains Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>13.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.031616</lat>
    <lon>-114.9294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62658</plant_id>
    <plant_name>Cuyahoga Falls 1</plant_name>
    <state>OH</state>
    <county>Summit</county>
    <operator>City of Cuyahoga Falls - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2020</latest_year>
    <lat>41.141773</lat>
    <lon>-81.47454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63941</plant_id>
    <plant_name>Oasis Alta</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>14.4</nameplate_mw>
    <summer_mw>14.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.059166</lat>
    <lon>-118.2919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10184</plant_id>
    <plant_name>Central Utility Plant</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Silicon Hills Campus, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>14.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>30.397351</lat>
    <lon>-97.84259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57085</plant_id>
    <plant_name>Lake Dorothy Hydroelectric Project</plant_name>
    <state>AK</state>
    <county>Juneau</county>
    <operator>Alaska Electric Light &amp; Power Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>14.3</nameplate_mw>
    <summer_mw>14.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>58.2325</lat>
    <lon>-134.0533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59070</plant_id>
    <plant_name>Jericho Power</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>Jericho Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>14.3</nameplate_mw>
    <summer_mw>12.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.466944</lat>
    <lon>-71.225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2310</plant_id>
    <plant_name>Wahoo</plant_name>
    <state>NE</state>
    <county>Saunders</county>
    <operator>City of Wahoo - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>14.2</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1973</latest_year>
    <lat>41.211798</lat>
    <lon>-96.61155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10487</plant_id>
    <plant_name>International Falls Power</plant_name>
    <state>MN</state>
    <county>Koochiching</county>
    <operator>Boise White Paper LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>14.2</nameplate_mw>
    <summer_mw>14.2</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1946</latest_year>
    <lat>48.608054</lat>
    <lon>-93.40431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54225</plant_id>
    <plant_name>Gillette SBMC</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>The Gillette Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>14.2</nameplate_mw>
    <summer_mw>14.2</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2011</latest_year>
    <lat>42.3436</lat>
    <lon>-71.0559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7715</plant_id>
    <plant_name>Pea Ridge</plant_name>
    <state>FL</state>
    <county>Santa Rosa</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>14.1</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>30.59208</lat>
    <lon>-87.13539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58265</plant_id>
    <plant_name>NCAH Central Utility Plant</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>National Centers for Animal Health</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>9</generators>
    <nameplate_mw>14.1</nameplate_mw>
    <summer_mw>14.1</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2010</latest_year>
    <lat>42.046111</lat>
    <lon>-93.57944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59012</plant_id>
    <plant_name>Walt Bailey Bioenergy Facility</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>DC Water</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>14.1</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.820556</lat>
    <lon>-77.01833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1200</plant_id>
    <plant_name>West Liberty</plant_name>
    <state>IA</state>
    <county>Muscatine</county>
    <operator>City of West Liberty - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>12.7</summer_mw>
    <first_year>1982</first_year>
    <latest_year>2004</latest_year>
    <lat>41.569128</lat>
    <lon>-91.26405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2520</plant_id>
    <plant_name>Southold</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>41.1059</lat>
    <lon>-72.3761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3834</plant_id>
    <plant_name>Philpott Lake</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>USCE-Wilmington District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>15.6</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>36.7803</lat>
    <lon>-80.0281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6125</plant_id>
    <plant_name>Shrewsbury</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Town of Shrewsbury - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1978</latest_year>
    <lat>42.2747</lat>
    <lon>-71.7172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6150</plant_id>
    <plant_name>Bellefonte</plant_name>
    <state>AL</state>
    <county>Jackson</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>34.7092</lat>
    <lon>-85.9278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7080</plant_id>
    <plant_name>St George Red Rock</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>City of St George - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.113736</lat>
    <lon>-113.5689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7479</plant_id>
    <plant_name>North Road Peak</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>City of Orangeburg - (SC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>33.5452</lat>
    <lon>-80.9109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7935</plant_id>
    <plant_name>Trenton South</plant_name>
    <state>MO</state>
    <county>Grundy</county>
    <operator>Trenton Municipal Utilities - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>13.2</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2004</latest_year>
    <lat>40.067218</lat>
    <lon>-93.60436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50037</plant_id>
    <plant_name>Rio Bravo Hydro Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Olcese Water District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>13.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.43</lat>
    <lon>-118.8222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50341</plant_id>
    <plant_name>PCS Nitrogen Fertilizer LP</plant_name>
    <state>LA</state>
    <county>Iberville</county>
    <operator>PCS Nitrogen LP</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2014</latest_year>
    <lat>30.226977</lat>
    <lon>-91.05511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50873</plant_id>
    <plant_name>Wheelabrator Concord Facility</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>43.2866</lat>
    <lon>-71.5769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50885</plant_id>
    <plant_name>Wheelabrator Gloucester LP</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Wheelabrator Environmental Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>39.8733</lat>
    <lon>-75.1381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52148</plant_id>
    <plant_name>Elkton</plant_name>
    <state>VA</state>
    <county>Rockingham</county>
    <operator>Merck &amp; Co Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>2025</latest_year>
    <lat>38.3836</lat>
    <lon>-78.6528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54512</plant_id>
    <plant_name>Domino Sugar Arabi Plant</plant_name>
    <state>LA</state>
    <county>St Bernard</county>
    <operator>American Sugar Refining Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>12.2</summer_mw>
    <first_year>1949</first_year>
    <latest_year>2003</latest_year>
    <lat>29.9468</lat>
    <lon>-90.0018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55133</plant_id>
    <plant_name>Thomson Reuters Campus Bldg A-D</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Thomson Corp</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.8196</lat>
    <lon>-93.1156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56080</plant_id>
    <plant_name>SJ/SC WPCP</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>San Jose/Santa Clara Water P C</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.4344</lat>
    <lon>-121.9464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57353</plant_id>
    <plant_name>Thermo No 1</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Thermo No 1 BE 01 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.160653</lat>
    <lon>-113.1945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58194</plant_id>
    <plant_name>West Campus Steam Plant</plant_name>
    <state>PA</state>
    <county>Centre</county>
    <operator>Penn State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>9.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2021</latest_year>
    <lat>40.792778</lat>
    <lon>-77.86472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59548</plant_id>
    <plant_name>Creswell Alligood Solar, LLC</plant_name>
    <state>NC</state>
    <county>Washington</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.898889</lat>
    <lon>-76.37944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59599</plant_id>
    <plant_name>Tropico Solar PV Plant</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.831944</lat>
    <lon>-119.0561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62588</plant_id>
    <plant_name>Derby Fuel Cell</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Derby Fuel Cell LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.325</lat>
    <lon>-73.09917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65016</plant_id>
    <plant_name>Gardy's Mill Solar</plant_name>
    <state>VA</state>
    <county>Westmoreland</county>
    <operator>Gardy's Mill Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.006741</lat>
    <lon>-76.60696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65902</plant_id>
    <plant_name>Gans Solar</plant_name>
    <state>PA</state>
    <county>Fayette</county>
    <operator>Gans Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.750126</lat>
    <lon>-79.8358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65903</plant_id>
    <plant_name>Pechin Solar</plant_name>
    <state>PA</state>
    <county>Fayette</county>
    <operator>Pechin Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.96106</lat>
    <lon>-79.64394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67758</plant_id>
    <plant_name>Slocum Energy Storage</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>14</nameplate_mw>
    <summer_mw>14</summer_mw>
    <battery_mwh>56</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.123049</lat>
    <lon>-83.18739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1188</plant_id>
    <plant_name>Story City</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>City of Story City - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>13.9</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>1964</first_year>
    <latest_year>2003</latest_year>
    <lat>42.186076</lat>
    <lon>-93.60048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7283</plant_id>
    <plant_name>Paragould Turbine</plant_name>
    <state>AR</state>
    <county>Greene</county>
    <operator>Paragould Municipal Utilities (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.9</nameplate_mw>
    <summer_mw>13.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1991</latest_year>
    <lat>36.024272</lat>
    <lon>-90.50923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54937</plant_id>
    <plant_name>Wellesley College Central Utility Plant</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Wellesley College</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>13.9</nameplate_mw>
    <summer_mw>14.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2021</latest_year>
    <lat>42.293927</lat>
    <lon>-71.30811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57197</plant_id>
    <plant_name>Blue Wing Solar Energy Generation</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.9</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>29.304177</lat>
    <lon>-98.40034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64723</plant_id>
    <plant_name>Alton Road Solar</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Revity Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.9</nameplate_mw>
    <summer_mw>13.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.407547</lat>
    <lon>-71.74833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1997</plant_id>
    <plant_name>Mora</plant_name>
    <state>MN</state>
    <county>Kanabec</county>
    <operator>City of Mora - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>13.8</nameplate_mw>
    <summer_mw>13.2</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1975</latest_year>
    <lat>45.877088</lat>
    <lon>-93.29514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10438</plant_id>
    <plant_name>Sunray 3</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Sunray Energy 3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.8</nameplate_mw>
    <summer_mw>13.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.863356</lat>
    <lon>-116.8276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54772</plant_id>
    <plant_name>South Glens Falls Hydroelectric</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Boralex Hydro Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13.8</nameplate_mw>
    <summer_mw>13.8</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>43.304413</lat>
    <lon>-73.63993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57496</plant_id>
    <plant_name>Tieton Dam Hydro Electric Project</plant_name>
    <state>WA</state>
    <county>Yakima</county>
    <operator>City of Burbank Water and Power - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13.8</nameplate_mw>
    <summer_mw>13.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>46.658</lat>
    <lon>-121.1287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58691</plant_id>
    <plant_name>South Fork Wind Farm</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>Aspenall Energies (Delaware), LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>13.8</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.587283</lat>
    <lon>-95.37512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63077</plant_id>
    <plant_name>Twittys Creek Solar, LLC</plant_name>
    <state>VA</state>
    <county>Charlotte</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.8</nameplate_mw>
    <summer_mw>13.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.018427</lat>
    <lon>-78.58127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67706</plant_id>
    <plant_name>Spring Lane</plant_name>
    <state>PA</state>
    <county>Westmoreland</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.8</nameplate_mw>
    <summer_mw>13.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.183449</lat>
    <lon>-79.31957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1911</plant_id>
    <plant_name>Hennepin Island</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>13.7</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1955</latest_year>
    <lat>44.982359</lat>
    <lon>-93.25416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4020</plant_id>
    <plant_name>Frederic Diesel</plant_name>
    <state>WI</state>
    <county>Polk</county>
    <operator>Northwestern Wisconsin Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>13.7</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2000</latest_year>
    <lat>45.654835</lat>
    <lon>-92.46506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6566</plant_id>
    <plant_name>Bethel</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>13.7</nameplate_mw>
    <summer_mw>13.7</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2025</latest_year>
    <lat>60.7897</lat>
    <lon>-161.7878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50310</plant_id>
    <plant_name>Standby Generation Plant</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Pensacola Christian College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>11</generators>
    <nameplate_mw>13.7</nameplate_mw>
    <summer_mw>13.7</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2006</latest_year>
    <lat>30.4736</lat>
    <lon>-87.2361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57758</plant_id>
    <plant_name>Mount Saint Mary's</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>Constellation Solar Horizons LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.7</nameplate_mw>
    <summer_mw>13.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.675</lat>
    <lon>-77.345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>241</plant_id>
    <plant_name>Halsey</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>13.6</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>1916</first_year>
    <latest_year>1916</latest_year>
    <lat>38.956985</lat>
    <lon>-121.0419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>291</plant_id>
    <plant_name>West Point PH</plant_name>
    <state>CA</state>
    <county>Amador</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>13.6</nameplate_mw>
    <summer_mw>14.5</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>38.420898</lat>
    <lon>-120.5496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>946</plant_id>
    <plant_name>Highland</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>City of Highland - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.6</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1993</latest_year>
    <lat>38.7412</lat>
    <lon>-89.6849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50897</plant_id>
    <plant_name>Allegheny Hydro No 8</plant_name>
    <state>PA</state>
    <county>Armstrong</county>
    <operator>Allegheny Hydro LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13.6</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.896596</lat>
    <lon>-79.47898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52086</plant_id>
    <plant_name>Coalinga 25D Cogen</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>13.6</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1987</latest_year>
    <lat>36.1556</lat>
    <lon>-120.3972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60735</plant_id>
    <plant_name>Longview Solar</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.6</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.394728</lat>
    <lon>-75.67272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>698</plant_id>
    <plant_name>Trenton North</plant_name>
    <state>MO</state>
    <county>Grundy</county>
    <operator>Trenton Municipal Utilities - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1975</latest_year>
    <lat>40.0786</lat>
    <lon>-93.635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>815</plant_id>
    <plant_name>Lower Malad</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>15.3</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>42.865783</lat>
    <lon>-114.9062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>955</plant_id>
    <plant_name>City of Peru Plank Road Generating Station</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>City of Peru - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.353293</lat>
    <lon>-89.13909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1725</plant_id>
    <plant_name>Colfax</plant_name>
    <state>MI</state>
    <county>Livingston</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>42.658653</lat>
    <lon>-84.09518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1735</plant_id>
    <plant_name>Oliver</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>43.8264</lat>
    <lon>-83.2383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1737</plant_id>
    <plant_name>Placid 12</plant_name>
    <state>MI</state>
    <county>Oakland</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>42.7106</lat>
    <lon>-83.4569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1739</plant_id>
    <plant_name>Putnam (MI)</plant_name>
    <state>MI</state>
    <county>Oakland</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>42.7108</lat>
    <lon>-83.4561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1746</plant_id>
    <plant_name>Wilmot</plant_name>
    <state>MI</state>
    <county>Tuscola</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>14</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>43.4566</lat>
    <lon>-83.1889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2851</plant_id>
    <plant_name>Monument</plant_name>
    <state>OH</state>
    <county>Montgomery</county>
    <operator>Kimura Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>39.7667</lat>
    <lon>-84.1739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2852</plant_id>
    <plant_name>Sidney (OH)</plant_name>
    <state>OH</state>
    <county>Shelby</county>
    <operator>Kimura Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>40.27917</lat>
    <lon>-84.19097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7555</plant_id>
    <plant_name>Nebraska City # 2</plant_name>
    <state>NE</state>
    <county>Otoe</county>
    <operator>City of Nebraska City - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>12.2</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>40.6661</lat>
    <lon>-95.86833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50540</plant_id>
    <plant_name>BP Carson Refinery</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesoro Carson Refinery</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1984</latest_year>
    <lat>33.8153</lat>
    <lon>-118.2358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50758</plant_id>
    <plant_name>Pejepscot Hydroelectric Project</plant_name>
    <state>ME</state>
    <county>Sagadahoc</county>
    <operator>Topsham Hydro Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>12.9</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.957448</lat>
    <lon>-70.02416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54808</plant_id>
    <plant_name>New York University Central Plant</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>New York University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2025</latest_year>
    <lat>40.7899</lat>
    <lon>-73.9233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56439</plant_id>
    <plant_name>Oregon Trail Wind Park</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.840556</lat>
    <lon>-114.9897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60000</plant_id>
    <plant_name>Turkey Creek PV1</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Fresh Air Energy XXXV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.441359</lat>
    <lon>-77.13558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62989</plant_id>
    <plant_name>Whitetail Solar 1</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.139673</lat>
    <lon>-77.60999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65258</plant_id>
    <plant_name>Wapakoneta-Pratt</plant_name>
    <state>OH</state>
    <county>Auglaize</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.544</lat>
    <lon>-84.187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65512</plant_id>
    <plant_name>Kansas Ethanol, LLC</plant_name>
    <state>KS</state>
    <county>Rice</county>
    <operator>Kansas Ethanol, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>11.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.286173</lat>
    <lon>-98.19213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65965</plant_id>
    <plant_name>Java Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Java Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.233522</lat>
    <lon>-119.8163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66983</plant_id>
    <plant_name>MDU / NVSS-II</plant_name>
    <state>NV</state>
    <county>Nye</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.5</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.274825</lat>
    <lon>-115.9724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>444</plant_id>
    <plant_name>Nimbus</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13.4</nameplate_mw>
    <summer_mw>16.6</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>38.63735</lat>
    <lon>-121.2202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>937</plant_id>
    <plant_name>Carmi</plant_name>
    <state>IL</state>
    <county>White</county>
    <operator>City of Carmi - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>13.4</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2013</latest_year>
    <lat>38.0967</lat>
    <lon>-88.1631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7934</plant_id>
    <plant_name>Industrial Park</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>City of Rock Falls - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>13.4</nameplate_mw>
    <summer_mw>13.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2011</latest_year>
    <lat>41.768199</lat>
    <lon>-89.67439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8034</plant_id>
    <plant_name>Yankton</plant_name>
    <state>SD</state>
    <county>Yankton</county>
    <operator>NorthWestern Energy - (SD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>13.4</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1975</latest_year>
    <lat>42.893333</lat>
    <lon>-97.35333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56469</plant_id>
    <plant_name>Roseburg Forest Products Biomass</plant_name>
    <state>CA</state>
    <county>Siskiyou</county>
    <operator>Roseburg Forest Products</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>13.4</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.435556</lat>
    <lon>-122.3769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58198</plant_id>
    <plant_name>Parnassus Central Utility Plant</plant_name>
    <state>CA</state>
    <county>San Francisco</county>
    <operator>University of California-San Francisco</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>3</generators>
    <nameplate_mw>13.4</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>37.762524</lat>
    <lon>-122.4567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63063</plant_id>
    <plant_name>Duke Energy CHP at Clemson University</plant_name>
    <state>SC</state>
    <county>Pickens</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>13.4</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.6779</lat>
    <lon>-82.8231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50225</plant_id>
    <plant_name>Regional Waste Systems</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Ecomaine</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>13.3</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>43.6556</lat>
    <lon>-70.3347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54210</plant_id>
    <plant_name>American Crystal Sugar Hillsboro</plant_name>
    <state>ND</state>
    <county>Traill</county>
    <operator>American Crystal Sugar Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>13.3</nameplate_mw>
    <summer_mw>13.3</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>47.437562</lat>
    <lon>-97.06311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56478</plant_id>
    <plant_name>MJMEUC Generating Station #1</plant_name>
    <state>MO</state>
    <county>Audrain</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>13.3</nameplate_mw>
    <summer_mw>11.3</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>39.251076</lat>
    <lon>-91.64007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65400</plant_id>
    <plant_name>Purdue CHP</plant_name>
    <state>IN</state>
    <county>Tippecanoe</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>13.3</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.417023</lat>
    <lon>-86.91533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67846</plant_id>
    <plant_name>Rivanna Solar</plant_name>
    <state>VA</state>
    <county>Albemarle</county>
    <operator>Rivanna Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.3</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.966</lat>
    <lon>-78.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2778</plant_id>
    <plant_name>Chatuge</plant_name>
    <state>NC</state>
    <county>Clay</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>13.9</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>35.019131</lat>
    <lon>-83.79144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3708</plant_id>
    <plant_name>Ascutney</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1961</first_year>
    <latest_year>1961</latest_year>
    <lat>43.4011</lat>
    <lon>-72.4203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7440</plant_id>
    <plant_name>VMEA 1 Credit Gen</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>City of Manassas - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>12.3</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2009</latest_year>
    <lat>38.74054</lat>
    <lon>-77.50806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56568</plant_id>
    <plant_name>Nellis Air Force Base Solar Array</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Solar Star NAFB LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>36.260278</lat>
    <lon>-115.0544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57022</plant_id>
    <plant_name>Waste Management King George LFGTE</plant_name>
    <state>VA</state>
    <county>King George</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>11.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2011</latest_year>
    <lat>38.2747</lat>
    <lon>-77.3081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58140</plant_id>
    <plant_name>Summit Street Power Plant</plant_name>
    <state>OH</state>
    <county>Portage</county>
    <operator>Kent State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2004</latest_year>
    <lat>41.143056</lat>
    <lon>-81.34083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58432</plant_id>
    <plant_name>Glass House Camarillo Cultivation</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Glass House Camarillo Cultivation</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>13.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2013</latest_year>
    <lat>34.179722</lat>
    <lon>-119.0831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59255</plant_id>
    <plant_name>Osprey Point RES</plant_name>
    <state>IN</state>
    <county>Sullivan</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>4</generators>
    <nameplate_mw>13.2</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.059167</lat>
    <lon>-87.50611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>357</plant_id>
    <plant_name>Rush Creek</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13.1</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>1916</first_year>
    <latest_year>1917</latest_year>
    <lat>37.766954</lat>
    <lon>-119.1233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10206</plant_id>
    <plant_name>Loma Linda University Cogen</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Loma Linda University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>13.1</nameplate_mw>
    <summer_mw>12.3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2018</latest_year>
    <lat>34.050391</lat>
    <lon>-117.2484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63451</plant_id>
    <plant_name>Monroe Solar Farm, LLC</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13.1</nameplate_mw>
    <summer_mw>13.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.312</lat>
    <lon>-74.425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>150</plant_id>
    <plant_name>Stewart Mountain</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>33.5661</lat>
    <lon>-111.536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1510</plant_id>
    <plant_name>Williams Hydro</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>14.9</summer_mw>
    <first_year>1939</first_year>
    <latest_year>1950</latest_year>
    <lat>44.9589</lat>
    <lon>-69.8703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10255</plant_id>
    <plant_name>West Enfield Hydro</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Brookfield Black Bear Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>45.2497</lat>
    <lon>-68.6483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10262</plant_id>
    <plant_name>California Institute of Technology</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>California Institute-Technology</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>11.1</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.138467</lat>
    <lon>-118.1256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50275</plant_id>
    <plant_name>Park 500 Philip Morris USA</plant_name>
    <state>VA</state>
    <county>Chesterfield</county>
    <operator>Philip Morris USA - Park 500</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>37.3389</lat>
    <lon>-77.2806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>51034</plant_id>
    <plant_name>Little Falls Hydro</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.040335</lat>
    <lon>-74.85062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54207</plant_id>
    <plant_name>Clevelandcliffs Warren</plant_name>
    <state>OH</state>
    <county>Trumbull</county>
    <operator>Clevelandcliffs Warren</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>2</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>12.1</summer_mw>
    <first_year>1934</first_year>
    <latest_year>1981</latest_year>
    <lat>41.2119</lat>
    <lon>-80.8176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57690</plant_id>
    <plant_name>Turnbull Hydro</plant_name>
    <state>MT</state>
    <county>Teton</county>
    <operator>Turnbull Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>47.605278</lat>
    <lon>-112.0969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57966</plant_id>
    <plant_name>Southeast Steam Plant</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>University of Minnesota Central Utilities</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>44.980833</lat>
    <lon>-93.24972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59872</plant_id>
    <plant_name>UC Davis South Campus</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>Solar Star California XXXII, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.55</lat>
    <lon>-121.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60023</plant_id>
    <plant_name>SR Jenkins Ft Lupton</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Jenkins, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.081444</lat>
    <lon>-104.7467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61853</plant_id>
    <plant_name>Jordanelle Dam Hydroelectric Project</plant_name>
    <state>UT</state>
    <county>Wasatch</county>
    <operator>Central Utah Water Conservancy District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.596605</lat>
    <lon>-111.4236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61864</plant_id>
    <plant_name>Dix Solar, L.L.C</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.977433</lat>
    <lon>-74.62186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62988</plant_id>
    <plant_name>Wildflower Solar 1</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.705</lat>
    <lon>-121.477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64010</plant_id>
    <plant_name>Energix Hollyfield, LLC</plant_name>
    <state>VA</state>
    <county>King William</county>
    <operator>Energix Hollyfield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.671</lat>
    <lon>-77.17</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66650</plant_id>
    <plant_name>Bear Canyon</plant_name>
    <state>CA</state>
    <county>Lake</county>
    <operator>Bear Canyon Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <battery_mwh>52</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.762781</lat>
    <lon>-122.6928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68874</plant_id>
    <plant_name>Inertia Energy Storage</plant_name>
    <state>TX</state>
    <county>Haskell</county>
    <operator>Inertia Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>13</nameplate_mw>
    <summer_mw>13</summer_mw>
    <battery_mwh>45</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.177277</lat>
    <lon>-99.56774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6407</plant_id>
    <plant_name>Roza</plant_name>
    <state>WA</state>
    <county>Yakima</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12.9</nameplate_mw>
    <summer_mw>12.9</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>46.618413</lat>
    <lon>-120.4778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>9038</plant_id>
    <plant_name>Cherry Street</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Town of Hudson - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>12.9</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1972</latest_year>
    <lat>42.388611</lat>
    <lon>-71.56</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59467</plant_id>
    <plant_name>Coldwater Peaking Plant</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>Coldwater Board of Public Util</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>12.9</nameplate_mw>
    <summer_mw>12.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.919444</lat>
    <lon>-85.02417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>293</plant_id>
    <plant_name>A G Wishon</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>20</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1910</latest_year>
    <lat>37.15105</lat>
    <lon>-119.5047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3860</plant_id>
    <plant_name>Snoqualmie</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.1</summer_mw>
    <first_year>1898</first_year>
    <latest_year>2013</latest_year>
    <lat>47.54011</lat>
    <lon>-121.837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7127</plant_id>
    <plant_name>Wynoochee</plant_name>
    <state>WA</state>
    <county>Grays Harbor</county>
    <operator>City of Tacoma - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>15.5</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>47.385072</lat>
    <lon>-123.6052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50577</plant_id>
    <plant_name>Omega Hills Gas Recovery</plant_name>
    <state>WI</state>
    <county>Washington</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>11.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2010</latest_year>
    <lat>43.1922</lat>
    <lon>-88.1597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54925</plant_id>
    <plant_name>Twin Bridges LFGTE</plant_name>
    <state>IN</state>
    <county>Hendricks</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Landfill Gas</technologies>
    <generators>14</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2012</latest_year>
    <lat>39.744983</lat>
    <lon>-86.49466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56465</plant_id>
    <plant_name>Liberty I &amp; II LFGTE</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas; Natural Gas Internal Combustion Engine</technologies>
    <generators>12</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2017</latest_year>
    <lat>40.885556</lat>
    <lon>-86.70444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57015</plant_id>
    <plant_name>Waste Management Columbia Ridge LFGTE</plant_name>
    <state>OR</state>
    <county>Gilliam</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>12</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2014</latest_year>
    <lat>45.5739</lat>
    <lon>-120.2969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57443</plant_id>
    <plant_name>Pine Tree Acres WM LFGTE</plant_name>
    <state>MI</state>
    <county>Macomb</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>8</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.765</lat>
    <lon>-82.74556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59966</plant_id>
    <plant_name>Camp Lejeune Solar and Energy Storage</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.725699</lat>
    <lon>-77.35027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60764</plant_id>
    <plant_name>Victory Solar LLC</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.795</lat>
    <lon>-104.433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63236</plant_id>
    <plant_name>Kings Plaza Total Energy Plant (TEP)</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Veolia North America</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.610181</lat>
    <lon>-73.92001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65389</plant_id>
    <plant_name>Midway Green Solar</plant_name>
    <state>SC</state>
    <county>Union</county>
    <operator>Midway Green Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.421</lat>
    <lon>-81.393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66567</plant_id>
    <plant_name>HEBHoustonDistributionCenter</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>32</generators>
    <nameplate_mw>12.8</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.8397</lat>
    <lon>-95.53685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>632</plant_id>
    <plant_name>Newcastle</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12.7</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>38.835182</lat>
    <lon>-121.093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6704</plant_id>
    <plant_name>Pebbly Beach Generating Station Hybrid</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Batteries</technologies>
    <generators>30</generators>
    <nameplate_mw>12.7</nameplate_mw>
    <summer_mw>12.7</summer_mw>
    <battery_mwh>6.8</battery_mwh>
    <first_year>1958</first_year>
    <latest_year>2012</latest_year>
    <lat>33.333056</lat>
    <lon>-118.3103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10504</plant_id>
    <plant_name>Amalgamated Sugar Twin Falls</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>The Amalgamated Sugar Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>12.7</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2025</latest_year>
    <lat>42.5328</lat>
    <lon>-114.4328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64603</plant_id>
    <plant_name>TPE King Solar Holdings1, LLC (CSG)</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.7</nameplate_mw>
    <summer_mw>12.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.979212</lat>
    <lon>-71.58131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7398</plant_id>
    <plant_name>Water Street Station</plant_name>
    <state>MI</state>
    <county>Bay</county>
    <operator>City of Bay City - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>12.6</nameplate_mw>
    <summer_mw>12.2</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1984</latest_year>
    <lat>43.582846</lat>
    <lon>-83.8967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10196</plant_id>
    <plant_name>Moose River</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>EONY Generation Limited</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12.6</nameplate_mw>
    <summer_mw>12.1</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.610664</lat>
    <lon>-75.34133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50373</plant_id>
    <plant_name>Paxton Creek Cogeneration</plant_name>
    <state>PA</state>
    <county>Dauphin</county>
    <operator>Energy Center Paxton LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>12.6</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>40.2653</lat>
    <lon>-76.8771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57202</plant_id>
    <plant_name>Jacksonville Solar</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>Jacksonville Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.6</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>30.320748</lat>
    <lon>-81.95638</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58352</plant_id>
    <plant_name>McKinley Paper Co. - Washington Mill</plant_name>
    <state>WA</state>
    <county>Clallam</county>
    <operator>McKinley Paper Co. - Washington Mill</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>12.6</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>48.134722</lat>
    <lon>-123.4656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59779</plant_id>
    <plant_name>Davis Monthan AFB (AZ) West Airfield</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.6</nameplate_mw>
    <summer_mw>12.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.17356</lat>
    <lon>-110.8997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62792</plant_id>
    <plant_name>DG AMP Solar Piqua Manier</plant_name>
    <state>OH</state>
    <county>Miami</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.6</nameplate_mw>
    <summer_mw>12.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.13043</lat>
    <lon>-84.25545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66392</plant_id>
    <plant_name>Jax LNG</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>Jax LNG</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>12.6</nameplate_mw>
    <summer_mw>12.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2023</latest_year>
    <lat>30.394298</lat>
    <lon>-81.55721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1970</plant_id>
    <plant_name>Detroit Lakes</plant_name>
    <state>MN</state>
    <county>Becker</county>
    <operator>City of Detroit Lakes - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>46.8175</lat>
    <lon>-95.84333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3779</plant_id>
    <plant_name>Reusens</plant_name>
    <state>VA</state>
    <county>Campbell</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1903</latest_year>
    <lat>37.4639</lat>
    <lon>-79.1856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10697</plant_id>
    <plant_name>St Francisville Mill</plant_name>
    <state>LA</state>
    <county>West Feliciana</county>
    <operator>Hood Container of Louisiana, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>16</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>30.7108</lat>
    <lon>-91.3236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>51038</plant_id>
    <plant_name>MacArthur Waste to Energy Facility</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Reworld MacArthur Renewable Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.7869</lat>
    <lon>-73.1064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54452</plant_id>
    <plant_name>Nutrien Kenai Nitrogen Operations</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Nutrien US LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1977</latest_year>
    <lat>60.6732</lat>
    <lon>-151.3784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56706</plant_id>
    <plant_name>Ampersand Chowchilla Biomass LLC</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Ampersand Chowchilla Biomass LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>37.106668</lat>
    <lon>-120.2485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56707</plant_id>
    <plant_name>El Nido Facility</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Merced Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>37.1867</lat>
    <lon>-120.4903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57118</plant_id>
    <plant_name>Greensburg</plant_name>
    <state>KS</state>
    <county>Kiowa</county>
    <operator>Greensburg Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>37.5499</lat>
    <lon>-99.3444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65972</plant_id>
    <plant_name>Raptor Ridge</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.146944</lat>
    <lon>-110.8781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66104</plant_id>
    <plant_name>Blue Elk VII Solar, LLC</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>Blue Elk VII Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>12.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.087</lat>
    <lon>-83.56749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68378</plant_id>
    <plant_name>Little Dixie</plant_name>
    <state>OK</state>
    <county>Coal</county>
    <operator>Peoples Electric Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>12.5</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.593851</lat>
    <lon>-96.29049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>813</plant_id>
    <plant_name>Cascade Dam (ID)</plant_name>
    <state>ID</state>
    <county>Valley</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1984</latest_year>
    <lat>44.5256</lat>
    <lon>-116.0483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1875</plant_id>
    <plant_name>Ubly</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Thumb Electric Coop of Mich</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>12.3</summer_mw>
    <first_year>1938</first_year>
    <latest_year>2002</latest_year>
    <lat>43.7217</lat>
    <lon>-82.9388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2357</plant_id>
    <plant_name>Garvins Falls</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>12.3</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1981</latest_year>
    <lat>43.165524</lat>
    <lon>-71.50944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2532</plant_id>
    <plant_name>Kent Falls</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>New York State Elec &amp; Gas Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1985</latest_year>
    <lat>44.7053</lat>
    <lon>-73.5967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52085</plant_id>
    <plant_name>Taft 26C Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>35.1133</lat>
    <lon>-119.4706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52104</plant_id>
    <plant_name>Cymric 36W Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>35.3633</lat>
    <lon>-119.6756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54520</plant_id>
    <plant_name>Village Creek Water Reclamation Facility</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Ft Worth, City of - (TX)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2001</latest_year>
    <lat>32.775093</lat>
    <lon>-97.14209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54604</plant_id>
    <plant_name>Warner Lambert</plant_name>
    <state>MI</state>
    <county>Washtenaw</county>
    <operator>University of Michigan NCampus Research</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>12.2</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2007</latest_year>
    <lat>42.299332</lat>
    <lon>-83.70532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58135</plant_id>
    <plant_name>Washington White Post Solar LLC</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>12.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.5052</lat>
    <lon>-76.8484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58328</plant_id>
    <plant_name>North Chicago Energy Center</plant_name>
    <state>IL</state>
    <county>Lake</county>
    <operator>Energy Systems Group LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>12.4</nameplate_mw>
    <summer_mw>12.3</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2005</latest_year>
    <lat>42.306389</lat>
    <lon>-87.85194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>936</plant_id>
    <plant_name>Carlyle</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>City of Carlyle - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>12.3</nameplate_mw>
    <summer_mw>12.3</summer_mw>
    <first_year>1964</first_year>
    <latest_year>2019</latest_year>
    <lat>38.6106</lat>
    <lon>-89.3583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2005</plant_id>
    <plant_name>Princeton (MN)</plant_name>
    <state>MN</state>
    <county>Mille Lacs</county>
    <operator>Princeton Public Utils Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>12.3</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>1953</first_year>
    <latest_year>2003</latest_year>
    <lat>45.569468</lat>
    <lon>-93.58724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4002</plant_id>
    <plant_name>Dells</plant_name>
    <state>WI</state>
    <county>Eau Claire</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>12.3</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1924</latest_year>
    <lat>44.828056</lat>
    <lon>-91.51111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10061</plant_id>
    <plant_name>Mars Wrigley Confectionery US, LLC</plant_name>
    <state>NJ</state>
    <county>WARREN</county>
    <operator>Mars Wrigley Confectionery US, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>12.3</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1989</latest_year>
    <lat>40.8625</lat>
    <lon>-74.825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52068</plant_id>
    <plant_name>Great Falls Hydro Project</plant_name>
    <state>NJ</state>
    <county>Passaic</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>12.3</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>40.915319</lat>
    <lon>-74.18099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67419</plant_id>
    <plant_name>CSWIND America Inc.</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>CS Wind America, Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12.3</nameplate_mw>
    <summer_mw>11.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.169473</lat>
    <lon>-104.619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10194</plant_id>
    <plant_name>Hawaii Cogen</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Island Energy Services</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>WO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>12.2</nameplate_mw>
    <summer_mw>12.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2011</latest_year>
    <lat>21.311667</lat>
    <lon>-158.1139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52036</plant_id>
    <plant_name>Yough Hydro Power</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>D/R Hydro Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>12.2</nameplate_mw>
    <summer_mw>12.2</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>39.801637</lat>
    <lon>-79.36821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>34</plant_id>
    <plant_name>Rollins</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Nevada Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12.1</nameplate_mw>
    <summer_mw>12.1</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>39.134259</lat>
    <lon>-120.9533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>227</plant_id>
    <plant_name>Coleman PH</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12.1</nameplate_mw>
    <summer_mw>13</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>40.404645</lat>
    <lon>-122.1219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>776</plant_id>
    <plant_name>Sly Creek</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>South Feather Water and Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12.1</nameplate_mw>
    <summer_mw>12.1</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>39.580413</lat>
    <lon>-121.1195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10593</plant_id>
    <plant_name>Agrilectric Power Partners Ltd</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Agrilectric Power Partners Ltd</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>12.1</nameplate_mw>
    <summer_mw>11.1</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>30.2012</lat>
    <lon>-93.1269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59448</plant_id>
    <plant_name>Waxdale</plant_name>
    <state>WI</state>
    <county>Racine</county>
    <operator>S.C. Johnson &amp; Son, Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas; Natural Gas Fired Combustion Turbine; Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>7</generators>
    <nameplate_mw>12.1</nameplate_mw>
    <summer_mw>12.1</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2024</latest_year>
    <lat>42.709444</lat>
    <lon>-87.88528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>95</plant_id>
    <plant_name>Wrangell</plant_name>
    <state>AK</state>
    <county>Wrangell Petersburg</county>
    <operator>City of Wrangell - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2020</latest_year>
    <lat>56.460976</lat>
    <lon>-132.3794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>390</plant_id>
    <plant_name>Solomon Gulch</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Copper Valley Elec Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>61.0828</lat>
    <lon>-146.3033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1509</plant_id>
    <plant_name>Weston Hydro</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>13.2</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1923</latest_year>
    <lat>44.763875</lat>
    <lon>-69.71828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1774</plant_id>
    <plant_name>Victoria Dam</plant_name>
    <state>MI</state>
    <county>Ontonagon</county>
    <operator>Upper Peninsula Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>46.6964</lat>
    <lon>-89.2089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1781</plant_id>
    <plant_name>Peavy Falls</plant_name>
    <state>MI</state>
    <county>Iron</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1943</latest_year>
    <lat>45.990781</lat>
    <lon>-88.21051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1894</plant_id>
    <plant_name>Fond Du Lac</plant_name>
    <state>MN</state>
    <county>St Louis</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>13.1</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>46.666768</lat>
    <lon>-92.2939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1929</plant_id>
    <plant_name>St James</plant_name>
    <state>MN</state>
    <county>Watonwan</county>
    <operator>City of St James - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>43.988158</lat>
    <lon>-94.61564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2192</plant_id>
    <plant_name>Mystic</plant_name>
    <state>MT</state>
    <county>Stillwater</county>
    <operator>NorthWestern Energy (MT Hydro)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>45.225741</lat>
    <lon>-109.7625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2294</plant_id>
    <plant_name>Ord</plant_name>
    <state>NE</state>
    <county>Valley</county>
    <operator>City of Ord - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1997</latest_year>
    <lat>41.604164</lat>
    <lon>-98.92614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2552</plant_id>
    <plant_name>Deferiet</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>44.0381</lat>
    <lon>-75.6806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3259</plant_id>
    <plant_name>Great Falls (SC)</plant_name>
    <state>SC</state>
    <county>Chester</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1907</first_year>
    <latest_year>1907</latest_year>
    <lat>34.5592</lat>
    <lon>-80.8917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3272</plant_id>
    <plant_name>99 Islands</plant_name>
    <state>SC</state>
    <county>Cherokee</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>15.2</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1910</latest_year>
    <lat>35.0314</lat>
    <lon>-81.4936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3782</plant_id>
    <plant_name>Bayview</plant_name>
    <state>VA</state>
    <county>Northampton</county>
    <operator>Calpine Mid-Atlantic Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12.6</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>37.2717</lat>
    <lon>-75.9682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3878</plant_id>
    <plant_name>Yelm</plant_name>
    <state>WA</state>
    <county>Thurston</county>
    <operator>City of Centralia - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1955</latest_year>
    <lat>46.974912</lat>
    <lon>-122.6358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6406</plant_id>
    <plant_name>Chandler</plant_name>
    <state>WA</state>
    <county>Benton</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1956</latest_year>
    <lat>46.26678</lat>
    <lon>-119.5898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7508</plant_id>
    <plant_name>Stone Creek</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Eugene Water &amp; Electric Board</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>45.081111</lat>
    <lon>-121.8866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7758</plant_id>
    <plant_name>South Plant (IA)</plant_name>
    <state>IA</state>
    <county>Bremer</county>
    <operator>Waverly Municipal Elec Utility - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>42.7317</lat>
    <lon>-92.4711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52076</plant_id>
    <plant_name>McKittrick Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.3161</lat>
    <lon>-119.6597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54267</plant_id>
    <plant_name>Koma Kulshan</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12.4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>48.680178</lat>
    <lon>-121.7233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54550</plant_id>
    <plant_name>W&amp;T Onshore Treating Facility (OTF)</plant_name>
    <state>AL</state>
    <county>Mobile</county>
    <operator>W&amp;T Offshore Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>4</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>11.1</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>30.43203</lat>
    <lon>-88.18241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56435</plant_id>
    <plant_name>Golden Valley Wind Park LLC</plant_name>
    <state>ID</state>
    <county>Cassia</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.436804</lat>
    <lon>-113.9255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56442</plant_id>
    <plant_name>Thousand Springs Wind Park</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.870278</lat>
    <lon>-114.9678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57662</plant_id>
    <plant_name>McGraw Hill Solar</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.279722</lat>
    <lon>-74.55639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57985</plant_id>
    <plant_name>SunE EPE2 LLC</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>SunE EPE2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>13.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.251667</lat>
    <lon>-106.9133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58234</plant_id>
    <plant_name>SEPV 8</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.171944</lat>
    <lon>-116.1525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58263</plant_id>
    <plant_name>Bay View Cogeneration Facility</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>COT/Division of Water Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2011</latest_year>
    <lat>41.688333</lat>
    <lon>-83.48472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58269</plant_id>
    <plant_name>Bay View Backup Power Facility</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>COT/Division of Water Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>41.688333</lat>
    <lon>-83.48472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58639</plant_id>
    <plant_name>KRS I Anahola Solar Hybrid</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Kauai Island Utility Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>22.131667</lat>
    <lon>-159.3031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58640</plant_id>
    <plant_name>KRS II Koloa Solar</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Kauai Island Utility Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>21.900833</lat>
    <lon>-159.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58718</plant_id>
    <plant_name>Orion Solar I</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Orion Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.150694</lat>
    <lon>-118.875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59086</plant_id>
    <plant_name>Cottonwood Solar, LLC (Goose Lake)</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.593611</lat>
    <lon>-119.58</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59087</plant_id>
    <plant_name>Cottonwood Solar, LLC (City of Corcoran)</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.134444</lat>
    <lon>-119.5544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59526</plant_id>
    <plant_name>Whitakers</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.127222</lat>
    <lon>-77.73444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59693</plant_id>
    <plant_name>Coastal Virginia Offshore Wind (CVOW) Pi</plant_name>
    <state>VA</state>
    <county>Virginia Beach</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Offshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Offshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.89155</lat>
    <lon>-75.4916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59947</plant_id>
    <plant_name>SR Camden</plant_name>
    <state>AR</state>
    <county>Calhoun</county>
    <operator>SR Camden, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.631538</lat>
    <lon>-92.70361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60681</plant_id>
    <plant_name>Annapolis Solar Park, LLC</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.992144</lat>
    <lon>-76.57377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60792</plant_id>
    <plant_name>Republic Services Renewable Energy, LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Republic Services Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.35867</lat>
    <lon>-114.8748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60996</plant_id>
    <plant_name>Iron Horse Battery Storage Hybrid</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <battery_mwh>2.5</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.098492</lat>
    <lon>-110.8191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61414</plant_id>
    <plant_name>NY Times Daily Production Facility</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>The NY Times Production Facility</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2008</latest_year>
    <lat>40.775397</lat>
    <lon>-73.83092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61464</plant_id>
    <plant_name>CoreSite Real Estate 2972 Stender, L.P.</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>CoreSite Real Estate 2972 Stender, L.P.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>37.376248</lat>
    <lon>-121.9707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61508</plant_id>
    <plant_name>Provo Power Plant</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Utah Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.2427</lat>
    <lon>-111.663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62346</plant_id>
    <plant_name>Trask East Solar</plant_name>
    <state>SC</state>
    <county>Beaufort</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.470606</lat>
    <lon>-80.74819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62582</plant_id>
    <plant_name>Newfield Community Solar LLC</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Newfield Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.39131</lat>
    <lon>-76.56424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63965</plant_id>
    <plant_name>Danville Farm, LLC</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Thor Solar 1 CEI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.591</lat>
    <lon>-79.302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64160</plant_id>
    <plant_name>SR North Stonington</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>SR North Stonington, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.434277</lat>
    <lon>-71.81404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65467</plant_id>
    <plant_name>Pennsauken Brownfield Solar</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.96307</lat>
    <lon>-75.07949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65951</plant_id>
    <plant_name>Bowling Green Energy Storage Project</plant_name>
    <state>OH</state>
    <county>Wood</county>
    <operator>VESI 21 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.382589</lat>
    <lon>-83.61123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69454</plant_id>
    <plant_name>Crosby Clean Energy Center (BESS)</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>On Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <battery_mwh>20.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.872984</lat>
    <lon>-95.01603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69456</plant_id>
    <plant_name>Maverick Clean Energy Center (BESS)</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>On Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <battery_mwh>20.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.364519</lat>
    <lon>-95.20221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69459</plant_id>
    <plant_name>Spencer Clean Energy Center (BESS)</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>On Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <battery_mwh>20.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.660045</lat>
    <lon>-95.19154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69460</plant_id>
    <plant_name>Winmil Clean Energy Center (BESS)</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>On Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <battery_mwh>20.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.225635</lat>
    <lon>-95.42969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69570</plant_id>
    <plant_name>Kieffer Funk</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.62498</lat>
    <lon>-77.6435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69670</plant_id>
    <plant_name>Samaritan Solar</plant_name>
    <state>PA</state>
    <county>Erie</county>
    <operator>Birch Creek Development</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>12</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.947629</lat>
    <lon>-79.84772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2574</plant_id>
    <plant_name>High Dam</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Oswego, City of - (NY)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>11.9</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1949</latest_year>
    <lat>43.4436</lat>
    <lon>-76.4961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56670</plant_id>
    <plant_name>Velva Windfarm LLC</plant_name>
    <state>ND</state>
    <county>McHenry</county>
    <operator>Acciona Wind Energy USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>11.9</nameplate_mw>
    <summer_mw>11.9</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>48.083625</lat>
    <lon>-100.9215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61026</plant_id>
    <plant_name>New York Presbyterian Hospital-168th St</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>New York Presbyterian Hospital- 168th Street</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>11.9</nameplate_mw>
    <summer_mw>11.9</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2008</latest_year>
    <lat>40.840854</lat>
    <lon>-73.94139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61342</plant_id>
    <plant_name>Barrett PV</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.9</nameplate_mw>
    <summer_mw>11.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.162207</lat>
    <lon>-71.86446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67534</plant_id>
    <plant_name>RB Inyokern Solar WDAT 1281 (CSG)</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.9</nameplate_mw>
    <summer_mw>11.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.659913</lat>
    <lon>-117.8103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>30</plant_id>
    <plant_name>Madelia</plant_name>
    <state>MN</state>
    <county>WATONWAN</county>
    <operator>City of Madelia - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>1954</first_year>
    <latest_year>2001</latest_year>
    <lat>44.0501</lat>
    <lon>-94.4178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>999</plant_id>
    <plant_name>Oakdale</plant_name>
    <state>IN</state>
    <county>Carroll</county>
    <operator>Northern Indiana Pub Serv Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>40.6564</lat>
    <lon>-86.7528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3825</plant_id>
    <plant_name>Pinnacles</plant_name>
    <state>VA</state>
    <county>Patrick</county>
    <operator>Northbrook Virginia Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.1</summer_mw>
    <first_year>1938</first_year>
    <latest_year>2021</latest_year>
    <lat>36.666866</lat>
    <lon>-80.4479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4214</plant_id>
    <plant_name>PHP 2</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>City of Portland (OR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>13.5</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>45.448977</lat>
    <lon>-122.1513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10139</plant_id>
    <plant_name>Isabella Hydro Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Isabella Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>35.64414</lat>
    <lon>-118.482</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52061</plant_id>
    <plant_name>Hartford Hospital Cogeneration</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Cartier Energy, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle; Other Natural Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2014</latest_year>
    <lat>41.7631</lat>
    <lon>-72.6733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55354</plant_id>
    <plant_name>Shaokatan Hills LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>Shaokatan Hills, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.421711</lat>
    <lon>-96.43469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56039</plant_id>
    <plant_name>H. Gonzales</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Vernon - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>33.9986</lat>
    <lon>-118.2219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56936</plant_id>
    <plant_name>Brookfield Power Glen Falls Hydro</plant_name>
    <state>NY</state>
    <county>Warren</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.3</summer_mw>
    <first_year>1944</first_year>
    <latest_year>1980</latest_year>
    <lat>43.308505</lat>
    <lon>-73.63658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56954</plant_id>
    <plant_name>Gastonia Prime Power Park</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2013</latest_year>
    <lat>35.3017</lat>
    <lon>-81.2092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57456</plant_id>
    <plant_name>San Emidio</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>USG Nevada LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.380556</lat>
    <lon>-119.3997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58228</plant_id>
    <plant_name>Milford Solar Farm</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Milford Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.923056</lat>
    <lon>-75.45333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63501</plant_id>
    <plant_name>Montclair State University Cogen</plant_name>
    <state>NJ</state>
    <county>Passaic</county>
    <operator>Cartier Energy, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2018</latest_year>
    <lat>40.865207</lat>
    <lon>-74.19665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67117</plant_id>
    <plant_name>Rhode Island Solar Renewable Energy IV,</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>Rhode Island Solar Renewable Energy IV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.613</lat>
    <lon>-71.156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67300</plant_id>
    <plant_name>Rattlesnake Ridge Battery Storage</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Rattlesnake Ridge Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <battery_mwh>47</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.197388</lat>
    <lon>-104.608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67304</plant_id>
    <plant_name>Davis Battery Storage</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Davis UP Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <battery_mwh>47</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.144366</lat>
    <lon>-104.7451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67305</plant_id>
    <plant_name>Bromley Battery Storage</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Bromley Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <battery_mwh>47</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.978775</lat>
    <lon>-104.7687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67306</plant_id>
    <plant_name>Keenesburg Battery Storage</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Keenesburg Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>11.8</summer_mw>
    <battery_mwh>47</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.146214</lat>
    <lon>-104.5487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67597</plant_id>
    <plant_name>Portage Solar Plant</plant_name>
    <state>WI</state>
    <county>Columbia</county>
    <operator>Portage Solar Plant</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.8</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.60706</lat>
    <lon>-89.24341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1278</plant_id>
    <plant_name>Garnett Municipal</plant_name>
    <state>KS</state>
    <county>Anderson</county>
    <operator>City of Garnett - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>11.7</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1930</first_year>
    <latest_year>2000</latest_year>
    <lat>38.2697</lat>
    <lon>-95.2447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10718</plant_id>
    <plant_name>Karen Avenue Wind Farm</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>San Gorgonio Farms Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>11.7</nameplate_mw>
    <summer_mw>11.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>33.92194</lat>
    <lon>-116.5622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50146</plant_id>
    <plant_name>Imperial Savannah LP</plant_name>
    <state>GA</state>
    <county>Chatham</county>
    <operator>US Sugar Savannah Refinery, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>11.7</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1946</first_year>
    <latest_year>1985</latest_year>
    <lat>32.143989</lat>
    <lon>-81.14655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1563</plant_id>
    <plant_name>Crisfield</plant_name>
    <state>MD</state>
    <county>Somerset</county>
    <operator>Calpine Mid-Atlantic Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>11.6</nameplate_mw>
    <summer_mw>10.4</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>37.994134</lat>
    <lon>-75.83768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1829</plant_id>
    <plant_name>Hillsdale</plant_name>
    <state>MI</state>
    <county>Hillsdale</county>
    <operator>Hillsdale Board of Public Wks</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>11.6</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1976</latest_year>
    <lat>41.9061</lat>
    <lon>-84.6319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2023</plant_id>
    <plant_name>Windom</plant_name>
    <state>MN</state>
    <county>Cottonwood</county>
    <operator>City of Windom (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>11.6</nameplate_mw>
    <summer_mw>10.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2024</latest_year>
    <lat>43.86811</lat>
    <lon>-95.11444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2685</plant_id>
    <plant_name>Crescent</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>11.6</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1991</latest_year>
    <lat>42.8056</lat>
    <lon>-73.72264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2686</plant_id>
    <plant_name>Vischer Ferry</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>11.6</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1991</latest_year>
    <lat>42.80746</lat>
    <lon>-73.84269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6618</plant_id>
    <plant_name>Highgate Falls</plant_name>
    <state>VT</state>
    <county>Franklin</county>
    <operator>Village of Swanton - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>11.6</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>1923</first_year>
    <latest_year>2012</latest_year>
    <lat>44.933611</lat>
    <lon>-73.05111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1261</plant_id>
    <plant_name>Augusta Electric Plant No 1</plant_name>
    <state>KS</state>
    <county>Butler</county>
    <operator>City of Augusta - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>1929</first_year>
    <latest_year>2016</latest_year>
    <lat>37.678454</lat>
    <lon>-96.97193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2519</plant_id>
    <plant_name>South Hampton</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>National Grid Generation LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>40.899997</lat>
    <lon>-72.38198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7646</plant_id>
    <plant_name>Monticello Dam</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Solano Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>38.513056</lat>
    <lon>-122.1044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7911</plant_id>
    <plant_name>Kern Canyon</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Kern and Tule Hydro LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>35.44072</lat>
    <lon>-118.7965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54472</plant_id>
    <plant_name>Simplot Phosphates</plant_name>
    <state>WY</state>
    <county>Sweetwater</county>
    <operator>Simplot Phosphates LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>41.5417</lat>
    <lon>-109.1328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55769</plant_id>
    <plant_name>Madison Windpower LLC</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Madison Windpower LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>42.894722</lat>
    <lon>-75.45167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55984</plant_id>
    <plant_name>CE Turbo LLC</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>33.1669</lat>
    <lon>-115.5114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56518</plant_id>
    <plant_name>South Energy Center</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Gainesville Regional Utilities</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2017</latest_year>
    <lat>29.6383</lat>
    <lon>-82.34</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57910</plant_id>
    <plant_name>Centennial Generating Station</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>City of Moorhead - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>46.8661</lat>
    <lon>-96.7464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58380</plant_id>
    <plant_name>JBER Landfill Gas Power Plant</plant_name>
    <state>AK</state>
    <county>Anchorage</county>
    <operator>Doyon Utilities, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2013</latest_year>
    <lat>61.286</lat>
    <lon>-149.61</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58404</plant_id>
    <plant_name>Pantex</plant_name>
    <state>TX</state>
    <county>Carson</county>
    <operator>Pantex (NNSA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.322778</lat>
    <lon>-101.5325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65151</plant_id>
    <plant_name>Energix Aditya, LLC</plant_name>
    <state>VA</state>
    <county>Louisa</county>
    <operator>Energix Aditya, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.5</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.017664</lat>
    <lon>-77.95287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1329</plant_id>
    <plant_name>Washington</plant_name>
    <state>KS</state>
    <county>Washington</county>
    <operator>City of Washington - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2024</latest_year>
    <lat>39.7306</lat>
    <lon>-96.9795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2011</plant_id>
    <plant_name>Sleepy Eye</plant_name>
    <state>MN</state>
    <county>Brown</county>
    <operator>Sleepy Eye Public Utility Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2009</latest_year>
    <lat>44.298116</lat>
    <lon>-94.72519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7373</plant_id>
    <plant_name>Towaoc</plant_name>
    <state>CO</state>
    <county>Montezuma</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>37.429538</lat>
    <lon>-108.5749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10221</plant_id>
    <plant_name>New York State Dam Hydro</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Boralex Hydro Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.781779</lat>
    <lon>-73.6961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54715</plant_id>
    <plant_name>Alliant SBD 9107 JBS USA</plant_name>
    <state>IA</state>
    <county>Marshall</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2000</latest_year>
    <lat>42.056</lat>
    <lon>-92.8971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56895</plant_id>
    <plant_name>Ameresco Ox Mountain</plant_name>
    <state>CA</state>
    <county>San Mateo</county>
    <operator>AMERESCO Ox Mountain Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>37.5</lat>
    <lon>-122.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58793</plant_id>
    <plant_name>JMB Mcguire-Dix-Lakehurst Solar Project</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.992818</lat>
    <lon>-74.63693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60311</plant_id>
    <plant_name>Portal Ridge Solar C, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Portal Ridge Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.71412</lat>
    <lon>-118.2739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62176</plant_id>
    <plant_name>Berry NMW Cogens</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Berry Petroleum Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>11.4</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.307555</lat>
    <lon>-119.6116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>353</plant_id>
    <plant_name>Poole</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>11.3</nameplate_mw>
    <summer_mw>11.3</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>37.944237</lat>
    <lon>-119.2161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>941</plant_id>
    <plant_name>Farmer City</plant_name>
    <state>IL</state>
    <county>DeWitt</county>
    <operator>City of Farmer City - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>11.3</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>1951</first_year>
    <latest_year>2012</latest_year>
    <lat>40.24611</lat>
    <lon>-88.63876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10175</plant_id>
    <plant_name>Childrens Hospital</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>DTE San Diego COGEN Inc.</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>11.3</nameplate_mw>
    <summer_mw>11.3</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2010</latest_year>
    <lat>32.7992</lat>
    <lon>-117.1517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50413</plant_id>
    <plant_name>Olmsted Waste Energy</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Olmsted County Public Works - (MN)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>11.3</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2010</latest_year>
    <lat>44.026072</lat>
    <lon>-92.43231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64611</plant_id>
    <plant_name>SEPV Sierra</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>SEPV Sierra, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>11.3</nameplate_mw>
    <summer_mw>11.3</summer_mw>
    <battery_mwh>3.4</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.733011</lat>
    <lon>-118.1385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8004</plant_id>
    <plant_name>Fife Brook</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Bear Swamp Power Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1974</latest_year>
    <lat>42.685681</lat>
    <lon>-72.97763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50572</plant_id>
    <plant_name>CSL Gas Recovery</plant_name>
    <state>FL</state>
    <county>Broward</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>10.9</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2000</latest_year>
    <lat>26.287966</lat>
    <lon>-80.16653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54536</plant_id>
    <plant_name>Sumpter Energy Associates</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>14</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1998</latest_year>
    <lat>42.105669</lat>
    <lon>-83.49885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54700</plant_id>
    <plant_name>Metro Methane Recovery Facility</plant_name>
    <state>IA</state>
    <county>Polk</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>11</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2014</latest_year>
    <lat>41.598889</lat>
    <lon>-93.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55353</plant_id>
    <plant_name>Lakota Ridge LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>Lakota Ridge, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.39956</lat>
    <lon>-96.42837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56250</plant_id>
    <plant_name>Ontario LFGTE</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Seneca Energy II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>11</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2013</latest_year>
    <lat>42.8586</lat>
    <lon>-77.0872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56294</plant_id>
    <plant_name>Bayway Refinery</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Phillips 66</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>40.637554</lat>
    <lon>-74.22122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57324</plant_id>
    <plant_name>Luke Solar</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.526111</lat>
    <lon>-112.3794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58476</plant_id>
    <plant_name>Dart Container Corp</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Dart Container Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.086463</lat>
    <lon>-76.17603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61387</plant_id>
    <plant_name>Georgia LFG Richland Creek Plant</plant_name>
    <state>GA</state>
    <county>Gwinnett</county>
    <operator>Cube District Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.127146</lat>
    <lon>-84.03338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61676</plant_id>
    <plant_name>NCSU Cates Cogeneration Plant</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>NC State University, Energy Systems</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.784027</lat>
    <lon>-78.6747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62762</plant_id>
    <plant_name>NASA Johnson Space Center CHP</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Energy Systems Group LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.562372</lat>
    <lon>-95.0893</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64695</plant_id>
    <plant_name>Angel Fire Energy Facility</plant_name>
    <state>NM</state>
    <county>Colfax</county>
    <operator>Angel Fire Energy Facility, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.416867</lat>
    <lon>-105.2807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66595</plant_id>
    <plant_name>FTBLID2</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>28</generators>
    <nameplate_mw>11.2</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.575316</lat>
    <lon>-95.63688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1258</plant_id>
    <plant_name>Anthony</plant_name>
    <state>KS</state>
    <county>Harper</county>
    <operator>City of Anthony - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>11.1</nameplate_mw>
    <summer_mw>11.1</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1981</latest_year>
    <lat>37.1517</lat>
    <lon>-98.0311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57764</plant_id>
    <plant_name>Naval Air Weapons Station China Lake</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11.1</nameplate_mw>
    <summer_mw>11.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.68771</lat>
    <lon>-117.6814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58173</plant_id>
    <plant_name>BMW Manufacturing Co</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>BMW Manufacturing Co LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>11.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2012</latest_year>
    <lat>34.894167</lat>
    <lon>-82.17833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58947</plant_id>
    <plant_name>Bristol Myers Squibb Lawrenceville</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Bristol-Myers Squibb Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>11.1</nameplate_mw>
    <summer_mw>10.3</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2021</latest_year>
    <lat>40.324722</lat>
    <lon>-74.70778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1332</plant_id>
    <plant_name>West 14th Street</plant_name>
    <state>KS</state>
    <county>Cowley</county>
    <operator>City of Winfield - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11.1</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1962</latest_year>
    <lat>37.2354</lat>
    <lon>-97.011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1868</plant_id>
    <plant_name>Dafter</plant_name>
    <state>MI</state>
    <county>Chippewa</county>
    <operator>Cloverland Electric Co-op</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>1960</first_year>
    <latest_year>2021</latest_year>
    <lat>46.37437</lat>
    <lon>-84.41723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1967</plant_id>
    <plant_name>Blue Earth</plant_name>
    <state>MN</state>
    <county>Faribault</county>
    <operator>Blue Earth Light &amp; Water</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>1960</first_year>
    <latest_year>2015</latest_year>
    <lat>43.6375</lat>
    <lon>-94.10167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2002</plant_id>
    <plant_name>North Branch (MN)</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>North Branch Water &amp; Light Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2011</latest_year>
    <lat>45.510601</lat>
    <lon>-92.97904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3026</plant_id>
    <plant_name>Fish Creek</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>10.4</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>43.274221</lat>
    <lon>-122.449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3037</plant_id>
    <plant_name>Soda Springs</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>43.3061</lat>
    <lon>-122.5014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7886</plant_id>
    <plant_name>Wind Turbine</plant_name>
    <state>WI</state>
    <county>Kewaunee</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.6694</lat>
    <lon>-87.6333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50621</plant_id>
    <plant_name>Central Power Plant</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>State of Rhode Island</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine; Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>8.1</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2015</latest_year>
    <lat>41.744973</lat>
    <lon>-71.45842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54408</plant_id>
    <plant_name>UW Madison Charter Street Plant</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>State of Wisconsin</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>43.07</lat>
    <lon>-89.4006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57896</plant_id>
    <plant_name>Concord Energy</plant_name>
    <state>NC</state>
    <county>Cabarrus</county>
    <operator>Concord Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.34598</lat>
    <lon>-80.67039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61901</plant_id>
    <plant_name>Redstone Arsenal Hybrid</plant_name>
    <state>AL</state>
    <county>Madison</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.610987</lat>
    <lon>-86.61155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62682</plant_id>
    <plant_name>Noland Wastewater Treatment Plant Hybrid</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <battery_mwh>13.1</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.082301</lat>
    <lon>-94.06715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62683</plant_id>
    <plant_name>Westside Wastewater Treatment Plant Hybr</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <battery_mwh>13.1</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.04135</lat>
    <lon>-94.14008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63735</plant_id>
    <plant_name>Silverstrand Grid Energy Storage System</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Silverstrand Grid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <battery_mwh>44</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.20774</lat>
    <lon>-119.0798</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63995</plant_id>
    <plant_name>Trenton</plant_name>
    <state>FL</state>
    <county>Gilchrist</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <battery_mwh>10.1</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.613561</lat>
    <lon>-82.80689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64190</plant_id>
    <plant_name>Waipio Peninsula</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Pacific Energy Solutions, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>21.363514</lat>
    <lon>-157.9856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64910</plant_id>
    <plant_name>Brighter Future Solar</plant_name>
    <state>NC</state>
    <county>Caldwell</county>
    <operator>Brighter Future Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.816094</lat>
    <lon>-81.37166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67163</plant_id>
    <plant_name>Auburn Renewables LLC</plant_name>
    <state>IN</state>
    <county>Dekalb</county>
    <operator>Auburn Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.343</lat>
    <lon>-85.092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68041</plant_id>
    <plant_name>Overland</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.135008</lat>
    <lon>-104.6454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69259</plant_id>
    <plant_name>Changewater 1</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.73639</lat>
    <lon>-74.95056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69988</plant_id>
    <plant_name>Warsaw 2 Energy Storage</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>11</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.003702</lat>
    <lon>-78.1165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1286</plant_id>
    <plant_name>Hoisington</plant_name>
    <state>KS</state>
    <county>Barton</county>
    <operator>City of Hoisington - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.9</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>1961</first_year>
    <latest_year>2023</latest_year>
    <lat>38.513</lat>
    <lon>-98.7747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1670</plant_id>
    <plant_name>High Street Station</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Town of Ipswich - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>10.9</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1986</latest_year>
    <lat>42.6986</lat>
    <lon>-70.8697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2115</plant_id>
    <plant_name>Butler Municipal Power Plant</plant_name>
    <state>MO</state>
    <county>Bates</county>
    <operator>City of Butler - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.9</nameplate_mw>
    <summer_mw>9.3</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2000</latest_year>
    <lat>38.264408</lat>
    <lon>-94.34439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2125</plant_id>
    <plant_name>Fayette</plant_name>
    <state>MO</state>
    <county>Howard</county>
    <operator>City of Fayette - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.9</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1985</latest_year>
    <lat>39.1406</lat>
    <lon>-92.68</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58056</plant_id>
    <plant_name>Irwindale Brew Yard, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Irwindale Brew Yard, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>10.9</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2007</latest_year>
    <lat>34.121667</lat>
    <lon>-117.9383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58398</plant_id>
    <plant_name>Heber Solar</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Axium US Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.9</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.7125</lat>
    <lon>-115.5406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64072</plant_id>
    <plant_name>Camp Ripley Solar</plant_name>
    <state>MN</state>
    <county>Morrison</county>
    <operator>Camp Riley Solar Facility</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.9</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>46.091</lat>
    <lon>-94.34</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69725</plant_id>
    <plant_name>Warroad Factory</plant_name>
    <state>MN</state>
    <county>Roseau</county>
    <operator>Marvin</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Batteries; Natural Gas Internal Combustion Engine</technologies>
    <generators>15</generators>
    <nameplate_mw>10.9</nameplate_mw>
    <summer_mw>10.9</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>1983</first_year>
    <latest_year>2025</latest_year>
    <lat>48.916352</lat>
    <lon>-95.32646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>354</plant_id>
    <plant_name>Portal</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1956</latest_year>
    <lat>37.257045</lat>
    <lon>-119.1589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>537</plant_id>
    <plant_name>Camanche</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>East Bay Municipal Util Dist - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>38.2268</lat>
    <lon>-121.0245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>935</plant_id>
    <plant_name>Bushnell</plant_name>
    <state>IL</state>
    <county>McDonough</county>
    <operator>City of Bushnell - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1940</first_year>
    <latest_year>2000</latest_year>
    <lat>40.548586</lat>
    <lon>-90.51381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1279</plant_id>
    <plant_name>Girard</plant_name>
    <state>KS</state>
    <county>Crawford</county>
    <operator>City of Girard - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1997</latest_year>
    <lat>37.507709</lat>
    <lon>-94.83932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2631</plant_id>
    <plant_name>Rio</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.9</summer_mw>
    <first_year>1927</first_year>
    <latest_year>2013</latest_year>
    <lat>41.4625</lat>
    <lon>-74.7578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2749</plant_id>
    <plant_name>Tennessee Creek</plant_name>
    <state>NC</state>
    <county>Jackson</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>11.5</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1955</latest_year>
    <lat>35.2139</lat>
    <lon>-83.0028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7774</plant_id>
    <plant_name>Cleveland Peaking</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.556714</lat>
    <lon>-81.58823</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7777</plant_id>
    <plant_name>Dover Peaking</plant_name>
    <state>OH</state>
    <county>Tuscarawas</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>40.5416</lat>
    <lon>-81.4985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7779</plant_id>
    <plant_name>Bryan Peaking</plant_name>
    <state>OH</state>
    <county>Williams</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>41.4609</lat>
    <lon>-84.527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7791</plant_id>
    <plant_name>Montpelier</plant_name>
    <state>OH</state>
    <county>Williams</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.5855</lat>
    <lon>-84.5794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8020</plant_id>
    <plant_name>Baldwin City Plant No 2</plant_name>
    <state>KS</state>
    <county>Douglas</county>
    <operator>City of Baldwin City- (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2025</latest_year>
    <lat>38.764905</lat>
    <lon>-95.19201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55274</plant_id>
    <plant_name>State Farm Support Center East</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>State Farm Mutual Auto Ins Co</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>34.086</lat>
    <lon>-84.245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55390</plant_id>
    <plant_name>State Farm Insur Support Center Central</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>State Farm Mutual Auto Ins Co</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>32.9192</lat>
    <lon>-96.9894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56686</plant_id>
    <plant_name>King &amp; Queen</plant_name>
    <state>VA</state>
    <county>King and Queen</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>36</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>37.6711</lat>
    <lon>-76.76</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57788</plant_id>
    <plant_name>US GSA Heating and Transmission</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>US GSA Heating and Transmission</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>38.885709</lat>
    <lon>-77.02837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58147</plant_id>
    <plant_name>Prescott Solar Plant</plant_name>
    <state>AZ</state>
    <county>Yavapai</county>
    <operator>SunE AZ1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.649444</lat>
    <lon>-112.4275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60226</plant_id>
    <plant_name>Rancho Seco Solar, LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Rancho Seco Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.339857</lat>
    <lon>-121.1145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61521</plant_id>
    <plant_name>Swamp Fox Solar</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.791505</lat>
    <lon>-81.25617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61522</plant_id>
    <plant_name>Champion Solar</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.794732</lat>
    <lon>-81.26242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61822</plant_id>
    <plant_name>Princeton Energy Center, LLC</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Princeton Energy Center LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine; Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.339838</lat>
    <lon>-74.62393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62447</plant_id>
    <plant_name>Mount Sinai South Nassau Hospital</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Mount Sinai South Nassau Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2025</latest_year>
    <lat>40.651614</lat>
    <lon>-73.62993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63062</plant_id>
    <plant_name>Fort Valley State University Solar</plant_name>
    <state>GA</state>
    <county>Peach</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.501558</lat>
    <lon>-83.88339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64080</plant_id>
    <plant_name>Dane County Airport Solar</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.160591</lat>
    <lon>-89.3295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66437</plant_id>
    <plant_name>Niles RTO BTM</plant_name>
    <state>OH</state>
    <county>Trumbull</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.168019</lat>
    <lon>-80.75292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66450</plant_id>
    <plant_name>Quakertown PA BTM</plant_name>
    <state>PA</state>
    <county>Bucks</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.446517</lat>
    <lon>-75.34042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66453</plant_id>
    <plant_name>Wadsworth IPS RTO BTM</plant_name>
    <state>OH</state>
    <county>Medina</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.086303</lat>
    <lon>-81.72744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66464</plant_id>
    <plant_name>Wadsworth HBS RTO BTM</plant_name>
    <state>OH</state>
    <county>Medina</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.03539</lat>
    <lon>-81.74896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68928</plant_id>
    <plant_name>Richland Township Solar II, LLC</plant_name>
    <state>IL</state>
    <county>Marshall</county>
    <operator>Birch Creek Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.8</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.94425</lat>
    <lon>-89.26966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10275</plant_id>
    <plant_name>Florida's Natural Growers</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Citrus World Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>10.7</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2000</latest_year>
    <lat>27.9114</lat>
    <lon>-81.6006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1376</plant_id>
    <plant_name>Paris (KY)</plant_name>
    <state>KY</state>
    <county>Bourbon</county>
    <operator>City of Paris - (KY)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>10.8</summer_mw>
    <first_year>1934</first_year>
    <latest_year>1974</latest_year>
    <lat>38.2049</lat>
    <lon>-84.2383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2233</plant_id>
    <plant_name>David City</plant_name>
    <state>NE</state>
    <county>Butler</county>
    <operator>City of David City -(NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1996</latest_year>
    <lat>41.254652</lat>
    <lon>-97.1192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3283</plant_id>
    <plant_name>Columbia Canal Hydro</plant_name>
    <state>SC</state>
    <county>Richland</county>
    <operator>City of Columbia - (SC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1953</latest_year>
    <lat>33.9972</lat>
    <lon>-81.0494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3421</plant_id>
    <plant_name>Wilbur</plant_name>
    <state>TN</state>
    <county>Carter</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>11.1</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1950</latest_year>
    <lat>36.341667</lat>
    <lon>-82.12639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10123</plant_id>
    <plant_name>Hoffmann LaRoche</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>PB Nutclif Master, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.8359</lat>
    <lon>-74.155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56447</plant_id>
    <plant_name>Hawi Wind Farm</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>20.257252</lat>
    <lon>-155.8504</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58009</plant_id>
    <plant_name>SunE CPS3 LLC</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>REC Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>29.221944</lat>
    <lon>-98.66917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58181</plant_id>
    <plant_name>Loyola University Health Plant</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Loyola University Health System</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>41.855833</lat>
    <lon>-87.83556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60679</plant_id>
    <plant_name>Fort Rucker Solar Array</plant_name>
    <state>AL</state>
    <county>Dale</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.331148</lat>
    <lon>-85.73019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62903</plant_id>
    <plant_name>NorthPark Solar</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.257726</lat>
    <lon>-74.44197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63893</plant_id>
    <plant_name>GD Hopkinton Main I, LLC</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>GD Hopkinton Main I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>10.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.438293</lat>
    <lon>-71.78109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66178</plant_id>
    <plant_name>South 49th 013445 SCS Norfolk, LLC</plant_name>
    <state>NE</state>
    <county>Madison</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>10.6</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.0312</lat>
    <lon>-97.48271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>109</plant_id>
    <plant_name>Dillingham</plant_name>
    <state>AK</state>
    <county>Dillingham</county>
    <operator>Nushagak Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2019</latest_year>
    <lat>59.042914</lat>
    <lon>-158.4686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1155</plant_id>
    <plant_name>Lamoni Municipal Utilities</plant_name>
    <state>IA</state>
    <county>Decatur</county>
    <operator>City of Lamoni - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1940</first_year>
    <latest_year>2011</latest_year>
    <lat>40.622</lat>
    <lon>-93.9326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1493</plant_id>
    <plant_name>Hiram</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>11.6</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1985</latest_year>
    <lat>43.8525</lat>
    <lon>-70.7969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50280</plant_id>
    <plant_name>Dahowa Hydro</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>GR Catalyst Two LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.1033</lat>
    <lon>-73.5369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50411</plant_id>
    <plant_name>Rutgers Biomedical and Health Cogen</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Rutgers, The State University of NJ</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.73928</lat>
    <lon>-74.18763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50741</plant_id>
    <plant_name>Pontook Hydro Facility</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>Pontook Operating LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.632842</lat>
    <lon>-71.24742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52078</plant_id>
    <plant_name>North Midway Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>35.2761</lat>
    <lon>-119.5986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54829</plant_id>
    <plant_name>Bristol Myers Squibb New Brunswick</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Bristol-Myers Squibb Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1999</latest_year>
    <lat>40.475724</lat>
    <lon>-74.4462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56308</plant_id>
    <plant_name>Fossil Gulch</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>42.858056</lat>
    <lon>-114.9494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56440</plant_id>
    <plant_name>Pilgrim Stage Wind Park</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.7975</lat>
    <lon>-114.9986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56443</plant_id>
    <plant_name>Tuana Gulch Wind Park</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Wind Partners 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.836854</lat>
    <lon>-114.9693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56682</plant_id>
    <plant_name>Brunswick Landfill Gas</plant_name>
    <state>VA</state>
    <county>Brunswick</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>35</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>36.7639</lat>
    <lon>-77.8108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57251</plant_id>
    <plant_name>Lakota Wind Wind Farm</plant_name>
    <state>IA</state>
    <county>Kossuth</county>
    <operator>Iowa Lakes Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.3839</lat>
    <lon>-94.1475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57252</plant_id>
    <plant_name>Iowa Lakes Superior Wind Farm</plant_name>
    <state>IA</state>
    <county>Dickinson</county>
    <operator>Iowa Lakes Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.445</lat>
    <lon>-94.98028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57775</plant_id>
    <plant_name>Kingman 1</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Kingman Energy Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.145833</lat>
    <lon>-114.0675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59407</plant_id>
    <plant_name>Newman Solar</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>Newman Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>31.978333</lat>
    <lon>-106.4275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60197</plant_id>
    <plant_name>Santolina Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.029719</lat>
    <lon>-106.8555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60945</plant_id>
    <plant_name>Spartan PV 1, LLC</plant_name>
    <state>MI</state>
    <county>Ingham</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.7151</lat>
    <lon>-84.4824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61013</plant_id>
    <plant_name>Marin Clean Energy Solar One</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.945296</lat>
    <lon>-122.3772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65499</plant_id>
    <plant_name>Danville BESS 1</plant_name>
    <state>VA</state>
    <county>Danville City</county>
    <operator>Doc Brown LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.5</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <battery_mwh>24.6</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.578864</lat>
    <lon>-79.38409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1266</plant_id>
    <plant_name>Burlington (KS)</plant_name>
    <state>KS</state>
    <county>Coffey</county>
    <operator>City of Burlington - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10.4</summer_mw>
    <first_year>1962</first_year>
    <latest_year>2005</latest_year>
    <lat>38.193441</lat>
    <lon>-95.74995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6483</plant_id>
    <plant_name>Mcindoes</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>44.2603</lat>
    <lon>-72.0592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7264</plant_id>
    <plant_name>Miki Basin</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Maui Electric Co Ltd</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1996</latest_year>
    <lat>20.79</lat>
    <lon>-156.9342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52024</plant_id>
    <plant_name>Rhode Island Hospital</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Rhode Island Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10.4</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1993</latest_year>
    <lat>41.8103</lat>
    <lon>-71.41</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54827</plant_id>
    <plant_name>Wailuku River Hydroelectric</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Wailuku Holding Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>19.712994</lat>
    <lon>-155.1486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55053</plant_id>
    <plant_name>Bridgeport Gas Processing Plant</plant_name>
    <state>TX</state>
    <county>Wise</county>
    <operator>EnLink Midstream Services, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>13</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10.4</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2013</latest_year>
    <lat>33.195763</lat>
    <lon>-97.80255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55370</plant_id>
    <plant_name>Green Mountain Storage, LLC</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Green Mountain Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10.4</summer_mw>
    <battery_mwh>10.4</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.851389</lat>
    <lon>-79.07056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56543</plant_id>
    <plant_name>Eastridge Wind Project</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Eastridge Wind Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10.4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.9358</lat>
    <lon>-95.9222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57599</plant_id>
    <plant_name>Fort Hill 1, 2, 3 &amp; 4</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.4711</lat>
    <lon>-72.1022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59415</plant_id>
    <plant_name>Backus Microgrid Project</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.542778</lat>
    <lon>-72.09361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64515</plant_id>
    <plant_name>Stamford Health</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Stamford Health Systems, Inc.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Other Natural Gas</technologies>
    <generators>9</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>10.5</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2023</latest_year>
    <lat>41.055636</lat>
    <lon>-73.55198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65836</plant_id>
    <plant_name>Toyah Power Station</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.4</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.113909</lat>
    <lon>-103.6655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1326</plant_id>
    <plant_name>Sterling</plant_name>
    <state>KS</state>
    <county>Rice</county>
    <operator>City of Sterling - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>10.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>1950</first_year>
    <latest_year>2002</latest_year>
    <lat>38.2143</lat>
    <lon>-98.2071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59035</plant_id>
    <plant_name>Biomass to Energy Facility, Kauai</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Mahipapa LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>10.3</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2016</latest_year>
    <lat>21.965278</lat>
    <lon>-159.4606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59811</plant_id>
    <plant_name>Rockfish Solar LLC</plant_name>
    <state>MD</state>
    <county>Charles</county>
    <operator>Rockfish Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.3</nameplate_mw>
    <summer_mw>10.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.591545</lat>
    <lon>-76.87486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>262</plant_id>
    <plant_name>Narrows PH</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Yuba County Water Agency - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>12</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1942</latest_year>
    <lat>39.2364</lat>
    <lon>-121.2717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1996</plant_id>
    <plant_name>Moose Lake</plant_name>
    <state>MN</state>
    <county>Carlton</county>
    <operator>Moose Lake Water &amp; Light Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2019</latest_year>
    <lat>46.454097</lat>
    <lon>-92.76056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6396</plant_id>
    <plant_name>Black Canyon</plant_name>
    <state>ID</state>
    <county>Gem</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>43.930462</lat>
    <lon>-116.4372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7767</plant_id>
    <plant_name>Bloomington Power Plant</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>City of St George - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>37.041997</lat>
    <lon>-113.6267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50080</plant_id>
    <plant_name>Otis Hydro</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>44.477807</lat>
    <lon>-70.20076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60293</plant_id>
    <plant_name>St. Matthews Solar</plant_name>
    <state>SC</state>
    <county>Calhoun</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.6867</lat>
    <lon>-80.7586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61529</plant_id>
    <plant_name>Estill Solar II</plant_name>
    <state>SC</state>
    <county>Allendale</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.727842</lat>
    <lon>-81.25345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61530</plant_id>
    <plant_name>Gaston Solar I - SC</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.774657</lat>
    <lon>-81.11055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61748</plant_id>
    <plant_name>Southern Current One, LLC</plant_name>
    <state>SC</state>
    <county>Allendale</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.2</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.947262</lat>
    <lon>-81.21594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>72</plant_id>
    <plant_name>Venice Hydro</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>34.01135</lat>
    <lon>-118.4168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2681</plant_id>
    <plant_name>Greenport</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Village of Greenport - (NY)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1997</latest_year>
    <lat>41.1055</lat>
    <lon>-72.3758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57256</plant_id>
    <plant_name>PA Solar Park</plant_name>
    <state>PA</state>
    <county>Carbon</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.860142</lat>
    <lon>-75.85221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57739</plant_id>
    <plant_name>SPS4 Monument</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>SunE SPS4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.681944</lat>
    <lon>-103.3036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57740</plant_id>
    <plant_name>SPS5 Hopi</plant_name>
    <state>NM</state>
    <county>Eddy</county>
    <operator>SunE SPS5, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.345556</lat>
    <lon>-104.2347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58330</plant_id>
    <plant_name>The Andersons Albion Ethanol LLC</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>The Andersons Albion Ethanol LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2016</latest_year>
    <lat>42.256111</lat>
    <lon>-84.78833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58556</plant_id>
    <plant_name>Indy Solar II, LLC</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.662778</lat>
    <lon>-85.98556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64510</plant_id>
    <plant_name>Arba Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Greene</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.419641</lat>
    <lon>-77.72909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69453</plant_id>
    <plant_name>Alamo Clean Energy Center (BESS)</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>On Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.902391</lat>
    <lon>-102.8728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69455</plant_id>
    <plant_name>Fort Stockton Clean Energy Center (BESS)</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>On Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.891456</lat>
    <lon>-102.8828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69457</plant_id>
    <plant_name>Mesquite Clean Energy Center (BESS)</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>On Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.098447</lat>
    <lon>-97.82261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69458</plant_id>
    <plant_name>North Pecos Clean Energy Center (BESS)</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>On Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.422461</lat>
    <lon>-103.5091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69727</plant_id>
    <plant_name>Martinsville BESS</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <battery_mwh>10.1</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.685297</lat>
    <lon>-79.87244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69728</plant_id>
    <plant_name>Shelby BESS</plant_name>
    <state>OH</state>
    <county>Richland</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10.1</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <battery_mwh>10.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.896525</lat>
    <lon>-82.67233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>243</plant_id>
    <plant_name>Hat Creek 1</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>40.929297</lat>
    <lon>-121.5445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>244</plant_id>
    <plant_name>Hat Creek 2</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>40.960675</lat>
    <lon>-121.5487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>385</plant_id>
    <plant_name>Drop 2 (CA)</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>32.705435</lat>
    <lon>-115.031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>414</plant_id>
    <plant_name>Beardsley</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Oakdale&amp;South San Joaquin Irrigation D.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>38.202569</lat>
    <lon>-120.077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>418</plant_id>
    <plant_name>Kelly Ridge</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>South Feather Water and Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1963</latest_year>
    <lat>39.531784</lat>
    <lon>-121.4912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>534</plant_id>
    <plant_name>Jones Fork</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>38.850283</lat>
    <lon>-120.3819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1124</plant_id>
    <plant_name>Atlantic</plant_name>
    <state>IA</state>
    <county>Cass</county>
    <operator>Atlantic Municipal Utilities (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>41.409</lat>
    <lon>-95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2569</plant_id>
    <plant_name>Granby</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>43.323441</lat>
    <lon>-76.42084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2586</plant_id>
    <plant_name>Minetto</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1915</latest_year>
    <lat>43.4003</lat>
    <lon>-76.4739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4185</plant_id>
    <plant_name>Fontenelle</plant_name>
    <state>WY</state>
    <county>Lincoln</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>11.2</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>42.027013</lat>
    <lon>-110.064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6516</plant_id>
    <plant_name>Rocky Ford</plant_name>
    <state>CO</state>
    <county>Otero</county>
    <operator>Black Hills Colorado Electric, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>38.0492</lat>
    <lon>-103.7136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7511</plant_id>
    <plant_name>McNary Dam Fish Attraction Project</plant_name>
    <state>WA</state>
    <county>Benton</county>
    <operator>Northern Wasco County PUD - (OR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>45.940034</lat>
    <lon>-119.2991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7723</plant_id>
    <plant_name>Nymans Plant Microgrid</plant_name>
    <state>AK</state>
    <county>Kodiak Island</county>
    <operator>Kodiak Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2000</latest_year>
    <lat>57.731608</lat>
    <lon>-152.507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7995</plant_id>
    <plant_name>Airport Industrial</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Black Hills Colorado Electric, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>38.2844</lat>
    <lon>-104.5308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>9096</plant_id>
    <plant_name>Upper Falls</plant_name>
    <state>WA</state>
    <county>Spokane</county>
    <operator>Avista Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10.2</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>47.654444</lat>
    <lon>-117.4189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10253</plant_id>
    <plant_name>Haypress</plant_name>
    <state>CA</state>
    <county>Sierra</county>
    <operator>EIF Haypress LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1989</latest_year>
    <lat>39.565677</lat>
    <lon>-120.5817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10480</plant_id>
    <plant_name>Mammoth G1</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>37.6451</lat>
    <lon>-118.9143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10878</plant_id>
    <plant_name>Salton Sea Power Gen Co - Unit 1</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>CalEnergy Operating Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>33.158</lat>
    <lon>-115.6475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56127</plant_id>
    <plant_name>Macon Energy Center</plant_name>
    <state>MO</state>
    <county>Macon</county>
    <operator>City of Macon - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10.9</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>39.748975</lat>
    <lon>-92.38448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56503</plant_id>
    <plant_name>Riley Generating Station</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>City of Zeeland - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>42.8333</lat>
    <lon>-86.0053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56545</plant_id>
    <plant_name>Seneca City of</plant_name>
    <state>SC</state>
    <county>Oconee</county>
    <operator>City of Seneca - (SC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>34.6875</lat>
    <lon>-82.9525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56561</plant_id>
    <plant_name>Filet Wind (5) LLC</plant_name>
    <state>TX</state>
    <county>Sherman</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>36.4453</lat>
    <lon>-101.8761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56562</plant_id>
    <plant_name>Tenderloin Wind (6) LLC</plant_name>
    <state>TX</state>
    <county>Sherman</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>36.4669</lat>
    <lon>-101.8222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56835</plant_id>
    <plant_name>Ribeye Wind (11) LLC</plant_name>
    <state>TX</state>
    <county>Moore</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>35.8119</lat>
    <lon>-101.9789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56837</plant_id>
    <plant_name>Tri-Tip Wind (9) LLC</plant_name>
    <state>TX</state>
    <county>Moore</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>35.9614</lat>
    <lon>-101.8033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56838</plant_id>
    <plant_name>Brisket Wind (8) LLC</plant_name>
    <state>TX</state>
    <county>Moore</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>36.0075</lat>
    <lon>-101.8614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56839</plant_id>
    <plant_name>Flat Iron Wind (7) LLC</plant_name>
    <state>TX</state>
    <county>Moore</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>36.0264</lat>
    <lon>-101.9</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56930</plant_id>
    <plant_name>Space Coast Next Gen Solar Energy</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>28.4586</lat>
    <lon>-80.6811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56944</plant_id>
    <plant_name>CM10</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>35.7881</lat>
    <lon>-114.9933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56970</plant_id>
    <plant_name>Four Mile Canyon Windfarm LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Echo 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.6447</lat>
    <lon>-119.4533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57203</plant_id>
    <plant_name>Wyandot Solar Farm</plant_name>
    <state>OH</state>
    <county>Wyandot</county>
    <operator>Wyandot Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.8795</lat>
    <lon>-83.31707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57240</plant_id>
    <plant_name>Roth Rock North Wind Farm, LLC</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Roth Rock Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.287222</lat>
    <lon>-79.43444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57337</plant_id>
    <plant_name>Dover Sun Park</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>White Oak Solar Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.183611</lat>
    <lon>-75.50444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57434</plant_id>
    <plant_name>Valley View Transmission LLC</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.902753</lat>
    <lon>-96.02174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57474</plant_id>
    <plant_name>Ralls Wind Farm</plant_name>
    <state>TX</state>
    <county>Crosby</county>
    <operator>Ralls Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.661111</lat>
    <lon>-101.39</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57521</plant_id>
    <plant_name>Giffen</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.530278</lat>
    <lon>-120.3161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57736</plant_id>
    <plant_name>SPS1 Dollarhide</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>SunE SPS1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.12743</lat>
    <lon>-103.1378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57737</plant_id>
    <plant_name>SPS2 Jal</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>SunE SPS2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.183611</lat>
    <lon>-103.1831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57738</plant_id>
    <plant_name>SPS3 Lea</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>SunE SPS3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.469722</lat>
    <lon>-103.3233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57948</plant_id>
    <plant_name>NJ Oak Solar Plant</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.380565</lat>
    <lon>-75.18831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57963</plant_id>
    <plant_name>Musselshell Wind Project</plant_name>
    <state>MT</state>
    <county>Wheatland</county>
    <operator>Musselshell Wind Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>46.275278</lat>
    <lon>-109.4828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57965</plant_id>
    <plant_name>Musselshell Wind Project Two LLC</plant_name>
    <state>MT</state>
    <county>Wheatland</county>
    <operator>Musselshell Wind Project Two LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>46.275278</lat>
    <lon>-109.4828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57986</plant_id>
    <plant_name>SunE EPE1 LLC</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>SunE EPE1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.034383</lat>
    <lon>-106.341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58027</plant_id>
    <plant_name>SunE CPS2 LLC</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>REC Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>29.245</lat>
    <lon>-98.41833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58068</plant_id>
    <plant_name>SunE CPS1 LLC</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>REC Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>29.245</lat>
    <lon>-98.41833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58206</plant_id>
    <plant_name>West Gates Solar Station</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.142222</lat>
    <lon>-120.1325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58238</plant_id>
    <plant_name>Georgia Mountain Community Wind Farm</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.661667</lat>
    <lon>-73.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58391</plant_id>
    <plant_name>IND Community Solar Farm 1st Phase</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.695209</lat>
    <lon>-86.31553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58417</plant_id>
    <plant_name>Lone Valley Solar Park I LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Lone Valley Solar Park I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.398059</lat>
    <lon>-116.8655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58469</plant_id>
    <plant_name>HNL Emergency Power Facility</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Hawaiian Electric Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBL</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>21.336389</lat>
    <lon>-157.9194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58488</plant_id>
    <plant_name>Bryan Solar, LLC</plant_name>
    <state>TX</state>
    <county>Presidio</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.6</lat>
    <lon>-104.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58502</plant_id>
    <plant_name>RE Columbia 3 LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.024722</lat>
    <lon>-118.1642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58552</plant_id>
    <plant_name>Indy Solar I, LLC</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.662778</lat>
    <lon>-85.98556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58627</plant_id>
    <plant_name>Western Antelope Dry Ranch</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.688889</lat>
    <lon>-118.3203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58940</plant_id>
    <plant_name>Anderson Wind II</plant_name>
    <state>NM</state>
    <county>Chaves</county>
    <operator>Anderson Wind II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.013889</lat>
    <lon>-103.865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58966</plant_id>
    <plant_name>Fairfield Wind</plant_name>
    <state>MT</state>
    <county>Teton</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>47.723333</lat>
    <lon>-111.9653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59076</plant_id>
    <plant_name>Chopin Wind LLC</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Chopin Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.88</lat>
    <lon>-118.4633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59273</plant_id>
    <plant_name>SEPV Palmdale East</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.613056</lat>
    <lon>-117.9389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59454</plant_id>
    <plant_name>Valencia Solar</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.145833</lat>
    <lon>-110.8669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59490</plant_id>
    <plant_name>Jett Creek Windfarm (Burnt River)</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Jett Creek</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.425</lat>
    <lon>-117.2739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59491</plant_id>
    <plant_name>Benson Creek Windfarm (Burnt River)</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Benson Creek</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.366944</lat>
    <lon>-117.3439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59492</plant_id>
    <plant_name>Durbin Creek Windfarm (Burnt River)</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Durbin Creek</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.353056</lat>
    <lon>-117.3231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59493</plant_id>
    <plant_name>Prospector Windfarm (Burnt River)</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Prospector</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.418056</lat>
    <lon>-117.255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59494</plant_id>
    <plant_name>Willow Spring Windfarm (Burnt River)</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Willow Spring</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.381944</lat>
    <lon>-117.2731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59498</plant_id>
    <plant_name>Tracy Solar</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.7998</lat>
    <lon>-78.1398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59569</plant_id>
    <plant_name>Whitetail Solar</plant_name>
    <state>SC</state>
    <county>Dillon</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.398056</lat>
    <lon>-79.38361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59601</plant_id>
    <plant_name>L&amp;D Landfill Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.980278</lat>
    <lon>-74.77028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60195</plant_id>
    <plant_name>South Valley Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.986073</lat>
    <lon>-106.7361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60198</plant_id>
    <plant_name>Rio Communities Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.582598</lat>
    <lon>-106.683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60242</plant_id>
    <plant_name>Algonquin SKIC 10 Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Algonquin Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.126111</lat>
    <lon>-119.2434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60332</plant_id>
    <plant_name>Open Range Solar Center, LLC</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.796766</lat>
    <lon>-117.0653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60334</plant_id>
    <plant_name>Thunderegg Solar Center, LLC</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.93097</lat>
    <lon>-116.9876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60335</plant_id>
    <plant_name>Vale Air Solar Center, LLC</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.965031</lat>
    <lon>-117.2581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60511</plant_id>
    <plant_name>Clear Spring Ranch PV Project</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.602102</lat>
    <lon>-104.6947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60519</plant_id>
    <plant_name>Albany Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.641268</lat>
    <lon>-94.59925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60530</plant_id>
    <plant_name>Paynesville Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.392905</lat>
    <lon>-94.72123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60532</plant_id>
    <plant_name>Waseca Solar</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.092414</lat>
    <lon>-93.53098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60604</plant_id>
    <plant_name>Wye Mills VNEM CSG</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.94037</lat>
    <lon>-76.04566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60641</plant_id>
    <plant_name>Henrietta D Energy Storage LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Convergent Energy and Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.228872</lat>
    <lon>-119.9047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60659</plant_id>
    <plant_name>Ridgeland Solar Project</plant_name>
    <state>SC</state>
    <county>Jasper</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.465</lat>
    <lon>-80.961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60993</plant_id>
    <plant_name>Darlington Solar, LLC</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.32</lat>
    <lon>-79.917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60997</plant_id>
    <plant_name>Everett PV1</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.821137</lat>
    <lon>-77.30957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61197</plant_id>
    <plant_name>Pima Energy Storage System</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Pima Energy Storage System</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.251647</lat>
    <lon>-110.9913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61200</plant_id>
    <plant_name>OR Solar 2, LLC</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>OR Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.542084</lat>
    <lon>-122.7813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61201</plant_id>
    <plant_name>OR Solar 3, LLC</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.022336</lat>
    <lon>-121.4189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61276</plant_id>
    <plant_name>Wilson Solar Farm 3</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.78</lat>
    <lon>-78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61277</plant_id>
    <plant_name>Wilson Solar Farm 4</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.7</lat>
    <lon>-78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61278</plant_id>
    <plant_name>Wilson Solar Farm 5</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.68</lat>
    <lon>-77.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61279</plant_id>
    <plant_name>Wilson Solar Farm 6</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.68</lat>
    <lon>-77.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61280</plant_id>
    <plant_name>Wilson Solar Farm 7</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.75</lat>
    <lon>-78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61281</plant_id>
    <plant_name>Bear Creek Solar Center</plant_name>
    <state>OR</state>
    <county>Deschutes</county>
    <operator>GCL New Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.060814</lat>
    <lon>-121.2372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61292</plant_id>
    <plant_name>Jackson Solar Farm</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.75</lat>
    <lon>-77.83</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61345</plant_id>
    <plant_name>WyEast Solar</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.5846</lat>
    <lon>-120.5999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61374</plant_id>
    <plant_name>Hecate Energy Clarke County LLC</plant_name>
    <state>VA</state>
    <county>Clarke</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.06485</lat>
    <lon>-78.13821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61424</plant_id>
    <plant_name>OR Solar 8, LLC</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.238888</lat>
    <lon>-121.5858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61430</plant_id>
    <plant_name>OR Solar 6, LLC</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.208988</lat>
    <lon>-120.3678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61476</plant_id>
    <plant_name>CoreSite Real Estate 2901 Coronado, L.P.</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>CoreSite Real Estate 2901 Coronado, L.P.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>37.375089</lat>
    <lon>-121.9717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61496</plant_id>
    <plant_name>Adams Solar Center</plant_name>
    <state>OR</state>
    <county>Jefferson</county>
    <operator>GCL New Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.675</lat>
    <lon>-121.122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61497</plant_id>
    <plant_name>Elbe Solar Center</plant_name>
    <state>OR</state>
    <county>Jefferson</county>
    <operator>GCL New Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.618</lat>
    <lon>-121.205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61524</plant_id>
    <plant_name>Whitewright Solar</plant_name>
    <state>TX</state>
    <county>Fannin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.498186</lat>
    <lon>-96.37889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61532</plant_id>
    <plant_name>Leon Solar</plant_name>
    <state>TX</state>
    <county>Hunt</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.16114</lat>
    <lon>-96.23974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61556</plant_id>
    <plant_name>Facebook 1 Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.831</lat>
    <lon>-106.762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61557</plant_id>
    <plant_name>Facebook 2 Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.08</lat>
    <lon>-106.865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61558</plant_id>
    <plant_name>Facebook 3 Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.075</lat>
    <lon>-106.865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61599</plant_id>
    <plant_name>New Road Solar, LLC</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.403238</lat>
    <lon>-74.56779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61759</plant_id>
    <plant_name>Covington Solar Farm</plant_name>
    <state>OK</state>
    <county>Garfield</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.31792</lat>
    <lon>-97.58589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61803</plant_id>
    <plant_name>Sierra Energy Storage, LLC</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.8744</lat>
    <lon>-120.4774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61810</plant_id>
    <plant_name>Chisum</plant_name>
    <state>TX</state>
    <county>Lamar</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.63291</lat>
    <lon>-95.39071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61840</plant_id>
    <plant_name>Hope Farm Solar, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.7479</lat>
    <lon>-71.5263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61861</plant_id>
    <plant_name>AES ES GILBERT</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>AES ES GILBERT, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.446804</lat>
    <lon>-111.9563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61867</plant_id>
    <plant_name>Bovine</plant_name>
    <state>TX</state>
    <county>Austin</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.631324</lat>
    <lon>-96.07689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61868</plant_id>
    <plant_name>Bronson</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.537482</lat>
    <lon>-95.96955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61871</plant_id>
    <plant_name>Sterling Solar (TX)</plant_name>
    <state>TX</state>
    <county>Hunt</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.166173</lat>
    <lon>-96.17262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61874</plant_id>
    <plant_name>Eddy II</plant_name>
    <state>TX</state>
    <county>McLennan</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.291151</lat>
    <lon>-97.26074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61875</plant_id>
    <plant_name>Cascade Solar (TX)</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.205355</lat>
    <lon>-96.02338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61996</plant_id>
    <plant_name>Rankin Solar Center, LLC</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.23453</lat>
    <lon>-79.65515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62353</plant_id>
    <plant_name>Yemassee Solar</plant_name>
    <state>SC</state>
    <county>Beaufort</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.705139</lat>
    <lon>-80.90328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62467</plant_id>
    <plant_name>Vista Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.741</lat>
    <lon>-106.655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62597</plant_id>
    <plant_name>Rio De Oro Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.692</lat>
    <lon>-106.688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62609</plant_id>
    <plant_name>Commerce ESS</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.43445</lat>
    <lon>-98.61765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62625</plant_id>
    <plant_name>West Water Street</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>City of Taunton - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.8809</lat>
    <lon>-71.0927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62713</plant_id>
    <plant_name>DSM Nutritional Products Solar</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>DG Northeast Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.836806</lat>
    <lon>-75.06547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62729</plant_id>
    <plant_name>Painter Energy Storage</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>Painter Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.41</lat>
    <lon>-119.515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62801</plant_id>
    <plant_name>Vallecito</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>Viridity Energy Solutions, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.407086</lat>
    <lon>-119.5115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62912</plant_id>
    <plant_name>Solar Hagerstown</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.64913</lat>
    <lon>-77.67837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62935</plant_id>
    <plant_name>Orchard Windfarm 1, LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Orchard Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.38</lat>
    <lon>-119.3332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62980</plant_id>
    <plant_name>Turquoise Liberty Solar</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Liberty Utilities (CalPeco Electric) LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.59</lat>
    <lon>-119.52</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63024</plant_id>
    <plant_name>Hertford Solar Power, LLC</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Capital V LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.268007</lat>
    <lon>-77.02821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63027</plant_id>
    <plant_name>Mars Solar</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.421553</lat>
    <lon>-98.83496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63081</plant_id>
    <plant_name>San Miguel I Solar Energy Center</plant_name>
    <state>NM</state>
    <county>San Miguel</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.63457</lat>
    <lon>-105.1784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63082</plant_id>
    <plant_name>San Miguel II Solar Energy Center</plant_name>
    <state>NM</state>
    <county>San Miguel</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.63471</lat>
    <lon>-105.1732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63184</plant_id>
    <plant_name>Rio Rancho Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.10476</lat>
    <lon>-106.4824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63186</plant_id>
    <plant_name>Imeson Solar</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>Imeson Solar Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>3.8</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.456753</lat>
    <lon>-81.71486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63301</plant_id>
    <plant_name>Garrett Solar</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>SOLV Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.16</lat>
    <lon>-120.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63330</plant_id>
    <plant_name>Duus Solar, LLC</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.318</lat>
    <lon>-122.331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63331</plant_id>
    <plant_name>Firwood Solar, LLC</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.35</lat>
    <lon>-122.25</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63458</plant_id>
    <plant_name>Rush Springs Energy Storage (BA)</plant_name>
    <state>OK</state>
    <county>Grady</county>
    <operator>Rush Springs Energy Storage</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.695647</lat>
    <lon>-97.82971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63505</plant_id>
    <plant_name>Cherry Blossom Solar LLC</plant_name>
    <state>SC</state>
    <county>Williamsburg</county>
    <operator>CBH Lessor LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.762185</lat>
    <lon>-79.45801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63520</plant_id>
    <plant_name>PA Solar Park II</plant_name>
    <state>PA</state>
    <county>Carbon</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.86159</lat>
    <lon>-75.84656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63778</plant_id>
    <plant_name>Suntex Solar, LLC</plant_name>
    <state>OR</state>
    <county>Harney</county>
    <operator>SC Oregon 2 Lessor Parent, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.56149</lat>
    <lon>-119.6862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63779</plant_id>
    <plant_name>Rock Garden Solar, LLC</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>SC Oregon 2 Lessor Parent, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.39691</lat>
    <lon>-120.9304</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63795</plant_id>
    <plant_name>Alkali Solar, LLC</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>SC Oregon 2 Lessor Parent, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.31942</lat>
    <lon>-121.0035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63796</plant_id>
    <plant_name>West Hines Solar I, LLC</plant_name>
    <state>OR</state>
    <county>Harney</county>
    <operator>SC Oregon 2 Lessor Parent, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.50259</lat>
    <lon>-119.1471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63925</plant_id>
    <plant_name>Riley</plant_name>
    <state>OR</state>
    <county>Harney</county>
    <operator>Riley Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.5559</lat>
    <lon>-119.6852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63926</plant_id>
    <plant_name>Fort Rock IV</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>Fort Rock Solar IV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.38988</lat>
    <lon>-120.9561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64051</plant_id>
    <plant_name>Orchard Windfarm 2, LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Orchard Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.38</lat>
    <lon>-119.3332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64052</plant_id>
    <plant_name>Orchard Windfarm 3, LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Orchard Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.38</lat>
    <lon>-119.3332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64053</plant_id>
    <plant_name>Orchard Windfarm 4, LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Orchard Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.38</lat>
    <lon>-119.3332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64079</plant_id>
    <plant_name>CatanSolar</plant_name>
    <state>TX</state>
    <county>Karnes</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.871642</lat>
    <lon>-97.69694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64084</plant_id>
    <plant_name>Blanchard Road 1 Community Solar</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>OYA Blanchard Road LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.25479</lat>
    <lon>-76.01178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64087</plant_id>
    <plant_name>Blanchard Road 2 Community Solar</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>OYA Blanchard Road 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.25479</lat>
    <lon>-76.01178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64090</plant_id>
    <plant_name>NYS Rte 12 Community Solar</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>OYA NYS Rte 12 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.25479</lat>
    <lon>-76.01178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64092</plant_id>
    <plant_name>Great Lakes Seaway Community Solar</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>OYA Great Lakes Seaway LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.25479</lat>
    <lon>-76.01178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64157</plant_id>
    <plant_name>Clyde Peaking Engine</plant_name>
    <state>OH</state>
    <county>Sandusky</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.293294</lat>
    <lon>-82.96526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64227</plant_id>
    <plant_name>Alexis Solar, LLC</plant_name>
    <state>TX</state>
    <county>Brooks</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>26.88913</lat>
    <lon>-98.23332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64374</plant_id>
    <plant_name>Norwich Solar and Energy Storage CSG</plant_name>
    <state>NY</state>
    <county>Chenango</county>
    <operator>DG New York CS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.552861</lat>
    <lon>-75.52957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64408</plant_id>
    <plant_name>Georges River Energy</plant_name>
    <state>ME</state>
    <county>Waldo</county>
    <operator>Robbins Lumber Inc</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.3331</lat>
    <lon>-69.2019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64546</plant_id>
    <plant_name>Wynwood Energy Storage</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>25.798978</lat>
    <lon>-80.1971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64612</plant_id>
    <plant_name>Kearny North Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.83347</lat>
    <lon>-117.1344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64614</plant_id>
    <plant_name>Kearny South Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.832886</lat>
    <lon>-117.1323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64627</plant_id>
    <plant_name>Blodgett Solar CSG</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Blodgett Street Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>4.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.678889</lat>
    <lon>-71.44511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64830</plant_id>
    <plant_name>Brightwood Solar, LLC</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.384949</lat>
    <lon>-122.0844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64970</plant_id>
    <plant_name>59 Federal Rd(CSG)</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>59FED WHAM8 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.828475</lat>
    <lon>-70.72121</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65230</plant_id>
    <plant_name>Truman Solar</plant_name>
    <state>MO</state>
    <county>Boone</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.956</lat>
    <lon>-92.243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65296</plant_id>
    <plant_name>Hawthorn Solar I</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.133772</lat>
    <lon>-94.4863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65412</plant_id>
    <plant_name>Northern Cardinal Solar SCS IL 1, LLC</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.07</lat>
    <lon>-88.243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65465</plant_id>
    <plant_name>Cinnaminson Landfill Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.01583</lat>
    <lon>-74.98355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65472</plant_id>
    <plant_name>Chukar Battery Energy Storage System</plant_name>
    <state>NV</state>
    <county>Storey</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.55636</lat>
    <lon>-119.4367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65635</plant_id>
    <plant_name>Hecate Energy Desert Storage 1 LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Hecate Energy Desert Storage 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.8079</lat>
    <lon>-116.494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65733</plant_id>
    <plant_name>Carris Storage I</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Hecate Grid Carris Storage 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.8079</lat>
    <lon>-116.494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65781</plant_id>
    <plant_name>Bishopville Solar II, LLC</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Bishopville Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.2081</lat>
    <lon>-80.22832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66053</plant_id>
    <plant_name>Generate Colchester Fuel Cells, LLC</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Generate Colchester Fuel Cells, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.59413</lat>
    <lon>-72.33131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66065</plant_id>
    <plant_name>West Valley Solar</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>West Valley Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.449</lat>
    <lon>-78.652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66180</plant_id>
    <plant_name>Huxley Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>3.5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.197564</lat>
    <lon>-72.48015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66181</plant_id>
    <plant_name>Beacon Solar, LLC</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>7.8</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.284</lat>
    <lon>-72.677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66265</plant_id>
    <plant_name>Paradise Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.70363</lat>
    <lon>-117.0498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66266</plant_id>
    <plant_name>Clairemont Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.825604</lat>
    <lon>-117.1832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66278</plant_id>
    <plant_name>Elliott Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.81638</lat>
    <lon>-117.0889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66279</plant_id>
    <plant_name>Boulevard Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.66184</lat>
    <lon>-116.2734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66280</plant_id>
    <plant_name>Pala Gomez Creek BESS</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.357667</lat>
    <lon>-117.1117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66422</plant_id>
    <plant_name>Westside Solar</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Westside Solar, LLC (Ecofin)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.053575</lat>
    <lon>-92.54849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66501</plant_id>
    <plant_name>Cicero Energy Storage 1 LLC</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Convergent Energy and Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.147448</lat>
    <lon>-76.08677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66503</plant_id>
    <plant_name>Cicero Energy Storage 2 LLC</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Convergent Energy and Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.151269</lat>
    <lon>-76.08879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66572</plant_id>
    <plant_name>Highpeak Solar 1</plant_name>
    <state>TX</state>
    <county>Howard</county>
    <operator>PPM Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.494346</lat>
    <lon>-101.2766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66715</plant_id>
    <plant_name>Fresno Community Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.696</lat>
    <lon>-119.885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66926</plant_id>
    <plant_name>SMT Mercedes LLC</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>SMT Mercedes LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.230501</lat>
    <lon>-97.91256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66927</plant_id>
    <plant_name>SMT Mission LLC</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>SMT Mission LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.189433</lat>
    <lon>-98.32293</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66928</plant_id>
    <plant_name>SMT Santa Rosa LLC</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>SMT Santa Rosa LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.232466</lat>
    <lon>-97.82317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66929</plant_id>
    <plant_name>SMT Alamo LLC</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>SMT Alamo LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.230677</lat>
    <lon>-98.11404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66930</plant_id>
    <plant_name>SMT Bay City LLC</plant_name>
    <state>TX</state>
    <county>Matagorda</county>
    <operator>SMT Bay City LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>28.987572</lat>
    <lon>-95.96984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66931</plant_id>
    <plant_name>SMT Elsa LLC</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>SMT Elsa LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.296101</lat>
    <lon>-98.0096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66932</plant_id>
    <plant_name>SMT Los Fresnos LLC</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>SMT Los Fresnos LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.074676</lat>
    <lon>-97.52318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66933</plant_id>
    <plant_name>SMT Harlingen II LLC</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>SMT Harlingen II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.179999</lat>
    <lon>-97.72561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66934</plant_id>
    <plant_name>SMT Rio Grande I LLC</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>SMT Rio Grande I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.408729</lat>
    <lon>-98.93743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66935</plant_id>
    <plant_name>SMT Rio Grande II LLC</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>SMT Rio Grande II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>26.390951</lat>
    <lon>-98.82039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67040</plant_id>
    <plant_name>Archie Horne</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.917699</lat>
    <lon>-77.63126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67042</plant_id>
    <plant_name>Butler</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.898072</lat>
    <lon>-78.89897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67051</plant_id>
    <plant_name>Sunflower Solar LLC</plant_name>
    <state>SC</state>
    <county>Williamsburg</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.730956</lat>
    <lon>-79.82786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67101</plant_id>
    <plant_name>Lightfoot Solar, LLC</plant_name>
    <state>MI</state>
    <county>Oscoda</county>
    <operator>Lightfoot Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.636472</lat>
    <lon>-84.17142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67118</plant_id>
    <plant_name>Santee BESS</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.854918</lat>
    <lon>-116.9684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67143</plant_id>
    <plant_name>Tank Farm 4</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>Solar Breakers LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.57196</lat>
    <lon>-71.28976</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67174</plant_id>
    <plant_name>Chihuahuan Desert Solar</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.560528</lat>
    <lon>-106.2586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67267</plant_id>
    <plant_name>Surbrook Solar, LLC</plant_name>
    <state>MI</state>
    <county>Jackson</county>
    <operator>Surbrook Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.3881</lat>
    <lon>-84.4902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67282</plant_id>
    <plant_name>FFP - NY Varano</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>FFP NY Goshen Project2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10.5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.375291</lat>
    <lon>-74.39291</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67417</plant_id>
    <plant_name>Exeter Renewables 1</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.58</lat>
    <lon>-71.523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67445</plant_id>
    <plant_name>Logan City 2</plant_name>
    <state>UT</state>
    <county>Cache</county>
    <operator>City of Logan - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.69976</lat>
    <lon>-111.8598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67487</plant_id>
    <plant_name>Jonesboro CWL Solar Park</plant_name>
    <state>AR</state>
    <county>Craighead</county>
    <operator>City Water and Light Plant - (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.814274</lat>
    <lon>-90.57867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67864</plant_id>
    <plant_name>McIntosh Solar</plant_name>
    <state>GA</state>
    <county>Effingham</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.350833</lat>
    <lon>-81.17194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67882</plant_id>
    <plant_name>Empire Clean Energy, LLC</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>NineDot Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>43.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.555339</lat>
    <lon>-74.2149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68038</plant_id>
    <plant_name>KDC Solar Madera LLC</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>TRITEC Americas</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.926</lat>
    <lon>-120.104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68683</plant_id>
    <plant_name>Crockett BESS</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Prologis Logistics Services Incorporated BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <battery_mwh>24.8</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.77682</lat>
    <lon>-95.37989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68684</plant_id>
    <plant_name>Century BESS</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Prologis Logistics Services Incorporated BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <battery_mwh>24.8</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.68657</lat>
    <lon>-97.08325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68685</plant_id>
    <plant_name>Liggett Switch</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Prologis Logistics Services Incorporated BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <battery_mwh>12.4</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.81479</lat>
    <lon>-97.025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68706</plant_id>
    <plant_name>City of Clarksville</plant_name>
    <state>AR</state>
    <county>Johnson</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.467464</lat>
    <lon>-93.51518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68954</plant_id>
    <plant_name>Alpaugh BESS</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.896993</lat>
    <lon>-119.4465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69192</plant_id>
    <plant_name>AETS Old Michigan Solar LLC</plant_name>
    <state>TX</state>
    <county>Culberson</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.826508</lat>
    <lon>-104.2103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69261</plant_id>
    <plant_name>Malakoff Solar Project</plant_name>
    <state>TX</state>
    <county>Henderson</county>
    <operator>Ellomay USA Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.183314</lat>
    <lon>-96.01754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69263</plant_id>
    <plant_name>Fairfield Solar Project</plant_name>
    <state>TX</state>
    <county>Freestone</county>
    <operator>Ellomay USA Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.714249</lat>
    <lon>-96.18668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69267</plant_id>
    <plant_name>Cedarvale Gas</plant_name>
    <state>TX</state>
    <county>Ward</county>
    <operator>RPC Merchant, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.515353</lat>
    <lon>-103.4507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69269</plant_id>
    <plant_name>Pyote Gas</plant_name>
    <state>TX</state>
    <county>Ward</county>
    <operator>RPC Merchant, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.453114</lat>
    <lon>-103.096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69296</plant_id>
    <plant_name>BESS La Feria</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Grenergy USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>25.1</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.116879</lat>
    <lon>-97.81167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69297</plant_id>
    <plant_name>BESS Stadium</plant_name>
    <state>TX</state>
    <county>Jim Wells</county>
    <operator>Grenergy USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>25.1</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.745926</lat>
    <lon>-98.05444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69350</plant_id>
    <plant_name>Matta Power Station</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>Matta Power Station LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>23.2</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.040031</lat>
    <lon>-103.6526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69365</plant_id>
    <plant_name>SMT Dallas BESS</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>SMT Dallas LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.777246</lat>
    <lon>-96.66501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69366</plant_id>
    <plant_name>SME Mission II BESS</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>SMT Mission II LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.168115</lat>
    <lon>-98.32448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69367</plant_id>
    <plant_name>SMT Dallas III BESS</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>SMT Dallas III LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.825042</lat>
    <lon>-96.86294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69411</plant_id>
    <plant_name>Snyder BESS</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Snyder ESS Assets, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.705086</lat>
    <lon>-100.906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69413</plant_id>
    <plant_name>Sweetwater BESS</plant_name>
    <state>TX</state>
    <county>Nolan</county>
    <operator>Sweetwater ESS Assets, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.457511</lat>
    <lon>-100.4437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69415</plant_id>
    <plant_name>Westover BESS</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Westover ESS Assets, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>20</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.83553</lat>
    <lon>-102.4435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69416</plant_id>
    <plant_name>Aggreko MSR Grid PC2</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>DGI Rattler LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>19.3</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>27.8059</lat>
    <lon>-97.4612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69417</plant_id>
    <plant_name>Aggreko MSR Grid PC5</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>DGI Rattler LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>19.3</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.192063</lat>
    <lon>-97.66029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69418</plant_id>
    <plant_name>Aggreko MSR Grid PC7</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>DGI Rattler LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>19.3</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.0014</lat>
    <lon>-97.5218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69574</plant_id>
    <plant_name>BESS TX Top Gear - BSHOU002</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Prologis Logistics Services Incorporated BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>25.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.963075</lat>
    <lon>-95.43693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69575</plant_id>
    <plant_name>BESS TX Panda - BSHOU004</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Prologis Logistics Services Incorporated BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.838018</lat>
    <lon>-95.35272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69688</plant_id>
    <plant_name>Allatoona Substation #10</plant_name>
    <state>GA</state>
    <county>Cobb</county>
    <operator>Cobb Electric Membership Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.086784</lat>
    <lon>-84.71883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69975</plant_id>
    <plant_name>Telview ESS</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>19.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.57954</lat>
    <lon>-95.48749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69976</plant_id>
    <plant_name>I-Eye ESS</plant_name>
    <state>TX</state>
    <county>Wharton</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>19.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.3133</lat>
    <lon>-96.10837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70244</plant_id>
    <plant_name>South River 2</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>South River Phase 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.443975</lat>
    <lon>-74.37804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70433</plant_id>
    <plant_name>Ebbie Solar, LLC</plant_name>
    <state>SC</state>
    <county>Marion</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>10</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.161</lat>
    <lon>-79.4007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>521</plant_id>
    <plant_name>Upper Molina</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1962</latest_year>
    <lat>39.143808</lat>
    <lon>-108.0048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6646</plant_id>
    <plant_name>San Dimas</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>34.1275</lat>
    <lon>-117.7958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50895</plant_id>
    <plant_name>Bypass</plant_name>
    <state>ID</state>
    <county>Jerome</county>
    <operator>North Side Energy Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>42.560876</lat>
    <lon>-114.0575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55765</plant_id>
    <plant_name>Green Knight Energy Center</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>Waste Management Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.8592</lat>
    <lon>-75.2627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56933</plant_id>
    <plant_name>Threemile Canyon</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Threemile Canyon Wind I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.6758</lat>
    <lon>-119.9375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56971</plant_id>
    <plant_name>Oregon Trail Windfarm LLC</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Echo 1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.7122</lat>
    <lon>-119.4044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56973</plant_id>
    <plant_name>Sand Ranch Windfarm LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Echo 1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.6447</lat>
    <lon>-119.4767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58464</plant_id>
    <plant_name>Broadview Energy Prime</plant_name>
    <state>NM</state>
    <county>Curry</county>
    <operator>Broadview Energy Prime LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.746944</lat>
    <lon>-103.325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58465</plant_id>
    <plant_name>Broadview Energy Prime 2</plant_name>
    <state>NM</state>
    <county>Curry</county>
    <operator>Broadview Energy Prime 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.728056</lat>
    <lon>-103.305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60548</plant_id>
    <plant_name>NorWest Energy 2, LLC</plant_name>
    <state>OR</state>
    <county>Deschutes</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.06803</lat>
    <lon>-121.2284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60649</plant_id>
    <plant_name>Rabbit Hill Energy Storage Project</plant_name>
    <state>TX</state>
    <county>Williamson</county>
    <operator>Rabbit Hill Energy Storage Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.587828</lat>
    <lon>-97.68702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60976</plant_id>
    <plant_name>OSLH, LLC</plant_name>
    <state>OR</state>
    <county>Deschutes</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.061</lat>
    <lon>-121.228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61560</plant_id>
    <plant_name>Eagle Point Solar</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.400814</lat>
    <lon>-122.8292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61580</plant_id>
    <plant_name>Tumbleweed Solar, LLC</plant_name>
    <state>OR</state>
    <county>Deschutes</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.192575</lat>
    <lon>-121.2331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61631</plant_id>
    <plant_name>Chiloquin Solar, LLC</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.610732</lat>
    <lon>-121.8612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61703</plant_id>
    <plant_name>Sikorsky Aircraft CHP</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Sikorsky Aircraft Corporation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>11</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2021</latest_year>
    <lat>41.250009</lat>
    <lon>-73.09865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62161</plant_id>
    <plant_name>Galactic Wind</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Galactic Wind</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.101605</lat>
    <lon>-89.33186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62753</plant_id>
    <plant_name>Prospect Storage</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>GlidePath Power Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.149166</lat>
    <lon>-95.65111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63180</plant_id>
    <plant_name>TPE Whitney Solar, LLC</plant_name>
    <state>TX</state>
    <county>Bosque</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.05</lat>
    <lon>-97.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63344</plant_id>
    <plant_name>Starvation</plant_name>
    <state>OR</state>
    <county>Harney</county>
    <operator>Starvation Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.50222</lat>
    <lon>-119.1485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63636</plant_id>
    <plant_name>Fort Rock I</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>Fort Rock Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.320081</lat>
    <lon>-121.0035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64078</plant_id>
    <plant_name>Pittsfield Solar LLC</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Pittsfiled Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.814009</lat>
    <lon>-69.44956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64293</plant_id>
    <plant_name>Alvin</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.433245</lat>
    <lon>-95.24937</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64294</plant_id>
    <plant_name>Odessa</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.871315</lat>
    <lon>-102.3984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64295</plant_id>
    <plant_name>Angleton</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.167065</lat>
    <lon>-95.44065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64296</plant_id>
    <plant_name>Brazoria</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.062635</lat>
    <lon>-95.57759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64297</plant_id>
    <plant_name>Heights</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.389595</lat>
    <lon>-94.94987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64298</plant_id>
    <plant_name>Magnolia TX</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.488335</lat>
    <lon>-95.13395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64314</plant_id>
    <plant_name>Dickinson</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.461255</lat>
    <lon>-95.05699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64315</plant_id>
    <plant_name>Loop 463</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>28.816475</lat>
    <lon>-97.07487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64316</plant_id>
    <plant_name>Lopeno</plant_name>
    <state>TX</state>
    <county>Zapata</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>26.687614</lat>
    <lon>-99.10942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64319</plant_id>
    <plant_name>Ranchtown</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.617885</lat>
    <lon>-98.73595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64321</plant_id>
    <plant_name>Sweeny</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Engie North America</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.055615</lat>
    <lon>-95.68724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64423</plant_id>
    <plant_name>TX7 Flat Top</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>16.5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.19791</lat>
    <lon>-103.3607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64424</plant_id>
    <plant_name>TX8 Worsham</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>17.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.35658</lat>
    <lon>-103.3365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64425</plant_id>
    <plant_name>TX2 Port Lavaca</plant_name>
    <state>TX</state>
    <county>Calhoun</county>
    <operator>Key Capture Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>11.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.58673</lat>
    <lon>-96.68376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64892</plant_id>
    <plant_name>TPE Erath Solar, LLC</plant_name>
    <state>TX</state>
    <county>Erath</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.26246</lat>
    <lon>-98.20754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64915</plant_id>
    <plant_name>Flower Valley I</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>Flower Valley</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.197283</lat>
    <lon>-103.3618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64916</plant_id>
    <plant_name>Swoose I</plant_name>
    <state>TX</state>
    <county>Ward</county>
    <operator>Swoose</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.45115</lat>
    <lon>-103.0962</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65127</plant_id>
    <plant_name>AES Belleville Solar LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.4872</lat>
    <lon>-90.0135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65809</plant_id>
    <plant_name>Caterina</plant_name>
    <state>TX</state>
    <county>Dimmit</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>28.34705</lat>
    <lon>-99.6737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65810</plant_id>
    <plant_name>Cedarville (TX)</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.514106</lat>
    <lon>-103.4524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65811</plant_id>
    <plant_name>Coyote Springs (TX)</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.39471</lat>
    <lon>-103.6303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65812</plant_id>
    <plant_name>Farmersville (TX)</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.16111</lat>
    <lon>-96.40913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65813</plant_id>
    <plant_name>Faulkner</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.262381</lat>
    <lon>-103.7949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65814</plant_id>
    <plant_name>Gomez</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.036537</lat>
    <lon>-103.0242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65829</plant_id>
    <plant_name>Holcomb (TX)</plant_name>
    <state>TX</state>
    <county>La Salle</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>28.03534</lat>
    <lon>-99.36173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65830</plant_id>
    <plant_name>Junction (TX)</plant_name>
    <state>TX</state>
    <county>Kimble</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.492453</lat>
    <lon>-99.7702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65831</plant_id>
    <plant_name>Lonestar</plant_name>
    <state>TX</state>
    <county>Ward</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.594864</lat>
    <lon>-103.2498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65833</plant_id>
    <plant_name>Rattlesnake (TX)</plant_name>
    <state>TX</state>
    <county>Ward</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.568978</lat>
    <lon>-103.2266</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65834</plant_id>
    <plant_name>Saddleback BESS2</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.332883</lat>
    <lon>-103.4984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65835</plant_id>
    <plant_name>Screwbean</plant_name>
    <state>TX</state>
    <county>Culberson</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.821423</lat>
    <lon>-104.0451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65837</plant_id>
    <plant_name>Val Verde</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.234145</lat>
    <lon>-98.07985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66416</plant_id>
    <plant_name>IMPA Washington Solar Park 2</plant_name>
    <state>IN</state>
    <county>Daviess</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.67826</lat>
    <lon>-87.20084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66782</plant_id>
    <plant_name>Hamilton BESS</plant_name>
    <state>TX</state>
    <county>Val Verde</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.376438</lat>
    <lon>-100.8485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66783</plant_id>
    <plant_name>Weil Tract BESS</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.796921</lat>
    <lon>-97.48707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66784</plant_id>
    <plant_name>Pauline BESS</plant_name>
    <state>TX</state>
    <county>Henderson</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.335025</lat>
    <lon>-96.0579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66788</plant_id>
    <plant_name>Mineral Wells East BESS</plant_name>
    <state>TX</state>
    <county>Palo Pinto</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.798754</lat>
    <lon>-98.06497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66789</plant_id>
    <plant_name>Lufkin South BESS</plant_name>
    <state>TX</state>
    <county>Angelina</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.291983</lat>
    <lon>-94.72424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66790</plant_id>
    <plant_name>Judkins BESS</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.715592</lat>
    <lon>-102.5981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66791</plant_id>
    <plant_name>Garden City East BESS</plant_name>
    <state>TX</state>
    <county>Glasscock</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.867209</lat>
    <lon>-101.4694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66792</plant_id>
    <plant_name>Falfurrias BESS</plant_name>
    <state>TX</state>
    <county>Brooks</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.242427</lat>
    <lon>-98.14055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66794</plant_id>
    <plant_name>Diboll BESS</plant_name>
    <state>TX</state>
    <county>Angelina</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.193794</lat>
    <lon>-94.79818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66795</plant_id>
    <plant_name>CISCO BESS</plant_name>
    <state>TX</state>
    <county>Eastland</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.391533</lat>
    <lon>-98.97816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67493</plant_id>
    <plant_name>Pavlov</plant_name>
    <state>TX</state>
    <county>Matagorda</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>28.994112</lat>
    <lon>-96.1262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67494</plant_id>
    <plant_name>Mainland</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.39521</lat>
    <lon>-95.04077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67495</plant_id>
    <plant_name>Russek</plant_name>
    <state>TX</state>
    <county>Reagan</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.183494</lat>
    <lon>-101.4604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67496</plant_id>
    <plant_name>Sandlake</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.508786</lat>
    <lon>-103.6175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67843</plant_id>
    <plant_name>Farmersville West</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>SBESS TX7 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.158</lat>
    <lon>-96.402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67845</plant_id>
    <plant_name>Junction BESS</plant_name>
    <state>TX</state>
    <county>Kimble</county>
    <operator>SBESS TX5 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.516525</lat>
    <lon>-99.76764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67949</plant_id>
    <plant_name>Poteet</plant_name>
    <state>TX</state>
    <county>Atascosa</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.038631</lat>
    <lon>-98.60988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67963</plant_id>
    <plant_name>Tynan</plant_name>
    <state>TX</state>
    <county>Bee</county>
    <operator>HEN Infrastructure, L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>28.184044</lat>
    <lon>-97.7729</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68678</plant_id>
    <plant_name>Museum Drive East Solar</plant_name>
    <state>NE</state>
    <county>Hall</county>
    <operator>City of Grand Island - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.924939</lat>
    <lon>-98.31058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68686</plant_id>
    <plant_name>Citrus City BESS</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Prologis Logistics Services Incorporated BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.32162</lat>
    <lon>-98.35149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68687</plant_id>
    <plant_name>Rio Grande City BESS 2</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Prologis Logistics Services Incorporated BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.39279</lat>
    <lon>-98.81941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69234</plant_id>
    <plant_name>Meadow Park Energy Center</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>CleanAmps AssetCo LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.4</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.84591</lat>
    <lon>-97.22742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69287</plant_id>
    <plant_name>Wheeler Gulch Solar, LLC</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.48234</lat>
    <lon>-108.1005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69289</plant_id>
    <plant_name>EDFR Bluebonnet</plant_name>
    <state>TX</state>
    <county>McLennan</county>
    <operator>Texas Bluebonnet Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.411854</lat>
    <lon>-97.42367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69300</plant_id>
    <plant_name>Regis Continental</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Regis Continental LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.514848</lat>
    <lon>-98.6094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69301</plant_id>
    <plant_name>Regis Gregory</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>Regis Gregory LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.921403</lat>
    <lon>-97.30941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69302</plant_id>
    <plant_name>Regis Palacios</plant_name>
    <state>TX</state>
    <county>Matagorda</county>
    <operator>Regis Palacios LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>28.757031</lat>
    <lon>-96.21178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69322</plant_id>
    <plant_name>Elm Street BESS</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>Elm St Infra LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.427531</lat>
    <lon>-103.4994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69323</plant_id>
    <plant_name>Highway 6 BESS</plant_name>
    <state>TX</state>
    <county>Brazos</county>
    <operator>Hwy 6 Infra LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.442324</lat>
    <lon>-96.13143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69324</plant_id>
    <plant_name>Buda BESS</plant_name>
    <state>TX</state>
    <county>Hays</county>
    <operator>Buda Infra LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>30.075567</lat>
    <lon>-97.85101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69331</plant_id>
    <plant_name>Regis Carrizo Springs</plant_name>
    <state>TX</state>
    <county>Dimmit</county>
    <operator>Regis Carrizo Springs LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>28.517736</lat>
    <lon>-99.83378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69332</plant_id>
    <plant_name>Regis Escondido</plant_name>
    <state>TX</state>
    <county>Maverick</county>
    <operator>Regis Escondido LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>28.730681</lat>
    <lon>-100.4746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69333</plant_id>
    <plant_name>Regis Goodwin LLC</plant_name>
    <state>TX</state>
    <county>Starr</county>
    <operator>Regis Goodwin LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>26.247029</lat>
    <lon>-98.45167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69335</plant_id>
    <plant_name>Regis Hidden Valley</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Regis Hidden Valley LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.909626</lat>
    <lon>-95.42364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69336</plant_id>
    <plant_name>Regis Gears Harris</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Regis Gears Harris LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.962405</lat>
    <lon>-95.44201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69337</plant_id>
    <plant_name>Regis Laureles</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Regis Laureles LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.122395</lat>
    <lon>-97.54792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69339</plant_id>
    <plant_name>Regis Lyssy</plant_name>
    <state>TX</state>
    <county>Karnes</county>
    <operator>Regis Lyssy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>28.894339</lat>
    <lon>-98.12413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69341</plant_id>
    <plant_name>Regis Medina Lake</plant_name>
    <state>TX</state>
    <county>Bandera</county>
    <operator>Regis Medina Lake LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.612674</lat>
    <lon>-98.93509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69342</plant_id>
    <plant_name>Regis Milton</plant_name>
    <state>TX</state>
    <county>Karnes</county>
    <operator>Regis Milton LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.057397</lat>
    <lon>-97.78802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69343</plant_id>
    <plant_name>Regis Utopia</plant_name>
    <state>TX</state>
    <county>Bandera</county>
    <operator>Regis Utopia LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.645365</lat>
    <lon>-99.52352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69344</plant_id>
    <plant_name>Regis Hearn</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Regis Hearn LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.849367</lat>
    <lon>-97.61106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69345</plant_id>
    <plant_name>Regis Mason</plant_name>
    <state>TX</state>
    <county>Mason</county>
    <operator>Regis Mason LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.738452</lat>
    <lon>-99.23248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69346</plant_id>
    <plant_name>Regis Monte Cristo LLC</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Regis Monte Cristo LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>26.36037</lat>
    <lon>-98.31517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69347</plant_id>
    <plant_name>Regis Muenster</plant_name>
    <state>TX</state>
    <county>Cooke</county>
    <operator>Regis Muenster LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.641097</lat>
    <lon>-97.33259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69348</plant_id>
    <plant_name>Regis Pirate</plant_name>
    <state>TX</state>
    <county>San Patricio</county>
    <operator>Regis Sinton-Pirate LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>28.028576</lat>
    <lon>-97.52049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69349</plant_id>
    <plant_name>Regis Falfurrias</plant_name>
    <state>TX</state>
    <county>Brooks</county>
    <operator>Regis Falfurrias LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>27.241365</lat>
    <lon>-98.14048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69353</plant_id>
    <plant_name>Sunset Ridge Energy Center, LLC</plant_name>
    <state>TX</state>
    <county>Frio</county>
    <operator>East Point Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>28.92633</lat>
    <lon>-99.09626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69361</plant_id>
    <plant_name>DGS Five Points</plant_name>
    <state>TX</state>
    <county>Taylor</county>
    <operator>Distributed Generation Solutions LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.46489</lat>
    <lon>-99.8126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69362</plant_id>
    <plant_name>Plaza Street</plant_name>
    <state>TX</state>
    <county>Taylor</county>
    <operator>DGSP2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>19.8</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.45759</lat>
    <lon>-99.78933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69422</plant_id>
    <plant_name>County Road BESS</plant_name>
    <state>TX</state>
    <county>Reeves</county>
    <operator>County Rd Infra LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.40078</lat>
    <lon>-103.4944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69510</plant_id>
    <plant_name>Cotulla BESS 1</plant_name>
    <state>TX</state>
    <county>La Salle</county>
    <operator>Marubeni Power International, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>28.442298</lat>
    <lon>-99.25255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69511</plant_id>
    <plant_name>Palmview BESS</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Marubeni Power International, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.23833</lat>
    <lon>-98.36946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69512</plant_id>
    <plant_name>SE Edinburg BESS</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Marubeni Power International, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>24.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>26.288269</lat>
    <lon>-98.14674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69576</plant_id>
    <plant_name>Non-PLD US-El Paso - BSSAT004</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Prologis Logistics Services Incorporated BESS</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>13.7</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.840393</lat>
    <lon>-102.7264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69607</plant_id>
    <plant_name>Bexar Corrilla BESS</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Bexar Corrilla LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>9.9</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.379708</lat>
    <lon>-98.3167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70239</plant_id>
    <plant_name>South River BESS Phase 1</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>South River OnSite Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9.9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <battery_mwh>15.6</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.44345</lat>
    <lon>-74.37815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1126</plant_id>
    <plant_name>Bellevue</plant_name>
    <state>IA</state>
    <county>Jackson</county>
    <operator>City of Bellevue - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1953</first_year>
    <latest_year>2021</latest_year>
    <lat>42.25</lat>
    <lon>-90.4167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1165</plant_id>
    <plant_name>Montezuma</plant_name>
    <state>IA</state>
    <county>Poweshiek</county>
    <operator>City of Montezuma - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>1940</first_year>
    <latest_year>2003</latest_year>
    <lat>41.586026</lat>
    <lon>-92.5228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1844</plant_id>
    <plant_name>Marshall (MI)</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>City of Marshall - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1978</latest_year>
    <lat>42.2717</lat>
    <lon>-84.9411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54908</plant_id>
    <plant_name>Enderlin</plant_name>
    <state>ND</state>
    <county>Ransom</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>46.6144</lat>
    <lon>-97.5765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59097</plant_id>
    <plant_name>Berry Plastics Solar</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.698333</lat>
    <lon>-75.15194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62793</plant_id>
    <plant_name>Crawfordsville 5 Solar Park</plant_name>
    <state>IN</state>
    <county>Montgomery</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.017668</lat>
    <lon>-86.85987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64876</plant_id>
    <plant_name>0 Hammond St CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>0HAM WHAM8 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <battery_mwh>4.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.808547</lat>
    <lon>-70.72668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67201</plant_id>
    <plant_name>DIA 9</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.8</nameplate_mw>
    <summer_mw>9.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.84666</lat>
    <lon>-104.6643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63</plant_id>
    <plant_name>Gold Creek</plant_name>
    <state>AK</state>
    <county>Juneau</county>
    <operator>Alaska Electric Light &amp; Power Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>9.7</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1966</latest_year>
    <lat>58.3107</lat>
    <lon>-134.4174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1990</plant_id>
    <plant_name>Luverne</plant_name>
    <state>MN</state>
    <county>Rock</county>
    <operator>City of Luverne - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>9.7</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>1967</first_year>
    <latest_year>2022</latest_year>
    <lat>43.654444</lat>
    <lon>-96.20194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4053</plant_id>
    <plant_name>Kilbourn</plant_name>
    <state>WI</state>
    <county>Columbia</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>9.7</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1939</latest_year>
    <lat>43.625845</lat>
    <lon>-89.78076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54006</plant_id>
    <plant_name>Broadwater Power Project</plant_name>
    <state>MT</state>
    <county>Broadwater</county>
    <operator>Montana Dept-Natural Res&amp;Consv</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>9.7</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>46.12061</lat>
    <lon>-111.4077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56591</plant_id>
    <plant_name>Horseshoe Bend Wind Park</plant_name>
    <state>MT</state>
    <county>Cascade</county>
    <operator>Cycle Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.7</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>47.4983</lat>
    <lon>-111.4392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59003</plant_id>
    <plant_name>Two Dot Wind Farm</plant_name>
    <state>MT</state>
    <county>Wheatland</county>
    <operator>NorthWestern Energy (MT wind/thermal)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.7</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>46.449444</lat>
    <lon>-110.0872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1780</plant_id>
    <plant_name>Michigamme Falls</plant_name>
    <state>MI</state>
    <county>Iron</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>45.9553</lat>
    <lon>-88.1958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3437</plant_id>
    <plant_name>Eagle Pass</plant_name>
    <state>TX</state>
    <county>Maverick</county>
    <operator>Maverick Cty Water Control &amp; Improvement</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1932</latest_year>
    <lat>28.829535</lat>
    <lon>-100.5522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7480</plant_id>
    <plant_name>Rowesville Rd Plant</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>City of Orangeburg - (SC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>33.436637</lat>
    <lon>-80.84739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54630</plant_id>
    <plant_name>American Gypsum Cogeneration</plant_name>
    <state>CO</state>
    <county>Eagle</county>
    <operator>Eagle Materials Co LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>39.648565</lat>
    <lon>-106.9494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56090</plant_id>
    <plant_name>Blacksand Generating Facility</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Bridge Energy LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>5</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2025</latest_year>
    <lat>33.9328</lat>
    <lon>-117.855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57123</plant_id>
    <plant_name>Trail Ridge Landfill Gas Recovery</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>30.227953</lat>
    <lon>-82.04088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57186</plant_id>
    <plant_name>Chautauqua LFGTE Facility</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Chautauqua Green Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2011</latest_year>
    <lat>42.1989</lat>
    <lon>-79.3186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57665</plant_id>
    <plant_name>SAF Hydroelectric LLC</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>SAF Hydroelectric LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>16</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.978889</lat>
    <lon>-93.24778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58208</plant_id>
    <plant_name>Cinnamon Bay Edgeboro Landfill</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Cinnamon Bay LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.465278</lat>
    <lon>-74.39389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58526</plant_id>
    <plant_name>Uwharrie Mountain Renewable</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Uwharrie Mountain Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.332974</lat>
    <lon>-79.96494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60701</plant_id>
    <plant_name>JED Solid Waste Mgmt Renewable Energy</plant_name>
    <state>FL</state>
    <county>Osceola</county>
    <operator>LMS Energy USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>28.063777</lat>
    <lon>-81.09724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63503</plant_id>
    <plant_name>Lakehurst Solar</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.024</lat>
    <lon>-74.312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65474</plant_id>
    <plant_name>GDIM 1, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>GDIM 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.966678</lat>
    <lon>-71.52599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65475</plant_id>
    <plant_name>GDIM 2, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>GDIM 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.967314</lat>
    <lon>-71.51961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65476</plant_id>
    <plant_name>GDIM 3, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>GDIM 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.963066</lat>
    <lon>-71.51693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65477</plant_id>
    <plant_name>GDIM 4, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>GDIM 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.963066</lat>
    <lon>-71.51693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67318</plant_id>
    <plant_name>OTHERTexasA&amp;M</plant_name>
    <state>TX</state>
    <county>Brazos</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>24</generators>
    <nameplate_mw>9.6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.641955</lat>
    <lon>-96.46097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50935</plant_id>
    <plant_name>Caterpillar</plant_name>
    <state>IN</state>
    <county>Tippecanoe</county>
    <operator>Caterpillar Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>10.1</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2024</latest_year>
    <lat>40.4175</lat>
    <lon>-86.8447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59276</plant_id>
    <plant_name>Leavenworth Greenworks LLC</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.925278</lat>
    <lon>-72.76333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60196</plant_id>
    <plant_name>Santa Fe Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Santa Fe</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.587795</lat>
    <lon>-106.0609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60421</plant_id>
    <plant_name>Veyo Heat Recovery Project</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>Utah Associated Mun Power Sys</operator>
    <sector>Electric Utility</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.348</lat>
    <lon>-113.765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60869</plant_id>
    <plant_name>Solar Star California, XLIV, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.511889</lat>
    <lon>-117.9228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63550</plant_id>
    <plant_name>Vassar Brothers Medical Center</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Vassar Brothers Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2020</latest_year>
    <lat>41.693606</lat>
    <lon>-73.93482</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64246</plant_id>
    <plant_name>Peru 2</plant_name>
    <state>IN</state>
    <county>Miami</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.758183</lat>
    <lon>-86.10501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64759</plant_id>
    <plant_name>Old Middleboro Road Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <battery_mwh>13.4</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.793</lat>
    <lon>-70.82031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65217</plant_id>
    <plant_name>South Goshen Community Solar</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>9.5</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <battery_mwh>17</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.3927</lat>
    <lon>-74.3478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>274</plant_id>
    <plant_name>Potter Valley</plant_name>
    <state>CA</state>
    <county>Mendocino</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1939</latest_year>
    <lat>39.361786</lat>
    <lon>-123.1279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1263</plant_id>
    <plant_name>Belleville</plant_name>
    <state>KS</state>
    <county>Republic</county>
    <operator>City of Belleville - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <first_year>1955</first_year>
    <latest_year>2005</latest_year>
    <lat>39.832769</lat>
    <lon>-97.63204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1453</plant_id>
    <plant_name>New Roads</plant_name>
    <state>LA</state>
    <county>Pointe Coupee</county>
    <operator>Louisiana Energy &amp; Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1971</latest_year>
    <lat>30.726111</lat>
    <lon>-91.36833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1874</plant_id>
    <plant_name>Caro</plant_name>
    <state>MI</state>
    <county>Tuscola</county>
    <operator>Thumb Electric Coop of Mich</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>1949</first_year>
    <latest_year>2000</latest_year>
    <lat>43.4659</lat>
    <lon>-83.3278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54524</plant_id>
    <plant_name>Horseshoe Bend Hydroelectric Co</plant_name>
    <state>ID</state>
    <county>Boise</county>
    <operator>Horseshoe Bend Hydroelectric Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9.4</nameplate_mw>
    <summer_mw>9.4</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.904085</lat>
    <lon>-116.2442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8106</plant_id>
    <plant_name>Tipton</plant_name>
    <state>IA</state>
    <county>Cedar</county>
    <operator>City of Tipton - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9.3</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2019</latest_year>
    <lat>41.7717</lat>
    <lon>-91.1321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10288</plant_id>
    <plant_name>Big Valley Power LLC</plant_name>
    <state>CA</state>
    <county>Lassen</county>
    <operator>Big Valley Power (BVP) LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>9.3</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>41.1325</lat>
    <lon>-121.1372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50252</plant_id>
    <plant_name>Sartell Dam</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>11</generators>
    <nameplate_mw>9.3</nameplate_mw>
    <summer_mw>9.3</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>45.617996</lat>
    <lon>-94.20079</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52133</plant_id>
    <plant_name>Tesoro Mandan Cogeneration Plant</plant_name>
    <state>ND</state>
    <county>Morton</county>
    <operator>PAR Petroleum</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>3</generators>
    <nameplate_mw>9.3</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1958</latest_year>
    <lat>46.8492</lat>
    <lon>-100.8808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>386</plant_id>
    <plant_name>Drop 3 (CA)</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>8.9</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1966</latest_year>
    <lat>32.705428</lat>
    <lon>-115.1261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>511</plant_id>
    <plant_name>Trinidad (CO)</plant_name>
    <state>CO</state>
    <county>Las Animas</county>
    <operator>City of Trinidad - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1999</latest_year>
    <lat>37.178979</lat>
    <lon>-104.4875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1202</plant_id>
    <plant_name>Wilton</plant_name>
    <state>IA</state>
    <county>Muscatine</county>
    <operator>City of Wilton - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2002</latest_year>
    <lat>41.587748</lat>
    <lon>-91.01946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1958</plant_id>
    <plant_name>Alexandria</plant_name>
    <state>MN</state>
    <county>Douglas</county>
    <operator>City of Alexandria - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1967</latest_year>
    <lat>45.889167</lat>
    <lon>-95.37972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6305</plant_id>
    <plant_name>Glennallen</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Copper Valley Elec Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2010</latest_year>
    <lat>62.110415</lat>
    <lon>-145.5325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7976</plant_id>
    <plant_name>Mulvane 2</plant_name>
    <state>KS</state>
    <county>Sedgwick</county>
    <operator>City of Mulvane - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>37.4908</lat>
    <lon>-97.2216</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10305</plant_id>
    <plant_name>Dutchess Cnty Resource Recovery Facility</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Dutchess County RRA - (NY)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>41.647</lat>
    <lon>-73.943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50082</plant_id>
    <plant_name>International Paper Livermore Hydro</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>9</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1910</first_year>
    <latest_year>2004</latest_year>
    <lat>44.470511</lat>
    <lon>-70.18733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50576</plant_id>
    <plant_name>Metro Gas Recovery</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2000</latest_year>
    <lat>42.850556</lat>
    <lon>-88.06972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50893</plant_id>
    <plant_name>Allegheny No. 5 Hydro Station</plant_name>
    <state>PA</state>
    <county>Armstrong</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.682875</lat>
    <lon>-79.6653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50894</plant_id>
    <plant_name>Allegheny No 6 Hydro Station</plant_name>
    <state>PA</state>
    <county>Armstrong</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.716389</lat>
    <lon>-79.57722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54663</plant_id>
    <plant_name>Turnkey Landfill Gas Recovery</plant_name>
    <state>NH</state>
    <county>Strafford</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1997</latest_year>
    <lat>43.241555</lat>
    <lon>-70.9664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54887</plant_id>
    <plant_name>DSM Pharmaceuticals</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Patheon Manufacturing Service LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Fired Combustion Turbine</technologies>
    <generators>8</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2015</latest_year>
    <lat>35.665961</lat>
    <lon>-77.35744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55342</plant_id>
    <plant_name>Woodstock Windfarm</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>43.985833</lat>
    <lon>-96.07861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56898</plant_id>
    <plant_name>Ameresco Chiquita Canyon</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AMERESCO Chiquita Canyon LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>34.431664</lat>
    <lon>-118.6429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57163</plant_id>
    <plant_name>Calabasas Gas to Energy Facility</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles County Sanitation</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>34.1511</lat>
    <lon>-118.7236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58258</plant_id>
    <plant_name>Central Utilities Plant LAX 2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>LAX Airport</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.943889</lat>
    <lon>-118.4042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58575</plant_id>
    <plant_name>Smithfield Packaged Meats Corp (Kinston)</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Smithfield Packaged Meats Corp (Kinston)</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.268333</lat>
    <lon>-77.65917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59395</plant_id>
    <plant_name>City of Tulare Water Facility</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>City of Tulare Water Pollution Control - (CA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Other Waste Biomass; Other Natural Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2020</latest_year>
    <lat>36.185</lat>
    <lon>-119.375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59836</plant_id>
    <plant_name>Twin Falls (WI)</plant_name>
    <state>WI</state>
    <county>Florence</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.872778</lat>
    <lon>-88.07083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63897</plant_id>
    <plant_name>Oxford PV - BD Solar Oxford LLC</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>BD Solar Oxford LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.2</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.151</lat>
    <lon>-70.476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1307</plant_id>
    <plant_name>Minneapolis City of</plant_name>
    <state>KS</state>
    <county>Ottawa</county>
    <operator>City of Minneapolis - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9.1</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1989</latest_year>
    <lat>39.1194</lat>
    <lon>-97.7086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2986</plant_id>
    <plant_name>Kingfisher</plant_name>
    <state>OK</state>
    <county>Kingfisher</county>
    <operator>City of Kingfisher - (OK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9.1</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1970</latest_year>
    <lat>35.8575</lat>
    <lon>-97.9277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59618</plant_id>
    <plant_name>Meadow Lake Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9.1</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.81</lat>
    <lon>-106.52</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60404</plant_id>
    <plant_name>Pisgah Mountain Wind</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Pisgah Mountain, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9.1</nameplate_mw>
    <summer_mw>9.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.777337</lat>
    <lon>-68.52342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63646</plant_id>
    <plant_name>Jacobi Medical Center</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Jacobi Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>11</generators>
    <nameplate_mw>9.1</nameplate_mw>
    <summer_mw>9.1</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2012</latest_year>
    <lat>40.85652</lat>
    <lon>-73.84737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>174</plant_id>
    <plant_name>Remmel</plant_name>
    <state>AR</state>
    <county>Hot Spring</county>
    <operator>Entergy Arkansas LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>11.4</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>34.4272</lat>
    <lon>-92.8941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>410</plant_id>
    <plant_name>McSwain</plant_name>
    <state>CA</state>
    <county>Mariposa</county>
    <operator>Merced Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>37.522065</lat>
    <lon>-120.3101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>560</plant_id>
    <plant_name>Falls Village</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>FirstLight Power Resources Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9.9</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1914</latest_year>
    <lat>41.957272</lat>
    <lon>-73.3693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>808</plant_id>
    <plant_name>Jarvis (Hinckley)</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>43.3121</lat>
    <lon>-75.109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1700</plant_id>
    <plant_name>Cooke</plant_name>
    <state>MI</state>
    <county>Iosco</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1911</latest_year>
    <lat>44.472624</lat>
    <lon>-83.57195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1705</plant_id>
    <plant_name>Foote</plant_name>
    <state>MI</state>
    <county>Iosco</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1918</latest_year>
    <lat>44.435381</lat>
    <lon>-83.44072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1964</plant_id>
    <plant_name>Benson City of</plant_name>
    <state>MN</state>
    <county>Swift</county>
    <operator>City of Benson - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>45.314444</lat>
    <lon>-95.60278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2012</plant_id>
    <plant_name>Springfield (MN)</plant_name>
    <state>MN</state>
    <county>Brown</county>
    <operator>Springfield Public Utils Comm - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2001</latest_year>
    <lat>44.239539</lat>
    <lon>-94.97626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2020</plant_id>
    <plant_name>Wells IC</plant_name>
    <state>MN</state>
    <county>Faribault</county>
    <operator>City of Wells - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>1953</first_year>
    <latest_year>2022</latest_year>
    <lat>43.74453</lat>
    <lon>-93.72413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2741</plant_id>
    <plant_name>Bear Creek Dam</plant_name>
    <state>NC</state>
    <county>Jackson</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9.5</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>35.242677</lat>
    <lon>-83.07201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2995</plant_id>
    <plant_name>Pawhuska</plant_name>
    <state>OK</state>
    <county>Osage</county>
    <operator>City of Pawhuska - (OK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1966</latest_year>
    <lat>36.669425</lat>
    <lon>-96.34741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6645</plant_id>
    <plant_name>Foothill Feeder</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>34.5148</lat>
    <lon>-118.6092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7719</plant_id>
    <plant_name>Meridian</plant_name>
    <state>MS</state>
    <county>Lauderdale</county>
    <operator>Tennessee Valley Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>32.55078</lat>
    <lon>-88.60669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10008</plant_id>
    <plant_name>Baptist Medical Center</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>Baptist Memorial Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8.1</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1993</latest_year>
    <lat>30.314467</lat>
    <lon>-81.66271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10531</plant_id>
    <plant_name>Beebee Island Hydro Plant</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>43.9767</lat>
    <lon>-75.9072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10740</plant_id>
    <plant_name>Magic Dam Hydroelectric Project</plant_name>
    <state>ID</state>
    <county>Blaine</county>
    <operator>Wood Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>43.2547</lat>
    <lon>-114.3569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54414</plant_id>
    <plant_name>John Deere Dubuque Works</plant_name>
    <state>IA</state>
    <county>Dubuque</county>
    <operator>John Deere Dubuque Works</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>42.5734</lat>
    <lon>-90.6926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54668</plant_id>
    <plant_name>Falls River Hydro</plant_name>
    <state>ID</state>
    <county>Fremont</county>
    <operator>Marysville Hydro Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>44.0597</lat>
    <lon>-111.3535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54927</plant_id>
    <plant_name>Grand Isle Gas Plant / Treating Station</plant_name>
    <state>LA</state>
    <county>Jefferson</county>
    <operator>Cox Operating LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>29.252062</lat>
    <lon>-89.9721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55803</plant_id>
    <plant_name>Somerset Windpower LLC</plant_name>
    <state>PA</state>
    <county>Somerset</county>
    <operator>Sequitur Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>39.979167</lat>
    <lon>-79.01278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56116</plant_id>
    <plant_name>IMEA Flora</plant_name>
    <state>IL</state>
    <county>Clay</county>
    <operator>Illinois Municipal Elec Agency (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>38.6658</lat>
    <lon>-88.4625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56229</plant_id>
    <plant_name>Cogeneration 1</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>University of Arizona</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>32.229922</lat>
    <lon>-110.9528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57187</plant_id>
    <plant_name>Pillar Mountain Wind Project Microgrid</plant_name>
    <state>AK</state>
    <county>Kodiak Island</county>
    <operator>Kodiak Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2012</latest_year>
    <lat>57.7869</lat>
    <lon>-152.4406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57190</plant_id>
    <plant_name>Little Quinnesec Falls Hydro Project</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1900</first_year>
    <latest_year>1916</latest_year>
    <lat>45.7736</lat>
    <lon>-87.9894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57191</plant_id>
    <plant_name>Exelon Solar Chicago</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Luminace Solar Chicago, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.6758</lat>
    <lon>-87.6514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57575</plant_id>
    <plant_name>Deming Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2013</latest_year>
    <lat>32.165833</lat>
    <lon>-107.7506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57578</plant_id>
    <plant_name>PaTu Wind Farm LLC</plant_name>
    <state>OR</state>
    <county>Sherman</county>
    <operator>PaTu Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>45.613061</lat>
    <lon>-120.6169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58042</plant_id>
    <plant_name>Black Mountain Solar LLC</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.0227</lat>
    <lon>-114.1627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58227</plant_id>
    <plant_name>SEPV9 Power Plant</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.192222</lat>
    <lon>-116.0903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58615</plant_id>
    <plant_name>Indianapolis Motor Speedway Solar PV</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.79</lat>
    <lon>-86.23361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59737</plant_id>
    <plant_name>Aspiration G</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.552186</lat>
    <lon>-120.3525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60331</plant_id>
    <plant_name>Hyline Solar Center, LLC</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.151256</lat>
    <lon>-117.0001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61487</plant_id>
    <plant_name>SL Babylon</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>SL Babylon, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.730844</lat>
    <lon>-73.37583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61519</plant_id>
    <plant_name>Baker Point</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.570338</lat>
    <lon>-77.36342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62497</plant_id>
    <plant_name>Orange County Energy Storage 2</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Convergent Energy and Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <battery_mwh>36</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.715536</lat>
    <lon>-117.8543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62969</plant_id>
    <plant_name>Syncarpha Puddon I Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Puddon I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.139492</lat>
    <lon>-71.63313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62970</plant_id>
    <plant_name>Syncarpha Puddon II Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Puddon II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.133867</lat>
    <lon>-71.63105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62977</plant_id>
    <plant_name>Syncarpha Northbridge I Hybrid(CSG)</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Northbridge I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>42.11239</lat>
    <lon>-71.64826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63000</plant_id>
    <plant_name>RT 52 Walden Solar 1, LLC Hybrid</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <battery_mwh>8.8</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2020</latest_year>
    <lat>41.5841</lat>
    <lon>-74.2163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63566</plant_id>
    <plant_name>HWY 158 PV</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.423222</lat>
    <lon>-77.07384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64247</plant_id>
    <plant_name>Richmond 5</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.805613</lat>
    <lon>-84.87455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64696</plant_id>
    <plant_name>Dunstable Solar 1, LLC</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <battery_mwh>20.2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.6656</lat>
    <lon>-71.5168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64831</plant_id>
    <plant_name>Oak Leaf Solar XVIII LLC</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.892563</lat>
    <lon>-104.6685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64843</plant_id>
    <plant_name>SR Washington I, LLC</plant_name>
    <state>TN</state>
    <county>Washington</county>
    <operator>SR Washington I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.347384</lat>
    <lon>-82.5984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65535</plant_id>
    <plant_name>Bakke</plant_name>
    <state>TX</state>
    <county>Andrews</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.295946</lat>
    <lon>-102.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65536</plant_id>
    <plant_name>Citrus City</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>26.320997</lat>
    <lon>-98.35174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65537</plant_id>
    <plant_name>Clara</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.845265</lat>
    <lon>-95.55395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65538</plant_id>
    <plant_name>Cutten</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.956811</lat>
    <lon>-95.52764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65539</plant_id>
    <plant_name>E. Porte Ct.</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>26.19208</lat>
    <lon>-97.66424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65540</plant_id>
    <plant_name>Frankel</plant_name>
    <state>TX</state>
    <county>Andrews</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.381434</lat>
    <lon>-102.7828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65542</plant_id>
    <plant_name>Goldsmith</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>31.975269</lat>
    <lon>-102.635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65543</plant_id>
    <plant_name>Mckeever</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.508402</lat>
    <lon>-95.47934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65544</plant_id>
    <plant_name>N. Mary Francis</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>31.921616</lat>
    <lon>-102.431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65573</plant_id>
    <plant_name>Ridge Rd</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>26.16815</lat>
    <lon>-98.09831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65574</plant_id>
    <plant_name>Santa Rosa</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>26.23055</lat>
    <lon>-97.82349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65575</plant_id>
    <plant_name>Southwick</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.59576</lat>
    <lon>-95.36578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65576</plant_id>
    <plant_name>Stonegate</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.785353</lat>
    <lon>-95.8755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65578</plant_id>
    <plant_name>Tumbleweed</plant_name>
    <state>TX</state>
    <county>Andrews</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.35123</lat>
    <lon>-102.5577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65579</plant_id>
    <plant_name>Vaquero</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>26.168074</lat>
    <lon>-97.65405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65580</plant_id>
    <plant_name>Villa Cavasos</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>26.02131</lat>
    <lon>-97.59628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65581</plant_id>
    <plant_name>Westover</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>15</generators>
    <nameplate_mw>9</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>31.8362</lat>
    <lon>-102.4461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1469</plant_id>
    <plant_name>Ellsworth Hydro Station</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>Brookfield Black Bear Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>8.9</nameplate_mw>
    <summer_mw>9.3</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1938</latest_year>
    <lat>44.5442</lat>
    <lon>-68.4306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1701</plant_id>
    <plant_name>Croton</plant_name>
    <state>MI</state>
    <county>Newaygo</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>8.9</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1907</first_year>
    <latest_year>1915</latest_year>
    <lat>43.437322</lat>
    <lon>-85.66446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56122</plant_id>
    <plant_name>Richland County Landfill</plant_name>
    <state>SC</state>
    <county>Richland</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>8.9</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2010</latest_year>
    <lat>34.102996</lat>
    <lon>-80.79049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57916</plant_id>
    <plant_name>Spreckels Sugar Company</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Spreckels Sugar Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8.9</nameplate_mw>
    <summer_mw>8.9</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>32.911111</lat>
    <lon>-115.5681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58169</plant_id>
    <plant_name>CSUF Trigeneration</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>California State University at Fullerton</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Solar Photovoltaic</technologies>
    <generators>7</generators>
    <nameplate_mw>8.9</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2020</latest_year>
    <lat>33.880638</lat>
    <lon>-117.8866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60028</plant_id>
    <plant_name>Shorthorn Holdings</plant_name>
    <state>SC</state>
    <county>Marlboro</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.9</nameplate_mw>
    <summer_mw>8.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.680287</lat>
    <lon>-79.54074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>396</plant_id>
    <plant_name>Foothill</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>34.318248</lat>
    <lon>-118.4944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1300</plant_id>
    <plant_name>Lincoln</plant_name>
    <state>KS</state>
    <county>Lincoln</county>
    <operator>City of Lincoln Center - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2017</latest_year>
    <lat>39.03719</lat>
    <lon>-98.15299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1504</plant_id>
    <plant_name>Shawmut</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1982</latest_year>
    <lat>44.629517</lat>
    <lon>-69.58353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2145</plant_id>
    <plant_name>Memphis</plant_name>
    <state>MO</state>
    <county>Scotland</county>
    <operator>City of Memphis - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>1945</first_year>
    <latest_year>1990</latest_year>
    <lat>40.4578</lat>
    <lon>-92.181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7056</plant_id>
    <plant_name>Bolton Falls</plant_name>
    <state>VT</state>
    <county>Washington</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.359381</lat>
    <lon>-72.81673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54661</plant_id>
    <plant_name>Pheasant Run Landfill Gas Recovery</plant_name>
    <state>WI</state>
    <county>Kenosha</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>11</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2002</latest_year>
    <lat>42.5825</lat>
    <lon>-88.0436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54989</plant_id>
    <plant_name>Pine Tree Acres</plant_name>
    <state>MI</state>
    <county>Macomb</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>9</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2010</latest_year>
    <lat>42.764456</lat>
    <lon>-82.74709</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56100</plant_id>
    <plant_name>St. Charles Power Plant</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>City of St Charles - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>43.9742</lat>
    <lon>-92.0597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56836</plant_id>
    <plant_name>T-Bone Wind (10) LLC</plant_name>
    <state>TX</state>
    <county>Moore</county>
    <operator>UPC Power Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>35.8081</lat>
    <lon>-101.9986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60788</plant_id>
    <plant_name>Suwannee Solar Facility</plant_name>
    <state>FL</state>
    <county>Suwannee</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.376254</lat>
    <lon>-83.17411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61073</plant_id>
    <plant_name>Pemberton Road I</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.981764</lat>
    <lon>-74.69737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61074</plant_id>
    <plant_name>Pemberton Road II</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.979936</lat>
    <lon>-74.70192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61600</plant_id>
    <plant_name>Old Bridge Solar Farm</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.444372</lat>
    <lon>-74.24338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61965</plant_id>
    <plant_name>Quakertown Solar Farm, LLC</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.522818</lat>
    <lon>-74.94417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62638</plant_id>
    <plant_name>McCullough Road Solar Farm</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.757615</lat>
    <lon>-74.95816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62974</plant_id>
    <plant_name>Syncarpha Millbury Hybrid (CSG)</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Millbury, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <battery_mwh>7.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2023</latest_year>
    <lat>42.175203</lat>
    <lon>-71.79303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62975</plant_id>
    <plant_name>Syncarpha Blandford Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Syncarpha Blandford, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <battery_mwh>7.9</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2020</latest_year>
    <lat>42.213074</lat>
    <lon>-72.93886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63064</plant_id>
    <plant_name>Asheville-Rock Hill Battery</plant_name>
    <state>NC</state>
    <county>Buncombe</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <battery_mwh>8.8</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.54012</lat>
    <lon>-82.51738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63149</plant_id>
    <plant_name>Franklin Solar (NJ)</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.72</lat>
    <lon>-75.06</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65015</plant_id>
    <plant_name>ASD Wallum MA Solar LLC(CSG)</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>ASD Wallum MA Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <battery_mwh>12.8</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.011623</lat>
    <lon>-71.76049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69306</plant_id>
    <plant_name>Costen Solar</plant_name>
    <state>MD</state>
    <county>Worcester</county>
    <operator>Costen Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.0978</lat>
    <lon>-75.6108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69498</plant_id>
    <plant_name>Quakertown Solar Farm II</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.8</nameplate_mw>
    <summer_mw>8.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.523</lat>
    <lon>-74.938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>789</plant_id>
    <plant_name>Orca</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Cordova Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2023</latest_year>
    <lat>60.555889</lat>
    <lon>-145.753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1145</plant_id>
    <plant_name>Grundy Center City Light Plant</plant_name>
    <state>IA</state>
    <county>Grundy</county>
    <operator>Grundy Center Mun Light &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1990</latest_year>
    <lat>42.363094</lat>
    <lon>-92.77232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2164</plant_id>
    <plant_name>Unionville City of</plant_name>
    <state>MO</state>
    <county>Putnam</county>
    <operator>City of Unionville - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1994</latest_year>
    <lat>40.476742</lat>
    <lon>-93.01002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2221</plant_id>
    <plant_name>Broken Bow</plant_name>
    <state>NE</state>
    <county>Custer</county>
    <operator>City of Broken Bow - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1970</latest_year>
    <lat>41.4031</lat>
    <lon>-99.6392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10191</plant_id>
    <plant_name>Tehachapi Wind Resource I</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CalWind Resources Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>35.060556</lat>
    <lon>-118.3897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10431</plant_id>
    <plant_name>Anheuser-Busch Jacksonville</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>Anheuser-Busch Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>30.43424</lat>
    <lon>-81.64535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50333</plant_id>
    <plant_name>Gay Robinson</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Gay &amp; Robinson Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>1982</first_year>
    <latest_year>2019</latest_year>
    <lat>21.9178</lat>
    <lon>-159.6294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50896</plant_id>
    <plant_name>S E Hazelton A</plant_name>
    <state>ID</state>
    <county>Jerome</county>
    <operator>North Side Energy Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.586701</lat>
    <lon>-114.0675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62642</plant_id>
    <plant_name>GE-Lubbock</plant_name>
    <state>TX</state>
    <county>Lubbock</county>
    <operator>GE Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>9.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2021</latest_year>
    <lat>33.59145</lat>
    <lon>-102.0569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64213</plant_id>
    <plant_name>Auburn Solar Project</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <battery_mwh>9.4</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.13</lat>
    <lon>-71.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64244</plant_id>
    <plant_name>Anderson 3</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.7</nameplate_mw>
    <summer_mw>8.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.081698</lat>
    <lon>-85.64203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1327</plant_id>
    <plant_name>Stockton</plant_name>
    <state>KS</state>
    <county>Rooks</county>
    <operator>City of Stockton - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <first_year>1955</first_year>
    <latest_year>2022</latest_year>
    <lat>39.43619</lat>
    <lon>-99.27793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1966</plant_id>
    <plant_name>Blooming Prairie</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>City of Blooming Prairie - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>1974</first_year>
    <latest_year>2023</latest_year>
    <lat>43.866</lat>
    <lon>-93.0504</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6306</plant_id>
    <plant_name>Valdez</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Copper Valley Elec Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2017</latest_year>
    <lat>61.1303</lat>
    <lon>-146.3647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10063</plant_id>
    <plant_name>Derby Hydro</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>McCallum Enterprises I LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>41.324308</lat>
    <lon>-73.10211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52184</plant_id>
    <plant_name>Tesoro Kenai Cogeneration Plant</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Tesoro Alaska Company LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>60.677</lat>
    <lon>-151.3815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54985</plant_id>
    <plant_name>Crestwood Dothan</plant_name>
    <state>AL</state>
    <county>Houston</county>
    <operator>Crestwood Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2002</latest_year>
    <lat>31.262356</lat>
    <lon>-85.40274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57348</plant_id>
    <plant_name>CityCenter Central Plant Cogen Units</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>CityCenter Land LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.1039</lat>
    <lon>-115.1794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58553</plant_id>
    <plant_name>Indy Solar III, LLC</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.659444</lat>
    <lon>-86.25972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58877</plant_id>
    <plant_name>Kinsley Landfill Solar</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.793333</lat>
    <lon>-75.10639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63044</plant_id>
    <plant_name>Ryan Road Solar LLC Hybrid(CSG)</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <battery_mwh>14</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.2637</lat>
    <lon>-72.0639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64242</plant_id>
    <plant_name>St. Cloud Hydro</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>St. Cloud Hydroelectric Generation Facility</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>45.547592</lat>
    <lon>-94.14858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64726</plant_id>
    <plant_name>West Haydenville PJ Community Solar</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.6</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.3831</lat>
    <lon>-72.7111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65</plant_id>
    <plant_name>Salmon Creek 1</plant_name>
    <state>AK</state>
    <county>Juneau</county>
    <operator>Alaska Electric Light &amp; Power Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>58.3269</lat>
    <lon>-134.4631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>290</plant_id>
    <plant_name>Volta 1</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>40.459111</lat>
    <lon>-121.8671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>316</plant_id>
    <plant_name>Sepulveda Canyon</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>34.0969</lat>
    <lon>-118.4795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1127</plant_id>
    <plant_name>Bloomfield</plant_name>
    <state>IA</state>
    <county>Davis</county>
    <operator>City of Bloomfield - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>1945</first_year>
    <latest_year>1975</latest_year>
    <lat>40.7031</lat>
    <lon>-92.4253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1274</plant_id>
    <plant_name>Ellinwood</plant_name>
    <state>KS</state>
    <county>Barton</county>
    <operator>City of Ellinwood - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1971</latest_year>
    <lat>38.354514</lat>
    <lon>-98.58344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2009</plant_id>
    <plant_name>Redwood Falls</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Redwood Falls Public Util Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2013</latest_year>
    <lat>44.5431</lat>
    <lon>-95.1178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2639</plant_id>
    <plant_name>Rochester 2</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Rochester Gas &amp; Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1960</latest_year>
    <lat>43.1611</lat>
    <lon>-77.615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50362</plant_id>
    <plant_name>Tunnel 1 Power Project</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Owyhee Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>43.642023</lat>
    <lon>-117.2327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56193</plant_id>
    <plant_name>Medford Operation</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>Boise Cascade Wood Products LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1965</latest_year>
    <lat>42.355517</lat>
    <lon>-122.9046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57306</plant_id>
    <plant_name>Pine Tree Solar Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.229635</lat>
    <lon>-118.1957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58951</plant_id>
    <plant_name>Delilah Road Landfill</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>CVI CleanCapital Solar 5 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.416111</lat>
    <lon>-74.54389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59366</plant_id>
    <plant_name>G&amp;S Wantage Solar LLC</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>G&amp;S Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.189167</lat>
    <lon>-74.59167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60457</plant_id>
    <plant_name>Athens Energy</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Athens Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.945514</lat>
    <lon>-69.66071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60534</plant_id>
    <plant_name>West Waconia Solar</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.789894</lat>
    <lon>-93.90129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60863</plant_id>
    <plant_name>Cooperative Solar One</plant_name>
    <state>KY</state>
    <county>Clark</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.027241</lat>
    <lon>-84.25473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61588</plant_id>
    <plant_name>Independence II Solar Farm</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>MC Power Companies Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.04</lat>
    <lon>-94.27</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64147</plant_id>
    <plant_name>ZPD-PT Solar Project 2017-038 Hybrid LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.5</summer_mw>
    <battery_mwh>6.7</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.516</lat>
    <lon>-71.6734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69745</plant_id>
    <plant_name>MCLB Biosteam to Energy</plant_name>
    <state>GA</state>
    <county>Dougherty</county>
    <operator>Inst and Envir Div Marine Logistics Base</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>PUR</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>8.5</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>31.554108</lat>
    <lon>-84.1064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>289</plant_id>
    <plant_name>Tule River</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Tule Hydro LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1914</latest_year>
    <lat>36.163076</lat>
    <lon>-118.7071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>324</plant_id>
    <plant_name>Bishop Creek 3</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1913</latest_year>
    <lat>37.301962</lat>
    <lon>-118.532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2355</plant_id>
    <plant_name>Ayers Island</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>43.597849</lat>
    <lon>-71.71768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3772</plant_id>
    <plant_name>Buck Hydro</plant_name>
    <state>VA</state>
    <county>Carroll</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>36.808229</lat>
    <lon>-80.93871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54306</plant_id>
    <plant_name>Wilson Lake Hydroelectric Project</plant_name>
    <state>ID</state>
    <county>Jerome</county>
    <operator>Hazelton/Wilson Joint Venture</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>42.628889</lat>
    <lon>-114.1747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54618</plant_id>
    <plant_name>Ingredion Winston Salem</plant_name>
    <state>NC</state>
    <county>Forsyth</county>
    <operator>Ingredion Inc - Winston Salem</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1993</latest_year>
    <lat>36.033761</lat>
    <lon>-80.2274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56346</plant_id>
    <plant_name>Bear Valley Power Plant</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Bear Valley Electric Service</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>34.2506</lat>
    <lon>-116.9025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56408</plant_id>
    <plant_name>Agriwind</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Agriwind Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>41.3017</lat>
    <lon>-89.6236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56934</plant_id>
    <plant_name>Cassia Wind</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Cassia Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.8444</lat>
    <lon>-115.0369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58521</plant_id>
    <plant_name>Manzano Solar</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.746667</lat>
    <lon>-106.6544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60250</plant_id>
    <plant_name>Swampy Acres Microgrid</plant_name>
    <state>AK</state>
    <county>Kodiak Island</county>
    <operator>Kodiak Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2015</latest_year>
    <lat>57.77556</lat>
    <lon>-152.4803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61601</plant_id>
    <plant_name>Raritan Solar - 53 Highway</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.453864</lat>
    <lon>-74.86303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63416</plant_id>
    <plant_name>Sierra Pacific Industries (2042-RD)</plant_name>
    <state>CA</state>
    <county>Tehama</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.121389</lat>
    <lon>-122.1919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63431</plant_id>
    <plant_name>Cisco</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.6256</lat>
    <lon>-95.3725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63661</plant_id>
    <plant_name>SWM Fuel Cell</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Yaphank Fuel Cell Park, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.79</lat>
    <lon>-72.93</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67281</plant_id>
    <plant_name>FFP - NY Urbanski</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>FFP NY Goshen Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.4</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <battery_mwh>10.5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.330899</lat>
    <lon>-74.40342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69</plant_id>
    <plant_name>Haines</plant_name>
    <state>AK</state>
    <county>Haines</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2021</latest_year>
    <lat>59.235931</lat>
    <lon>-135.4462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>225</plant_id>
    <plant_name>Chili Bar</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Sacramento Municipal Util Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>38.771764</lat>
    <lon>-120.8132</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>823</plant_id>
    <plant_name>Upper Malad</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>42.864267</lat>
    <lon>-114.8855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4130</plant_id>
    <plant_name>New Lisbon</plant_name>
    <state>WI</state>
    <county>Juneau</county>
    <operator>City of New Lisbon (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>1966</first_year>
    <latest_year>2005</latest_year>
    <lat>43.8797</lat>
    <lon>-90.1645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56972</plant_id>
    <plant_name>Pacific Canyon Windfarm LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Echo 1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.6542</lat>
    <lon>-119.4869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60755</plant_id>
    <plant_name>Spartan</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.047769</lat>
    <lon>-74.61646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62652</plant_id>
    <plant_name>Happy Hollow CSG Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <battery_mwh>6.6</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.606995</lat>
    <lon>-72.04529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63475</plant_id>
    <plant_name>Randall Solar Project Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.3921</lat>
    <lon>-71.6611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63805</plant_id>
    <plant_name>Williamsville Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>147 Williamsville Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <battery_mwh>6.7</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.469505</lat>
    <lon>-72.06978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63999</plant_id>
    <plant_name>Micanopy Energy Storage Facility</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <battery_mwh>11.7</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.5112</lat>
    <lon>-82.27483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64664</plant_id>
    <plant_name>Clark Road Solar 1, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Clark Road Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2021</latest_year>
    <lat>42.59613</lat>
    <lon>-72.02024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64875</plant_id>
    <plant_name>276 Federal Rd(CSG)</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>276FED WHAM8 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <battery_mwh>6.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.805144</lat>
    <lon>-70.72524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65056</plant_id>
    <plant_name>160 Tihonet Rd Hybrid(CSG)</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>160TIH WHAM8 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <battery_mwh>6.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.793414</lat>
    <lon>-70.71267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67596</plant_id>
    <plant_name>Adams PV Plant</plant_name>
    <state>WI</state>
    <county>Adams</county>
    <operator>Adams PV Plant (WI)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.95014</lat>
    <lon>-89.68088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68743</plant_id>
    <plant_name>Adams Grove Solar</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <battery_mwh>3.3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.60783</lat>
    <lon>-73.13566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69686</plant_id>
    <plant_name>RE Solar, LLC</plant_name>
    <state>SD</state>
    <county>Spink</county>
    <operator>Redfield Energy, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.3</nameplate_mw>
    <summer_mw>8.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.923852</lat>
    <lon>-98.50219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>325</plant_id>
    <plant_name>Bishop Creek 4</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>1905</first_year>
    <latest_year>1909</latest_year>
    <lat>37.323035</lat>
    <lon>-118.5017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>406</plant_id>
    <plant_name>Tok</plant_name>
    <state>AK</state>
    <county>Southeast Fairbanks</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2023</latest_year>
    <lat>63.33552</lat>
    <lon>-143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1306</plant_id>
    <plant_name>Meade</plant_name>
    <state>KS</state>
    <county>Meade</county>
    <operator>City of Meade - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1972</latest_year>
    <lat>37.285176</lat>
    <lon>-100.3324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1456</plant_id>
    <plant_name>Rayne</plant_name>
    <state>LA</state>
    <county>Acadia</county>
    <operator>Louisiana Energy &amp; Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>30.234627</lat>
    <lon>-92.27217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1994</plant_id>
    <plant_name>Melrose</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Melrose Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>1945</first_year>
    <latest_year>1969</latest_year>
    <lat>45.675</lat>
    <lon>-94.81528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4120</plant_id>
    <plant_name>New Badger</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>City of Kaukauna (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.2772</lat>
    <lon>-88.2678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10188</plant_id>
    <plant_name>Cutrale Citrus Juices USA II</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Cutrale Citrus Juices USA Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>28.05485</lat>
    <lon>-81.79817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10547</plant_id>
    <plant_name>Pyrites Plant</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1985</latest_year>
    <lat>44.522043</lat>
    <lon>-75.18811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54690</plant_id>
    <plant_name>Amalgamated Sugar LLC Nampa</plant_name>
    <state>ID</state>
    <county>Canyon</county>
    <operator>Amalgamated Sugar Co-Nampa</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1968</latest_year>
    <lat>43.6058</lat>
    <lon>-116.5753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56481</plant_id>
    <plant_name>SunE Alamosa</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>SunE Alamosa1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>37.690304</lat>
    <lon>-105.8805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60732</plant_id>
    <plant_name>Frankford Solar</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.166566</lat>
    <lon>-74.70165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61324</plant_id>
    <plant_name>Odyssey Solar</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.79</lat>
    <lon>-81.266</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61523</plant_id>
    <plant_name>Haley Solar</plant_name>
    <state>SC</state>
    <county>Allendale</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.023402</lat>
    <lon>-81.29337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61974</plant_id>
    <plant_name>Diamond Solar</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>DP-C2 Episode 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.786193</lat>
    <lon>-81.27363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62233</plant_id>
    <plant_name>Jefferson Solar (SC)</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Jefferson Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.349567</lat>
    <lon>-80.05812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62398</plant_id>
    <plant_name>Albert Einstein College of Medicine</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Albert Einstein College of Medicine</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>11</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2012</latest_year>
    <lat>40.85132</lat>
    <lon>-73.8483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67145</plant_id>
    <plant_name>Union Bridge Solar</plant_name>
    <state>MD</state>
    <county>Carroll</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.2</nameplate_mw>
    <summer_mw>8.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.563</lat>
    <lon>-77.183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>517</plant_id>
    <plant_name>Marys Lake</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>9.3</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>40.34408</lat>
    <lon>-105.5343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2700</plant_id>
    <plant_name>Watertown</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>City of Watertown - (NY)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>43.975801</lat>
    <lon>-75.87467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3974</plant_id>
    <plant_name>Wisconsin Rapids</plant_name>
    <state>WI</state>
    <county>Wood</county>
    <operator>Consolidated Water Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>8.1</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1920</latest_year>
    <lat>44.3939</lat>
    <lon>-89.825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7396</plant_id>
    <plant_name>Front Street</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>City of Chicopee - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>42.1483</lat>
    <lon>-72.5911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58186</plant_id>
    <plant_name>HVCC Cogen Plant</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Hudson Valley Community College</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2005</latest_year>
    <lat>42.696944</lat>
    <lon>-73.68</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61054</plant_id>
    <plant_name>IMPA Anderson Solar Park 2</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>8.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.138307</lat>
    <lon>-85.69091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61954</plant_id>
    <plant_name>Delta Solar Power I</plant_name>
    <state>MI</state>
    <county>Eaton</county>
    <operator>Delta Solar Power I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.7</lat>
    <lon>-84.701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63869</plant_id>
    <plant_name>IBM Solar</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>8.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.038266</lat>
    <lon>-105.2449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64129</plant_id>
    <plant_name>East Brookfield Adams Road Solar LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>East Brookfield Adams Road Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <battery_mwh>6.3</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.196032</lat>
    <lon>-72.03084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64980</plant_id>
    <plant_name>UMass Boston</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>MSS Energy Holdings, LLC (d.b.a. Calibrant Energy)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Solar Photovoltaic; Batteries</technologies>
    <generators>18</generators>
    <nameplate_mw>8.1</nameplate_mw>
    <summer_mw>8.1</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>1972</first_year>
    <latest_year>2021</latest_year>
    <lat>42.312977</lat>
    <lon>-71.03637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>508</plant_id>
    <plant_name>Lamar Plant</plant_name>
    <state>CO</state>
    <county>Prowers</county>
    <operator>City of Lamar - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1946</first_year>
    <latest_year>2004</latest_year>
    <lat>38.033327</lat>
    <lon>-102.5379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>559</plant_id>
    <plant_name>Rainbow (CT)</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Farmington River Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>41.915312</lat>
    <lon>-72.69362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>841</plant_id>
    <plant_name>City Power Plant</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>City of Idaho Falls - (ID)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>43.491398</lat>
    <lon>-112.0454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>844</plant_id>
    <plant_name>Upper Power Plant</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>City of Idaho Falls - (ID)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>43.552695</lat>
    <lon>-112.051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1693</plant_id>
    <plant_name>Alcona</plant_name>
    <state>MI</state>
    <county>Alcona</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>44.561961</lat>
    <lon>-83.80451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1786</plant_id>
    <plant_name>White Rapids</plant_name>
    <state>MI</state>
    <county>Menominee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>45.482084</lat>
    <lon>-87.80218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2248</plant_id>
    <plant_name>Kimball</plant_name>
    <state>NE</state>
    <county>Kimball</county>
    <operator>City of Kimball - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.2382</lat>
    <lon>-103.6667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2582</plant_id>
    <plant_name>Lighthouse Hill</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>43.524103</lat>
    <lon>-75.97032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2588</plant_id>
    <plant_name>Moshier</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1929</first_year>
    <latest_year>1929</latest_year>
    <lat>43.8719</lat>
    <lon>-75.1364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2621</plant_id>
    <plant_name>Varick</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>43.4486</lat>
    <lon>-76.5056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2634</plant_id>
    <plant_name>Swinging Bridge 2</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8.6</summer_mw>
    <first_year>1939</first_year>
    <latest_year>2019</latest_year>
    <lat>41.5717</lat>
    <lon>-74.7828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3071</plant_id>
    <plant_name>Walterville</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>Eugene Water &amp; Electric Board</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>44.069636</lat>
    <lon>-122.835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7012</plant_id>
    <plant_name>Lower No 1</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>City of Idaho Falls - (ID)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>43.468679</lat>
    <lon>-112.0625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7058</plant_id>
    <plant_name>Solon Diesel</plant_name>
    <state>WI</state>
    <county>Douglas</county>
    <operator>Dahlberg Light &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>8</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1995</latest_year>
    <lat>46.358956</lat>
    <lon>-91.82363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7116</plant_id>
    <plant_name>McClure Dam</plant_name>
    <state>MI</state>
    <county>Marquette</county>
    <operator>Upper Peninsula Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>46.5717</lat>
    <lon>-87.4764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7200</plant_id>
    <plant_name>Robert D Willis</plant_name>
    <state>TX</state>
    <county>Jasper</county>
    <operator>USACE-Fort Worth District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>30.7975</lat>
    <lon>-94.1756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7470</plant_id>
    <plant_name>Marceline</plant_name>
    <state>MO</state>
    <county>Linn</county>
    <operator>City of Marceline - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2004</latest_year>
    <lat>39.716944</lat>
    <lon>-92.94583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7593</plant_id>
    <plant_name>El Vado Dam</plant_name>
    <state>NM</state>
    <county>Rio Arriba</county>
    <operator>Los Alamos County - (NM)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>36.592775</lat>
    <lon>-106.7321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7856</plant_id>
    <plant_name>North Generation Plant</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>City of Greenfield - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2011</latest_year>
    <lat>41.3164</lat>
    <lon>-94.455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7921</plant_id>
    <plant_name>Maquoketa 2</plant_name>
    <state>IA</state>
    <county>Jackson</county>
    <operator>City of Maquoketa - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2002</latest_year>
    <lat>42.07</lat>
    <lon>-90.66</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10296</plant_id>
    <plant_name>South Forks Hydro</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>South Forks Joint Venture</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>42.4937</lat>
    <lon>-114.3102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10424</plant_id>
    <plant_name>Gross Hydro Plant</plant_name>
    <state>CO</state>
    <county>Jefferson</county>
    <operator>Denver City &amp; County of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>39.9456</lat>
    <lon>-105.3565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54294</plant_id>
    <plant_name>West Group Data Center</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>CADC MSP01, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>44.8256</lat>
    <lon>-93.1139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54624</plant_id>
    <plant_name>South District Wastewater Treatment Plt</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>Miami Dade Water &amp; Sewer Dept</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>25.549834</lat>
    <lon>-80.33625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56600</plant_id>
    <plant_name>Overall Road Station</plant_name>
    <state>MO</state>
    <county>St Francois</county>
    <operator>City of Farmington - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>6.7</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>37.7608</lat>
    <lon>-90.4526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56870</plant_id>
    <plant_name>Taylor</plant_name>
    <state>GA</state>
    <county>Taylor</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>8</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2011</latest_year>
    <lat>32.4522</lat>
    <lon>-84.3872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56957</plant_id>
    <plant_name>Pioneer Crossing Energy, LLC</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>Pioneer Crossing Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2013</latest_year>
    <lat>40.275</lat>
    <lon>-75.8167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56969</plant_id>
    <plant_name>Four Corners Windfarm LLC</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Echo 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.7286</lat>
    <lon>-119.4181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57462</plant_id>
    <plant_name>Napoleon Solar I</plant_name>
    <state>OH</state>
    <county>Henry</county>
    <operator>Enfinity BNB Napoleon Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.388431</lat>
    <lon>-84.09584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57485</plant_id>
    <plant_name>Flemington Solar</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.483888</lat>
    <lon>-74.85667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58251</plant_id>
    <plant_name>C&amp;H Sugar Plant</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>C&amp;H Sugar Company Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>PUR</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>10</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1958</latest_year>
    <lat>38.057222</lat>
    <lon>-122.2189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58444</plant_id>
    <plant_name>Junction Hilltop Wind Farm</plant_name>
    <state>IA</state>
    <county>Greene</county>
    <operator>Junction Hilltop Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.098889</lat>
    <lon>-94.26917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58520</plant_id>
    <plant_name>Otero Solar</plant_name>
    <state>NM</state>
    <county>Otero</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.976389</lat>
    <lon>-105.9711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58548</plant_id>
    <plant_name>Huerfano River Wind</plant_name>
    <state>CO</state>
    <county>Huerfano</county>
    <operator>Huerfano River Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.772222</lat>
    <lon>-104.8322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58563</plant_id>
    <plant_name>Hometown Bio Energy LLC</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>Hometown Bio Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.435556</lat>
    <lon>-93.90639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58721</plant_id>
    <plant_name>Orion Solar II</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Orion Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.150694</lat>
    <lon>-118.8753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58770</plant_id>
    <plant_name>Maywood Photovoltaic Project</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>ENI New Energy US Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.743889</lat>
    <lon>-86.21806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58901</plant_id>
    <plant_name>Tri-County Water Hydropower Project</plant_name>
    <state>CO</state>
    <county>Ouray</county>
    <operator>Tri-County Water Conservancy District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.239167</lat>
    <lon>-107.7581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59319</plant_id>
    <plant_name>Rock Solid</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.229725</lat>
    <lon>-74.22582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59622</plant_id>
    <plant_name>Future Generation Wind</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.774444</lat>
    <lon>-70.61583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59631</plant_id>
    <plant_name>Imclone Solar Electric Facility</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>CVI CleanCapital Solar 5 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.555</lat>
    <lon>-74.70944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59952</plant_id>
    <plant_name>Potrero Hills Energy Producers</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Potrero Hills Energy Producers, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.216973</lat>
    <lon>-121.9795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60130</plant_id>
    <plant_name>Big Sand Draw Plant</plant_name>
    <state>WY</state>
    <county>Fremont</county>
    <operator>Denbury Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.7527</lat>
    <lon>-108.1697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60556</plant_id>
    <plant_name>Selmer II</plant_name>
    <state>TN</state>
    <county>McNairy</county>
    <operator>Selmer North Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.166111</lat>
    <lon>-88.64667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60616</plant_id>
    <plant_name>BC Solar</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>BC Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.175</lat>
    <lon>-120.3598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61423</plant_id>
    <plant_name>OR Solar 5, LLC</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.030332</lat>
    <lon>-121.6116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61433</plant_id>
    <plant_name>SCE&amp;G Nimitz CSG</plant_name>
    <state>SC</state>
    <county>Jasper</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.497759</lat>
    <lon>-80.95608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61474</plant_id>
    <plant_name>CoreSite Real Estate 55 S. Market Street</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>CoreSite Real Estate 55 S. Market Street, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>37.334151</lat>
    <lon>-121.8916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61559</plant_id>
    <plant_name>Woodline Solar</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.236443</lat>
    <lon>-121.5777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61567</plant_id>
    <plant_name>Woodhull Hospital</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Woodhull Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2001</latest_year>
    <lat>40.704774</lat>
    <lon>-73.94186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61737</plant_id>
    <plant_name>Navy Yard Peaker Station</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Philadelphia Authority for Industrial Development</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2018</latest_year>
    <lat>39.890223</lat>
    <lon>-75.18554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62272</plant_id>
    <plant_name>Bly Solar Center</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>GCL New Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.392193</lat>
    <lon>-121.0245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62406</plant_id>
    <plant_name>City of Gallup Solar</plant_name>
    <state>NM</state>
    <county>McKinley</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.52236</lat>
    <lon>-108.7788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62859</plant_id>
    <plant_name>Coventry Clean Energy Corporation</plant_name>
    <state>VT</state>
    <county>Orleans</county>
    <operator>Washington Electric Coop - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2009</latest_year>
    <lat>44.908716</lat>
    <lon>-72.22145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62978</plant_id>
    <plant_name>Syncarpha Northbridge II Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Northbridge II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.115652</lat>
    <lon>-71.64405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62999</plant_id>
    <plant_name>Finchville Solar, LLC Hybrid CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>4.4</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.4565</lat>
    <lon>-74.5465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63150</plant_id>
    <plant_name>Pohatcong Solar Farm</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.67</lat>
    <lon>-75.16</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63214</plant_id>
    <plant_name>Middleton Solar Park</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>6.6</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>42.581678</lat>
    <lon>-70.99867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63337</plant_id>
    <plant_name>Lansing Renewables, LLC</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Lansing Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2022</latest_year>
    <lat>42.59251</lat>
    <lon>-76.56563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63339</plant_id>
    <plant_name>Hales Mills Solar, LLC</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Hales Mills Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <battery_mwh>12.8</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2024</latest_year>
    <lat>43.01827</lat>
    <lon>-74.32918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63340</plant_id>
    <plant_name>Owlville Creek Solar 2, LLC</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Owlville Creek Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>12.8</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2022</latest_year>
    <lat>43.078888</lat>
    <lon>-75.77222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63341</plant_id>
    <plant_name>Owlville Creek Solar, LLC</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Owlville Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>12.8</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2022</latest_year>
    <lat>43.08748</lat>
    <lon>-75.77959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64727</plant_id>
    <plant_name>Brookwood Drive Community Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.59</lat>
    <lon>-71.0942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64780</plant_id>
    <plant_name>Hermsdorf Solar</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.0596</lat>
    <lon>-89.2609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64982</plant_id>
    <plant_name>West Plains Solar I</plant_name>
    <state>MO</state>
    <county>Howell</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.785338</lat>
    <lon>-91.8674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65737</plant_id>
    <plant_name>Schumann Wind Farm</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Chopin Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.90676</lat>
    <lon>-118.4973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65949</plant_id>
    <plant_name>Kearsarge Smithfield LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Kearsarge Smithfield LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.93139</lat>
    <lon>-71.57895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66222</plant_id>
    <plant_name>Landau II Solar (Hybrid)</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.900186</lat>
    <lon>-74.02439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67856</plant_id>
    <plant_name>NLMU Diesel</plant_name>
    <state>IA</state>
    <county>Henry</county>
    <operator>New London Municipal Utilities - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2002</latest_year>
    <lat>40.929204</lat>
    <lon>-91.39023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67883</plant_id>
    <plant_name>Gabby Giffords Clean Energy, LLC</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>NineDot Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>34.1</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.552574</lat>
    <lon>-74.15088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67885</plant_id>
    <plant_name>Nelson Clean Energy, LLC</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>NineDot Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>34.1</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.543029</lat>
    <lon>-74.14633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68254</plant_id>
    <plant_name>SR Sequatchie</plant_name>
    <state>TN</state>
    <county>Sequatchie</county>
    <operator>SR Sequatchie, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.412666</lat>
    <lon>-85.3278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68950</plant_id>
    <plant_name>Marston Mills Solar</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.663333</lat>
    <lon>-70.39889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69136</plant_id>
    <plant_name>Redemeyer Road Solar</plant_name>
    <state>CA</state>
    <county>Mendocino</county>
    <operator>RPCA Solar 10, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>16</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.182276</lat>
    <lon>-123.1906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69260</plant_id>
    <plant_name>Mexia Solar Project</plant_name>
    <state>TX</state>
    <county>Limestone</county>
    <operator>Ellomay USA Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>31.7056</lat>
    <lon>-96.5189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69386</plant_id>
    <plant_name>NL MA - Copicut</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>8</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.772597</lat>
    <lon>-71.07385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>481</plant_id>
    <plant_name>Perris</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>33.8361</lat>
    <lon>-117.1831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1160</plant_id>
    <plant_name>Manning</plant_name>
    <state>IA</state>
    <county>Carroll</county>
    <operator>City of Manning - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>1928</first_year>
    <latest_year>2012</latest_year>
    <lat>41.9067</lat>
    <lon>-95.0347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10861</plant_id>
    <plant_name>Archer Daniels Midland Des Moines</plant_name>
    <state>IA</state>
    <county>Polk</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>41.624438</lat>
    <lon>-93.58452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10862</plant_id>
    <plant_name>Archer Daniels Midland Lincoln</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.866463</lat>
    <lon>-96.61449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50479</plant_id>
    <plant_name>Georgia-Pacific Big Island</plant_name>
    <state>VA</state>
    <county>Bedford</county>
    <operator>GP Big Island LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1965</latest_year>
    <lat>37.534</lat>
    <lon>-79.357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58180</plant_id>
    <plant_name>UNH 7.9 MW Plant</plant_name>
    <state>NH</state>
    <county>Strafford</county>
    <operator>Emcor Energy Services</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.13674</lat>
    <lon>-70.93613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58564</plant_id>
    <plant_name>Frenchtown III Solar</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.4825</lat>
    <lon>-75.01806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60673</plant_id>
    <plant_name>Nixa Solar, LLC</plant_name>
    <state>MO</state>
    <county>Christian</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.043903</lat>
    <lon>-93.33897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60990</plant_id>
    <plant_name>Florence Solar W3-080, LLC</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.095611</lat>
    <lon>-74.78761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61282</plant_id>
    <plant_name>APG Combined Heat and Power Plant</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>US Dept of Army, Garrison, APG</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.3975</lat>
    <lon>-76.2991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62484</plant_id>
    <plant_name>Crawfordsville 2 Solar Park</plant_name>
    <state>IN</state>
    <county>Montgomery</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.055753</lat>
    <lon>-86.88841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64177</plant_id>
    <plant_name>CED Manchester Wind</plant_name>
    <state>IA</state>
    <county>Delaware</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.469289</lat>
    <lon>-91.47393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64178</plant_id>
    <plant_name>CED Centerville Wind</plant_name>
    <state>IA</state>
    <county>Appanoose</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.70991</lat>
    <lon>-92.84835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64182</plant_id>
    <plant_name>BWC Lake Lashaway, LLC Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <battery_mwh>9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.24</lat>
    <lon>-72.0555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68027</plant_id>
    <plant_name>Lemoore West</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Leprino Foods</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.9</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.30018</lat>
    <lon>-119.8214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1475</plant_id>
    <plant_name>Milford Hydro Station</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Brookfield Black Bear Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>1941</first_year>
    <latest_year>2011</latest_year>
    <lat>44.942064</lat>
    <lon>-68.64504</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1776</plant_id>
    <plant_name>Chalk Hill</plant_name>
    <state>MI</state>
    <county>Menominee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>45.5136</lat>
    <lon>-87.8011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2273</plant_id>
    <plant_name>Monroe (NE)</plant_name>
    <state>NE</state>
    <county>Platte</county>
    <operator>Loup River Public Power Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1936</latest_year>
    <lat>41.4872</lat>
    <lon>-97.6078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2945</plant_id>
    <plant_name>Anadarko</plant_name>
    <state>OH</state>
    <county>Monroe</county>
    <operator>City of Woodsfield - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1983</latest_year>
    <lat>39.756982</lat>
    <lon>-81.1155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56134</plant_id>
    <plant_name>Regional Wastewater Control Facility</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>City of Stockton MUD - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Other Waste Biomass</technologies>
    <generators>5</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2025</latest_year>
    <lat>37.9369</lat>
    <lon>-121.3294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56426</plant_id>
    <plant_name>Ameresco Chicopee Energy</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>AMERESCO Chicopee Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2010</latest_year>
    <lat>42.162647</lat>
    <lon>-72.5367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57296</plant_id>
    <plant_name>Carleton College</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Carleton College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2011</latest_year>
    <lat>44.461908</lat>
    <lon>-93.15639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58117</plant_id>
    <plant_name>TNSG South Plant</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>TDX North Slope Generating Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2006</latest_year>
    <lat>70.2</lat>
    <lon>-148.4667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59001</plant_id>
    <plant_name>Parkland Landfill Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.1275</lat>
    <lon>-74.71083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59452</plant_id>
    <plant_name>East. Michigan Univ. Heating Plant</plant_name>
    <state>MI</state>
    <county>Washtenaw</county>
    <operator>East. Michigan Univ. Heating Plant</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.248889</lat>
    <lon>-83.62889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60283</plant_id>
    <plant_name>SR Mavericks</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Mavericks, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.23</lat>
    <lon>-105.03</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60791</plant_id>
    <plant_name>SunAnza</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Arizona Electric Pwr Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <battery_mwh>9.2</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2023</latest_year>
    <lat>33.555267</lat>
    <lon>-116.6396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61413</plant_id>
    <plant_name>NYC-HH - CONEY ISLAND HOSPITAL</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>NYC-HH Coney Island Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2022</latest_year>
    <lat>40.58549</lat>
    <lon>-73.96558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63474</plant_id>
    <plant_name>Annese Solar Project Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <battery_mwh>6.7</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.0755</lat>
    <lon>-72.0052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63829</plant_id>
    <plant_name>POET Biorefining - Marion, LLC</plant_name>
    <state>OH</state>
    <county>Marion</county>
    <operator>POET Biorefining - Marion, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.622</lat>
    <lon>-83.157</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64000</plant_id>
    <plant_name>Amaterasu LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.519282</lat>
    <lon>-71.6734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64248</plant_id>
    <plant_name>Anderson 4</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.082667</lat>
    <lon>-85.63608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66247</plant_id>
    <plant_name>Ash Mesa Solar, LLC</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.663372</lat>
    <lon>-107.9967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67301</plant_id>
    <plant_name>Parkway Battery Storage</plant_name>
    <state>CO</state>
    <county>Broomfield</county>
    <operator>Parkway Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <battery_mwh>31.3</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.985694</lat>
    <lon>-105.0104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67302</plant_id>
    <plant_name>Frederick Battery Storage</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Frederick Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <battery_mwh>31.3</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.10462</lat>
    <lon>-104.9845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67303</plant_id>
    <plant_name>Mead Battery Storage</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Mead Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <battery_mwh>31.3</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.219394</lat>
    <lon>-104.9422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67307</plant_id>
    <plant_name>Platte Valley Battery Storage</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Platte Valley Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <battery_mwh>31.3</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.988332</lat>
    <lon>-104.8451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70124</plant_id>
    <plant_name>Alliance Solar</plant_name>
    <state>NE</state>
    <county>Box Butte</county>
    <operator>SE Municipal Nebraska, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.8</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.0959</lat>
    <lon>-102.8716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1508</plant_id>
    <plant_name>West Buxton</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>7.7</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>1904</first_year>
    <latest_year>1982</latest_year>
    <lat>43.66687</lat>
    <lon>-70.60213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3983</plant_id>
    <plant_name>Big Falls</plant_name>
    <state>WI</state>
    <county>Rusk</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>7.7</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1993</latest_year>
    <lat>45.491667</lat>
    <lon>-91.0469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7806</plant_id>
    <plant_name>Pine Street</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Village of Sebewaing - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>7.7</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.740164</lat>
    <lon>-83.44995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54477</plant_id>
    <plant_name>Oroville Cogeneration, LLC</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Apex Power Generation Corp.</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>7.7</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>39.492</lat>
    <lon>-121.5628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58482</plant_id>
    <plant_name>Azalea Solar, LLC</plant_name>
    <state>GA</state>
    <county>Washington</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.7</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.980833</lat>
    <lon>-82.59167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61895</plant_id>
    <plant_name>Toyota HQ Plan</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.7</nameplate_mw>
    <summer_mw>5.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.084219</lat>
    <lon>-96.84113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64102</plant_id>
    <plant_name>GE 19th Hole</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.7</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.985644</lat>
    <lon>-74.31309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>248</plant_id>
    <plant_name>Inskip</plant_name>
    <state>CA</state>
    <county>Tehama</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>40.400988</lat>
    <lon>-121.9655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10167</plant_id>
    <plant_name>Seadrift Coke LP</plant_name>
    <state>TX</state>
    <county>Calhoun</county>
    <operator>Seadrift Coke L P</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>28.513929</lat>
    <lon>-96.79415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50389</plant_id>
    <plant_name>Port Allen (LA)</plant_name>
    <state>LA</state>
    <county>West Baton Rouge</county>
    <operator>Placid Refining Co LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>30.477</lat>
    <lon>-91.211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54558</plant_id>
    <plant_name>Hazelton B Hydro</plant_name>
    <state>ID</state>
    <county>Jerome</county>
    <operator>Hazelton/Wilson Joint Venture</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>42.6051</lat>
    <lon>-114.093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55861</plant_id>
    <plant_name>Stevens Point Mill</plant_name>
    <state>WI</state>
    <county>Portage</county>
    <operator>Pixelle Specialty Solution, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>44.3528</lat>
    <lon>-89.5836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58401</plant_id>
    <plant_name>Volkswagen Solar System</plant_name>
    <state>TN</state>
    <county>Hamilton</county>
    <operator>SR Enterprise South, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.0975</lat>
    <lon>-85.12694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59425</plant_id>
    <plant_name>Zimmerman Energy</plant_name>
    <state>IN</state>
    <county>Marshall</county>
    <operator>Landfill Energy Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2020</latest_year>
    <lat>41.237778</lat>
    <lon>-86.24611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59619</plant_id>
    <plant_name>Cibola</plant_name>
    <state>NM</state>
    <county>Cibola</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.20115</lat>
    <lon>-107.2452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60906</plant_id>
    <plant_name>Mt. Tom Solar Project Hybrid</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Mt. Tom Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <battery_mwh>6.1</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2019</latest_year>
    <lat>42.2686</lat>
    <lon>-72.603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61794</plant_id>
    <plant_name>Gateway Solar</plant_name>
    <state>MD</state>
    <county>Worcester</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.376941</lat>
    <lon>-75.2742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62655</plant_id>
    <plant_name>HL Solar (Lassen)</plant_name>
    <state>CA</state>
    <county>Lassen</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.373</lat>
    <lon>-120.262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62971</plant_id>
    <plant_name>Syncarpha Westminster Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Westminster, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2023</latest_year>
    <lat>42.593028</lat>
    <lon>-71.86582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66809</plant_id>
    <plant_name>Avenue 26 Solar</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>RPCA Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.125754</lat>
    <lon>-120.1788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68750</plant_id>
    <plant_name>City of Peru Hydro-Electric Generating S</plant_name>
    <state>IL</state>
    <county>Lasalle</county>
    <operator>City of Peru - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>7.6</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>41.321861</lat>
    <lon>-88.98117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>768</plant_id>
    <plant_name>Waimea</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hawaii Electric Light Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1972</latest_year>
    <lat>20.0252</lat>
    <lon>-155.6955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1157</plant_id>
    <plant_name>Laurens</plant_name>
    <state>IA</state>
    <county>Pocahontas</county>
    <operator>City of Laurens - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.8486</lat>
    <lon>-94.8506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1297</plant_id>
    <plant_name>La Crosse</plant_name>
    <state>KS</state>
    <county>Rush</county>
    <operator>City of La Crosse - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1962</first_year>
    <latest_year>2024</latest_year>
    <lat>38.531667</lat>
    <lon>-99.30833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1787</plant_id>
    <plant_name>Grand Rapids</plant_name>
    <state>MI</state>
    <county>Menominee</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1945</latest_year>
    <lat>45.3547</lat>
    <lon>-87.6494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3798</plant_id>
    <plant_name>Cushaw</plant_name>
    <state>VA</state>
    <county>Amherst</county>
    <operator>Cushaw Hydro LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>37.592887</lat>
    <lon>-79.38082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50088</plant_id>
    <plant_name>University of Northern Iowa</plant_name>
    <state>IA</state>
    <county>Black Hawk</county>
    <operator>University of Northern Iowa</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>42.513608</lat>
    <lon>-92.45912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50544</plant_id>
    <plant_name>Port Townsend Paper</plant_name>
    <state>WA</state>
    <county>Jefferson</county>
    <operator>Port Townsend Paper Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>BLQ</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>48.0931</lat>
    <lon>-122.7958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50696</plant_id>
    <plant_name>Plant No 1 Orange County</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Orange County Sanitation Dist - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>33.6942</lat>
    <lon>-117.9381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50921</plant_id>
    <plant_name>Co-Gen LLC</plant_name>
    <state>OR</state>
    <county>Grant</county>
    <operator>Co-Generation Co</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.458696</lat>
    <lon>-118.7206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50993</plant_id>
    <plant_name>Co-Gen II LLC</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>Co-Gen II</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>42.961126</lat>
    <lon>-123.3591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>51033</plant_id>
    <plant_name>West Delaware Tunnel Plant</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>41.859601</lat>
    <lon>-74.51026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52065</plant_id>
    <plant_name>Houston Plant</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Eco Services Corp.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>OTH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1977</latest_year>
    <lat>29.71977</lat>
    <lon>-95.27056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54214</plant_id>
    <plant_name>American Crystal Sugar East Grand Forks</plant_name>
    <state>MN</state>
    <county>Polk</county>
    <operator>American Crystal Sugar Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>47.927202</lat>
    <lon>-97.00715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54240</plant_id>
    <plant_name>Louisiana Tech University Power Plant</plant_name>
    <state>LA</state>
    <county>Lincoln</county>
    <operator>Louisiana Tech University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>32.5256</lat>
    <lon>-92.6497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54298</plant_id>
    <plant_name>Coram Energy LLC (ECT)</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Nextera Energy Resources</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>35.0583</lat>
    <lon>-118.3417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54355</plant_id>
    <plant_name>Chace Mill Winooski One</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>City of Burlington Electric - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>44.49</lat>
    <lon>-73.1875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54517</plant_id>
    <plant_name>Sierra Pacific Sonora</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.966389</lat>
    <lon>-120.3178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54533</plant_id>
    <plant_name>Southern Minnesota Beet Sugar</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Southern Minnesota Beet Sugar</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>44.796405</lat>
    <lon>-95.17979</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56300</plant_id>
    <plant_name>Jersey-Atlantic Wind Farm</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Leeward Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>39.382222</lat>
    <lon>-74.4475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56499</plant_id>
    <plant_name>Tiber Dam Hydroelectric Plant</plant_name>
    <state>MT</state>
    <county>Liberty</county>
    <operator>Tiber Montana LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>48.318</lat>
    <lon>-111.1018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57597</plant_id>
    <plant_name>Cana Gas Processing Plant</plant_name>
    <state>OK</state>
    <county>Canadian</county>
    <operator>EnLink Midstream Services, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2012</latest_year>
    <lat>35.5331</lat>
    <lon>-98.1011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57684</plant_id>
    <plant_name>Goodsprings Waste Heat Recovery</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Nevada Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.809444</lat>
    <lon>-115.4114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57763</plant_id>
    <plant_name>Youngs Creek Hydroelectric Project</plant_name>
    <state>WA</state>
    <county>Snohomish</county>
    <operator>PUD No 1 of Snohomish County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>47.7916</lat>
    <lon>-121.8</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58036</plant_id>
    <plant_name>Riverside Renewable Energy LLC</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Riverside Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.903056</lat>
    <lon>-75.12583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58138</plant_id>
    <plant_name>Otter Creek Ethanol Poet - Ashton</plant_name>
    <state>IA</state>
    <county>Osceola</county>
    <operator>Otter Creek Ethanol LLC - Poet Ashton</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>43.275</lat>
    <lon>-95.80972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58882</plant_id>
    <plant_name>Mercer County Community College</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Sunlight General Mercer Solar LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.255833</lat>
    <lon>-74.64528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59357</plant_id>
    <plant_name>Dorena Hydro-Electric Facility</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>Dorena Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.786667</lat>
    <lon>-122.9581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59424</plant_id>
    <plant_name>IND Solar Farm (Phase IIA)</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.694722</lat>
    <lon>-86.32167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60489</plant_id>
    <plant_name>Hamilton Solar-Crosswicks</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.168958</lat>
    <lon>-74.6301</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60527</plant_id>
    <plant_name>Lake Pulaski Solar</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.195854</lat>
    <lon>-93.81214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60569</plant_id>
    <plant_name>El Cajon Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <battery_mwh>30</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.8115</lat>
    <lon>-117.0505</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60729</plant_id>
    <plant_name>Raritan Solar</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.464221</lat>
    <lon>-74.85788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61872</plant_id>
    <plant_name>Lampwick</plant_name>
    <state>TX</state>
    <county>Menard</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.872228</lat>
    <lon>-99.53726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61907</plant_id>
    <plant_name>Springfield Solar Project</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.032087</lat>
    <lon>-74.64739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61961</plant_id>
    <plant_name>Gaston II</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.778378</lat>
    <lon>-81.11025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62162</plant_id>
    <plant_name>4710 Hosting</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Epic Hosting, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.070814</lat>
    <lon>-92.52227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62332</plant_id>
    <plant_name>Blue Star</plant_name>
    <state>MD</state>
    <county>Kent</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.35</lat>
    <lon>-75.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62492</plant_id>
    <plant_name>DTE Atlantic, LLC</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>DTE Atlantic, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.3733</lat>
    <lon>-74.4369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62637</plant_id>
    <plant_name>Milford Solar Farm (NJ) LLC</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.614955</lat>
    <lon>-75.15649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63347</plant_id>
    <plant_name>AOC, Capitol Power Plant</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Architect of the Capitol, Capitol Power Plant</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.882704</lat>
    <lon>-77.00744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63521</plant_id>
    <plant_name>CED Mason City Wind</plant_name>
    <state>IA</state>
    <county>Cerro Gordo</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.140697</lat>
    <lon>-93.09848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64123</plant_id>
    <plant_name>James W. Broderick Hydropower Plant</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>James W. Broderick Hydropower Plant</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.27</lat>
    <lon>-104.72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64917</plant_id>
    <plant_name>Triple Butte I</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Triple Butte</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.75956</lat>
    <lon>-103.0679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65035</plant_id>
    <plant_name>Fox Hills Battery Station</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Consolidated Edison Co-NY Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <battery_mwh>30</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.61081</lat>
    <lon>-74.07717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65201</plant_id>
    <plant_name>Certain Solar - Staten Island</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.540416</lat>
    <lon>-74.17685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65426</plant_id>
    <plant_name>Perendale Holdings, LLC</plant_name>
    <state>NC</state>
    <county>Davie</county>
    <operator>Perendale Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.985701</lat>
    <lon>-80.54407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65968</plant_id>
    <plant_name>Hodag Solar</plant_name>
    <state>WI</state>
    <county>Oneida</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.61246</lat>
    <lon>-89.44366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66764</plant_id>
    <plant_name>SCH - (2A) 156 Barhydt Rd Glenville</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.85</lat>
    <lon>-74.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67726</plant_id>
    <plant_name>Bonduel Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Shawano</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.731025</lat>
    <lon>-88.37428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67729</plant_id>
    <plant_name>Jackson Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Ozaukee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.309855</lat>
    <lon>-88.09147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67732</plant_id>
    <plant_name>Silver Lake Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Kenosha</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.574884</lat>
    <lon>-88.18958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67733</plant_id>
    <plant_name>Spring Prairie Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Walworth</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.678365</lat>
    <lon>-88.33919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68108</plant_id>
    <plant_name>SR Maryville East</plant_name>
    <state>TN</state>
    <county>Blount</county>
    <operator>SR Maryville East, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.77527</lat>
    <lon>-83.91361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68375</plant_id>
    <plant_name>Buzzard Flop</plant_name>
    <state>OK</state>
    <county>Hughes</county>
    <operator>Peoples Electric Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.855303</lat>
    <lon>-96.22909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68679</plant_id>
    <plant_name>Partridge Solar</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.49</lat>
    <lon>-73.214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68742</plant_id>
    <plant_name>Skyline Solar</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.50277</lat>
    <lon>-73.22821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69265</plant_id>
    <plant_name>Talco Solar Project</plant_name>
    <state>TX</state>
    <county>Franklin</county>
    <operator>Ellomay USA Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.5</nameplate_mw>
    <summer_mw>7.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.3516</lat>
    <lon>-95.1732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2138</plant_id>
    <plant_name>Kahoka</plant_name>
    <state>MO</state>
    <county>Clark</county>
    <operator>City of Kahoka - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1999</latest_year>
    <lat>40.4225</lat>
    <lon>-91.7206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3717</plant_id>
    <plant_name>Milton</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1929</first_year>
    <latest_year>1929</latest_year>
    <lat>44.641433</lat>
    <lon>-73.11336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4114</plant_id>
    <plant_name>Fennimore</plant_name>
    <state>WI</state>
    <county>Grant</county>
    <operator>City of Fennimore - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1999</latest_year>
    <lat>42.9828</lat>
    <lon>-90.6558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6359</plant_id>
    <plant_name>Felt</plant_name>
    <state>ID</state>
    <county>Teton</county>
    <operator>Fall River Rural Elec Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>5.9</summer_mw>
    <first_year>1946</first_year>
    <latest_year>1986</latest_year>
    <lat>43.913476</lat>
    <lon>-111.2833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50064</plant_id>
    <plant_name>University of California Santa Cruz</plant_name>
    <state>CA</state>
    <county>Santa Cruz</county>
    <operator>University of California Santa Cruz</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Solar Photovoltaic; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2013</first_year>
    <latest_year>2022</latest_year>
    <lat>36.9997</lat>
    <lon>-122.0622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50903</plant_id>
    <plant_name>Sagamore Plant Cogeneration</plant_name>
    <state>IN</state>
    <county>Tippecanoe</county>
    <operator>Tate &amp; Lyle Ingredients Americas Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>40.4439</lat>
    <lon>-86.86</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54834</plant_id>
    <plant_name>Fort Greely Power Plant</plant_name>
    <state>AK</state>
    <county>Southeast Fairbanks</county>
    <operator>Doyon Utilities - Fort Greely</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2010</latest_year>
    <lat>63.973572</lat>
    <lon>-145.7166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56570</plant_id>
    <plant_name>Terra-Gen VG Wind LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>35.1161</lat>
    <lon>-118.3789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58597</plant_id>
    <plant_name>HTW Plant 303 COGEN</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>The University of Utah</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.763056</lat>
    <lon>-111.8417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59701</plant_id>
    <plant_name>Subase Microgrid Project</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.400008</lat>
    <lon>-72.08599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60680</plant_id>
    <plant_name>ANAD Solar Array</plant_name>
    <state>AL</state>
    <county>Calhoun</county>
    <operator>Alabama Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.626728</lat>
    <lon>-85.96948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60805</plant_id>
    <plant_name>Beaver Run</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.152955</lat>
    <lon>-74.63808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61250</plant_id>
    <plant_name>USPS PV</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.977922</lat>
    <lon>-118.2587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61729</plant_id>
    <plant_name>Richmond Solar Site 2</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.833452</lat>
    <lon>-84.81621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61743</plant_id>
    <plant_name>Naval Sub Base New London Fuel Cell</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Groton Station Fuel Cell, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.4</lat>
    <lon>-72.0855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62250</plant_id>
    <plant_name>NYC-HH-New Bellevue Hospital</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>NYC-HH-New Bellevue Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2011</latest_year>
    <lat>40.739556</lat>
    <lon>-73.97608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63470</plant_id>
    <plant_name>McDougle-Mitchell Solar Project Hybrid C</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <battery_mwh>5.7</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.1649</lat>
    <lon>-72.0014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70214</plant_id>
    <plant_name>KSU Solar Array</plant_name>
    <state>OH</state>
    <county>Portage</county>
    <operator>Onsite Partners Projectco, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.4</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <battery_mwh>1.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.133315</lat>
    <lon>-81.32222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>323</plant_id>
    <plant_name>Bishop Creek 2</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <first_year>1908</first_year>
    <latest_year>1911</latest_year>
    <lat>37.273581</lat>
    <lon>-118.5733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>998</plant_id>
    <plant_name>Norway (IN)</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Northern Indiana Pub Serv Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>40.7803</lat>
    <lon>-86.76</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2630</plant_id>
    <plant_name>Mongaup Falls</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>7.6</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>41.537722</lat>
    <lon>-74.77138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55094</plant_id>
    <plant_name>MM San Diego-Miramar</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>MM San Diego Energy-Miramar</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>32.844845</lat>
    <lon>-117.1627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58254</plant_id>
    <plant_name>Chatham</plant_name>
    <state>MI</state>
    <county>Kent</county>
    <operator>City of Lowell - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2016</latest_year>
    <lat>42.934444</lat>
    <lon>-85.3475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60035</plant_id>
    <plant_name>Tequesquite Landfill Solar PV Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Solar Star California XXXI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.97819</lat>
    <lon>-117.3851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61879</plant_id>
    <plant_name>Bartow Solar Energy LLC</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.925984</lat>
    <lon>-81.8191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64436</plant_id>
    <plant_name>Wilmarth Solar</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Wilmarth Lane Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <battery_mwh>4.6</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.025049</lat>
    <lon>-71.35355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64818</plant_id>
    <plant_name>Connexus Solar Stanford 1STF</plant_name>
    <state>MN</state>
    <county>Anoka</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.41715</lat>
    <lon>-93.38854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66599</plant_id>
    <plant_name>Dark Sky Energy Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <battery_mwh>7.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.270508</lat>
    <lon>-116.347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67276</plant_id>
    <plant_name>Upland</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.3</nameplate_mw>
    <summer_mw>7.3</summer_mw>
    <battery_mwh>5.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.964076</lat>
    <lon>-70.78877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>193</plant_id>
    <plant_name>Municipal Light</plant_name>
    <state>AR</state>
    <county>Clay</county>
    <operator>City of Piggott - (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1976</latest_year>
    <lat>36.3858</lat>
    <lon>-90.1867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>531</plant_id>
    <plant_name>Sacramento Municipal Util Dist</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>South Sutter Water District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>39.048802</lat>
    <lon>-121.317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>541</plant_id>
    <plant_name>Bulls Bridge</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>FirstLight Power Resources Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>8.4</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1903</latest_year>
    <lat>41.659046</lat>
    <lon>-73.49198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1129</plant_id>
    <plant_name>Cascade</plant_name>
    <state>IA</state>
    <county>Dubuque</county>
    <operator>Cascade Municipal Utilities - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>1951</first_year>
    <latest_year>2020</latest_year>
    <lat>42.29821</lat>
    <lon>-91.01197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1753</plant_id>
    <plant_name>Berrien Springs</plant_name>
    <state>MI</state>
    <county>Berrien</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>12</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>41.9439</lat>
    <lon>-86.3289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1778</plant_id>
    <plant_name>Kingsford</plant_name>
    <state>MI</state>
    <county>Dickinson</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>45.807956</lat>
    <lon>-88.12512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2127</plant_id>
    <plant_name>Gallatin (MO)</plant_name>
    <state>MO</state>
    <county>Daviess</county>
    <operator>City of Gallatin - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1977</first_year>
    <latest_year>1993</latest_year>
    <lat>39.917222</lat>
    <lon>-93.95389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2571</plant_id>
    <plant_name>Hannawa</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1920</latest_year>
    <lat>44.6192</lat>
    <lon>-74.9733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3034</plant_id>
    <plant_name>Prospect 3</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.7</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1932</latest_year>
    <lat>42.730606</lat>
    <lon>-122.4185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3972</plant_id>
    <plant_name>Du Bay</plant_name>
    <state>WI</state>
    <county>Portage</county>
    <operator>Consolidated Water Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1942</latest_year>
    <lat>44.6647</lat>
    <lon>-89.6511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6012</plant_id>
    <plant_name>Sherman</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>42.7297</lat>
    <lon>-72.9303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7397</plant_id>
    <plant_name>Falling Spring</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>Borough of Chambersburg - (PA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>1967</first_year>
    <latest_year>2001</latest_year>
    <lat>39.9389</lat>
    <lon>-77.6583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7990</plant_id>
    <plant_name>Altamont</plant_name>
    <state>IL</state>
    <county>Effingham</county>
    <operator>City of Altamont - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2006</latest_year>
    <lat>39.068747</lat>
    <lon>-88.75555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10066</plant_id>
    <plant_name>Lockwood Hydroelectric Facility</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Merimil Ltd Partnership</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1988</latest_year>
    <lat>44.5467</lat>
    <lon>-69.6292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54523</plant_id>
    <plant_name>Hoffer Plastics</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Hoffer Plastics</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>9</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1995</latest_year>
    <lat>41.998889</lat>
    <lon>-88.30222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54757</plant_id>
    <plant_name>Grand Blanc Generating Station</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>7</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2012</latest_year>
    <lat>42.908815</lat>
    <lon>-83.72509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57886</plant_id>
    <plant_name>City West Diesel Plant</plant_name>
    <state>SC</state>
    <county>Union</county>
    <operator>Lockhart Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.7225</lat>
    <lon>-81.64694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59817</plant_id>
    <plant_name>Tooele Army Depot(CSG)</plant_name>
    <state>UT</state>
    <county>Tooele</county>
    <operator>Tooele Army Depot</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Solar Thermal without Energy Storage; Solar Photovoltaic; Batteries</technologies>
    <generators>5</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2010</first_year>
    <latest_year>2025</latest_year>
    <lat>40.50303</lat>
    <lon>-112.3706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61918</plant_id>
    <plant_name>Blackville Solar Farm, LLC</plant_name>
    <state>SC</state>
    <county>Barnwell</county>
    <operator>Dominion Energy Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.342619</lat>
    <lon>-81.25893</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61927</plant_id>
    <plant_name>Georgia-Pacific Taylorsville Plywood</plant_name>
    <state>MS</state>
    <county>Smith</county>
    <operator>Georgia-Pacific Wood Products LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.837173</lat>
    <lon>-89.4635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62001</plant_id>
    <plant_name>The Bank of New York</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>The Bank of New York</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>40.659328</lat>
    <lon>-73.93375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63895</plant_id>
    <plant_name>Augusta PV - BD Solar Augusta LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>BD Solar Augusta LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.328</lat>
    <lon>-69.731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64432</plant_id>
    <plant_name>Breckenridge Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Breckenridge Street Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <battery_mwh>4.7</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.17406</lat>
    <lon>-72.3158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65055</plant_id>
    <plant_name>77 Farm to Market Rd Hybrid(CSG)</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>77F2M WHAM8 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <battery_mwh>4.8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.79455</lat>
    <lon>-70.72339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65541</plant_id>
    <plant_name>GCWA</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Power Depot Group A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>12</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2014</latest_year>
    <lat>29.380114</lat>
    <lon>-94.95342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66474</plant_id>
    <plant_name>MA Blackstone</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Catalyze Blackstone 83 Federal Street Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <battery_mwh>6.4</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.026499</lat>
    <lon>-71.5285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69740</plant_id>
    <plant_name>Tucson - CAVSARP</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.2</nameplate_mw>
    <summer_mw>7.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.246736</lat>
    <lon>-111.2553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1187</plant_id>
    <plant_name>State Center</plant_name>
    <state>IA</state>
    <county>Marshall</county>
    <operator>City of State Center - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine; Solar Photovoltaic</technologies>
    <generators>6</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2017</latest_year>
    <lat>42.01667</lat>
    <lon>-93.16333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1315</plant_id>
    <plant_name>Osborne</plant_name>
    <state>KS</state>
    <county>Osborne</county>
    <operator>City of Osborne - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1994</latest_year>
    <lat>39.441979</lat>
    <lon>-98.6903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2013</plant_id>
    <plant_name>Spring Valley</plant_name>
    <state>MN</state>
    <county>Fillmore</county>
    <operator>Spring Valley Pub Utils Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>1952</first_year>
    <latest_year>2009</latest_year>
    <lat>43.687322</lat>
    <lon>-92.38939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6567</plant_id>
    <plant_name>Block Island</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Block Island Utility District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2018</latest_year>
    <lat>41.175556</lat>
    <lon>-71.5711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54569</plant_id>
    <plant_name>Bayville Central Facility</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Ocean County Utilities Auth - (NJ)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Other Waste Biomass; Solar Photovoltaic</technologies>
    <generators>8</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2007</latest_year>
    <lat>39.909424</lat>
    <lon>-74.17804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57937</plant_id>
    <plant_name>Western Sugar Coop - Scottsbluff</plant_name>
    <state>NE</state>
    <county>Scotts Bluff</county>
    <operator>Western Sugar Cooperative</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.85887</lat>
    <lon>-103.6344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61388</plant_id>
    <plant_name>AEP Jacksonville Solar Project</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.523647</lat>
    <lon>-81.68644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61680</plant_id>
    <plant_name>Tatanka Wi</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>HQC Tatanka Wi Solar Power Generation LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.210766</lat>
    <lon>-93.88427</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62766</plant_id>
    <plant_name>Scottsburg Solar Park</plant_name>
    <state>IN</state>
    <county>Scott</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.661999</lat>
    <lon>-85.78554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62791</plant_id>
    <plant_name>Richmond Solar Park 4</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.862889</lat>
    <lon>-84.92966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67242</plant_id>
    <plant_name>5 Berry</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7.1</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <battery_mwh>7.5</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.021</lat>
    <lon>-71.342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>281</plant_id>
    <plant_name>Spaulding 1</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>39.324613</lat>
    <lon>-120.6448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2308</plant_id>
    <plant_name>Tecumseh</plant_name>
    <state>NE</state>
    <county>Johnson</county>
    <operator>City of Tecumseh - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1993</latest_year>
    <lat>40.3664</lat>
    <lon>-96.19</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3976</plant_id>
    <plant_name>Gordon</plant_name>
    <state>WI</state>
    <county>Douglas</county>
    <operator>Dahlberg Light &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1949</first_year>
    <latest_year>2001</latest_year>
    <lat>46.23669</lat>
    <lon>-91.78553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4065</plant_id>
    <plant_name>High Falls (WI)</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1910</latest_year>
    <lat>45.2794</lat>
    <lon>-88.1997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10279</plant_id>
    <plant_name>Kansas River Project</plant_name>
    <state>KS</state>
    <county>Douglas</county>
    <operator>Bowersock Mills &amp; Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>11</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1920</first_year>
    <latest_year>2012</latest_year>
    <lat>38.974022</lat>
    <lon>-95.23508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52077</plant_id>
    <plant_name>Lost Hills Cogeneration Plant</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AERA Energy LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>35.666111</lat>
    <lon>-119.7669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54409</plant_id>
    <plant_name>Dartmouth College Heating Plant</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Dartmouth College</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>RFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1992</latest_year>
    <lat>43.701916</lat>
    <lon>-72.28674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54800</plant_id>
    <plant_name>Saint Agnes Medical Center</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Saint Agnes Medical Center</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>36.8347</lat>
    <lon>-119.7667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54910</plant_id>
    <plant_name>Brent Run Generating Station</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2012</latest_year>
    <lat>43.17642</lat>
    <lon>-83.84797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57571</plant_id>
    <plant_name>Los Lunas Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2013</latest_year>
    <lat>34.833136</lat>
    <lon>-106.7724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58160</plant_id>
    <plant_name>Williams College - Campus CHP</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>President &amp; Trustees of Williams College</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2017</latest_year>
    <lat>42.709722</lat>
    <lon>-73.20222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58195</plant_id>
    <plant_name>East Campus Steam Plant</plant_name>
    <state>PA</state>
    <county>Centre</county>
    <operator>Penn State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.809167</lat>
    <lon>-77.8475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58197</plant_id>
    <plant_name>POET Biorefining Lake Crystal</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>POET Biorefining Lake Crystal</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>44.093333</lat>
    <lon>-94.27667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59186</plant_id>
    <plant_name>West Pemberton</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.006667</lat>
    <lon>-74.73028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59440</plant_id>
    <plant_name>Adelanto Solar II, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Adelanto Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.557222</lat>
    <lon>-117.3775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60299</plant_id>
    <plant_name>HMV Minster Energy Storage System</plant_name>
    <state>OH</state>
    <county>Auglaize</county>
    <operator>Summit Ridge Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>7</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.398844</lat>
    <lon>-84.38727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60728</plant_id>
    <plant_name>Howell Solar</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.147009</lat>
    <lon>-74.16752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61006</plant_id>
    <plant_name>SCDA Solar 1</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>SCDA Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.690186</lat>
    <lon>-121.5865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61910</plant_id>
    <plant_name>Yeoman Creek</plant_name>
    <state>IL</state>
    <county>Lake</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.391136</lat>
    <lon>-87.84941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62381</plant_id>
    <plant_name>GMP Solar/Storage-Milton Hybrid</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.392141</lat>
    <lon>-73.10233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62382</plant_id>
    <plant_name>GMP Solar/Storage-Ferrisburgh Hybrid</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.133411</lat>
    <lon>-73.14406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63324</plant_id>
    <plant_name>Camp Atterbury Microgrid Hybrid</plant_name>
    <state>IN</state>
    <county>Johnson</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.3617</lat>
    <lon>-86.025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63973</plant_id>
    <plant_name>Cardinal Solar LLC</plant_name>
    <state>SC</state>
    <county>Marion</county>
    <operator>Cardinal Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.199824</lat>
    <lon>-79.38585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64068</plant_id>
    <plant_name>BD Solar Hancock LLC</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>BD Solar Hancock LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.535671</lat>
    <lon>-68.35473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64069</plant_id>
    <plant_name>Winslow PV - BD Solar 2 LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>BD Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.56</lat>
    <lon>-69.59</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64070</plant_id>
    <plant_name>BD Solar Ellsworth LLC</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>BD Solar Hancock North LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.534547</lat>
    <lon>-68.37879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64525</plant_id>
    <plant_name>Troupsburg</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.0121</lat>
    <lon>-77.3751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64617</plant_id>
    <plant_name>Kearsarge William Way</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Kearsarge William Way LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>9.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.081919</lat>
    <lon>-71.49245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64867</plant_id>
    <plant_name>Slayton Settlement Road Solar CSG</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>RPNY Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.203558</lat>
    <lon>-78.64543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64986</plant_id>
    <plant_name>Franklin County Solar</plant_name>
    <state>IA</state>
    <county>Franklin</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.72084</lat>
    <lon>-93.20609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65351</plant_id>
    <plant_name>General Dynamics</plant_name>
    <state>AR</state>
    <county>Ouachita</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>9.6</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.602</lat>
    <lon>-92.541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65953</plant_id>
    <plant_name>Howell Energy Storage Project</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>VESI 24 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>7</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.1337</lat>
    <lon>-74.17086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66075</plant_id>
    <plant_name>Blacksmith Road Solar 1</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Blacksmith Road Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>3.3</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.60169</lat>
    <lon>-70.605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67060</plant_id>
    <plant_name>C&amp;B Graham Energy, LLC</plant_name>
    <state>IN</state>
    <county>Hendricks</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.81968</lat>
    <lon>-86.45848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67170</plant_id>
    <plant_name>Amazon SAN3 Solar Project</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Solar Star Prime 4 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>8.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.566208</lat>
    <lon>-116.9335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69291</plant_id>
    <plant_name>Esky Solar</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.71</lat>
    <lon>-75.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69311</plant_id>
    <plant_name>Blount BESS</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>28</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.078904</lat>
    <lon>-89.37388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69312</plant_id>
    <plant_name>Huiskamp BESS</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>28</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.158256</lat>
    <lon>-89.41138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69313</plant_id>
    <plant_name>West Middleton BESS</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <battery_mwh>28</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.093352</lat>
    <lon>-89.56979</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1285</plant_id>
    <plant_name>Hill City</plant_name>
    <state>KS</state>
    <county>Graham</county>
    <operator>City of Hill City -(KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1974</latest_year>
    <lat>39.3582</lat>
    <lon>-99.8417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1607</plant_id>
    <plant_name>Riverside Holyoke</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>City of Holyoke Gas and Elec Dept - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1931</latest_year>
    <lat>42.200592</lat>
    <lon>-72.59443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6450</plant_id>
    <plant_name>Proctor</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>1905</first_year>
    <latest_year>1984</latest_year>
    <lat>43.662775</lat>
    <lon>-73.03402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50054</plant_id>
    <plant_name>Rice University</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Rice University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1989</latest_year>
    <lat>29.721048</lat>
    <lon>-95.39536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56367</plant_id>
    <plant_name>Electric Avenue Facility</plant_name>
    <state>VA</state>
    <county>Culpeper</county>
    <operator>Town of Culpeper- (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2004</latest_year>
    <lat>38.28</lat>
    <lon>-77.59</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61668</plant_id>
    <plant_name>Creston Ridge II, LLC</plant_name>
    <state>NE</state>
    <county>Platte</county>
    <operator>Creston Ridge II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.677</lat>
    <lon>-97.391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61677</plant_id>
    <plant_name>Perennial Windfarm</plant_name>
    <state>NE</state>
    <county>Fillmore</county>
    <operator>Perennial Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.631872</lat>
    <lon>-97.64271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62453</plant_id>
    <plant_name>Mt. Sinai- Morningside</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Mt. Sinai- Morningside</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>1960</first_year>
    <latest_year>2015</latest_year>
    <lat>40.928827</lat>
    <lon>-73.89802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64251</plant_id>
    <plant_name>Pickford Solar</plant_name>
    <state>MI</state>
    <county>Chippewa</county>
    <operator>Heritage Sustainable Energy. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.9</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>46.189254</lat>
    <lon>-84.34545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>820</plant_id>
    <plant_name>Thousand Springs</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.9</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>42.740542</lat>
    <lon>-114.8367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1134</plant_id>
    <plant_name>Corning</plant_name>
    <state>IA</state>
    <county>Adams</county>
    <operator>City of Corning - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2006</latest_year>
    <lat>40.9871</lat>
    <lon>-94.7352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1322</plant_id>
    <plant_name>St John</plant_name>
    <state>KS</state>
    <county>Stafford</county>
    <operator>City of St. John - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>1965</first_year>
    <latest_year>2023</latest_year>
    <lat>37.9953</lat>
    <lon>-98.7602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1716</plant_id>
    <plant_name>Rogers</plant_name>
    <state>MI</state>
    <county>Mecosta</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>43.613001</lat>
    <lon>-85.47947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10882</plant_id>
    <plant_name>Hatchet Creek Project</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Mega Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>40.874144</lat>
    <lon>-121.9204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50750</plant_id>
    <plant_name>Coalinga Cogeneration Facility</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Aera Energy LLC-Coalinga</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>36.170317</lat>
    <lon>-120.3641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52054</plant_id>
    <plant_name>Rapidan Hydro Facility</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>44.092689</lat>
    <lon>-94.10882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52081</plant_id>
    <plant_name>Cymric 31X Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>35.3639</lat>
    <lon>-119.6592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52082</plant_id>
    <plant_name>Cymric 6Z Cogen</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>35.346102</lat>
    <lon>-119.6434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52083</plant_id>
    <plant_name>Coalinga 6C Cogen</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Chevron USA Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>36.2097</lat>
    <lon>-120.3828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54015</plant_id>
    <plant_name>MM West Covina</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>MM West Covina Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>34.033206</lat>
    <lon>-117.9061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55278</plant_id>
    <plant_name>Beaver Creek Gas Plant</plant_name>
    <state>WY</state>
    <county>Fremont</county>
    <operator>Denbury Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; All Other</technologies>
    <generators>4</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1983</first_year>
    <latest_year>2018</latest_year>
    <lat>42.8475</lat>
    <lon>-108.3136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57305</plant_id>
    <plant_name>Adelanto Solar Project</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.550833</lat>
    <lon>-117.4353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57667</plant_id>
    <plant_name>Seabrook Solar Plant</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2014</latest_year>
    <lat>39.485</lat>
    <lon>-75.215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58136</plant_id>
    <plant_name>Adkins Energy LLC</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Adkins Energy LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2019</latest_year>
    <lat>42.362222</lat>
    <lon>-89.80361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60535</plant_id>
    <plant_name>Saluda Solar, LLC</plant_name>
    <state>SC</state>
    <county>Saluda</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.96839</lat>
    <lon>-81.7829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60734</plant_id>
    <plant_name>Bordentown Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.0389</lat>
    <lon>-74.7766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60932</plant_id>
    <plant_name>Creston Ridge Wind Farm</plant_name>
    <state>NE</state>
    <county>Platte</county>
    <operator>Creston Ridge, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.678</lat>
    <lon>-97.386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61325</plant_id>
    <plant_name>Hampton Solar I</plant_name>
    <state>SC</state>
    <county>Hampton</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.879</lat>
    <lon>-81.133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64249</plant_id>
    <plant_name>Anderson 6</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.085081</lat>
    <lon>-85.74671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65086</plant_id>
    <plant_name>Bremen</plant_name>
    <state>IN</state>
    <county>Marshall</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.46303</lat>
    <lon>-86.16353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65641</plant_id>
    <plant_name>SR Paris</plant_name>
    <state>TN</state>
    <county>Henry</county>
    <operator>SR Paris, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.8</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.445894</lat>
    <lon>-88.32769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>280</plant_id>
    <plant_name>South</plant_name>
    <state>CA</state>
    <county>Tehama</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>40.395396</lat>
    <lon>-121.8792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>825</plant_id>
    <plant_name>Ashton</plant_name>
    <state>ID</state>
    <county>Fremont</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>7.1</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1925</latest_year>
    <lat>44.07863</lat>
    <lon>-111.4973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1199</plant_id>
    <plant_name>West Bend</plant_name>
    <state>IA</state>
    <county>Palo Alto</county>
    <operator>City of West Bend - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1954</first_year>
    <latest_year>2013</latest_year>
    <lat>42.961151</lat>
    <lon>-94.44557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1976</plant_id>
    <plant_name>Grand Marais</plant_name>
    <state>MN</state>
    <county>Cook</county>
    <operator>City of Grand Marais - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>47.750278</lat>
    <lon>-90.35722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10214</plant_id>
    <plant_name>Lower Saranac Hydroelectric Facility</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>44.6694</lat>
    <lon>-73.5075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10301</plant_id>
    <plant_name>Louisiana Sugar Refining</plant_name>
    <state>LA</state>
    <county>St James</county>
    <operator>Louisiana Sugar Refining LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1977</latest_year>
    <lat>30.0497</lat>
    <lon>-90.6839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50999</plant_id>
    <plant_name>Aziscohos Hydroelectric Project</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>6.8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>44.9439</lat>
    <lon>-70.9975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54103</plant_id>
    <plant_name>Port Edwards Mill</plant_name>
    <state>WI</state>
    <county>Wood</county>
    <operator>Domtar Industries Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>11</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1977</latest_year>
    <lat>44.3364</lat>
    <lon>-89.8672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64098</plant_id>
    <plant_name>Tesla Reno GigaFactory</plant_name>
    <state>NV</state>
    <county>Storey</county>
    <operator>Tesla Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>6</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>6.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2022</latest_year>
    <lat>39.539511</lat>
    <lon>-119.4392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65387</plant_id>
    <plant_name>Holland Solar Farm</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.7</nameplate_mw>
    <summer_mw>6.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.619</lat>
    <lon>-75.155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>283</plant_id>
    <plant_name>Spaulding 3</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1929</first_year>
    <latest_year>1929</latest_year>
    <lat>39.337679</lat>
    <lon>-120.6355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1486</plant_id>
    <plant_name>Cataract Hydro</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>8</summer_mw>
    <first_year>1937</first_year>
    <latest_year>1937</latest_year>
    <lat>43.4956</lat>
    <lon>-70.4472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4113</plant_id>
    <plant_name>Elroy</plant_name>
    <state>WI</state>
    <county>Juneau</county>
    <operator>City of Elroy - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2005</latest_year>
    <lat>43.7395</lat>
    <lon>-90.2675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7034</plant_id>
    <plant_name>Hydro II</plant_name>
    <state>UT</state>
    <county>Cache</county>
    <operator>City of Logan - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>41.743728</lat>
    <lon>-111.7832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7406</plant_id>
    <plant_name>Shelbina Power #2</plant_name>
    <state>MO</state>
    <county>Shelby</county>
    <operator>City of Shelbina - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1999</latest_year>
    <lat>39.694784</lat>
    <lon>-92.04674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7982</plant_id>
    <plant_name>South Generation</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Redwood Falls Public Util Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.5331</lat>
    <lon>-95.1122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10339</plant_id>
    <plant_name>Southside Water Reclamation Plant</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Albuquerque City of</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>2002</latest_year>
    <lat>35.016111</lat>
    <lon>-106.6697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50081</plant_id>
    <plant_name>International Paper Riley Hydro</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>44.503431</lat>
    <lon>-70.24914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54057</plant_id>
    <plant_name>Riverview Energy Systems</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>Riverview Energy Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>42.166106</lat>
    <lon>-83.2129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54305</plant_id>
    <plant_name>Westward Seafoods</plant_name>
    <state>AK</state>
    <county>Aleutians West</county>
    <operator>Westward Seafoods Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>53.858508</lat>
    <lon>-166.5529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55014</plant_id>
    <plant_name>Greene Valley Gas Recovery</plant_name>
    <state>IL</state>
    <county>DuPage</county>
    <operator>WM Illinois Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>41.73379</lat>
    <lon>-88.08491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56036</plant_id>
    <plant_name>WWTP Power Generation Station</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>East Bay Municipal Util Dist - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>37.8258</lat>
    <lon>-122.2961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56975</plant_id>
    <plant_name>Ward Butte Windfarm LLC</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Echo 1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.6967</lat>
    <lon>-119.4097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58484</plant_id>
    <plant_name>MAS ASB Cogen Plant</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>Cube District Energy, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.655</lat>
    <lon>-84.39444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58505</plant_id>
    <plant_name>Livingston Solar Canopies</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Rutgers, The State University of NJ</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.5275</lat>
    <lon>-74.43833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60375</plant_id>
    <plant_name>ILR Landfill</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>ILR Landfill</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.470539</lat>
    <lon>-74.38362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61385</plant_id>
    <plant_name>Georgia LFG Oak Grove Plant</plant_name>
    <state>GA</state>
    <county>Barrow</county>
    <operator>Cube District Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.964988</lat>
    <lon>-83.76564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61386</plant_id>
    <plant_name>Georgia LFG Pine Ridge Plant</plant_name>
    <state>GA</state>
    <county>Spalding</county>
    <operator>Cube District Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.244192</lat>
    <lon>-84.12203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61675</plant_id>
    <plant_name>NCSU CCUP Cogeneration Plant</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>NC State University, Energy Systems</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.775583</lat>
    <lon>-78.67372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61754</plant_id>
    <plant_name>SunSelect1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>SunSelect Produce (California) Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.096709</lat>
    <lon>-118.6022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62062</plant_id>
    <plant_name>Athens MN CONX</plant_name>
    <state>MN</state>
    <county>Isanti</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.459021</lat>
    <lon>-93.26571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62695</plant_id>
    <plant_name>CED Northampton Solar LLC Hybrid</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <battery_mwh>4.9</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2020</latest_year>
    <lat>42.3057</lat>
    <lon>-72.71064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63136</plant_id>
    <plant_name>Hopkins Hill CSG</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>6.6</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.61609</lat>
    <lon>-71.56683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1164</plant_id>
    <plant_name>Milford</plant_name>
    <state>IA</state>
    <county>Dickinson</county>
    <operator>City of Milford - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1997</latest_year>
    <lat>43.326083</lat>
    <lon>-95.14834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1488</plant_id>
    <plant_name>Deer Rips</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1924</latest_year>
    <lat>44.134572</lat>
    <lon>-70.20372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2014</plant_id>
    <plant_name>Thief River Falls</plant_name>
    <state>MN</state>
    <county>Pennington</county>
    <operator>City of Thief River Falls - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1927</first_year>
    <latest_year>2001</latest_year>
    <lat>48.114262</lat>
    <lon>-96.17918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7431</plant_id>
    <plant_name>Dalles Dam North Fishway Project</plant_name>
    <state>OR</state>
    <county>Wasco</county>
    <operator>Northern Wasco County PUD - (OR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>45.614375</lat>
    <lon>-121.1369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10215</plant_id>
    <plant_name>Snowbird Power Plant</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Snowbird Corporation</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.58337</lat>
    <lon>-111.6539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50647</plant_id>
    <plant_name>Covanta Indianapolis Energy</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Reworld Indianapolis Inc</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>39.734456</lat>
    <lon>-86.18908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54212</plant_id>
    <plant_name>American Crystal Sugar Crookston</plant_name>
    <state>MN</state>
    <county>Polk</county>
    <operator>American Crystal Sugar Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1975</latest_year>
    <lat>47.76468</lat>
    <lon>-96.63338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54750</plant_id>
    <plant_name>Coram Tehachapi</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Nextera Energy Resources</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>35.0663</lat>
    <lon>-118.3394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57302</plant_id>
    <plant_name>Garnet Wind Energy Center</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>33.9053</lat>
    <lon>-116.5825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57435</plant_id>
    <plant_name>Solar Star North Carolina II LLC</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.425</lat>
    <lon>-77.064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58539</plant_id>
    <plant_name>Lake Pleasant WTP</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.820556</lat>
    <lon>-112.24</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58757</plant_id>
    <plant_name>Summer North Solar</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.723056</lat>
    <lon>-118.2897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58982</plant_id>
    <plant_name>Allison Creek Hydro</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Copper Valley Elec Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>61.084444</lat>
    <lon>-146.3533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59556</plant_id>
    <plant_name>Dalton 2</plant_name>
    <state>GA</state>
    <county>Murray</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.718056</lat>
    <lon>-84.93194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59676</plant_id>
    <plant_name>Innovative Solar 55</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.69648</lat>
    <lon>-79.21681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60147</plant_id>
    <plant_name>Floyd Solar, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.509128</lat>
    <lon>-79.13588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60231</plant_id>
    <plant_name>Genentech-Oceanside Hybrid</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.211095</lat>
    <lon>-117.2996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60522</plant_id>
    <plant_name>Chisago Solar</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.452479</lat>
    <lon>-92.90195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60523</plant_id>
    <plant_name>Dodge Center Solar</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.026007</lat>
    <lon>-92.88155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60621</plant_id>
    <plant_name>Worcester Landfill</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>City of Worcester DPW - (MA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.219</lat>
    <lon>-71.791</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62383</plant_id>
    <plant_name>GMP Solar/Storage-Essex Hybrid</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.285937</lat>
    <lon>-73.02337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62770</plant_id>
    <plant_name>Richmond Solar Park 3</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.83901</lat>
    <lon>-84.82559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63452</plant_id>
    <plant_name>Solvay Solar</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>West Deptford Distributed Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.846549</lat>
    <lon>-75.21202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64395</plant_id>
    <plant_name>ZPD-PT Solar Project 2017-006 LLC Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>8</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.23</lat>
    <lon>-72.21</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66584</plant_id>
    <plant_name>White Rock Road LLC</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>White Rock Road LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.400949</lat>
    <lon>-71.8395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68107</plant_id>
    <plant_name>SR Lexington</plant_name>
    <state>TN</state>
    <county>Henderson</county>
    <operator>SR Lexington, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.720616</lat>
    <lon>-88.36943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68114</plant_id>
    <plant_name>SR Trezevant</plant_name>
    <state>TN</state>
    <county>Carroll</county>
    <operator>SR Trezevant, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.5</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.001402</lat>
    <lon>-88.61944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>224</plant_id>
    <plant_name>Centerville PH</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1900</first_year>
    <latest_year>1900</latest_year>
    <lat>39.788877</lat>
    <lon>-121.6574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2356</plant_id>
    <plant_name>Eastman Falls</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1937</first_year>
    <latest_year>1983</latest_year>
    <lat>43.447219</lat>
    <lon>-71.6579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2743</plant_id>
    <plant_name>Cedar Cliff</plant_name>
    <state>NC</state>
    <county>Jackson</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>35.2531</lat>
    <lon>-83.0983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4021</plant_id>
    <plant_name>Grantsburg Diesel</plant_name>
    <state>WI</state>
    <county>Burnett</county>
    <operator>Northwestern Wisconsin Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>1963</first_year>
    <latest_year>2007</latest_year>
    <lat>45.779189</lat>
    <lon>-92.67805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4061</plant_id>
    <plant_name>Caldron Falls</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>45.3569</lat>
    <lon>-88.2306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4178</plant_id>
    <plant_name>Guernsey</plant_name>
    <state>WY</state>
    <county>Platte</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1928</latest_year>
    <lat>42.289868</lat>
    <lon>-104.7606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7400</plant_id>
    <plant_name>Salisbury City of</plant_name>
    <state>MO</state>
    <county>Chariton</county>
    <operator>City of Salisbury - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1986</latest_year>
    <lat>39.4236</lat>
    <lon>-92.8028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7441</plant_id>
    <plant_name>VMEA Peaking Gen</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>City of Manassas - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1993</latest_year>
    <lat>38.74054</lat>
    <lon>-77.50806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50365</plant_id>
    <plant_name>Ridgewood Providence Power</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Rhode Island LFG Genco</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>41.8069</lat>
    <lon>-71.53</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54756</plant_id>
    <plant_name>Coopersville</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>7</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2006</latest_year>
    <lat>43.047306</lat>
    <lon>-85.95617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54926</plant_id>
    <plant_name>Prairie View I &amp; II LFGTE</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2007</latest_year>
    <lat>41.4936</lat>
    <lon>-86.1658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54956</plant_id>
    <plant_name>Deercroft I &amp; II LFGTE</plant_name>
    <state>IN</state>
    <county>LaPorte</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Landfill Gas</technologies>
    <generators>8</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2007</latest_year>
    <lat>41.6514</lat>
    <lon>-86.9036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56323</plant_id>
    <plant_name>Modern Innovative Energy LLC</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Innovative Energy Systems Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.2094</lat>
    <lon>-78.9836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56324</plant_id>
    <plant_name>Colonie LFGTE Facility</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Innovative Energy Systems Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2016</latest_year>
    <lat>42.803325</lat>
    <lon>-73.72674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56520</plant_id>
    <plant_name>Deertrack Park Gas Recovery</plant_name>
    <state>WI</state>
    <county>Jefferson</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>8</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2007</latest_year>
    <lat>43.089999</lat>
    <lon>-88.73968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56526</plant_id>
    <plant_name>Chaffee Gas Recovery</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>8</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2009</latest_year>
    <lat>42.5831</lat>
    <lon>-78.4864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56887</plant_id>
    <plant_name>Cumberland County PA LFG Recovery</plant_name>
    <state>PA</state>
    <county>Cumberland</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.1356</lat>
    <lon>-77.5072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56958</plant_id>
    <plant_name>DANC LFGTE Facility</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Innovative Energy Systems Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2012</latest_year>
    <lat>43.82</lat>
    <lon>-75.9175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56986</plant_id>
    <plant_name>Clinton LFGTE Facility</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Casella Waste Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>44.6917</lat>
    <lon>-73.5944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57018</plant_id>
    <plant_name>Waste Management Middle Peninsula LFGTE</plant_name>
    <state>VA</state>
    <county>Middlesex</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>8</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>37.519714</lat>
    <lon>-76.62451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57026</plant_id>
    <plant_name>Superior Landfill Gas Recovery</plant_name>
    <state>GA</state>
    <county>Chatham</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>8</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>32.0303</lat>
    <lon>-81.2722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57466</plant_id>
    <plant_name>Blue Ridge Landfill</plant_name>
    <state>PA</state>
    <county>Franklin</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.961944</lat>
    <lon>-77.56111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57897</plant_id>
    <plant_name>Richmond Energy</plant_name>
    <state>VA</state>
    <county>Henrico</county>
    <operator>Richmond Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>37.505833</lat>
    <lon>-77.37389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59221</plant_id>
    <plant_name>Pecan Row Landfill To Electric Facility</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2013</latest_year>
    <lat>30.815</lat>
    <lon>-83.3625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59436</plant_id>
    <plant_name>Lennon Generating</plant_name>
    <state>MI</state>
    <county>Shiawassee</county>
    <operator>North American Natural Res</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2014</latest_year>
    <lat>42.981667</lat>
    <lon>-83.97944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59686</plant_id>
    <plant_name>Sarasota County LFGTE Facility</plant_name>
    <state>FL</state>
    <county>Sarasota</county>
    <operator>Landfill Energy Systems Florida</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2019</latest_year>
    <lat>27.203</lat>
    <lon>-82.387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61012</plant_id>
    <plant_name>Mill Seat Renewable Energy Facility</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>8</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>43.063706</lat>
    <lon>-77.9329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61777</plant_id>
    <plant_name>Brevard</plant_name>
    <state>FL</state>
    <county>Brevard</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>28.39265</lat>
    <lon>-80.82867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63001</plant_id>
    <plant_name>Whitegrass No. 1</plant_name>
    <state>NV</state>
    <county>Lyon</county>
    <operator>Open Mountain Energy LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>4</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.163279</lat>
    <lon>-119.1805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65073</plant_id>
    <plant_name>Berrenda Mesa Water District</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>The Greater Light USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.613342</lat>
    <lon>-119.8668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66613</plant_id>
    <plant_name>HEB_CPSSADC</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>16</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.417338</lat>
    <lon>-98.36088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67317</plant_id>
    <plant_name>HEBTEMDistCenter</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>16</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>31.152387</lat>
    <lon>-97.36118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68736</plant_id>
    <plant_name>HEBTEMDistCenter2A</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>16</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.152387</lat>
    <lon>-97.36118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69752</plant_id>
    <plant_name>OTHERChildrensPlano</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>16</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.079222</lat>
    <lon>-96.8014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70388</plant_id>
    <plant_name>Pacifico Power Lancaster 01</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Pacifico Power Lancaster 01 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6.4</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.78141</lat>
    <lon>-118.1668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1848</plant_id>
    <plant_name>Norway (MI)</plant_name>
    <state>MI</state>
    <county>Dickinson</county>
    <operator>City of Norway - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>1905</first_year>
    <latest_year>1988</latest_year>
    <lat>45.74123</lat>
    <lon>-87.86278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3720</plant_id>
    <plant_name>Peterson</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>44.6381</lat>
    <lon>-73.1625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7439</plant_id>
    <plant_name>Godwin Drive Plant</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>City of Manassas - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1992</latest_year>
    <lat>38.74054</lat>
    <lon>-77.50806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56785</plant_id>
    <plant_name>Virginia Tech Power Plant</plant_name>
    <state>VA</state>
    <county>Montgomery</county>
    <operator>Virginia Polytechnic Inst and State Unv</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>37.2319</lat>
    <lon>-80.4211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57789</plant_id>
    <plant_name>Peak Power 1 Cogen</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>Peak Power 1, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.751111</lat>
    <lon>-73.99167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57959</plant_id>
    <plant_name>Desert Green Solar Farm LLC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.27055</lat>
    <lon>-116.3481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58682</plant_id>
    <plant_name>Dartmouth</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Mass Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.676111</lat>
    <lon>-70.99694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60742</plant_id>
    <plant_name>Argonne National Laboratory CHP</plant_name>
    <state>IL</state>
    <county>DuPage</county>
    <operator>Argonne National Laboratory</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.716534</lat>
    <lon>-87.97061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61761</plant_id>
    <plant_name>Douglas County Forest Products</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>Douglas County Forest Products - (OR)</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.2898</lat>
    <lon>-123.3616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62649</plant_id>
    <plant_name>SFDK Solar</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.132245</lat>
    <lon>-122.232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62942</plant_id>
    <plant_name>DG AMP 1048 Wadsworth</plant_name>
    <state>OH</state>
    <county>Medina</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.012786</lat>
    <lon>-81.76434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64640</plant_id>
    <plant_name>Hot Springs Energy Storage &amp; Microgrid</plant_name>
    <state>NC</state>
    <county>Madison</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <battery_mwh>4.4</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.89071</lat>
    <lon>-82.82513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64731</plant_id>
    <plant_name>Maple(CSG)</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Maple Street Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <battery_mwh>4.8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.062793</lat>
    <lon>-71.26433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65705</plant_id>
    <plant_name>Canoe Brook Solar</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.3</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.74525</lat>
    <lon>-74.34379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2015</plant_id>
    <plant_name>Truman</plant_name>
    <state>MN</state>
    <county>Martin</county>
    <operator>City of Truman - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1975</first_year>
    <latest_year>2005</latest_year>
    <lat>43.828415</lat>
    <lon>-94.43691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4201</plant_id>
    <plant_name>Combined Locks</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>City of Kaukauna (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>44.273511</lat>
    <lon>-88.30055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10801</plant_id>
    <plant_name>Ware Shoals Hydro Project</plant_name>
    <state>SC</state>
    <county>Laurens</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1939</first_year>
    <latest_year>1986</latest_year>
    <lat>34.404006</lat>
    <lon>-82.23358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50010</plant_id>
    <plant_name>Glen Ferris Hydro</plant_name>
    <state>WV</state>
    <county>Fayette</county>
    <operator>Hawks Nest Hydro LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1917</latest_year>
    <lat>38.1483</lat>
    <lon>-81.2147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50099</plant_id>
    <plant_name>Tamarack Energy</plant_name>
    <state>ID</state>
    <county>Adams</county>
    <operator>Tamarack Energy</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>44.954853</lat>
    <lon>-116.3871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54228</plant_id>
    <plant_name>Erving Paper Mills</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Erving Paper Mills Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2015</latest_year>
    <lat>42.5983</lat>
    <lon>-72.3875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54867</plant_id>
    <plant_name>Neenah Paper Munising Mill</plant_name>
    <state>MI</state>
    <county>Alger</county>
    <operator>Neenah Paper Michigan Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>46.4094</lat>
    <lon>-86.6443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55090</plant_id>
    <plant_name>Plummer Cogen</plant_name>
    <state>ID</state>
    <county>Benewah</county>
    <operator>Stimson Lumber Company</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>47.331006</lat>
    <lon>-116.8904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57977</plant_id>
    <plant_name>High Sierra Cogeneration Plant</plant_name>
    <state>CA</state>
    <county>Lassen</county>
    <operator>Plumas Sierra Rural Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.4128</lat>
    <lon>-120.4774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58165</plant_id>
    <plant_name>College of New Jersey</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>The College of New Jersey</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>40.269444</lat>
    <lon>-74.77333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60762</plant_id>
    <plant_name>Pfizer Peapack Solar</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>CVI CleanCapital Solar 5 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.711882</lat>
    <lon>-74.66343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63540</plant_id>
    <plant_name>Essex County Correctional Facility Cogen</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Essex County Correctional Facility Cogen</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>40.7205</lat>
    <lon>-74.1263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63763</plant_id>
    <plant_name>CES Agawam Tuckahoe Solar Hybrid</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>CES Agawam Tuckahoe Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <battery_mwh>5.2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.059</lat>
    <lon>-72.691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67745</plant_id>
    <plant_name>White Plains RFP Shapham Place</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Shapham Place Solar Project 2020 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.021546</lat>
    <lon>-73.75892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67899</plant_id>
    <plant_name>PNY BESS LLC</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <battery_mwh>6.2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.89023</lat>
    <lon>-75.18554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69980</plant_id>
    <plant_name>Kiefer Landfill Generating Phase II</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>6.2</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.51465</lat>
    <lon>-121.1926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>426</plant_id>
    <plant_name>Oxbow (CA)</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Placer County Water Agency - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1966</first_year>
    <latest_year>1966</latest_year>
    <lat>39.003372</lat>
    <lon>-120.7467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>948</plant_id>
    <plant_name>McLeansboro</plant_name>
    <state>IL</state>
    <county>Hamilton</county>
    <operator>City of McLeansboro - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1995</latest_year>
    <lat>38.094683</lat>
    <lon>-88.54133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1158</plant_id>
    <plant_name>Lenox</plant_name>
    <state>IA</state>
    <county>Taylor</county>
    <operator>City of Lenox - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1948</first_year>
    <latest_year>2016</latest_year>
    <lat>40.88</lat>
    <lon>-94.5589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7229</plant_id>
    <plant_name>Black Butte</plant_name>
    <state>CA</state>
    <county>Tehama</county>
    <operator>City of Santa Clara - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>39.814905</lat>
    <lon>-122.3323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10863</plant_id>
    <plant_name>Archer Daniels Midland Mankato</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Archer Daniels Midland Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.187066</lat>
    <lon>-93.99242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50205</plant_id>
    <plant_name>Williams Ignacio Natural Gas Plant</plant_name>
    <state>CO</state>
    <county>La Plata</county>
    <operator>Harvest Midstream Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>37.145556</lat>
    <lon>-107.7847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50492</plant_id>
    <plant_name>Gas Utilization Facility</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>City of San Diego - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass; Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2002</latest_year>
    <lat>32.679172</lat>
    <lon>-117.2467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55996</plant_id>
    <plant_name>Alliant SBD0201 Ingredion</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.97007</lat>
    <lon>-91.66623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56374</plant_id>
    <plant_name>Robert Mueller Energy Center</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Austin Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>30.304994</lat>
    <lon>-97.70768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56694</plant_id>
    <plant_name>Russell D Smith</plant_name>
    <state>WA</state>
    <county>Adams</county>
    <operator>Columbia Basin Hydropower</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>46.7392</lat>
    <lon>-119.1122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59558</plant_id>
    <plant_name>Sandoval Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.283611</lat>
    <lon>-106.8128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60266</plant_id>
    <plant_name>Cedar Branch</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.503337</lat>
    <lon>-74.96448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60844</plant_id>
    <plant_name>Genentech Vacaville Meter #1</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.390756</lat>
    <lon>-121.9478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61434</plant_id>
    <plant_name>SCE&amp;G Springfield CSG</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.491</lat>
    <lon>-81.297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62270</plant_id>
    <plant_name>Westchester County Medical Center</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Westchester County Medical Center - (NY)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2019</latest_year>
    <lat>41.08921</lat>
    <lon>-73.80443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63645</plant_id>
    <plant_name>St. Joseph's Regional Medical Center (NJ)</plant_name>
    <state>NJ</state>
    <county>Passaic</county>
    <operator>St. Joseph's Regional Medical Center (NJ)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>9</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2011</latest_year>
    <lat>40.9026</lat>
    <lon>-74.1656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63921</plant_id>
    <plant_name>POET Biorefining - Shelbyville</plant_name>
    <state>IN</state>
    <county>Shelby</county>
    <operator>POET Biorefining- Shelbyville</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.56</lat>
    <lon>-85.822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66748</plant_id>
    <plant_name>IMPA Richmond 8 Solar Park</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.82229</lat>
    <lon>-84.95008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68680</plant_id>
    <plant_name>Saddleback Solar</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <battery_mwh>2.5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.536</lat>
    <lon>-73.229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69880</plant_id>
    <plant_name>University of Montana CHP</plant_name>
    <state>MT</state>
    <county>Missoula</county>
    <operator>University of Montana</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>6.1</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>46.862567</lat>
    <lon>-113.9827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>284</plant_id>
    <plant_name>Spring Gap</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>38.18653</lat>
    <lon>-120.1117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>704</plant_id>
    <plant_name>Burton Dam</plant_name>
    <state>GA</state>
    <county>Rabun</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>9.6</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>34.7939</lat>
    <lon>-83.5402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>791</plant_id>
    <plant_name>Canyon</plant_name>
    <state>TX</state>
    <county>Comal</county>
    <operator>Guadalupe Blanco River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>29.87056</lat>
    <lon>-98.19473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1312</plant_id>
    <plant_name>Oberlin (KS)</plant_name>
    <state>KS</state>
    <county>Decatur</county>
    <operator>City of Oberlin - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.8217</lat>
    <lon>-100.5289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1704</plant_id>
    <plant_name>Five Channels</plant_name>
    <state>MI</state>
    <county>Iosco</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>44.455518</lat>
    <lon>-83.67627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1853</plant_id>
    <plant_name>Main Street (MI)</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Village of Sebewaing - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1979</latest_year>
    <lat>43.732508</lat>
    <lon>-83.45331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1855</plant_id>
    <plant_name>Sturgis City Diesel Plant</plant_name>
    <state>MI</state>
    <county>St Joseph</county>
    <operator>City of Sturgis - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>41.7992</lat>
    <lon>-85.4256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2231</plant_id>
    <plant_name>Crete</plant_name>
    <state>NE</state>
    <county>Saline</county>
    <operator>City of Crete - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1973</latest_year>
    <lat>40.6253</lat>
    <lon>-96.9601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2546</plant_id>
    <plant_name>Black River</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>44.000122</lat>
    <lon>-75.81315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2555</plant_id>
    <plant_name>Eagle</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1925</latest_year>
    <lat>43.909714</lat>
    <lon>-75.20083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2575</plant_id>
    <plant_name>High Falls - Croghan NY</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>43.9247</lat>
    <lon>-75.3731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2576</plant_id>
    <plant_name>Higley</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.5306</lat>
    <lon>-74.9331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2579</plant_id>
    <plant_name>Inghams</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6.2</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>43.061017</lat>
    <lon>-74.76435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2581</plant_id>
    <plant_name>Kamargo</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>44.0117</lat>
    <lon>-75.7967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2595</plant_id>
    <plant_name>Oswego Falls East</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1914</latest_year>
    <lat>43.3161</lat>
    <lon>-76.4153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2678</plant_id>
    <plant_name>Plant No 1 Freeport</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Village of Freeport - (NY)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1954</latest_year>
    <lat>40.6561</lat>
    <lon>-73.5922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3998</plant_id>
    <plant_name>Cedar Falls (WI)</plant_name>
    <state>WI</state>
    <county>Dunn</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1915</latest_year>
    <lat>44.9367</lat>
    <lon>-91.8883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6369</plant_id>
    <plant_name>Detour</plant_name>
    <state>MI</state>
    <county>Chippewa</county>
    <operator>Cloverland Electric Co-op</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1973</first_year>
    <latest_year>1976</latest_year>
    <lat>45.98363</lat>
    <lon>-83.90788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6486</plant_id>
    <plant_name>Mill C</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>New York State Elec &amp; Gas Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1943</first_year>
    <latest_year>1984</latest_year>
    <lat>44.6967</lat>
    <lon>-73.6122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6510</plant_id>
    <plant_name>Brunswick</plant_name>
    <state>NV</state>
    <county>Carson City</county>
    <operator>Sierra Pacific Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1960</latest_year>
    <lat>39.1522</lat>
    <lon>-119.7478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6579</plant_id>
    <plant_name>Johnson</plant_name>
    <state>KS</state>
    <county>Stanton</county>
    <operator>City of Johnson - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.566881</lat>
    <lon>-101.7511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7381</plant_id>
    <plant_name>Searsburg Wind Turbine</plant_name>
    <state>VT</state>
    <county>Bennington</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>42.8625</lat>
    <lon>-72.9628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7862</plant_id>
    <plant_name>Power Creek</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Cordova Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>60.588686</lat>
    <lon>-145.6045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7977</plant_id>
    <plant_name>Granite Falls 2</plant_name>
    <state>MN</state>
    <county>Yellow Medicine</county>
    <operator>City of Granite Falls - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.8047</lat>
    <lon>-95.557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10548</plant_id>
    <plant_name>San Jose Cogeneration</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>San Jose State University Fclts Dev &amp;Ops</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>37.336113</lat>
    <lon>-121.8783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50094</plant_id>
    <plant_name>Vicinity Energy Trenton, L.P.</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Vicinity Energy Trenton, L.P.</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>40.2167</lat>
    <lon>-74.7667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50537</plant_id>
    <plant_name>SRI International Cogen Project</plant_name>
    <state>CA</state>
    <county>San Mateo</county>
    <operator>IPT SRI Cogeneration Inc</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.455314</lat>
    <lon>-122.1728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50563</plant_id>
    <plant_name>Settlers Hill Gas Recovery</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>WM Illinois Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1998</latest_year>
    <lat>41.871914</lat>
    <lon>-88.28772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50571</plant_id>
    <plant_name>Altamont Gas Recovery</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>37.749308</lat>
    <lon>-121.6499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50575</plant_id>
    <plant_name>Lake Gas Recovery</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>WM Illinois Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>42.10625</lat>
    <lon>-87.81374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50965</plant_id>
    <plant_name>Toledo Ref Power Recovery Train</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>Toledo Refining Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>41.6325</lat>
    <lon>-83.5042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54213</plant_id>
    <plant_name>American Crystal Sugar Drayton</plant_name>
    <state>ND</state>
    <county>Pembina</county>
    <operator>American Crystal Sugar Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1965</latest_year>
    <lat>48.593158</lat>
    <lon>-97.17608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54449</plant_id>
    <plant_name>Dome Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Sentinel Peak Resources California, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>35.220833</lat>
    <lon>-119.5831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54540</plant_id>
    <plant_name>Charter Dura-Bar</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Wells Manufacturing Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.2891</lat>
    <lon>-88.413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54813</plant_id>
    <plant_name>Shepherd Center</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>Shepherd Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2025</latest_year>
    <lat>33.8111</lat>
    <lon>-84.3928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55067</plant_id>
    <plant_name>MPEA Energy Center</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Metropolitan Pier and Exposition Auth</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.852709</lat>
    <lon>-87.61851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55074</plant_id>
    <plant_name>Lakeview Gas Recovery</plant_name>
    <state>PA</state>
    <county>Erie</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>42.060172</lat>
    <lon>-80.02077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55597</plant_id>
    <plant_name>GRS C&amp;C</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>Gas Recovery Systems Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2007</latest_year>
    <lat>42.356343</lat>
    <lon>-85.00578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56148</plant_id>
    <plant_name>Ft. Pierre</plant_name>
    <state>SD</state>
    <county>Stanley</county>
    <operator>City of Fort Pierre - (SD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>44.368056</lat>
    <lon>-100.3808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56181</plant_id>
    <plant_name>Genoa Diesel Generating Station</plant_name>
    <state>OH</state>
    <county>Ottawa</county>
    <operator>Village of Genoa - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>41.5092</lat>
    <lon>-83.3606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56597</plant_id>
    <plant_name>Elm Street Substation Generators</plant_name>
    <state>MO</state>
    <county>St Francois</county>
    <operator>City of Farmington - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.7814</lat>
    <lon>-90.4156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57034</plant_id>
    <plant_name>Willmar Municipal East Substation</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Willmar Municipal Utilities (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>45.1272</lat>
    <lon>-95.025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57035</plant_id>
    <plant_name>Willmar Municipal SW Substation</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Willmar Municipal Utilities (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>45.105</lat>
    <lon>-95.0844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57359</plant_id>
    <plant_name>Avenal Park</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Avenal Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.989722</lat>
    <lon>-120.11</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57756</plant_id>
    <plant_name>Coastal Energy Project</plant_name>
    <state>WA</state>
    <county>Grays Harbor</county>
    <operator>Coastal Community Action Program</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>46.793581</lat>
    <lon>-124.0654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57929</plant_id>
    <plant_name>East Campus Utility Plant</plant_name>
    <state>OH</state>
    <county>Hamilton</county>
    <operator>University of Cincinnati</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2022</latest_year>
    <lat>39.137935</lat>
    <lon>-84.50495</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58172</plant_id>
    <plant_name>Seaside Heights Power Plant</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Seaside Heights Municipal Utility (NJ)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.943333</lat>
    <lon>-74.07861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58233</plant_id>
    <plant_name>Wagner Wind LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.908889</lat>
    <lon>-116.5556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58549</plant_id>
    <plant_name>Port Allen Solar</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Ka Ie Ie Waho Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>21.901944</lat>
    <lon>-159.5817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58685</plant_id>
    <plant_name>Mahoning Creek Hydroelectric Project</plant_name>
    <state>PA</state>
    <county>Armstrong</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.921111</lat>
    <lon>-79.28167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58873</plant_id>
    <plant_name>Stuyvesant Falls</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>Albany Engineering Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.351389</lat>
    <lon>-73.73389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59044</plant_id>
    <plant_name>Rio Rico Solar</plant_name>
    <state>AZ</state>
    <county>Santa Cruz</county>
    <operator>UNS Electric, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>31.5</lat>
    <lon>-111.0081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59611</plant_id>
    <plant_name>LKL BLBD, LLC</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>LKL BLBD, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>28.066389</lat>
    <lon>-82.0175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59614</plant_id>
    <plant_name>Monterey Diesel Generation Facility</plant_name>
    <state>VA</state>
    <county>Highland</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>10</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.421389</lat>
    <lon>-79.59139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59660</plant_id>
    <plant_name>Washington City Electric Generation</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>City of Washington - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2008</latest_year>
    <lat>37.155</lat>
    <lon>-113.4392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59774</plant_id>
    <plant_name>BioTown Ag</plant_name>
    <state>IN</state>
    <county>White</county>
    <operator>Bio Town Biogas, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>6</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2014</latest_year>
    <lat>40.765611</lat>
    <lon>-86.87968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60330</plant_id>
    <plant_name>Grove Solar Center, LLC</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.936687</lat>
    <lon>-117.3812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60418</plant_id>
    <plant_name>Calligan Creek Hydroelectric Project</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>PUD No 1 of Snohomish County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>47.6008</lat>
    <lon>-121.6886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60517</plant_id>
    <plant_name>Hancock Creek Hydroelectric Project</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>PUD No 1 of Snohomish County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>47.5722</lat>
    <lon>-121.6897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60520</plant_id>
    <plant_name>Annandale Solar</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.247009</lat>
    <lon>-94.10693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60737</plant_id>
    <plant_name>Church Hill</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.100947</lat>
    <lon>-75.95968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60750</plant_id>
    <plant_name>Osawatomie Power Plant South Sub</plant_name>
    <state>KS</state>
    <county>Miami</county>
    <operator>City of Osawatomie - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.495623</lat>
    <lon>-94.95255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60751</plant_id>
    <plant_name>Osawatomie Power Plant North Sub</plant_name>
    <state>KS</state>
    <county>Miami</county>
    <operator>City of Osawatomie - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.501309</lat>
    <lon>-94.95692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60808</plant_id>
    <plant_name>US Foods Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>CD US Solar MT1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.534414</lat>
    <lon>-74.27515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61207</plant_id>
    <plant_name>Green Island Hydroelectric Station</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Albany Engineering Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>42.748106</lat>
    <lon>-73.69022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61510</plant_id>
    <plant_name>Monroe County Sites C, D, &amp; E</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.31879</lat>
    <lon>-77.74021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61849</plant_id>
    <plant_name>Danville</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.660591</lat>
    <lon>-79.29906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62211</plant_id>
    <plant_name>Denmark Solar</plant_name>
    <state>SC</state>
    <county>Bamberg</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.347128</lat>
    <lon>-81.14284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62241</plant_id>
    <plant_name>NorWest Energy 9 LLC</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.917</lat>
    <lon>-119.343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62304</plant_id>
    <plant_name>Woodleaf Solar Facility</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.724427</lat>
    <lon>-80.60845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62461</plant_id>
    <plant_name>Farmers Electric Cooperative - Kalona</plant_name>
    <state>IA</state>
    <county>Johnson</county>
    <operator>Farmers Electric Coop - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2006</latest_year>
    <lat>41.566688</lat>
    <lon>-91.73666</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62499</plant_id>
    <plant_name>Orange County Energy Storage 3</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Convergent Energy and Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <battery_mwh>24</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.714896</lat>
    <lon>-117.8543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62908</plant_id>
    <plant_name>Anoka BESS</plant_name>
    <state>MN</state>
    <county>Anoka</county>
    <operator>Gopher Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.32</lat>
    <lon>-93.48</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62931</plant_id>
    <plant_name>City of Pratt Solar</plant_name>
    <state>KS</state>
    <county>Pratt</county>
    <operator>Kenyon Energy KS Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.710556</lat>
    <lon>-98.72093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62937</plant_id>
    <plant_name>Athens BESS</plant_name>
    <state>MN</state>
    <county>Isanti</county>
    <operator>Gopher Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.45</lat>
    <lon>-93.24</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63756</plant_id>
    <plant_name>Omtanke Solar</plant_name>
    <state>SC</state>
    <county>Berkeley</county>
    <operator>DG South Carolina Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.133705</lat>
    <lon>-80.25372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64152</plant_id>
    <plant_name>SR Rattlesnake</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Rattlesnake, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.105427</lat>
    <lon>-104.4131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64350</plant_id>
    <plant_name>Orbit Bloom Fuel Cell</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>DG Fuel Cell, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.819031</lat>
    <lon>-72.96574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64519</plant_id>
    <plant_name>Centinela State Prison</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.825833</lat>
    <lon>-115.7829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64521</plant_id>
    <plant_name>Calipatria State Prison</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.163055</lat>
    <lon>-115.4848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65281</plant_id>
    <plant_name>Bomber CSG</plant_name>
    <state>MD</state>
    <county>Carroll</county>
    <operator>Hampstead Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.59902</lat>
    <lon>-76.8526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65658</plant_id>
    <plant_name>DRPA Lindenwold Station Solar Project</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Solar Star River SLB, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.831654</lat>
    <lon>-74.99923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66505</plant_id>
    <plant_name>EnerSmart Chula Vista Sub Station</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>EnerSmart Chula Vista Sub Station</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.5945</lat>
    <lon>-117.0507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66887</plant_id>
    <plant_name>Houston Solar</plant_name>
    <state>AK</state>
    <county>Matanuska Susitna</county>
    <operator>Energy 49, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>61.59</lat>
    <lon>-149.79</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67196</plant_id>
    <plant_name>Tyto Solar</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.987731</lat>
    <lon>-89.378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67724</plant_id>
    <plant_name>Antigo-Forrest Street Solar Project</plant_name>
    <state>WI</state>
    <county>Langlade</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.123935</lat>
    <lon>-89.17536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67727</plant_id>
    <plant_name>Caledonia Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Racine</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.797719</lat>
    <lon>-87.96506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67730</plant_id>
    <plant_name>LaFayette Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Walworth</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.702133</lat>
    <lon>-88.53314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67731</plant_id>
    <plant_name>Raymond Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Racine</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.762565</lat>
    <lon>-88.05788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67907</plant_id>
    <plant_name>Strix Solar</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.971615</lat>
    <lon>-89.39461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68248</plant_id>
    <plant_name>SR Gray</plant_name>
    <state>TN</state>
    <county>Washington</county>
    <operator>SR Gray, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.439504</lat>
    <lon>-82.47351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69036</plant_id>
    <plant_name>Chanute Solar</plant_name>
    <state>KS</state>
    <county>Neosho</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.637</lat>
    <lon>-95.468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69249</plant_id>
    <plant_name>National Park Solar</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.860635</lat>
    <lon>-75.17987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69430</plant_id>
    <plant_name>Spring Brook Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Walworth</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.786466</lat>
    <lon>-88.7536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69432</plant_id>
    <plant_name>Antigo Solar Partners, LLC</plant_name>
    <state>WI</state>
    <county>Langlade</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.152419</lat>
    <lon>-89.16997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69433</plant_id>
    <plant_name>La Grange Solar Partners, LLC</plant_name>
    <state>WI</state>
    <county>Walworth</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.79717</lat>
    <lon>-88.58368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69501</plant_id>
    <plant_name>Bristol Woods Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Kenosha</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.526689</lat>
    <lon>-87.99353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69503</plant_id>
    <plant_name>Perch Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Winnebago</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.109735</lat>
    <lon>-88.51583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69504</plant_id>
    <plant_name>Strawberry Creek Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Kenosha</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.58629</lat>
    <lon>-88.01427</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69942</plant_id>
    <plant_name>Dudley</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>6</summer_mw>
    <battery_mwh>2.4</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.073832</lat>
    <lon>-71.88426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70511</plant_id>
    <plant_name>ZNC Turkey Creek, LLC</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>ZNC Turkey Creek, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>6</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.991</lat>
    <lon>-78.194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70527</plant_id>
    <plant_name>UE-00601MD, LLC</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Unison Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>6</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.781576</lat>
    <lon>-77.0169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>484</plant_id>
    <plant_name>Red Mountain</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5.9</nameplate_mw>
    <summer_mw>5.9</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>33.3944</lat>
    <lon>-117.1889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52091</plant_id>
    <plant_name>NewYork-Presbyterian Brooklyn Methodist</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>NewYork-Presbyterian Brooklyn Methodist Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>5.9</nameplate_mw>
    <summer_mw>5.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2020</latest_year>
    <lat>40.6679</lat>
    <lon>-73.9787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54333</plant_id>
    <plant_name>Bucknell University</plant_name>
    <state>PA</state>
    <county>Union</county>
    <operator>Bucknell University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>5.9</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1998</latest_year>
    <lat>40.955015</lat>
    <lon>-76.87884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54554</plant_id>
    <plant_name>Spicer Meadow Project</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Northern California Power Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.9</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>38.3914</lat>
    <lon>-120.0008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55155</plant_id>
    <plant_name>MM Albany Energy</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>MM Albany Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>5.9</nameplate_mw>
    <summer_mw>5.9</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2012</latest_year>
    <lat>42.704391</lat>
    <lon>-73.85087</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60562</plant_id>
    <plant_name>GMP Solar - Panton Hybrid</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.9</nameplate_mw>
    <summer_mw>5.9</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2018</latest_year>
    <lat>44.085795</lat>
    <lon>-73.19539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62374</plant_id>
    <plant_name>JBAB - Washington DC</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>JBAB Solar I, LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.9</nameplate_mw>
    <summer_mw>5.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.852655</lat>
    <lon>-77.00929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65562</plant_id>
    <plant_name>Amazon Bakersfield 1 Solar Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Solar Star Prime 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.9</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <battery_mwh>5.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.446616</lat>
    <lon>-119.0509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1985</plant_id>
    <plant_name>Lake Crystal</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>City of Lake Crystal - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1999</latest_year>
    <lat>44.106888</lat>
    <lon>-94.2197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3971</plant_id>
    <plant_name>Biron</plant_name>
    <state>WI</state>
    <county>Wood</county>
    <operator>Consolidated Water Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1896</first_year>
    <latest_year>1921</latest_year>
    <lat>44.4306</lat>
    <lon>-89.7808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7469</plant_id>
    <plant_name>Madison Utilities</plant_name>
    <state>NE</state>
    <county>Madison</county>
    <operator>City of Madison - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1953</first_year>
    <latest_year>2006</latest_year>
    <lat>41.829754</lat>
    <lon>-97.45628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7814</plant_id>
    <plant_name>Webb Forging</plant_name>
    <state>SC</state>
    <county>Union</county>
    <operator>Central Electric Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.5567</lat>
    <lon>-81.4919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10693</plant_id>
    <plant_name>Eastern Correctional Institute</plant_name>
    <state>MD</state>
    <county>Somerset</county>
    <operator>Maryland Environmental Service</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1988</latest_year>
    <lat>38.159</lat>
    <lon>-75.704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50203</plant_id>
    <plant_name>US Gypsum Oakfield</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>U S Gypsum Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>43.0647</lat>
    <lon>-78.2972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50206</plant_id>
    <plant_name>Vallecito Hydroelectric</plant_name>
    <state>CO</state>
    <county>La Plata</county>
    <operator>Ptarmigan Res &amp; Engy Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>37.377715</lat>
    <lon>-107.5787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56215</plant_id>
    <plant_name>Allendorf</plant_name>
    <state>IA</state>
    <county>Osceola</county>
    <operator>E&amp;E Enterprises LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2020</latest_year>
    <lat>43.4</lat>
    <lon>-95.6333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58327</plant_id>
    <plant_name>Bradley Energy Center</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Ameresco Select Inc</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2010</latest_year>
    <lat>41.927102</lat>
    <lon>-72.68314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59785</plant_id>
    <plant_name>Fremont Community Digester, LLC</plant_name>
    <state>MI</state>
    <county>Newaygo</county>
    <operator>Generate Fremont Digester, LLC.</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.45965</lat>
    <lon>-85.9761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61723</plant_id>
    <plant_name>HEBT Irvine 2</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Electrodes</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <battery_mwh>34.8</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.665246</lat>
    <lon>-117.7682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61755</plant_id>
    <plant_name>East Acres Solar NG, LLC</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.487476</lat>
    <lon>-73.24233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61884</plant_id>
    <plant_name>Kearney NPPD Solar Project</plant_name>
    <state>NE</state>
    <county>Buffalo</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.721688</lat>
    <lon>-99.0412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63094</plant_id>
    <plant_name>Santa Barbara ReSource Center</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>County of Santa Barbara - (CA)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas; Other Waste Biomass; Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>34.482175</lat>
    <lon>-120.1235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66339</plant_id>
    <plant_name>Brainerd Airport</plant_name>
    <state>MN</state>
    <county>Crow Wing</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>46.39096</lat>
    <lon>-94.14054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66899</plant_id>
    <plant_name>Marlowe Solar</plant_name>
    <state>WV</state>
    <county>Berkeley</county>
    <operator>Monongahela Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.589315</lat>
    <lon>-77.83555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67457</plant_id>
    <plant_name>665 Scenic Highway</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.8</nameplate_mw>
    <summer_mw>5.8</summer_mw>
    <battery_mwh>31</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.77</lat>
    <lon>-70.571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>585</plant_id>
    <plant_name>Drop 1</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>32.711611</lat>
    <lon>-114.9427</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2299</plant_id>
    <plant_name>Red Cloud</plant_name>
    <state>NE</state>
    <county>Webster</county>
    <operator>City of Red Cloud - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1973</latest_year>
    <lat>40.097954</lat>
    <lon>-98.51903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6388</plant_id>
    <plant_name>Turners Falls</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>FirstLight Power Resources, Inc. - MA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1905</first_year>
    <latest_year>1913</latest_year>
    <lat>42.608042</lat>
    <lon>-72.56146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6451</plant_id>
    <plant_name>Beldens</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1988</latest_year>
    <lat>44.0525</lat>
    <lon>-73.1762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10417</plant_id>
    <plant_name>Indian Orchard Plant 1</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Solutia Inc-Indian</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.156898</lat>
    <lon>-72.52415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10687</plant_id>
    <plant_name>Black River Hydro Associates</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>43.591246</lat>
    <lon>-75.34421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50626</plant_id>
    <plant_name>Chalmette Refining LLC</plant_name>
    <state>LA</state>
    <county>St Bernard</county>
    <operator>Chalmette Refining LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>OTH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>29.9383</lat>
    <lon>-89.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50713</plant_id>
    <plant_name>Huntington Falls</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>44.0703</lat>
    <lon>-73.1961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56120</plant_id>
    <plant_name>Lee County Landfill</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>34.181042</lat>
    <lon>-80.26778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57702</plant_id>
    <plant_name>Signal Hill West Unit</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Signal Hill Petroleum, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>33.811182</lat>
    <lon>-118.1756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58545</plant_id>
    <plant_name>Community Solar 1</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Solar Community I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.982778</lat>
    <lon>-115.4819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64440</plant_id>
    <plant_name>White Plains Hospital Medical Center</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>White Plains Hospital Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2022</latest_year>
    <lat>41.032</lat>
    <lon>-73.75296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65726</plant_id>
    <plant_name>Montgomery County Community Solar Center</plant_name>
    <state>MO</state>
    <county>Montgomery</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.7</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.890697</lat>
    <lon>-91.42322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>398</plant_id>
    <plant_name>Haiwee</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>36.109722</lat>
    <lon>-117.9567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>403</plant_id>
    <plant_name>San Fernando</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>6.1</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>34.312778</lat>
    <lon>-118.4928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>494</plant_id>
    <plant_name>Manitou Springs</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>City of Colorado Springs - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>1927</first_year>
    <latest_year>2006</latest_year>
    <lat>38.855556</lat>
    <lon>-104.9331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>507</plant_id>
    <plant_name>Las Animas</plant_name>
    <state>CO</state>
    <county>Bent</county>
    <operator>City of Las Animas - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1967</latest_year>
    <lat>38.0647</lat>
    <lon>-103.2159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>520</plant_id>
    <plant_name>Lower Molina</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1962</first_year>
    <latest_year>1962</latest_year>
    <lat>39.19366</lat>
    <lon>-108.0441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1259</plant_id>
    <plant_name>Ashland</plant_name>
    <state>KS</state>
    <county>Clark</county>
    <operator>City of Ashland - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1953</first_year>
    <latest_year>2014</latest_year>
    <lat>37.193787</lat>
    <lon>-99.76307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1852</plant_id>
    <plant_name>St Louis</plant_name>
    <state>MI</state>
    <county>Gratiot</county>
    <operator>City of St Louis - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1919</first_year>
    <latest_year>2003</latest_year>
    <lat>43.4019</lat>
    <lon>-84.6014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6565</plant_id>
    <plant_name>Berlin</plant_name>
    <state>MD</state>
    <county>Worcester</county>
    <operator>Town of Berlin - (MD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1961</first_year>
    <latest_year>2020</latest_year>
    <lat>38.327778</lat>
    <lon>-75.21722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7725</plant_id>
    <plant_name>Coffin Butte</plant_name>
    <state>OR</state>
    <county>Benton</county>
    <operator>Pacific Northwest Generating Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2007</latest_year>
    <lat>44.6969</lat>
    <lon>-123.2234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8013</plant_id>
    <plant_name>Winter</plant_name>
    <state>WI</state>
    <county>Sawyer</county>
    <operator>North Central Power Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>45.836675</lat>
    <lon>-90.97352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10884</plant_id>
    <plant_name>Olive View Medical Center</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles County DHS</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>34.326242</lat>
    <lon>-118.4448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54716</plant_id>
    <plant_name>Alliant SBD 8602 Marion Sub</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>42.0289</lat>
    <lon>-91.5975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54719</plant_id>
    <plant_name>Alliant SBD 9203 Profol</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>American Profol Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2012</latest_year>
    <lat>41.935</lat>
    <lon>-91.6361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54863</plant_id>
    <plant_name>Bassett Medical Center</plant_name>
    <state>NY</state>
    <county>Otsego</county>
    <operator>Bassett Healthcare</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2006</latest_year>
    <lat>42.6944</lat>
    <lon>-74.9242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55757</plant_id>
    <plant_name>Model City Energy Facility</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Model City Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>7</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>43.2094</lat>
    <lon>-78.9836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56703</plant_id>
    <plant_name>Lyons Falls Hydroelectric</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Northbrook Lyons Falls LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1974</latest_year>
    <lat>43.61863</lat>
    <lon>-75.35858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57023</plant_id>
    <plant_name>Waste Management Rolling Meadows LFGTE</plant_name>
    <state>KS</state>
    <county>Shawnee</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>7</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.174577</lat>
    <lon>-95.73113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57170</plant_id>
    <plant_name>Suburban Landfill Gas Recovery</plant_name>
    <state>OH</state>
    <county>Perry</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>7</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.912438</lat>
    <lon>-82.24499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58201</plant_id>
    <plant_name>Monroe Community College Plant</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Monroe County - (NY)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>43.103889</lat>
    <lon>-77.61028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58326</plant_id>
    <plant_name>PWD Northeast WPCP Biogas Cogen Plant</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Philadelphia Water Department</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.988611</lat>
    <lon>-75.08333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59496</plant_id>
    <plant_name>BYUI Central Energy Facility</plant_name>
    <state>ID</state>
    <county>Madison</county>
    <operator>Brigham Young Univ Idaho</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>43.816944</lat>
    <lon>-111.7858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60392</plant_id>
    <plant_name>Pfizer Groton Fuel Cell</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Groton Fuel Cell 1 LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.333889</lat>
    <lon>-72.07111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60536</plant_id>
    <plant_name>UA Central Utility Plant</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>University Of Arkansas</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.066336</lat>
    <lon>-94.17225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62268</plant_id>
    <plant_name>NorWest Energy 4, LLC</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.695</lat>
    <lon>-121.614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62654</plant_id>
    <plant_name>Foundation Dole Fresh Vegetables</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Foundation CA Fund X Manager LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.459294</lat>
    <lon>-121.3501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62731</plant_id>
    <plant_name>Middleton Airport Solar</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Madison Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.11626</lat>
    <lon>-89.53245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62976</plant_id>
    <plant_name>Syncarpha Northampton Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Syncarpha Northampton, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.290526</lat>
    <lon>-72.70944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63485</plant_id>
    <plant_name>ECP Uptown Campus</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>ECP Uptown Campus LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>40.43727</lat>
    <lon>-79.98741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63689</plant_id>
    <plant_name>Red Lake Falls Community Hybrid</plant_name>
    <state>MN</state>
    <county>Red Lake</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>47.869258</lat>
    <lon>-96.31896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64042</plant_id>
    <plant_name>Montague Road Solar</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Montague Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2024</latest_year>
    <lat>42.421721</lat>
    <lon>-72.53686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65014</plant_id>
    <plant_name>ASD Cotuit MA Solar LLC</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>ASD Cotuit MA Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <battery_mwh>4.2</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2024</latest_year>
    <lat>41.688722</lat>
    <lon>-70.47748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65163</plant_id>
    <plant_name>Orioles Community Solar</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>Azimuth 180 Solar Electric, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.426</lat>
    <lon>-73.817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66195</plant_id>
    <plant_name>SPPW1, LLC</plant_name>
    <state>NE</state>
    <county>Franklin</county>
    <operator>SPPW1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.313772</lat>
    <lon>-98.96028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66742</plant_id>
    <plant_name>Laskin Solar</plant_name>
    <state>MN</state>
    <county>St Louis</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>47.52262</lat>
    <lon>-92.17835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67308</plant_id>
    <plant_name>AbbVie Waco</plant_name>
    <state>TX</state>
    <county>McLennan</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>14</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.48819</lat>
    <lon>-97.20061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67490</plant_id>
    <plant_name>Spectrum Solar Hybrid</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Spectrum Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.95</lat>
    <lon>-76.95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68346</plant_id>
    <plant_name>Brownsville Energy Storage System</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Consolidated Edison Co-NY Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5.6</nameplate_mw>
    <summer_mw>5.6</summer_mw>
    <battery_mwh>23.2</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.669539</lat>
    <lon>-73.89851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>233</plant_id>
    <plant_name>Deer Creek PH</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Nevada Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.7</summer_mw>
    <first_year>1908</first_year>
    <latest_year>1908</latest_year>
    <lat>39.29807</lat>
    <lon>-120.8443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2522</plant_id>
    <plant_name>Cadyville</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>New York State Elec &amp; Gas Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1986</latest_year>
    <lat>44.695</lat>
    <lon>-73.6219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6520</plant_id>
    <plant_name>Waterbury 22</plant_name>
    <state>VT</state>
    <county>Washington</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>44.38126</lat>
    <lon>-72.76769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10423</plant_id>
    <plant_name>North Fork Hydro Plant</plant_name>
    <state>CO</state>
    <county>Park</county>
    <operator>Denver City &amp; County of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>39.4616</lat>
    <lon>-105.677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54848</plant_id>
    <plant_name>South Georgia Medical Center Inc</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>Lowndes County Hospital Authority</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2013</latest_year>
    <lat>30.8625</lat>
    <lon>-83.2894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57554</plant_id>
    <plant_name>AFA Solar Farm</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Solar Star Colorado II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.957901</lat>
    <lon>-104.8066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57653</plant_id>
    <plant_name>Oregon State University Energy Center</plant_name>
    <state>OR</state>
    <county>Benton</county>
    <operator>Oregon State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>44.564333</lat>
    <lon>-123.2891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58030</plant_id>
    <plant_name>Reeves Station Rd East</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.928333</lat>
    <lon>-74.81444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58223</plant_id>
    <plant_name>Hoag Hospital Cogen Plant</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Hoag Memorial Presbyterian Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <battery_mwh>4.2</battery_mwh>
    <first_year>2006</first_year>
    <latest_year>2020</latest_year>
    <lat>33.622778</lat>
    <lon>-117.9364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58400</plant_id>
    <plant_name>Central Energy Facility</plant_name>
    <state>SC</state>
    <county>Pickens</county>
    <operator>Clemson University - Main Campus</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>34.679444</lat>
    <lon>-82.84028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58463</plant_id>
    <plant_name>Herbert Farm Solar</plant_name>
    <state>MD</state>
    <county>Charles</county>
    <operator>SMECO Solar LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.545556</lat>
    <lon>-76.79944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59204</plant_id>
    <plant_name>OCI Alamo 3 LLC</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>29.479167</lat>
    <lon>-98.29722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59233</plant_id>
    <plant_name>Cogeneration 2</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>University of Arizona</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>32.240833</lat>
    <lon>-110.9483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60524</plant_id>
    <plant_name>Eastwood Solar</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.154526</lat>
    <lon>-93.91656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60533</plant_id>
    <plant_name>West Faribault Solar</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.274932</lat>
    <lon>-93.31063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61243</plant_id>
    <plant_name>Old Wardour Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.237578</lat>
    <lon>-72.03745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61245</plant_id>
    <plant_name>Vuelta Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.237578</lat>
    <lon>-72.03745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61722</plant_id>
    <plant_name>HEBT Irvine 1</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Electrodes</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <battery_mwh>33.5</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.713489</lat>
    <lon>-117.8521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62306</plant_id>
    <plant_name>IFF Union Beach Project</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.446574</lat>
    <lon>-74.15463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63483</plant_id>
    <plant_name>ACM - Midtown Thermal</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Cartier Energy, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.359831</lat>
    <lon>-74.43423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63996</plant_id>
    <plant_name>Cape San Blas</plant_name>
    <state>FL</state>
    <county>Gulf</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <battery_mwh>14.3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.732141</lat>
    <lon>-85.39143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63998</plant_id>
    <plant_name>Jennings Energy Storage Facility</plant_name>
    <state>FL</state>
    <county>Hamilton</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <battery_mwh>5.5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>30.603831</lat>
    <lon>-83.09806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64418</plant_id>
    <plant_name>Big Bear</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.015287</lat>
    <lon>-118.1929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65132</plant_id>
    <plant_name>University of the Pacific</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>The Greater Light USA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <battery_mwh>2.2</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.980054</lat>
    <lon>-121.3124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66900</plant_id>
    <plant_name>Rivesville Solar</plant_name>
    <state>WV</state>
    <county>Marion</county>
    <operator>Monongahela Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.539042</lat>
    <lon>-80.0944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68103</plant_id>
    <plant_name>SR Hickman</plant_name>
    <state>TN</state>
    <county>Hickman</county>
    <operator>SR Hickman, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.5</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.92802</lat>
    <lon>-87.27945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>706</plant_id>
    <plant_name>Flint River</plant_name>
    <state>GA</state>
    <county>Dougherty</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>6.3</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1925</latest_year>
    <lat>31.6026</lat>
    <lon>-84.137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>964</plant_id>
    <plant_name>Lakeside</plant_name>
    <state>IL</state>
    <county>Sangamon</county>
    <operator>City of Springfield - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.757327</lat>
    <lon>-89.60051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1156</plant_id>
    <plant_name>La Porte</plant_name>
    <state>IA</state>
    <county>Black Hawk</county>
    <operator>La Porte City Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2013</latest_year>
    <lat>42.3159</lat>
    <lon>-92.1928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1191</plant_id>
    <plant_name>Sumner</plant_name>
    <state>IA</state>
    <county>BREMER</county>
    <operator>City of Sumner - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.8464</lat>
    <lon>-92.0978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1866</plant_id>
    <plant_name>Wyandotte</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>Wyandotte Municipal Serv Comm - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>42.2081</lat>
    <lon>-83.1453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1983</plant_id>
    <plant_name>Kenyon Municipal</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Kenyon Municipal Utilities - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>44.2718</lat>
    <lon>-92.9848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2572</plant_id>
    <plant_name>Herrings</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>44.0217</lat>
    <lon>-75.6511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2735</plant_id>
    <plant_name>Turner Shoals</plant_name>
    <state>NC</state>
    <county>Polk</county>
    <operator>Northbrook Carolina Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>35.334767</lat>
    <lon>-82.18637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4009</plant_id>
    <plant_name>Menomonie</plant_name>
    <state>WI</state>
    <county>Dunn</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>44.884167</lat>
    <lon>-91.92944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4077</plant_id>
    <plant_name>Wausau</plant_name>
    <state>WI</state>
    <county>Marathon</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1924</latest_year>
    <lat>44.9575</lat>
    <lon>-89.6367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6580</plant_id>
    <plant_name>Beaver Falls</plant_name>
    <state>AK</state>
    <county>Ketchikan Gateway</county>
    <operator>Ketchikan Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1954</latest_year>
    <lat>55.37975</lat>
    <lon>-131.4703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6586</plant_id>
    <plant_name>Wilkins Station</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Town of Marblehead - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1975</first_year>
    <latest_year>1975</latest_year>
    <lat>42.5131</lat>
    <lon>-70.8583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7775</plant_id>
    <plant_name>Versailles Peaking</plant_name>
    <state>OH</state>
    <county>Darke</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>40.2247</lat>
    <lon>-84.4769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7776</plant_id>
    <plant_name>Napoleon Peaking</plant_name>
    <state>OH</state>
    <county>Henry</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>41.4079</lat>
    <lon>-84.1095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7778</plant_id>
    <plant_name>Orrville Peaking</plant_name>
    <state>OH</state>
    <county>Wayne</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>40.86</lat>
    <lon>-81.7586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7847</plant_id>
    <plant_name>Coon Rapids II</plant_name>
    <state>IA</state>
    <county>Carroll</county>
    <operator>City of Coon Rapids -(IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.871043</lat>
    <lon>-94.68078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7918</plant_id>
    <plant_name>Galion</plant_name>
    <state>OH</state>
    <county>Crawford</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>40.7303</lat>
    <lon>-82.7939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7919</plant_id>
    <plant_name>Seville</plant_name>
    <state>OH</state>
    <county>Medina</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.0317</lat>
    <lon>-81.8714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10387</plant_id>
    <plant_name>Sycamore Energy LLC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Sycamore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2011</latest_year>
    <lat>32.857709</lat>
    <lon>-117.0288</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10798</plant_id>
    <plant_name>Fries Hydroelectric Project</plant_name>
    <state>VA</state>
    <county>Grayson</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1933</first_year>
    <latest_year>1981</latest_year>
    <lat>36.715103</lat>
    <lon>-80.98562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50980</plant_id>
    <plant_name>Siphon Power Project</plant_name>
    <state>OR</state>
    <county>Deschutes</county>
    <operator>Central Oregon Irrigation Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>44.033022</lat>
    <lon>-121.3297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56053</plant_id>
    <plant_name>Casey City of</plant_name>
    <state>IL</state>
    <county>Clark</county>
    <operator>City of Casey - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.310555</lat>
    <lon>-87.99259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56117</plant_id>
    <plant_name>Flora Site A</plant_name>
    <state>IL</state>
    <county>Clay</county>
    <operator>City of Flora - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.6693</lat>
    <lon>-88.4635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56262</plant_id>
    <plant_name>Gastonia, Tulip Drive</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>35.28914</lat>
    <lon>-81.20522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56415</plant_id>
    <plant_name>Fairmont Wind</plant_name>
    <state>MN</state>
    <county>Martin</county>
    <operator>Southern Minnesota Mun P Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2005</latest_year>
    <lat>43.575</lat>
    <lon>-94.44667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56680</plant_id>
    <plant_name>Wicomico</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>18</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>38.3847</lat>
    <lon>-75.6344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56688</plant_id>
    <plant_name>New Bern</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>18</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2011</latest_year>
    <lat>35.1681</lat>
    <lon>-77.2267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56690</plant_id>
    <plant_name>Pine Grove</plant_name>
    <state>PA</state>
    <county>Schuylkill</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>18</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.5553</lat>
    <lon>-76.3886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57030</plant_id>
    <plant_name>Pacolet Diesel Generation Facility</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Lockhart Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>34.8986</lat>
    <lon>-81.7397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57298</plant_id>
    <plant_name>Cedar Hills</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>King County Solid Waste Division</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>18</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>47.455833</lat>
    <lon>-122.0428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57606</plant_id>
    <plant_name>Eastside WWTP</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>City Of High Point - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>35.9428</lat>
    <lon>-79.9089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58480</plant_id>
    <plant_name>Plymouth Solar LLC</plant_name>
    <state>NC</state>
    <county>Washington</county>
    <operator>SunEnergy1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.875</lat>
    <lon>-76.71056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59845</plant_id>
    <plant_name>New River</plant_name>
    <state>VA</state>
    <county>Pulaski</county>
    <operator>Ingenco Renewable Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>18</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.183</lat>
    <lon>-80.699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60144</plant_id>
    <plant_name>Baltimore Church Solar, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.466688</lat>
    <lon>-79.15244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60864</plant_id>
    <plant_name>Kokomo Solar 1, LLC</plant_name>
    <state>IN</state>
    <county>Howard</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.473</lat>
    <lon>-86.146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61327</plant_id>
    <plant_name>Barnwell Solar</plant_name>
    <state>SC</state>
    <county>Barnwell</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.237</lat>
    <lon>-81.351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62957</plant_id>
    <plant_name>DG Iron Mountain</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>DG Edison New Jersey LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.52132</lat>
    <lon>-74.34739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63853</plant_id>
    <plant_name>POET Biorefining - Chancellor</plant_name>
    <state>SD</state>
    <county>Turner</county>
    <operator>POET Biorefining- Chancellor</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.3705</lat>
    <lon>-96.9598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64291</plant_id>
    <plant_name>Lincoln Medical and Mental Health Center</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Lincoln Medical and Mental Health Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1970</first_year>
    <latest_year>2007</latest_year>
    <lat>40.816971</lat>
    <lon>-73.92411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64844</plant_id>
    <plant_name>Three Rivers Solar LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>ASD Three Rivers Road MA Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <battery_mwh>2.8</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.16882</lat>
    <lon>-72.39438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65069</plant_id>
    <plant_name>Linton</plant_name>
    <state>IN</state>
    <county>Greene</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.04355</lat>
    <lon>-87.13619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65070</plant_id>
    <plant_name>Austin TX GigaFactory</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Tesla Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2025</latest_year>
    <lat>30.22021</lat>
    <lon>-97.61968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66331</plant_id>
    <plant_name>Wonderful Firebaugh</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.835981</lat>
    <lon>-120.3205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66443</plant_id>
    <plant_name>Weatherly(PA) RTO BTM</plant_name>
    <state>PA</state>
    <county>Carbon</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.947494</lat>
    <lon>-75.82721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66445</plant_id>
    <plant_name>Blakely (PA) RTO BTM</plant_name>
    <state>PA</state>
    <county>Lackawanna</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.475957</lat>
    <lon>-75.6006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66446</plant_id>
    <plant_name>Ephrata PA BTM</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.188351</lat>
    <lon>-76.17122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66451</plant_id>
    <plant_name>Schuylkill Haven PA BTM</plant_name>
    <state>PA</state>
    <county>Schuylkill</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.630683</lat>
    <lon>-76.17813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66452</plant_id>
    <plant_name>Mifflinburg PA BTM</plant_name>
    <state>PA</state>
    <county>Union</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.911223</lat>
    <lon>-77.04497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66472</plant_id>
    <plant_name>San Manuel Central Plant Cogens</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Yuhaaviatam of San Manuel Nation</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.151193</lat>
    <lon>-117.2303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68751</plant_id>
    <plant_name>City of Peru Rail Generating Station</plant_name>
    <state>IL</state>
    <county>Lasalle</county>
    <operator>City of Peru - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.371729</lat>
    <lon>-89.12833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69003</plant_id>
    <plant_name>Windshare LLC</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.4</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.960767</lat>
    <lon>-95.97919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>242</plant_id>
    <plant_name>Hamilton Branch</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>40.268712</lat>
    <lon>-121.0895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1775</plant_id>
    <plant_name>Brule</plant_name>
    <state>WI</state>
    <county>Florence</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1921</latest_year>
    <lat>45.9472</lat>
    <lon>-88.2189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3258</plant_id>
    <plant_name>Gaston Shoals</plant_name>
    <state>SC</state>
    <county>Cherokee</county>
    <operator>Northbrook Carolina Hydro II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>1908</first_year>
    <latest_year>1927</latest_year>
    <lat>35.1381</lat>
    <lon>-81.5975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7841</plant_id>
    <plant_name>Valdez Cogen</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Copper Valley Elec Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>WO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>61.0839</lat>
    <lon>-146.2529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50219</plant_id>
    <plant_name>Frankenheimer Power Plant</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>37.830378</lat>
    <lon>-120.807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50963</plant_id>
    <plant_name>Naval Hospital Medical Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Department of the Navy</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>32.7261</lat>
    <lon>-117.1464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54675</plant_id>
    <plant_name>Spartanburg Water System</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Spartanburg Commissioners PW</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>1926</first_year>
    <latest_year>2025</latest_year>
    <lat>35.1103</lat>
    <lon>-81.9675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55599</plant_id>
    <plant_name>GRS CMS</plant_name>
    <state>NC</state>
    <county>Cabarrus</county>
    <operator>Gas Recovery Systems Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>35.353269</lat>
    <lon>-80.66802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58166</plant_id>
    <plant_name>Smith College Central Heating Plant</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>The Trustees of Smith College</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>42.3125</lat>
    <lon>-72.63944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60600</plant_id>
    <plant_name>Old Pageland Monroe Road Solar Farm</plant_name>
    <state>NC</state>
    <county>Union</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.95233</lat>
    <lon>-80.48191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61117</plant_id>
    <plant_name>Bakersfield PV 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.324982</lat>
    <lon>-118.9815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61409</plant_id>
    <plant_name>Highway 56 Solar</plant_name>
    <state>TX</state>
    <county>Grayson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.614436</lat>
    <lon>-96.69045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61466</plant_id>
    <plant_name>IOS - ERW9</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.595</lat>
    <lon>-74.225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61513</plant_id>
    <plant_name>Marlin Solar</plant_name>
    <state>TX</state>
    <county>Limestone</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.286739</lat>
    <lon>-96.87721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62205</plant_id>
    <plant_name>Nickelson Solar, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.747103</lat>
    <lon>-77.98738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62305</plant_id>
    <plant_name>Tipton Solar Park</plant_name>
    <state>IN</state>
    <county>Tipton</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.276073</lat>
    <lon>-86.0769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63804</plant_id>
    <plant_name>Partridgeville Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Partridgeville Road Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <battery_mwh>3.9</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.571449</lat>
    <lon>-72.25739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64252</plant_id>
    <plant_name>Richmond 6</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.805984</lat>
    <lon>-84.87833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65057</plant_id>
    <plant_name>299 Farm to Market Rd Hybrid(CSG)</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>299F2M WHAM8 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <battery_mwh>4.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.795092</lat>
    <lon>-70.72704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68976</plant_id>
    <plant_name>GD Richmond Beaver River I LLC</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>GD Richmond Beaver River I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.47111</lat>
    <lon>-71.62651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69536</plant_id>
    <plant_name>DMAT Denso - SEAT Solar Holdings, LLC</plant_name>
    <state>TN</state>
    <county>McMinn</county>
    <operator>Solarity Aggregator, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.3</nameplate_mw>
    <summer_mw>5.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.481807</lat>
    <lon>-84.64314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55</plant_id>
    <plant_name>Point A</plant_name>
    <state>AL</state>
    <county>Covington</county>
    <operator>PowerSouth Energy Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1949</latest_year>
    <lat>31.361146</lat>
    <lon>-86.51831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1184</plant_id>
    <plant_name>Sibley One</plant_name>
    <state>IA</state>
    <county>Osceola</county>
    <operator>City of Sibley - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2000</latest_year>
    <lat>43.405</lat>
    <lon>-95.7261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10285</plant_id>
    <plant_name>Townsend Hydro</plant_name>
    <state>PA</state>
    <county>Beaver</county>
    <operator>Beaver Falls Municipal Auth - (PA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.733545</lat>
    <lon>-80.3148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10753</plant_id>
    <plant_name>Lachute Hydro Upper</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.843869</lat>
    <lon>-73.43121</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57580</plant_id>
    <plant_name>Broadridge Cogen</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Broadridge Customer Communications</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2011</latest_year>
    <lat>38.6183</lat>
    <lon>-121.0564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57598</plant_id>
    <plant_name>Bridge Street 1 &amp; 2</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.362778</lat>
    <lon>-72.0825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57601</plant_id>
    <plant_name>Gary Court 1 &amp; 2</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.3367</lat>
    <lon>-72.02</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57603</plant_id>
    <plant_name>LNG 1 &amp; 2</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.5694</lat>
    <lon>-72.1175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57604</plant_id>
    <plant_name>Lebanon Pines 1 &amp; 2</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.5683</lat>
    <lon>-72.2322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57605</plant_id>
    <plant_name>Water Treatment 1 &amp; 2</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.3469</lat>
    <lon>-72.0411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58356</plant_id>
    <plant_name>The Lawrenceville School Solar Facility</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>CVI CleanCapital Solar 4 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.301409</lat>
    <lon>-74.72212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58638</plant_id>
    <plant_name>Orbit Energy Charlotte</plant_name>
    <state>NC</state>
    <county>Mecklenburg</county>
    <operator>Anaergia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.2625</lat>
    <lon>-80.81167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59630</plant_id>
    <plant_name>CentraState Medical Center PV Facility</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.236111</lat>
    <lon>-74.32139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60238</plant_id>
    <plant_name>McDonald Solar Farm, LLC</plant_name>
    <state>IN</state>
    <county>Vigo</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.59458</lat>
    <lon>-87.474</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60239</plant_id>
    <plant_name>Pastime Farm, LLC</plant_name>
    <state>IN</state>
    <county>Clay</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.52086</lat>
    <lon>-87.18155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60363</plant_id>
    <plant_name>White Farm Solar, LLC</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.34764</lat>
    <lon>-77.22244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60367</plant_id>
    <plant_name>Snow Camp Solar, LLC</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.86267</lat>
    <lon>-79.42346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60369</plant_id>
    <plant_name>Battleboro Farm</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.05864</lat>
    <lon>-77.76077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60370</plant_id>
    <plant_name>Flint Hill Solar, LLC</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.40274</lat>
    <lon>-79.55308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60401</plant_id>
    <plant_name>Bizzell Church Solar 1, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.549401</lat>
    <lon>-78.17986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60402</plant_id>
    <plant_name>CB Bladen Solar, LLC</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.822869</lat>
    <lon>-78.62428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60403</plant_id>
    <plant_name>Currin Solar, LLC</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.289625</lat>
    <lon>-78.63328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60408</plant_id>
    <plant_name>Nash 97 Solar, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.84927</lat>
    <lon>-78.21152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60409</plant_id>
    <plant_name>South Winston Farm, LLC</plant_name>
    <state>NC</state>
    <county>Forsyth</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.0288</lat>
    <lon>-80.302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60410</plant_id>
    <plant_name>Sullivan Solar, LLC</plant_name>
    <state>IN</state>
    <county>Sullivan</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.13199</lat>
    <lon>-87.41383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60415</plant_id>
    <plant_name>Hardison Farm Solar, LLC</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.83079</lat>
    <lon>-77.02194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61152</plant_id>
    <plant_name>Intel Folsom Phase 3</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.645961</lat>
    <lon>-121.1626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61514</plant_id>
    <plant_name>North Gainesville Solar</plant_name>
    <state>TX</state>
    <county>Cooke</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.656072</lat>
    <lon>-97.14857</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63432</plant_id>
    <plant_name>Lincoln Heights I</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>44.287778</lat>
    <lon>-96.43333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63705</plant_id>
    <plant_name>EQX011 Duane Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.37816</lat>
    <lon>-121.955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65464</plant_id>
    <plant_name>Lerdo Detention Facility - Solar 2, 3</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>County of Kern - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.510942</lat>
    <lon>-119.1099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65614</plant_id>
    <plant_name>Orange Coast College PH2 Solar Project</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Solar Star Coastal Pirate, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.672565</lat>
    <lon>-117.9125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66529</plant_id>
    <plant_name>NY Lancaster Shisler Rd Site 2 Solar CSG</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>AC Power 14, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.678878</lat>
    <lon>-74.96407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67859</plant_id>
    <plant_name>Foster Clean Power B</plant_name>
    <state>CA</state>
    <county>Humboldt</county>
    <operator>Foster Clean Power B LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <battery_mwh>5.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.882295</lat>
    <lon>-124.1012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68547</plant_id>
    <plant_name>Tipton 1 - (CA)</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <battery_mwh>3.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.050157</lat>
    <lon>-119.3147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68891</plant_id>
    <plant_name>Visalia - (CA)</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5.2</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <battery_mwh>3.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.459317</lat>
    <lon>-119.2978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1321</plant_id>
    <plant_name>St Francis</plant_name>
    <state>KS</state>
    <county>Cheyenne</county>
    <operator>City of St Francis - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1972</latest_year>
    <lat>39.770868</lat>
    <lon>-101.8101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1827</plant_id>
    <plant_name>Hart</plant_name>
    <state>MI</state>
    <county>Oceana</county>
    <operator>City of Hart Hydro - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1985</latest_year>
    <lat>43.704076</lat>
    <lon>-86.36626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3975</plant_id>
    <plant_name>Whiting</plant_name>
    <state>WI</state>
    <county>Portage</county>
    <operator>Consolidated Water Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>9</summer_mw>
    <first_year>1891</first_year>
    <latest_year>1963</latest_year>
    <lat>44.4889</lat>
    <lon>-89.5756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6647</plant_id>
    <plant_name>Yorba Linda</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>33.9117</lat>
    <lon>-117.8192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7432</plant_id>
    <plant_name>Oxford (KS)</plant_name>
    <state>KS</state>
    <county>Sumner</county>
    <operator>City of Oxford - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2007</latest_year>
    <lat>37.2758</lat>
    <lon>-97.1636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7497</plant_id>
    <plant_name>Croswell</plant_name>
    <state>MI</state>
    <county>Sanilac</county>
    <operator>City of Croswell - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1996</latest_year>
    <lat>43.271944</lat>
    <lon>-82.61389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7556</plant_id>
    <plant_name>State Farm</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>State Farm Insurance</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>40.4535</lat>
    <lon>-88.9605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10748</plant_id>
    <plant_name>Marina Landfill Gas</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Monterey Regional Waste Mgmt</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2018</latest_year>
    <lat>36.7131</lat>
    <lon>-121.7686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55525</plant_id>
    <plant_name>MMSD South Shore Wastewater</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>Milwaukee Metro Sewerage Dist</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>5</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2010</latest_year>
    <lat>42.8869</lat>
    <lon>-87.8422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57565</plant_id>
    <plant_name>RP-Orlando, LLC</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>28.488889</lat>
    <lon>-81.18222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57630</plant_id>
    <plant_name>Long Creek Waste Water Plant</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>City of Gastonia - (NC)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>35.3119</lat>
    <lon>-81.1414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57928</plant_id>
    <plant_name>SIUC</plant_name>
    <state>IL</state>
    <county>Jackson</county>
    <operator>Southern Illinois University Carbondale</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>37.711944</lat>
    <lon>-89.215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58114</plant_id>
    <plant_name>Foundation NWNA</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Foundation CA Fund V Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2018</latest_year>
    <lat>33.914167</lat>
    <lon>-116.7492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60071</plant_id>
    <plant_name>Perry Solar Facility</plant_name>
    <state>FL</state>
    <county>Taylor</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>30.119304</lat>
    <lon>-83.56005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60994</plant_id>
    <plant_name>French's Landfill PV</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.109677</lat>
    <lon>-74.1302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61641</plant_id>
    <plant_name>Seneca Falls Hydroelectric Project</plant_name>
    <state>NY</state>
    <county>Seneca</county>
    <operator>C-S Canal Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>5.1</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>42.915299</lat>
    <lon>-76.78672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>466</plant_id>
    <plant_name>Boulder Canyon Hydro</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Boulder, City of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.004725</lat>
    <lon>-105.3325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>817</plant_id>
    <plant_name>Salmon Diesel</plant_name>
    <state>ID</state>
    <county>Lemhi</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>45.183368</lat>
    <lon>-113.8853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>992</plant_id>
    <plant_name>CC Perry K</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Citizens Thermal Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1938</latest_year>
    <lat>39.7631</lat>
    <lon>-86.1667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1714</plant_id>
    <plant_name>Mio</plant_name>
    <state>MI</state>
    <county>Oscoda</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1916</first_year>
    <latest_year>1916</latest_year>
    <lat>44.661114</lat>
    <lon>-84.13169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2563</plant_id>
    <plant_name>Flat Rock</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>44.2217</lat>
    <lon>-75.0742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2590</plant_id>
    <plant_name>Norfolk</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>44.8053</lat>
    <lon>-74.9975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2710</plant_id>
    <plant_name>Marshall Dam</plant_name>
    <state>NC</state>
    <county>Madison</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>35.702527</lat>
    <lon>-82.71057</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2736</plant_id>
    <plant_name>Tuxedo</plant_name>
    <state>NC</state>
    <county>Henderson</county>
    <operator>Northbrook Tuxedo, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>6.4</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>35.245006</lat>
    <lon>-82.38937</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3656</plant_id>
    <plant_name>Pioneer</plant_name>
    <state>UT</state>
    <county>Weber</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1910</latest_year>
    <lat>41.243643</lat>
    <lon>-111.9465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3739</plant_id>
    <plant_name>Marshfield 6</plant_name>
    <state>VT</state>
    <county>Washington</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>44.3606</lat>
    <lon>-72.3356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3821</plant_id>
    <plant_name>Snowden</plant_name>
    <state>VA</state>
    <county>Bedford</county>
    <operator>Town of Bedford - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.5736</lat>
    <lon>-79.3715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4148</plant_id>
    <plant_name>Washington Island</plant_name>
    <state>WI</state>
    <county>Door</county>
    <operator>Washington Island El Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1945</first_year>
    <latest_year>1997</latest_year>
    <lat>45.370922</lat>
    <lon>-86.93082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6408</plant_id>
    <plant_name>Heart Mountain</plant_name>
    <state>WY</state>
    <county>Park</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>44.513767</lat>
    <lon>-109.1296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7151</plant_id>
    <plant_name>Stony Gorge</plant_name>
    <state>CA</state>
    <county>Glenn</county>
    <operator>City of Santa Clara - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>39.586864</lat>
    <lon>-122.5332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7458</plant_id>
    <plant_name>Basalt</plant_name>
    <state>CO</state>
    <county>Eagle</county>
    <operator>City of Aspen- (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>39.363056</lat>
    <lon>-106.8219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10108</plant_id>
    <plant_name>Hampton Facility</plant_name>
    <state>NH</state>
    <county>Rockingham</county>
    <operator>Foss Manufacturing Company LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>42.9383</lat>
    <lon>-70.8406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10122</plant_id>
    <plant_name>CIP II/AR Bridgewater Holdings - NJCOE</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>COE Bridgewater LLC c/o Thor Equities, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.624</lat>
    <lon>-74.634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10238</plant_id>
    <plant_name>Dolgeville Hydro</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>EONY Generation Limited</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.090635</lat>
    <lon>-74.76696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10282</plant_id>
    <plant_name>Big Creek Water Works</plant_name>
    <state>CA</state>
    <county>Trinity</county>
    <operator>Big Creek Water Works Ltd</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.646733</lat>
    <lon>-123.498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10526</plant_id>
    <plant_name>Dodge Falls Associates</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Dodge Falls Associates LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>44.2081</lat>
    <lon>-72.0581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10530</plant_id>
    <plant_name>Feeder Dam Hydro Plant</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>43.289874</lat>
    <lon>-73.66583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10661</plant_id>
    <plant_name>Collins Pine Project</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Collins Pine Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.303422</lat>
    <lon>-121.2444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10707</plant_id>
    <plant_name>Cove Hydroelectric</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Snow Mountain Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.8713</lat>
    <lon>-121.9487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50035</plant_id>
    <plant_name>MMWAC Resource Recovery Facility</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Maine Waste to Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>44.067792</lat>
    <lon>-70.26083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50141</plant_id>
    <plant_name>Snider Industries</plant_name>
    <state>TX</state>
    <county>Harrison</county>
    <operator>Snider Industries Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>32.574722</lat>
    <lon>-94.37389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50179</plant_id>
    <plant_name>Box Canyon Dam</plant_name>
    <state>CA</state>
    <county>Siskiyou</county>
    <operator>Siskiyou Power Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>41.2792</lat>
    <lon>-122.3292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50180</plant_id>
    <plant_name>Olsen</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Olsen Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.63722</lat>
    <lon>-121.9281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50361</plant_id>
    <plant_name>Owyhee Dam Power Project</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Owyhee Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.641603</lat>
    <lon>-117.2437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50514</plant_id>
    <plant_name>Fort Miller Hydroelectric Facility</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Albany Engineering Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>43.160868</lat>
    <lon>-73.58408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52064</plant_id>
    <plant_name>Dominguez Plant</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Eco Services Corp.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>33.8431</lat>
    <lon>-118.2347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54017</plant_id>
    <plant_name>San Gabriel Hydro Project</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles County-San Gabriel</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>34.204311</lat>
    <lon>-117.8557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54211</plant_id>
    <plant_name>American Crystal Sugar Moorhead</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>American Crystal Sugar Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1961</latest_year>
    <lat>46.9026</lat>
    <lon>-96.76112</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54374</plant_id>
    <plant_name>Sinclair Oil Refinery</plant_name>
    <state>WY</state>
    <county>Carbon</county>
    <operator>HF Sinclair Parco Refining LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Other Gases; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1925</first_year>
    <latest_year>2024</latest_year>
    <lat>41.77952</lat>
    <lon>-107.1097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54447</plant_id>
    <plant_name>Welport Lease Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Sentinel Peak Resources California, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>35.354444</lat>
    <lon>-119.6617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54457</plant_id>
    <plant_name>Hewlett Packard Enterprise</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>SWVP Alpharetta Owners, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1991</latest_year>
    <lat>34.0864</lat>
    <lon>-84.2677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54850</plant_id>
    <plant_name>Cox Waste to Energy</plant_name>
    <state>KY</state>
    <county>Taylor</county>
    <operator>Cox Companies, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2002</latest_year>
    <lat>37.3208</lat>
    <lon>-85.3611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54886</plant_id>
    <plant_name>Presence Saint Mary of Nazareth Hospital</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Presence Health</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2024</latest_year>
    <lat>41.9031</lat>
    <lon>-87.6831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55036</plant_id>
    <plant_name>University of Tennessee Steam Plant</plant_name>
    <state>TN</state>
    <county>Knox</county>
    <operator>University of Tennessee</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>35.949209</lat>
    <lon>-83.92607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56429</plant_id>
    <plant_name>Ameresco Delaware South</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>AMERESCO Delaware South</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2010</latest_year>
    <lat>38.5992</lat>
    <lon>-75.4342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56430</plant_id>
    <plant_name>Ameresco Delaware Central</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>AMERESCO Delaware Central</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2014</latest_year>
    <lat>39.0339</lat>
    <lon>-75.7233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56538</plant_id>
    <plant_name>Loess Hills</plant_name>
    <state>MO</state>
    <county>Atchison</county>
    <operator>Loess Hills Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.4144</lat>
    <lon>-95.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56768</plant_id>
    <plant_name>CalRenew-1</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>CalRenew-1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>36.7575</lat>
    <lon>-120.3658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56967</plant_id>
    <plant_name>Butter Creek Power LLC</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>CR51 Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.7017</lat>
    <lon>-119.4222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57281</plant_id>
    <plant_name>OREG 3 Inc</plant_name>
    <state>MN</state>
    <county>Martin</county>
    <operator>Ormat Nevada Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>43.76</lat>
    <lon>-94.7514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57437</plant_id>
    <plant_name>Juniper Ridge Hydroelectric Project</plant_name>
    <state>OR</state>
    <county>Deschutes</county>
    <operator>Central Oregon Irrigation Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>44.142698</lat>
    <lon>-121.2697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57441</plant_id>
    <plant_name>Solar Photovoltaic Project #42</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>10</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.028056</lat>
    <lon>-119.0747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57576</plant_id>
    <plant_name>Las Vegas Solar Energy Center</plant_name>
    <state>NM</state>
    <county>San Miguel</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.643333</lat>
    <lon>-105.2067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57577</plant_id>
    <plant_name>Alamogordo Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Otero</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.86571</lat>
    <lon>-105.9998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57591</plant_id>
    <plant_name>Hatch Solar Energy Center I, LLC</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>Hatch Solar Energy Center I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.63</lat>
    <lon>-107.2597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57778</plant_id>
    <plant_name>RE Kammerer 1 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.365053</lat>
    <lon>-121.3811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57780</plant_id>
    <plant_name>RE Kammerer 2 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.365053</lat>
    <lon>-121.3811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57782</plant_id>
    <plant_name>RE Kammerer 3 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.365053</lat>
    <lon>-121.3811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57783</plant_id>
    <plant_name>RE Bruceville 1 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.3475</lat>
    <lon>-121.4128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57784</plant_id>
    <plant_name>RE Bruceville 2 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.3475</lat>
    <lon>-121.4128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57785</plant_id>
    <plant_name>RE Bruceville 3 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.3475</lat>
    <lon>-121.4128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57813</plant_id>
    <plant_name>GL Wind</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>GL Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.991667</lat>
    <lon>-91.87778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57816</plant_id>
    <plant_name>RE McKenzie 1 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.302594</lat>
    <lon>-121.2958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57817</plant_id>
    <plant_name>RE McKenzie 2 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.302594</lat>
    <lon>-121.2958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57818</plant_id>
    <plant_name>RE McKenzie 3 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.302594</lat>
    <lon>-121.2958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57819</plant_id>
    <plant_name>RE McKenzie 4 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.302594</lat>
    <lon>-121.2958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57820</plant_id>
    <plant_name>RE McKenzie 5 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.302594</lat>
    <lon>-121.2958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57821</plant_id>
    <plant_name>RE McKenzie 6 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.302594</lat>
    <lon>-121.2958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57968</plant_id>
    <plant_name>Cashton Greens Wind Farm</plant_name>
    <state>WI</state>
    <county>Monroe</county>
    <operator>Cashton Greens Wind Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.733889</lat>
    <lon>-90.805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58043</plant_id>
    <plant_name>Lilly Technical Center</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Eli Lilly and Company</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2015</latest_year>
    <lat>39.7475</lat>
    <lon>-86.18306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58051</plant_id>
    <plant_name>Vitro Architectural Glass (PA)</plant_name>
    <state>PA</state>
    <county>Cumberland</county>
    <operator>Vitro Architectural Glass (PA)</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2021</latest_year>
    <lat>40.126389</lat>
    <lon>-77.16444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58091</plant_id>
    <plant_name>Keystone Solar</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.861111</lat>
    <lon>-76.22111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58139</plant_id>
    <plant_name>Central Energy Plant USU</plant_name>
    <state>UT</state>
    <county>Cache</county>
    <operator>Utah State University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>41.748611</lat>
    <lon>-111.8117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58179</plant_id>
    <plant_name>MTSU Power Co-Gen Plant</plant_name>
    <state>TN</state>
    <county>Rutherford</county>
    <operator>Middle Tennessee State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>35.851389</lat>
    <lon>-86.365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58205</plant_id>
    <plant_name>Grand Ave Plant</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>Yolo County of - (CA)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>39.111944</lat>
    <lon>-94.58111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58222</plant_id>
    <plant_name>E.B. Eddy Paper Inc</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>Port Huron Multimodal Hub, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>42.9896</lat>
    <lon>-82.4379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58259</plant_id>
    <plant_name>Kalaeloa Solar Two</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>21.32</lat>
    <lon>-158.0869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58273</plant_id>
    <plant_name>South Robeson Farm</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>USF Surry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.561146</lat>
    <lon>-79.28097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58274</plant_id>
    <plant_name>Raeford Farm</plant_name>
    <state>NC</state>
    <county>Hoke</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.968889</lat>
    <lon>-79.21194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58276</plant_id>
    <plant_name>Mass Midstate Solar 2</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.170417</lat>
    <lon>-72.20015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58279</plant_id>
    <plant_name>Mass Midstate Solar 1</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.219722</lat>
    <lon>-71.87833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58311</plant_id>
    <plant_name>Chadbourn Farm</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.324656</lat>
    <lon>-78.7649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58313</plant_id>
    <plant_name>Mocksville Farm</plant_name>
    <state>NC</state>
    <county>Davie</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.878611</lat>
    <lon>-80.54194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58315</plant_id>
    <plant_name>Arndt Farm</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.779167</lat>
    <lon>-81.17556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58316</plant_id>
    <plant_name>Railroad Farm</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.82</lat>
    <lon>-78.97083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58317</plant_id>
    <plant_name>Watts Farm</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.726944</lat>
    <lon>-79.33528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58323</plant_id>
    <plant_name>Shannon Farm</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.8475</lat>
    <lon>-79.12889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58331</plant_id>
    <plant_name>Fuquay Farm</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.564354</lat>
    <lon>-78.71026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58332</plant_id>
    <plant_name>Haynes Farm</plant_name>
    <state>NC</state>
    <county>Lincoln</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.525833</lat>
    <lon>-81.23528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58333</plant_id>
    <plant_name>Lenoir Farm</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.331667</lat>
    <lon>-77.66639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58334</plant_id>
    <plant_name>Lenoir Farm 2</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.350081</lat>
    <lon>-77.47511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58335</plant_id>
    <plant_name>Marshville Farm</plant_name>
    <state>NC</state>
    <county>Union</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.988889</lat>
    <lon>-80.38361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58336</plant_id>
    <plant_name>Mile Farm</plant_name>
    <state>NC</state>
    <county>Durham</county>
    <operator>Palmetto Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.230561</lat>
    <lon>-78.94959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58337</plant_id>
    <plant_name>Moore Solar Farm</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.273192</lat>
    <lon>-79.7592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58338</plant_id>
    <plant_name>Moorings Farm</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.305833</lat>
    <lon>-77.82917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58339</plant_id>
    <plant_name>New Bern Farm</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.209564</lat>
    <lon>-77.05673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58340</plant_id>
    <plant_name>Roxboro Farm</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.4797</lat>
    <lon>-78.91736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58341</plant_id>
    <plant_name>White Cross Farm</plant_name>
    <state>NC</state>
    <county>Orange</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.907144</lat>
    <lon>-79.1883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58342</plant_id>
    <plant_name>Wilson Farm 1</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.803611</lat>
    <lon>-77.87361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58343</plant_id>
    <plant_name>Yanceyville Farm</plant_name>
    <state>NC</state>
    <county>Caswell</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.439444</lat>
    <lon>-79.27889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58344</plant_id>
    <plant_name>AM Best Farm</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.418889</lat>
    <lon>-77.98556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58345</plant_id>
    <plant_name>Mt Olive Farm 2</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.218056</lat>
    <lon>-78.06972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58346</plant_id>
    <plant_name>Dibrell Farm</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.471667</lat>
    <lon>-79.52806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58347</plant_id>
    <plant_name>Rock Farm</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.965556</lat>
    <lon>-79.60972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58348</plant_id>
    <plant_name>Two Lines Farm</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.629167</lat>
    <lon>-81.32667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58349</plant_id>
    <plant_name>Bolton Farm</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.421617</lat>
    <lon>-78.13231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58350</plant_id>
    <plant_name>McCallum Farm</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.543889</lat>
    <lon>-79.30219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58418</plant_id>
    <plant_name>Victor Dry Farm Ranch A</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.501111</lat>
    <lon>-117.4667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58419</plant_id>
    <plant_name>Victor Dry Farm Ranch B</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.497778</lat>
    <lon>-117.4711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58500</plant_id>
    <plant_name>RE Rio Grande Solar LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.00745</lat>
    <lon>-118.1645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58554</plant_id>
    <plant_name>Somers Solar Center, LLC</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.955</lat>
    <lon>-72.44583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58569</plant_id>
    <plant_name>Paradise Solar Energy Center</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Paradise Solar Urban Renewal, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.835833</lat>
    <lon>-75.2225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58605</plant_id>
    <plant_name>Blueberry One</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.313889</lat>
    <lon>-78.15417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58651</plant_id>
    <plant_name>Kalaeloa Renewable Energy Park</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>ENI New Energy US Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>21.328056</lat>
    <lon>-158.04</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58655</plant_id>
    <plant_name>Waihonu North Solar</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>ERCAM LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>10</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>21.470556</lat>
    <lon>-158.0133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58659</plant_id>
    <plant_name>Aloha Solar Energy Fund 1 PK1</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>21.406944</lat>
    <lon>-158.1514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58667</plant_id>
    <plant_name>Biscoe Solar LLC</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.383889</lat>
    <lon>-79.77028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58669</plant_id>
    <plant_name>Selma Solar LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.576389</lat>
    <lon>-78.18333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58670</plant_id>
    <plant_name>Turkey Branch Solar LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.524444</lat>
    <lon>-79.10444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58673</plant_id>
    <plant_name>Gates Solar LLC</plant_name>
    <state>NC</state>
    <county>Gates</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.450833</lat>
    <lon>-76.80361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58674</plant_id>
    <plant_name>Cirrus Solar LLC</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.969444</lat>
    <lon>-78.265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58675</plant_id>
    <plant_name>Chocowinity Solar LLC</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.515</lat>
    <lon>-77.09</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58722</plant_id>
    <plant_name>Charlotte Solar</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.261944</lat>
    <lon>-81.82167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58725</plant_id>
    <plant_name>Elliana Solar</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.131111</lat>
    <lon>-79.3325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58726</plant_id>
    <plant_name>Flash Solar</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.758056</lat>
    <lon>-81.22944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58731</plant_id>
    <plant_name>Angel Solar</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.651111</lat>
    <lon>-81.20861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58741</plant_id>
    <plant_name>Nick Solar</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.991111</lat>
    <lon>-79.54806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58742</plant_id>
    <plant_name>Owen Solar</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Owen Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.586111</lat>
    <lon>-81.31528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58746</plant_id>
    <plant_name>Star Solar</plant_name>
    <state>NC</state>
    <county>Durham</county>
    <operator>Star Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.08</lat>
    <lon>-78.82389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58750</plant_id>
    <plant_name>Lancaster Dry Farm Ranch B</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.716944</lat>
    <lon>-118.2894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58782</plant_id>
    <plant_name>Sonne One</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.437222</lat>
    <lon>-77.83361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58791</plant_id>
    <plant_name>Kirkwall Holdings</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.988889</lat>
    <lon>-78.1375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58799</plant_id>
    <plant_name>Pamlico Partners Solar</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Pamlico Partners Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.501111</lat>
    <lon>-76.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58805</plant_id>
    <plant_name>Samarcand Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>10</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.311667</lat>
    <lon>-79.695</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58806</plant_id>
    <plant_name>Albemarle Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.293056</lat>
    <lon>-77.55694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58807</plant_id>
    <plant_name>Boseman Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.008056</lat>
    <lon>-77.81</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58808</plant_id>
    <plant_name>Flemming Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.668889</lat>
    <lon>-77.38389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58809</plant_id>
    <plant_name>Littlefield Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.433889</lat>
    <lon>-77.43806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58810</plant_id>
    <plant_name>Rams Horn Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.64295</lat>
    <lon>-77.31654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58812</plant_id>
    <plant_name>Upchurch Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.781944</lat>
    <lon>-77.88389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58828</plant_id>
    <plant_name>Apple One</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.629444</lat>
    <lon>-81.15694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58829</plant_id>
    <plant_name>Sonne Two</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.656667</lat>
    <lon>-81.18361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58842</plant_id>
    <plant_name>Gato Montes Solar, LLC</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.102778</lat>
    <lon>-110.8197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58843</plant_id>
    <plant_name>Bethel Price Solar, LLC</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.794722</lat>
    <lon>-77.38111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58845</plant_id>
    <plant_name>Washington Airport Solar LLC</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.565278</lat>
    <lon>-77.05361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58846</plant_id>
    <plant_name>Washington Millfield Solar, LLC</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.499444</lat>
    <lon>-76.83361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58847</plant_id>
    <plant_name>Windsor Cooper HIill Solar, LLC</plant_name>
    <state>NC</state>
    <county>Bertie</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.981944</lat>
    <lon>-76.91778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58851</plant_id>
    <plant_name>Oakboro Farm</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.795833</lat>
    <lon>-79.53833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58853</plant_id>
    <plant_name>McKenzie Farm</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.323889</lat>
    <lon>-78.69194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58854</plant_id>
    <plant_name>Nash 58 Farm</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.047222</lat>
    <lon>-78.03083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58855</plant_id>
    <plant_name>Nash 64 Farm</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.949444</lat>
    <lon>-78.0925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58856</plant_id>
    <plant_name>Pate Farm</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.816667</lat>
    <lon>-79.19944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58859</plant_id>
    <plant_name>Erwin Farm</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.333333</lat>
    <lon>-78.66139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58861</plant_id>
    <plant_name>Sigmon Catawba Farm</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.612222</lat>
    <lon>-81.24333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58862</plant_id>
    <plant_name>Wagstaff Farm 1</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.458658</lat>
    <lon>-78.95674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58863</plant_id>
    <plant_name>Waco Farm</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.352222</lat>
    <lon>-81.42611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58864</plant_id>
    <plant_name>Sunfish Farm</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.558056</lat>
    <lon>-78.73583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58866</plant_id>
    <plant_name>Garrell Solar Farm</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.325278</lat>
    <lon>-78.79306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58867</plant_id>
    <plant_name>Angier Farm</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.516389</lat>
    <lon>-78.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58868</plant_id>
    <plant_name>Bladenboro Farm</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.535</lat>
    <lon>-78.81306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58874</plant_id>
    <plant_name>Dement Farm LLC</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.27</lat>
    <lon>-78.34833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58879</plant_id>
    <plant_name>Duplin Solar LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.011944</lat>
    <lon>-78.07833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58887</plant_id>
    <plant_name>Com Adam 1WF-1</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>FPC Services Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>41.660278</lat>
    <lon>-89.24972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58907</plant_id>
    <plant_name>Valley Center 2</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.234167</lat>
    <lon>-117.0017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58911</plant_id>
    <plant_name>Ramona 2</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.012222</lat>
    <lon>-116.875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58939</plant_id>
    <plant_name>Anderson Wind I</plant_name>
    <state>NM</state>
    <county>Chaves</county>
    <operator>Anderson Wind I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.029444</lat>
    <lon>-103.8558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59037</plant_id>
    <plant_name>Hiilangaay Hydro</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Haida Energy, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>55.217254</lat>
    <lon>-132.61</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59082</plant_id>
    <plant_name>Dennis Landfill</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.693056</lat>
    <lon>-70.145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59102</plant_id>
    <plant_name>Dragstrip Farm</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.758056</lat>
    <lon>-81.41611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59103</plant_id>
    <plant_name>Fremont Farm LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.531944</lat>
    <lon>-77.96917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59107</plant_id>
    <plant_name>Mount Olive Farm</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.201944</lat>
    <lon>-78.08167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59109</plant_id>
    <plant_name>Spicewood Solar Farm LLC</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.3025</lat>
    <lon>-79.70167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59111</plant_id>
    <plant_name>West Salisbury Farm LLC</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.668333</lat>
    <lon>-80.52361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59112</plant_id>
    <plant_name>West Siler</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.720841</lat>
    <lon>-79.50375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59113</plant_id>
    <plant_name>Yanceyville Farm 2 LLC</plant_name>
    <state>NC</state>
    <county>Caswell</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.413889</lat>
    <lon>-79.31694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59126</plant_id>
    <plant_name>Daniel Farm LLC</plant_name>
    <state>NC</state>
    <county>Davie</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.848889</lat>
    <lon>-80.55361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59127</plant_id>
    <plant_name>Bailey Farm LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.7875</lat>
    <lon>-78.13972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59148</plant_id>
    <plant_name>Green Farm</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.831667</lat>
    <lon>-77.26972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59149</plant_id>
    <plant_name>Simons Farm</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.306389</lat>
    <lon>-76.99722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59152</plant_id>
    <plant_name>Thornton PV1</plant_name>
    <state>NC</state>
    <county>Greene</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.395833</lat>
    <lon>-77.66167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59154</plant_id>
    <plant_name>Bradley PV1</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.260556</lat>
    <lon>-77.07639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59156</plant_id>
    <plant_name>Carter PV1</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.021111</lat>
    <lon>-78.7875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59157</plant_id>
    <plant_name>Pecan PV1</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.909167</lat>
    <lon>-79.82944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59158</plant_id>
    <plant_name>Langley PV1</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.801944</lat>
    <lon>-77.84889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59162</plant_id>
    <plant_name>Mariposa Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.373889</lat>
    <lon>-81.08694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59163</plant_id>
    <plant_name>Highland Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.363889</lat>
    <lon>-77.45194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59170</plant_id>
    <plant_name>Jakana Solar</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.875278</lat>
    <lon>-77.08111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59171</plant_id>
    <plant_name>Windsor Solar</plant_name>
    <state>NC</state>
    <county>Bertie</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.016944</lat>
    <lon>-76.88306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59173</plant_id>
    <plant_name>Bethel Solar</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.794328</lat>
    <lon>-77.38454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59174</plant_id>
    <plant_name>Lewiston Solar</plant_name>
    <state>NC</state>
    <county>Bertie</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.141111</lat>
    <lon>-77.21111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59175</plant_id>
    <plant_name>Woodland Solar</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.341944</lat>
    <lon>-77.22111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59176</plant_id>
    <plant_name>Williamston Solar</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.801111</lat>
    <lon>-77.06306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59177</plant_id>
    <plant_name>Winton Solar</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.375</lat>
    <lon>-76.93889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59185</plant_id>
    <plant_name>Jacobstown</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.063743</lat>
    <lon>-74.58243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59191</plant_id>
    <plant_name>Soluga Farms 1</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.243056</lat>
    <lon>-78.38694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59192</plant_id>
    <plant_name>Soluga Farms 2 LLC</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.500008</lat>
    <lon>-78.68917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59213</plant_id>
    <plant_name>Clipperton Holdings LLC</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.966944</lat>
    <lon>-78.35444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59217</plant_id>
    <plant_name>Tiburon Holdings</plant_name>
    <state>NC</state>
    <county>Davie</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.903333</lat>
    <lon>-80.41694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59262</plant_id>
    <plant_name>Lancaster Little Rock</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.599444</lat>
    <lon>-117.9328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59274</plant_id>
    <plant_name>Sutter Greenworks LLC</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.928056</lat>
    <lon>-72.77111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59318</plant_id>
    <plant_name>North Run</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.069601</lat>
    <lon>-74.58484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59337</plant_id>
    <plant_name>Harrell's Hill Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.211944</lat>
    <lon>-78.10083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59374</plant_id>
    <plant_name>Old Mill Solar</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Old Mill Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.203333</lat>
    <lon>-121.0464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59381</plant_id>
    <plant_name>The Methodist Hospital, Gas Turbine</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>The Methodist Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>29.709444</lat>
    <lon>-95.40028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59396</plant_id>
    <plant_name>Shaffer</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>CD US Solar MT3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.594167</lat>
    <lon>-71.24944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59426</plant_id>
    <plant_name>GKS Solar</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.248333</lat>
    <lon>-76.50194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59427</plant_id>
    <plant_name>Two Mile Solar</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.223056</lat>
    <lon>-76.46194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59429</plant_id>
    <plant_name>Downs Farm Solar</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.361944</lat>
    <lon>-76.91694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59446</plant_id>
    <plant_name>Cranbury</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>RE Cranbury Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.314722</lat>
    <lon>-74.49917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59455</plant_id>
    <plant_name>Tech Park Solar</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.097884</lat>
    <lon>-110.8157</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59497</plant_id>
    <plant_name>Andrew Solar</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.1608</lat>
    <lon>-77.1099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59499</plant_id>
    <plant_name>Candace Solar</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.487</lat>
    <lon>-78.1922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59500</plant_id>
    <plant_name>Sarah Solar</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>USF Surry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.139444</lat>
    <lon>-78.14694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59501</plant_id>
    <plant_name>Nitro Solar</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>USF Surry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.486944</lat>
    <lon>-78.31389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59502</plant_id>
    <plant_name>Melinda Solar</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.2487</lat>
    <lon>-78.3475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59503</plant_id>
    <plant_name>Jacob Solar</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.2922</lat>
    <lon>-79.6214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59504</plant_id>
    <plant_name>Porter Solar</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.2167</lat>
    <lon>-77.0743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59505</plant_id>
    <plant_name>Sun Devil Solar</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.432</lat>
    <lon>-77.9703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59508</plant_id>
    <plant_name>Chei Solar</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.8918</lat>
    <lon>-78.1823</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59510</plant_id>
    <plant_name>Husky Solar</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.2847</lat>
    <lon>-79.5667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59514</plant_id>
    <plant_name>Flat Meeks PV 1</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.806667</lat>
    <lon>-77.27056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59515</plant_id>
    <plant_name>Benthall Bridge PV 1</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.42</lat>
    <lon>-77.10028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59517</plant_id>
    <plant_name>Baker PV 1</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.270278</lat>
    <lon>-77.06028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59520</plant_id>
    <plant_name>Manning PV 1</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.119167</lat>
    <lon>-79.52139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59521</plant_id>
    <plant_name>Little River PV 1</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.538889</lat>
    <lon>-79.80417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59533</plant_id>
    <plant_name>Princeton</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>USF Surry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.504444</lat>
    <lon>-78.19222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59534</plant_id>
    <plant_name>4Oaks</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>USF Surry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.4325</lat>
    <lon>-78.41167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59549</plant_id>
    <plant_name>Everetts Wildcat Solar, LLC</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.847222</lat>
    <lon>-77.11139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59561</plant_id>
    <plant_name>Crockett Farm</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.230833</lat>
    <lon>-77.5525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59562</plant_id>
    <plant_name>Eastover Farm</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.742222</lat>
    <lon>-79.46306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59563</plant_id>
    <plant_name>Foxfire Solar Farm</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.220556</lat>
    <lon>-79.55194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59564</plant_id>
    <plant_name>Hutchinson Farm</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.260833</lat>
    <lon>-81.51583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59565</plant_id>
    <plant_name>Keen Farm</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.426667</lat>
    <lon>-78.39998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59567</plant_id>
    <plant_name>Bearford Farm Solar Project</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.61</lat>
    <lon>-77.92417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59575</plant_id>
    <plant_name>Manway Solar Farm</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.745833</lat>
    <lon>-78.42944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59576</plant_id>
    <plant_name>Millikan Farm</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.81771</lat>
    <lon>-79.77109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59577</plant_id>
    <plant_name>Misenheimer Farm</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.468611</lat>
    <lon>-80.29361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59578</plant_id>
    <plant_name>Monroe Moore Farm</plant_name>
    <state>NC</state>
    <county>Union</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.971944</lat>
    <lon>-80.60194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59581</plant_id>
    <plant_name>Stout Farm</plant_name>
    <state>NC</state>
    <county>Orange</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.079167</lat>
    <lon>-79.19972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59583</plant_id>
    <plant_name>Tart Farm</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.204444</lat>
    <lon>-78.68111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59584</plant_id>
    <plant_name>Wellons Farm</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Wellons Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.511698</lat>
    <lon>-78.29113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59586</plant_id>
    <plant_name>Woodland Church Farm</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.058333</lat>
    <lon>-77.85361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59591</plant_id>
    <plant_name>Schell Solar Farm</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.435556</lat>
    <lon>-77.56639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59592</plant_id>
    <plant_name>Sedberry Farm</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.243889</lat>
    <lon>-79.32167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59593</plant_id>
    <plant_name>Spring Valley Farm 2, LLC</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.371111</lat>
    <lon>-78.41528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59595</plant_id>
    <plant_name>Stikeleather Farm</plant_name>
    <state>NC</state>
    <county>Alexander</county>
    <operator>Stikeleather Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.902222</lat>
    <lon>-81.10611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59603</plant_id>
    <plant_name>Walters Solar (FLS 260)</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.496944</lat>
    <lon>-79.04889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59604</plant_id>
    <plant_name>Stagecoach Solar</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.414722</lat>
    <lon>-78.45972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59605</plant_id>
    <plant_name>Vicksburg Solar</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.325</lat>
    <lon>-78.34306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59628</plant_id>
    <plant_name>Hanover</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.065278</lat>
    <lon>-74.59056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59641</plant_id>
    <plant_name>Garysburg Solar</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.468</lat>
    <lon>-77.592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59642</plant_id>
    <plant_name>Gaston Solar</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.514722</lat>
    <lon>-77.65611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59643</plant_id>
    <plant_name>Seaboard Solar LLC</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.476944</lat>
    <lon>-77.46778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59645</plant_id>
    <plant_name>Mt Olive Solar 1</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.181111</lat>
    <lon>-78.09694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59648</plant_id>
    <plant_name>Tarboro Solar</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.858056</lat>
    <lon>-77.49917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59663</plant_id>
    <plant_name>Cornwall Solar Center, LLC</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.366944</lat>
    <lon>-78.62611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59694</plant_id>
    <plant_name>Aspen Solar, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.791163</lat>
    <lon>-78.01212</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59706</plant_id>
    <plant_name>BRE</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.372546</lat>
    <lon>-78.59851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59708</plant_id>
    <plant_name>Franklinton Solar</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.08113</lat>
    <lon>-78.35384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59738</plant_id>
    <plant_name>Citizen B</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.723806</lat>
    <lon>-120.4321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59760</plant_id>
    <plant_name>Red Hill Solar Center, LLC</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.404382</lat>
    <lon>-78.14111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59761</plant_id>
    <plant_name>Van Slyke Solar Center, LLC</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.776992</lat>
    <lon>-77.88052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59762</plant_id>
    <plant_name>Broadway Solar Center, LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.309261</lat>
    <lon>-78.83143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59781</plant_id>
    <plant_name>Upper Blackstone (MA) Treasure Valley</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Nexamp Treasure Valley Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.332831</lat>
    <lon>-71.98763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59795</plant_id>
    <plant_name>Ahoskie</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.306369</lat>
    <lon>-76.99314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59796</plant_id>
    <plant_name>Kelford (Cypress)</plant_name>
    <state>NC</state>
    <county>Bertie</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.154227</lat>
    <lon>-77.2185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59824</plant_id>
    <plant_name>Sweetgum Solar</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.458333</lat>
    <lon>-79.18111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59825</plant_id>
    <plant_name>South Louisburg Solar</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.057</lat>
    <lon>-78.308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59828</plant_id>
    <plant_name>Balsam</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.458889</lat>
    <lon>-79.17389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59829</plant_id>
    <plant_name>Hickory</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Current Energy Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.802222</lat>
    <lon>-78.00917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59832</plant_id>
    <plant_name>Kinston Solar</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.351436</lat>
    <lon>-77.47228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59833</plant_id>
    <plant_name>Laurinburg Solar</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.756481</lat>
    <lon>-79.43024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59854</plant_id>
    <plant_name>OlivePV</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.7</lat>
    <lon>-86.49</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59856</plant_id>
    <plant_name>SoINCPower6, LLC</plant_name>
    <state>NC</state>
    <county>Gates</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.443</lat>
    <lon>-76.581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59857</plant_id>
    <plant_name>SoINCPower5, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.052801</lat>
    <lon>-77.76246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59899</plant_id>
    <plant_name>Choco Solar, LLC</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Choco Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.482032</lat>
    <lon>-77.11307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59901</plant_id>
    <plant_name>Albertson Solar LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Albertson Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.093021</lat>
    <lon>-77.81267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59912</plant_id>
    <plant_name>Freemont Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Lincoln</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.427587</lat>
    <lon>-80.99722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59914</plant_id>
    <plant_name>Crestwood Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.353533</lat>
    <lon>-78.58421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59917</plant_id>
    <plant_name>Pollocksville Solar</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.998</lat>
    <lon>-77.219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59921</plant_id>
    <plant_name>Lillington Solar</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.368</lat>
    <lon>-78.801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59928</plant_id>
    <plant_name>Vance Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.258478</lat>
    <lon>-78.41197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59929</plant_id>
    <plant_name>Cline Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>Cline Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.721133</lat>
    <lon>-81.41531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59930</plant_id>
    <plant_name>BG Stewart Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Union</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.970486</lat>
    <lon>-80.38962</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59936</plant_id>
    <plant_name>Meadowbrook Solar Farm</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.55543</lat>
    <lon>-80.38589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59937</plant_id>
    <plant_name>Coats Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.414507</lat>
    <lon>-78.69058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60054</plant_id>
    <plant_name>UI RCP Bridgeport Seaside</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>United Illuminating Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>41.157591</lat>
    <lon>-73.20808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60106</plant_id>
    <plant_name>Rockingham Solar, LLC</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.980661</lat>
    <lon>-79.60373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60108</plant_id>
    <plant_name>SID Solar I, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.258647</lat>
    <lon>-81.50561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60133</plant_id>
    <plant_name>Morgan Farm, LLC</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.095572</lat>
    <lon>-78.15199</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60135</plant_id>
    <plant_name>Cedar Solar, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.915767</lat>
    <lon>-77.77574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60136</plant_id>
    <plant_name>Elm Solar, LLC</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.453828</lat>
    <lon>-79.18953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60156</plant_id>
    <plant_name>Shelter Solar</plant_name>
    <state>NC</state>
    <county>Hoke</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.983772</lat>
    <lon>-79.26803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60160</plant_id>
    <plant_name>Tate Solar</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>USF Essex Lessor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.066109</lat>
    <lon>-78.02961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60178</plant_id>
    <plant_name>Cash Solar</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.02818</lat>
    <lon>-77.92331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60179</plant_id>
    <plant_name>Daystar Solar</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.035589</lat>
    <lon>-77.20245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60180</plant_id>
    <plant_name>Kathleen Solar</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.513769</lat>
    <lon>-78.80238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60181</plant_id>
    <plant_name>Grove Solar</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.16922</lat>
    <lon>-77.1182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60187</plant_id>
    <plant_name>Antelope DSR 2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.686944</lat>
    <lon>-118.3117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60188</plant_id>
    <plant_name>Conetoe Solar</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>Conetoe Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.825182</lat>
    <lon>-77.45777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60189</plant_id>
    <plant_name>Sugar Run Solar</plant_name>
    <state>NC</state>
    <county>Gates</county>
    <operator>Sugar Run Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.437752</lat>
    <lon>-76.59783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60207</plant_id>
    <plant_name>Hemlock Solar</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Hemlock Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.469089</lat>
    <lon>-77.59752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60208</plant_id>
    <plant_name>Long Farm 46 Solar, LLC</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.467021</lat>
    <lon>-77.61796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60209</plant_id>
    <plant_name>HXNAir Solar One</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>HXNAir Solar One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.348734</lat>
    <lon>-77.63151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60253</plant_id>
    <plant_name>IMPA Anderson Solar Park</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.051556</lat>
    <lon>-85.73713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60257</plant_id>
    <plant_name>Stainback Solar Farm</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.395286</lat>
    <lon>-78.32829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60284</plant_id>
    <plant_name>Organ Church Solar</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.525584</lat>
    <lon>-80.45113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60287</plant_id>
    <plant_name>Willard Solar</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>USF Essex Lessor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.70249</lat>
    <lon>-77.9697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60288</plant_id>
    <plant_name>Ajax Solar</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.83091</lat>
    <lon>-79.1194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60290</plant_id>
    <plant_name>Jester Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.36118</lat>
    <lon>-77.8861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60291</plant_id>
    <plant_name>Trinity Solar</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Trinity Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.871021</lat>
    <lon>-79.92708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60298</plant_id>
    <plant_name>Pine Valley Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.21812</lat>
    <lon>-79.52933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60301</plant_id>
    <plant_name>Holloman Solar Facility</plant_name>
    <state>NM</state>
    <county>Otero</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.921261</lat>
    <lon>-106.0724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60361</plant_id>
    <plant_name>Wortham Solar Farm</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.352489</lat>
    <lon>-78.37634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60364</plant_id>
    <plant_name>White Street Renewables</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>White Street Renewables LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2020</latest_year>
    <lat>36.10447</lat>
    <lon>-79.72362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60378</plant_id>
    <plant_name>NHA at Mansfield NJ</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>Luminace Solar New Jersey, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.76</lat>
    <lon>-74.935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60384</plant_id>
    <plant_name>Hertford Solar Farm</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.13026</lat>
    <lon>-76.49092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60394</plant_id>
    <plant_name>Tamworth Holdings</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.745617</lat>
    <lon>-78.42119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60395</plant_id>
    <plant_name>MC1 Solar</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>MC1 Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.8748</lat>
    <lon>-77.1397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60439</plant_id>
    <plant_name>Sellers Farm Solar</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.881973</lat>
    <lon>-79.66535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60440</plant_id>
    <plant_name>McGrigor Farm Solar</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Carolina Solar Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.019771</lat>
    <lon>-78.35009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60487</plant_id>
    <plant_name>River Road Solar, LLC</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.351</lat>
    <lon>-76.842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60538</plant_id>
    <plant_name>Langdon Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.447278</lat>
    <lon>-78.41348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60549</plant_id>
    <plant_name>ZV Solar 3, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.816182</lat>
    <lon>-79.20022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60553</plant_id>
    <plant_name>Southerland Farm Solar</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.265611</lat>
    <lon>-78.36781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60575</plant_id>
    <plant_name>Wadesboro Farm 2</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.023406</lat>
    <lon>-80.09319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60576</plant_id>
    <plant_name>Wadesboro Farm 3</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.969356</lat>
    <lon>-80.05103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60577</plant_id>
    <plant_name>Hector Farm</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.376236</lat>
    <lon>-79.90972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60578</plant_id>
    <plant_name>Kojak Farm</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.79915</lat>
    <lon>-78.10218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60579</plant_id>
    <plant_name>Meriwether Farm</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.288911</lat>
    <lon>-78.60459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60580</plant_id>
    <plant_name>Soluga Farms III</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.219272</lat>
    <lon>-78.67333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60597</plant_id>
    <plant_name>Wayne Solar III LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Wayne Solar III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.324377</lat>
    <lon>-77.87123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60598</plant_id>
    <plant_name>Wayne Solar II LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Wayne Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.31556</lat>
    <lon>-78.07948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60599</plant_id>
    <plant_name>Duplin Solar I LLC (160 Houston Lane)</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Duplin Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.960083</lat>
    <lon>-77.98039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60601</plant_id>
    <plant_name>Bay Branch Solar</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.4745</lat>
    <lon>-77.1191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60602</plant_id>
    <plant_name>Wayne Solar I LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Wayne Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.221083</lat>
    <lon>-78.01903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60627</plant_id>
    <plant_name>BRE NC Solar 3</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.383</lat>
    <lon>-78.612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60631</plant_id>
    <plant_name>Empire Solar</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.66438</lat>
    <lon>-93.10881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60634</plant_id>
    <plant_name>Auten Road Farm, LLC</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.30498</lat>
    <lon>-81.13735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60635</plant_id>
    <plant_name>Creech Solar 2, LLC</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.72196</lat>
    <lon>-78.60434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60636</plant_id>
    <plant_name>Bunn Level Farm, LLC</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.308639</lat>
    <lon>-78.77433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60651</plant_id>
    <plant_name>North Nash Farm, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.070336</lat>
    <lon>-78.03832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60691</plant_id>
    <plant_name>Tanager Holdings</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.7527</lat>
    <lon>-79.78463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60695</plant_id>
    <plant_name>BentonSun LLC</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.766167</lat>
    <lon>-93.85794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60700</plant_id>
    <plant_name>Wind Colebrook South</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>Wind Colebrook South</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.961067</lat>
    <lon>-73.14078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60712</plant_id>
    <plant_name>Ursa Community Solar</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Ursa Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.671581</lat>
    <lon>-93.08256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60713</plant_id>
    <plant_name>Sunrise Community Solar</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Sunrise Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.474994</lat>
    <lon>-92.89109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60714</plant_id>
    <plant_name>Rosemount Community Solar</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Rosemount Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.72241</lat>
    <lon>-93.02291</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60715</plant_id>
    <plant_name>Paynesville Community Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Paynesville Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2017</latest_year>
    <lat>45.402543</lat>
    <lon>-94.71547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60717</plant_id>
    <plant_name>Northfield Community Solar</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Northfield Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.475433</lat>
    <lon>-93.19831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60761</plant_id>
    <plant_name>Roper Farm, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.187475</lat>
    <lon>-81.44072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60778</plant_id>
    <plant_name>Hew Fulton Farm, LLC</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.784039</lat>
    <lon>-79.47454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60779</plant_id>
    <plant_name>McGoogan Farm, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.888736</lat>
    <lon>-79.06271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60783</plant_id>
    <plant_name>Leggett Solar, LLC</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.058</lat>
    <lon>-77.623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60784</plant_id>
    <plant_name>Jersey Holdings</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.564307</lat>
    <lon>-79.03748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60830</plant_id>
    <plant_name>Webster Holdco Solar CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Webster Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.529703</lat>
    <lon>-93.41062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60832</plant_id>
    <plant_name>Farmington Holdco Solar</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Farmington Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.623117</lat>
    <lon>-93.134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60833</plant_id>
    <plant_name>Dodge Holdco Solar CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Dodge Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.022374</lat>
    <lon>-92.75697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60834</plant_id>
    <plant_name>Hwy 14 Holdco Solar CSG</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Hwy 14 Holdco, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.021848</lat>
    <lon>-92.59219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60836</plant_id>
    <plant_name>Big Lake Holdco Solar CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Big Lake Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.334575</lat>
    <lon>-93.77558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60837</plant_id>
    <plant_name>Forest Lake Solar CSG</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Forest Lake Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.253488</lat>
    <lon>-92.89397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60850</plant_id>
    <plant_name>Thigpen Farms Solar, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.709198</lat>
    <lon>-79.3519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60874</plant_id>
    <plant_name>GMP Solar - Hartford</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.632074</lat>
    <lon>-72.41857</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60877</plant_id>
    <plant_name>GMP Solar - Williamstown</plant_name>
    <state>VT</state>
    <county>Orange</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.136051</lat>
    <lon>-72.51051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60882</plant_id>
    <plant_name>Carl Friedrich Gauss Solar</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.345842</lat>
    <lon>-77.63348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60929</plant_id>
    <plant_name>Red Oak Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.993015</lat>
    <lon>-77.93352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60944</plant_id>
    <plant_name>Vega Community Solar</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Vega Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.382813</lat>
    <lon>-95.20374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60948</plant_id>
    <plant_name>Washington Solar</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.272037</lat>
    <lon>-79.79247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60958</plant_id>
    <plant_name>Nesvold Watertown Solar</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.937098</lat>
    <lon>-93.82867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60961</plant_id>
    <plant_name>Violet Solar</plant_name>
    <state>NC</state>
    <county>Cabarrus</county>
    <operator>Violet Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.401091</lat>
    <lon>-80.4185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60965</plant_id>
    <plant_name>Cotten Farm, LLC</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.528489</lat>
    <lon>-79.19848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60980</plant_id>
    <plant_name>ZV Solar 1</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.81319</lat>
    <lon>-79.20143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60982</plant_id>
    <plant_name>Atkinson Farm Solar</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.896953</lat>
    <lon>-77.79517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61008</plant_id>
    <plant_name>Brook Street Solar 1 CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Brook Street Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.955897</lat>
    <lon>-70.78613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61019</plant_id>
    <plant_name>Siler 421 Farm, LLC</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.747372</lat>
    <lon>-79.44968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61031</plant_id>
    <plant_name>Floyd Road Solar Farm</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.50592</lat>
    <lon>-77.67747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61059</plant_id>
    <plant_name>Novel OYA of Osakis CSG</plant_name>
    <state>MN</state>
    <county>Douglas</county>
    <operator>NRG MN Community LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.85</lat>
    <lon>-95.15</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61072</plant_id>
    <plant_name>Lemond Solar</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.080995</lat>
    <lon>-93.28593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61085</plant_id>
    <plant_name>Stone Solar</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.583119</lat>
    <lon>-79.03184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61086</plant_id>
    <plant_name>Tripple State Farm</plant_name>
    <state>NC</state>
    <county>Iredell</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.734972</lat>
    <lon>-80.77487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61087</plant_id>
    <plant_name>Wadesboro Farm 1</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.99115</lat>
    <lon>-80.09732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61088</plant_id>
    <plant_name>Delco Farm</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.318997</lat>
    <lon>-78.20905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61089</plant_id>
    <plant_name>Fisher Solar Farm - NC</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.24125</lat>
    <lon>-80.03465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61090</plant_id>
    <plant_name>Kinston Davis Farm</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.2184</lat>
    <lon>-77.64259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61091</plant_id>
    <plant_name>Laurinburg Farm</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.764403</lat>
    <lon>-79.44297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61093</plant_id>
    <plant_name>Mills Anson Farm</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.968056</lat>
    <lon>-79.93584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61094</plant_id>
    <plant_name>Old Wire Farm</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.817836</lat>
    <lon>-79.51393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61095</plant_id>
    <plant_name>Railroad Farm 2</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.807903</lat>
    <lon>-78.95049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61124</plant_id>
    <plant_name>Elizabeth Mines Solar 1</plant_name>
    <state>VT</state>
    <county>Orange</county>
    <operator>Elizabeth Mines Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.823611</lat>
    <lon>-72.33111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61129</plant_id>
    <plant_name>Wadesboro Solar</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.973863</lat>
    <lon>-80.02899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61134</plant_id>
    <plant_name>Phelps 158 Solar Farm</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.442636</lat>
    <lon>-77.16151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61142</plant_id>
    <plant_name>WasecaSun</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.051448</lat>
    <lon>-93.38646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61156</plant_id>
    <plant_name>St. Pauls Solar 2</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.770037</lat>
    <lon>-78.98176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61157</plant_id>
    <plant_name>Boaz Farm Solar</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.469321</lat>
    <lon>-79.13491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61158</plant_id>
    <plant_name>Bizzell Church Solar 2</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.543738</lat>
    <lon>-78.17673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61177</plant_id>
    <plant_name>Corvus Community Solar</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Corvus Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.191352</lat>
    <lon>-93.944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61178</plant_id>
    <plant_name>Capella Community Solar</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Capella Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.0901</lat>
    <lon>-96.1612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61181</plant_id>
    <plant_name>Andromeda Community Solar</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Andromeda Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.901926</lat>
    <lon>-94.03163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61194</plant_id>
    <plant_name>Barker Solar, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.635599</lat>
    <lon>-78.92866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61196</plant_id>
    <plant_name>Mill Pond Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.307121</lat>
    <lon>-78.70146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61203</plant_id>
    <plant_name>Lahr 1, LLC</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.431189</lat>
    <lon>-94.42604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61218</plant_id>
    <plant_name>Broadridge Solar, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.522942</lat>
    <lon>-78.95721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61219</plant_id>
    <plant_name>Kelly Solar, LLC</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.391194</lat>
    <lon>-78.44902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61220</plant_id>
    <plant_name>Spencer Farm, LLC</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.712886</lat>
    <lon>-80.40785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61275</plant_id>
    <plant_name>Wilson Solar Farm 2</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.683</lat>
    <lon>-78.016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61287</plant_id>
    <plant_name>Sun Farm V, LLC</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.160629</lat>
    <lon>-76.48936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61288</plant_id>
    <plant_name>Roxboro Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.326821</lat>
    <lon>-78.62224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61352</plant_id>
    <plant_name>Bondi Solar</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.134054</lat>
    <lon>-77.53849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61363</plant_id>
    <plant_name>Equuleus Community Solar Gardens</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.726098</lat>
    <lon>-93.02269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61370</plant_id>
    <plant_name>Walnut Springs Solar</plant_name>
    <state>TX</state>
    <county>Bosque</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.07868</lat>
    <lon>-97.76846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61379</plant_id>
    <plant_name>DodgeSun CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.040418</lat>
    <lon>-92.69</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61381</plant_id>
    <plant_name>Koppelman Sun CSG</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.182609</lat>
    <lon>-93.87627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61383</plant_id>
    <plant_name>Rengstorf Solar CSG</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.259504</lat>
    <lon>-94.28907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61384</plant_id>
    <plant_name>St. Cloud Solar CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.477397</lat>
    <lon>-94.12131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61403</plant_id>
    <plant_name>Deep Branch Farm</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.670842</lat>
    <lon>-79.19938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61404</plant_id>
    <plant_name>Pikeville Farm</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.478155</lat>
    <lon>-77.97917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61405</plant_id>
    <plant_name>Moorings Farm 2, LLC</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.305747</lat>
    <lon>-77.82889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61410</plant_id>
    <plant_name>Whitesboro Solar</plant_name>
    <state>TX</state>
    <county>Grayson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.616526</lat>
    <lon>-96.86872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61411</plant_id>
    <plant_name>Whitesboro Solar II</plant_name>
    <state>TX</state>
    <county>Grayson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.624853</lat>
    <lon>-96.86747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61426</plant_id>
    <plant_name>Gopher CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.398562</lat>
    <lon>-92.67916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61427</plant_id>
    <plant_name>Richmond CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.458606</lat>
    <lon>-94.51385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61428</plant_id>
    <plant_name>Taylors Falls CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.391842</lat>
    <lon>-92.68435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61451</plant_id>
    <plant_name>Northfield Holdco CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Northfield Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.457874</lat>
    <lon>-93.12465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61453</plant_id>
    <plant_name>B.R. Corcoran CSG</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>Minnesota Solar CSG 19, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.0695</lat>
    <lon>-93.6432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61455</plant_id>
    <plant_name>B.R. Sauk Rapids CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>Minnesota Solar CSG 9, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.6236</lat>
    <lon>-94.0782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61457</plant_id>
    <plant_name>Palmer Solar Center</plant_name>
    <state>VA</state>
    <county>Fluvanna</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.96724</lat>
    <lon>-78.23096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61458</plant_id>
    <plant_name>Martin Solar Center</plant_name>
    <state>VA</state>
    <county>Goochland</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.88051</lat>
    <lon>-78.04919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61475</plant_id>
    <plant_name>CoreSite Real Estate 1656 McCarthy, L.P.</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>CoreSite Real Estate 1656 McCarthy, L.P.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>37.405727</lat>
    <lon>-121.9162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61478</plant_id>
    <plant_name>SunE Feely 1 CSG, LLC</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.655217</lat>
    <lon>-93.1104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61483</plant_id>
    <plant_name>Cottage Grove CSG, LLC</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.842124</lat>
    <lon>-92.87366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61484</plant_id>
    <plant_name>Fox CSG, LLC</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.392643</lat>
    <lon>-92.68132</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61486</plant_id>
    <plant_name>Wyoming 2 CSG, LLC</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.35</lat>
    <lon>-92.95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61525</plant_id>
    <plant_name>ABD Farms</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.728738</lat>
    <lon>-79.74827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61527</plant_id>
    <plant_name>Bakatsias Solar</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.072359</lat>
    <lon>-79.34747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61528</plant_id>
    <plant_name>Bayboro Solar Farm</plant_name>
    <state>NC</state>
    <county>Pamlico</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.148339</lat>
    <lon>-76.81023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61533</plant_id>
    <plant_name>Mustang Solar</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.416167</lat>
    <lon>-79.57597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61535</plant_id>
    <plant_name>Statesville Solar</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.739704</lat>
    <lon>-80.71241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61536</plant_id>
    <plant_name>Wakefield Solar</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.814236</lat>
    <lon>-78.3124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61542</plant_id>
    <plant_name>PopeSun CSG, LLC</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.643438</lat>
    <lon>-95.52617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61544</plant_id>
    <plant_name>LeSun CSG, LLC</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.213446</lat>
    <lon>-93.55242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61547</plant_id>
    <plant_name>WrightSun CSG, LLC</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.21643</lat>
    <lon>-93.71838</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61581</plant_id>
    <plant_name>Davis Lane Solar, LLC</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.107345</lat>
    <lon>-76.52924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61585</plant_id>
    <plant_name>Scandia CSG</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.2528</lat>
    <lon>-92.8766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61586</plant_id>
    <plant_name>MontSun Community Solar</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.060283</lat>
    <lon>-93.90466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61587</plant_id>
    <plant_name>WaveSun Community Solar</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.060844</lat>
    <lon>-93.98023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61614</plant_id>
    <plant_name>Cyril</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.8981</lat>
    <lon>-98.22787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61620</plant_id>
    <plant_name>CDCR (CA) - Corcoran State Prison</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>SunE Corcoran SP Owner, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.06502</lat>
    <lon>-119.5576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61625</plant_id>
    <plant_name>West Moore Solar II</plant_name>
    <state>TX</state>
    <county>Grayson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.61748</lat>
    <lon>-96.6284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61626</plant_id>
    <plant_name>Dundas Solar Holdings LLC CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.439647</lat>
    <lon>-93.19733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61627</plant_id>
    <plant_name>Waterville CSG Solar Holdings LLC</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.197103</lat>
    <lon>-93.57117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61672</plant_id>
    <plant_name>Sherburne Community Solar</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.438123</lat>
    <lon>-94.04417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61681</plant_id>
    <plant_name>Middle Daisy</plant_name>
    <state>NM</state>
    <county>Lea</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.978636</lat>
    <lon>-103.3713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61690</plant_id>
    <plant_name>Foreman's Hill Community Solar</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Foreman's Hill CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.553337</lat>
    <lon>-92.63686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61742</plant_id>
    <plant_name>System Control Center</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Austin Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Flywheels</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Flywheels</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>30.219946</lat>
    <lon>-97.70881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61762</plant_id>
    <plant_name>Sherburne North Project CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.4978</lat>
    <lon>-94.1143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61781</plant_id>
    <plant_name>Edenton Solar</plant_name>
    <state>NC</state>
    <county>Chowan</county>
    <operator>Edenton Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.054</lat>
    <lon>-76.544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61817</plant_id>
    <plant_name>Big Lake Project CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.334</lat>
    <lon>-93.792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61833</plant_id>
    <plant_name>Freedom Solar</plant_name>
    <state>SC</state>
    <county>Dillon</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.287</lat>
    <lon>-79.148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61842</plant_id>
    <plant_name>Sun Farm VI, LLC</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.114444</lat>
    <lon>-76.50778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61869</plant_id>
    <plant_name>Scenic Hill Solar III</plant_name>
    <state>AR</state>
    <county>Johnson</county>
    <operator>Scenic Hill Solar III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.46715</lat>
    <lon>-93.51517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61870</plant_id>
    <plant_name>Montevideo Solar LLC, CSG</plant_name>
    <state>MN</state>
    <county>Yellow Medicine</county>
    <operator>Montevideo Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.899475</lat>
    <lon>-95.69419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61873</plant_id>
    <plant_name>Yellow Jacket</plant_name>
    <state>TX</state>
    <county>Bosque</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.933841</lat>
    <lon>-97.65375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61919</plant_id>
    <plant_name>Frontenac Holdco LLC, CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Frontenac Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.501673</lat>
    <lon>-92.35871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61971</plant_id>
    <plant_name>Corcoran CSG</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.095757</lat>
    <lon>-93.64501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61978</plant_id>
    <plant_name>Pinesage</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.220823</lat>
    <lon>-79.51909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61995</plant_id>
    <plant_name>UC Merced Solar Hybrid</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <battery_mwh>0.9</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.365688</lat>
    <lon>-120.4322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62031</plant_id>
    <plant_name>Nautilus Saint Cloud Solar (CSG)</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.495562</lat>
    <lon>-94.11892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62036</plant_id>
    <plant_name>Sartell Holdco CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Sartell Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.36443</lat>
    <lon>-94.12329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62054</plant_id>
    <plant_name>Alpha Value Solar</plant_name>
    <state>NC</state>
    <county>Perquimans</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.157401</lat>
    <lon>-76.48956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62059</plant_id>
    <plant_name>East Longmeadow Solar PV</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.046767</lat>
    <lon>-72.45912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62067</plant_id>
    <plant_name>Urtica Solar Project</plant_name>
    <state>WA</state>
    <county>Kittitas</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>47.10754</lat>
    <lon>-120.6897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62069</plant_id>
    <plant_name>Penstemon Solar Project</plant_name>
    <state>WA</state>
    <county>Kittitas</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>46.95931</lat>
    <lon>-120.5091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62071</plant_id>
    <plant_name>Camas Solar Project</plant_name>
    <state>WA</state>
    <county>Kittitas</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>46.95931</lat>
    <lon>-120.5091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62082</plant_id>
    <plant_name>Southwick Solar PV</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.05</lat>
    <lon>-72.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62098</plant_id>
    <plant_name>Tiller CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.435</lat>
    <lon>-94.0403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62102</plant_id>
    <plant_name>Sadiebrook NC Solar</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.44</lat>
    <lon>-78.658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62104</plant_id>
    <plant_name>Lane Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.395</lat>
    <lon>-78.051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62105</plant_id>
    <plant_name>Monticello Project CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.2722</lat>
    <lon>-93.8278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62136</plant_id>
    <plant_name>Arthur Solar, LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.16087</lat>
    <lon>-78.84663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62164</plant_id>
    <plant_name>Meridian II</plant_name>
    <state>MS</state>
    <county>Lauderdale</county>
    <operator>SR Meridian II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.55332</lat>
    <lon>-88.5804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62168</plant_id>
    <plant_name>Church Road Solar LLC</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.523663</lat>
    <lon>-78.62535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62209</plant_id>
    <plant_name>Randolph CSG PV1-5</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.527671</lat>
    <lon>-92.97211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62210</plant_id>
    <plant_name>Felton CSG PV1-5</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.541704</lat>
    <lon>-92.97358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62223</plant_id>
    <plant_name>Warren Solar Farm LLC</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.252</lat>
    <lon>-78.369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62240</plant_id>
    <plant_name>Burgaw Solar, LLC</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>CI-II Mitchell Holding LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.536</lat>
    <lon>-77.91168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62267</plant_id>
    <plant_name>Held Solar Project</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.5239</lat>
    <lon>-94.2736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62327</plant_id>
    <plant_name>Synergen Panorama, LLC CSG</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.772107</lat>
    <lon>-76.97338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62328</plant_id>
    <plant_name>Mill Pond Solar, LLC</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.829426</lat>
    <lon>-76.79076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62329</plant_id>
    <plant_name>Jamesville Road Solar, LLC</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.845354</lat>
    <lon>-76.80149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62330</plant_id>
    <plant_name>Camden Dam Solar, LLC</plant_name>
    <state>NC</state>
    <county>Camden</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.311822</lat>
    <lon>-76.12585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62357</plant_id>
    <plant_name>Gloversville Landfill Solar</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Gloversville Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.052981</lat>
    <lon>-74.30836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62365</plant_id>
    <plant_name>Wright Kirby 1-5 CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.259</lat>
    <lon>-93.791</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62474</plant_id>
    <plant_name>Gaskill Rd Community Solar Farm CSG</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.116</lat>
    <lon>-76.183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62502</plant_id>
    <plant_name>Route 19 #2 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.533807</lat>
    <lon>-78.15377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62583</plant_id>
    <plant_name>Tanglewood Circle Solar 1 LLC</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Tanglewood Circle Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.252046</lat>
    <lon>-73.10996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62595</plant_id>
    <plant_name>Wendell Solar Farm LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.734581</lat>
    <lon>-78.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62596</plant_id>
    <plant_name>Sabattus Solar LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.819</lat>
    <lon>-78.135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62600</plant_id>
    <plant_name>Cookstown</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.436844</lat>
    <lon>-77.97375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62602</plant_id>
    <plant_name>Starr</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.015398</lat>
    <lon>-78.3508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62603</plant_id>
    <plant_name>Badger</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.83896</lat>
    <lon>-77.22878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62610</plant_id>
    <plant_name>Commerce Solar</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.43445</lat>
    <lon>-98.61765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62621</plant_id>
    <plant_name>Achilles Solar</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.359674</lat>
    <lon>-79.91142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62623</plant_id>
    <plant_name>Arborgate Solar</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.717391</lat>
    <lon>-79.11946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62644</plant_id>
    <plant_name>Minuteman Energy Storage</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Minuteman Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.567614</lat>
    <lon>-71.09813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62659</plant_id>
    <plant_name>Pecan Grove Solar, LLC</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>CI-II Mitchell Holding LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.067661</lat>
    <lon>-77.18521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62660</plant_id>
    <plant_name>1025 Traveller Solar, LLC</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>CI-II Mitchell Holding LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.427308</lat>
    <lon>-79.12632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62662</plant_id>
    <plant_name>Ennis Solar, LLC</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>CI-II Mitchell Holding LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.421964</lat>
    <lon>-78.72168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62674</plant_id>
    <plant_name>Antelope Expansion 3B</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.720162</lat>
    <lon>-118.3225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62691</plant_id>
    <plant_name>Shiloh Hwy Solar</plant_name>
    <state>NC</state>
    <county>Camden</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.27</lat>
    <lon>-76.033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62692</plant_id>
    <plant_name>Sandy Solar</plant_name>
    <state>NC</state>
    <county>Camden</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.33</lat>
    <lon>-76.058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62693</plant_id>
    <plant_name>Chowan Jehu Solar</plant_name>
    <state>NC</state>
    <county>Chowan</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.283778</lat>
    <lon>-76.6023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62697</plant_id>
    <plant_name>Mission College Blvd. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.38633</lat>
    <lon>-121.9624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62708</plant_id>
    <plant_name>Northfield Solar CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.417131</lat>
    <lon>-93.15306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62733</plant_id>
    <plant_name>East Hampton Energy Storage Center</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>East Hampton Energy Storage Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.961751</lat>
    <lon>-72.20986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62734</plant_id>
    <plant_name>Montauk Energy Storage Center</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Montauk Energy Storage Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>40</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.03988</lat>
    <lon>-71.96436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62737</plant_id>
    <plant_name>West Valley West</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>BQ Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.442927</lat>
    <lon>-78.63214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62738</plant_id>
    <plant_name>West Valley East</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>BQ Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.443632</lat>
    <lon>-78.63213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62744</plant_id>
    <plant_name>Arcadia Solar</plant_name>
    <state>WI</state>
    <county>Trempealeau</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.243436</lat>
    <lon>-91.45824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62781</plant_id>
    <plant_name>10 Briggs Solar NG, LLC (East)</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.63269</lat>
    <lon>-71.49625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62862</plant_id>
    <plant_name>Nabb Battery Energy Storage System</plant_name>
    <state>IN</state>
    <county>Clark</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.501908</lat>
    <lon>-85.69457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62897</plant_id>
    <plant_name>Holiday Hill Community Wind</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.212535</lat>
    <lon>-72.87126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62940</plant_id>
    <plant_name>Starratt Solar</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>C2 Starratt Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.494361</lat>
    <lon>-81.60056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62953</plant_id>
    <plant_name>Griffin Solar</plant_name>
    <state>TX</state>
    <county>McLennan</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.474114</lat>
    <lon>-97.14122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62997</plant_id>
    <plant_name>Spring Hope Solar 3, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.905578</lat>
    <lon>-78.19246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63012</plant_id>
    <plant_name>Ransomville Solar 1, LLC</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.1994</lat>
    <lon>-78.94984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63015</plant_id>
    <plant_name>Plott Hound Solar</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>Plott Hound Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.138</lat>
    <lon>-77.092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63016</plant_id>
    <plant_name>Carolina Lily Solar</plant_name>
    <state>NC</state>
    <county>Davie</county>
    <operator>Carolina Lily Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.956</lat>
    <lon>-80.444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63017</plant_id>
    <plant_name>Ray Wilson Solar</plant_name>
    <state>NC</state>
    <county>Davie</county>
    <operator>Ray Wilson Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.933</lat>
    <lon>-80.376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63047</plant_id>
    <plant_name>W. Orange Rd Solar LLC</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.6026</lat>
    <lon>-72.3418</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63048</plant_id>
    <plant_name>Wilbur Woods Solar LLC</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.6113</lat>
    <lon>-72.3452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63129</plant_id>
    <plant_name>Allis Medina Solar LLC CSG</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.2205</lat>
    <lon>-78.3574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63131</plant_id>
    <plant_name>West Street Solar 1 LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.595</lat>
    <lon>-72.0446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63224</plant_id>
    <plant_name>NY 26 Carthage CSG</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.955471</lat>
    <lon>-75.61807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63270</plant_id>
    <plant_name>Strider Solar, LLC</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.6</lat>
    <lon>-79.79</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63302</plant_id>
    <plant_name>South Windsor Fuel Cell</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>South Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.815417</lat>
    <lon>-72.61438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63332</plant_id>
    <plant_name>Aulander Hwy 42 Solar, LLC</plant_name>
    <state>NC</state>
    <county>Hertford</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.248563</lat>
    <lon>-77.08524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63338</plant_id>
    <plant_name>Granby Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Granby Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>42.22712</lat>
    <lon>-72.5222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63370</plant_id>
    <plant_name>GSSP Schneider LLC</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.529535</lat>
    <lon>-94.29745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63373</plant_id>
    <plant_name>Saratoga Solar LLC</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.07377</lat>
    <lon>-73.90395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63377</plant_id>
    <plant_name>ESA Hamlet NC , LLC</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.879581</lat>
    <lon>-79.67328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63383</plant_id>
    <plant_name>ATOOD Solar IV, LLC</plant_name>
    <state>NC</state>
    <county>Brunswick</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.27532</lat>
    <lon>-78.06102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63411</plant_id>
    <plant_name>Greenwich Solar 1, LLC CSG</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.0783</lat>
    <lon>-73.5331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63444</plant_id>
    <plant_name>1001 Ebenezer Church Solar</plant_name>
    <state>NC</state>
    <county>Surry</county>
    <operator>1001 Ebenezer Church Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.283819</lat>
    <lon>-80.84342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63449</plant_id>
    <plant_name>Lang Solar Farm</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Lang Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.19587</lat>
    <lon>-77.50276</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63460</plant_id>
    <plant_name>Rock County Wind Fuel, LLC</plant_name>
    <state>MN</state>
    <county>Rock</county>
    <operator>Rock County Wind Fuel, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.641928</lat>
    <lon>-96.26248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63463</plant_id>
    <plant_name>Mohea Solar Energy Center, LLC</plant_name>
    <state>SC</state>
    <county>Cherokee</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.08849</lat>
    <lon>-81.62438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63499</plant_id>
    <plant_name>Choctaw Nation Solar Farm</plant_name>
    <state>OK</state>
    <county>Bryan</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.968856</lat>
    <lon>-96.43458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63500</plant_id>
    <plant_name>Chickasaw Nation Solar Farm</plant_name>
    <state>OK</state>
    <county>Murray</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.47741</lat>
    <lon>-97.10524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63733</plant_id>
    <plant_name>Eros Solar, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.16513</lat>
    <lon>-78.08025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63734</plant_id>
    <plant_name>Ventura Solar, LLC</plant_name>
    <state>NC</state>
    <county>Alexander</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.878809</lat>
    <lon>-81.17712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63826</plant_id>
    <plant_name>POET Biorefining - Jewell</plant_name>
    <state>IA</state>
    <county>Hamilton</county>
    <operator>POET Biorefining - Jewell</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.3284</lat>
    <lon>-93.6623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63844</plant_id>
    <plant_name>Fort Calhoun Community Solar</plant_name>
    <state>NE</state>
    <county>Washington</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.456612</lat>
    <lon>-96.00477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63896</plant_id>
    <plant_name>Fairfield PV - BD Solar Fairfield LLC</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>BD Solar Fairfield LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.634</lat>
    <lon>-69.597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63919</plant_id>
    <plant_name>POET Biorefining LLC - Corning</plant_name>
    <state>IA</state>
    <county>Adams</county>
    <operator>POET Biorefining LLC - Corning</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.966198</lat>
    <lon>-94.79575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63923</plant_id>
    <plant_name>POET Biorefining - Gowrie</plant_name>
    <state>IA</state>
    <county>Webster</county>
    <operator>POET Biorefining - Gowrie</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.319817</lat>
    <lon>-94.28735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63975</plant_id>
    <plant_name>Harrison Solar, LLC</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Harrison Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.984262</lat>
    <lon>-78.52454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63997</plant_id>
    <plant_name>Pine Hill</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.821004</lat>
    <lon>-71.5625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64002</plant_id>
    <plant_name>Buttercup Solar, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.82354</lat>
    <lon>-77.97275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64014</plant_id>
    <plant_name>28 Livermore Hill Road Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>28 Livermore Hill Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.55151</lat>
    <lon>-71.95111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64055</plant_id>
    <plant_name>Wonderful Orchards - New Columbia</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.8249</lat>
    <lon>-120.3179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64062</plant_id>
    <plant_name>Palmyra PV - BD Solar Palmyra LLC</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>BD Solar Palmyra LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.84</lat>
    <lon>-69.31</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64091</plant_id>
    <plant_name>Moore Road Community Solar</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>OYA 2643 Moore Road LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.213</lat>
    <lon>-78.903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64107</plant_id>
    <plant_name>Canton</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Captona Canton LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.145126</lat>
    <lon>-71.13092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64109</plant_id>
    <plant_name>Ravenbrook</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Captona Ravenbrook LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.919675</lat>
    <lon>-70.81942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64110</plant_id>
    <plant_name>Hudson</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Captona Hudson LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.404047</lat>
    <lon>-71.54136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64125</plant_id>
    <plant_name>Podunque Road CSG</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.415067</lat>
    <lon>-78.23753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64128</plant_id>
    <plant_name>Ware Palmer Road Solar LLC CSG</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Ware Palmer Road Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>4.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.247172</lat>
    <lon>-72.27493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64175</plant_id>
    <plant_name>Beth</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.975586</lat>
    <lon>-79.61837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64193</plant_id>
    <plant_name>Moore Solar</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Moore Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.29345</lat>
    <lon>-79.73881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64207</plant_id>
    <plant_name>Crane Battery Energy Storage System</plant_name>
    <state>IN</state>
    <county>Martin</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.813511</lat>
    <lon>-86.88642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64220</plant_id>
    <plant_name>Wonderful Orchards - Westside</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.73277</lat>
    <lon>-119.7452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64221</plant_id>
    <plant_name>Wonderful Orchards - Belridge</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.50012</lat>
    <lon>-119.7494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64310</plant_id>
    <plant_name>Corning Riverview (CSG)</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.001066</lat>
    <lon>-78.91407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64363</plant_id>
    <plant_name>ESA Boston Solar, LLC</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.486008</lat>
    <lon>-78.92177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64366</plant_id>
    <plant_name>Trojan Solar, LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.312472</lat>
    <lon>-78.20425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64371</plant_id>
    <plant_name>Cortlandville I Solar CSG</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>DG New York CS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.606794</lat>
    <lon>-76.15449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64372</plant_id>
    <plant_name>Sangerfield Solar CSG</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>DG New York CS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.924419</lat>
    <lon>-75.42005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64373</plant_id>
    <plant_name>Clay Solar CSG</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>DG New York CS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.194525</lat>
    <lon>-76.21195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64385</plant_id>
    <plant_name>Gliden (Op Zone)</plant_name>
    <state>NC</state>
    <county>Chowan</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.30161</lat>
    <lon>-76.60357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64392</plant_id>
    <plant_name>Branch Solar Farm</plant_name>
    <state>AR</state>
    <county>Franklin</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.306183</lat>
    <lon>-93.92576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64400</plant_id>
    <plant_name>BYU - Hawaii</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <battery_mwh>1.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>21.640774</lat>
    <lon>-157.9251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64471</plant_id>
    <plant_name>Byron Highway Solar</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>RPCA Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.847114</lat>
    <lon>-121.6173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64527</plant_id>
    <plant_name>Flatwood Farm</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.588</lat>
    <lon>-79.0323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64542</plant_id>
    <plant_name>Coxsackie Solar</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>FPS Coxsackie Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.33337</lat>
    <lon>-73.8475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64552</plant_id>
    <plant_name>Downtown Generation Plant</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>City of Greenfield - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.30399</lat>
    <lon>-94.46049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64556</plant_id>
    <plant_name>Bright Hill Solar LLC(CSG)</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.46723</lat>
    <lon>-77.70378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64557</plant_id>
    <plant_name>River Valley LLC (NY) (CSG)</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.06724</lat>
    <lon>-78.47783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64560</plant_id>
    <plant_name>Tioga Solar South(CSG)</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>237 State Route 96 Site 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.14134</lat>
    <lon>-76.28797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64561</plant_id>
    <plant_name>Tioga Solar North(CSG)</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>237 State Route 96 Site 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.14134</lat>
    <lon>-76.28797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64588</plant_id>
    <plant_name>Adirondack A+B Community Solar Garden</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>BWC Connecticut River LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.679012</lat>
    <lon>-71.11106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64593</plant_id>
    <plant_name>Bellisario Solar 1</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>Lapeer-Cortland Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.449783</lat>
    <lon>-76.12112</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64594</plant_id>
    <plant_name>Bellisario Solar 2</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>Lapeer-Cortland Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.451944</lat>
    <lon>-76.12112</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64595</plant_id>
    <plant_name>Bellisario Solar 3</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>Lapeer-Cortland Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.452956</lat>
    <lon>-76.13176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64676</plant_id>
    <plant_name>Lake Herman</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.0971</lat>
    <lon>-122.1417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64677</plant_id>
    <plant_name>Ryland Road Solar</plant_name>
    <state>NC</state>
    <county>Chowan</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.27585</lat>
    <lon>-76.64867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64678</plant_id>
    <plant_name>Windsor Hwy 17 Solar</plant_name>
    <state>NC</state>
    <county>Bertie</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.021253</lat>
    <lon>-76.87244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64679</plant_id>
    <plant_name>Hamlin Solar 1, LLC</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.30141</lat>
    <lon>-77.94429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64680</plant_id>
    <plant_name>Clifton Park Solar 1, LLC</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.839013</lat>
    <lon>-73.83472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64715</plant_id>
    <plant_name>Dusenberry</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.7677</lat>
    <lon>-73.6247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64716</plant_id>
    <plant_name>Knapp East (CSG)</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.0134</lat>
    <lon>-78.4601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64717</plant_id>
    <plant_name>Main Rd Community Solar</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.9976</lat>
    <lon>-78.5047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64720</plant_id>
    <plant_name>Knapp West(CSG)</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.0148</lat>
    <lon>-78.4609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64721</plant_id>
    <plant_name>Rowe (CSG)</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.0687</lat>
    <lon>-78.3752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64722</plant_id>
    <plant_name>Redman South Community Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.2743</lat>
    <lon>-77.965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64724</plant_id>
    <plant_name>Townline Community Solar</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.0421</lat>
    <lon>-78.1337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64743</plant_id>
    <plant_name>Tierra Buena Energy Storage</plant_name>
    <state>CA</state>
    <county>Sutter</county>
    <operator>VESI 10 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.17133</lat>
    <lon>-121.6621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64747</plant_id>
    <plant_name>Fuel Cell 3245 Yates Avenue</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Bronx Community Clean Energy Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.87317</lat>
    <lon>-73.85519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64882</plant_id>
    <plant_name>Woodfin Solar</plant_name>
    <state>NC</state>
    <county>Buncombe</county>
    <operator>Duke Energy Progress - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.660109</lat>
    <lon>-82.59838</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65084</plant_id>
    <plant_name>Pitkin County Solar</plant_name>
    <state>CO</state>
    <county>Pitkin</county>
    <operator>Coolangatta Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.247705</lat>
    <lon>-106.8768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65090</plant_id>
    <plant_name>Cortlandville III Solar CSG</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>DG Empire Shine, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.60575</lat>
    <lon>-76.13247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65112</plant_id>
    <plant_name>River Road</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Norridgewock River Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.74111</lat>
    <lon>-69.76286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65142</plant_id>
    <plant_name>Bristol Landfill Solar</plant_name>
    <state>RI</state>
    <county>Bristol</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.727627</lat>
    <lon>-71.28849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65156</plant_id>
    <plant_name>ASA DeKalb NY Solar I LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>ASA DeKalb NY Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.492092</lat>
    <lon>-75.2448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65159</plant_id>
    <plant_name>ASA Volney NY Solar I LLC</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>ASA Volney NY Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.328217</lat>
    <lon>-76.359</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65239</plant_id>
    <plant_name>AE-ESS NWS 1, LLC</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <battery_mwh>24.6</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.74041</lat>
    <lon>-73.95107</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65240</plant_id>
    <plant_name>Maysville BESS</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.851782</lat>
    <lon>-77.18158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65241</plant_id>
    <plant_name>McKinney BESS</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.905833</lat>
    <lon>-79.75702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65242</plant_id>
    <plant_name>Charlemont A</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>3.8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.642</lat>
    <lon>-72.896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65245</plant_id>
    <plant_name>Rocky Point BESS</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.475294</lat>
    <lon>-77.82995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65246</plant_id>
    <plant_name>Walkers Crossroads BESS</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.925227</lat>
    <lon>-78.50515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65247</plant_id>
    <plant_name>Zion Hill BESS</plant_name>
    <state>NC</state>
    <county>Brunswick</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.993923</lat>
    <lon>-78.22455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65249</plant_id>
    <plant_name>Docs Road BESS</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.323928</lat>
    <lon>-78.9975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65250</plant_id>
    <plant_name>Five Points BESS</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.632465</lat>
    <lon>-79.68196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65298</plant_id>
    <plant_name>DOCCS Eastern</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>DOCCS Eastern</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.738928</lat>
    <lon>-74.36863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65299</plant_id>
    <plant_name>DOCCS Wende</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>DOCCS Wende</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.929982</lat>
    <lon>-78.55481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65309</plant_id>
    <plant_name>Millersport GM 1</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.99208</lat>
    <lon>-78.79084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65337</plant_id>
    <plant_name>Maybrook Solar, LLC (CSG)</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.463056</lat>
    <lon>-74.24778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65342</plant_id>
    <plant_name>Gorham Solar 1 (CSG)</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.660252</lat>
    <lon>-70.4105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65378</plant_id>
    <plant_name>OYA Robinson Road</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.26323</lat>
    <lon>-75.99105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65434</plant_id>
    <plant_name>OYA Wayside Drive</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.017</lat>
    <lon>-75.922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65436</plant_id>
    <plant_name>OYA Main Street</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>OYA Main Street LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.875</lat>
    <lon>-77.877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65459</plant_id>
    <plant_name>OYA Church Road</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>OYA Church Road A LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.19133</lat>
    <lon>-76.38954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65461</plant_id>
    <plant_name>Unity Solar</plant_name>
    <state>ME</state>
    <county>Waldo</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.598</lat>
    <lon>-69.357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65502</plant_id>
    <plant_name>Beaker</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.597904</lat>
    <lon>-77.60944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65506</plant_id>
    <plant_name>Gladstone Farm</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.213491</lat>
    <lon>-79.55714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65530</plant_id>
    <plant_name>Portage Industrial Battery</plant_name>
    <state>WI</state>
    <county>Columbia</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.552111</lat>
    <lon>-89.48773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65531</plant_id>
    <plant_name>Deer Run Battery</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.951256</lat>
    <lon>-91.69405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65532</plant_id>
    <plant_name>Baldwin (ME)</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Maine DG Solar Baldwin, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.79322</lat>
    <lon>-70.75685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65534</plant_id>
    <plant_name>Monmouth</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Maine DG Solar Monmouth, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.192188</lat>
    <lon>-70.02169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65547</plant_id>
    <plant_name>Wedge</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.416191</lat>
    <lon>-77.9192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65548</plant_id>
    <plant_name>Truman (NC)</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.713283</lat>
    <lon>-78.32689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65549</plant_id>
    <plant_name>Trent River Farm</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.059582</lat>
    <lon>-77.18659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65551</plant_id>
    <plant_name>Sneads Grove</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.79217</lat>
    <lon>-79.46581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65552</plant_id>
    <plant_name>Henry Farm</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.859618</lat>
    <lon>-79.57791</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65553</plant_id>
    <plant_name>Kalish Farm Solar</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.308176</lat>
    <lon>-79.72054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65554</plant_id>
    <plant_name>Kendall Farm</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.850341</lat>
    <lon>-79.55502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65555</plant_id>
    <plant_name>Peake Road</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.271819</lat>
    <lon>-78.654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65566</plant_id>
    <plant_name>Bradford Solar</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Bradford Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.751153</lat>
    <lon>-71.09445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65567</plant_id>
    <plant_name>Smith Solar Farm</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.775083</lat>
    <lon>-79.55841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65587</plant_id>
    <plant_name>RT32 Westerlo Solar 1</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>RT32 Westerlo Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.44623</lat>
    <lon>-74.01607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65624</plant_id>
    <plant_name>Union Springs 40</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.85</lat>
    <lon>-76.65</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65625</plant_id>
    <plant_name>Union Springs 963</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.85</lat>
    <lon>-76.65</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65626</plant_id>
    <plant_name>North Eagle Village Solar</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.05</lat>
    <lon>-75.95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65627</plant_id>
    <plant_name>Green Lakes Solar</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.05</lat>
    <lon>-75.95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65628</plant_id>
    <plant_name>Judd Road Solar</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.15</lat>
    <lon>-75.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65643</plant_id>
    <plant_name>Castleton</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.523</lat>
    <lon>-73.703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65667</plant_id>
    <plant_name>East Windsor Solar One</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>DG Connecticut III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.89</lat>
    <lon>-72.518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65717</plant_id>
    <plant_name>Settlers Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Settlers Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.60734</lat>
    <lon>-71.76125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65720</plant_id>
    <plant_name>Woodland Avenue Solar 1</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Woodland Avenue Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.8884</lat>
    <lon>-71.31839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65721</plant_id>
    <plant_name>RT405 Westerlo Solar 2</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>RT405 Westerlo Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.44506</lat>
    <lon>-74.01609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65723</plant_id>
    <plant_name>LR Wheatfield Solar 1</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>LR Wheatfield Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.12163</lat>
    <lon>-78.91409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65724</plant_id>
    <plant_name>Pendleton Solar 1</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Pendleton Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.09723</lat>
    <lon>-78.75382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65753</plant_id>
    <plant_name>ELP Greenport CSG</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.237</lat>
    <lon>-73.782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65754</plant_id>
    <plant_name>ELP Kinderhook CSG</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.464</lat>
    <lon>-73.691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65826</plant_id>
    <plant_name>Day Hollow Road Community Solar</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.113052</lat>
    <lon>-76.17806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65827</plant_id>
    <plant_name>Halsey Lane Solar Community Solar</plant_name>
    <state>NY</state>
    <county>Seneca</county>
    <operator>NY Lodi I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.603975</lat>
    <lon>-76.83834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65858</plant_id>
    <plant_name>Dynamic Corinth (CSG)</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.011548</lat>
    <lon>-69.0267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65859</plant_id>
    <plant_name>Dynamic Madison (CSG)</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.791662</lat>
    <lon>-69.7374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65945</plant_id>
    <plant_name>Brookville Smart Bus Depot Microgrid</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>AlphaStruxure Service Co LP</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Solar Photovoltaic; Batteries</technologies>
    <generators>5</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>4.3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2024</latest_year>
    <lat>38.99903</lat>
    <lon>-77.058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65954</plant_id>
    <plant_name>Kearsarge West Shore Solar LLC</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>Kearsarge West Shore Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.6202</lat>
    <lon>-71.26842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66034</plant_id>
    <plant_name>Sugar Hill Solar 1</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Sugar Hill Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.83259</lat>
    <lon>-73.84255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66041</plant_id>
    <plant_name>Eureka South Solar</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Eureka South Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.13071</lat>
    <lon>-75.41617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66055</plant_id>
    <plant_name>Cathcart Solar, LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Modal Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.333898</lat>
    <lon>-78.75281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66061</plant_id>
    <plant_name>Angelica Solar Site 1</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>NSF Angelica Site 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.30639</lat>
    <lon>-78.07039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66062</plant_id>
    <plant_name>Angelica Solar Site 2</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>NSF Angelica Site 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.304408</lat>
    <lon>-78.07668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66063</plant_id>
    <plant_name>Angelica Solar Site 3</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>NSF Angelica Site 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.301546</lat>
    <lon>-78.07492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66064</plant_id>
    <plant_name>Angelica Solar Site 4</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>NSF Angelica Site 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.303015</lat>
    <lon>-78.07092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66100</plant_id>
    <plant_name>Water Street Solar</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.2424</lat>
    <lon>-69.7543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66115</plant_id>
    <plant_name>HCE Amelia Solar I, LLC</plant_name>
    <state>VA</state>
    <county>Amelia</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.45383</lat>
    <lon>-77.95682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66116</plant_id>
    <plant_name>HCE Amelia Solar II, LLC</plant_name>
    <state>VA</state>
    <county>Amelia</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.481141</lat>
    <lon>-77.96789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66117</plant_id>
    <plant_name>HCE Millboro Springs Solar, LLC</plant_name>
    <state>VA</state>
    <county>Bath</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.99997</lat>
    <lon>-79.56874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66119</plant_id>
    <plant_name>HCE Powhatan Solar, LLC</plant_name>
    <state>VA</state>
    <county>Powhatan</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.52885</lat>
    <lon>-77.95977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66120</plant_id>
    <plant_name>HCE Reams Solar, LLC</plant_name>
    <state>VA</state>
    <county>Dinwiddie</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.09028</lat>
    <lon>-77.48346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66121</plant_id>
    <plant_name>HCE Red House Solar, LLC</plant_name>
    <state>VA</state>
    <county>Charlotte</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.18378</lat>
    <lon>-78.81415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66136</plant_id>
    <plant_name>AES Daigle Solar, LLC</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>47.2779</lat>
    <lon>-68.5713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66144</plant_id>
    <plant_name>Smithfield 1</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.3881</lat>
    <lon>-112.9946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66166</plant_id>
    <plant_name>South Street - Middlebury</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Bowser Road Solar Project 2021, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.986404</lat>
    <lon>-73.17487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66169</plant_id>
    <plant_name>Cortez Solar 2, LLC</plant_name>
    <state>CO</state>
    <county>Montezuma</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.378286</lat>
    <lon>-108.6149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66182</plant_id>
    <plant_name>Town of Amherst Solar</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.356</lat>
    <lon>-72.479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66206</plant_id>
    <plant_name>Mohawk View Solar</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Mohawk View Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.9412</lat>
    <lon>-74.37218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66207</plant_id>
    <plant_name>Van Epps Solar</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Van Epps Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.93404</lat>
    <lon>-74.3782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66209</plant_id>
    <plant_name>Bantam Solar</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.070426</lat>
    <lon>-74.73077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66212</plant_id>
    <plant_name>Canoga Solar</plant_name>
    <state>NY</state>
    <county>Seneca</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.85206</lat>
    <lon>-76.8001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66214</plant_id>
    <plant_name>County Route 84 Solar</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.027157</lat>
    <lon>-77.58255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66215</plant_id>
    <plant_name>Cafferty Hill Solar</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.081843</lat>
    <lon>-76.11289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66219</plant_id>
    <plant_name>Dunkleman Solar</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.35131</lat>
    <lon>-78.84824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66220</plant_id>
    <plant_name>Finney Solar</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.979546</lat>
    <lon>-74.27508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66221</plant_id>
    <plant_name>Henrietta Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.021133</lat>
    <lon>-77.7068</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66225</plant_id>
    <plant_name>NY70 Solar</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.552187</lat>
    <lon>-77.96799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66230</plant_id>
    <plant_name>State Route 14A Solar</plant_name>
    <state>NY</state>
    <county>Yates</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.740808</lat>
    <lon>-77.07242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66233</plant_id>
    <plant_name>West Creek Solar</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.192559</lat>
    <lon>-76.25935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66236</plant_id>
    <plant_name>Wildflower Way Solar</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.358381</lat>
    <lon>-77.30423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66248</plant_id>
    <plant_name>Butterfield Solar Farm</plant_name>
    <state>OK</state>
    <county>Bryan</county>
    <operator>Oklahoma Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.96895</lat>
    <lon>-96.43461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66256</plant_id>
    <plant_name>Source Power Company - Aldrich</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Morristown Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.534193</lat>
    <lon>-75.65947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66259</plant_id>
    <plant_name>Source Power NY III - Medina II (CSG)</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>TJA-NY-11202 Ridge Rd Medina, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.267674</lat>
    <lon>-78.39954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66272</plant_id>
    <plant_name>RIC - Hanover (CSG)</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.55</lat>
    <lon>-79.15</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66273</plant_id>
    <plant_name>Summit - Cicero</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.2</lat>
    <lon>-76.12</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66322</plant_id>
    <plant_name>Summit - Scriba CSG</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.46</lat>
    <lon>-76.46472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66345</plant_id>
    <plant_name>Elk Solar LLC</plant_name>
    <state>NC</state>
    <county>Hoke</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.983948</lat>
    <lon>-79.27671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66352</plant_id>
    <plant_name>Longleaf Pine Solar LLC</plant_name>
    <state>NC</state>
    <county>Davie</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.97964</lat>
    <lon>-80.45767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66356</plant_id>
    <plant_name>Williams Solar LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.27917</lat>
    <lon>-78.3704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66361</plant_id>
    <plant_name>Royal Solar Partners (CSG)</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Royal Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.656306</lat>
    <lon>-75.49844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66372</plant_id>
    <plant_name>Overhill Solar</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.98247</lat>
    <lon>-78.31906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66373</plant_id>
    <plant_name>Polk Farm</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.922572</lat>
    <lon>-79.65445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66374</plant_id>
    <plant_name>Selwyn Farm</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.974485</lat>
    <lon>-79.99161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66375</plant_id>
    <plant_name>Shieldwall Solar</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.455422</lat>
    <lon>-77.88511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66377</plant_id>
    <plant_name>Gray Fox Solar LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.862599</lat>
    <lon>-79.14071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66380</plant_id>
    <plant_name>SCS Penfield One 010750 Penfield, LLC</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.134</lat>
    <lon>-77.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66386</plant_id>
    <plant_name>Albion A</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>NY USLE Albion Long Bridge A LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.22669</lat>
    <lon>-78.28802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66387</plant_id>
    <plant_name>Oswego</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>NY USLE Oswego SR104 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.472383</lat>
    <lon>-76.34096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66424</plant_id>
    <plant_name>ELP Livingston Solar</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>ELP Livingston Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.169</lat>
    <lon>-73.76708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66425</plant_id>
    <plant_name>ELP Claverack Solar</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>ELP Claverack Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.248364</lat>
    <lon>-73.73802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66442</plant_id>
    <plant_name>LSE Musca Solar</plant_name>
    <state>NY</state>
    <county>Schuyler</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.30895</lat>
    <lon>-77.0403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66447</plant_id>
    <plant_name>Westport Stone &amp; Sand Solar (CSG)</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.621053</lat>
    <lon>-71.05525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66457</plant_id>
    <plant_name>Apple Staten Island - Industrial Loop</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.552176</lat>
    <lon>-74.23257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66460</plant_id>
    <plant_name>Apple Staten Island - Winant Place</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.536563</lat>
    <lon>-74.24094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66465</plant_id>
    <plant_name>Spring Hope Solar 2, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Spring Hope Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.90708</lat>
    <lon>-78.19376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66483</plant_id>
    <plant_name>Stanford</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.865</lat>
    <lon>-73.703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66487</plant_id>
    <plant_name>Moyer Solar</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Moyer Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.419826</lat>
    <lon>-79.9071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66490</plant_id>
    <plant_name>Bullitt Farm Solar</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.19567</lat>
    <lon>-75.26312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66495</plant_id>
    <plant_name>Magruder Solar Community Solar</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Magruder Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.602936</lat>
    <lon>-74.1377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66504</plant_id>
    <plant_name>Sunnyside 1 Solar</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Solar DG NY Sunnyside 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.836275</lat>
    <lon>-73.94395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66521</plant_id>
    <plant_name>Afton Solar</plant_name>
    <state>NY</state>
    <county>Chenango</county>
    <operator>Afton Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.242298</lat>
    <lon>-75.53364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66522</plant_id>
    <plant_name>Amherst Community Solar</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Amherst Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.049931</lat>
    <lon>-78.74605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66523</plant_id>
    <plant_name>NY Beaver Dams Dix 1239 Duvall Rd Solar</plant_name>
    <state>NY</state>
    <county>Schuyler</county>
    <operator>Solitude Solar Dix Duvall Rd Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.294646</lat>
    <lon>-76.94717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66524</plant_id>
    <plant_name>Greene Community Solar</plant_name>
    <state>NY</state>
    <county>Chenango</county>
    <operator>Greene Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.252071</lat>
    <lon>-75.82642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66525</plant_id>
    <plant_name>NY Fredonia 9824 Route 60 Solar</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>SL Fredonia, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.431064</lat>
    <lon>-79.30247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66526</plant_id>
    <plant_name>NY Geneseo 3240 W Lake Rd Solar</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>NYSolar03 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.847208</lat>
    <lon>-77.71827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66527</plant_id>
    <plant_name>NY Grand Island 871 Whitehaven Rd Solar</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Grand Island Sunrise LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.027501</lat>
    <lon>-78.92066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66528</plant_id>
    <plant_name>NY Lancaster Gunnville Rd Site 1 Solar C</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>AC Power 14, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.952629</lat>
    <lon>-78.61796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66583</plant_id>
    <plant_name>Phillips Route 82 Solar LLC</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Phillips Route 82 Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.65</lat>
    <lon>-73.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66585</plant_id>
    <plant_name>French King Solar LLC</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>French King Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.5945</lat>
    <lon>-72.4895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66586</plant_id>
    <plant_name>DOCCS Greene</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>Green Correctional Coxsackie NY Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.35</lat>
    <lon>-73.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66602</plant_id>
    <plant_name>Beckwith Solar</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Beckwith Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.151927</lat>
    <lon>-78.89158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66605</plant_id>
    <plant_name>Arthur 2 Solar</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Arthur Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.172948</lat>
    <lon>-78.83556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66700</plant_id>
    <plant_name>Banner Solar</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.413724</lat>
    <lon>-78.55542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66710</plant_id>
    <plant_name>Brick City Solar</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.726402</lat>
    <lon>-77.98345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66711</plant_id>
    <plant_name>Clovelly Solar</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.416929</lat>
    <lon>-78.77325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66712</plant_id>
    <plant_name>Coogee Solar</plant_name>
    <state>NC</state>
    <county>Pamlico</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.150766</lat>
    <lon>-76.8236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66720</plant_id>
    <plant_name>Oakwood Solar</plant_name>
    <state>NC</state>
    <county>Orange</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.090512</lat>
    <lon>-79.23319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66721</plant_id>
    <plant_name>Overman Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.299225</lat>
    <lon>-78.07718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66722</plant_id>
    <plant_name>Saw Solar</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.556436</lat>
    <lon>-80.6518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66725</plant_id>
    <plant_name>Whiskey Solar</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>PGRP Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.273434</lat>
    <lon>-79.73631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66727</plant_id>
    <plant_name>Georgia Ballard BESS</plant_name>
    <state>VT</state>
    <county>Franklin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.697674</lat>
    <lon>-73.12467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66728</plant_id>
    <plant_name>Springfield BESS</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.329411</lat>
    <lon>-72.5241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66749</plant_id>
    <plant_name>Herrington Solar</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Herrington Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.873378</lat>
    <lon>-73.62203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66765</plant_id>
    <plant_name>SCH County - (2B) 4982 Rynex Corners Rd</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.884182</lat>
    <lon>-74.08078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66769</plant_id>
    <plant_name>Source Power Company - Silver Creek</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.517279</lat>
    <lon>-79.22132</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66777</plant_id>
    <plant_name>Geneseo Solar</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>Helios Energy New York 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.821</lat>
    <lon>-77.72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66822</plant_id>
    <plant_name>Carthage A</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>NY USLE Carthage SR26 A LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.997512</lat>
    <lon>-75.66294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66828</plant_id>
    <plant_name>FFP - NY Game Farm CSG</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.012763</lat>
    <lon>-76.00873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66829</plant_id>
    <plant_name>FFP - NY Werner CSG</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.966063</lat>
    <lon>-77.68387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66856</plant_id>
    <plant_name>NY Sorrell Hill II CSG</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>DG Empire Lumen 2023, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.14672</lat>
    <lon>-76.35467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66874</plant_id>
    <plant_name>Cenergy - Pulk</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>BAP Grounded 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.107288</lat>
    <lon>-70.11036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66876</plant_id>
    <plant_name>Cenergy - Waterville (CSG)</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Luminace Sunbeam Development Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.538719</lat>
    <lon>-69.66888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66878</plant_id>
    <plant_name>Cenergy - Wiscasset (CSG)</plant_name>
    <state>ME</state>
    <county>Lincoln</county>
    <operator>Luminace Sunbeam Development Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.964548</lat>
    <lon>-69.70476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66940</plant_id>
    <plant_name>Halsey Valley</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>LSE Pegasus LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.069077</lat>
    <lon>-76.35324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66962</plant_id>
    <plant_name>ME Novel Lighthouse - Carrabassett</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Luminace Sunbeam Development Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.101453</lat>
    <lon>-70.34123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66996</plant_id>
    <plant_name>Hemings Solar</plant_name>
    <state>VA</state>
    <county>Richmond</county>
    <operator>Hemings Solar Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.957975</lat>
    <lon>-76.81883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67029</plant_id>
    <plant_name>Henry Gibson Solar</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Henry Gibson Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.780905</lat>
    <lon>-79.56957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67035</plant_id>
    <plant_name>NY SHERMAN 191 W MAIN ST - SL 2</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>SL Sherman II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.156051</lat>
    <lon>-79.60161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67043</plant_id>
    <plant_name>Double Creek</plant_name>
    <state>NC</state>
    <county>Stokes</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.413913</lat>
    <lon>-80.41</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67044</plant_id>
    <plant_name>Fairfield Harbor</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.15122</lat>
    <lon>-76.99299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67045</plant_id>
    <plant_name>NY Avon I CSG</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>DG Empire Sun, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.9002</lat>
    <lon>-77.7295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67056</plant_id>
    <plant_name>Ledgeview</plant_name>
    <state>WI</state>
    <county>Fond Du Lac</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.779832</lat>
    <lon>-88.34653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67061</plant_id>
    <plant_name>Fort Fairfield</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>46.773222</lat>
    <lon>-67.85083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67100</plant_id>
    <plant_name>Byrne Solar, LLC</plant_name>
    <state>MI</state>
    <county>Kent</county>
    <operator>Byrne Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.044306</lat>
    <lon>-85.39025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67138</plant_id>
    <plant_name>White Stone Ocran Solar LLC Community So</plant_name>
    <state>VA</state>
    <county>Lancaster</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.6529</lat>
    <lon>-76.3888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67141</plant_id>
    <plant_name>Kendall DG Solar</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>DG Kendall, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.328613</lat>
    <lon>-78.07082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67155</plant_id>
    <plant_name>Our Katahdin</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.650357</lat>
    <lon>-68.70798</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67169</plant_id>
    <plant_name>Bear Creek Solar (Orinda)</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Solar Star Bear Creek, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.919197</lat>
    <lon>-122.1863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67186</plant_id>
    <plant_name>Holden BESS 1</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Holden BESS 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>22.4</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.338797</lat>
    <lon>-71.83864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67194</plant_id>
    <plant_name>ME - EDFR - Phase I - Bristol</plant_name>
    <state>ME</state>
    <county>Lincoln</county>
    <operator>Overlook Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.965641</lat>
    <lon>-69.51811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67212</plant_id>
    <plant_name>Sweden 1</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Helios Energy New York 3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.17</lat>
    <lon>-77.941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67228</plant_id>
    <plant_name>Broadway CDG Solar LLC</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Broadway CDG Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.904125</lat>
    <lon>-78.71426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67235</plant_id>
    <plant_name>Cunningham Solar LLC</plant_name>
    <state>VA</state>
    <county>Fluvanna</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.8893</lat>
    <lon>-78.323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67248</plant_id>
    <plant_name>McCormick NY CSG LLC</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>McCormick NY CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.153</lat>
    <lon>-77.806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67286</plant_id>
    <plant_name>Athens AT01</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.9485</lat>
    <lon>-69.6523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67295</plant_id>
    <plant_name>Source Power NY II - Locust 1</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>Locust Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.613905</lat>
    <lon>-76.16685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67333</plant_id>
    <plant_name>Standish</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.7511</lat>
    <lon>-70.5466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67335</plant_id>
    <plant_name>Tiffany</plant_name>
    <state>NY</state>
    <county>Chenango</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.58319</lat>
    <lon>-75.47034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67336</plant_id>
    <plant_name>Town House</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.28</lat>
    <lon>-69.74456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67338</plant_id>
    <plant_name>Ver Plank South (CSG)</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.194602</lat>
    <lon>-76.17513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67349</plant_id>
    <plant_name>ME-EDFR-Phase I-Woolwich</plant_name>
    <state>ME</state>
    <county>Sagadahoc</county>
    <operator>Green Mile Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.93795</lat>
    <lon>-69.78418</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67350</plant_id>
    <plant_name>ME-EDFR-Phase I-Embden</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Tower Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.949</lat>
    <lon>-69.87913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67361</plant_id>
    <plant_name>Dove Solar CSG</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.318</lat>
    <lon>-104.8914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67362</plant_id>
    <plant_name>Lark Bunting Solar CSG</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.311735</lat>
    <lon>-104.7714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67364</plant_id>
    <plant_name>BecLee Solar CSG</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.47111</lat>
    <lon>-104.6514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67373</plant_id>
    <plant_name>TPE Irish Road Solar, LLC</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.727159</lat>
    <lon>-79.50649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67374</plant_id>
    <plant_name>TPE Whitmell Solar, LLC</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.727159</lat>
    <lon>-79.50649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67375</plant_id>
    <plant_name>BWC Beech Ridge Brook, LLC</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.614962</lat>
    <lon>-70.40802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67400</plant_id>
    <plant_name>North Bridgton</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.1012</lat>
    <lon>-70.70577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67411</plant_id>
    <plant_name>Exeter Mail CSG</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.53216</lat>
    <lon>-71.5597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67412</plant_id>
    <plant_name>Geer Road Solar 2 CSG</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.36</lat>
    <lon>-73.563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67413</plant_id>
    <plant_name>Geer Road Solar 3 CSG</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.354</lat>
    <lon>-73.571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67414</plant_id>
    <plant_name>Princetown Solar 1</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.78</lat>
    <lon>-74.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67415</plant_id>
    <plant_name>County Highway Solar 1 CSG</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.992</lat>
    <lon>-74.313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67416</plant_id>
    <plant_name>County Highway Solar 2 (CSG)</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.993</lat>
    <lon>-74.311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67418</plant_id>
    <plant_name>Geer Road Solar 1 CSG</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.356</lat>
    <lon>-73.566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67426</plant_id>
    <plant_name>Wolcott Hill (Camden) (CSG)</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.350259</lat>
    <lon>-75.72924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67427</plant_id>
    <plant_name>BNRG Masardis (CSG)</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.53099</lat>
    <lon>-68.33932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67437</plant_id>
    <plant_name>North Woods (CSG)</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.6177</lat>
    <lon>-75.1622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67438</plant_id>
    <plant_name>Oakland</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.57221</lat>
    <lon>-69.6917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67448</plant_id>
    <plant_name>Quarry</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.33777</lat>
    <lon>-70.73331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67449</plant_id>
    <plant_name>Ryans Ranch</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.179791</lat>
    <lon>-70.51458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67451</plant_id>
    <plant_name>Sanford CGA</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.43216</lat>
    <lon>-70.71432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67453</plant_id>
    <plant_name>Shaker</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.89492</lat>
    <lon>-70.34346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67465</plant_id>
    <plant_name>CBEP Solar 1, LLC</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.665825</lat>
    <lon>-103.2035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67467</plant_id>
    <plant_name>CBEP Solar 5, LLC</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.340485</lat>
    <lon>-104.8817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67468</plant_id>
    <plant_name>GSPP 7024 Fox Rd, LLC</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.200586</lat>
    <lon>-75.25808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67472</plant_id>
    <plant_name>GSPP 126 Little Bow Rd S, LLC</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.344964</lat>
    <lon>-75.48606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67477</plant_id>
    <plant_name>Pulpit Hill</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>LSE Fornax LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.410571</lat>
    <lon>-72.53117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67499</plant_id>
    <plant_name>Brewer (CSG)</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.7977</lat>
    <lon>-68.7146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67530</plant_id>
    <plant_name>Waynesboro Bridge Solar, LLC Community S</plant_name>
    <state>VA</state>
    <county>Augusta</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.102168</lat>
    <lon>-78.92343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67532</plant_id>
    <plant_name>Fairfield Lee Solar, LLC Community Solar</plant_name>
    <state>VA</state>
    <county>Rockbridge</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.878085</lat>
    <lon>-79.39692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67571</plant_id>
    <plant_name>NY Newark St Rt 31 - Environomics S1</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Catalyze Newark Solar Farm 1 Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.03497</lat>
    <lon>-77.14838</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67574</plant_id>
    <plant_name>Sunnyside 2 Solar</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Solar DG NY Sunnyside 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.836275</lat>
    <lon>-73.94395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67582</plant_id>
    <plant_name>Collins (NY) (CSG)</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Azimuth 180 Solar Electric, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.27</lat>
    <lon>-75.19</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67592</plant_id>
    <plant_name>NSF Aurelius Site 1 LLC</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>NSF Energy One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.92211</lat>
    <lon>-76.60788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67593</plant_id>
    <plant_name>NSF Aurelius Site 2, LLC</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>NSF Energy One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.92269</lat>
    <lon>-76.60255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67594</plant_id>
    <plant_name>NSF Aurelius Site 3 LLC</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>NSF Energy One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.91942</lat>
    <lon>-76.60775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67599</plant_id>
    <plant_name>NY ALTONA MAYOTT - Environomics P1</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Catalyze Pombrio Solar Farm 1 Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.878445</lat>
    <lon>-73.58349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67600</plant_id>
    <plant_name>NY ALTONA MAYOTT - Environomics P2</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Catalyze Pombrio Solar Farm 2 Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.878445</lat>
    <lon>-73.58349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67604</plant_id>
    <plant_name>NSF Torrey Site 3</plant_name>
    <state>NY</state>
    <county>Yates</county>
    <operator>NSF Torrey Site 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.659</lat>
    <lon>-76.927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67605</plant_id>
    <plant_name>NSF Torrey Site 2</plant_name>
    <state>NY</state>
    <county>Yates</county>
    <operator>NSF Torrey Site 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.659</lat>
    <lon>-76.931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67615</plant_id>
    <plant_name>Krumkill Road Solar North, LLC</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.66627</lat>
    <lon>-73.85647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67620</plant_id>
    <plant_name>Ridgeway 1</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.189133</lat>
    <lon>-77.74272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67634</plant_id>
    <plant_name>Buck Run</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.282648</lat>
    <lon>-77.96581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67635</plant_id>
    <plant_name>Dakota</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.389211</lat>
    <lon>-89.48509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67636</plant_id>
    <plant_name>Galt</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.784441</lat>
    <lon>-89.76102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67640</plant_id>
    <plant_name>Meltwater</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.068278</lat>
    <lon>-75.94744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67642</plant_id>
    <plant_name>Skyline</plant_name>
    <state>IL</state>
    <county>Christian</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.563746</lat>
    <lon>-89.27005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67644</plant_id>
    <plant_name>Towanda</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.434241</lat>
    <lon>-89.06233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67646</plant_id>
    <plant_name>Walldog</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.913454</lat>
    <lon>-88.64291</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67679</plant_id>
    <plant_name>NY FONDA 182 BOSHART RD - Montgomery 1</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>NY CDG Montgomery 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.965485</lat>
    <lon>-74.37945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67693</plant_id>
    <plant_name>Tubolino CSG</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.803688</lat>
    <lon>-76.03003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67703</plant_id>
    <plant_name>Grinnell Customer Hosted Solar</plant_name>
    <state>IA</state>
    <county>Poweshiek</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.74614</lat>
    <lon>-92.74071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67725</plant_id>
    <plant_name>Auburn Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Fond Du Lac</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.599344</lat>
    <lon>-88.23868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67728</plant_id>
    <plant_name>Hackbarth Solar WI, LLC</plant_name>
    <state>WI</state>
    <county>Jefferson</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.88773</lat>
    <lon>-88.87717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67826</plant_id>
    <plant_name>Caribou Solar</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.819577</lat>
    <lon>-67.99213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67835</plant_id>
    <plant_name>Costa View Farms</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>127 CVF, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.99</lat>
    <lon>-120.308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67880</plant_id>
    <plant_name>Arthur Kill Energy, LLC</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>NineDot Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>21.7</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.556252</lat>
    <lon>-74.21179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67902</plant_id>
    <plant_name>BWC Jimmie Pond</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.75093</lat>
    <lon>-68.84456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67908</plant_id>
    <plant_name>Richmond (NY)</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.792865</lat>
    <lon>-77.52679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67911</plant_id>
    <plant_name>Catskill Solar</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>Catskill View Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.27</lat>
    <lon>-73.748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67912</plant_id>
    <plant_name>Claverack Creek Solar</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>Claverack Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.271</lat>
    <lon>-73.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67926</plant_id>
    <plant_name>Plympton Main Street Solar, LLC</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.972946</lat>
    <lon>-70.80504</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67932</plant_id>
    <plant_name>Bodhi Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Bodhi Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.012</lat>
    <lon>-77.874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67979</plant_id>
    <plant_name>Brookhaven Landfill Solar Farm 1</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Brookhaven 1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.799699</lat>
    <lon>-72.92396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68004</plant_id>
    <plant_name>Ontario 2 CDG</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>NY CDG Ontario 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.964632</lat>
    <lon>-77.1113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68008</plant_id>
    <plant_name>Above Grid Montour Solar LLC</plant_name>
    <state>NY</state>
    <county>Schuyler</county>
    <operator>Above Grid Montour Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.330348</lat>
    <lon>-76.83241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68010</plant_id>
    <plant_name>Johnson City Solar</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>Above Grid Binghamton Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.200933</lat>
    <lon>-75.97879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68020</plant_id>
    <plant_name>Independence East</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.073301</lat>
    <lon>-77.79781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68037</plant_id>
    <plant_name>NY Selkirk S Albany RD - Hemlock Hills S</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Selkirk Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.548056</lat>
    <lon>-73.83611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68067</plant_id>
    <plant_name>Niagara Solar Project</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>DG Niagara, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.208</lat>
    <lon>-78.904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68091</plant_id>
    <plant_name>Independence Road (CSG)</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.089058</lat>
    <lon>-77.82268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68092</plant_id>
    <plant_name>Ruhlmann A (CSG)</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.151901</lat>
    <lon>-78.70247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68115</plant_id>
    <plant_name>Ticon Solar</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>Ticon Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.868</lat>
    <lon>-73.44</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68152</plant_id>
    <plant_name>Rush Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Rush Solar Farm 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.947</lat>
    <lon>-77.698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68154</plant_id>
    <plant_name>Guilderland Solar</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Helios Energy New York 13 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.716554</lat>
    <lon>-74.02264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68158</plant_id>
    <plant_name>Enfield Solar Site 2</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>NSF Enfield Site 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.445</lat>
    <lon>-76.608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68159</plant_id>
    <plant_name>Enfield Solar Site 3</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>NSF Enfield Site 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.446</lat>
    <lon>-76.603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68160</plant_id>
    <plant_name>Enfield Solar Site 1</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>NSF Enfield Site 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.448</lat>
    <lon>-76.609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68162</plant_id>
    <plant_name>Coventry Solar Site 2</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>NSF Coventry Site 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.315</lat>
    <lon>-75.671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68163</plant_id>
    <plant_name>Coventry Solar Site 3</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>NSF Coventry Site 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.18</lat>
    <lon>-75.402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68188</plant_id>
    <plant_name>Trousdale Solar I</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Trousdale Solar I</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.97</lat>
    <lon>-78.147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68190</plant_id>
    <plant_name>Trousdale Solar II</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Trousdale Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.966</lat>
    <lon>-78.141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68206</plant_id>
    <plant_name>CAMILLUS B (CSG)</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.07487</lat>
    <lon>-76.31272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68207</plant_id>
    <plant_name>CAMILLUS A (CSG)</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.073458</lat>
    <lon>-76.31411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68379</plant_id>
    <plant_name>Stuart (OK)</plant_name>
    <state>OK</state>
    <county>Pittsburg</county>
    <operator>Peoples Electric Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.879814</lat>
    <lon>-96.05448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68387</plant_id>
    <plant_name>Warrior Solar Partners</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Warrior Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.072972</lat>
    <lon>-75.12689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68388</plant_id>
    <plant_name>AES Rt 5 Solar CSG</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.97347</lat>
    <lon>-78.01527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68389</plant_id>
    <plant_name>AES Glengarry Farms Solar CSG</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.9183</lat>
    <lon>-74.1477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68395</plant_id>
    <plant_name>Wheeler Ridge 2</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.9846</lat>
    <lon>-118.9085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68398</plant_id>
    <plant_name>Lake Hallie</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.899592</lat>
    <lon>-91.38375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68402</plant_id>
    <plant_name>TJA-NY-Cohocton Solar Farm, LLC</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.545103</lat>
    <lon>-77.45685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68405</plant_id>
    <plant_name>Caledonia CSG LLC</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.9763</lat>
    <lon>-77.8724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68419</plant_id>
    <plant_name>Richland North</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.52434</lat>
    <lon>-76.1585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68420</plant_id>
    <plant_name>Richland South</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.520882</lat>
    <lon>-76.15718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68421</plant_id>
    <plant_name>Ellisburg</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.798261</lat>
    <lon>-76.08254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68475</plant_id>
    <plant_name>Kearsarge Riverpark I LLC</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Kearsarge Riverpark I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>11.2</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.554017</lat>
    <lon>-71.13597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68476</plant_id>
    <plant_name>Kearsarge Riverpark II LLC</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Kearsarge Riverpark I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>11.2</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.554017</lat>
    <lon>-71.13597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68599</plant_id>
    <plant_name>North Kern 3</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.5768</lat>
    <lon>-119.1536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68625</plant_id>
    <plant_name>Bates College Skowhegan</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.75753</lat>
    <lon>-69.63688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68628</plant_id>
    <plant_name>Eden Dowmont Road</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Dowmont Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.270625</lat>
    <lon>-73.52408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68629</plant_id>
    <plant_name>Eden Hidden Meadows</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Hidden Meadows Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.282021</lat>
    <lon>-73.52267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68631</plant_id>
    <plant_name>CES Heuvelton</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Heuvelton Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.620618</lat>
    <lon>-75.44491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68636</plant_id>
    <plant_name>GSPP 409 Ferris Road</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.734853</lat>
    <lon>-74.64869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68639</plant_id>
    <plant_name>CBEP Solar 7</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.34036</lat>
    <lon>-104.8789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68646</plant_id>
    <plant_name>Kilmer</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Kilmer Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.19049</lat>
    <lon>-78.88973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68647</plant_id>
    <plant_name>Manlius East</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>CVE US EI5 Manlius East LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.01548</lat>
    <lon>-75.96947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68649</plant_id>
    <plant_name>Manlius West</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>CVE US EI5 Manlius West LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.0112</lat>
    <lon>-75.96874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68650</plant_id>
    <plant_name>Mantisi</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Mantisi Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.19415</lat>
    <lon>-77.98454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68651</plant_id>
    <plant_name>New Marlborough</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Sunrise on Knight Rd. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.15208</lat>
    <lon>-73.27795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68653</plant_id>
    <plant_name>Quaker</plant_name>
    <state>NY</state>
    <county>Warren</county>
    <operator>CVE US EI8 Quaker LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.32288</lat>
    <lon>-73.61235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68654</plant_id>
    <plant_name>Rak 1</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Rak 1 Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.44156</lat>
    <lon>-79.29234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68656</plant_id>
    <plant_name>Tolland</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Sunrise on Clubhouse Rd. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.08722</lat>
    <lon>-73.0116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68657</plant_id>
    <plant_name>Westhampton</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Sunrise on Montague Rd. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.33515</lat>
    <lon>-72.73866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68664</plant_id>
    <plant_name>Swaggertown Solar II</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.895595</lat>
    <lon>-73.95846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68677</plant_id>
    <plant_name>Maple West</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.984025</lat>
    <lon>-74.20083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68702</plant_id>
    <plant_name>NLRED 5MW</plant_name>
    <state>AR</state>
    <county>Pulaski</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.743456</lat>
    <lon>-92.17993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68708</plant_id>
    <plant_name>Hindsville</plant_name>
    <state>AR</state>
    <county>Madison</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.155318</lat>
    <lon>-93.89012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68711</plant_id>
    <plant_name>People's</plant_name>
    <state>OK</state>
    <county>Pontotoc</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.680844</lat>
    <lon>-96.76817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68727</plant_id>
    <plant_name>Veolia (Gum Springs)</plant_name>
    <state>AR</state>
    <county>Clark</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.060838</lat>
    <lon>-93.08608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68756</plant_id>
    <plant_name>USS Ducks Solar CSG</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>USS Ducks Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.0142</lat>
    <lon>-89.351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68875</plant_id>
    <plant_name>Wakefield MA BESS 1</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Wakefield MA BESS 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>22.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.495028</lat>
    <lon>-71.05059</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68905</plant_id>
    <plant_name>ME - EDF - Phase II - Belfast</plant_name>
    <state>ME</state>
    <county>Waldo</county>
    <operator>Shining Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.451691</lat>
    <lon>-68.99329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68943</plant_id>
    <plant_name>Pivot Solar 20</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.31766</lat>
    <lon>-104.9309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68944</plant_id>
    <plant_name>Pivot Solar 21</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.728452</lat>
    <lon>-104.769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68946</plant_id>
    <plant_name>Pivot Solar NY 1</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.861617</lat>
    <lon>-73.4459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68948</plant_id>
    <plant_name>Pivot Solar NY 6</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.856722</lat>
    <lon>-73.4494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68949</plant_id>
    <plant_name>Pivot Solar NY 9</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.878473</lat>
    <lon>-73.44854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68957</plant_id>
    <plant_name>Pivot Solar 30</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.434751</lat>
    <lon>-104.6459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68971</plant_id>
    <plant_name>Moseley Hermon Solar</plant_name>
    <state>VA</state>
    <county>Chesterfield</county>
    <operator>Moseley Hermon Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.46754</lat>
    <lon>-77.73352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68974</plant_id>
    <plant_name>Ashley Solar LLC PV</plant_name>
    <state>IL</state>
    <county>Washington</county>
    <operator>Ashley Solar LLC PV</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.325312</lat>
    <lon>-89.19887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68991</plant_id>
    <plant_name>Pivot Solar 32</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.27482</lat>
    <lon>-103.6344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68996</plant_id>
    <plant_name>Ohio Solar LLC</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Ohio Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.563936</lat>
    <lon>-89.49413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69002</plant_id>
    <plant_name>Brattleboro (Windham Landfill)</plant_name>
    <state>VT</state>
    <county>Windham</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.89335</lat>
    <lon>-72.54054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69006</plant_id>
    <plant_name>St. Clair Solar 5</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.587326</lat>
    <lon>-89.80984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69014</plant_id>
    <plant_name>North Franklin Solar</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.65</lat>
    <lon>-72.15</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69015</plant_id>
    <plant_name>Bureau Solar 1</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.442306</lat>
    <lon>-89.48587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69018</plant_id>
    <plant_name>Pivot Solar NY 10</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.673387</lat>
    <lon>-75.48876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69019</plant_id>
    <plant_name>MD - EDFR - Phase II - Lewiston</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Hayworth Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.074467</lat>
    <lon>-70.13778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69043</plant_id>
    <plant_name>Big Creek Solar (IL) (CSG)</plant_name>
    <state>IL</state>
    <county>Macoupin</county>
    <operator>Big Creek Solar (IL), LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.070944</lat>
    <lon>-90.13983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69061</plant_id>
    <plant_name>ASG-4 Community Solar</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>Affordable Solar Silver City, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.609944</lat>
    <lon>-106.8156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69062</plant_id>
    <plant_name>ASG-8</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>Affordable Solar Silver City, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.656861</lat>
    <lon>-106.8152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69066</plant_id>
    <plant_name>Goldenrod (IL)</plant_name>
    <state>IL</state>
    <county>Mercer</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.20946</lat>
    <lon>-90.58643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69070</plant_id>
    <plant_name>Anacott</plant_name>
    <state>IL</state>
    <county>Montgomery</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.14763</lat>
    <lon>-89.4496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69078</plant_id>
    <plant_name>Green Acres (VA)</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.782222</lat>
    <lon>-79.94778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69083</plant_id>
    <plant_name>Spring Street Road</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.84676</lat>
    <lon>-76.67594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69086</plant_id>
    <plant_name>SP-425 Memphis</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.09582</lat>
    <lon>-76.38432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69094</plant_id>
    <plant_name>State HWY 17C</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.06674</lat>
    <lon>-76.33938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69095</plant_id>
    <plant_name>Day Hollow</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.1129</lat>
    <lon>-76.17569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69096</plant_id>
    <plant_name>Jericho</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.24172</lat>
    <lon>-77.78193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69103</plant_id>
    <plant_name>ASG-2 Community Solar</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Affordable Solar Silver City, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.24175</lat>
    <lon>-106.8145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69104</plant_id>
    <plant_name>SLO-1 Community Solar</plant_name>
    <state>NM</state>
    <county>Valencia</county>
    <operator>Affordable Solar Silver City, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.784861</lat>
    <lon>-106.654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69105</plant_id>
    <plant_name>SLO-2</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Affordable Solar Silver City, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.363052</lat>
    <lon>-106.631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69106</plant_id>
    <plant_name>SLO-3 Community Solar</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>Affordable Solar Silver City, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.433</lat>
    <lon>-106.6862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69107</plant_id>
    <plant_name>XCEL-1 Community Solar</plant_name>
    <state>NM</state>
    <county>Chaves</county>
    <operator>Affordable Solar Silver City, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.326556</lat>
    <lon>-104.536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69134</plant_id>
    <plant_name>Penobscot Narrows Solar I</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>Penobscot Narrows Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.590083</lat>
    <lon>-68.80834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69137</plant_id>
    <plant_name>Althea Avenue Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>RPCA Solar 8, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.893121</lat>
    <lon>-120.6569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69153</plant_id>
    <plant_name>NSF Edmeston Site 1</plant_name>
    <state>NY</state>
    <county>Otsego</county>
    <operator>NSF Energy Three LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.67956</lat>
    <lon>-75.31425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69179</plant_id>
    <plant_name>Chester</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.375398</lat>
    <lon>-74.27752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69203</plant_id>
    <plant_name>KN07</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.87528</lat>
    <lon>-88.42583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69208</plant_id>
    <plant_name>Route 14-1</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.041852</lat>
    <lon>-76.98501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69209</plant_id>
    <plant_name>Route 14-2</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.042769</lat>
    <lon>-76.9809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69212</plant_id>
    <plant_name>Ransom</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.174955</lat>
    <lon>-75.92147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69213</plant_id>
    <plant_name>Sawyer</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.78285</lat>
    <lon>-89.95483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69214</plant_id>
    <plant_name>Shoddy Hollow</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.476229</lat>
    <lon>-74.50891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69216</plant_id>
    <plant_name>State Route 42</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.548989</lat>
    <lon>-74.74971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69227</plant_id>
    <plant_name>MEVS Clark LLC</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>MEVS Clark LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.06377</lat>
    <lon>-69.88589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69228</plant_id>
    <plant_name>Mound City Solar</plant_name>
    <state>IL</state>
    <county>Pulaski</county>
    <operator>Mound City Solar PV</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.090121</lat>
    <lon>-89.17606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69229</plant_id>
    <plant_name>Dunkirk Solar One, LLC</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Dunkirk Solar One, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.497778</lat>
    <lon>-79.30389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69230</plant_id>
    <plant_name>Pope Creek Solar PV</plant_name>
    <state>IL</state>
    <county>Mercer</county>
    <operator>Pope Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.204012</lat>
    <lon>-90.73258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69231</plant_id>
    <plant_name>Sunset Road Solar 3 Community Solar</plant_name>
    <state>IL</state>
    <county>Macoupin</county>
    <operator>Sunset Road Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.150791</lat>
    <lon>-89.768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69240</plant_id>
    <plant_name>Rocky Mountain Elk Solar Community Solar</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Rocky Mountain Elk Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.364</lat>
    <lon>-89.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69250</plant_id>
    <plant_name>Suwannee</plant_name>
    <state>FL</state>
    <county>Suwannee</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.37651</lat>
    <lon>-83.18066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69270</plant_id>
    <plant_name>Juniper Sol Solar CSG</plant_name>
    <state>NM</state>
    <county>Santa Fe</county>
    <operator>Juniper Sol Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.5089</lat>
    <lon>-105.9517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69280</plant_id>
    <plant_name>NY 5 King LLC</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>NY 5 King LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.140227</lat>
    <lon>-73.68773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69281</plant_id>
    <plant_name>NY 24 Sherman LLC</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>NY 24 Sherman LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.14137</lat>
    <lon>-73.69206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69308</plant_id>
    <plant_name>NL IL - Esmen East CSG</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Esmen Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.94792</lat>
    <lon>-88.66554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69315</plant_id>
    <plant_name>NL IL - 241 North CSG</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.289917</lat>
    <lon>-87.8115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69316</plant_id>
    <plant_name>NL IL - 1875 North Road CSG</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.894923</lat>
    <lon>-88.65766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69317</plant_id>
    <plant_name>NL IL - 2000 North Road CSG</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.149011</lat>
    <lon>-87.78951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69330</plant_id>
    <plant_name>Cenergy IL - BA Family CSG</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.126242</lat>
    <lon>-87.98852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69379</plant_id>
    <plant_name>NSF Chateaugay Site 1</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>NSF Chateaugay Site 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.93</lat>
    <lon>-74.032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69387</plant_id>
    <plant_name>Beecher (IL)</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.340311</lat>
    <lon>-87.68268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69389</plant_id>
    <plant_name>O'Brien 1</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.410513</lat>
    <lon>-76.2185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69390</plant_id>
    <plant_name>O'Brien 2</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.410513</lat>
    <lon>-76.2185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69400</plant_id>
    <plant_name>Independence North</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.07463</lat>
    <lon>-77.79626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69401</plant_id>
    <plant_name>Jeffery</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.092129</lat>
    <lon>-87.9844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69402</plant_id>
    <plant_name>Oak Orchard</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.712749</lat>
    <lon>-74.00599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69405</plant_id>
    <plant_name>NSF Marshall Site 2</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>NSF Marshall Site 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.936</lat>
    <lon>-75.419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69406</plant_id>
    <plant_name>NSF Marshall Site 1</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>NSF Marshall Site 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.938</lat>
    <lon>-75.426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69409</plant_id>
    <plant_name>NSF Danby Site 1, LLC</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>NSF Energy Two, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.35211</lat>
    <lon>-76.49782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69410</plant_id>
    <plant_name>NSF Danby Site 2, LLC</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>NSF Energy Two, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.35311</lat>
    <lon>-76.49364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69419</plant_id>
    <plant_name>NE IL - Esmen West</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.94816</lat>
    <lon>-88.67369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69421</plant_id>
    <plant_name>South Belleville Solar, LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.481308</lat>
    <lon>-89.98829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69431</plant_id>
    <plant_name>Rock LakeSolar WI, LLC</plant_name>
    <state>WI</state>
    <county>Jefferson</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.113153</lat>
    <lon>-88.97524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69439</plant_id>
    <plant_name>Medanos Solar LLC</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.041163</lat>
    <lon>-87.95006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69440</plant_id>
    <plant_name>Drummer Creek I Solar LLC</plant_name>
    <state>IL</state>
    <county>Ford</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.448185</lat>
    <lon>-88.37912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69442</plant_id>
    <plant_name>Beckham Solar LLC</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.029463</lat>
    <lon>-88.49735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69526</plant_id>
    <plant_name>NL IL - Maples Road</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.852588</lat>
    <lon>-89.4049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69527</plant_id>
    <plant_name>NL IL - McConnell Road</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.425623</lat>
    <lon>-89.46585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69529</plant_id>
    <plant_name>Pluma - Pino</plant_name>
    <state>NM</state>
    <county>San Miguel</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.632083</lat>
    <lon>-105.2281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69530</plant_id>
    <plant_name>Emi NM Bent Bow</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.735792000000004</lat>
    <lon>-107.2411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69531</plant_id>
    <plant_name>REDP - Trenton</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.484539</lat>
    <lon>-68.36707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69532</plant_id>
    <plant_name>Pluma - SLT Las Cruces</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.427319</lat>
    <lon>-106.7088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69542</plant_id>
    <plant_name>Fairfax Landfill</plant_name>
    <state>VA</state>
    <county>Fairfax</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.69017</lat>
    <lon>-77.24049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69557</plant_id>
    <plant_name>Pluma - Reynolds (CSG)</plant_name>
    <state>NM</state>
    <county>Otero</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.051876</lat>
    <lon>-106.008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69569</plant_id>
    <plant_name>TJA MA Wakeby Road</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.667</lat>
    <lon>-70.453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69571</plant_id>
    <plant_name>Cambridge Solar</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.07872</lat>
    <lon>-73.37509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69572</plant_id>
    <plant_name>Beebalm Solar</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.033046</lat>
    <lon>-88.64122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69573</plant_id>
    <plant_name>Geranium Solar</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.335006</lat>
    <lon>-89.22322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69597</plant_id>
    <plant_name>Owens 2</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.420849</lat>
    <lon>-74.36924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69600</plant_id>
    <plant_name>Route 19N</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.00129</lat>
    <lon>-77.98421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69610</plant_id>
    <plant_name>USS Tall Grass Solar LLC</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.665453</lat>
    <lon>-104.7164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69611</plant_id>
    <plant_name>USS Calico Solar LLC</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.657753</lat>
    <lon>-104.7163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69612</plant_id>
    <plant_name>USS Great Plains Solar LLC</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.653269</lat>
    <lon>-104.7254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69613</plant_id>
    <plant_name>USS Hampden Solar LLC</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.665453</lat>
    <lon>-104.7164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69614</plant_id>
    <plant_name>USS High Plains Solar LLC</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.653269</lat>
    <lon>-104.7254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69615</plant_id>
    <plant_name>USS Raptor Solar LLC</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.657753</lat>
    <lon>-104.7163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69618</plant_id>
    <plant_name>Winema Solar Partners</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Winema Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.086667</lat>
    <lon>-75.59158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69621</plant_id>
    <plant_name>Bethlehem</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>38DN Asset Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.58</lat>
    <lon>-73.79</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69622</plant_id>
    <plant_name>New Hartford</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>38DN Asset Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.06</lat>
    <lon>-75.32</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69624</plant_id>
    <plant_name>Rose Hill Road Solar 1 - Spafford 1</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>38DN Asset Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.87</lat>
    <lon>-76.34</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69655</plant_id>
    <plant_name>Oreana Renewables</plant_name>
    <state>IL</state>
    <county>Macon</county>
    <operator>Oreana Renewables LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.953571</lat>
    <lon>-88.83941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69692</plant_id>
    <plant_name>ILSOLAR05 LLC</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.950444</lat>
    <lon>-88.48855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69717</plant_id>
    <plant_name>Geneva CSG 1 LLC</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.865056</lat>
    <lon>-77.01783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69732</plant_id>
    <plant_name>Fort Polk (fka Johnson) - Chaffee East</plant_name>
    <state>LA</state>
    <county>Vernon</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.099924</lat>
    <lon>-93.19611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69735</plant_id>
    <plant_name>Marathon Petroleum - Robinson Refinery</plant_name>
    <state>IL</state>
    <county>Crawford</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.003586</lat>
    <lon>-87.727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69744</plant_id>
    <plant_name>Altamont Road Solar, LLC</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.653654</lat>
    <lon>-73.96058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69787</plant_id>
    <plant_name>AC IL - Hillsboro CSG</plant_name>
    <state>IL</state>
    <county>Montgomery</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.163692</lat>
    <lon>-89.47698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69800</plant_id>
    <plant_name>Oreana Solar</plant_name>
    <state>IL</state>
    <county>Macon</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.935097</lat>
    <lon>-88.89152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69829</plant_id>
    <plant_name>Kanesolar01 LLC</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.89689</lat>
    <lon>-88.54354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69838</plant_id>
    <plant_name>Paris Solar, LLC (CSG)</plant_name>
    <state>IL</state>
    <county>Macoupin</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.486016</lat>
    <lon>-89.78921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69839</plant_id>
    <plant_name>Gracy Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.288362</lat>
    <lon>-88.27987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69841</plant_id>
    <plant_name>Bluestar Solar Project, LLC</plant_name>
    <state>IL</state>
    <county>Montgomery</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.150212</lat>
    <lon>-89.45092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69846</plant_id>
    <plant_name>Gerstenschlager Family Solar 1, LLC (CSG)</plant_name>
    <state>IL</state>
    <county>Jackson</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.74351</lat>
    <lon>-89.29814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69847</plant_id>
    <plant_name>Spillertown CSG 2 LLC</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.771487</lat>
    <lon>-88.91635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69848</plant_id>
    <plant_name>Spillertown CSG 1 LLC</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.761959</lat>
    <lon>-88.9226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69849</plant_id>
    <plant_name>Corfee Solar LLC</plant_name>
    <state>IL</state>
    <county>Macoupin</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.125025</lat>
    <lon>-89.79977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69850</plant_id>
    <plant_name>Blue Iris Solar, LLC CSG</plant_name>
    <state>IL</state>
    <county>DeWitt</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.27849</lat>
    <lon>-88.6161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69851</plant_id>
    <plant_name>Salvia Solar, LLC</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.413122</lat>
    <lon>-89.44486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69852</plant_id>
    <plant_name>McCray Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Bond</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.892269</lat>
    <lon>-89.41314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69876</plant_id>
    <plant_name>New Road</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.059116</lat>
    <lon>-78.72938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69918</plant_id>
    <plant_name>Midwest Power Partners LLC (Pirolo)</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.986622</lat>
    <lon>-89.75252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69950</plant_id>
    <plant_name>Allium</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.819503</lat>
    <lon>-88.63028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69955</plant_id>
    <plant_name>Kearsarge St Johnsville</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Kearsarge St Johnsville LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.999235</lat>
    <lon>-74.6961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69985</plant_id>
    <plant_name>Cortlandville</plant_name>
    <state>NY</state>
    <county>Cortland</county>
    <operator>Cortlandville PV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.554142</lat>
    <lon>-76.19036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70014</plant_id>
    <plant_name>IL - ForeFront CS (BBCHS 1) Community Solar</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>IL Solar Bradley Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.178796</lat>
    <lon>-87.80649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70043</plant_id>
    <plant_name>Clover - (IL) CSG</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.794758</lat>
    <lon>-90.11378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70044</plant_id>
    <plant_name>NL IL Kane Rd CSG</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.759639</lat>
    <lon>-88.82733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70045</plant_id>
    <plant_name>NL IL Bastian CSG</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.752297</lat>
    <lon>-88.73477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70054</plant_id>
    <plant_name>DG CS NY Townline</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.102819</lat>
    <lon>-78.83314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70059</plant_id>
    <plant_name>GSPP ROUTE 262, LLC</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.079559</lat>
    <lon>-78.02045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70064</plant_id>
    <plant_name>IL - Nexamp Kewanee</plant_name>
    <state>IL</state>
    <county>Henry</county>
    <operator>Kewanee Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.260592</lat>
    <lon>-89.9217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70065</plant_id>
    <plant_name>IL - Nexamp Percy (CSG)</plant_name>
    <state>IL</state>
    <county>Randolph</county>
    <operator>Percy Renewables 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.022811</lat>
    <lon>-89.59673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70144</plant_id>
    <plant_name>Hermon Solar, LLC</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>SREOG Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.792699</lat>
    <lon>-68.84454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70145</plant_id>
    <plant_name>Somerset Solar, LLC (ME)</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>SREOG Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.785203</lat>
    <lon>-69.40084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70146</plant_id>
    <plant_name>Brewer PV, LLC</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>SREOG Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.754021</lat>
    <lon>-68.73675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70147</plant_id>
    <plant_name>South Paris PV, LLC</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>SREOG Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.263927</lat>
    <lon>-70.5265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70184</plant_id>
    <plant_name>WSD Coventry</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>WSD Coventry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.665055</lat>
    <lon>-71.54776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70422</plant_id>
    <plant_name>IL - Ameresco - Alton</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>Alton Landfill Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.927937</lat>
    <lon>-90.17851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70430</plant_id>
    <plant_name>Baron Solar, LLC</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.988</lat>
    <lon>-80.04</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70431</plant_id>
    <plant_name>IL - Nexamp Argenta</plant_name>
    <state>IL</state>
    <county>Macon</county>
    <operator>Argenta Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.969476</lat>
    <lon>-88.83344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70438</plant_id>
    <plant_name>VA - Ameresco - Mechanicsville</plant_name>
    <state>VA</state>
    <county>Hanover</county>
    <operator>Peppertown Road Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.633568</lat>
    <lon>-77.24501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70446</plant_id>
    <plant_name>Dragon's Breath Solar LLC PV</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>Dragon's Breath Solar LLC PV</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.428093</lat>
    <lon>-89.37261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70518</plant_id>
    <plant_name>Larson</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.642816</lat>
    <lon>-70.3749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70521</plant_id>
    <plant_name>Lily Creek Solar</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.3118</lat>
    <lon>-89.6824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70566</plant_id>
    <plant_name>KA04</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.176022</lat>
    <lon>-87.76939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70567</plant_id>
    <plant_name>LI18</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.861306</lat>
    <lon>-88.61206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70568</plant_id>
    <plant_name>KA32</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.234165</lat>
    <lon>-87.81372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70570</plant_id>
    <plant_name>Highway 20</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.091043</lat>
    <lon>-88.46335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70578</plant_id>
    <plant_name>Carroll County MD Solar LLC</plant_name>
    <state>MD</state>
    <county>Carroll</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.583576</lat>
    <lon>-76.8493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1325</plant_id>
    <plant_name>Stafford</plant_name>
    <state>KS</state>
    <county>Stafford</county>
    <operator>City of Stafford - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2015</latest_year>
    <lat>37.956117</lat>
    <lon>-98.59929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1982</plant_id>
    <plant_name>Janesville</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>City of Janesville - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1998</latest_year>
    <lat>44.1172</lat>
    <lon>-93.7073</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2296</plant_id>
    <plant_name>Pender</plant_name>
    <state>NE</state>
    <county>Thurston</county>
    <operator>City of Pender - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1973</latest_year>
    <lat>42.114742</lat>
    <lon>-96.70543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6644</plant_id>
    <plant_name>Lake Mathews</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>33.8553</lat>
    <lon>-117.4537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54364</plant_id>
    <plant_name>Works 4</plant_name>
    <state>TX</state>
    <county>Wichita</county>
    <operator>Vitro Architectural Glass</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1974</first_year>
    <latest_year>1980</latest_year>
    <lat>34.003489</lat>
    <lon>-98.55354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54654</plant_id>
    <plant_name>Kekawaka Power House</plant_name>
    <state>CA</state>
    <county>Trinity</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.0941</lat>
    <lon>-123.509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58880</plant_id>
    <plant_name>North Carolina Solar III LLC</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.766667</lat>
    <lon>-79.55972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59014</plant_id>
    <plant_name>Bolton PV</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.449722</lat>
    <lon>-71.64306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59100</plant_id>
    <plant_name>Chauncey Farm LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.3375</lat>
    <lon>-78.52194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59105</plant_id>
    <plant_name>Market Farm</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.390278</lat>
    <lon>-79.64722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59110</plant_id>
    <plant_name>Springfield Solar 1 LLC</plant_name>
    <state>MO</state>
    <county>Greene</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.246389</lat>
    <lon>-93.16639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59430</plant_id>
    <plant_name>Solar Las Vegas MB-1</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>NRG Solar Las Vegas MB-1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.088611</lat>
    <lon>-115.1778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59486</plant_id>
    <plant_name>Lanier Solar</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.898889</lat>
    <lon>-77.80889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59487</plant_id>
    <plant_name>Highwater Solar I</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.433889</lat>
    <lon>-77.99</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59488</plant_id>
    <plant_name>Bearford Solar II</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>Bearford Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.613494</lat>
    <lon>-77.92959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59667</plant_id>
    <plant_name>Innovative Solar 48</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.711628</lat>
    <lon>-79.30235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59675</plant_id>
    <plant_name>Innovative Solar 44</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.85735</lat>
    <lon>-79.10391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59677</plant_id>
    <plant_name>Innovative Solar 64</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.041048</lat>
    <lon>-78.32968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59831</plant_id>
    <plant_name>Royal Solar</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.216</lat>
    <lon>-78.689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59973</plant_id>
    <plant_name>Walt Disney World Solar Facility</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>Duke Energy Florida Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>28.3737</lat>
    <lon>-81.56259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60020</plant_id>
    <plant_name>McLean Homestead</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.781934</lat>
    <lon>-79.49775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60053</plant_id>
    <plant_name>Innovative Solar 63, LLC</plant_name>
    <state>NC</state>
    <county>Greene</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.39169</lat>
    <lon>-77.6204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60146</plant_id>
    <plant_name>Cohen Farm Solar, LLC</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>6.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.557224</lat>
    <lon>-79.19579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60240</plant_id>
    <plant_name>Yanceyville Farm 3, LLC</plant_name>
    <state>NC</state>
    <county>Caswell</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.428608</lat>
    <lon>-79.34889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60312</plant_id>
    <plant_name>Howell Midland Farm, LLC</plant_name>
    <state>NC</state>
    <county>Cabarrus</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.225669</lat>
    <lon>-80.54309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60313</plant_id>
    <plant_name>Augustus Farm, LLC</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.599685</lat>
    <lon>-77.63911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60396</plant_id>
    <plant_name>St. Pauls Solar 1, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.7716</lat>
    <lon>-78.9836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60397</plant_id>
    <plant_name>Kennedy Solar, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.012282</lat>
    <lon>-78.09219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60398</plant_id>
    <plant_name>Innovative Solar 65</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.7587</lat>
    <lon>-79.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60399</plant_id>
    <plant_name>Lincoln Solar, LLC (NC)</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.379505</lat>
    <lon>-81.81758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60400</plant_id>
    <plant_name>Exum Farm Solar, LLC</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.370441</lat>
    <lon>-77.4549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60416</plant_id>
    <plant_name>Maxton Solar, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.71472</lat>
    <lon>-79.31463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60417</plant_id>
    <plant_name>Modlin Solar Farm</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.85028</lat>
    <lon>-77.11023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60484</plant_id>
    <plant_name>Williamston West Farm, LLC</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.836544</lat>
    <lon>-77.10804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60796</plant_id>
    <plant_name>Red Wing Community Solar</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.53509</lat>
    <lon>-92.51608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60966</plant_id>
    <plant_name>Lind Solar CSG</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.802355</lat>
    <lon>-93.90872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61255</plant_id>
    <plant_name>Haywood Farm Solar</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.34258</lat>
    <lon>-79.89813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61256</plant_id>
    <plant_name>Hood Farm Solar</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.216144</lat>
    <lon>-77.50085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61257</plant_id>
    <plant_name>ZV Solar 2</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.815668</lat>
    <lon>-79.20372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61694</plant_id>
    <plant_name>Lockheed Martin Solar</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>Lockheed Martin RMS</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Solar Photovoltaic</technologies>
    <generators>9</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2025</latest_year>
    <lat>28.539415</lat>
    <lon>-81.21637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61731</plant_id>
    <plant_name>Solten Plainville 6000, LLC</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.041166</lat>
    <lon>-71.29328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61877</plant_id>
    <plant_name>Hanover Solar, LLC</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.800947</lat>
    <lon>-77.21377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61928</plant_id>
    <plant_name>Saint Albans Solar</plant_name>
    <state>VT</state>
    <county>Franklin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.779729</lat>
    <lon>-73.10582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61983</plant_id>
    <plant_name>Cottage Grove Project CSG</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.7907</lat>
    <lon>-92.8727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62100</plant_id>
    <plant_name>Warrenton I Solar</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.412</lat>
    <lon>-78.178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62167</plant_id>
    <plant_name>County Home Solar LLC</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.925452</lat>
    <lon>-79.72285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62703</plant_id>
    <plant_name>Equinix Lundy Ave. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2019</latest_year>
    <lat>37.38846</lat>
    <lon>-121.889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63225</plant_id>
    <plant_name>AGA TAG Solar IV LLC</plant_name>
    <state>NC</state>
    <county>Brunswick</county>
    <operator>AGA TAG Solar IV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.27355</lat>
    <lon>-78.06444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63398</plant_id>
    <plant_name>Kearsarge Amesbury Hybrid</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Kearsarge Amesbury LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <battery_mwh>3.8</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.837376</lat>
    <lon>-70.93867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63445</plant_id>
    <plant_name>1009 Yadkin Solar</plant_name>
    <state>NC</state>
    <county>Yadkin</county>
    <operator>1009 Yadkin Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.14749</lat>
    <lon>-80.65611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63447</plant_id>
    <plant_name>1008 Matthews Solar</plant_name>
    <state>NC</state>
    <county>Surry</county>
    <operator>1008 Matthews Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.21669</lat>
    <lon>-80.55247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63448</plant_id>
    <plant_name>1045 Tomlin Mill Solar</plant_name>
    <state>NC</state>
    <county>Iredell</county>
    <operator>1045 Tomlin Mill Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.916178</lat>
    <lon>-80.83549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63450</plant_id>
    <plant_name>Chenango Solar</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.198167</lat>
    <lon>-75.92728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63616</plant_id>
    <plant_name>OCSD</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <battery_mwh>32.6</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.693129</lat>
    <lon>-117.9409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63835</plant_id>
    <plant_name>Pilot Mountain Solar, LLC</plant_name>
    <state>NC</state>
    <county>Stokes</county>
    <operator>USF Essex Lessor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.27066</lat>
    <lon>-80.37635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63836</plant_id>
    <plant_name>Benson Solar, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>USF Essex Lessor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.3962</lat>
    <lon>-78.56223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63837</plant_id>
    <plant_name>Lane II Solar, LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>USF Essex Lessor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.39977</lat>
    <lon>-78.05327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64117</plant_id>
    <plant_name>Meadowlark Solar</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>Meadowlark Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.329706</lat>
    <lon>-78.61443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64118</plant_id>
    <plant_name>Nash 97 Solar 2</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Nash 97 Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.849645</lat>
    <lon>-78.21347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64119</plant_id>
    <plant_name>Nickelson Solar 2</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Nickelson Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.748656</lat>
    <lon>-77.98834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64121</plant_id>
    <plant_name>Siler City Solar 2</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Siler City Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.688832</lat>
    <lon>-79.46602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64192</plant_id>
    <plant_name>Bo Biggs Solar</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Bo Biggs Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.586884</lat>
    <lon>-78.95972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64231</plant_id>
    <plant_name>Hadley 3 Solar (North)</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Hadley 3 Solar, LLC (North)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <battery_mwh>4.4</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2024</latest_year>
    <lat>42.35885</lat>
    <lon>-72.5426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64237</plant_id>
    <plant_name>Solar Lee, LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Solar Lee, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.184704</lat>
    <lon>-78.08459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64238</plant_id>
    <plant_name>Acme Solar, LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Acme Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.324366</lat>
    <lon>-78.99615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64351</plant_id>
    <plant_name>Amazon JFK8 Solar Project</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Solar Star Prime 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.618892</lat>
    <lon>-74.18752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64389</plant_id>
    <plant_name>Niagara Bottling - Seguin</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.589139</lat>
    <lon>-97.9772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64476</plant_id>
    <plant_name>Swansboro Solar, LLC</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>Swansboro Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.810913</lat>
    <lon>-77.21041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64478</plant_id>
    <plant_name>1034 Catherine Lake Solar, LLC</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>1034 Catherine Lake Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.78471</lat>
    <lon>-77.49876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64704</plant_id>
    <plant_name>Lincoln ME 1</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>SREOG Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.335174</lat>
    <lon>-68.52511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64763</plant_id>
    <plant_name>Rumford ESS</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.532169</lat>
    <lon>-70.51896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64765</plant_id>
    <plant_name>Madison ESS</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.793</lat>
    <lon>-69.876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65996</plant_id>
    <plant_name>Harmony Solar (ME)</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Maine DG Solar Harmony, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.98</lat>
    <lon>-69.54635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66043</plant_id>
    <plant_name>Arctaris Saddleback Solar</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Arctaris Saddleback Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.94641</lat>
    <lon>-70.52716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66243</plant_id>
    <plant_name>Lewiston Junction Road Solar</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>NextGrid Peppertree, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.050556</lat>
    <lon>-70.30706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66360</plant_id>
    <plant_name>Ruler Solar Partners (CSG)</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Ruler Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.656306</lat>
    <lon>-75.49711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66381</plant_id>
    <plant_name>SCS Harpswell 012903 Brunswick, LLC</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.897</lat>
    <lon>-69.947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66664</plant_id>
    <plant_name>Dublin Street LLC</plant_name>
    <state>ME</state>
    <county>Washington</county>
    <operator>Dublin Street LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.70049</lat>
    <lon>-67.46977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66947</plant_id>
    <plant_name>Mannys Corners Solar 1 (CSG)</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.964</lat>
    <lon>-74.1444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66956</plant_id>
    <plant_name>Pittsfield Solar (N. Main St)</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Maine DG Solar Pittsfield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.782085</lat>
    <lon>-69.36242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67012</plant_id>
    <plant_name>Dynamic - Norridgewock Martin Stream (CSG)</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.694066</lat>
    <lon>-69.787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67013</plant_id>
    <plant_name>Dynamic - Leeds Solar (CSG)</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.288243</lat>
    <lon>-70.1139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67014</plant_id>
    <plant_name>Dynamic - Gray Solar</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.89244</lat>
    <lon>-70.317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67016</plant_id>
    <plant_name>Dynamic - Enfield Hammett Road CSG</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.243615</lat>
    <lon>-68.6206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67017</plant_id>
    <plant_name>Dynamic - Glenburn Broadway One (CSG)</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.875771</lat>
    <lon>-68.851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67025</plant_id>
    <plant_name>Osawatomie Solar</plant_name>
    <state>KS</state>
    <county>Miami</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.521483</lat>
    <lon>-94.93821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67225</plant_id>
    <plant_name>Amherst Solar Facility (VA)</plant_name>
    <state>VA</state>
    <county>Amherst</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.553598</lat>
    <lon>-79.0173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67366</plant_id>
    <plant_name>Caterpillar Hill</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.3123</lat>
    <lon>-68.6586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67388</plant_id>
    <plant_name>Farmingdale FA01</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.2471</lat>
    <lon>-69.8005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67389</plant_id>
    <plant_name>Fryeburg</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.02099</lat>
    <lon>-70.95782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67450</plant_id>
    <plant_name>Sabattus SB01</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.0651</lat>
    <lon>-70.1021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67452</plant_id>
    <plant_name>Sanford -NY</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.43461</lat>
    <lon>-70.75387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67462</plant_id>
    <plant_name>Farmington</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.655</lat>
    <lon>-70.151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67513</plant_id>
    <plant_name>ADC Varner</plant_name>
    <state>AR</state>
    <county>Lincoln</county>
    <operator>Entegrity Solar ADC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.041298</lat>
    <lon>-91.62795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67595</plant_id>
    <plant_name>NSF Aurelius Site 4 LLC</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>NSF Energy One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.91947</lat>
    <lon>-76.60423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67611</plant_id>
    <plant_name>Glen Mary 1</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.108829</lat>
    <lon>-76.29721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67617</plant_id>
    <plant_name>Spencer (NY)</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.233962</lat>
    <lon>-76.36963</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67631</plant_id>
    <plant_name>County Route 11B</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.939563</lat>
    <lon>-73.67152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67686</plant_id>
    <plant_name>DeKalb Taylor LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.934706</lat>
    <lon>-88.71142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68286</plant_id>
    <plant_name>Kennett Solar</plant_name>
    <state>MO</state>
    <county>Dunklin</county>
    <operator>City of Kennett - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.207917</lat>
    <lon>-90.05722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68394</plant_id>
    <plant_name>Waterboro</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.591111</lat>
    <lon>-70.71861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68401</plant_id>
    <plant_name>TJA-NY-1454 CR 15 Oswegatchie, LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.60128</lat>
    <lon>-75.35402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68403</plant_id>
    <plant_name>TJA-NY-Canton Solar Farm LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.601551</lat>
    <lon>-75.13156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68620</plant_id>
    <plant_name>Overlook</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.567605</lat>
    <lon>-71.9195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68632</plant_id>
    <plant_name>Wymans Deblois</plant_name>
    <state>ME</state>
    <county>Washington</county>
    <operator>REC RWD, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.71022</lat>
    <lon>-67.96419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69033</plant_id>
    <plant_name>Peoria Solar 3</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.811998</lat>
    <lon>-89.69964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69074</plant_id>
    <plant_name>SP-231 Clifton</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.794167</lat>
    <lon>-68.56472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69131</plant_id>
    <plant_name>Hampden Landfill Solar LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Hampden Landfill Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <battery_mwh>6.7</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.064097</lat>
    <lon>-72.39751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69391</plant_id>
    <plant_name>Broadlea</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.382356</lat>
    <lon>-74.28659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69546</plant_id>
    <plant_name>Broadhead</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.52169</lat>
    <lon>-69.67441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69565</plant_id>
    <plant_name>Rockfish Solar</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Fayetteville Public Works Commission</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.963091</lat>
    <lon>-78.8395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70113</plant_id>
    <plant_name>USS Auburn Solar</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>USS Auburn Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.363197</lat>
    <lon>-104.6399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70427</plant_id>
    <plant_name>Peony</plant_name>
    <state>IL</state>
    <county>Morgan</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.708694</lat>
    <lon>-90.23499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70444</plant_id>
    <plant_name>Cottonwood - IL</plant_name>
    <state>IL</state>
    <county>Woodford</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.9</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.684739</lat>
    <lon>-89.00338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>338</plant_id>
    <plant_name>Kaweah 3</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1913</latest_year>
    <lat>36.486059</lat>
    <lon>-118.8356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>718</plant_id>
    <plant_name>Nacoochee</plant_name>
    <state>GA</state>
    <county>Rabun</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>34.7549</lat>
    <lon>-83.5012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>989</plant_id>
    <plant_name>Twin Branch</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>41.665</lat>
    <lon>-86.1322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1750</plant_id>
    <plant_name>Manistique</plant_name>
    <state>MI</state>
    <county>Schoolcraft</county>
    <operator>Cloverland Electric Co-op</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1972</latest_year>
    <lat>45.955014</lat>
    <lon>-86.25629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2481</plant_id>
    <plant_name>Dashville</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Central Hudson Gas &amp; Elec Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>41.8217</lat>
    <lon>-74.0497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3973</plant_id>
    <plant_name>Stevens Point</plant_name>
    <state>WI</state>
    <county>Portage</county>
    <operator>Consolidated Water Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1918</latest_year>
    <lat>44.5153</lat>
    <lon>-89.585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4204</plant_id>
    <plant_name>Island Park</plant_name>
    <state>ID</state>
    <county>Fremont</county>
    <operator>Fall River Rural Elec Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>44.418293</lat>
    <lon>-111.396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6047</plant_id>
    <plant_name>Deerfield 2</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>6.6</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1913</latest_year>
    <lat>42.573084</lat>
    <lon>-72.70727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6083</plant_id>
    <plant_name>Deerfield 3</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>42.5995</lat>
    <lon>-72.7335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6119</plant_id>
    <plant_name>Deerfield 4</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>6</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>42.6198</lat>
    <lon>-72.7376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6404</plant_id>
    <plant_name>Deer Creek (UT)</plant_name>
    <state>UT</state>
    <county>Wasatch</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>5.4</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>40.404354</lat>
    <lon>-111.5284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6537</plant_id>
    <plant_name>Little Cottonwood</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>City of Murray - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>40.584985</lat>
    <lon>-111.8006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7822</plant_id>
    <plant_name>Kaukauna City Hydro</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>City of Kaukauna (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1942</latest_year>
    <lat>44.274582</lat>
    <lon>-88.31907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10608</plant_id>
    <plant_name>Gilman Mill</plant_name>
    <state>VT</state>
    <county>Essex</county>
    <operator>Ampersand Gilman Hydro LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1986</latest_year>
    <lat>44.4122</lat>
    <lon>-71.7228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10807</plant_id>
    <plant_name>Dietrich Drop</plant_name>
    <state>ID</state>
    <county>Lincoln</county>
    <operator>Wood Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.836046</lat>
    <lon>-114.268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50570</plant_id>
    <plant_name>Chestnut Ridge Gas Recovery</plant_name>
    <state>TN</state>
    <county>Anderson</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2011</latest_year>
    <lat>36.1172</lat>
    <lon>-84.0317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54623</plant_id>
    <plant_name>Central District Wastewater Treat Plant</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>Miami Dade Water &amp; Sewer Dept</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2015</latest_year>
    <lat>25.748565</lat>
    <lon>-80.15279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54662</plant_id>
    <plant_name>Woodland Landfill Gas Recovery</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>WM Illinois Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2010</latest_year>
    <lat>41.981004</lat>
    <lon>-88.27452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54918</plant_id>
    <plant_name>Ergon Refining Vicksburg</plant_name>
    <state>MS</state>
    <county>Warren</county>
    <operator>Ergon Refining Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>32.388271</lat>
    <lon>-90.90834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55925</plant_id>
    <plant_name>Ridgeview</plant_name>
    <state>WI</state>
    <county>Manitowoc</county>
    <operator>Bio-Energy Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2006</latest_year>
    <lat>44.175007</lat>
    <lon>-87.82852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56190</plant_id>
    <plant_name>Central Michigan University</plant_name>
    <state>MI</state>
    <county>Isabella</county>
    <operator>Central Michigan University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1990</latest_year>
    <lat>43.590456</lat>
    <lon>-84.779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56277</plant_id>
    <plant_name>Bavarian LFGTE</plant_name>
    <state>KY</state>
    <county>Boone</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2016</latest_year>
    <lat>38.8608</lat>
    <lon>-84.6556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56522</plant_id>
    <plant_name>Springhill Gas Recovery Plant</plant_name>
    <state>FL</state>
    <county>Jackson</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>30.928333</lat>
    <lon>-85.42611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56523</plant_id>
    <plant_name>Two Pine Landfill Gas Recovery</plant_name>
    <state>AR</state>
    <county>Pulaski</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2017</latest_year>
    <lat>34.8332</lat>
    <lon>-92.1571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56524</plant_id>
    <plant_name>Austin Gas Recovery</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>30.3344</lat>
    <lon>-97.6217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56527</plant_id>
    <plant_name>Fitchburg Gas Recovery</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2009</latest_year>
    <lat>42.535393</lat>
    <lon>-71.84806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56531</plant_id>
    <plant_name>Waste Management Bethel LFGTE</plant_name>
    <state>VA</state>
    <county>Hampton City</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>37.076352</lat>
    <lon>-76.44437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56851</plant_id>
    <plant_name>Bryon Center</plant_name>
    <state>MI</state>
    <county>KENT</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2024</latest_year>
    <lat>42.7814</lat>
    <lon>-85.6728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56853</plant_id>
    <plant_name>Trans-Jordan Generating Station</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.55</lat>
    <lon>-112.0631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56884</plant_id>
    <plant_name>Cumberland County Solid Waste Complex</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.4494</lat>
    <lon>-75.0928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57014</plant_id>
    <plant_name>Waste Management Arden LFGTE</plant_name>
    <state>PA</state>
    <county>Washington</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.2058</lat>
    <lon>-80.2611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57019</plant_id>
    <plant_name>Riverbend Landfill</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>45.1672</lat>
    <lon>-123.2511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57250</plant_id>
    <plant_name>Earthmovers LFGTE</plant_name>
    <state>IN</state>
    <county>Elkhart</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.622942</lat>
    <lon>-85.97516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57409</plant_id>
    <plant_name>West Camden</plant_name>
    <state>TN</state>
    <county>Benton</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.057892</lat>
    <lon>-88.14197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57988</plant_id>
    <plant_name>Lincoln Landfill</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Energy 2001 Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2012</latest_year>
    <lat>38.838056</lat>
    <lon>-121.3419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58282</plant_id>
    <plant_name>Leicester One MA Solar LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.222778</lat>
    <lon>-71.87861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58377</plant_id>
    <plant_name>Rochelle Energy Center</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>Frontier Operation Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.924722</lat>
    <lon>-88.99861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58687</plant_id>
    <plant_name>Finley Buttes Landfill Gas</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>Finley BioEnergy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>45.69</lat>
    <lon>-119.61</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58952</plant_id>
    <plant_name>Dessie Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Dessie Solar Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.302778</lat>
    <lon>-78.83583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58955</plant_id>
    <plant_name>BearPond Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>BearPond Solar Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.276111</lat>
    <lon>-78.37722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58956</plant_id>
    <plant_name>Shankle Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Hoke</county>
    <operator>Shankle Solar Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.943889</lat>
    <lon>-79.19583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58957</plant_id>
    <plant_name>Graham Solar Center LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Graham Solar Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.309722</lat>
    <lon>-79.01444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58977</plant_id>
    <plant_name>Whitman</plant_name>
    <state>AK</state>
    <county>Ketchikan Gateway</county>
    <operator>Ketchikan Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>55.328056</lat>
    <lon>-131.5308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59390</plant_id>
    <plant_name>True North</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>CD US Solar MT1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.8475</lat>
    <lon>-70.89833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59574</plant_id>
    <plant_name>Southeast Berrien Generating Facility</plant_name>
    <state>MI</state>
    <county>Berrien</county>
    <operator>North American Natural Res</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.808611</lat>
    <lon>-86.32389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59646</plant_id>
    <plant_name>FLS Solar 230 (Warren)</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.016111</lat>
    <lon>-77.82194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59710</plant_id>
    <plant_name>Sand Valley Power Station</plant_name>
    <state>AL</state>
    <county>Dekalb</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.343875</lat>
    <lon>-85.8661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59767</plant_id>
    <plant_name>Chester Solar Farm</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Kearsarge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.312</lat>
    <lon>-72.949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60056</plant_id>
    <plant_name>Syncarpha Palmer, LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Syncarpha Palmer, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.222824</lat>
    <lon>-72.30951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61145</plant_id>
    <plant_name>Brown County LFGTE Power Station</plant_name>
    <state>OH</state>
    <county>Brown</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.895</lat>
    <lon>-83.903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61190</plant_id>
    <plant_name>Shavano Falls Hydro Drop 4</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>Shavano Falls Hydro LLC - Drop 4 Project</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.450483</lat>
    <lon>-107.7767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61246</plant_id>
    <plant_name>ACE-Stanton PV</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>ACE-Stanton, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>28.47735</lat>
    <lon>-81.18036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61283</plant_id>
    <plant_name>Bladenboro Solar, LLC</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.547761</lat>
    <lon>-78.81765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61780</plant_id>
    <plant_name>Seminole Energy</plant_name>
    <state>FL</state>
    <county>Seminole</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>28.790186</lat>
    <lon>-81.08902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61975</plant_id>
    <plant_name>Edison Solar</plant_name>
    <state>SC</state>
    <county>Barnwell</county>
    <operator>DP-C2 Episode 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.244191</lat>
    <lon>-81.38616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62037</plant_id>
    <plant_name>Rollingstone Holdco CSG</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Rollingstone Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.114425</lat>
    <lon>-91.79125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62099</plant_id>
    <plant_name>Hammer CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.4176</lat>
    <lon>-94.0094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62368</plant_id>
    <plant_name>BWC Origination 18</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>BWC Origination 18, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.679081</lat>
    <lon>-70.83639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62485</plant_id>
    <plant_name>Crawfordsville 3 Solar Park</plant_name>
    <state>IN</state>
    <county>Montgomery</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.078126</lat>
    <lon>-86.89681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62671</plant_id>
    <plant_name>Equinix Caspian Dr. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.415092</lat>
    <lon>-122.0521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62701</plant_id>
    <plant_name>Kaiser Napa Valley Corporate Dr Fuel Cel</plant_name>
    <state>CA</state>
    <county>Napa</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.25477</lat>
    <lon>-122.2731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62968</plant_id>
    <plant_name>Syncarpha Tewksbury Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Syncarpha Tewksbury, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.593706</lat>
    <lon>-71.17749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63173</plant_id>
    <plant_name>Orange Street G1</plant_name>
    <state>VA</state>
    <county>Bedford</county>
    <operator>Town of Bedford - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2017</latest_year>
    <lat>37.33206</lat>
    <lon>-79.51109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64386</plant_id>
    <plant_name>Gilcrest V CSG</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.317966</lat>
    <lon>-104.7707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64618</plant_id>
    <plant_name>Kearsarge Haverhill</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Kearsarge Haverhill LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <battery_mwh>9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.75288</lat>
    <lon>-71.04697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65550</plant_id>
    <plant_name>Tinker (NC)</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.688268</lat>
    <lon>-79.13692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65638</plant_id>
    <plant_name>SR Greenville I</plant_name>
    <state>TN</state>
    <county>Greene</county>
    <operator>SR Greenville I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.294811</lat>
    <lon>-82.69888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65639</plant_id>
    <plant_name>SR Greenville II</plant_name>
    <state>TN</state>
    <county>Greene</county>
    <operator>SR Greenville II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.1905</lat>
    <lon>-82.74005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66226</plant_id>
    <plant_name>Reid Solar</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.205594</lat>
    <lon>-75.38297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66393</plant_id>
    <plant_name>Towanda Facility</plant_name>
    <state>PA</state>
    <county>Bradford</county>
    <operator>REV LNG SSL BC, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.814444</lat>
    <lon>-76.2875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66603</plant_id>
    <plant_name>IGS OXR1</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.212521</lat>
    <lon>-119.1297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66719</plant_id>
    <plant_name>Millers Chapel Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.360306</lat>
    <lon>-77.89806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67080</plant_id>
    <plant_name>SR Clarksville II, LLC</plant_name>
    <state>TN</state>
    <county>Montgomery</county>
    <operator>SR Clarksville II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.52119</lat>
    <lon>-87.31507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67081</plant_id>
    <plant_name>Sr Byhalia, LLC</plant_name>
    <state>MS</state>
    <county>Marshall</county>
    <operator>SR Byhalia, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.860802</lat>
    <lon>-89.66623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67113</plant_id>
    <plant_name>SSC Oswego II LLC</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Reactivate</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.470642</lat>
    <lon>-76.47192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67130</plant_id>
    <plant_name>SR Panola II, LLC</plant_name>
    <state>MS</state>
    <county>Panola</county>
    <operator>SR Panola II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.340856</lat>
    <lon>-89.91117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67132</plant_id>
    <plant_name>SR Panola I, LLC</plant_name>
    <state>MS</state>
    <county>Panola</county>
    <operator>SR Panola I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.304153</lat>
    <lon>-89.98632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67133</plant_id>
    <plant_name>SR Monroe, LLC</plant_name>
    <state>TN</state>
    <county>Overton</county>
    <operator>SR Monroe, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.44055</lat>
    <lon>-85.25356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67135</plant_id>
    <plant_name>SR West Marshall, LLC</plant_name>
    <state>MS</state>
    <county>Marshall</county>
    <operator>SR West Marshall, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.958436</lat>
    <lon>-89.70122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67340</plant_id>
    <plant_name>Wells (ME)</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.32736</lat>
    <lon>-70.62898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67471</plant_id>
    <plant_name>GSPP 126 Little Bow Rd N, LLC</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.344964</lat>
    <lon>-75.48606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67584</plant_id>
    <plant_name>Oneida East</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Azimuth 180 Solar Electric, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.19</lat>
    <lon>-75.21</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67938</plant_id>
    <plant_name>Perkins Road Belfast Solar, LLC</plant_name>
    <state>ME</state>
    <county>Waldo</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.400239</lat>
    <lon>-68.99242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68026</plant_id>
    <plant_name>SL JAMESTOWN ARRAY 2</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>SL Jamestown II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.0475</lat>
    <lon>-79.28417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68097</plant_id>
    <plant_name>SR Cherry Valley</plant_name>
    <state>AR</state>
    <county>Cross</county>
    <operator>SR Cherry Valley, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.372893</lat>
    <lon>-90.7708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68100</plant_id>
    <plant_name>SR Dumas</plant_name>
    <state>AR</state>
    <county>Desha</county>
    <operator>SR Dumas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.891711</lat>
    <lon>-91.47006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68101</plant_id>
    <plant_name>SR Fisher</plant_name>
    <state>AR</state>
    <county>Poinsett</county>
    <operator>SR Fisher, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.500413</lat>
    <lon>-90.96679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68112</plant_id>
    <plant_name>SR South Gibson</plant_name>
    <state>TN</state>
    <county>Gibson</county>
    <operator>SR South Gibson, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.826426</lat>
    <lon>-88.81739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68979</plant_id>
    <plant_name>Hanover II PV (CSG)</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Hanover II PV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.485899</lat>
    <lon>-79.10273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69274</plant_id>
    <plant_name>Dunkirk Solar Two</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Dunkirk Solar Two, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.497778</lat>
    <lon>-79.30389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69558</plant_id>
    <plant_name>Pluma - SLT Grant</plant_name>
    <state>NM</state>
    <county>Grant</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.762349</lat>
    <lon>-108.1793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69625</plant_id>
    <plant_name>Moore Rd</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>38DN Asset Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.6125</lat>
    <lon>-73.6536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69718</plant_id>
    <plant_name>Geneva CSG 2 LLC</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.865056</lat>
    <lon>-77.01783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69739</plant_id>
    <plant_name>Toyota Boshoku</plant_name>
    <state>IL</state>
    <county>Lawrence</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.721952</lat>
    <lon>-87.63615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70037</plant_id>
    <plant_name>LAX Rental Car Center Solar Power Plant</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>LAX Airport</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.8</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.949726</lat>
    <lon>-118.374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66</plant_id>
    <plant_name>Skagway</plant_name>
    <state>AK</state>
    <county>Skagway Hoonah Angoon</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>8</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1909</first_year>
    <latest_year>2023</latest_year>
    <lat>59.4545</lat>
    <lon>-135.3131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50326</plant_id>
    <plant_name>Nalco</plant_name>
    <state>IL</state>
    <county>DuPage</county>
    <operator>Nalco Co</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combined Cycle</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combined Cycle</technologies>
    <generators>2</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>41.800909</lat>
    <lon>-88.19716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54360</plant_id>
    <plant_name>Fuyao Glass Illinois Inc.</plant_name>
    <state>IL</state>
    <county>Macon</county>
    <operator>Fuyao Glass Illinois, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>39.77896</lat>
    <lon>-88.90163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54933</plant_id>
    <plant_name>Mondelez Global LLC</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Mondelez Global, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>42.3156</lat>
    <lon>-89.0356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54975</plant_id>
    <plant_name>New Mexico State University</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>New Mexico State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>32.164818</lat>
    <lon>-106.4513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57765</plant_id>
    <plant_name>Arizona Western College PV</plant_name>
    <state>AZ</state>
    <county>Yuma</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2015</latest_year>
    <lat>32.687778</lat>
    <lon>-114.4961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58069</plant_id>
    <plant_name>PRSI FCC Generator</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Pasadena Refining System Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Coke</primary_technology>
    <primary_energy_source>PC</primary_energy_source>
    <technologies>Petroleum Coke</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>29.723333</lat>
    <lon>-95.21028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58090</plant_id>
    <plant_name>Middlesex Apple Orchard Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>CVI CleanCapital Solar 4 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.426389</lat>
    <lon>-74.49222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59373</plant_id>
    <plant_name>Broshco Fabricated Products</plant_name>
    <state>OH</state>
    <county>Richland</county>
    <operator>Broshco Fabricated Products</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2005</latest_year>
    <lat>40.776111</lat>
    <lon>-82.56861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60875</plant_id>
    <plant_name>GMP Solar - Williston</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.465485</lat>
    <lon>-73.10324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61315</plant_id>
    <plant_name>Golden Hills Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Golden Hills Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.4</lat>
    <lon>-72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61380</plant_id>
    <plant_name>Johnson Solar CSG</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.912138</lat>
    <lon>-96.18703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62735</plant_id>
    <plant_name>Phoenix Solar South Farms LLC Solar Farm</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Phoenix Solar South Farms LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.081738</lat>
    <lon>-88.2445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62788</plant_id>
    <plant_name>Sugarhill Road - Solitude Solar CSG</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.822572</lat>
    <lon>-73.84853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63446</plant_id>
    <plant_name>1073 Onslow Solar</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>1073 Onslow Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.773578</lat>
    <lon>-77.18577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63671</plant_id>
    <plant_name>Harlem Hospital Center</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>Harlem Hospital Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2008</latest_year>
    <lat>40.81453</lat>
    <lon>-73.9399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63942</plant_id>
    <plant_name>Sunpin Blandford</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Blandford Sun, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.17337</lat>
    <lon>-73.0247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64113</plant_id>
    <plant_name>Kilvert</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>Captona Kilvert Street Warwick LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.727505</lat>
    <lon>-71.44961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64185</plant_id>
    <plant_name>ZPD-PT Solar Project 2017-023 LLC Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <battery_mwh>3.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.07</lat>
    <lon>-72.01</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65668</plant_id>
    <plant_name>Southington Solar One</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>DG Connecticut III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.89</lat>
    <lon>-72.518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66615</plant_id>
    <plant_name>Eunice LA Plant</plant_name>
    <state>LA</state>
    <county>Acadia</county>
    <operator>EnLink Processing Services, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>30.461</lat>
    <lon>-92.532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67034</plant_id>
    <plant_name>NY SHERMAN 176 W MAIN ST - SL 1</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>SL Sherman, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.156051</lat>
    <lon>-79.60161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67470</plant_id>
    <plant_name>GSPP 4643 Twelve Corners Road, LLC</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.841631</lat>
    <lon>-76.44535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67904</plant_id>
    <plant_name>Southwick Solar, LLC Community Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.067202</lat>
    <lon>-72.74594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68404</plant_id>
    <plant_name>TJA-NY-Barrett Rd New Woodstock, LLC</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.830348</lat>
    <lon>-75.8271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69154</plant_id>
    <plant_name>NSF Edmeston Site 2</plant_name>
    <state>NY</state>
    <county>Otsego</county>
    <operator>NSF Energy Three LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.679736</lat>
    <lon>-75.31302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69700</plant_id>
    <plant_name>Skaneateles PV, LLC</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.908908</lat>
    <lon>-76.43289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69986</plant_id>
    <plant_name>Pomfret II Community Solar</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Pomfret II PV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.43926</lat>
    <lon>-79.3742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70110</plant_id>
    <plant_name>Parkton Landfill</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>TotalEnergies Renewables USA LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.7</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.662157</lat>
    <lon>-76.64722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>88</plant_id>
    <plant_name>Ashokan</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>New York Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>9.2</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>41.949</lat>
    <lon>-74.2063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1896</plant_id>
    <plant_name>Little Falls (MN)</plant_name>
    <state>MN</state>
    <county>Morrison</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>5.1</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1979</latest_year>
    <lat>45.975013</lat>
    <lon>-94.36909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6206</plant_id>
    <plant_name>Tacoma</plant_name>
    <state>CO</state>
    <county>La Plata</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1905</first_year>
    <latest_year>1906</latest_year>
    <lat>37.52372</lat>
    <lon>-107.7828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6338</plant_id>
    <plant_name>St Marys IC</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>62.051525</lat>
    <lon>-163.1726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7405</plant_id>
    <plant_name>Shelbina Power #1</plant_name>
    <state>MO</state>
    <county>Shelby</county>
    <operator>City of Shelbina - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1989</latest_year>
    <lat>39.694755</lat>
    <lon>-92.04701</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50329</plant_id>
    <plant_name>West Point Treatment Plant</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>King County Dept-Natural Res - (WA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>47.661111</lat>
    <lon>-122.4464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50353</plant_id>
    <plant_name>Penacook Lower Falls</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Briar-Hydro Associates</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>43.285761</lat>
    <lon>-71.59496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54300</plant_id>
    <plant_name>Coram Energy LLC (4.5MW)</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Nextera Energy Resources</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2004</latest_year>
    <lat>35.0583</lat>
    <lon>-118.3083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54769</plant_id>
    <plant_name>NYU Langone Hospital- Brooklyn</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>NYU Langone Health</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2006</latest_year>
    <lat>40.6467</lat>
    <lon>-74.0211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55319</plant_id>
    <plant_name>Athens Regional Medical Center</plant_name>
    <state>GA</state>
    <county>Clarke</county>
    <operator>Piedmont Athens Regional Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>6</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2007</latest_year>
    <lat>33.9625</lat>
    <lon>-83.3981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57696</plant_id>
    <plant_name>Power Generation Station (PGS) 2</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>East Bay Municipal Util Dist - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>37.825833</lat>
    <lon>-122.2961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57798</plant_id>
    <plant_name>OBP Cogen</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>OBP Cogen LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.754865</lat>
    <lon>-73.98325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57869</plant_id>
    <plant_name>Heller Industrial Parks</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Marina Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2013</latest_year>
    <lat>40.373898</lat>
    <lon>-74.48924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58664</plant_id>
    <plant_name>Frito Lay Incorporated</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Frito Lay Incorporated Dayville</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.862778</lat>
    <lon>-71.89167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59458</plant_id>
    <plant_name>W Plant</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Qualcomm Incorporated</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>32.903333</lat>
    <lon>-117.1956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59853</plant_id>
    <plant_name>Watervliet PV</plant_name>
    <state>MI</state>
    <county>Berrien</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.19</lat>
    <lon>-86.23</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60075</plant_id>
    <plant_name>Fisher Road Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Fisher Road Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.593314</lat>
    <lon>-71.01805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62622</plant_id>
    <plant_name>Overlook Medical Center</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Atlantic Health System</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2025</latest_year>
    <lat>40.711684</lat>
    <lon>-74.35423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62877</plant_id>
    <plant_name>Amazon Denver DEN3</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.885061</lat>
    <lon>-104.9823</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62972</plant_id>
    <plant_name>Syncarpha Leicester Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Leicester, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <battery_mwh>4.2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.254281</lat>
    <lon>-71.88788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63478</plant_id>
    <plant_name>Ross Hall Central Utility Plant</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>The George Washington University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.900216</lat>
    <lon>-77.05079</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64404</plant_id>
    <plant_name>Mesa Carport PV</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Apple, Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.347</lat>
    <lon>-111.602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65487</plant_id>
    <plant_name>Washington Avenue Solar, LLC</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.821552</lat>
    <lon>-73.94991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66018</plant_id>
    <plant_name>Norton Powerhouse 2</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Norton Powerhouse 2</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.299</lat>
    <lon>-71.804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66244</plant_id>
    <plant_name>Webb Road Solar</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>NextGrid Mastic, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.528235</lat>
    <lon>-69.69731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66245</plant_id>
    <plant_name>Merrill Road Solar</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>NextGrid Mangrove, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.15792</lat>
    <lon>-70.19714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66807</plant_id>
    <plant_name>SEPV Cuyama Hybrid</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>SEPV Cuyama, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.904711</lat>
    <lon>-119.585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67110</plant_id>
    <plant_name>Broadway Solar (CSG)</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>NextGrid Bitterbush, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.856462</lat>
    <lon>-68.81839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67111</plant_id>
    <plant_name>Corkwood Solar (CSG)</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>NextGrid Corkwood, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.258078</lat>
    <lon>-68.66646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67606</plant_id>
    <plant_name>NSF Torrey Site 1</plant_name>
    <state>NY</state>
    <county>Yates</county>
    <operator>NSF Torrey Site 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.659</lat>
    <lon>-76.935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67621</plant_id>
    <plant_name>Rivard 2</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.50275</lat>
    <lon>-79.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67747</plant_id>
    <plant_name>Nachtigall 1836-WD</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.608721</lat>
    <lon>-119.3258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67748</plant_id>
    <plant_name>Terry 1818-WD</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.607804</lat>
    <lon>-119.3288</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68740</plant_id>
    <plant_name>Zeuber</plant_name>
    <state>AR</state>
    <county>Pulaski</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.699096</lat>
    <lon>-92.21184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68804</plant_id>
    <plant_name>Rivard 1</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.50275</lat>
    <lon>-79.28172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69547</plant_id>
    <plant_name>Morristown Medical Center</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Atlantic Health System</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.78985</lat>
    <lon>-74.46591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69803</plant_id>
    <plant_name>55 Drive BESS</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>55 Drive BESS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <battery_mwh>4.6</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.726</lat>
    <lon>-73.907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69896</plant_id>
    <plant_name>7999 Gateway Solar</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Coast Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.6</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.5215</lat>
    <lon>-122.0397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>326</plant_id>
    <plant_name>Bishop Creek 5</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1943</latest_year>
    <lat>37.3344</lat>
    <lon>-118.4797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>440</plant_id>
    <plant_name>La Grange</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>37.6697</lat>
    <lon>-120.4436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>515</plant_id>
    <plant_name>Big Thompson</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1959</latest_year>
    <lat>40.421031</lat>
    <lon>-105.2238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7541</plant_id>
    <plant_name>Spirit Mountain</plant_name>
    <state>WY</state>
    <county>Park</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>44.512699</lat>
    <lon>-109.1299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7584</plant_id>
    <plant_name>Panora</plant_name>
    <state>IA</state>
    <county>GUTHRIE</county>
    <operator>City of Panora - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1993</latest_year>
    <lat>41.694673</lat>
    <lon>-94.36757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7752</plant_id>
    <plant_name>Black Bear Lake</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>55.476472</lat>
    <lon>-133.1477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10115</plant_id>
    <plant_name>Grossmont Hospital</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Sharp Grossmont Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.77973</lat>
    <lon>-117.0064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50260</plant_id>
    <plant_name>Corewell Health Dearborn Campus</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>Corewell Health Dearborn Campus</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>42.2917</lat>
    <lon>-83.2119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54655</plant_id>
    <plant_name>Schoolfield Dam</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>36.576778</lat>
    <lon>-79.4325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54984</plant_id>
    <plant_name>Salem Energy Systems LLC</plant_name>
    <state>NC</state>
    <county>Forsyth</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.191241</lat>
    <lon>-80.18346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55037</plant_id>
    <plant_name>Opryland USA</plant_name>
    <state>TN</state>
    <county>Davidson</county>
    <operator>Gaylord Entertainment Co</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>36.211389</lat>
    <lon>-86.69444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55864</plant_id>
    <plant_name>Kaheka Hydro</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Mahi Pono LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>20.8886</lat>
    <lon>-156.3569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55995</plant_id>
    <plant_name>Minot Wind Project</plant_name>
    <state>ND</state>
    <county>Ward</county>
    <operator>Basin Electric Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>48.021271</lat>
    <lon>-101.2805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56139</plant_id>
    <plant_name>Neptune Gas Processing Plant</plant_name>
    <state>LA</state>
    <county>St Mary</county>
    <operator>Enterprise Products Optg LP</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>OTH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>29.7336</lat>
    <lon>-91.4431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56274</plant_id>
    <plant_name>Valley Queen Cheese</plant_name>
    <state>SD</state>
    <county>Grant</county>
    <operator>Valley Queen Cheese Factory, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2004</latest_year>
    <lat>45.221111</lat>
    <lon>-96.63722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56928</plant_id>
    <plant_name>Fairfield University CHP Plant</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Fairfield University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>41.1589</lat>
    <lon>-73.2572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57130</plant_id>
    <plant_name>Beaver Ridge Wind</plant_name>
    <state>ME</state>
    <county>Waldo</county>
    <operator>CPV Beaver Ridge Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>44.4967</lat>
    <lon>-69.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57253</plant_id>
    <plant_name>MA Military Reservation Wind Project</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Air Force Civil Engineer Center</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2011</latest_year>
    <lat>41.6647</lat>
    <lon>-70.5942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57351</plant_id>
    <plant_name>Uilk Wind LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>RENEW Energy Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>43.9811</lat>
    <lon>-96.4269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57354</plant_id>
    <plant_name>Fox Island Wind LLC</plant_name>
    <state>ME</state>
    <county>Knox</county>
    <operator>Fox Island Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.094167</lat>
    <lon>-68.86583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57559</plant_id>
    <plant_name>Sunset Reservoir North Basin</plant_name>
    <state>CA</state>
    <county>San Francisco</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>37.750894</lat>
    <lon>-122.4818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57570</plant_id>
    <plant_name>Cooper Farms VW Project</plant_name>
    <state>OH</state>
    <county>Van Wert</county>
    <operator>Cooper Hatchery Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.905833</lat>
    <lon>-84.57028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57795</plant_id>
    <plant_name>RE Ajo 1 LLC</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.367013</lat>
    <lon>-112.8314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57969</plant_id>
    <plant_name>Darrington</plant_name>
    <state>WA</state>
    <county>Snohomish</county>
    <operator>Hampton Lumber Mills - Washington Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>48.269737</lat>
    <lon>-121.6</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58100</plant_id>
    <plant_name>Kern Oil &amp; Refining Co</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Kern Oil &amp; Refining Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.295556</lat>
    <lon>-118.9183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58171</plant_id>
    <plant_name>Prairie Fire</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.116389</lat>
    <lon>-110.82</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58220</plant_id>
    <plant_name>Haviland Plastic Products</plant_name>
    <state>OH</state>
    <county>Paulding</county>
    <operator>Haviland Plastic Products Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.016111</lat>
    <lon>-84.5875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58283</plant_id>
    <plant_name>Freetown Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Mass Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.766389</lat>
    <lon>-70.98083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58688</plant_id>
    <plant_name>LRI LFGTE Facility</plant_name>
    <state>WA</state>
    <county>Pierce</county>
    <operator>Frontier Operation Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>46.975556</lat>
    <lon>-122.2906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58745</plant_id>
    <plant_name>Sophie Solar</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Sophie Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.305</lat>
    <lon>-81.69694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58840</plant_id>
    <plant_name>Kenansville Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>9</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.97</lat>
    <lon>-77.97611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59085</plant_id>
    <plant_name>Lepomis PV Energy LLC</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.857222</lat>
    <lon>-70.55833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59140</plant_id>
    <plant_name>EDF Lancaster</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.529167</lat>
    <lon>-71.66528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59203</plant_id>
    <plant_name>Farmersville</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.19</lat>
    <lon>-119.12</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59302</plant_id>
    <plant_name>WED Coventry 2</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>WED Coventry Two, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.6725</lat>
    <lon>-71.70583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59314</plant_id>
    <plant_name>WED Coventry 6</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.669722</lat>
    <lon>-71.70833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59692</plant_id>
    <plant_name>NBC Field's Point Wind Farm</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Narragansett Bay Commission</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.79413</lat>
    <lon>-71.38919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59818</plant_id>
    <plant_name>Concord Farm</plant_name>
    <state>NC</state>
    <county>Cabarrus</county>
    <operator>Shoe Show, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.444235</lat>
    <lon>-80.66364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59927</plant_id>
    <plant_name>Hunt Road Solar</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.829833</lat>
    <lon>-70.96021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60048</plant_id>
    <plant_name>TWE Chocowinity Solar, LLC</plant_name>
    <state>NC</state>
    <county>Beaufort</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.501688</lat>
    <lon>-77.10561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60128</plant_id>
    <plant_name>Zephyr Wind</plant_name>
    <state>OH</state>
    <county>Hancock</county>
    <operator>Findlay Wind 19, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.096111</lat>
    <lon>-83.64138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60157</plant_id>
    <plant_name>Heedeh Solar</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.308744</lat>
    <lon>-78.22148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60333</plant_id>
    <plant_name>Railroad Solar Center, LLC</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.998019</lat>
    <lon>-117.1012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60525</plant_id>
    <plant_name>Hastings Solar</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.759275</lat>
    <lon>-92.82488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60526</plant_id>
    <plant_name>Lake Emily Solar</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.320364</lat>
    <lon>-93.90317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60727</plant_id>
    <plant_name>East Orange Solar</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.747582</lat>
    <lon>-74.33576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60739</plant_id>
    <plant_name>DSM Solar</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.843699</lat>
    <lon>-75.06516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60775</plant_id>
    <plant_name>Deerfield CSG Solar</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.56288</lat>
    <lon>-72.58919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60799</plant_id>
    <plant_name>Iron Horse Solar 4, LLC</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Iron Horse Solar 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.580047</lat>
    <lon>-71.26033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61005</plant_id>
    <plant_name>Whirlpool Corporation - Marion Wind Farm</plant_name>
    <state>OH</state>
    <county>Marion</county>
    <operator>Marion Wind 23, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.591154</lat>
    <lon>-83.17849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61607</plant_id>
    <plant_name>Stenner Creek Solar</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Stenner Creek Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.32</lat>
    <lon>-120.691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61660</plant_id>
    <plant_name>Whirlpool Corp-Greenville Wind Farm</plant_name>
    <state>OH</state>
    <county>Darke</county>
    <operator>Greenville Wind 26, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.131293</lat>
    <lon>-84.60986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61814</plant_id>
    <plant_name>Kearsarge Concord II</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Kearsarge Concord II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.449306</lat>
    <lon>-71.42043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61826</plant_id>
    <plant_name>O'Fallon Renewable Energy Center</plant_name>
    <state>MO</state>
    <county>St Charles</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.826648</lat>
    <lon>-90.67812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62028</plant_id>
    <plant_name>CSU Long Beach Lots 7 &amp; 14</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.78104</lat>
    <lon>-118.1136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62095</plant_id>
    <plant_name>Quarter Horse Solar</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.437</lat>
    <lon>-77.642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62101</plant_id>
    <plant_name>Bladenboro Solar 2</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.536</lat>
    <lon>-78.799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62271</plant_id>
    <plant_name>NYPH-Queens</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>NYPH-Queens</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2010</latest_year>
    <lat>40.75043</lat>
    <lon>-73.82573</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62302</plant_id>
    <plant_name>Founders Homestead Farms Solar</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.57677</lat>
    <lon>-71.2782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62414</plant_id>
    <plant_name>Lady Slipper Solar Array CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.554384</lat>
    <lon>-92.66169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62653</plant_id>
    <plant_name>Zephyr Wind Project - 2.0</plant_name>
    <state>OH</state>
    <county>Hancock</county>
    <operator>Findlay Wind 30, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.093078</lat>
    <lon>-83.63778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62702</plant_id>
    <plant_name>Equinix Great Oaks Blvd. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.24097</lat>
    <lon>-121.7826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62752</plant_id>
    <plant_name>LafargeHolcim - Paulding Wind Project</plant_name>
    <state>OH</state>
    <county>Paulding</county>
    <operator>Paulding Wind 28, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.192377</lat>
    <lon>-84.61256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62905</plant_id>
    <plant_name>Day Four Solar LLC</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.053</lat>
    <lon>-74.556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62995</plant_id>
    <plant_name>Grants CDEC 2</plant_name>
    <state>NM</state>
    <county>Cibola</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.14</lat>
    <lon>-107.821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63230</plant_id>
    <plant_name>Knaggs Brothers Farm</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Dynamic Energy Holdings LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.73035</lat>
    <lon>-73.9691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63345</plant_id>
    <plant_name>Scotch Bonnet Solar, LLC</plant_name>
    <state>NC</state>
    <county>Pender</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.53827</lat>
    <lon>-77.90811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63385</plant_id>
    <plant_name>SCV Water - Gladbach Water Treatment Plant Phases I and II</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>SCV Water</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.433332</lat>
    <lon>-118.5108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64273</plant_id>
    <plant_name>Sweet Tea Solar, LLC</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>Sweet Tea Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.160889</lat>
    <lon>-77.1333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64453</plant_id>
    <plant_name>Volney II</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>DG New York CS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.341</lat>
    <lon>-76.354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64508</plant_id>
    <plant_name>Hall Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.799</lat>
    <lon>-77.947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64511</plant_id>
    <plant_name>Rose Acre Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Hyde</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.637337</lat>
    <lon>-76.53598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64514</plant_id>
    <plant_name>Ludie Brown Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <battery_mwh>2.5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.831</lat>
    <lon>-77.77</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64516</plant_id>
    <plant_name>Lowe Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.718429</lat>
    <lon>-79.90948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64520</plant_id>
    <plant_name>Spencer Meadow Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.718429</lat>
    <lon>-79.90948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64530</plant_id>
    <plant_name>Woodville Solar (CSG)</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.45854</lat>
    <lon>-71.70421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64589</plant_id>
    <plant_name>Westport B Community Solar Garden</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>BWC Hamilton Brook LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.70463</lat>
    <lon>-71.08973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64965</plant_id>
    <plant_name>Bullis Road Solar (CSG)</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>RPNY Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.836293</lat>
    <lon>-78.57279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65175</plant_id>
    <plant_name>ENGIE 2019 ProjectCo-MA1, LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>ENGIE 2019 ProjectCo MA-1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.041614</lat>
    <lon>-72.65322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65199</plant_id>
    <plant_name>Keysight - Santa Rosa</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.481931</lat>
    <lon>-122.7111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65379</plant_id>
    <plant_name>OYA State Route 122</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.922</lat>
    <lon>-74.265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65556</plant_id>
    <plant_name>Seagrove</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.532427</lat>
    <lon>-79.78763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65806</plant_id>
    <plant_name>DIA 8</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.903739</lat>
    <lon>-104.6634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66086</plant_id>
    <plant_name>Milo CSG</plant_name>
    <state>ME</state>
    <county>Piscataquis</county>
    <operator>Milo CSG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.24368</lat>
    <lon>-69.01552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66146</plant_id>
    <plant_name>Kaiser - LA</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.099359</lat>
    <lon>-118.2957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66174</plant_id>
    <plant_name>Treasure Lane Solar 1</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.3352</lat>
    <lon>-69.8401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66234</plant_id>
    <plant_name>Wheatland 2A Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.017211</lat>
    <lon>-77.7987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66235</plant_id>
    <plant_name>Wheatland 2B Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.015501</lat>
    <lon>-77.79864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66261</plant_id>
    <plant_name>Martin Marietta Wind Project</plant_name>
    <state>OH</state>
    <county>Sandusky</county>
    <operator>Sandusky Wind 33, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.466</lat>
    <lon>-83.367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66271</plant_id>
    <plant_name>Ameresco HCE Solar LLC</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>Ameresco HCE Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.46647</lat>
    <lon>-107.2348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66370</plant_id>
    <plant_name>BWC Unity Pond LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.587076</lat>
    <lon>-69.55082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66476</plant_id>
    <plant_name>CA Jurupa Valley 3251 De Forest Circle</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.026711</lat>
    <lon>-117.5211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66713</plant_id>
    <plant_name>Wheeler Ridge</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.082</lat>
    <lon>-119.316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66767</plant_id>
    <plant_name>Source Power Company - Richland</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <battery_mwh>9.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.511296</lat>
    <lon>-76.11955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67011</plant_id>
    <plant_name>Dynamic - Wales Leeds Junction Road (CSG)</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.199291</lat>
    <lon>-70.068</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67074</plant_id>
    <plant_name>Heimlich Solar</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Heimlich Solar Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.795634</lat>
    <lon>-75.60607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67089</plant_id>
    <plant_name>Cedar Rapids Community Solar</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.956215</lat>
    <lon>-91.69363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67146</plant_id>
    <plant_name>Ashland Solar</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.258</lat>
    <lon>-71.476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67213</plant_id>
    <plant_name>Hamlin 1</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Helios Energy New York 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.33</lat>
    <lon>-77.965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67939</plant_id>
    <plant_name>Route 3 China Solar, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.40937</lat>
    <lon>-69.53127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67975</plant_id>
    <plant_name>AES Baird Solar CSG</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.201203</lat>
    <lon>-78.19452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68094</plant_id>
    <plant_name>SR Arcadia</plant_name>
    <state>LA</state>
    <county>Bienville</county>
    <operator>SR Arcadia South, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.56461</lat>
    <lon>-92.92538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68234</plant_id>
    <plant_name>Vinelands Power Plant</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>Grand Valley Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.101686</lat>
    <lon>-108.3457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68601</plant_id>
    <plant_name>Davidson III</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>SunE B9 Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.740813</lat>
    <lon>-80.28785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68704</plant_id>
    <plant_name>Manilus</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.045646</lat>
    <lon>-76.02489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69016</plant_id>
    <plant_name>Pivot Solar 34</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.082241</lat>
    <lon>-105.1669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69133</plant_id>
    <plant_name>Manville Hill Road Solar</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Manville Hill Road Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.972496</lat>
    <lon>-71.46998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69241</plant_id>
    <plant_name>Buckheart Creek Solar I Community Solar</plant_name>
    <state>IL</state>
    <county>Fulton</county>
    <operator>Buckheart Creek Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.53985</lat>
    <lon>-90.02651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69368</plant_id>
    <plant_name>Tinta Wita 5 MW Solar PV System</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Tinta Wita Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.632</lat>
    <lon>-92.643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69733</plant_id>
    <plant_name>Fort Polk (fka Johnson) - Chaffee West</plant_name>
    <state>LA</state>
    <county>Vernon</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>31.099349</lat>
    <lon>-93.1984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69954</plant_id>
    <plant_name>Kearsarge Southampton</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Kearsarge Southampton LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.93042</lat>
    <lon>-72.39827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70062</plant_id>
    <plant_name>CBEP SOLAR 6, LLC</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.4804</lat>
    <lon>-104.7167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70449</plant_id>
    <plant_name>RITC Solar and Battery Rooftop System</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Burbank Water and Power - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <battery_mwh>7.8</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.193109</lat>
    <lon>-118.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70539</plant_id>
    <plant_name>LI77</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.5</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.002952</lat>
    <lon>-88.64607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>489</plant_id>
    <plant_name>Upper Dawson</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>5.5</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>37.6508</lat>
    <lon>-120.4706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1754</plant_id>
    <plant_name>Buchanan (MI)</plant_name>
    <state>MI</state>
    <county>Berrien</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>10</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1927</latest_year>
    <lat>41.839566</lat>
    <lon>-86.35105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2313</plant_id>
    <plant_name>West Point Municipal</plant_name>
    <state>NE</state>
    <county>Cuming</county>
    <operator>City of West Point - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1965</latest_year>
    <lat>41.844936</lat>
    <lon>-96.71345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3289</plant_id>
    <plant_name>Neal Shoals</plant_name>
    <state>SC</state>
    <county>Union</county>
    <operator>Dominion Energy South Carolina, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1905</first_year>
    <latest_year>1905</latest_year>
    <lat>34.6642</lat>
    <lon>-81.4486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4263</plant_id>
    <plant_name>Echo Dam</plant_name>
    <state>UT</state>
    <county>Summit</county>
    <operator>City of Bountiful - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.964828</lat>
    <lon>-111.4339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6220</plant_id>
    <plant_name>Durant</plant_name>
    <state>IA</state>
    <county>Cedar</county>
    <operator>City of Durant - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2011</latest_year>
    <lat>41.59976</lat>
    <lon>-90.91195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7484</plant_id>
    <plant_name>NSB Nuiqsut Utility</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>North Slope Borough Power &amp; Light (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2013</latest_year>
    <lat>70.220565</lat>
    <lon>-150.9935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7821</plant_id>
    <plant_name>Big Quinnesec 61</plant_name>
    <state>MI</state>
    <county>Dickinson</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1914</latest_year>
    <lat>45.7883</lat>
    <lon>-88.0415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10058</plant_id>
    <plant_name>Wabtec U.S Rail, Grove City Engine Plant</plant_name>
    <state>PA</state>
    <county>Mercer</county>
    <operator>General Electric Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>41.1694</lat>
    <lon>-80.1055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50328</plant_id>
    <plant_name>Byllesby</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Dakota County, MN</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.5119</lat>
    <lon>-92.9394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50352</plant_id>
    <plant_name>Nacimiento Hydro Project</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Monterey Cnty Water Res Agency</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>35.798576</lat>
    <lon>-120.8833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50759</plant_id>
    <plant_name>West End Dam Hydroelectric Project</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.98289</lat>
    <lon>-75.62058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54285</plant_id>
    <plant_name>Hastings City Hydroelectric</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Hastings Lock &amp; Dam</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>44.760249</lat>
    <lon>-92.86774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57364</plant_id>
    <plant_name>Siphon Drop Power Plant</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Yuma County Water User's Association</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>32.7792</lat>
    <lon>-114.6344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58131</plant_id>
    <plant_name>Outback Solar At Christmas Valley</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>Outback Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.236944</lat>
    <lon>-120.49</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58249</plant_id>
    <plant_name>VA Sepulveda Ambulatory Care Center</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>VA Sepulveda Ambulatory Care Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.248889</lat>
    <lon>-118.4833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58390</plant_id>
    <plant_name>Jordan Hydroelectric Project</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Jordan Hydroelectric LTD PTP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.654722</lat>
    <lon>-79.06833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58435</plant_id>
    <plant_name>Ameresco Vasco Road</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Ameresco Vasco Road, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.754444</lat>
    <lon>-121.7289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58436</plant_id>
    <plant_name>Ameresco San Joaquin</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Ameresco San Joaquin, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.029722</lat>
    <lon>-120.9297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58437</plant_id>
    <plant_name>Ameresco Forward</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Ameresco Forward, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.883406</lat>
    <lon>-121.1851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58716</plant_id>
    <plant_name>OCI Alamo 2, LLC</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>OCI Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>29.469444</lat>
    <lon>-98.33194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58960</plant_id>
    <plant_name>Laguna Water Reclamation Facility</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>City of Santa Rosa - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.368889</lat>
    <lon>-122.7658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59649</plant_id>
    <plant_name>Nelson Gardens Landfill Gas to Energy</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Nelson Gardens Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>29.33</lat>
    <lon>-98.66</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59819</plant_id>
    <plant_name>Mohave Electric at Fort Mohave</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>Mohave Electric Cooperative, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.9843</lat>
    <lon>-114.5565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59847</plant_id>
    <plant_name>Northwest Community Hospital</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Northwest Community Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>42.067753</lat>
    <lon>-87.99349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60065</plant_id>
    <plant_name>Federal Road Solar 1, LLC CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Federal Road Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.806894</lat>
    <lon>-70.72572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60265</plant_id>
    <plant_name>Junction Road</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.5237</lat>
    <lon>-74.8434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60603</plant_id>
    <plant_name>Jacobson 5 MW Solar</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>UNS Electric, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.304528</lat>
    <lon>-114.0118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60815</plant_id>
    <plant_name>Hampshire College Hybrid</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.37686</lat>
    <lon>-72.46914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62173</plant_id>
    <plant_name>SR Jonesborough</plant_name>
    <state>TN</state>
    <county>Washington</county>
    <operator>SR Jonesborough II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.252039</lat>
    <lon>-82.52092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62174</plant_id>
    <plant_name>Maimonides Medical Center</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Maimonides Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2025</latest_year>
    <lat>40.639538</lat>
    <lon>-73.99883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64365</plant_id>
    <plant_name>Western Meadowlark Solar SCS NE 1, LLC</plant_name>
    <state>NE</state>
    <county>Scotts Bluff</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.889</lat>
    <lon>-103.649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64766</plant_id>
    <plant_name>Redwood Coast Airport Microgrid</plant_name>
    <state>CA</state>
    <county>Humboldt</county>
    <operator>Redwood Coast Energy Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <battery_mwh>8.8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.967222</lat>
    <lon>-124.1044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65485</plant_id>
    <plant_name>Graniterock Quarry</plant_name>
    <state>CA</state>
    <county>San Benito</county>
    <operator>CalCom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.878164</lat>
    <lon>-121.6028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66020</plant_id>
    <plant_name>DRPA Woodcrest Station Solar Project</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Solar Star River SLB, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.907271</lat>
    <lon>-75.04693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66231</plant_id>
    <plant_name>State Highway 17B Solar</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.682259</lat>
    <lon>-74.87654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66367</plant_id>
    <plant_name>IMPA Richmond Solar Park 7</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.8136</lat>
    <lon>-84.95814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66438</plant_id>
    <plant_name>Perkasie PA BTM</plant_name>
    <state>PA</state>
    <county>Bucks</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.379054</lat>
    <lon>-75.30352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66530</plant_id>
    <plant_name>NY Potsdam 28 Hamilton St. Solar</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Potsdam Community Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.678878</lat>
    <lon>-74.96407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66734</plant_id>
    <plant_name>Marathon Solar Farm LLC South</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.0832</lat>
    <lon>-75.7351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66892</plant_id>
    <plant_name>Conflitti Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>CES Electron Farm One, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.6281</lat>
    <lon>-120.5708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67077</plant_id>
    <plant_name>BESSP1, LLC.</plant_name>
    <state>TX</state>
    <county>Lubbock</county>
    <operator>BESSP1, LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.695594</lat>
    <lon>-101.9707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67144</plant_id>
    <plant_name>DG Moorman Creek</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>DG Moorman Creek, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.288</lat>
    <lon>-77.865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67329</plant_id>
    <plant_name>Sheesley (CSG)</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.6059</lat>
    <lon>-75.1589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67550</plant_id>
    <plant_name>State Route 5</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.070724</lat>
    <lon>-75.4944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69157</plant_id>
    <plant_name>SV CSG Paloma Solar</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>SV CSG Paloma Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.581609</lat>
    <lon>-89.44544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69380</plant_id>
    <plant_name>NSF Chateaugay Site 2</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>NSF Chateaugay Site 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.95</lat>
    <lon>-74.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70572</plant_id>
    <plant_name>Barnes East</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.305</lat>
    <lon>-79.372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1276</plant_id>
    <plant_name>Erie</plant_name>
    <state>KS</state>
    <county>Neosho</county>
    <operator>City of Erie - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>1958</first_year>
    <latest_year>2005</latest_year>
    <lat>37.56681</lat>
    <lon>-95.2375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1722</plant_id>
    <plant_name>Webber</plant_name>
    <state>MI</state>
    <county>Ionia</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1907</first_year>
    <latest_year>1949</latest_year>
    <lat>42.9528</lat>
    <lon>-84.9025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7438</plant_id>
    <plant_name>Church Street Plant</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>City of Manassas - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1996</latest_year>
    <lat>38.752347</lat>
    <lon>-77.46292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7857</plant_id>
    <plant_name>Gilliam South</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>City of Stuart - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2012</latest_year>
    <lat>41.496111</lat>
    <lon>-94.32722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8110</plant_id>
    <plant_name>Stanberry</plant_name>
    <state>MO</state>
    <county>Gentry</county>
    <operator>City of Stanberry - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1979</latest_year>
    <lat>40.212746</lat>
    <lon>-94.54236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10173</plant_id>
    <plant_name>Cherokee Falls</plant_name>
    <state>SC</state>
    <county>Cherokee</county>
    <operator>Hydroland Omega LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>35.0642</lat>
    <lon>-81.5458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50351</plant_id>
    <plant_name>Rolfe Canal Hydro</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Briar-Hydro Associates</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.27456</lat>
    <lon>-71.60403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54251</plant_id>
    <plant_name>Opal Springs Hydro</plant_name>
    <state>OR</state>
    <county>Jefferson</county>
    <operator>Deschutes Valley Water District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>44.49004</lat>
    <lon>-121.2988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54296</plant_id>
    <plant_name>Biola University Hybrid</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Biola University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <battery_mwh>0.5</battery_mwh>
    <first_year>2002</first_year>
    <latest_year>2023</latest_year>
    <lat>33.906953</lat>
    <lon>-118.0131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54387</plant_id>
    <plant_name>Weeks Falls</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>47.43348</lat>
    <lon>-121.6483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54407</plant_id>
    <plant_name>Waupun Correctional Central Heating Plt</plant_name>
    <state>WI</state>
    <county>Dodge</county>
    <operator>State of Wisconsin</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Steam Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1998</latest_year>
    <lat>43.6233</lat>
    <lon>-88.7297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57160</plant_id>
    <plant_name>White River Lock and Dam 1</plant_name>
    <state>AR</state>
    <county>Independence</county>
    <operator>Ozark Hydro Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.757401</lat>
    <lon>-91.63689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57162</plant_id>
    <plant_name>White River Lock and Dam 3</plant_name>
    <state>AR</state>
    <county>Stone</county>
    <operator>Ozark Hydro Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.84361</lat>
    <lon>-91.85052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58152</plant_id>
    <plant_name>Danbury Hospital Cogen Plant</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Danbury Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.405278</lat>
    <lon>-73.4475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58441</plant_id>
    <plant_name>Swauk Wind LLC</plant_name>
    <state>WA</state>
    <county>Kittitas</county>
    <operator>Gamesa Wind US LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>47.139167</lat>
    <lon>-120.7531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59551</plant_id>
    <plant_name>FLS Solar 200, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.581944</lat>
    <lon>-78.94</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59780</plant_id>
    <plant_name>New Bedford (MA) Plymouth</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>BWC Origination 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.925352</lat>
    <lon>-70.64903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60359</plant_id>
    <plant_name>Gastonia Solar Center</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.229033</lat>
    <lon>-81.18908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60607</plant_id>
    <plant_name>CMEEC - Polaris Park Solar Hybrid</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <battery_mwh>3.3</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.381256</lat>
    <lon>-72.07689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60609</plant_id>
    <plant_name>CMEEC - Norwich Stott St Solar Hybrid</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.576946</lat>
    <lon>-72.10461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60721</plant_id>
    <plant_name>Green Cow Power</plant_name>
    <state>IN</state>
    <county>Elkhart</county>
    <operator>Green Cow Power LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2021</latest_year>
    <lat>41.536735</lat>
    <lon>-85.9272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60995</plant_id>
    <plant_name>Ramona Solar Energy</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>San Diego Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.018486</lat>
    <lon>-116.8607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61989</plant_id>
    <plant_name>Pacific Ethanol Madera Solar Array</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Seaboard Energy California, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.916111</lat>
    <lon>-119.9714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62487</plant_id>
    <plant_name>Flowers Solar LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.41218</lat>
    <lon>-78.60309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62769</plant_id>
    <plant_name>Columbia City Solar Park</plant_name>
    <state>IN</state>
    <county>Whitley</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.175519</lat>
    <lon>-85.5053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62948</plant_id>
    <plant_name>NASA Wallops Flight Facility Solar</plant_name>
    <state>VA</state>
    <county>Accomack</county>
    <operator>Ameresco Federal Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.938056</lat>
    <lon>-75.47361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63473</plant_id>
    <plant_name>West A&amp;B Solar Project Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <battery_mwh>3.5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.0748</lat>
    <lon>-72.0038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63903</plant_id>
    <plant_name>Pinesburg Solar LLC</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.625172</lat>
    <lon>-77.8609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65091</plant_id>
    <plant_name>IGS KSBD</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.10535</lat>
    <lon>-117.2348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65473</plant_id>
    <plant_name>GD Johnson Scituate I, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>GD Johnson Scituate I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.807129</lat>
    <lon>-71.50538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65636</plant_id>
    <plant_name>Dartmouth Farms Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Dartmouth Farms Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2020</latest_year>
    <lat>41.6628</lat>
    <lon>-71.00347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66816</plant_id>
    <plant_name>Glenville Solar (CSG)</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>NY USLE Glenville Freemans Bridge LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.83949</lat>
    <lon>-73.93256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66907</plant_id>
    <plant_name>Barefoot Solar</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.595751</lat>
    <lon>-69.60503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67126</plant_id>
    <plant_name>SR Albany, LLC</plant_name>
    <state>TN</state>
    <county>Greene</county>
    <operator>SR Albany, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.243794</lat>
    <lon>-82.90936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67288</plant_id>
    <plant_name>Foster Clean Power A</plant_name>
    <state>CA</state>
    <county>Humboldt</county>
    <operator>Foster Clean Power A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <battery_mwh>5.2</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.882295</lat>
    <lon>-124.1012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67589</plant_id>
    <plant_name>NY Evans 7690 SW Blvd - SL Evans Array 1</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>SL Evans, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.680833</lat>
    <lon>-78.9525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67610</plant_id>
    <plant_name>NY PAVILION 6464 SHEPARD RD - Genesee 4</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>NY CDG Genesee 4 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.877408</lat>
    <lon>-78.05346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67632</plant_id>
    <plant_name>Acer</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.756501</lat>
    <lon>-75.1604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67683</plant_id>
    <plant_name>SV CSG Plato Solar 1 LLC</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.039337</lat>
    <lon>-88.42313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68754</plant_id>
    <plant_name>USS Origami Solar</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>USS Origami Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.8344</lat>
    <lon>-90.1452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69525</plant_id>
    <plant_name>Pennsville Landfill (CSG)</plant_name>
    <state>NJ</state>
    <county>Salem</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.3</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.637595</lat>
    <lon>-75.54404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>84</plant_id>
    <plant_name>Ketchikan</plant_name>
    <state>AK</state>
    <county>Ketchikan Gateway</county>
    <operator>Ketchikan Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1954</latest_year>
    <lat>55.344641</lat>
    <lon>-131.6334</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1125</plant_id>
    <plant_name>Bancroft</plant_name>
    <state>IA</state>
    <county>Kossuth</county>
    <operator>Bancroft Municipal Utilities - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>1954</first_year>
    <latest_year>2001</latest_year>
    <lat>43.292628</lat>
    <lon>-94.21708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1262</plant_id>
    <plant_name>Baldwin City Plant No 1</plant_name>
    <state>KS</state>
    <county>Douglas</county>
    <operator>City of Baldwin City- (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1970</latest_year>
    <lat>38.7745</lat>
    <lon>-95.1867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2528</plant_id>
    <plant_name>Harris Lake</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>New York State Elec &amp; Gas Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1967</first_year>
    <latest_year>2017</latest_year>
    <lat>43.9719</lat>
    <lon>-74.1861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3699</plant_id>
    <plant_name>Boulder</plant_name>
    <state>UT</state>
    <county>Garfield</county>
    <operator>Garkane Energy Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1961</latest_year>
    <lat>37.9858</lat>
    <lon>-111.4383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4060</plant_id>
    <plant_name>Alexander</plant_name>
    <state>WI</state>
    <county>Lincoln</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>45.1875</lat>
    <lon>-89.7553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7958</plant_id>
    <plant_name>Horry Land Fill Gas Site</plant_name>
    <state>SC</state>
    <county>Horry</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2003</latest_year>
    <lat>33.8125</lat>
    <lon>-78.96722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10523</plant_id>
    <plant_name>Benton Falls Associates</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Essex Hydro Associates LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.580175</lat>
    <lon>-69.55452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10538</plant_id>
    <plant_name>Dexter Plant</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1988</latest_year>
    <lat>44.003984</lat>
    <lon>-76.04128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50241</plant_id>
    <plant_name>Tenet Hospital</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>Tenet Hospital Ltd</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>31.7697</lat>
    <lon>-106.5014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50961</plant_id>
    <plant_name>Slate Creek</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.976859</lat>
    <lon>-122.4563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54203</plant_id>
    <plant_name>Mississippi Baptist Medical Center</plant_name>
    <state>MS</state>
    <county>Hinds</county>
    <operator>Mississippi Baptist Medical</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>32.3133</lat>
    <lon>-90.1797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54363</plant_id>
    <plant_name>Shelby, NC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Electric Glass Fiber America, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1972</first_year>
    <latest_year>1972</latest_year>
    <lat>35.3264</lat>
    <lon>-81.6292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54790</plant_id>
    <plant_name>CSL Behring LLC</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>CSL Behring LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>41.1603</lat>
    <lon>-87.8542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54965</plant_id>
    <plant_name>Cargill Salt</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>Cargill Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2017</latest_year>
    <lat>42.8183</lat>
    <lon>-82.4856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56824</plant_id>
    <plant_name>Marshall Wind 2 LLC</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Marshall Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>44.3236</lat>
    <lon>-95.8222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56825</plant_id>
    <plant_name>Marshall Wind 3 LLC</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Marshall Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>44.3211</lat>
    <lon>-95.7942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56826</plant_id>
    <plant_name>Marshall Wind 4 LLC</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Marshall Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>44.3361</lat>
    <lon>-95.8242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58357</plant_id>
    <plant_name>Amazon</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>CVI CleanCapital Solar 4 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.566389</lat>
    <lon>-74.22139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58431</plant_id>
    <plant_name>West Tennessee Solar Farm</plant_name>
    <state>TN</state>
    <county>Haywood</county>
    <operator>UT West Tennessee Solar Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.408611</lat>
    <lon>-89.3875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58585</plant_id>
    <plant_name>Sierra Nevada Brewing Co Hybrid</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Sierra Nevada Brewing Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine; Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2007</first_year>
    <latest_year>2017</latest_year>
    <lat>39.724167</lat>
    <lon>-121.8153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58946</plant_id>
    <plant_name>Ameresco Dallas LLC</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Ameresco Dallas LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.648611</lat>
    <lon>-96.64444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59783</plant_id>
    <plant_name>Croda Atlas Point CHP</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Croda Inc.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2021</latest_year>
    <lat>39.693333</lat>
    <lon>-75.54306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60822</plant_id>
    <plant_name>Intel - Ocotillo Campus Solar</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2018</latest_year>
    <lat>33.243261</lat>
    <lon>-111.8924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61555</plant_id>
    <plant_name>DG Crystal Spring CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>DG Crystal Spring LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.679836</lat>
    <lon>-70.49528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61758</plant_id>
    <plant_name>Gaston County Renewable Energy Center</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>Gaston County Solid Waste and Recycling Division</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.3857</lat>
    <lon>-81.172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62680</plant_id>
    <plant_name>Garfield Solar</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.888632</lat>
    <lon>-74.12223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63022</plant_id>
    <plant_name>Fort Carson Battery Energy Storage Syste</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Department of the Army, Fort Carson</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <battery_mwh>8.5</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.745474</lat>
    <lon>-104.7777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64198</plant_id>
    <plant_name>Horn Rapids Solar, Storage and Training</plant_name>
    <state>WA</state>
    <county>Benton</county>
    <operator>Energy Northwest</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>46.3529</lat>
    <lon>-119.3222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64399</plant_id>
    <plant_name>EMWD - San Jacinto RES BCT</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.802869</lat>
    <lon>-117.0236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64749</plant_id>
    <plant_name>Fuel Cell 18B Sneden Avenue</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Annadale Community Clean Energy Projects LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.540457</lat>
    <lon>-74.17656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65174</plant_id>
    <plant_name>Cranberry Highway Solar LLC</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Cranberry Highway Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <battery_mwh>4.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.787462</lat>
    <lon>-70.74522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65652</plant_id>
    <plant_name>Niagara Bottling - Rialto</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.126094</lat>
    <lon>-117.4185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66010</plant_id>
    <plant_name>IGS CMH4, LLC</plant_name>
    <state>OH</state>
    <county>Madison</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.943015</lat>
    <lon>-83.31775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66486</plant_id>
    <plant_name>Ramapo</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.081</lat>
    <lon>-74.174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67269</plant_id>
    <plant_name>Spano Solar - Ocean County Landfill - CS</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.025166</lat>
    <lon>-74.24949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67641</plant_id>
    <plant_name>Niagara (NY)</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.295921</lat>
    <lon>-78.82587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69091</plant_id>
    <plant_name>Kirkland</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.2</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.0591</lat>
    <lon>-75.3738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>487</plant_id>
    <plant_name>Valley View</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>33.9001</lat>
    <lon>-117.8291</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2311</plant_id>
    <plant_name>Wakefield</plant_name>
    <state>NE</state>
    <county>Dixon</county>
    <operator>City of Wakefield - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1971</latest_year>
    <lat>42.2691</lat>
    <lon>-96.8621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6459</plant_id>
    <plant_name>Big Fork</plant_name>
    <state>MT</state>
    <county>Flathead</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1928</latest_year>
    <lat>48.0592</lat>
    <lon>-114.0708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8108</plant_id>
    <plant_name>Hopkinton</plant_name>
    <state>IA</state>
    <county>Delaware</county>
    <operator>City of Hopkinton - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1973</first_year>
    <latest_year>2011</latest_year>
    <lat>42.343542</lat>
    <lon>-91.2471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10020</plant_id>
    <plant_name>Cutrale Citrus Juices USA I</plant_name>
    <state>FL</state>
    <county>Lake</county>
    <operator>Cutrale Citrus Juices USA Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>28.811828</lat>
    <lon>-81.86527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10280</plant_id>
    <plant_name>Central Plant</plant_name>
    <state>SC</state>
    <county>GREENVILLE</county>
    <operator>Bob Jones University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2008</latest_year>
    <lat>34.871811</lat>
    <lon>-82.36604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10735</plant_id>
    <plant_name>Barber Dam</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Barber Pool Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>43.561001</lat>
    <lon>-116.1213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52187</plant_id>
    <plant_name>Falls Creek</plant_name>
    <state>OR</state>
    <county>Linn</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>44.396815</lat>
    <lon>-122.3502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54929</plant_id>
    <plant_name>Alliant SBD 9403 Aegon DC</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2007</latest_year>
    <lat>41.9167</lat>
    <lon>-91.6542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57081</plant_id>
    <plant_name>Calpine Vineland Solar LLC</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>Calpine Vineland Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>39.4636</lat>
    <lon>-75.0667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57647</plant_id>
    <plant_name>Toys R Us- DE, Inc. at Mt. Olive, NJ</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Luminace Solar New Jersey II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.818888</lat>
    <lon>-74.71861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58010</plant_id>
    <plant_name>WSMR I</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>Siemens Government Technologies Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.395833</lat>
    <lon>-106.4772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58358</plant_id>
    <plant_name>North Jersey Media Group Solar Facility</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>CVI CleanCapital Solar 4 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.924167</lat>
    <lon>-74.49472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58996</plant_id>
    <plant_name>St. Olaf StandBy Generators</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>St. Olaf College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>44.461111</lat>
    <lon>-93.18083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59453</plant_id>
    <plant_name>Albany Medical Ctr Cogen Plant</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Albany Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.655</lat>
    <lon>-73.7777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60276</plant_id>
    <plant_name>West Groton CHP</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Hollingsworth &amp; Vose Co West Groton</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.61343</lat>
    <lon>-71.63377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60426</plant_id>
    <plant_name>RCWD PV Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.5226</lat>
    <lon>-117.1815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60930</plant_id>
    <plant_name>Dublin Solar I</plant_name>
    <state>GA</state>
    <county>Laurens</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>32.581</lat>
    <lon>-82.926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61247</plant_id>
    <plant_name>ACE-Stanton A PV</plant_name>
    <state>FL</state>
    <county>Orange</county>
    <operator>ACE-Stanton A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>28.48455</lat>
    <lon>-81.17411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61326</plant_id>
    <plant_name>Cameron Solar II</plant_name>
    <state>SC</state>
    <county>Calhoun</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.567</lat>
    <lon>-80.699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61460</plant_id>
    <plant_name>IOS - MEW Phase 1</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.804</lat>
    <lon>-69.838</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62092</plant_id>
    <plant_name>Montague Site 36-Grosolar</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.5</lat>
    <lon>-72.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62507</plant_id>
    <plant_name>County Route 11 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.935</lat>
    <lon>-73.677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63381</plant_id>
    <plant_name>Railroad Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.68056</lat>
    <lon>-79.185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65154</plant_id>
    <plant_name>UMass PV Lot 22</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <battery_mwh>4.3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.393012</lat>
    <lon>-72.52023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65740</plant_id>
    <plant_name>Canal Energy S23, LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.1761</lat>
    <lon>-119.5604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66402</plant_id>
    <plant_name>Caribou</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>46.909</lat>
    <lon>-68.046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66403</plant_id>
    <plant_name>Loring</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>46.93905</lat>
    <lon>-67.92889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67638</plant_id>
    <plant_name>Grass River</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.623428</lat>
    <lon>-75.20335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68675</plant_id>
    <plant_name>Maple North 1</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.986</lat>
    <lon>-74.183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69328</plant_id>
    <plant_name>V Street Solar</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>V Street Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.917755</lat>
    <lon>-76.99072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69834</plant_id>
    <plant_name>Avon CSG 2 LLC</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.885817</lat>
    <lon>-77.71431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69898</plant_id>
    <plant_name>Lakeside Pipeline</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Maas Energy Works</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.24514</lat>
    <lon>-119.5834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69899</plant_id>
    <plant_name>Merced Pipeline</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Maas Energy Works</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.2185</lat>
    <lon>-120.5108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69900</plant_id>
    <plant_name>Five Points Pipeline</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Maas Energy Works</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.476501</lat>
    <lon>-120.0123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70149</plant_id>
    <plant_name>Winslow PV, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>SREOG Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4.1</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.508645</lat>
    <lon>-69.63403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62</plant_id>
    <plant_name>Annex Creek</plant_name>
    <state>AK</state>
    <county>Juneau</county>
    <operator>Alaska Electric Light &amp; Power Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1915</latest_year>
    <lat>58.3176</lat>
    <lon>-134.101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>277</plant_id>
    <plant_name>San Joaquin 3</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>37.253718</lat>
    <lon>-119.5194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>314</plant_id>
    <plant_name>Drop 5 (CA)</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>32.673097</lat>
    <lon>-115.392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1121</plant_id>
    <plant_name>Alta Municipal Utilities</plant_name>
    <state>IA</state>
    <county>Buena Vista</county>
    <operator>City of Alta - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.6736</lat>
    <lon>-95.3026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1153</plant_id>
    <plant_name>Lake Park</plant_name>
    <state>IA</state>
    <county>Dickinson</county>
    <operator>City of Lake Park - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>43.4301</lat>
    <lon>-95.3153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1193</plant_id>
    <plant_name>Villisca Municipal Power Plant</plant_name>
    <state>IA</state>
    <county>Montgomery</county>
    <operator>City of Villisca - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>40.9315</lat>
    <lon>-94.9855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1224</plant_id>
    <plant_name>Bird City</plant_name>
    <state>KS</state>
    <county>Cheyenne</county>
    <operator>Midwest Energy Inc - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1965</first_year>
    <latest_year>1966</latest_year>
    <lat>39.7581</lat>
    <lon>-101.5319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1265</plant_id>
    <plant_name>Burlingame</plant_name>
    <state>KS</state>
    <county>Osage</county>
    <operator>City of Burlingame - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1980</latest_year>
    <lat>38.7551</lat>
    <lon>-95.8368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1712</plant_id>
    <plant_name>Loud</plant_name>
    <state>MI</state>
    <county>Iosco</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.9</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1913</latest_year>
    <lat>44.4631</lat>
    <lon>-83.7208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1902</plant_id>
    <plant_name>Winton</plant_name>
    <state>MN</state>
    <county>Lake</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>47.9344</lat>
    <lon>-91.7639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2223</plant_id>
    <plant_name>Cambridge</plant_name>
    <state>NE</state>
    <county>Furnas</county>
    <operator>City of Cambridge - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>40.286178</lat>
    <lon>-100.1768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2256</plant_id>
    <plant_name>Syracuse # 2</plant_name>
    <state>NE</state>
    <county>Otoe</county>
    <operator>City of Nebraska City - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1970</latest_year>
    <lat>40.6756</lat>
    <lon>-96.17778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2540</plant_id>
    <plant_name>Allens Falls</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>44.660338</lat>
    <lon>-74.86027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2560</plant_id>
    <plant_name>Ephratah</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1920</latest_year>
    <lat>43.0092</lat>
    <lon>-74.5372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2561</plant_id>
    <plant_name>East Norfolk</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>44.7989</lat>
    <lon>-74.9856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2580</plant_id>
    <plant_name>Johnsonville Dam</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1909</first_year>
    <latest_year>1909</latest_year>
    <lat>42.920374</lat>
    <lon>-73.50889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2604</plant_id>
    <plant_name>South Edwards</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1994</latest_year>
    <lat>44.2678</lat>
    <lon>-75.1961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2616</plant_id>
    <plant_name>Sugar Island</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>44.642181</lat>
    <lon>-74.97647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2617</plant_id>
    <plant_name>Taylorville</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1927</latest_year>
    <lat>43.927002</lat>
    <lon>-75.32188</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2623</plant_id>
    <plant_name>Waterport</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>43.3272</lat>
    <lon>-78.2394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2811</plant_id>
    <plant_name>Grafton</plant_name>
    <state>ND</state>
    <county>Walsh</county>
    <operator>City of Grafton - (ND)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1937</first_year>
    <latest_year>1956</latest_year>
    <lat>48.430028</lat>
    <lon>-97.40333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2830</plant_id>
    <plant_name>Walter C Beckjord</plant_name>
    <state>OH</state>
    <county>Clermont</county>
    <operator>Duke Energy Ohio Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>1.8</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.9917</lat>
    <lon>-84.2981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3261</plant_id>
    <plant_name>Hollidays Bridge Hydro</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Northbrook Carolina Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.8</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>34.527475</lat>
    <lon>-82.37496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3697</plant_id>
    <plant_name>Gateway</plant_name>
    <state>UT</state>
    <county>Morgan</county>
    <operator>Weber Basin Water Conserv Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>41.136547</lat>
    <lon>-111.8314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3731</plant_id>
    <plant_name>Newport</plant_name>
    <state>VT</state>
    <county>Orleans</county>
    <operator>Great Bay Hydro Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1936</first_year>
    <latest_year>1944</latest_year>
    <lat>44.937579</lat>
    <lon>-72.17997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6377</plant_id>
    <plant_name>Ocracoke Hybrid</plant_name>
    <state>NC</state>
    <county>Hyde</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>1991</first_year>
    <latest_year>2017</latest_year>
    <lat>35.109444</lat>
    <lon>-75.97972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6529</plant_id>
    <plant_name>Searsburg</plant_name>
    <state>VT</state>
    <county>Bennington</county>
    <operator>Great River Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>42.87084</lat>
    <lon>-72.92732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7751</plant_id>
    <plant_name>Goat Lake Hydro</plant_name>
    <state>AK</state>
    <county>Skagway Hoonah Angoon</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>59.5357</lat>
    <lon>-135.2123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7924</plant_id>
    <plant_name>Albertville</plant_name>
    <state>AL</state>
    <county>Marshall</county>
    <operator>Albertville Municipal Utilities Board (AL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>34.363389</lat>
    <lon>-86.22389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7940</plant_id>
    <plant_name>Ponton Diesel Generating Facility</plant_name>
    <state>VA</state>
    <county>Amelia</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.2953</lat>
    <lon>-77.9862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7941</plant_id>
    <plant_name>Nottoway Diesel Generating Facility</plant_name>
    <state>VA</state>
    <county>Southampton</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>36.697222</lat>
    <lon>-77.105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8105</plant_id>
    <plant_name>Halstad</plant_name>
    <state>MN</state>
    <county>Norman</county>
    <operator>City of Halstad - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>47.350064</lat>
    <lon>-96.83191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50261</plant_id>
    <plant_name>New Lahontan</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Truckee-Carson Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>39.463569</lat>
    <lon>-119.0652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52063</plant_id>
    <plant_name>Martinez Sulfuric Acid Regeneration Plt</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Eco Services Corp.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>OTH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1978</first_year>
    <latest_year>1978</latest_year>
    <lat>38.0314</lat>
    <lon>-122.1139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54340</plant_id>
    <plant_name>Norway Point Hydropower Project</plant_name>
    <state>MI</state>
    <county>Alpena</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>45.1025</lat>
    <lon>-83.5189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55288</plant_id>
    <plant_name>Medway Hydro</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Brookfield Black Bear Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1925</latest_year>
    <lat>45.6072</lat>
    <lon>-68.5453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55964</plant_id>
    <plant_name>Brown Station Road Plant II</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Prince George's County - (MD)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.847585</lat>
    <lon>-76.78591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56016</plant_id>
    <plant_name>Grimes Way</plant_name>
    <state>WA</state>
    <county>Whitman</county>
    <operator>Washington State University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>46.7289</lat>
    <lon>-117.1514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56025</plant_id>
    <plant_name>Traer East</plant_name>
    <state>IA</state>
    <county>Tama</county>
    <operator>City of Traer - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>42.1817</lat>
    <lon>-92.4663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56098</plant_id>
    <plant_name>Hillsboro</plant_name>
    <state>ND</state>
    <county>Traill</county>
    <operator>City of Hillsboro - (ND)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>47.396944</lat>
    <lon>-97.06056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56348</plant_id>
    <plant_name>Laverne Diesel Generating Plant</plant_name>
    <state>OK</state>
    <county>Harper</county>
    <operator>Town of Laverne - (OK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>36.7106</lat>
    <lon>-99.8906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56517</plant_id>
    <plant_name>West Diesel Generation Unit</plant_name>
    <state>IA</state>
    <county>Pocahontas</county>
    <operator>City of Pocahontas - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>42.730291</lat>
    <lon>-94.66439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56521</plant_id>
    <plant_name>Lake Mills Gas Recovery</plant_name>
    <state>IA</state>
    <county>Winnebago</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.3864</lat>
    <lon>-93.5589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56571</plant_id>
    <plant_name>Eastern Landfill Gas LLC</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>5.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2022</latest_year>
    <lat>39.389728</lat>
    <lon>-76.39201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57025</plant_id>
    <plant_name>Waste Management Eco Vista LFGTE</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>36.140849</lat>
    <lon>-94.25971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57168</plant_id>
    <plant_name>Waste Management Naples LFGTE Project</plant_name>
    <state>FL</state>
    <county>Collier</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>26.155833</lat>
    <lon>-81.65806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57179</plant_id>
    <plant_name>HSCo CHP</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Cartier Energy, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.7614</lat>
    <lon>-72.6686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57410</plant_id>
    <plant_name>Geneva</plant_name>
    <state>OH</state>
    <county>Ashtabula</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.795</lat>
    <lon>-80.91</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57411</plant_id>
    <plant_name>Mahoning</plant_name>
    <state>OH</state>
    <county>Mahoning</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.914444</lat>
    <lon>-80.58611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57660</plant_id>
    <plant_name>Vineland Mays Landing Solar</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.4175</lat>
    <lon>-74.97389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57722</plant_id>
    <plant_name>North Palm Springs 4A</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.909722</lat>
    <lon>-116.5625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57723</plant_id>
    <plant_name>Johnson Matthey, Inc. Solar</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Luminace Solar New Jersey II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.825278</lat>
    <lon>-75.21972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58275</plant_id>
    <plant_name>Mass Midstate Solar 3</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.219722</lat>
    <lon>-71.87861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58308</plant_id>
    <plant_name>Lindsay Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.211944</lat>
    <lon>-119.1339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58312</plant_id>
    <plant_name>Warrenton Farm</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.415</lat>
    <lon>-78.17111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58314</plant_id>
    <plant_name>Belwood Farm</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Palmetto Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.47</lat>
    <lon>-81.50833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58438</plant_id>
    <plant_name>Spearfish Hydro</plant_name>
    <state>SD</state>
    <county>Lawrence</county>
    <operator>City of Spearfish - (SD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>44.478333</lat>
    <lon>-103.8547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58447</plant_id>
    <plant_name>Arrache 8083</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.647778</lat>
    <lon>-118.0611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58449</plant_id>
    <plant_name>Rutan</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.643889</lat>
    <lon>-118.1631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58453</plant_id>
    <plant_name>Dixon Dairy Road Solar</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.199167</lat>
    <lon>-81.41083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58473</plant_id>
    <plant_name>Bruce A Henry Solar Farm</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Delaware Electric Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.663992</lat>
    <lon>-75.40054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58493</plant_id>
    <plant_name>Progress Solar 1, LLC</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.948056</lat>
    <lon>-78.25083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58506</plant_id>
    <plant_name>Chuckawalla Solar</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.568333</lat>
    <lon>-114.9181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58513</plant_id>
    <plant_name>Ironwood Solar LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.565</lat>
    <lon>-114.9181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58528</plant_id>
    <plant_name>Garnet Solar Generation Station I LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Garnet Solar Generation Station I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.8906</lat>
    <lon>-116.5431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58534</plant_id>
    <plant_name>Westford Solar Park</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.636389</lat>
    <lon>-71.41944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58546</plant_id>
    <plant_name>Watervliet</plant_name>
    <state>MI</state>
    <county>Berrien</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2019</latest_year>
    <lat>42.175833</lat>
    <lon>-86.28</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58665</plant_id>
    <plant_name>Celina Solar Project #1, LLC</plant_name>
    <state>OH</state>
    <county>Mercer</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.540556</lat>
    <lon>-84.59056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58703</plant_id>
    <plant_name>Lenape II</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Lenape Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.776667</lat>
    <lon>-86.04278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58735</plant_id>
    <plant_name>Buddy Solar</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.541944</lat>
    <lon>-80.36333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58783</plant_id>
    <plant_name>South Canal Hydro-1</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>Delta-Montrose Electric Association</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.483333</lat>
    <lon>-107.755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58790</plant_id>
    <plant_name>Cohalan</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>CD US Solar MT1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.762465</lat>
    <lon>-73.19444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59017</plant_id>
    <plant_name>Carol Jean Solar</plant_name>
    <state>NC</state>
    <county>Stokes</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.316111</lat>
    <lon>-80.14444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59052</plant_id>
    <plant_name>Fairmont-FLS 100</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.52</lat>
    <lon>-79.13</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59078</plant_id>
    <plant_name>Harwich Landfill</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.696111</lat>
    <lon>-70.09194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59081</plant_id>
    <plant_name>Barnstable Landfill</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.659722</lat>
    <lon>-70.39556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59137</plant_id>
    <plant_name>Plymouth Site 1</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.96</lat>
    <lon>-70.77861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59179</plant_id>
    <plant_name>Franklin 2</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.054167</lat>
    <lon>-71.39167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59299</plant_id>
    <plant_name>Waste Mangement Redwood LFGTE</plant_name>
    <state>CA</state>
    <county>Marin</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.160833</lat>
    <lon>-122.565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59310</plant_id>
    <plant_name>Black Oak Power Producers</plant_name>
    <state>MO</state>
    <county>Wright</county>
    <operator>Cube District Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.231944</lat>
    <lon>-92.45389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59335</plant_id>
    <plant_name>MCLB Landfill Gas to Energy</plant_name>
    <state>GA</state>
    <county>Dougherty</county>
    <operator>Inst and Envir Div Marine Logistics Base</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2021</latest_year>
    <lat>31.546111</lat>
    <lon>-84.0675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59495</plant_id>
    <plant_name>Antares-GRE 314 East Lyme LLC</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.416944</lat>
    <lon>-72.23444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59506</plant_id>
    <plant_name>Quincy Solar (NC)</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.0717</lat>
    <lon>-78.8078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59509</plant_id>
    <plant_name>Murdock Solar</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.6633</lat>
    <lon>-78.5206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59511</plant_id>
    <plant_name>Beetle Solar</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.1785</lat>
    <lon>-81.665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59512</plant_id>
    <plant_name>Happy Solar</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.3965</lat>
    <lon>-78.5108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59557</plant_id>
    <plant_name>Apple Campus 2 Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Apple, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.33</lat>
    <lon>-122.01</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59566</plant_id>
    <plant_name>Ashley Solar Farm</plant_name>
    <state>NC</state>
    <county>Yadkin</county>
    <operator>Ashley Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.126111</lat>
    <lon>-80.79889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59636</plant_id>
    <plant_name>Charlton Solar I CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Charlton Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.1275</lat>
    <lon>-71.99639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59713</plant_id>
    <plant_name>Holdrege Solar Center</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.824736</lat>
    <lon>-96.82032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59816</plant_id>
    <plant_name>Nanticoke LFG</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>Broome Energy Resources, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>42.243704</lat>
    <lon>-75.98253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60076</plant_id>
    <plant_name>Palmer Landfill</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Syncarpha Bondsville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.216634</lat>
    <lon>-72.31553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60161</plant_id>
    <plant_name>Eagle Solar</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>USF Essex Lessor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.458327</lat>
    <lon>-78.15509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60191</plant_id>
    <plant_name>TWE New Bern Solar Project, LLC</plant_name>
    <state>NC</state>
    <county>Craven</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.154273</lat>
    <lon>-77.13432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60234</plant_id>
    <plant_name>Belle Haven Diesel Generation Facility</plant_name>
    <state>VA</state>
    <county>Accomack</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.54864</lat>
    <lon>-75.79082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60235</plant_id>
    <plant_name>Perdue Diesel Generation Facility</plant_name>
    <state>VA</state>
    <county>Accomack</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.741967</lat>
    <lon>-75.65598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60236</plant_id>
    <plant_name>Onancock Diesel Generation Facility</plant_name>
    <state>VA</state>
    <county>Accomack</county>
    <operator>Old Dominion Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.74542</lat>
    <lon>-75.72049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60247</plant_id>
    <plant_name>Valley View Solar</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Clinch, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.418786</lat>
    <lon>-104.8919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60248</plant_id>
    <plant_name>Skylark</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Clinch, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.577889</lat>
    <lon>-104.8948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60252</plant_id>
    <plant_name>IMPA Washington Solar Park</plant_name>
    <state>IN</state>
    <county>Daviess</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.653455</lat>
    <lon>-87.20922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60393</plant_id>
    <plant_name>Warbler Holdings</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.318824</lat>
    <lon>-81.62393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60412</plant_id>
    <plant_name>Munro Valley Solar</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.2647</lat>
    <lon>-117.9955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60507</plant_id>
    <plant_name>Broome County</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.104731</lat>
    <lon>-75.93073</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60518</plant_id>
    <plant_name>Stafford Hill Solar Hybrid</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>3.4</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>43.619444</lat>
    <lon>-72.95028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60521</plant_id>
    <plant_name>Atwater Solar</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.140869</lat>
    <lon>-94.76973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60531</plant_id>
    <plant_name>Pine Island Solar</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.206624</lat>
    <lon>-92.66365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60612</plant_id>
    <plant_name>Morin Solar 2013 LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CVI CleanCapital Solar 6</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.166995</lat>
    <lon>-72.1929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60711</plant_id>
    <plant_name>Chisago Community Solar</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Chisago Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.413357</lat>
    <lon>-92.68296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60865</plant_id>
    <plant_name>Equity Industrial Turbines</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Equity Industrial Turbines</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.625649</lat>
    <lon>-70.65649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60933</plant_id>
    <plant_name>Hopewell Cogeneration NJ</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Hopewell Campus Owners LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.348275</lat>
    <lon>-74.7715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60938</plant_id>
    <plant_name>Aries Community Solar</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Aries Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.044924</lat>
    <lon>-92.98857</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60971</plant_id>
    <plant_name>Michael Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.667472</lat>
    <lon>-94.70833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61007</plant_id>
    <plant_name>Redbrook Community Solar 1</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Redbrook Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.829117</lat>
    <lon>-70.61484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61139</plant_id>
    <plant_name>Marmas Solar CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.556056</lat>
    <lon>-94.11711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61174</plant_id>
    <plant_name>Taurus Community Solar</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Taurus Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.95028</lat>
    <lon>-95.69147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61179</plant_id>
    <plant_name>Carina Community Solar</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>Carina Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.164677</lat>
    <lon>-92.24119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61295</plant_id>
    <plant_name>Belchertown Renewables Community Solar</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Belchertown Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.3</lat>
    <lon>-72.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61378</plant_id>
    <plant_name>Northern Westchester Hospital</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Northern Westchester Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2017</latest_year>
    <lat>41.196839</lat>
    <lon>-73.7257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61494</plant_id>
    <plant_name>Wright Cuddyer CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Minnesota Solar CSG 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.1831</lat>
    <lon>-93.7341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61507</plant_id>
    <plant_name>DG New Jersey Solar RLS Logistics</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>DG New Jersey Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.575217</lat>
    <lon>-75.01415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61540</plant_id>
    <plant_name>Fort Hays State University Wind Farm</plant_name>
    <state>KS</state>
    <county>Ellis</county>
    <operator>Fort Hays State University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.874316</lat>
    <lon>-99.40521</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61545</plant_id>
    <plant_name>CGSun, LLC Community Solar</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.847916</lat>
    <lon>-92.87499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61569</plant_id>
    <plant_name>Mount Sinai Beth Israel</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>Mount Sinai Beth Israel</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.732666</lat>
    <lon>-73.9816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61603</plant_id>
    <plant_name>UMASS</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.391306</lat>
    <lon>-72.5325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61606</plant_id>
    <plant_name>Vilas Solar Array</plant_name>
    <state>CO</state>
    <county>Baca</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.384</lat>
    <lon>-102.466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61618</plant_id>
    <plant_name>Tuttle</plant_name>
    <state>OK</state>
    <county>Grady</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.266556</lat>
    <lon>-97.84653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61629</plant_id>
    <plant_name>West Brookfield Solar - Gilbertsville Rd</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.272516</lat>
    <lon>-72.21029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61885</plant_id>
    <plant_name>Staunton</plant_name>
    <state>IN</state>
    <county>Clay</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.45746</lat>
    <lon>-87.20824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61886</plant_id>
    <plant_name>Bar D</plant_name>
    <state>CO</state>
    <county>Rio Blanco</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.923679</lat>
    <lon>-108.4627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61898</plant_id>
    <plant_name>Solean Solar Project</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.086926</lat>
    <lon>-78.44821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62016</plant_id>
    <plant_name>UC Riverside Lots 30 &amp; 32</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.97036</lat>
    <lon>-117.331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62072</plant_id>
    <plant_name>Springfield Solar PV</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.134453</lat>
    <lon>-72.54969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62150</plant_id>
    <plant_name>Chaffey College Rancho Cucamonga Campus</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Chaffey Community College District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.148139</lat>
    <lon>-117.5704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62202</plant_id>
    <plant_name>Williamsburg</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.425855</lat>
    <lon>-72.769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62208</plant_id>
    <plant_name>NIST Solar</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.127</lat>
    <lon>-77.216</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62301</plant_id>
    <plant_name>Richmond NMCA</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.440191</lat>
    <lon>-71.71539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62322</plant_id>
    <plant_name>Mechanicville Hydroelectric Station</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Albany Engineering Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.876535</lat>
    <lon>-73.68017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62369</plant_id>
    <plant_name>BWC Gibbs Brook</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>BWC Gibbs Brook, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.774864</lat>
    <lon>-70.69593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62373</plant_id>
    <plant_name>I25 Battery Storage</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>United Power, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>16</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.140285</lat>
    <lon>-104.978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62412</plant_id>
    <plant_name>Daum Solar</plant_name>
    <state>NY</state>
    <county>Yates</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.760799</lat>
    <lon>-77.24733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62557</plant_id>
    <plant_name>Kearsarge Montague</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Kearsarge Montague LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.586363</lat>
    <lon>-72.56349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62580</plant_id>
    <plant_name>Route 14A CDG Solar North and South LLC</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Route 14A CDG Solar North and South, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.815086</lat>
    <lon>-77.04613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62706</plant_id>
    <plant_name>Helen Solar CSG</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.789369</lat>
    <lon>-94.06001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62707</plant_id>
    <plant_name>Walcott Solar CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.235164</lat>
    <lon>-93.27501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62778</plant_id>
    <plant_name>Hecate Energy Blair Road LLC</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>Hecate Energy Blair Road LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.286</lat>
    <lon>-81.834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62860</plant_id>
    <plant_name>Chambers Road Solar</plant_name>
    <state>NY</state>
    <county>Chemung</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.187443</lat>
    <lon>-76.89439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62890</plant_id>
    <plant_name>GSPP Boxborough Littleton (MA)</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.485559</lat>
    <lon>-71.54086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62992</plant_id>
    <plant_name>Goose Pond Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>LSE Dorado, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.0077</lat>
    <lon>-72.7807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62998</plant_id>
    <plant_name>25 Ashdown Road Solar, LLC</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.8826</lat>
    <lon>-73.879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63013</plant_id>
    <plant_name>Johnstown Solar 1, LLC</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.0724</lat>
    <lon>-74.3228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63060</plant_id>
    <plant_name>Pearl CSG</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.981335</lat>
    <lon>-78.29042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63369</plant_id>
    <plant_name>Riley Road LLC</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.469132</lat>
    <lon>-74.07837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63372</plant_id>
    <plant_name>Catlin Solar 1 LLC</plant_name>
    <state>NY</state>
    <county>Schuyler</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.285942</lat>
    <lon>-76.95398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63414</plant_id>
    <plant_name>IOS II-LAX9</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.09</lat>
    <lon>-117.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63651</plant_id>
    <plant_name>North Kern State Prison Phase II</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>SunE P11L Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.780407</lat>
    <lon>-119.3088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63694</plant_id>
    <plant_name>Butler Solar, LLC</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.101804</lat>
    <lon>-123.4101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63708</plant_id>
    <plant_name>EQX015 Great Oaks Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.24187</lat>
    <lon>-121.7816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63832</plant_id>
    <plant_name>POET Biorefining-Hanlontown, LLC</plant_name>
    <state>IA</state>
    <county>Worth</county>
    <operator>POET Biorefining-Hanlontown, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>OTH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.29236</lat>
    <lon>-93.3928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63961</plant_id>
    <plant_name>SSD Clackamas 1, LLC</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Thor Solar 1 CEI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.42</lat>
    <lon>-122.333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63977</plant_id>
    <plant_name>Central Generating</plant_name>
    <state>MI</state>
    <county>Montcalm</county>
    <operator>North American Central - LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2020</latest_year>
    <lat>43.33349</lat>
    <lon>-85.50601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64017</plant_id>
    <plant_name>Brick Church Solar</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Brick Church Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.755594</lat>
    <lon>-73.58003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64044</plant_id>
    <plant_name>Off Airport Road - West</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Off Airport Road - West, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.785648</lat>
    <lon>-74.22904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64045</plant_id>
    <plant_name>Fitchburg Renewables</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Fitchburg Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.604396</lat>
    <lon>-71.79571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64046</plant_id>
    <plant_name>6140 Route 209 - North</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>6140 Route 209 - North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.787555</lat>
    <lon>-74.28889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64173</plant_id>
    <plant_name>Lotus</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.13621</lat>
    <lon>-79.53957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64176</plant_id>
    <plant_name>Charlie</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.97485</lat>
    <lon>-79.60948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64201</plant_id>
    <plant_name>McDonough Solar 1, LLC CSG</plant_name>
    <state>IL</state>
    <county>McDonough</county>
    <operator>McDonough Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.555424</lat>
    <lon>-90.85113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64311</plant_id>
    <plant_name>Sun Farm VIII, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.06</lat>
    <lon>-77.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64417</plant_id>
    <plant_name>Wilbraham</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>BWC East Brook, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.10391</lat>
    <lon>-72.38129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64420</plant_id>
    <plant_name>Scribner Diesel Generation Facility</plant_name>
    <state>NE</state>
    <county>Dodge</county>
    <operator>City of Scribner (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBL</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.668419</lat>
    <lon>-96.66913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64506</plant_id>
    <plant_name>Cokato CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Cokato Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.087225</lat>
    <lon>-94.21561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64554</plant_id>
    <plant_name>Bright Field Solar LLC(CSG)</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.46</lat>
    <lon>-77.73832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64555</plant_id>
    <plant_name>Bright Oak Solar LLC(CSG)</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.033</lat>
    <lon>-78.24481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64719</plant_id>
    <plant_name>Glenmere Lake</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>7.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.3698</lat>
    <lon>-74.366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64725</plant_id>
    <plant_name>Williams Rd</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.204</lat>
    <lon>-78.943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64781</plant_id>
    <plant_name>Kearsarge Westerly</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Kearsarge Westerly LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.385761</lat>
    <lon>-71.7322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64881</plant_id>
    <plant_name>NMSU Solar and Storage</plant_name>
    <state>NM</state>
    <county>Dona Ana</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>32.286048</lat>
    <lon>-106.7445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65047</plant_id>
    <plant_name>Enfield Solar One</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Enfield Solar One, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.994902</lat>
    <lon>-72.52527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65105</plant_id>
    <plant_name>CA-DGS-California Correctional Inst</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.1135</lat>
    <lon>-118.569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65149</plant_id>
    <plant_name>East Windsor Solar Two</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>East Windsor Solar Two, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.894366</lat>
    <lon>-72.53211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65158</plant_id>
    <plant_name>ASA Gouverneur NY Solar II LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>ASA Gouverneur NY Solar II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.360089</lat>
    <lon>-75.42747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65362</plant_id>
    <plant_name>MA CS Uxbridge Community Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>MA CS Uxbridge, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.071033</lat>
    <lon>-71.62324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65368</plant_id>
    <plant_name>Linden Hawk Rise Solar CSG</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.60395</lat>
    <lon>-74.24549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65382</plant_id>
    <plant_name>Lincoln WWTF Hybrid</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Lincoln Solar Star, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>38.859</lat>
    <lon>-121.346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65393</plant_id>
    <plant_name>Neal Energy Center Solar</plant_name>
    <state>IA</state>
    <county>Woodbury</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.33304</lat>
    <lon>-96.34822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65460</plant_id>
    <plant_name>Hartland Solar</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.85045</lat>
    <lon>-69.45384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65517</plant_id>
    <plant_name>Abel Road Bioenergy</plant_name>
    <state>CA</state>
    <county>Colusa</county>
    <operator>ACC Renewable Resources</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.145608</lat>
    <lon>-122.1186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65520</plant_id>
    <plant_name>Vasquez V CSG</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.231806</lat>
    <lon>-104.7989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65785</plant_id>
    <plant_name>1639 RT 29 Solar 1</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>1639 RT 29 Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.04296</lat>
    <lon>-74.24935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65898</plant_id>
    <plant_name>Gaylord Rockies CHP</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Carstensen Wind, LLC (Longroad)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.82</lat>
    <lon>-104.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66037</plant_id>
    <plant_name>3232 Batavia Solar</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>3232 Batavia Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.00024</lat>
    <lon>-78.26818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66089</plant_id>
    <plant_name>Canal Road Solar</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.535</lat>
    <lon>-74.563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66135</plant_id>
    <plant_name>AES Pelletier Solar, LLC</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>47.2355</lat>
    <lon>-68.6183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66218</plant_id>
    <plant_name>Dubois Solar (Hybrid)</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.598889</lat>
    <lon>-74.28583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66228</plant_id>
    <plant_name>Salt Point Solar (Hybrid)</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.741126</lat>
    <lon>-73.88207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66232</plant_id>
    <plant_name>Svenski Solar (Hybrid)</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.535043</lat>
    <lon>-74.32287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66327</plant_id>
    <plant_name>Elmore BESS</plant_name>
    <state>ID</state>
    <county>Elmore</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>16</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.17756</lat>
    <lon>-115.7167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66413</plant_id>
    <plant_name>Spanish Fork Community Solar</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Utah Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.127951</lat>
    <lon>-111.6334</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66449</plant_id>
    <plant_name>Northline Solar CSG</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.8691</lat>
    <lon>-73.6153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66488</plant_id>
    <plant_name>Davis Solar</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.42453</lat>
    <lon>-74.36029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66751</plant_id>
    <plant_name>Toms River CSG</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.987519</lat>
    <lon>-74.23644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66802</plant_id>
    <plant_name>BEMS East Solar (CSG)</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Solar DG NJ BEMS East, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.893694</lat>
    <lon>-74.69801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66803</plant_id>
    <plant_name>BEMS West Solar CSG</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Solar DG NJ BEMS West, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.892036</lat>
    <lon>-74.69498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66863</plant_id>
    <plant_name>Blackjack Solar</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>South County Packing</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.181538</lat>
    <lon>-121.0267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66945</plant_id>
    <plant_name>East Victory Way Solar</plant_name>
    <state>CO</state>
    <county>Moffat</county>
    <operator>East Victory Way Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.51313</lat>
    <lon>-107.5018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67015</plant_id>
    <plant_name>Dynamic - Exeter Solar CSG</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.975721</lat>
    <lon>-69.0904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67058</plant_id>
    <plant_name>TX Fort Worth 5200 Gold Spike Drive</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Catalyze Fort Worth 5200 Gold Spike Drive Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.831328</lat>
    <lon>-97.34727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67119</plant_id>
    <plant_name>Ring Road</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>13.5</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.975339</lat>
    <lon>-70.78148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67139</plant_id>
    <plant_name>Prince Edward CSG LLC</plant_name>
    <state>VA</state>
    <county>Prince Edward</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.2259</lat>
    <lon>-78.6877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67150</plant_id>
    <plant_name>Oxford Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.087</lat>
    <lon>-71.853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67181</plant_id>
    <plant_name>Hunt Creek</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>LSE Perseus LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.053168</lat>
    <lon>-76.32049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67202</plant_id>
    <plant_name>Avon Solar Farm LLC</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Avon Solar Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.927</lat>
    <lon>-77.738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67337</plant_id>
    <plant_name>Ver Plank North (CSG)</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.201165</lat>
    <lon>-76.17609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67339</plant_id>
    <plant_name>Washington WS01</plant_name>
    <state>ME</state>
    <county>Knox</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.2355</lat>
    <lon>-69.3739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67391</plant_id>
    <plant_name>KE73 CSG</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.2348</lat>
    <lon>-75.56284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67402</plant_id>
    <plant_name>Mainely Solar (Wyman Hill Solar LLC)</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Wyman Hill Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.517714</lat>
    <lon>-70.51785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67406</plant_id>
    <plant_name>Comfort CSG</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.0169</lat>
    <lon>-78.9779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67432</plant_id>
    <plant_name>Double J Dairy Array</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Bravo REC Management LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.362673</lat>
    <lon>-119.426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67440</plant_id>
    <plant_name>Peterboro (CSG)</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.070743</lat>
    <lon>-75.54529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67466</plant_id>
    <plant_name>CBEP Solar 4, LLC</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.319191000000004</lat>
    <lon>-104.8362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67483</plant_id>
    <plant_name>Norfolk Landfill Solar Project</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.981</lat>
    <lon>-73.152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67484</plant_id>
    <plant_name>Raffia Road Solar Project</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.964</lat>
    <lon>-72.561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67519</plant_id>
    <plant_name>Fayetteville Public Schools (SWEPCO)</plant_name>
    <state>AR</state>
    <county>Logan</county>
    <operator>Nabholz Solar FPS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.147412</lat>
    <lon>-93.87086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67520</plant_id>
    <plant_name>LRWRA</plant_name>
    <state>AR</state>
    <county>Logan</county>
    <operator>Entegrity Solar LRWRA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.147412</lat>
    <lon>-93.87086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67578</plant_id>
    <plant_name>Sandwich</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>LSE Ophiuchus LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>4.6</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.71775</lat>
    <lon>-70.47994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67585</plant_id>
    <plant_name>Ny Frankfort Bleecker St - Frankfort -NG</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Frankfort Solar Farm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.088444</lat>
    <lon>-75.17699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67586</plant_id>
    <plant_name>NY Newark ST RT 31 - Environomics S2</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Catalyze Newark Solar Farm 2 Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.033056</lat>
    <lon>-77.14639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67590</plant_id>
    <plant_name>NY Evans 7690 SW Blvd - SL Evans Array 2</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>SL Evans, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.678611</lat>
    <lon>-78.95417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67603</plant_id>
    <plant_name>River Ranch Dairy</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Renewable Solar, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.249006</lat>
    <lon>-119.5829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67713</plant_id>
    <plant_name>IL Joliet 1101 Cherry Hl Rd</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Catalyze Joliet 1101 Cherry Hill Road Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.507951</lat>
    <lon>-88.02602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67807</plant_id>
    <plant_name>Madawaska Solar</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>47.343</lat>
    <lon>-68.239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67903</plant_id>
    <plant_name>ISM Solar Shepherd Acres</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.283611</lat>
    <lon>-70.5259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67929</plant_id>
    <plant_name>Nutting Ridge Solar, LLC</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.070765</lat>
    <lon>-70.54286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67940</plant_id>
    <plant_name>Searsmont Road Lincolnville Solar, LLC</plant_name>
    <state>ME</state>
    <county>Waldo</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.303763</lat>
    <lon>-69.11344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68042</plant_id>
    <plant_name>Dairy Farm</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.837429</lat>
    <lon>-69.88389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68069</plant_id>
    <plant_name>Old Frontier Solar III</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Old Frontier Solar III PV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>2.2</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.494046</lat>
    <lon>-72.62251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68260</plant_id>
    <plant_name>GCC Trident Solar Project</plant_name>
    <state>MT</state>
    <county>Gallatin</county>
    <operator>GCC Trident LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2025</latest_year>
    <lat>45.93728</lat>
    <lon>-111.4637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68442</plant_id>
    <plant_name>Ellis Creek Solar</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Ellis Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.2223</lat>
    <lon>-122.5737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68552</plant_id>
    <plant_name>Old Route 17</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>NY Thompson III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.738414</lat>
    <lon>-74.73387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68637</plant_id>
    <plant_name>GSPP 641 Ferris Road East</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.755047</lat>
    <lon>-74.65055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68645</plant_id>
    <plant_name>Belair</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>CVE US EI7 Belair LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.75382</lat>
    <lon>-73.64631</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68659</plant_id>
    <plant_name>Wheatfield</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>CVE US EI3 Wheatfield LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.12266</lat>
    <lon>-78.85095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68674</plant_id>
    <plant_name>East Windsor</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.85</lat>
    <lon>-72.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68746</plant_id>
    <plant_name>North Troy</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.775263</lat>
    <lon>-73.6533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68958</plant_id>
    <plant_name>Edgar Solar 1</plant_name>
    <state>IL</state>
    <county>Edgar</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.575155</lat>
    <lon>-87.69508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68973</plant_id>
    <plant_name>Ridge Farm Renewables LLC PV</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>Ridge Farm Renewables LLC PV</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.891889</lat>
    <lon>-87.6647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68977</plant_id>
    <plant_name>White Brook Renewables PV</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>White Brook Renewables LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.610968</lat>
    <lon>-71.674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69050</plant_id>
    <plant_name>MD - WL Gore - Cherry Hill</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>Solar DG MD Cherry Hill, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.67039</lat>
    <lon>-75.85812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69097</plant_id>
    <plant_name>NJ - CS Energy - Berkeley 1</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Eagles Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.9051</lat>
    <lon>-74.23512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69098</plant_id>
    <plant_name>NJ - CS Energy - Berkeley II</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Eagles Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.9051</lat>
    <lon>-74.23512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69130</plant_id>
    <plant_name>ESNY-Yorktown</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>ESNY-Yorktown, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.21595</lat>
    <lon>-73.80604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69141</plant_id>
    <plant_name>DE-ECA CS Hartly</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Hartly Community Energy Initiative LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.186235</lat>
    <lon>-75.73084</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69266</plant_id>
    <plant_name>Rockhound Sol Solar CSG</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>Rockhound Sol</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.1617</lat>
    <lon>-107.8022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69282</plant_id>
    <plant_name>Stafford Solar One</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.95</lat>
    <lon>-72.25</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69448</plant_id>
    <plant_name>Ava Solar</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.2657</lat>
    <lon>-72.3151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69502</plant_id>
    <plant_name>Adams Road Solar</plant_name>
    <state>WI</state>
    <county>Racine</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.774153</lat>
    <lon>-87.91919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69544</plant_id>
    <plant_name>0 Middle</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>1.5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.690131</lat>
    <lon>-70.00878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69561</plant_id>
    <plant_name>Sunrise Solar Lincoln DE (CSG)</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.853476</lat>
    <lon>-75.40124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69596</plant_id>
    <plant_name>Owens 1</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.417025</lat>
    <lon>-74.36646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69716</plant_id>
    <plant_name>Franklin Solar 3 LLC</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.480055</lat>
    <lon>-74.49904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69794</plant_id>
    <plant_name>Rose Solar</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.2687</lat>
    <lon>-72.2686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69831</plant_id>
    <plant_name>Chaberton Solar Blue Hen LLC</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.471439</lat>
    <lon>-75.17959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69832</plant_id>
    <plant_name>Chaberton Solar Biggins Creek LLC</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.46313</lat>
    <lon>-75.15985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69917</plant_id>
    <plant_name>Essex Solar</plant_name>
    <state>IL</state>
    <county>Stark</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.02652</lat>
    <lon>-89.78273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69919</plant_id>
    <plant_name>Rock Cut Solar</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.2828</lat>
    <lon>-89.1576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70040</plant_id>
    <plant_name>CA- US Foods- La Mirada</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Generate USF La Mirada, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <battery_mwh>2.6</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.88474</lat>
    <lon>-118.0094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70042</plant_id>
    <plant_name>Limestone - (ME)</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.943316</lat>
    <lon>-67.89607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70051</plant_id>
    <plant_name>Kearsarge Grissom</plant_name>
    <state>NH</state>
    <county>Sullivan</county>
    <operator>Kearsarge Grissom LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.344697</lat>
    <lon>-72.37781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70056</plant_id>
    <plant_name>CE DE - Harbeson</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.724453</lat>
    <lon>-75.27757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70127</plant_id>
    <plant_name>Gering Solar</plant_name>
    <state>NE</state>
    <county>Scotts Bluff</county>
    <operator>SE Municipal Nebraska, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.8345</lat>
    <lon>-103.6387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70159</plant_id>
    <plant_name>Gateway Solar, LLC</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>SREOG ME Credit Seller 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.6106</lat>
    <lon>-68.52517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70162</plant_id>
    <plant_name>Gardiner A, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>SREOG Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.226932</lat>
    <lon>-69.79048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70179</plant_id>
    <plant_name>FL Solar D1, LLC</plant_name>
    <state>FL</state>
    <county>Gadsden</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.654933</lat>
    <lon>-84.42836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70264</plant_id>
    <plant_name>East Marion IL 1, LLC</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>SRC Partnership 16, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.726357</lat>
    <lon>-88.8436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70284</plant_id>
    <plant_name>7001 Quad Solar, LLC</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.302532</lat>
    <lon>-76.52128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70481</plant_id>
    <plant_name>IL2-WI384 Rodman</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.46803</lat>
    <lon>-87.55688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70520</plant_id>
    <plant_name>Granite City Solar</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>4</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.731467</lat>
    <lon>-90.14769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1169</plant_id>
    <plant_name>Ogden</plant_name>
    <state>IA</state>
    <county>Boone</county>
    <operator>City of Ogden - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>4</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1971</latest_year>
    <lat>42.0372</lat>
    <lon>-94.0462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2222</plant_id>
    <plant_name>Burwell</plant_name>
    <state>NE</state>
    <county>Garfield</county>
    <operator>City of Burwell - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1972</latest_year>
    <lat>41.780313</lat>
    <lon>-99.13607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2238</plant_id>
    <plant_name>Franklin (NE)</plant_name>
    <state>NE</state>
    <county>Franklin</county>
    <operator>City of Franklin - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1974</latest_year>
    <lat>40.0892</lat>
    <lon>-98.9508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3305</plant_id>
    <plant_name>Rocky River (SC)</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>City of Abbeville - (SC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1941</first_year>
    <latest_year>2013</latest_year>
    <lat>34.2572</lat>
    <lon>-82.6097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6302</plant_id>
    <plant_name>Purple Lake</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Metlakatla Power &amp; Light</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1962</latest_year>
    <lat>55.091263</lat>
    <lon>-131.545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6506</plant_id>
    <plant_name>Moyie Springs</plant_name>
    <state>ID</state>
    <county>Boundary</county>
    <operator>City of Bonners Ferry (ID)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>4.3</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1982</latest_year>
    <lat>48.7339</lat>
    <lon>-116.1752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7493</plant_id>
    <plant_name>King Cove</plant_name>
    <state>AK</state>
    <county>Aleutians East</county>
    <operator>City of King Cove - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2017</latest_year>
    <lat>55.04817</lat>
    <lon>-162.2932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54830</plant_id>
    <plant_name>Emory Decatur Hospital</plant_name>
    <state>GA</state>
    <county>DeKalb</county>
    <operator>DeKalb Regional Health System</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1991</first_year>
    <latest_year>2004</latest_year>
    <lat>33.7919</lat>
    <lon>-84.2831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56883</plant_id>
    <plant_name>Pennsauken Solar</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>10</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2018</latest_year>
    <lat>39.9894</lat>
    <lon>-75.04</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58029</plant_id>
    <plant_name>Constellation New Energy Inc</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Luminace Solar Federal, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.928889</lat>
    <lon>-74.81806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58167</plant_id>
    <plant_name>William Floyd School District</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>William Floyd School District</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.776944</lat>
    <lon>-72.85083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58593</plant_id>
    <plant_name>DGS Central Utility Plant</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>State of CA DGS BPM</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.573889</lat>
    <lon>-121.5014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59438</plant_id>
    <plant_name>Orono B</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Brookfield Black Bear Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.884444</lat>
    <lon>-68.66389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59782</plant_id>
    <plant_name>Waynoka Gas Processing Plant</plant_name>
    <state>OK</state>
    <county>Woods</county>
    <operator>Targa Pipeline Mid-Continent West OK LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>36.651</lat>
    <lon>-98.7656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60795</plant_id>
    <plant_name>Eichtens Community Solar</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.382662</lat>
    <lon>-92.77254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60835</plant_id>
    <plant_name>Pine Island Solar CSG</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Pine Island Holdco, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.220122</lat>
    <lon>-92.65432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61097</plant_id>
    <plant_name>Syncarpha Freetown</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Marie's Way Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.768919</lat>
    <lon>-70.78649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63433</plant_id>
    <plant_name>Lincoln Heights II</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>ALLETE Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>44.315537</lat>
    <lon>-96.33168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63755</plant_id>
    <plant_name>Milner Butte LFGE</plant_name>
    <state>ID</state>
    <county>Cassia</county>
    <operator>Southern Idaho Solid Waste</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2023</latest_year>
    <lat>42.466911</lat>
    <lon>-114.0046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63852</plant_id>
    <plant_name>POET Biorefining - North Manchester, LLC</plant_name>
    <state>IN</state>
    <county>Wabash</county>
    <operator>POET Biorefining - North Manchester, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.941967</lat>
    <lon>-85.80359</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64360</plant_id>
    <plant_name>American Goldfinch SCS ACY2 NJ, LLC</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.08556</lat>
    <lon>-74.84089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65164</plant_id>
    <plant_name>Grinnell College</plant_name>
    <state>IA</state>
    <county>Poweshiek</county>
    <operator>Azimuth 180 Solar Electric, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.76</lat>
    <lon>-92.72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65367</plant_id>
    <plant_name>POET Bioprocessing- Mitchell</plant_name>
    <state>SD</state>
    <county>Davison</county>
    <operator>POET Bioprocessing- Mitchell</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.80237</lat>
    <lon>-98.10182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66731</plant_id>
    <plant_name>Lightstar Renewables - Project 1001</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.7754</lat>
    <lon>-73.8758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67266</plant_id>
    <plant_name>Nationwide</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Nationwide Solar Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.50289</lat>
    <lon>-71.6913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68013</plant_id>
    <plant_name>Amazon BDL4</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Telyon AMZ Windsor LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.90376</lat>
    <lon>-72.65809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68399</plant_id>
    <plant_name>TJA-NY- Dix Solar Farm LLC</plant_name>
    <state>NY</state>
    <county>Schuyler</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.3085</lat>
    <lon>-76.891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68964</plant_id>
    <plant_name>Pivot Solar 35</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.32734</lat>
    <lon>-104.7518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70140</plant_id>
    <plant_name>Knights Pond Solar, LLC</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>SREOG Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.24959</lat>
    <lon>-70.78127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70142</plant_id>
    <plant_name>RE Gardiner Solar, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>SREOG Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.205964</lat>
    <lon>-69.76677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70276</plant_id>
    <plant_name>Kearsarge Burrillville</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Kearsarge Burrillville LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.945093</lat>
    <lon>-71.59589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70279</plant_id>
    <plant_name>IL - Ameresco - Freeport South</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Freeport Solar South, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.9</nameplate_mw>
    <summer_mw>3.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.262295</lat>
    <lon>-89.61938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1851</plant_id>
    <plant_name>Frank Jenkins</plant_name>
    <state>MI</state>
    <county>Ionia</county>
    <operator>City of Portland - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1950</first_year>
    <latest_year>2002</latest_year>
    <lat>42.868611</lat>
    <lon>-84.89556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3032</plant_id>
    <plant_name>Prospect 1</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>4.6</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>42.730717</lat>
    <lon>-122.5151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3661</plant_id>
    <plant_name>Weber</plant_name>
    <state>UT</state>
    <county>Weber</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1911</latest_year>
    <lat>41.137621</lat>
    <lon>-111.8849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4074</plant_id>
    <plant_name>Sandstone Rapids</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>45.2333</lat>
    <lon>-88.0678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6637</plant_id>
    <plant_name>Yakutat</plant_name>
    <state>AK</state>
    <county>Yakutat</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2012</latest_year>
    <lat>59.544553</lat>
    <lon>-139.7243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10720</plant_id>
    <plant_name>Kyocera International Inc.(San Diego)</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Hawthorne Power Systems</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.819675</lat>
    <lon>-117.1405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10752</plant_id>
    <plant_name>Lachute Hydro Lower</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.849029</lat>
    <lon>-73.4207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56002</plant_id>
    <plant_name>Minwind</plant_name>
    <state>MN</state>
    <county>Rock</county>
    <operator>Community Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>43.5564</lat>
    <lon>-96.30361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56076</plant_id>
    <plant_name>ABC Coke</plant_name>
    <state>AL</state>
    <county>Jefferson</county>
    <operator>ABC Coke - Drummond Co, Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>33.582793</lat>
    <lon>-86.77987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56146</plant_id>
    <plant_name>False Island</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2023</latest_year>
    <lat>55.48918</lat>
    <lon>-133.1345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56897</plant_id>
    <plant_name>Ameresco Keller Canyon</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>AMERESCO Keller Canyon LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.003928</lat>
    <lon>-121.9345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57458</plant_id>
    <plant_name>145 Talmadge Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Avidan Energy Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.535787</lat>
    <lon>-74.39127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58153</plant_id>
    <plant_name>Eastern Maine Medical Center</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Eastern Maine Medical Center</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>44.808333</lat>
    <lon>-68.75083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59056</plant_id>
    <plant_name>Spring House</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>Janssen Pharmaceutical Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.183889</lat>
    <lon>-75.23417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59172</plant_id>
    <plant_name>Belmont</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Marion Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.72</lat>
    <lon>-86.19306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59954</plant_id>
    <plant_name>Osceola Solar Facility</plant_name>
    <state>FL</state>
    <county>Osceola</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>28.058078</lat>
    <lon>-81.24168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60165</plant_id>
    <plant_name>Robin Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.264418</lat>
    <lon>-78.08139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60951</plant_id>
    <plant_name>West Dubuque Solar</plant_name>
    <state>IA</state>
    <county>Dubuque</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.491754</lat>
    <lon>-90.79225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61128</plant_id>
    <plant_name>Salisbury Solar</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.632585</lat>
    <lon>-80.42263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61732</plant_id>
    <plant_name>Randolph</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.177563</lat>
    <lon>-71.07739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61799</plant_id>
    <plant_name>Rensselaer Solar Site 2</plant_name>
    <state>IN</state>
    <county>Jasper</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.949786</lat>
    <lon>-87.14817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62496</plant_id>
    <plant_name>Telegraph Rd #1 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.561672</lat>
    <lon>-78.17953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62551</plant_id>
    <plant_name>Kearsarge SKSC1 LLC</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Kearsarge SKSC1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.471571</lat>
    <lon>-71.49445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62739</plant_id>
    <plant_name>KDC Solar ASGM</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.409744</lat>
    <lon>-75.21855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62827</plant_id>
    <plant_name>Ajax Solar, LLC (MA)</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.018945</lat>
    <lon>-71.05857</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62842</plant_id>
    <plant_name>Nextsun Energy Littleton</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.551461</lat>
    <lon>-71.51018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63286</plant_id>
    <plant_name>DG Amaze ACY1</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>DG Amaze New Jersey, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.822945</lat>
    <lon>-75.21629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63831</plant_id>
    <plant_name>POET Biorefining Caro, LLC</plant_name>
    <state>MI</state>
    <county>Tuscola</county>
    <operator>POET Biorefining Caro, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.472885</lat>
    <lon>-83.41176</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63944</plant_id>
    <plant_name>Blackhorse Farm Solar, LLC CSG</plant_name>
    <state>RI</state>
    <county>Bristol</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.7186</lat>
    <lon>-71.2342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64124</plant_id>
    <plant_name>IGS Stockton DG CSG</plant_name>
    <state>IL</state>
    <county>Jo Daviess</county>
    <operator>SRC Partnership 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.348183</lat>
    <lon>-90.01124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64620</plant_id>
    <plant_name>Kearsarge Montague BD(CSG)</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Kearsarge Montague BD LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <battery_mwh>5.1</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.585933</lat>
    <lon>-72.55801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64714</plant_id>
    <plant_name>Rice Lake Solar Array</plant_name>
    <state>WI</state>
    <county>Barron</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.526558</lat>
    <lon>-91.75693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64751</plant_id>
    <plant_name>Amazon PSP1</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.92624</lat>
    <lon>-116.9944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65297</plant_id>
    <plant_name>DOCCS Midstate</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>DOCCS Midstate</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.164033</lat>
    <lon>-75.30409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65466</plant_id>
    <plant_name>Kinsley II Landfill Solar System</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.79271</lat>
    <lon>-75.11138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65469</plant_id>
    <plant_name>Sealed Air Madera Solar Project</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Sealed Air Corporation</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <battery_mwh>3.1</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.945582</lat>
    <lon>-120.056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65646</plant_id>
    <plant_name>MA-Dighton-A</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>MA CS Dighton, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.833775</lat>
    <lon>-71.16006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65801</plant_id>
    <plant_name>Limestone CSG 1 LLC</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Limestone CSG 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.916446</lat>
    <lon>-67.85511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65950</plant_id>
    <plant_name>Kearsarge 100 Sohier Rd</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Kearsarge Beverly LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <battery_mwh>6.4</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.56465</lat>
    <lon>-70.88105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65985</plant_id>
    <plant_name>IGS AKC1</plant_name>
    <state>OH</state>
    <county>Summit</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.049604</lat>
    <lon>-81.58158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66964</plant_id>
    <plant_name>Franklin Solar 2 LLC Community Solar</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.480841</lat>
    <lon>-74.49472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67033</plant_id>
    <plant_name>3715 Oxford RD</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Solitude Solar New Hartford Oxford Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.039</lat>
    <lon>-75.283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67270</plant_id>
    <plant_name>THD Baltimore DCs - 5829 Project Lion</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.221979</lat>
    <lon>-76.48317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67345</plant_id>
    <plant_name>Smith Creek</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>LSE Pisces LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.053168</lat>
    <lon>-76.32049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67442</plant_id>
    <plant_name>Gowans (CSG)</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.641661</lat>
    <lon>-79.0173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67531</plant_id>
    <plant_name>Suffolk CSG, LLC</plant_name>
    <state>VA</state>
    <county>Suffolk</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.68565</lat>
    <lon>-76.763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67616</plant_id>
    <plant_name>Krumkill Road Solar South, LLC</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.66627</lat>
    <lon>-73.85647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67920</plant_id>
    <plant_name>Augusta Road Bowdoin Solar, LLC</plant_name>
    <state>ME</state>
    <county>Sagadahoc</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.012164</lat>
    <lon>-69.94961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67922</plant_id>
    <plant_name>Church Hill Road Augusta Solar, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.370724</lat>
    <lon>-69.70385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68406</plant_id>
    <plant_name>Lebanon CSG LLC</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.376709</lat>
    <lon>-70.94155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68773</plant_id>
    <plant_name>Apollo</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Sunrise on Wing Ln. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <battery_mwh>2.8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.67911</lat>
    <lon>-70.89435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68807</plant_id>
    <plant_name>Catskill</plant_name>
    <state>NY</state>
    <county>Broome</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.337823</lat>
    <lon>-75.90345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68816</plant_id>
    <plant_name>Google Bayhill Solar PV and Microgrid</plant_name>
    <state>CA</state>
    <county>San Mateo</county>
    <operator>Google, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <battery_mwh>5.3</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.626915</lat>
    <lon>-122.4283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69500</plant_id>
    <plant_name>Pittsylvania CSG LLC</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.857981</lat>
    <lon>-79.39841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69559</plant_id>
    <plant_name>Pluma - SLT Hidalgo CSG</plant_name>
    <state>NM</state>
    <county>Hidalgo</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.370399</lat>
    <lon>-108.7079</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70129</plant_id>
    <plant_name>Sidney Solar</plant_name>
    <state>NE</state>
    <county>Cheyenne</county>
    <operator>SE Municipal Nebraska, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.1428</lat>
    <lon>-102.9782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70389</plant_id>
    <plant_name>Pacifico Power Palmdale 01</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Pacifico Power Palmdale 01 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.8</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.596819</lat>
    <lon>-118.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1</plant_id>
    <plant_name>Sand Point</plant_name>
    <state>AK</state>
    <county>Aleutians East</county>
    <operator>Sand Point Generating, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Onshore Wind Turbine</technologies>
    <generators>6</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2023</latest_year>
    <lat>55.339722</lat>
    <lon>-160.4972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>282</plant_id>
    <plant_name>Spaulding 2</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>4.4</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>39.324592</lat>
    <lon>-120.6454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2004</plant_id>
    <plant_name>Preston (MN)</plant_name>
    <state>MN</state>
    <county>Fillmore</county>
    <operator>Preston Public Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1974</latest_year>
    <lat>43.6661</lat>
    <lon>-92.0831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6379</plant_id>
    <plant_name>Indian Orchard</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Central Rivers Power MA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>42.160954</lat>
    <lon>-72.50763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54330</plant_id>
    <plant_name>Westhollow Technology Center</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Shell Chemical LP</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>29.726017</lat>
    <lon>-95.63825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54860</plant_id>
    <plant_name>Black Creek</plant_name>
    <state>WA</state>
    <county>King</county>
    <operator>Black Creek Hydro Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>47.549652</lat>
    <lon>-121.7105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57745</plant_id>
    <plant_name>The City of Vineland at West Vineland</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>Luminace Solar New Jersey, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.462376</lat>
    <lon>-75.07004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58304</plant_id>
    <plant_name>Kingsburg Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.505278</lat>
    <lon>-119.5403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59382</plant_id>
    <plant_name>Paisley Geothermal Generating Plant</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>Surprise Valley Electrification</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Geothermal</primary_technology>
    <primary_energy_source>GEO</primary_energy_source>
    <technologies>Geothermal</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.695833</lat>
    <lon>-120.5578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60085</plant_id>
    <plant_name>AVS Lancaster 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.748894</lat>
    <lon>-117.9736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60429</plant_id>
    <plant_name>Tides Lane Farm</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.06936</lat>
    <lon>-78.2988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60683</plant_id>
    <plant_name>TRS Fuel Cell</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>TRS Fuel Cell, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.3907</lat>
    <lon>-73.4354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61727</plant_id>
    <plant_name>Onyx - Brockton Thatcher Landfill Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.066369</lat>
    <lon>-70.98345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61893</plant_id>
    <plant_name>BNB Camden Solar</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.93903</lat>
    <lon>-75.10802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62020</plant_id>
    <plant_name>Stanford Campus Solar</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.43434</lat>
    <lon>-122.1608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62041</plant_id>
    <plant_name>Cuyahoga County Landfill</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.443122</lat>
    <lon>-81.75153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62524</plant_id>
    <plant_name>Route 22 Community Solar Farm CSG</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.725076</lat>
    <lon>-73.46703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62831</plant_id>
    <plant_name>Hickory Grove #1</plant_name>
    <state>NY</state>
    <county>Chemung</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.186827</lat>
    <lon>-76.84506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63294</plant_id>
    <plant_name>Parking Lot Array</plant_name>
    <state>OH</state>
    <county>Hamilton</county>
    <operator>Cincinnati Zoo &amp; Botanical Garden</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2024</latest_year>
    <lat>39.141852</lat>
    <lon>-84.51074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63334</plant_id>
    <plant_name>Campus Drive Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.056213</lat>
    <lon>-74.88094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63357</plant_id>
    <plant_name>Colonial Pipeline Woodbury West Deptford</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.817319</lat>
    <lon>-75.19687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64127</plant_id>
    <plant_name>Townsend Road(CSG)</plant_name>
    <state>NY</state>
    <county>Schuyler</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.350101</lat>
    <lon>-76.93801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64403</plant_id>
    <plant_name>California State Univ at Channel Islands</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.162058</lat>
    <lon>-119.0434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64437</plant_id>
    <plant_name>Dresser Hill CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Dresser Hill Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.081793</lat>
    <lon>-72.00652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65300</plant_id>
    <plant_name>DOCCS Greenhaven</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>DOCCS Greenhaven</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.578415</lat>
    <lon>-73.72058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65688</plant_id>
    <plant_name>Kearsarge Ludlow LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Kearsarge Ludlow LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.20128</lat>
    <lon>-72.49416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66489</plant_id>
    <plant_name>Genesee - CCR Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.31085</lat>
    <lon>-77.78582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66776</plant_id>
    <plant_name>Brookdale CC BTM at Lincroft</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>Solar DG NJ Brookdale, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.326056</lat>
    <lon>-74.13094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66836</plant_id>
    <plant_name>Source Power II - Taft CSG</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.12198</lat>
    <lon>-76.04235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69017</plant_id>
    <plant_name>Pivot Solar 52</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.2728</lat>
    <lon>-103.6341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69863</plant_id>
    <plant_name>Galva Landfill</plant_name>
    <state>IL</state>
    <county>Henry</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.177203</lat>
    <lon>-90.0335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70112</plant_id>
    <plant_name>Swire Coca-Cola Draper</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Swire Coca-Cola</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.521309</lat>
    <lon>-111.9006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70307</plant_id>
    <plant_name>Milk Street Solar, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.7</nameplate_mw>
    <summer_mw>3.7</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.038</lat>
    <lon>-71.557</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>261</plant_id>
    <plant_name>Murphys</plant_name>
    <state>CA</state>
    <county>Calaveras</county>
    <operator>Utica Water &amp; Power Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>38.147093</lat>
    <lon>-120.4464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1176</plant_id>
    <plant_name>Preston (IA)</plant_name>
    <state>IA</state>
    <county>Jackson</county>
    <operator>City of Preston - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.8</summer_mw>
    <first_year>1980</first_year>
    <latest_year>2020</latest_year>
    <lat>42.0507</lat>
    <lon>-90.3942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1638</plant_id>
    <plant_name>Redbridge</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Central Rivers Power MA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1934</latest_year>
    <lat>42.176047</lat>
    <lon>-72.40952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2140</plant_id>
    <plant_name>La Plata</plant_name>
    <state>MO</state>
    <county>Macon</county>
    <operator>City of La Plata - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.0244</lat>
    <lon>-92.4896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2315</plant_id>
    <plant_name>Wilber</plant_name>
    <state>NE</state>
    <county>Saline</county>
    <operator>City of Wilber - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1997</latest_year>
    <lat>40.4797</lat>
    <lon>-96.9604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2773</plant_id>
    <plant_name>Lake Lure</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Town of Lake Lure - (NC)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>35.42591</lat>
    <lon>-82.18401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3582</plant_id>
    <plant_name>Dunlap TP 1</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>Guadalupe Blanco River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>29.640187</lat>
    <lon>-98.04593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3691</plant_id>
    <plant_name>Spanish Fork</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>Strawberry Water Users Assn</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1937</first_year>
    <latest_year>1983</latest_year>
    <lat>40.080042</lat>
    <lon>-111.6048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3722</plant_id>
    <plant_name>Pittsford</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1914</latest_year>
    <lat>43.694</lat>
    <lon>-72.955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3778</plant_id>
    <plant_name>Niagara</plant_name>
    <state>VA</state>
    <county>Roanoke</county>
    <operator>Appalachian Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1954</latest_year>
    <lat>37.2544</lat>
    <lon>-79.8756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4045</plant_id>
    <plant_name>Pine</plant_name>
    <state>WI</state>
    <county>Florence</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>45.8275</lat>
    <lon>-88.2483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6207</plant_id>
    <plant_name>Ames Hydro</plant_name>
    <state>CO</state>
    <county>San Miguel</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1906</latest_year>
    <lat>37.866</lat>
    <lon>-107.8831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7066</plant_id>
    <plant_name>Stampede</plant_name>
    <state>CA</state>
    <county>Sierra</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>39.470447</lat>
    <lon>-120.1046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7657</plant_id>
    <plant_name>Auglaize Hydro</plant_name>
    <state>OH</state>
    <county>Defiance</county>
    <operator>City of Bryan - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>4.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2004</latest_year>
    <lat>41.237206</lat>
    <lon>-84.39976</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7798</plant_id>
    <plant_name>Gateway Gen</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>City of Manassas - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2009</latest_year>
    <lat>38.725278</lat>
    <lon>-77.50972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7854</plant_id>
    <plant_name>Avenue A Generator Sets</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>City of Rock Falls - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.780735</lat>
    <lon>-89.68942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7860</plant_id>
    <plant_name>Shelbina Power #3</plant_name>
    <state>MO</state>
    <county>Shelby</county>
    <operator>City of Shelbina - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>39.69755</lat>
    <lon>-92.05346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7874</plant_id>
    <plant_name>Edgerton</plant_name>
    <state>OH</state>
    <county>Williams</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.449992</lat>
    <lon>-84.76721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7926</plant_id>
    <plant_name>South Strawberry</plant_name>
    <state>IA</state>
    <county>Clayton</county>
    <operator>City of Strawberry Point -(IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.7114</lat>
    <lon>-91.5469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10197</plant_id>
    <plant_name>Philadlephia</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>EONY Generation Limited</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.158611</lat>
    <lon>-75.70878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10413</plant_id>
    <plant_name>Wainiha Hydro</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>BBCP Kauai Operating LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1910</latest_year>
    <lat>22.196292</lat>
    <lon>-159.5561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10520</plant_id>
    <plant_name>Dayton Hydro</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>41.387792</lat>
    <lon>-88.78966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10555</plant_id>
    <plant_name>Brassua Hydroelectric Project</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Brassua Hydroelectric LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>45.6603</lat>
    <lon>-69.81217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50427</plant_id>
    <plant_name>Bronx Zoo</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>New York Zoological Society</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1995</latest_year>
    <lat>40.844114</lat>
    <lon>-73.87689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50546</plant_id>
    <plant_name>Bowman</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Nevada Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>39.448352</lat>
    <lon>-120.6534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50907</plant_id>
    <plant_name>Oswego County Energy Recovery</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Oswego County - (NY)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Municipal Solid Waste</primary_technology>
    <primary_energy_source>MSW</primary_energy_source>
    <technologies>Municipal Solid Waste</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>43.348808</lat>
    <lon>-76.42517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54394</plant_id>
    <plant_name>Dry Creek Project</plant_name>
    <state>ID</state>
    <county>Butte</county>
    <operator>Dry Creek LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.027444</lat>
    <lon>-112.7194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54567</plant_id>
    <plant_name>MM Yolo Power</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>Yolo County Community Services Department</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1998</latest_year>
    <lat>38.596283</lat>
    <lon>-121.6875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54710</plant_id>
    <plant_name>Alliant SBD 9205 A Y McDonald</plant_name>
    <state>IA</state>
    <county>Dubuque</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2016</latest_year>
    <lat>42.490556</lat>
    <lon>-90.745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56114</plant_id>
    <plant_name>IMEA Highland</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>City of Highland - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>38.7417</lat>
    <lon>-89.6847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56118</plant_id>
    <plant_name>Flora Site B</plant_name>
    <state>IL</state>
    <county>Clay</county>
    <operator>City of Flora - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.6714</lat>
    <lon>-88.4894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56260</plant_id>
    <plant_name>High Point, Pump Station Rd</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>35.9861</lat>
    <lon>-79.9497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56261</plant_id>
    <plant_name>Lexington</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>35.7736</lat>
    <lon>-80.2594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56263</plant_id>
    <plant_name>Albemarle Prime Power Park</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.407208</lat>
    <lon>-80.15185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56269</plant_id>
    <plant_name>IBM West</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Rochester Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>44.0587</lat>
    <lon>-92.5119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56893</plant_id>
    <plant_name>Chester Diversion Hydroelectric Project</plant_name>
    <state>ID</state>
    <county>Fremont</county>
    <operator>Fall River Rural Elec Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.018333</lat>
    <lon>-111.5836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57356</plant_id>
    <plant_name>Henrico</plant_name>
    <state>VA</state>
    <county>Henrico</county>
    <operator>Industrial Power Generating Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>12</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>37.6788</lat>
    <lon>-77.5678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57382</plant_id>
    <plant_name>Yardville Solar Farm</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.168811</lat>
    <lon>-74.65672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57397</plant_id>
    <plant_name>Dow Jones South Brunswick Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Dow Jones &amp; Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2011</latest_year>
    <lat>40.369772</lat>
    <lon>-74.58685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57489</plant_id>
    <plant_name>Oak Grove Power Producers</plant_name>
    <state>KS</state>
    <county>Crawford</county>
    <operator>Cube District Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2013</latest_year>
    <lat>37.6297</lat>
    <lon>-94.6414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58163</plant_id>
    <plant_name>Mercy Medical Center</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Mercy Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2020</latest_year>
    <lat>40.688333</lat>
    <lon>-73.63083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58224</plant_id>
    <plant_name>CCSU Co-Gen-STBY Gen</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Central Connecticut State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2012</latest_year>
    <lat>41.691389</lat>
    <lon>-72.76861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58375</plant_id>
    <plant_name>Triton East and West Cogen</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Triton College</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2015</latest_year>
    <lat>41.916944</lat>
    <lon>-87.84556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59542</plant_id>
    <plant_name>Innovative Solar 6</plant_name>
    <state>NC</state>
    <county>Buncombe</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.6575</lat>
    <lon>-82.71028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59809</plant_id>
    <plant_name>Mountain Home Energy Center</plant_name>
    <state>TN</state>
    <county>Washington</county>
    <operator>Energy Systems Group LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>36.309609</lat>
    <lon>-82.3775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61972</plant_id>
    <plant_name>Richardson Solar</plant_name>
    <state>SC</state>
    <county>Barnwell</county>
    <operator>DP-C2 Episode 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.27774</lat>
    <lon>-81.35173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62091</plant_id>
    <plant_name>Hatfield Solar PV</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.41</lat>
    <lon>-72.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62392</plant_id>
    <plant_name>Guyton Community Solar</plant_name>
    <state>GA</state>
    <county>Effingham</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.412773</lat>
    <lon>-81.44285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62686</plant_id>
    <plant_name>TPE Pennsylvania Solar 1, LLC</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.198529</lat>
    <lon>-76.16159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62825</plant_id>
    <plant_name>GSPP Terrawatt Westfield LLC CSG</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.177501</lat>
    <lon>-72.72702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63457</plant_id>
    <plant_name>Progress Drive Generation Station</plant_name>
    <state>OH</state>
    <county>Richland</county>
    <operator>City of Shelby - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2019</latest_year>
    <lat>40.53</lat>
    <lon>-82.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63918</plant_id>
    <plant_name>POET Biorefining - Hudson</plant_name>
    <state>SD</state>
    <county>Lincoln</county>
    <operator>POET Biorefining - Hudson</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.096898</lat>
    <lon>-96.47698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63924</plant_id>
    <plant_name>POET Biorefining- Alexandria, LLC</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>POET Biorefining - Alexandria, LLC.</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.294347</lat>
    <lon>-85.65444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64748</plant_id>
    <plant_name>Fuel Cell 18A Sneden Avenue</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Annadale Community Clean Energy Projects LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.540377</lat>
    <lon>-74.17676</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65089</plant_id>
    <plant_name>Foothill Sanitary Landfill - Solar Array</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Ameresco San Joaquin Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.042352</lat>
    <lon>-120.9338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65510</plant_id>
    <plant_name>Sierra Pacific Chinese Camp</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Sierra Pacific Industries</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.883393</lat>
    <lon>-120.4544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65570</plant_id>
    <plant_name>West Valley Mission CCD Solar Project</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>West Valley-Mission Community College District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.264377</lat>
    <lon>-122.006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65633</plant_id>
    <plant_name>Boaz Microgrid Battery</plant_name>
    <state>WI</state>
    <county>Richland</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.310598</lat>
    <lon>-90.53274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65817</plant_id>
    <plant_name>Clear Solar I, LLC</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Clear Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.308314</lat>
    <lon>-81.84183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66005</plant_id>
    <plant_name>Limelight Solar III, LLC</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Limelight Solar III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.956394</lat>
    <lon>-81.97983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66151</plant_id>
    <plant_name>CoreSite - Somerville</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.376613</lat>
    <lon>-71.08052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67032</plant_id>
    <plant_name>15 Glen Harris RD</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>ME Sandy River LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.665</lat>
    <lon>-69.986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67136</plant_id>
    <plant_name>NY Attica 264 Maplewood Rd</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>EF NY CDG 010, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.866</lat>
    <lon>-78.257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67360</plant_id>
    <plant_name>Hat Creek Bioenergy</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Hat Creek Bioenergy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.987783</lat>
    <lon>-121.6225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68400</plant_id>
    <plant_name>TJA-NY-Chestnut Ridge Rd Moravia, LLC</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.72657</lat>
    <lon>-76.39461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68575</plant_id>
    <plant_name>Visalia Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>United Parcel Service</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <battery_mwh>4.3</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.36139</lat>
    <lon>-119.3926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68660</plant_id>
    <plant_name>Wolf</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Wolf Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.19827</lat>
    <lon>-77.98811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68676</plant_id>
    <plant_name>Maple North 2</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.986</lat>
    <lon>-74.183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69032</plant_id>
    <plant_name>LaSalle Solar 6</plant_name>
    <state>IL</state>
    <county>Lasalle</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.41779</lat>
    <lon>-88.83754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69593</plant_id>
    <plant_name>MCCo BESS Generating Facility</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>The Medical Center Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.3026</lat>
    <lon>-81.3604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69714</plant_id>
    <plant_name>Avon CSG 1 LLC</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.873687</lat>
    <lon>-77.71747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69845</plant_id>
    <plant_name>CVE US IL TAMAROA 316 LLC</plant_name>
    <state>IL</state>
    <county>Perry</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.140412</lat>
    <lon>-89.18613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70133</plant_id>
    <plant_name>Waverly Solar - (IA)</plant_name>
    <state>IA</state>
    <county>Bremer</county>
    <operator>SE Municipal Iowa, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.6</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.7129</lat>
    <lon>-92.5044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1192</plant_id>
    <plant_name>Traer Main</plant_name>
    <state>IA</state>
    <county>Tama</county>
    <operator>City of Traer - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1963</first_year>
    <latest_year>1970</latest_year>
    <lat>42.1926</lat>
    <lon>-92.4636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1634</plant_id>
    <plant_name>Gardners Falls</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Central Rivers Power MA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1964</latest_year>
    <lat>42.5914</lat>
    <lon>-72.7308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2249</plant_id>
    <plant_name>Laurel</plant_name>
    <state>NE</state>
    <county>Cedar</county>
    <operator>City of Laurel - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1992</latest_year>
    <lat>42.430539</lat>
    <lon>-97.09081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3712</plant_id>
    <plant_name>Fairfax Falls</plant_name>
    <state>VT</state>
    <county>Franklin</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1919</latest_year>
    <lat>44.6534</lat>
    <lon>-72.9961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4107</plant_id>
    <plant_name>Cashton</plant_name>
    <state>WI</state>
    <county>Monroe</county>
    <operator>Village of Cashton - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1932</first_year>
    <latest_year>2002</latest_year>
    <lat>43.742874</lat>
    <lon>-90.78033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7189</plant_id>
    <plant_name>Whiskeytown</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>City of Redding - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>40.597617</lat>
    <lon>-122.5387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7489</plant_id>
    <plant_name>Lake Mendocino</plant_name>
    <state>CA</state>
    <county>Mendocino</county>
    <operator>City of Ukiah - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>39.197222</lat>
    <lon>-123.1856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10042</plant_id>
    <plant_name>Kaweah Delta District Hospital</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Kaweah Delta Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>36.3275</lat>
    <lon>-119.2947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10422</plant_id>
    <plant_name>Williams Fork Hydro Plant</plant_name>
    <state>CO</state>
    <county>Grand</county>
    <operator>Denver City &amp; County of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1959</first_year>
    <latest_year>2012</latest_year>
    <lat>40.035</lat>
    <lon>-106.2053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10824</plant_id>
    <plant_name>Oakdale Power Station</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Massachusetts Water Res Auth</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>42.38697</lat>
    <lon>-71.80246</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50384</plant_id>
    <plant_name>Gregg Falls</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.0168</lat>
    <lon>-71.5679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52058</plant_id>
    <plant_name>Ogdensburg</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Ampersand Ogdensburg Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.704089</lat>
    <lon>-75.48705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54679</plant_id>
    <plant_name>Boulder City Lakewood Hydro</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Boulder, City of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>40.0111</lat>
    <lon>-105.3347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54735</plant_id>
    <plant_name>Alliant SBD 9301 Prairie Farms</plant_name>
    <state>IA</state>
    <county>Dubuque</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2019</latest_year>
    <lat>42.53</lat>
    <lon>-90.6847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54855</plant_id>
    <plant_name>Mars Snackfood US</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>M&amp;M Mars Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>41.91708</lat>
    <lon>-87.79218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56966</plant_id>
    <plant_name>RMQ 1 and 2</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>RMQ Ventures LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2013</latest_year>
    <lat>35.9222</lat>
    <lon>-77.6731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57133</plant_id>
    <plant_name>G2 Energy Ostrom Road LLC</plant_name>
    <state>CA</state>
    <county>Yuba</county>
    <operator>G2 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2013</latest_year>
    <lat>39.0728</lat>
    <lon>-121.3992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57161</plant_id>
    <plant_name>White River Lock and Dam 2</plant_name>
    <state>AR</state>
    <county>Independence</county>
    <operator>Ozark Hydro Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.744036</lat>
    <lon>-91.76542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57573</plant_id>
    <plant_name>CCCSD Wastewater Treatment Plnt</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Central Contra Costa Sanitary District</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>37.9978</lat>
    <lon>-122.0697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57661</plant_id>
    <plant_name>Manalapan Village Solar</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.256667</lat>
    <lon>-74.34972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57728</plant_id>
    <plant_name>Mill Creek Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.031388</lat>
    <lon>-74.82472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57815</plant_id>
    <plant_name>Titusville Solar</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Janssen Pharmaceutical Co</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.292778</lat>
    <lon>-74.84722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57970</plant_id>
    <plant_name>Butte College Main Campus Solar</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Butte-Glenn Community College District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>4.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.648056</lat>
    <lon>-121.6442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58082</plant_id>
    <plant_name>AMP Napoleon Solar Facility</plant_name>
    <state>OH</state>
    <county>Henry</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.406667</lat>
    <lon>-84.11083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58097</plant_id>
    <plant_name>Green Meadows</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.669444</lat>
    <lon>-70.53194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58270</plant_id>
    <plant_name>Acushnet AD Makepeace</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.798889</lat>
    <lon>-70.74361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58306</plant_id>
    <plant_name>Exeter Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.2675</lat>
    <lon>-119.1286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58307</plant_id>
    <plant_name>Ivanhoe Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.3875</lat>
    <lon>-119.255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58309</plant_id>
    <plant_name>Porterville Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.102778</lat>
    <lon>-119.0397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58362</plant_id>
    <plant_name>Quittacas Pond Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.781944</lat>
    <lon>-70.91333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58492</plant_id>
    <plant_name>Ararat Rock Solar, LLC</plant_name>
    <state>NC</state>
    <county>Surry</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.461111</lat>
    <lon>-80.60056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58494</plant_id>
    <plant_name>Progress Solar II, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.476111</lat>
    <lon>-79.0975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58495</plant_id>
    <plant_name>Progress Solar III, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.714167</lat>
    <lon>-79.35389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58662</plant_id>
    <plant_name>Mauka FIT One</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Valta Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>21.679722</lat>
    <lon>-157.9844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58668</plant_id>
    <plant_name>Rockwell Solar LLC</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.541667</lat>
    <lon>-80.47472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58784</plant_id>
    <plant_name>South Canal Hydro-3</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>Delta-Montrose Electric Association</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.470278</lat>
    <lon>-107.7714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58865</plant_id>
    <plant_name>Reventure Park</plant_name>
    <state>NC</state>
    <county>Mecklenburg</county>
    <operator>Clean Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2015</latest_year>
    <lat>35.294444</lat>
    <lon>-80.99889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59038</plant_id>
    <plant_name>Battleground</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.22</lat>
    <lon>-81.33</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59519</plant_id>
    <plant_name>Old Catawba PV 1</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.711667</lat>
    <lon>-81.13417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59606</plant_id>
    <plant_name>Soul City Solar</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.25</lat>
    <lon>-78.25</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59754</plant_id>
    <plant_name>Lakeland Electric Co. (FL) - Airport II</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Sun E N7 Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>27.991144</lat>
    <lon>-82.0473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59794</plant_id>
    <plant_name>Chicago West Side Energy Center</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Energy Systems Group LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.870751</lat>
    <lon>-87.67838</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59950</plant_id>
    <plant_name>Yadkinville Solar</plant_name>
    <state>NC</state>
    <county>Yadkin</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.13727</lat>
    <lon>-80.59601</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60131</plant_id>
    <plant_name>Durham Solar</plant_name>
    <state>NC</state>
    <county>Durham</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.004941</lat>
    <lon>-78.84848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60528</plant_id>
    <plant_name>Lawrence Creek Solar</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.401289</lat>
    <lon>-92.69373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60529</plant_id>
    <plant_name>Montrose Solar</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Enel Green Power NA, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.055628</lat>
    <lon>-93.92281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60854</plant_id>
    <plant_name>Bird Machine Solar Farm</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Bird Machine Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.109564</lat>
    <lon>-71.26674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61060</plant_id>
    <plant_name>Novel - OYA of Mapleton CSG</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>NRG MN Community LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.93</lat>
    <lon>-93.96</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61208</plant_id>
    <plant_name>Gulfport Naval Base CSG PV System</plant_name>
    <state>MS</state>
    <county>Harrison</county>
    <operator>Arcadia Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.379866</lat>
    <lon>-89.11923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61209</plant_id>
    <plant_name>Sacramento Regional County Sanitation PV</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.448604</lat>
    <lon>-121.4637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61314</plant_id>
    <plant_name>SR Kersey</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Kersey, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.386197</lat>
    <lon>-104.551</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61467</plant_id>
    <plant_name>City of Lexington</plant_name>
    <state>NE</state>
    <county>Dawson</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.757</lat>
    <lon>-99.734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61589</plant_id>
    <plant_name>UL Advanced Wind Turbine Test Facility</plant_name>
    <state>TX</state>
    <county>Randall</county>
    <operator>West Texas A&amp;M University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2018</latest_year>
    <lat>34.966012</lat>
    <lon>-101.7841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62073</plant_id>
    <plant_name>Hampden Solar PV</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.04565</lat>
    <lon>-72.45927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62135</plant_id>
    <plant_name>Palmer</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.20382</lat>
    <lon>-72.32536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62581</plant_id>
    <plant_name>Tolland Solar NG LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.089484</lat>
    <lon>-73.06143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63130</plant_id>
    <plant_name>Beals Medina Solar LLC CSG</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.2256</lat>
    <lon>-78.3559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63325</plant_id>
    <plant_name>Yorktown Battery Energy Storage Facility</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <battery_mwh>9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.00467</lat>
    <lon>-118.0684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63326</plant_id>
    <plant_name>Cadillac Battery Energy Storage Facility</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <battery_mwh>8.8</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.00469</lat>
    <lon>-118.0684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63469</plant_id>
    <plant_name>Alicea Solar Project Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.0686</lat>
    <lon>-72.0062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63492</plant_id>
    <plant_name>DCO Burlington</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Cartier Energy, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.108316</lat>
    <lon>-74.8264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63535</plant_id>
    <plant_name>Solar BESS Hybrid</plant_name>
    <state>GA</state>
    <county>Cobb</county>
    <operator>Cobb Electric Membership Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Natural Gas Fired Combustion Turbine; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2022</latest_year>
    <lat>33.979348</lat>
    <lon>-84.55613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63603</plant_id>
    <plant_name>Illumina Way SD</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Bloom Energy</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.87302</lat>
    <lon>-117.1997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63690</plant_id>
    <plant_name>Oak Street Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.148611</lat>
    <lon>-72.49694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63917</plant_id>
    <plant_name>DC Water Solar</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Marbury Point Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.819244</lat>
    <lon>-77.01894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63920</plant_id>
    <plant_name>POET Biorefining - Fostoria</plant_name>
    <state>OH</state>
    <county>Seneca</county>
    <operator>Fostoria Ethanol</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.1718</lat>
    <lon>-83.3777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63922</plant_id>
    <plant_name>POET Biorefining - Portland</plant_name>
    <state>IN</state>
    <county>Jay</county>
    <operator>POET Biorefining - Portland</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.414455</lat>
    <lon>-85.02555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63927</plant_id>
    <plant_name>POET Biorefining - Leipsic, LLC</plant_name>
    <state>OH</state>
    <county>Putnam</county>
    <operator>POET Biorefining - Leipsic, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.12055</lat>
    <lon>-83.97062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64526</plant_id>
    <plant_name>Raboth - Marion Drive</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.96951</lat>
    <lon>-70.72541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64673</plant_id>
    <plant_name>Acton</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Acton H Road Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.543731</lat>
    <lon>-70.91275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64964</plant_id>
    <plant_name>Rock Island Road Solar Community Solar</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>RPNY Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.369913</lat>
    <lon>-75.457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65370</plant_id>
    <plant_name>BWC Maces Pond LLC</plant_name>
    <state>ME</state>
    <county>Knox</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.17362</lat>
    <lon>-69.12333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65435</plant_id>
    <plant_name>OYA Pulaski</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.583</lat>
    <lon>-76.18</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65505</plant_id>
    <plant_name>Gilead</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.198537</lat>
    <lon>-80.01325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65784</plant_id>
    <plant_name>Burlington Solar 1</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>DG Connecticut III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.72795</lat>
    <lon>-72.93262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66040</plant_id>
    <plant_name>Niagara Depot Solar</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Niagara Depot Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.1191</lat>
    <lon>-79.00705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66042</plant_id>
    <plant_name>Eureka North Solar</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Eureka North Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.12887</lat>
    <lon>-75.41637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66045</plant_id>
    <plant_name>TPE RI WA1 Solar</plant_name>
    <state>RI</state>
    <county>Bristol</county>
    <operator>TPE RI WA1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.73934</lat>
    <lon>-71.26728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66274</plant_id>
    <plant_name>Summit - Lysander (CSG)</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.160278</lat>
    <lon>-76.28361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66332</plant_id>
    <plant_name>Wonderful Kings</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.769028</lat>
    <lon>-119.8685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66388</plant_id>
    <plant_name>NY USLE Rome-Oriskany</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>NY USLE Rome Rome-Oriskany LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.193134</lat>
    <lon>-75.42758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66645</plant_id>
    <plant_name>ELP - Kipp</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>ELP Kipp Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.20193</lat>
    <lon>-73.78298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66714</plant_id>
    <plant_name>Crystal Farms Local Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.633807</lat>
    <lon>-120.1771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66762</plant_id>
    <plant_name>SCH County - (1B) 10 Alice Wagner Way Ni</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.83447</lat>
    <lon>-73.89808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66835</plant_id>
    <plant_name>Lightstar Renewables - Project 1004</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.09927</lat>
    <lon>-73.95526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67131</plant_id>
    <plant_name>SR Panola III, LLC</plant_name>
    <state>MS</state>
    <county>Panola</county>
    <operator>SR Panola III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.302365</lat>
    <lon>-89.98784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67164</plant_id>
    <plant_name>SR Warren, LLC</plant_name>
    <state>KY</state>
    <county>Simpson</county>
    <operator>SR Warren, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.71168</lat>
    <lon>-86.54856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67268</plant_id>
    <plant_name>Source Power NY III - Remsen</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.334376</lat>
    <lon>-75.17795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67376</plant_id>
    <plant_name>BWC Rams Horn Channel LLC</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.567764</lat>
    <lon>-70.87132</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67475</plant_id>
    <plant_name>Saratoga Solar III, LLC</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.07072</lat>
    <lon>-73.89807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67476</plant_id>
    <plant_name>Saratoga Solar IV, LLC</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.068154</lat>
    <lon>-73.92014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68003</plant_id>
    <plant_name>NY Breesport 625 Breesport Rd</plant_name>
    <state>NY</state>
    <county>Chemung</county>
    <operator>Catalyze Breesport Road Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.173889</lat>
    <lon>-76.73806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68066</plant_id>
    <plant_name>Poet Bioprocessing Emmetsburg</plant_name>
    <state>IA</state>
    <county>Palo Alto</county>
    <operator>Poet Bioprocessing Emmetsburg</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.091625</lat>
    <lon>-94.64306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68757</plant_id>
    <plant_name>USS Beard Solar</plant_name>
    <state>IL</state>
    <county>Cass</county>
    <operator>USS Beard Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.9895</lat>
    <lon>-90.3538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68764</plant_id>
    <plant_name>Rak 2</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Rak 2 Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.4367</lat>
    <lon>-79.29715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69114</plant_id>
    <plant_name>Amazon Visalia (FAT2)</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.35914</lat>
    <lon>-119.3869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69123</plant_id>
    <plant_name>1519 Crandall Road</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>1519 Crandall Road LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.579338</lat>
    <lon>-71.1398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69202</plant_id>
    <plant_name>KE109</plant_name>
    <state>IL</state>
    <county>Kendall</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.64804</lat>
    <lon>-88.58344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69264</plant_id>
    <plant_name>CFF Rice Mill Solar Plant</plant_name>
    <state>CA</state>
    <county>Colusa</county>
    <operator>California Family Foods</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.04162</lat>
    <lon>-122.0666</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69399</plant_id>
    <plant_name>Guyer</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.894497</lat>
    <lon>-73.89087</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69446</plant_id>
    <plant_name>Frieden</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <battery_mwh>4.5</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.116506</lat>
    <lon>-79.54658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69802</plant_id>
    <plant_name>Berwick Hubbard Solar 1</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Berwick Hubbard Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.328</lat>
    <lon>-70.911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70063</plant_id>
    <plant_name>GSPP 1450 Curtiss Rd, LLC</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.367871</lat>
    <lon>-75.79425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70185</plant_id>
    <plant_name>Copenhagen Ct</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>11601 Copenhagen Ct, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.939381</lat>
    <lon>-87.91775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70216</plant_id>
    <plant_name>Tosoh SMD</plant_name>
    <state>OH</state>
    <county>Franklin</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.889983</lat>
    <lon>-83.05349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70263</plant_id>
    <plant_name>Champaign Solar, LLC</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>SRC Partnership 16, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.150813</lat>
    <lon>-88.2421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70412</plant_id>
    <plant_name>Lincoln Solar LLC (OR)</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>KSI III Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.5</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>45.017705</lat>
    <lon>-123.0835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>258</plant_id>
    <plant_name>Merced Falls</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Merced Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>37.52301</lat>
    <lon>-120.3299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>986</plant_id>
    <plant_name>Elkhart</plant_name>
    <state>IN</state>
    <county>Elkhart</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1921</latest_year>
    <lat>41.6928</lat>
    <lon>-85.965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1146</plant_id>
    <plant_name>Harlan</plant_name>
    <state>IA</state>
    <county>Shelby</county>
    <operator>Harlan Municipal Utilities - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>41.644542</lat>
    <lon>-95.31528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2232</plant_id>
    <plant_name>Curtis</plant_name>
    <state>NE</state>
    <county>Frontier</county>
    <operator>City of Curtis - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1975</latest_year>
    <lat>40.631453</lat>
    <lon>-100.5152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2295</plant_id>
    <plant_name>Oxford (NE)</plant_name>
    <state>NE</state>
    <county>Furnas</county>
    <operator>Village of Oxford - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1972</latest_year>
    <lat>40.2581</lat>
    <lon>-99.6108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3986</plant_id>
    <plant_name>Ladysmith Dam</plant_name>
    <state>WI</state>
    <county>Rusk</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1983</latest_year>
    <lat>45.464444</lat>
    <lon>-91.08361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4067</plant_id>
    <plant_name>Johnson Falls</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>45.2875</lat>
    <lon>-88.1603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7115</plant_id>
    <plant_name>Hoist</plant_name>
    <state>MI</state>
    <county>Marquette</county>
    <operator>Upper Peninsula Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>46.5628</lat>
    <lon>-87.5686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7129</plant_id>
    <plant_name>Thermalito Diverson Dam</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>California Dept. of Water Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>39.528749</lat>
    <lon>-121.5464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7415</plant_id>
    <plant_name>Lakefield Utilities</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>City of Lakefield - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2003</latest_year>
    <lat>43.674186</lat>
    <lon>-95.1706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10116</plant_id>
    <plant_name>Hampshire Paper</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Hampshire Paper Co Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.296544</lat>
    <lon>-75.36645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10453</plant_id>
    <plant_name>LAC Courte Oreilles Hydroelect</plant_name>
    <state>WI</state>
    <county>Sawyer</county>
    <operator>Zero6 Energy Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>45.888333</lat>
    <lon>-91.07694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50414</plant_id>
    <plant_name>Penacook Upper Falls Hydro</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Briar-Hydro Associates</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>43.283208</lat>
    <lon>-71.60083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50490</plant_id>
    <plant_name>PPG Plant C Caustic</plant_name>
    <state>LA</state>
    <county>Calcasieu</county>
    <operator>Westlake 2 US LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>30.226444</lat>
    <lon>-93.29377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50768</plant_id>
    <plant_name>Forestport</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.442468</lat>
    <lon>-75.21595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54395</plant_id>
    <plant_name>Stillwater Hydro Electric Project</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>GR Catalyst One, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>42.937465</lat>
    <lon>-73.65439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54839</plant_id>
    <plant_name>Valdosta Water Treatment Plant</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>City of Valdosta - (GA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2008</latest_year>
    <lat>30.9136</lat>
    <lon>-83.2529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56414</plant_id>
    <plant_name>Redwood Falls Wind</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Southern Minnesota Mun P Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2005</latest_year>
    <lat>44.502778</lat>
    <lon>-95.175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57645</plant_id>
    <plant_name>City &amp; County of Denver at Denver Int'l</plant_name>
    <state>CO</state>
    <county>Denver</county>
    <operator>Denver Airport Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.902981</lat>
    <lon>-104.6595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57648</plant_id>
    <plant_name>Henkel U.S. Operations Corporation</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Henkel U.S. Operations Corporation</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.886944</lat>
    <lon>-76.96833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58025</plant_id>
    <plant_name>Mt Wachusett Community College</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Mt Wachusett Community College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.588583</lat>
    <lon>-71.98419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58630</plant_id>
    <plant_name>RP Wind</plant_name>
    <state>OH</state>
    <county>Logan</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.449444</lat>
    <lon>-83.89333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58661</plant_id>
    <plant_name>Cape Cod Air Force Station - 6 SWS</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>US Space Force</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.7525</lat>
    <lon>-70.53889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58992</plant_id>
    <plant_name>Dept of Corrections NCCI Wind</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Dept of Corrections NCCI Wind</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.572222</lat>
    <lon>-71.94472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59434</plant_id>
    <plant_name>Duke Building 129</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Concord New Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.910833</lat>
    <lon>-86.24528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59934</plant_id>
    <plant_name>Soluga Farms IV</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.21871</lat>
    <lon>-78.66948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60109</plant_id>
    <plant_name>UDR Glastonbury Fuel Cell</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>UIL Distributed Resources, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.716998</lat>
    <lon>-72.53608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60438</plant_id>
    <plant_name>Whitakers Farm (Fisher Rd)</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.115542</lat>
    <lon>-77.72515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61274</plant_id>
    <plant_name>Wilson Solar Farm 1</plant_name>
    <state>NC</state>
    <county>Wilson</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.7</lat>
    <lon>-77.9</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61323</plant_id>
    <plant_name>Saluda Solar II</plant_name>
    <state>SC</state>
    <county>Saluda</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.011</lat>
    <lon>-81.739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61509</plant_id>
    <plant_name>Monroe County Sites A &amp; B</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.174071</lat>
    <lon>-77.39223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61543</plant_id>
    <plant_name>CF Novel Solar CSG Gardens Five, LLC</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.093763</lat>
    <lon>-93.40168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62061</plant_id>
    <plant_name>Anoka County MN CONX</plant_name>
    <state>MN</state>
    <county>Anoka</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.234722</lat>
    <lon>-93.48296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62746</plant_id>
    <plant_name>KDC Solar CSCP LLC</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.237803</lat>
    <lon>-74.31442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63288</plant_id>
    <plant_name>Brass Mill Center</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Brass Mill Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.5489</lat>
    <lon>-73.0245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64396</plant_id>
    <plant_name>EMWD - Perris Valley RWRF</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.75998</lat>
    <lon>-117.1877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65385</plant_id>
    <plant_name>Airport Road Solar (CSG)</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.42827</lat>
    <lon>-74.39665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65503</plant_id>
    <plant_name>Belafonte</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.161492</lat>
    <lon>-78.09015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66044</plant_id>
    <plant_name>TPE RI WA2 Solar</plant_name>
    <state>RI</state>
    <county>Bristol</county>
    <operator>TPE RI WA2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.73836</lat>
    <lon>-71.26739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66318</plant_id>
    <plant_name>WEB Brookfield</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>WEB Brookfield Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.191583</lat>
    <lon>-72.10939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66320</plant_id>
    <plant_name>3Colton</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.20618</lat>
    <lon>-71.73999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68641</plant_id>
    <plant_name>Randall Road Solar I</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.975944</lat>
    <lon>-73.92723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68849</plant_id>
    <plant_name>SF Auto O1</plant_name>
    <state>UT</state>
    <county>Weber</county>
    <operator>Autoliv ASP, Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.207</lat>
    <lon>-112.004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69437</plant_id>
    <plant_name>Lathrop 4 - SLCVA204</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.809438</lat>
    <lon>-121.283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69556</plant_id>
    <plant_name>Pluma - Clovis Concrete North CSG</plant_name>
    <state>NM</state>
    <county>Curry</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.363937</lat>
    <lon>-103.1968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70121</plant_id>
    <plant_name>Fort Morgan Solar</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>SE Municipal Colorado, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.265</lat>
    <lon>-103.784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70131</plant_id>
    <plant_name>Indianola Solar</plant_name>
    <state>IA</state>
    <county>Warren</county>
    <operator>SE Municipal Iowa, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.342</lat>
    <lon>-93.5752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70384</plant_id>
    <plant_name>Yorktown NY 1, LLC</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Valta Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.4</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <battery_mwh>5.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.333326</lat>
    <lon>-73.85907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>161</plant_id>
    <plant_name>Turlock Lake</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>37.611461</lat>
    <lon>-120.5947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4119</plant_id>
    <plant_name>Little Chute</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>City of Kaukauna (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>44.279897</lat>
    <lon>-88.25558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6397</plant_id>
    <plant_name>Boise R Diversion</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>43.537685</lat>
    <lon>-116.0938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7831</plant_id>
    <plant_name>Beaver Island</plant_name>
    <state>MI</state>
    <county>Charlevoix</county>
    <operator>Great Lakes Energy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2001</latest_year>
    <lat>45.7291</lat>
    <lon>-85.5244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10467</plant_id>
    <plant_name>Fourth Branch Hydroelectric Facility</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Albany Engineering Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>42.787575</lat>
    <lon>-73.69168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10545</plant_id>
    <plant_name>Copenhagen Plant</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>43.899745</lat>
    <lon>-75.66027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10800</plant_id>
    <plant_name>Pelzer Lower</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>34.616522</lat>
    <lon>-82.44791</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50917</plant_id>
    <plant_name>Middle Fork Irrigation District</plant_name>
    <state>OR</state>
    <county>Hood River</county>
    <operator>Middle Fork Irrigation Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>45.480701</lat>
    <lon>-121.5998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54548</plant_id>
    <plant_name>Longfalls Facility</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Ampersand Long Falls Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>43.980806</lat>
    <lon>-75.62468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55931</plant_id>
    <plant_name>Boulder City Silver Lake Hydro</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Boulder, City of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>39.991311</lat>
    <lon>-105.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56419</plant_id>
    <plant_name>Beecher Gas Recovery</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Will County Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2008</latest_year>
    <lat>41.38109</lat>
    <lon>-87.63754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56974</plant_id>
    <plant_name>Wagon Trail LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>CR51 Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.6531</lat>
    <lon>-119.4625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58037</plant_id>
    <plant_name>Buckeye Union HS District 201</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Luminace Solar Arizona, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.419167</lat>
    <lon>-112.5761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58053</plant_id>
    <plant_name>Vitro Flat Glass LLC</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Vitro Flat Glass LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1983</first_year>
    <latest_year>2000</latest_year>
    <lat>36.69</lat>
    <lon>-119.72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58477</plant_id>
    <plant_name>Las Vegas WPCF Solar Plant</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>City of Las Vegas - (NV)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.134444</lat>
    <lon>-115.0353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58565</plant_id>
    <plant_name>Gettysburg Energy &amp; Nutrient Rec Facilit</plant_name>
    <state>PA</state>
    <county>Adams</county>
    <operator>Gettysburg Energy and Nutrient Rec Facility LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBS</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.950278</lat>
    <lon>-77.12528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60193</plant_id>
    <plant_name>Whitethorn Solar LLC</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Whitethorn Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.691</lat>
    <lon>-121.717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60867</plant_id>
    <plant_name>Kearsarge Southwick LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Kearsarge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.01627</lat>
    <lon>-72.77524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61548</plant_id>
    <plant_name>CF Novel Solar CSG Gardens Seven, LLC</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.430807</lat>
    <lon>-94.02188</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61702</plant_id>
    <plant_name>Greater New Bedford LFG Utiliz. Facility</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>CommonWealth New Bedford Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>41.72496</lat>
    <lon>-70.97797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62010</plant_id>
    <plant_name>Gibbon Solar</plant_name>
    <state>MN</state>
    <county>Sibley</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.520923</lat>
    <lon>-94.52436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62055</plant_id>
    <plant_name>Wareham Solar PV</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.78</lat>
    <lon>-70.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62898</plant_id>
    <plant_name>Town of Burrillville Solar CSG</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.954239</lat>
    <lon>-71.6612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62973</plant_id>
    <plant_name>Syncarpha Halifax Hybrid CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Syncarpha Halifax, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <battery_mwh>3.2</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.983721</lat>
    <lon>-70.85683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63264</plant_id>
    <plant_name>Partridge Hill Solar Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <battery_mwh>1.5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.1189</lat>
    <lon>-71.9371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63468</plant_id>
    <plant_name>Hurteau Solar Project Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <battery_mwh>1.5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.0248</lat>
    <lon>-71.5925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63472</plant_id>
    <plant_name>Cycz Solar Project CSG Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <battery_mwh>2.5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.218</lat>
    <lon>-71.9761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63691</plant_id>
    <plant_name>Hunker Solar River, LLC</plant_name>
    <state>PA</state>
    <county>Westmoreland</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.216382</lat>
    <lon>-79.64711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64061</plant_id>
    <plant_name>Hecate Energy West Newberry, LLC</plant_name>
    <state>SC</state>
    <county>Newberry</county>
    <operator>Hecate Energy West Newberry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.249814</lat>
    <lon>-81.64895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64708</plant_id>
    <plant_name>Santee Solar Partners, LLC</plant_name>
    <state>MN</state>
    <county>Isanti</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.4173</lat>
    <lon>-93.3885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64752</plant_id>
    <plant_name>John Hopkins Middle School Microgrid</plant_name>
    <state>FL</state>
    <county>Pinellas</county>
    <operator>Duke Energy Florida, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <battery_mwh>18</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>27.767931</lat>
    <lon>-82.65477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65067</plant_id>
    <plant_name>ASA DeKalb NY Solar III LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>ASA DeKalb NY Solar III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.424108</lat>
    <lon>-75.37919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65183</plant_id>
    <plant_name>Norton LLC</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.98309</lat>
    <lon>-71.21461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65222</plant_id>
    <plant_name>County Road 17 (CSG)</plant_name>
    <state>NY</state>
    <county>Chenango</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.27842</lat>
    <lon>-75.5415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65470</plant_id>
    <plant_name>Cummins Whitakers PV Arrays</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Cummins, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.089369</lat>
    <lon>-77.72681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65525</plant_id>
    <plant_name>CA-DGS RFP-Salinas Valley State Prison</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.467471</lat>
    <lon>-121.3845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65640</plant_id>
    <plant_name>SR Bolivar</plant_name>
    <state>TN</state>
    <county>Hardeman</county>
    <operator>SR Bolivar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.256656</lat>
    <lon>-89.02028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65798</plant_id>
    <plant_name>Easton CSG 1 LLC</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Easton CSG 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.643254</lat>
    <lon>-67.90871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66081</plant_id>
    <plant_name>Lenox Renewables</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Lenox Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.11064</lat>
    <lon>-75.77579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66087</plant_id>
    <plant_name>Livermore Falls CSG</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Livermore Falls CSG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.48002</lat>
    <lon>-70.16987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66482</plant_id>
    <plant_name>Ghent (NY)</plant_name>
    <state>NY</state>
    <county>Columbia</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.277433</lat>
    <lon>-73.7092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66823</plant_id>
    <plant_name>Carthage B</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>NY USLE Carthage SR26 B LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.990287</lat>
    <lon>-75.66126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66939</plant_id>
    <plant_name>IMPA Winamac Solar Park</plant_name>
    <state>IN</state>
    <county>Pulaski</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.05569</lat>
    <lon>-86.57676</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67125</plant_id>
    <plant_name>SR Christiana, LLC</plant_name>
    <state>TN</state>
    <county>Rutherford</county>
    <operator>SR Christiana, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.700485</lat>
    <lon>-86.36604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67156</plant_id>
    <plant_name>Pine Hill Westport</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.605142</lat>
    <lon>-71.04409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67275</plant_id>
    <plant_name>White Plains_RFP-Gedney Way Landfill</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <battery_mwh>5.1</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.008926</lat>
    <lon>-73.75766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67428</plant_id>
    <plant_name>BRNG Nicolin (CSG)</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.620776</lat>
    <lon>-68.50923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67927</plant_id>
    <plant_name>Market Street Gardiner Solar, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.182319</lat>
    <lon>-69.81898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68259</plant_id>
    <plant_name>Oneida 2 CDG</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>NY CDG Oneida 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.196874</lat>
    <lon>-75.43545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68545</plant_id>
    <plant_name>USNY - Geddes</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Abundant Solar Power Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.065015</lat>
    <lon>-76.2196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68640</plant_id>
    <plant_name>ECA CO Greeley</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.481029</lat>
    <lon>-104.7159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68652</plant_id>
    <plant_name>Peru (MA)</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Sunrise on West Main Rd. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.44527</lat>
    <lon>-73.0565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69543</plant_id>
    <plant_name>Great Valley Gernatt</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.204</lat>
    <lon>-78.642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69703</plant_id>
    <plant_name>Sussex CSG 2 LLC</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.521663</lat>
    <lon>-75.24609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70148</plant_id>
    <plant_name>Vassalboro PV, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>SREOG Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.479326</lat>
    <lon>-69.67388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70163</plant_id>
    <plant_name>Chester A, LLC</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>SREOG Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.3</nameplate_mw>
    <summer_mw>3.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.933946</lat>
    <lon>-70.5352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>361</plant_id>
    <plant_name>Santa Ana 1</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1899</first_year>
    <latest_year>1899</latest_year>
    <lat>34.14522</lat>
    <lon>-117.0585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>391</plant_id>
    <plant_name>Big Pine Creek</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>37.142795</lat>
    <lon>-118.3241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>402</plant_id>
    <plant_name>Pleasant Valley Hydro</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>37.41416</lat>
    <lon>-118.5239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>579</plant_id>
    <plant_name>High Falls</plant_name>
    <state>NY</state>
    <county>ULSTER</county>
    <operator>Central Hudson Gas &amp; Elec Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>41.828814</lat>
    <lon>-74.13188</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1173</plant_id>
    <plant_name>Ottumwa City of</plant_name>
    <state>IA</state>
    <county>Wapello</county>
    <operator>City of Ottumwa - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>41.016346</lat>
    <lon>-92.41487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1637</plant_id>
    <plant_name>Putts Bridge</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Central Rivers Power MA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1918</latest_year>
    <lat>42.157896</lat>
    <lon>-72.48643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1842</plant_id>
    <plant_name>James R Smith</plant_name>
    <state>MI</state>
    <county>Marquette</county>
    <operator>City of Marquette - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1922</latest_year>
    <lat>46.571639</lat>
    <lon>-87.41046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2360</plant_id>
    <plant_name>Jackman</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.6</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>43.11055</lat>
    <lon>-71.94889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3025</plant_id>
    <plant_name>East Side</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>42.224847</lat>
    <lon>-121.7955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3740</plant_id>
    <plant_name>Middlesex 2</plant_name>
    <state>VT</state>
    <county>Washington</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>44.292391</lat>
    <lon>-72.6824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7413</plant_id>
    <plant_name>Short Mountain</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>Emerald People's Utility Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1993</latest_year>
    <lat>43.96211</lat>
    <lon>-122.9974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7482</plant_id>
    <plant_name>NSB Atqasuk Utility</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>North Slope Borough Power &amp; Light (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2003</latest_year>
    <lat>70.4826</lat>
    <lon>-157.4252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10026</plant_id>
    <plant_name>Encina Water Pollution Control</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Encina Joint Powers Authority</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>33.1165</lat>
    <lon>-117.3215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10532</plant_id>
    <plant_name>Grand River</plant_name>
    <state>MI</state>
    <county>Clinton</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1997</latest_year>
    <lat>42.791028</lat>
    <lon>-84.69568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10825</plant_id>
    <plant_name>Cosgrove Intake and Power Station</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Massachusetts Water Res Auth</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>42.40439</lat>
    <lon>-71.68722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50156</plant_id>
    <plant_name>Bear Creek (CA)</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.534454</lat>
    <lon>-121.9591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50230</plant_id>
    <plant_name>Robbins Lumber</plant_name>
    <state>ME</state>
    <county>WALDO</county>
    <operator>Robbins Lumber Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1987</latest_year>
    <lat>44.3331</lat>
    <lon>-69.2019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54302</plant_id>
    <plant_name>Goodwin Hydroelectric</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Metropolitan Dist of Hartford</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>41.988611</lat>
    <lon>-73.0194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54723</plant_id>
    <plant_name>I 95 Landfill Phase II</plant_name>
    <state>VA</state>
    <county>Fairfax</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>38.6892</lat>
    <lon>-77.2375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54865</plant_id>
    <plant_name>Phoenix Hydro Project</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>43.227058</lat>
    <lon>-76.30214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54890</plant_id>
    <plant_name>Peoples Generating Station</plant_name>
    <state>MI</state>
    <county>Saginaw</county>
    <operator>Sagepoint Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.27975</lat>
    <lon>-83.86507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55184</plant_id>
    <plant_name>Aera San Ardo Cogen Facility</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Aera Energy LLC-San Ardo</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>35.953293</lat>
    <lon>-120.86</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55752</plant_id>
    <plant_name>Sonoma Central Landfill Phase I</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>County of Sonoma Dept of Trnsp</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>38.3017</lat>
    <lon>-122.7489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55753</plant_id>
    <plant_name>Sonoma Central Landfill Phase II</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>County of Sonoma Dept of Trnsp</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>38.3017</lat>
    <lon>-122.7489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55953</plant_id>
    <plant_name>Pretlow</plant_name>
    <state>VA</state>
    <county>Southampton</county>
    <operator>City of Franklin - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>36.659167</lat>
    <lon>-76.92667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55954</plant_id>
    <plant_name>Downtown</plant_name>
    <state>VA</state>
    <county>Southampton</county>
    <operator>City of Franklin - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>36.680278</lat>
    <lon>-76.92194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56327</plant_id>
    <plant_name>Pendleton County LFGTE</plant_name>
    <state>KY</state>
    <county>Pendleton</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>38.734218</lat>
    <lon>-84.4059</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56404</plant_id>
    <plant_name>Noble Hill Landfill</plant_name>
    <state>MO</state>
    <county>Greene</county>
    <operator>City of Springfield - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>37.3811</lat>
    <lon>-93.3514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56463</plant_id>
    <plant_name>Oak Ridge LFGTE</plant_name>
    <state>IN</state>
    <county>Cass</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>40.721322</lat>
    <lon>-86.34214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56464</plant_id>
    <plant_name>Jay County LFGTE</plant_name>
    <state>IN</state>
    <county>Jay</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>40.379703</lat>
    <lon>-85.08819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56510</plant_id>
    <plant_name>Frey Farm Landfill</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>39.9589</lat>
    <lon>-76.4442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56512</plant_id>
    <plant_name>GLRA Landfill</plant_name>
    <state>PA</state>
    <county>Lebanon</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>40.3664</lat>
    <lon>-76.4931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56525</plant_id>
    <plant_name>Timberline Trail Gas Recovery</plant_name>
    <state>WI</state>
    <county>Rusk</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2007</latest_year>
    <lat>45.4533</lat>
    <lon>-91.3583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56529</plant_id>
    <plant_name>Five Oaks Gas Recovery</plant_name>
    <state>IL</state>
    <county>Christian</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.5678</lat>
    <lon>-89.3683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56530</plant_id>
    <plant_name>DADS Gas Recovery</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.6522</lat>
    <lon>-104.7161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56554</plant_id>
    <plant_name>Salt Lake Energy Systems</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>40.7461</lat>
    <lon>-112.0339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56850</plant_id>
    <plant_name>Lanchester Generating Station</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2010</latest_year>
    <lat>40.1108</lat>
    <lon>-75.9547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56852</plant_id>
    <plant_name>Pinconning White Feather</plant_name>
    <state>MI</state>
    <county>BAY</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>43.8983</lat>
    <lon>-83.9494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56962</plant_id>
    <plant_name>Iredell County LFG Facility</plant_name>
    <state>NC</state>
    <county>Iredell</county>
    <operator>Iredell Transmission LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>35.769281</lat>
    <lon>-80.826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57003</plant_id>
    <plant_name>Fulton LFGTE Facility</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Innovative Energy Systems Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>43.0142</lat>
    <lon>-74.4739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57016</plant_id>
    <plant_name>Waste Management Crossroads LFGTE</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.7014</lat>
    <lon>-69.8319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57017</plant_id>
    <plant_name>Spruce Ridge Gas Recovery</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2010</latest_year>
    <lat>44.8158</lat>
    <lon>-94.2489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57020</plant_id>
    <plant_name>Westside Landfill Gas Recovery</plant_name>
    <state>TX</state>
    <county>Parker</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>32.724553</lat>
    <lon>-97.53712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57165</plant_id>
    <plant_name>Farmers Branch Renewable Energy Facility</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.031111</lat>
    <lon>-96.95722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57166</plant_id>
    <plant_name>Waste Management Lockwood LFGTE</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.493315</lat>
    <lon>-119.6203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57167</plant_id>
    <plant_name>Mesquite Creek LFGTE Project</plant_name>
    <state>TX</state>
    <county>Comal</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>29.7372</lat>
    <lon>-98.0228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57182</plant_id>
    <plant_name>PPL Frey Farm Landfill Wind</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.959167</lat>
    <lon>-76.45556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57403</plant_id>
    <plant_name>Northwest Regional</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.681944</lat>
    <lon>-112.4767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57404</plant_id>
    <plant_name>Oneida Herkimer</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2013</latest_year>
    <lat>43.462222</lat>
    <lon>-75.41833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57405</plant_id>
    <plant_name>Eagle Valley (MI)</plant_name>
    <state>MI</state>
    <county>Oakland</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.7225</lat>
    <lon>-83.26306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57502</plant_id>
    <plant_name>Perdido</plant_name>
    <state>FL</state>
    <county>Escambia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>30.57</lat>
    <lon>-87.39</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57581</plant_id>
    <plant_name>Allenwood</plant_name>
    <state>PA</state>
    <county>Lycoming</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.151111</lat>
    <lon>-76.91778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57582</plant_id>
    <plant_name>Lycoming County</plant_name>
    <state>PA</state>
    <county>Lycoming</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.151111</lat>
    <lon>-76.91778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57706</plant_id>
    <plant_name>Blue Water Renewables Inc</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>Blue Water Renewables Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.91577</lat>
    <lon>-82.59451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57828</plant_id>
    <plant_name>Tulsa LFG LLC</plant_name>
    <state>OK</state>
    <county>Osage</county>
    <operator>Tulsa LFG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2020</latest_year>
    <lat>36.161953</lat>
    <lon>-96.18651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57861</plant_id>
    <plant_name>Hidden Hollow Energy</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Hidden Hollow Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>43.697222</lat>
    <lon>-116.2714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57902</plant_id>
    <plant_name>Fighting Creek LFGTE Plant</plant_name>
    <state>ID</state>
    <county>Kootenai</county>
    <operator>Kootenai Renewable Energy LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>47.531667</lat>
    <lon>-116.93</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57945</plant_id>
    <plant_name>Berkeley County Landfill</plant_name>
    <state>SC</state>
    <county>Berkeley</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.121111</lat>
    <lon>-80.02944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57989</plant_id>
    <plant_name>Groveland Solar</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.751111</lat>
    <lon>-71.03722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58101</plant_id>
    <plant_name>Foundation Cemex River Plant</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Foundation CA Fund VI Manager LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.561944</lat>
    <lon>-117.3072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58130</plant_id>
    <plant_name>Blue Mountain Biogas</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Blue Mountain Biogas LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.173889</lat>
    <lon>-113.2972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58245</plant_id>
    <plant_name>Northeastern Illinois University Cogen</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Northeastern Illinois University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>41.981111</lat>
    <lon>-87.71917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58246</plant_id>
    <plant_name>Millersville LFG</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>LES Operations Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.084722</lat>
    <lon>-76.67639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58497</plant_id>
    <plant_name>L&amp;S Sweetners</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.090556</lat>
    <lon>-76.14556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58568</plant_id>
    <plant_name>Cottage Street Solar Facility</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Western Massachusetts Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.145278</lat>
    <lon>-72.53833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58577</plant_id>
    <plant_name>Veolia ES Blackfoot Landfill Facility</plant_name>
    <state>IN</state>
    <county>Pike</county>
    <operator>Southern Indiana Gas &amp; Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.327222</lat>
    <lon>-87.20056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58704</plant_id>
    <plant_name>Zeeland Farm Services</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>Zeeland Farm Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2009</latest_year>
    <lat>42.813056</lat>
    <lon>-85.98611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58747</plant_id>
    <plant_name>Viresco Turtle Lake</plant_name>
    <state>WI</state>
    <county>Polk</county>
    <operator>Viresco Turtle Lake</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>45.390278</lat>
    <lon>-92.1625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59143</plant_id>
    <plant_name>Front Range Project</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Timberline Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.029444</lat>
    <lon>-105.0047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59529</plant_id>
    <plant_name>Bannock County LFG to Energy</plant_name>
    <state>ID</state>
    <county>Bannock</county>
    <operator>Bannock County Landfill - (ID)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2019</latest_year>
    <lat>42.787778</lat>
    <lon>-112.3656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59635</plant_id>
    <plant_name>Clinton LFGTE</plant_name>
    <state>IL</state>
    <county>Dewitt</county>
    <operator>Wabash Valley Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>40.120833</lat>
    <lon>-88.96111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59709</plant_id>
    <plant_name>St. Paul Intl Airport Red &amp; Blue Parking</plant_name>
    <state>MN</state>
    <county>Hennepin</county>
    <operator>Metropolitan Airports Commission</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>44.88</lat>
    <lon>-93.21</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59717</plant_id>
    <plant_name>Framingham State University Plant</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Framingham State University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Solar Photovoltaic</technologies>
    <generators>10</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2016</latest_year>
    <lat>42.297949</lat>
    <lon>-71.43607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59815</plant_id>
    <plant_name>Granby LFG</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Industrial Power Services Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.227281</lat>
    <lon>-72.54719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59842</plant_id>
    <plant_name>CNE at Cambridge MD</plant_name>
    <state>MD</state>
    <county>Dorchester</county>
    <operator>Luminace Solar Maryland II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.5158</lat>
    <lon>-76.0192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60102</plant_id>
    <plant_name>Lorin Industries</plant_name>
    <state>MI</state>
    <county>Muskegon</county>
    <operator>Lorin Industries</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>43.216639</lat>
    <lon>-86.21444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60241</plant_id>
    <plant_name>Union Renewable Energy Facility</plant_name>
    <state>SC</state>
    <county>Union</county>
    <operator>Lockhart Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.61577</lat>
    <lon>-81.81866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60494</plant_id>
    <plant_name>Hampden</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.044663</lat>
    <lon>-72.43875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60797</plant_id>
    <plant_name>Lake Forest Hospital Central Energy Plan</plant_name>
    <state>IL</state>
    <county>Lake</county>
    <operator>Northwestern Lake Forest Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>42.25416</lat>
    <lon>-87.86428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60831</plant_id>
    <plant_name>Orbit Energy RI</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Anaergia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.8054</lat>
    <lon>-71.51417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62790</plant_id>
    <plant_name>Tell City Solar Park</plant_name>
    <state>IN</state>
    <county>Perry</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.965852</lat>
    <lon>-86.73733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63181</plant_id>
    <plant_name>Monroeville Solar</plant_name>
    <state>OH</state>
    <county>Huron</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.230142</lat>
    <lon>-82.71179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63246</plant_id>
    <plant_name>New River Clean Energy</plant_name>
    <state>WV</state>
    <county>Raleigh</county>
    <operator>Cox Enterprises</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.81577</lat>
    <lon>-81.16193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63353</plant_id>
    <plant_name>Allied Beverages Elizabeth</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.665678</lat>
    <lon>-74.17523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63415</plant_id>
    <plant_name>Middletown Solar 1, LLC Hybrid CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <battery_mwh>6.6</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.3902</lat>
    <lon>-74.5199</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63546</plant_id>
    <plant_name>St. Luke's Cornwall Hospital</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>St. Luke's Cornwall Hospital - Newburgh</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.50365</lat>
    <lon>-74.01454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64142</plant_id>
    <plant_name>LabCorp Engine</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.570448</lat>
    <lon>-74.63951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64505</plant_id>
    <plant_name>Flathead Landfill to Gas Energy Facility</plant_name>
    <state>MT</state>
    <county>Flathead</county>
    <operator>Flathead Electric Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2023</latest_year>
    <lat>48.313067</lat>
    <lon>-114.3421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65330</plant_id>
    <plant_name>8500 Balboa PV, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>8500 Balboa PV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.22379</lat>
    <lon>-118.4997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66028</plant_id>
    <plant_name>DRPA Ferry Ave Station Solar Project</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Solar Star River SLB, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.921831</lat>
    <lon>-75.09254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66122</plant_id>
    <plant_name>HCE Roark Mill Solar, LLC</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.05622</lat>
    <lon>-79.3051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66258</plant_id>
    <plant_name>Source Power NY II - Whaling</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Whaling Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.191807</lat>
    <lon>-75.18548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66565</plant_id>
    <plant_name>HEBCCBakery</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>27.786287</lat>
    <lon>-97.46234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66592</plant_id>
    <plant_name>ERDC</plant_name>
    <state>MS</state>
    <county>Warren</county>
    <operator>Entergy Texas Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.3103</lat>
    <lon>-90.85987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66597</plant_id>
    <plant_name>RavenChem</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>8</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.820648</lat>
    <lon>-94.91399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66834</plant_id>
    <plant_name>ME Novel Lighthouse - Front St. Solar CS</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Luminace Sunbeam Development Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.746062</lat>
    <lon>-69.7447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67027</plant_id>
    <plant_name>Energy Developments, Hancock</plant_name>
    <state>OH</state>
    <county>Hancock</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>4</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.06571</lat>
    <lon>-83.40949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67028</plant_id>
    <plant_name>Randolf Solar</plant_name>
    <state>VA</state>
    <county>Shenandoah</county>
    <operator>Randolf Solar Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.745097</lat>
    <lon>-78.67523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67436</plant_id>
    <plant_name>West Point RNG</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Camco International Group, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.75</lat>
    <lon>-114.646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67572</plant_id>
    <plant_name>AstraZeneca Newark Solar</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>AstraZeneca Pharmaceuticals</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.648491</lat>
    <lon>-75.70611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67900</plant_id>
    <plant_name>Oak Leaf Solar XVII Community Solar</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.421787</lat>
    <lon>-73.2925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68272</plant_id>
    <plant_name>CA OXNARD 2600 Sakioka Dr</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.2134</lat>
    <lon>-119.1396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68608</plant_id>
    <plant_name>Western Berks</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.305766</lat>
    <lon>-75.99149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69065</plant_id>
    <plant_name>Burns Road Solar</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.668272</lat>
    <lon>-79.00245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69146</plant_id>
    <plant_name>Cuyahoga Generating Facility</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>Northeastern Power Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.380236</lat>
    <lon>-81.47494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69398</plant_id>
    <plant_name>Green Haven</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.579885</lat>
    <lon>-73.7108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69987</plant_id>
    <plant_name>2065 George St Community Solar</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>2065 George St Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.913475</lat>
    <lon>-87.84756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70181</plant_id>
    <plant_name>Prologis - SLCNJ001 - Community Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.56877</lat>
    <lon>-74.49457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70385</plant_id>
    <plant_name>NESG Solar Holding Company 1, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.606</lat>
    <lon>-71.7753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70526</plant_id>
    <plant_name>UE-00501MD, LLC</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Unison Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>3.2</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.361706</lat>
    <lon>-75.60078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>363</plant_id>
    <plant_name>Santa Ana 3</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>34.107245</lat>
    <lon>-117.0991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>483</plant_id>
    <plant_name>Coyote Creek</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>33.92493</lat>
    <lon>-117.9552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>771</plant_id>
    <plant_name>Puueo</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hawaii Electric Light Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1918</first_year>
    <latest_year>2005</latest_year>
    <lat>19.7264</lat>
    <lon>-155.0908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1142</plant_id>
    <plant_name>Graettinger</plant_name>
    <state>IA</state>
    <county>Palo Alto</county>
    <operator>City of Graettinger - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2002</latest_year>
    <lat>43.2397</lat>
    <lon>-94.7498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1603</plant_id>
    <plant_name>Boatlock</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>City of Holyoke Gas and Elec Dept - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1924</latest_year>
    <lat>42.2086</lat>
    <lon>-72.6014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6229</plant_id>
    <plant_name>Mobile</plant_name>
    <state>NE</state>
    <county>York</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1996</latest_year>
    <lat>40.883013</lat>
    <lon>-97.60136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7464</plant_id>
    <plant_name>Kake</plant_name>
    <state>AK</state>
    <county>Wrangell Petersburg</county>
    <operator>Inside Passage Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2017</latest_year>
    <lat>56.962983</lat>
    <lon>-133.9226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7485</plant_id>
    <plant_name>NSB Point Hope Utility</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>North Slope Borough Power &amp; Light (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2014</latest_year>
    <lat>68.348424</lat>
    <lon>-166.7372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10070</plant_id>
    <plant_name>Foothills Hydro Plant</plant_name>
    <state>CO</state>
    <county>Douglas</county>
    <operator>Denver City &amp; County-Foothills - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>39.4588</lat>
    <lon>-105.0657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10325</plant_id>
    <plant_name>Mink Creek Hydro</plant_name>
    <state>ID</state>
    <county>Franklin</county>
    <operator>Mink Creek Hydro Entity</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>42.260844</lat>
    <lon>-111.6656</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50047</plant_id>
    <plant_name>International Paper Jay Hydro</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>44.503704</lat>
    <lon>-70.22097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54594</plant_id>
    <plant_name>University of Arizona - Biosphere 2</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>University of Arizona - Biosphere 2</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2000</latest_year>
    <lat>32.578011</lat>
    <lon>-110.8526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57673</plant_id>
    <plant_name>Macys Goodyear</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Macys Corporate Services, Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>33.409063</lat>
    <lon>-112.4146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58512</plant_id>
    <plant_name>Cornerstone Power Vineland I LLC</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.439722</lat>
    <lon>-75.04389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60747</plant_id>
    <plant_name>Seabrook Village</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>CVI CleanCapital Solar 5 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.234177</lat>
    <lon>-74.08723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60772</plant_id>
    <plant_name>Adams Ave MS and HS</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2012</latest_year>
    <lat>39.411372</lat>
    <lon>-74.53087</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60782</plant_id>
    <plant_name>Barnhill Road Solar, LLC</plant_name>
    <state>NC</state>
    <county>Pasquotank</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.269175</lat>
    <lon>-76.29947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60853</plant_id>
    <plant_name>SR Houston</plant_name>
    <state>MS</state>
    <county>Chickasaw</county>
    <operator>SR Houston Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.926666</lat>
    <lon>-88.99756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61634</plant_id>
    <plant_name>DG Dighton LLC CSG</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>DG Dighton, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.801491</lat>
    <lon>-71.14484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62558</plant_id>
    <plant_name>Kearsarge SKSC2 LLC</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Kearsarge SKSC2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.498281</lat>
    <lon>-71.53341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62688</plant_id>
    <plant_name>Malech Solar Farm</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>County of Santa Clara - (CA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.228736</lat>
    <lon>-121.7386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63123</plant_id>
    <plant_name>Syncarpha Taos</plant_name>
    <state>NM</state>
    <county>Taos</county>
    <operator>Syncarpha Taos I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.371326</lat>
    <lon>-105.6602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63185</plant_id>
    <plant_name>Sayreville Solar Project</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.438</lat>
    <lon>-74.336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63718</plant_id>
    <plant_name>ISM Solar Cranston CSG</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.735147</lat>
    <lon>-71.46304</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63908</plant_id>
    <plant_name>SulusSolar17</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.34891</lat>
    <lon>-122.4335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65085</plant_id>
    <plant_name>580 River Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.680766</lat>
    <lon>-72.0761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66069</plant_id>
    <plant_name>IGS PCW1</plant_name>
    <state>OH</state>
    <county>Wood</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.548503</lat>
    <lon>-83.57865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66148</plant_id>
    <plant_name>Kaiser - Woodland Hills</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.173105</lat>
    <lon>-118.5903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67238</plant_id>
    <plant_name>SF Auto T1</plant_name>
    <state>UT</state>
    <county>Box Elder</county>
    <operator>Autoliv ASP, Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.730687</lat>
    <lon>-112.1796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67771</plant_id>
    <plant_name>Valley Sun Solar</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Valley Sun Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>47.31</lat>
    <lon>-68.164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67818</plant_id>
    <plant_name>Corcoran Irrigation District Floating So</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Solar Powered Ag, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.138287</lat>
    <lon>-119.5643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67933</plant_id>
    <plant_name>Halifax CSG LLC</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.679324</lat>
    <lon>-78.93916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68634</plant_id>
    <plant_name>Avalon Dairy</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Renewable Solar, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.716444</lat>
    <lon>-119.4304</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70277</plant_id>
    <plant_name>Kearsarge KWW LLC</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Kearsarge KWW LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.412439</lat>
    <lon>-71.59286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70575</plant_id>
    <plant_name>Champlain III</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3.1</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.984315</lat>
    <lon>-73.38621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>53</plant_id>
    <plant_name>Gantt</plant_name>
    <state>AL</state>
    <county>Covington</county>
    <operator>PowerSouth Energy Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1985</latest_year>
    <lat>31.4033</lat>
    <lon>-86.47947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>143</plant_id>
    <plant_name>Crosscut</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1939</first_year>
    <latest_year>1939</latest_year>
    <lat>33.439375</lat>
    <lon>-111.9461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>332</plant_id>
    <plant_name>Fontana</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>34.155162</lat>
    <lon>-117.3971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>342</plant_id>
    <plant_name>Lundy</plant_name>
    <state>CA</state>
    <county>Mono</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1912</latest_year>
    <lat>38.042729</lat>
    <lon>-119.172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>843</plant_id>
    <plant_name>Lower No 2</plant_name>
    <state>ID</state>
    <county>Bonneville</county>
    <operator>City of Idaho Falls - (ID)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1940</latest_year>
    <lat>43.468398</lat>
    <lon>-112.0626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1324</plant_id>
    <plant_name>Sharon Spring</plant_name>
    <state>KS</state>
    <county>Wallace</county>
    <operator>City of Sharon Springs - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1970</latest_year>
    <lat>38.890552</lat>
    <lon>-101.7515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2099</plant_id>
    <plant_name>Niangua</plant_name>
    <state>MO</state>
    <county>Camden</county>
    <operator>Sho-Me Power Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>37.9385</lat>
    <lon>-92.8477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2316</plant_id>
    <plant_name>Wisner</plant_name>
    <state>NE</state>
    <county>Cuming</county>
    <operator>City of Wisner (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.988069</lat>
    <lon>-96.91599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2550</plant_id>
    <plant_name>Chasm</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1926</latest_year>
    <lat>44.7533</lat>
    <lon>-74.2169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2557</plant_id>
    <plant_name>Effley</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1902</first_year>
    <latest_year>1923</latest_year>
    <lat>43.922831</lat>
    <lon>-75.27792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2578</plant_id>
    <plant_name>Hydraulic Race</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1942</latest_year>
    <lat>43.170948</lat>
    <lon>-78.69155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2596</plant_id>
    <plant_name>Oswego Falls West</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1914</first_year>
    <latest_year>2008</latest_year>
    <lat>43.3156</lat>
    <lon>-76.4172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2597</plant_id>
    <plant_name>Parishville</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>44.63</lat>
    <lon>-74.8258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2638</plant_id>
    <plant_name>Rochester 26</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Rochester Gas &amp; Electric Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1952</latest_year>
    <lat>43.1522</lat>
    <lon>-77.6098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2751</plant_id>
    <plant_name>Tuckasegee</plant_name>
    <state>NC</state>
    <county>Jackson</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1950</latest_year>
    <lat>35.247011</lat>
    <lon>-83.12811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3711</plant_id>
    <plant_name>Clark Falls</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1937</first_year>
    <latest_year>1937</latest_year>
    <lat>44.6356</lat>
    <lon>-73.12</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3728</plant_id>
    <plant_name>Weybridge</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3.4</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>44.0661</lat>
    <lon>-73.2158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4183</plant_id>
    <plant_name>Shoshone (WY)</plant_name>
    <state>WY</state>
    <county>Park</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>44.502897</lat>
    <lon>-109.1812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6449</plant_id>
    <plant_name>Azusa</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Pasadena - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>34.1548</lat>
    <lon>-117.9093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6475</plant_id>
    <plant_name>Gorge 18</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>44.489997</lat>
    <lon>-73.16931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7147</plant_id>
    <plant_name>Mill Creek 3</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1904</latest_year>
    <lat>34.088019</lat>
    <lon>-117.0395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7488</plant_id>
    <plant_name>NSB Wainwright Utility</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>North Slope Borough Power &amp; Light (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2001</latest_year>
    <lat>70.642877</lat>
    <lon>-160.0205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7501</plant_id>
    <plant_name>Princeton Wind Farm</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Town of Princeton - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.4789</lat>
    <lon>-71.9</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7771</plant_id>
    <plant_name>Springview</plant_name>
    <state>NE</state>
    <county>Keya Paha</county>
    <operator>Bluestem LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.82579</lat>
    <lon>-99.77747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10137</plant_id>
    <plant_name>Deweys Mill</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>43.6411</lat>
    <lon>-72.4061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10183</plant_id>
    <plant_name>Mine Falls Generating Station</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>City of Nashua - (NH)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.750278</lat>
    <lon>-71.50528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10220</plant_id>
    <plant_name>Sissonville Hydro</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Boralex Hydro Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>44.685589</lat>
    <lon>-75.00287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10570</plant_id>
    <plant_name>Errol Hydroelectric Project</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>Errol Hydroelectric Co LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.786648</lat>
    <lon>-71.12433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10706</plant_id>
    <plant_name>Burney Creek</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Snow Mountain Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.8579</lat>
    <lon>-121.7225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50031</plant_id>
    <plant_name>Mt Ida Hydroelectric</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.721326</lat>
    <lon>-73.68061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50268</plant_id>
    <plant_name>Hewittville Hydroelectric</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>44.705167</lat>
    <lon>-75.00793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50269</plant_id>
    <plant_name>Unionville Hydro Project 2499 NY</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>44.714518</lat>
    <lon>-74.99658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50573</plant_id>
    <plant_name>CID Gas Recovery</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>WM Illinois Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>41.658794</lat>
    <lon>-87.57772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50652</plant_id>
    <plant_name>Lyonsdale Associates</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>43.618874</lat>
    <lon>-75.30546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50755</plant_id>
    <plant_name>New Hogan Power Plant</plant_name>
    <state>CA</state>
    <county>Calaveras</county>
    <operator>Modesto Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>38.149582</lat>
    <lon>-120.8149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50820</plant_id>
    <plant_name>East Winds Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Terra-Gen Operating Co-Wind</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>33.890913</lat>
    <lon>-116.5415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50831</plant_id>
    <plant_name>Nove Power Plant</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Nove Investments I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1987</latest_year>
    <lat>37.9676</lat>
    <lon>-122.382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50892</plant_id>
    <plant_name>Rock Creek LP</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Hydroland Omega LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>38.78342</lat>
    <lon>-120.7785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54299</plant_id>
    <plant_name>Coram Energy LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Nextera Energy Resources</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>35.075</lat>
    <lon>-118.3417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54680</plant_id>
    <plant_name>Boulder City Betasso Hydro Plant</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Boulder, City of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.0111</lat>
    <lon>-105.3347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54731</plant_id>
    <plant_name>Hendricks Regional Health</plant_name>
    <state>IN</state>
    <county>Hendricks</county>
    <operator>Hendricks Regional Health</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2010</latest_year>
    <lat>39.761513</lat>
    <lon>-86.50159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54969</plant_id>
    <plant_name>Dixon Hydroelectric Dam</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>41.845306</lat>
    <lon>-89.48129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55033</plant_id>
    <plant_name>Missouri River Wastewater Treatment</plant_name>
    <state>NE</state>
    <county>Douglas</county>
    <operator>City of Omaha - (NE)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2001</latest_year>
    <lat>41.2033</lat>
    <lon>-95.9292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55152</plant_id>
    <plant_name>Bank of America Plaza</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>600 Peachtree PropCo, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>33.7708</lat>
    <lon>-84.3861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55161</plant_id>
    <plant_name>MM Lopez Energy</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>MM Lopez Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>34.2925</lat>
    <lon>-118.3894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56228</plant_id>
    <plant_name>Prescott Airport</plant_name>
    <state>AZ</state>
    <county>Yavapai</county>
    <operator>Arizona Public Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>34.6584</lat>
    <lon>-112.4008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56358</plant_id>
    <plant_name>Western Renewable Energy</plant_name>
    <state>AZ</state>
    <county>Apache</county>
    <operator>Western Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>34.093006</lat>
    <lon>-109.29</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56427</plant_id>
    <plant_name>Ameresco Janesville</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>AMERESCO Janesville LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>42.7083</lat>
    <lon>-89.0208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56428</plant_id>
    <plant_name>Ameresco Santa Cruz Energy</plant_name>
    <state>CA</state>
    <county>Santa Cruz</county>
    <operator>AMERESCO Santa Cruz Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>36.9178</lat>
    <lon>-121.8156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56542</plant_id>
    <plant_name>Kasidaya Creek Hydro</plant_name>
    <state>AK</state>
    <county>Skagway Hoonah Angoon</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>59.4072</lat>
    <lon>-135.3408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56896</plant_id>
    <plant_name>Ameresco Jefferson City</plant_name>
    <state>MO</state>
    <county>Cole</county>
    <operator>AMERESCO Jefferson City LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.552371</lat>
    <lon>-92.04493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56993</plant_id>
    <plant_name>MF Mesa Lane LLC</plant_name>
    <state>PA</state>
    <county>Bucks</county>
    <operator>MF Mesa Lane LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.1483</lat>
    <lon>-74.7772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57412</plant_id>
    <plant_name>Knouse Solar Project 1</plant_name>
    <state>PA</state>
    <county>Cumberland</county>
    <operator>Knouse Food Cooperative Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.0264</lat>
    <lon>-77.2344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57486</plant_id>
    <plant_name>Frenchtown I Solar</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.521667</lat>
    <lon>-75.01222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57487</plant_id>
    <plant_name>Frenchtown II Solar</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.514444</lat>
    <lon>-74.97694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57507</plant_id>
    <plant_name>CO- CSU- Fort Collins II</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>RV CSU Power II LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.592841</lat>
    <lon>-105.1471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57697</plant_id>
    <plant_name>Aerojet I</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.613508</lat>
    <lon>-121.1629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57777</plant_id>
    <plant_name>RE Dillard 1 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.468611</lat>
    <lon>-121.1819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57779</plant_id>
    <plant_name>RE Dillard 2 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.466111</lat>
    <lon>-121.1778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57781</plant_id>
    <plant_name>RE Dillard 3 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.461944</lat>
    <lon>-121.1803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57803</plant_id>
    <plant_name>Lime Wind</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Lime Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.396944</lat>
    <lon>-117.2719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57849</plant_id>
    <plant_name>Green Acres Solar Facility 1</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>SIT Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.282021</lat>
    <lon>-121.4647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58046</plant_id>
    <plant_name>Works 53</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>Electric Glass Fiber America, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1988</latest_year>
    <lat>35.755</lat>
    <lon>-80.27778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58076</plant_id>
    <plant_name>Edwards Air Force Base</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.9077</lat>
    <lon>-117.9206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58081</plant_id>
    <plant_name>Western Sugar Coop- Ft Morgan</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Western Sugar Cooperative</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1947</latest_year>
    <lat>40.263</lat>
    <lon>-103.8069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58102</plant_id>
    <plant_name>Foundation Cemex BMQ</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Foundation CA Fund VI Manager LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.623056</lat>
    <lon>-117.1125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58116</plant_id>
    <plant_name>Cellu Tissue</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Dunn Paper East Hartford, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.776111</lat>
    <lon>-72.60667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58119</plant_id>
    <plant_name>Depot Park Solar System</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Depot Park Solar Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.515</lat>
    <lon>-121.3983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58177</plant_id>
    <plant_name>Kishwaukee CHP Plant</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Four Rivers Sanitation Authority</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.221944</lat>
    <lon>-89.09333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58192</plant_id>
    <plant_name>Arkalon Ethanol LLC</plant_name>
    <state>KS</state>
    <county>Seward</county>
    <operator>Arkalon Ethanol LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>37.110556</lat>
    <lon>-100.8036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58280</plant_id>
    <plant_name>Millbury Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.164722</lat>
    <lon>-71.795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58361</plant_id>
    <plant_name>Williams-Sonoma Solar Facility</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>CVI CleanCapital Solar 4 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.387778</lat>
    <lon>-74.45528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58364</plant_id>
    <plant_name>Tissington Solar</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.200278</lat>
    <lon>-74.49194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58403</plant_id>
    <plant_name>Bellingham PV</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.075</lat>
    <lon>-71.70306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58405</plant_id>
    <plant_name>ESS Battery Microgrid</plant_name>
    <state>AK</state>
    <county>Kodiak Island</county>
    <operator>Kodiak Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>57.799167</lat>
    <lon>-152.4042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58410</plant_id>
    <plant_name>Marshfield PV</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.111667</lat>
    <lon>-70.70944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58423</plant_id>
    <plant_name>Southbridge PV</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.047361</lat>
    <lon>-71.99287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58455</plant_id>
    <plant_name>45 Mile Hydroelectric Project</plant_name>
    <state>OR</state>
    <county>Jefferson</county>
    <operator>EBD Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>44.528056</lat>
    <lon>-121.1528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58536</plant_id>
    <plant_name>Cornerstone Power Holmdel LLC</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>OCI Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.352222</lat>
    <lon>-74.18778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58559</plant_id>
    <plant_name>Bi-County Gas Producers</plant_name>
    <state>TN</state>
    <county>Montgomery</county>
    <operator>Cube District Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2013</latest_year>
    <lat>36.540556</lat>
    <lon>-87.54444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58583</plant_id>
    <plant_name>Forbes Street Solar</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.773056</lat>
    <lon>-71.33889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58598</plant_id>
    <plant_name>Beryl Solar Plant</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.639167</lat>
    <lon>-113.6458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58599</plant_id>
    <plant_name>Cedar Valley Solar Plant</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.807778</lat>
    <lon>-113.09</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58600</plant_id>
    <plant_name>Buckhorn Solar Plant</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.023333</lat>
    <lon>-112.7317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58601</plant_id>
    <plant_name>Milford Flat Solar Plant</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.291389</lat>
    <lon>-113.0083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58602</plant_id>
    <plant_name>Laho Solar Plant</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.291389</lat>
    <lon>-113.0356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58604</plant_id>
    <plant_name>Granite Peak Solar Plant</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.402778</lat>
    <lon>-112.9889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58632</plant_id>
    <plant_name>Actus Lend Lease DMAFB</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>32.1825</lat>
    <lon>-110.8633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58642</plant_id>
    <plant_name>Tulare 1 and 2</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.2</lat>
    <lon>-119.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58650</plant_id>
    <plant_name>North Brookfield</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Mass Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.278056</lat>
    <lon>-72.05306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58698</plant_id>
    <plant_name>Mira Loma</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Costco Wholesale</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.013056</lat>
    <lon>-117.5375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58730</plant_id>
    <plant_name>Amethyst Solar</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Amethyst Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.316944</lat>
    <lon>-81.92639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58732</plant_id>
    <plant_name>Audrey Solar</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Audrey Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.328056</lat>
    <lon>-81.62194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58739</plant_id>
    <plant_name>Milo Solar</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>Milo Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.148889</lat>
    <lon>-79.34889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58740</plant_id>
    <plant_name>Minnie Solar</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>Minnie Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.948056</lat>
    <lon>-79.36194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58814</plant_id>
    <plant_name>Shasta Solar Farm</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Ignite Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.031389</lat>
    <lon>-121.4225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58871</plant_id>
    <plant_name>Berkley East Solar LLC</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.823889</lat>
    <lon>-71.04139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59026</plant_id>
    <plant_name>Back River Waste Water Treatment</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>Mayor and City Council of Baltimore City - (MD)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass; Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2012</latest_year>
    <lat>39.299722</lat>
    <lon>-76.49417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59030</plant_id>
    <plant_name>Chicopee Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.185556</lat>
    <lon>-72.5825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59053</plant_id>
    <plant_name>Michelangelo Wind 3 LLC</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Michelangelo Wind 3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.019</lat>
    <lon>-93.514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59123</plant_id>
    <plant_name>Moncure Farm LLC</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.568333</lat>
    <lon>-79.0325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59124</plant_id>
    <plant_name>Martin Creek Farm LLC</plant_name>
    <state>NC</state>
    <county>Vance</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.286389</lat>
    <lon>-78.38611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59146</plant_id>
    <plant_name>XPF Solar Field</plant_name>
    <state>NC</state>
    <county>Durham</county>
    <operator>United Therapeutics Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.911667</lat>
    <lon>-78.87333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59178</plant_id>
    <plant_name>Franklin 1</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.040556</lat>
    <lon>-71.39361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59219</plant_id>
    <plant_name>Porterville 6 and 7</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.05</lat>
    <lon>-119.02</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59223</plant_id>
    <plant_name>Optimum Wind 5 LLC</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.014</lat>
    <lon>-93.51806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59224</plant_id>
    <plant_name>Optimum Wind 6 LLC</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.006944</lat>
    <lon>-93.52361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59225</plant_id>
    <plant_name>Optimum Wind 7 LLC</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.028333</lat>
    <lon>-93.43028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59226</plant_id>
    <plant_name>Optimum Wind 4 LLC</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.016389</lat>
    <lon>-93.51583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59227</plant_id>
    <plant_name>Optimum Wind 3 LLC</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.019167</lat>
    <lon>-93.51361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59228</plant_id>
    <plant_name>Leonardo Wind 1 LLC</plant_name>
    <state>IA</state>
    <county>Hardin</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.498056</lat>
    <lon>-93.36778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59230</plant_id>
    <plant_name>Venus Wind 3 LLC</plant_name>
    <state>IA</state>
    <county>Poweshiek</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.741944</lat>
    <lon>-92.67222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59231</plant_id>
    <plant_name>Michelangelo Wind 1 LLC</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.881</lat>
    <lon>-93.62306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59232</plant_id>
    <plant_name>Michelangelo Wind 4 LLC</plant_name>
    <state>IA</state>
    <county>Boone</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.978</lat>
    <lon>-93.70056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59240</plant_id>
    <plant_name>Port Charlotte Energy LLC</plant_name>
    <state>FL</state>
    <county>Charlotte</county>
    <operator>Port Charlotte Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>26.790833</lat>
    <lon>-81.96528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59241</plant_id>
    <plant_name>Brockelman</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Integrys MA Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.481389</lat>
    <lon>-71.71694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59300</plant_id>
    <plant_name>Hanford 1 and 2</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.306667</lat>
    <lon>-119.6292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59358</plant_id>
    <plant_name>Devens</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.559173</lat>
    <lon>-71.62588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59464</plant_id>
    <plant_name>Monson Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.124444</lat>
    <lon>-72.3325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59481</plant_id>
    <plant_name>IMPA Peru Solar Park</plant_name>
    <state>IN</state>
    <county>Miami</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.767778</lat>
    <lon>-86.04556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59483</plant_id>
    <plant_name>IMPA Crawfordsville Solar Park</plant_name>
    <state>IN</state>
    <county>Montgomery</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.053056</lat>
    <lon>-86.88722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59507</plant_id>
    <plant_name>Kenneth Solar</plant_name>
    <state>NC</state>
    <county>Warren</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.4338</lat>
    <lon>-78.1526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59587</plant_id>
    <plant_name>Yadkin 601 Farm</plant_name>
    <state>NC</state>
    <county>Yadkin</county>
    <operator>Yadkin 601 Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.199167</lat>
    <lon>-80.69722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59627</plant_id>
    <plant_name>Harmony</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.755289</lat>
    <lon>-75.17096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59725</plant_id>
    <plant_name>Fairhaven Wind</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Fairhaven Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.639061</lat>
    <lon>-70.87337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59731</plant_id>
    <plant_name>Templeton</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Sunny Templeton, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.521217</lat>
    <lon>-72.06733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59739</plant_id>
    <plant_name>Lancaster WAD B</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.780192</lat>
    <lon>-118.1933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59775</plant_id>
    <plant_name>Adams Farm Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.6</lat>
    <lon>-72.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59786</plant_id>
    <plant_name>Fiddler's Canyon #2</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>SunE Solar XVII Project 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.794678</lat>
    <lon>-113.2837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59787</plant_id>
    <plant_name>Fiddler's Canyon #1</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>SunE Solar XVII Project 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.750268</lat>
    <lon>-113.2537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59820</plant_id>
    <plant_name>Hunt Farm Solar</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.553732</lat>
    <lon>-72.29972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59821</plant_id>
    <plant_name>205 Sturbridge A</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.109272</lat>
    <lon>-72.17051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59898</plant_id>
    <plant_name>SunEnergy1-Scotland Neck, LLC</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>SunEnergy1-Scotland Neck, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.124961</lat>
    <lon>-77.40909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59932</plant_id>
    <plant_name>Fiddler's Canyon 3</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>SunE Solar XVII Project 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.731338</lat>
    <lon>-113.2166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59958</plant_id>
    <plant_name>Milford 2</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>SunE DB24 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.388243</lat>
    <lon>-112.9908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59999</plant_id>
    <plant_name>Ouchchy PV1</plant_name>
    <state>NC</state>
    <county>Orange</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.084097</lat>
    <lon>-79.24481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60015</plant_id>
    <plant_name>Findlay Wind Farm</plant_name>
    <state>OH</state>
    <county>Hancock</county>
    <operator>Findlay Wind 20, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.101219</lat>
    <lon>-83.64439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60026</plant_id>
    <plant_name>Little Rock Pham Solar</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.600231</lat>
    <lon>-117.9475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60083</plant_id>
    <plant_name>Fresno Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Wellhead Services, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.616846</lat>
    <lon>-120.1051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60086</plant_id>
    <plant_name>US-TOPCO (Soccer Center)</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.66072</lat>
    <lon>-118.0812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60110</plant_id>
    <plant_name>Town of Needham VNEM CSG</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.276717</lat>
    <lon>-71.25939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60118</plant_id>
    <plant_name>Grand Valley Solar Gardens</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.9531</lat>
    <lon>-85.90117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60124</plant_id>
    <plant_name>Goldfinch</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Goldfinch (Lakeland)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>27.982089</lat>
    <lon>-82.04201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60190</plant_id>
    <plant_name>HMW Minster PV I</plant_name>
    <state>OH</state>
    <county>Auglaize</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.390362</lat>
    <lon>-84.4016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60255</plant_id>
    <plant_name>Weymouth Solar Plant</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.108618</lat>
    <lon>-117.7822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60281</plant_id>
    <plant_name>Central Antelope Dry Ranch B LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Central Antelope Dry Ranch B, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.705549</lat>
    <lon>-118.3014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60300</plant_id>
    <plant_name>Montana Solar Facility</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>El Paso Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.813061</lat>
    <lon>-106.2189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60452</plant_id>
    <plant_name>Calverton</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.921086</lat>
    <lon>-72.7437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60516</plant_id>
    <plant_name>NLP Granger</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.2704</lat>
    <lon>-117.0588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60615</plant_id>
    <plant_name>Southern Sky Renew Energy Berkley LLC</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Southern Sky Renewable Energy Berkley, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.83777</lat>
    <lon>-71.0913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60632</plant_id>
    <plant_name>Blue Lake Solar</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.79642</lat>
    <lon>-93.42959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60694</plant_id>
    <plant_name>WakeSun LLC</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.472889</lat>
    <lon>-94.40642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60709</plant_id>
    <plant_name>IFF Hazlet</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.43819</lat>
    <lon>-74.16015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60716</plant_id>
    <plant_name>Orion Community Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Orion Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.587899</lat>
    <lon>-94.40144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60744</plant_id>
    <plant_name>SEPV Imperial Dixieland West</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.79411</lat>
    <lon>-115.7793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60756</plant_id>
    <plant_name>Meadow Solar</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.230095</lat>
    <lon>-71.13334</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60763</plant_id>
    <plant_name>Holland Solar</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.599743</lat>
    <lon>-75.10862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60790</plant_id>
    <plant_name>PVN Milliken, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>PVN Milliken, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.038433</lat>
    <lon>-117.5658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60838</plant_id>
    <plant_name>Wabasha Holdco Solar CSG</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>Wabasha Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.36714</lat>
    <lon>-92.01928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60913</plant_id>
    <plant_name>Ohio Northern University Solar Site</plant_name>
    <state>OH</state>
    <county>Hardin</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2018</latest_year>
    <lat>40.759622</lat>
    <lon>-83.8391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60914</plant_id>
    <plant_name>Westmont 300B</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.766067</lat>
    <lon>-118.2847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60940</plant_id>
    <plant_name>Gemini Community Solar</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Gemini Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.300294</lat>
    <lon>-92.80436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60941</plant_id>
    <plant_name>Mapleton Community Solar</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Mapleton Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.928851</lat>
    <lon>-93.95606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60942</plant_id>
    <plant_name>Morgan Community Solar</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Morgan Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.413186</lat>
    <lon>-94.90762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60962</plant_id>
    <plant_name>Red Maple Solar</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.3194</lat>
    <lon>-93.899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61058</plant_id>
    <plant_name>Kramer Solar CSG</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.746994</lat>
    <lon>-94.70574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61069</plant_id>
    <plant_name>BWC Wading River One, Two, Three CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Ameresco BWC Wading River LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.085278</lat>
    <lon>-71.52667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61092</plant_id>
    <plant_name>Independence Solar Farm</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>MC Power Companies Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.117142</lat>
    <lon>-94.28816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61119</plant_id>
    <plant_name>Quichapa 1</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Quichapa 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.658223</lat>
    <lon>-113.2167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61120</plant_id>
    <plant_name>Quichapa 2</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Quichapa 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.666772</lat>
    <lon>-113.189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61121</plant_id>
    <plant_name>Quichapa 3</plant_name>
    <state>UT</state>
    <county>Iron</county>
    <operator>Quichapa 3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.649816</lat>
    <lon>-113.2369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61126</plant_id>
    <plant_name>Bedford Solar (Oppidum)</plant_name>
    <state>VA</state>
    <county>Bedford</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.335046</lat>
    <lon>-79.481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61127</plant_id>
    <plant_name>Gamble Solar</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.348375</lat>
    <lon>-81.81736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61131</plant_id>
    <plant_name>Tolson Solar</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.829572</lat>
    <lon>-77.61587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61138</plant_id>
    <plant_name>Armstrong Solar</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>ETCAP NES CS MN 06 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.642252</lat>
    <lon>-95.35635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61141</plant_id>
    <plant_name>CF Novel Solar CSG Gardens Eleven, LLC</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.24</lat>
    <lon>-93.96</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61176</plant_id>
    <plant_name>Antares Community Solar</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Antares Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.226179</lat>
    <lon>-95.6238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61182</plant_id>
    <plant_name>Lyra Community Solar</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>Lyra Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.240346</lat>
    <lon>-93.58579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61183</plant_id>
    <plant_name>Argo Navis Community Solar</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Argo Navis Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.255245</lat>
    <lon>-92.77228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61186</plant_id>
    <plant_name>Boston Medical Center CHP Plant</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>Boston Medical Center</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2023</latest_year>
    <lat>42.334651</lat>
    <lon>-71.07417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61215</plant_id>
    <plant_name>Green Beanworks C PV</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.597</lat>
    <lon>-117.931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61216</plant_id>
    <plant_name>Green Beanworks D PV</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.654976</lat>
    <lon>-118.0822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61290</plant_id>
    <plant_name>South Mills Solar, LLC</plant_name>
    <state>MT</state>
    <county>Big Horn</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.730113</lat>
    <lon>-107.6326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61291</plant_id>
    <plant_name>Green Meadow Solar, LLC</plant_name>
    <state>MT</state>
    <county>Lewis and Clark</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>46.694488</lat>
    <lon>-112.0636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61328</plant_id>
    <plant_name>Crater Community Solar</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Crater Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.798733</lat>
    <lon>-95.50833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61334</plant_id>
    <plant_name>Volkman Road Solar Array Hybrid</plant_name>
    <state>IN</state>
    <county>Vanderburgh</county>
    <operator>Southern Indiana Gas &amp; Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>4.6</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>38.1492</lat>
    <lon>-87.54821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61335</plant_id>
    <plant_name>Great Divide Solar, LLC</plant_name>
    <state>MT</state>
    <county>Lewis and Clark</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>46.805739</lat>
    <lon>-112.249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61336</plant_id>
    <plant_name>Black Eagle Solar, LLC</plant_name>
    <state>MT</state>
    <county>Cascade</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>47.547466</lat>
    <lon>-111.254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61337</plant_id>
    <plant_name>Magpie Solar, LLC</plant_name>
    <state>MT</state>
    <county>Golden Valley</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>46.291439</lat>
    <lon>-108.9379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61339</plant_id>
    <plant_name>Green Beanworks B PV</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.688042</lat>
    <lon>-117.9895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61356</plant_id>
    <plant_name>Valfilm Wind Project</plant_name>
    <state>OH</state>
    <county>Hancock</county>
    <operator>Findlay Wind 25, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.084329</lat>
    <lon>-83.64413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61382</plant_id>
    <plant_name>Lindstrom Solar CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.319892</lat>
    <lon>-92.7966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61418</plant_id>
    <plant_name>Valencia 1 Solar CA</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.04358</lat>
    <lon>-115.6278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61420</plant_id>
    <plant_name>Merced 1 PV</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>ZGlobal Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.989475</lat>
    <lon>-120.8781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61454</plant_id>
    <plant_name>B.R. Sartell CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Minnesota Solar CSG 21, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.665</lat>
    <lon>-94.2254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61456</plant_id>
    <plant_name>Montgomery Winsted CSG</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Minnesota Solar CSG 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.9517</lat>
    <lon>-94.0556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61485</plant_id>
    <plant_name>SunE Stolee CSG, LLC</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.173879</lat>
    <lon>-93.35047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61495</plant_id>
    <plant_name>Carver Gladden CSG</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Minnesota Solar CSG 8, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.8071</lat>
    <lon>-93.8717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61500</plant_id>
    <plant_name>Porter Way Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.851028</lat>
    <lon>-93.7784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61541</plant_id>
    <plant_name>Town of Rocky Hill PV CSG</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.643223</lat>
    <lon>-72.63301</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61550</plant_id>
    <plant_name>DG Haverhill CSG</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>DG Haverhill LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.817023</lat>
    <lon>-71.11679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61562</plant_id>
    <plant_name>Falmouth Landfill Solar</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.610106</lat>
    <lon>-70.59861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61602</plant_id>
    <plant_name>CED Chicopee Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.203921</lat>
    <lon>-72.55103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61615</plant_id>
    <plant_name>Hinton</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.494656</lat>
    <lon>-98.38566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61616</plant_id>
    <plant_name>Marietta</plant_name>
    <state>OK</state>
    <county>Love</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.943183</lat>
    <lon>-97.10861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61617</plant_id>
    <plant_name>Pine Ridge</plant_name>
    <state>OK</state>
    <county>Caddo</county>
    <operator>Western Farmers Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.013397</lat>
    <lon>-98.44472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61622</plant_id>
    <plant_name>WED Kingstown Solar I - East Array</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.492253</lat>
    <lon>-71.61911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61662</plant_id>
    <plant_name>Carrizozo Solar</plant_name>
    <state>NM</state>
    <county>Lincoln</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.610306</lat>
    <lon>-105.7478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61692</plant_id>
    <plant_name>IVC Solar</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.83186</lat>
    <lon>-115.5066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61733</plant_id>
    <plant_name>Haywood Solar</plant_name>
    <state>TN</state>
    <county>Haywood</county>
    <operator>Haywood Solar, SMLLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.5775</lat>
    <lon>-89.28694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61740</plant_id>
    <plant_name>Gratis Road Solar Facility</plant_name>
    <state>GA</state>
    <county>Walton</county>
    <operator>Walton Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.844621</lat>
    <lon>-83.69736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61753</plant_id>
    <plant_name>Imboden Solar Garden</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.786769</lat>
    <lon>-104.5836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61824</plant_id>
    <plant_name>RPUWD Scheuer Well Solar Project</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.11193</lat>
    <lon>-117.2733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61855</plant_id>
    <plant_name>Morgan Solar Center</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.951376</lat>
    <lon>-117.0748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61856</plant_id>
    <plant_name>Vale Solar Center</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.157874</lat>
    <lon>-117.4443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61860</plant_id>
    <plant_name>Ontario Solar Center</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.112841</lat>
    <lon>-117.0281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61914</plant_id>
    <plant_name>Susquehanna University Solar</plant_name>
    <state>PA</state>
    <county>Snyder</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.795166</lat>
    <lon>-76.88253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61968</plant_id>
    <plant_name>Chisago Holdco LLC, CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Chisago Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.386802</lat>
    <lon>-92.80124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62032</plant_id>
    <plant_name>Nautilus Winsted Solar (CSG)</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.948882</lat>
    <lon>-94.08566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62056</plant_id>
    <plant_name>Lancaster</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.743383</lat>
    <lon>-117.9722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62106</plant_id>
    <plant_name>WED Green Hill, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>WED Green Hill, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.79785</lat>
    <lon>-71.52974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62107</plant_id>
    <plant_name>WED Plainfield II, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>WED Plainfield II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.794583</lat>
    <lon>-71.53997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62108</plant_id>
    <plant_name>WED Plainfield III, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>WED Plainfield III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.793519</lat>
    <lon>-71.53062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62109</plant_id>
    <plant_name>WED Plainfield, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>WED Plainfield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.796078</lat>
    <lon>-71.53583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62110</plant_id>
    <plant_name>WED Shun I, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>WED Shun I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.798456</lat>
    <lon>-71.54066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62111</plant_id>
    <plant_name>WED Shun II, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>WED Shun II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.800111</lat>
    <lon>-71.53619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62112</plant_id>
    <plant_name>WED Shun III, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>WED Shun III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.799078</lat>
    <lon>-71.54933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62117</plant_id>
    <plant_name>Beloit Memorial Hospital Power Plant</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Beloit Memorial Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>42.5486</lat>
    <lon>-89.0083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62118</plant_id>
    <plant_name>WED GW Solar, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.937033</lat>
    <lon>-71.48757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62219</plant_id>
    <plant_name>Ashburnham Energy Storage Project</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Massachusetts Mun Wholes Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.671444</lat>
    <lon>-71.9267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62408</plant_id>
    <plant_name>Fort Indiantown Gap</plant_name>
    <state>PA</state>
    <county>Lebanon</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.427558</lat>
    <lon>-76.57313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62446</plant_id>
    <plant_name>JLL-One Rockwood Road</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>JLL-One Rockwood Road</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.109042</lat>
    <lon>-73.86259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62459</plant_id>
    <plant_name>Micro Santa Clara</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.378422</lat>
    <lon>-121.9</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62508</plant_id>
    <plant_name>Furnace Rd Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.241</lat>
    <lon>-77.27</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62579</plant_id>
    <plant_name>Plainfield Community Solar LLC</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Plainfield Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2024</latest_year>
    <lat>42.5205</lat>
    <lon>-72.9191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62585</plant_id>
    <plant_name>Beebe Substation Battery Storage</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Massachusetts Mun Wholes Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.48791</lat>
    <lon>-71.04781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62651</plant_id>
    <plant_name>Haven Solar Project CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.518</lat>
    <lon>-94.122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62661</plant_id>
    <plant_name>1047 Little Mountain Solar, LLC</plant_name>
    <state>NC</state>
    <county>Yadkin</county>
    <operator>CI-II Mitchell Holding LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.197067</lat>
    <lon>-80.80673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62687</plant_id>
    <plant_name>American Canyon Solar</plant_name>
    <state>CA</state>
    <county>Napa</county>
    <operator>RP Napa Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.160858</lat>
    <lon>-122.214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62829</plant_id>
    <plant_name>GSPP Held LLC CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.52677</lat>
    <lon>-94.28475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62847</plant_id>
    <plant_name>Fennimore Solar</plant_name>
    <state>WI</state>
    <county>Grant</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.971</lat>
    <lon>-90.662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62861</plant_id>
    <plant_name>Forest City Solar</plant_name>
    <state>IA</state>
    <county>Winnebago</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.276</lat>
    <lon>-93.629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62875</plant_id>
    <plant_name>Wildcat I Energy Storage LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Wildcat I Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.807988</lat>
    <lon>-116.4898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62946</plant_id>
    <plant_name>Dickinson Solar</plant_name>
    <state>PA</state>
    <county>Cumberland</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.1976</lat>
    <lon>-77.2197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63011</plant_id>
    <plant_name>Cronin Road Solar 1, LLC CSG Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>7.7</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.1763</lat>
    <lon>-72.154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63054</plant_id>
    <plant_name>CalCity Solar 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CalCity Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.141374</lat>
    <lon>-117.9657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63078</plant_id>
    <plant_name>Eagle Creek</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>ZGlobal Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.214023</lat>
    <lon>-119.3952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63090</plant_id>
    <plant_name>Athens - Coopers Corner BESS</plant_name>
    <state>MN</state>
    <county>Isanti</county>
    <operator>Gopher Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.458119</lat>
    <lon>-93.26763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63231</plant_id>
    <plant_name>Woodbury Solar</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>MN CSG 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.881944</lat>
    <lon>-92.9675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63293</plant_id>
    <plant_name>Cottonwood Solar, LLC</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.50806</lat>
    <lon>-77.61444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63392</plant_id>
    <plant_name>DEC Phase II at Georgetown</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.664989</lat>
    <lon>-75.39944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63406</plant_id>
    <plant_name>Vermillion River_MN_GRE DEA-GM</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.599804</lat>
    <lon>-93.13611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63585</plant_id>
    <plant_name>NY3 Battery</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Orange &amp; Rockland Utils Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.18512</lat>
    <lon>-74.07467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63635</plant_id>
    <plant_name>Crown</plant_name>
    <state>SC</state>
    <county>Lancaster</county>
    <operator>Crown Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.648205</lat>
    <lon>-80.71988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63681</plant_id>
    <plant_name>Oak Leaf Solar XXXIII LLC (Lantz)</plant_name>
    <state>CO</state>
    <county>Chaffee</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.5357</lat>
    <lon>-106.0753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63717</plant_id>
    <plant_name>TLR000 Hansen Fuel Cell</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>36.65676</lat>
    <lon>-121.6243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63729</plant_id>
    <plant_name>CES Marbletown Solar</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.885716</lat>
    <lon>-74.10272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63762</plant_id>
    <plant_name>Silveira Ranch Road Solar</plant_name>
    <state>CA</state>
    <county>Marin</county>
    <operator>Silveira Ranch Road Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.153474</lat>
    <lon>-122.5657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63833</plant_id>
    <plant_name>Bluebird Solar SC LLC</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Bluebird Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.599083</lat>
    <lon>-82.73922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63875</plant_id>
    <plant_name>Kern Valley SP</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.764049</lat>
    <lon>-119.3138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63969</plant_id>
    <plant_name>SulusSolar35</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.140551</lat>
    <lon>-122.6497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63974</plant_id>
    <plant_name>Hayes Solar, LLC</plant_name>
    <state>NC</state>
    <county>Surry</county>
    <operator>Hayes Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.388216</lat>
    <lon>-80.73741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64006</plant_id>
    <plant_name>SulusSolar33</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.08</lat>
    <lon>-123.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64007</plant_id>
    <plant_name>SulusSolar28</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.1</lat>
    <lon>-123.52</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64008</plant_id>
    <plant_name>MilfordSolar OR</plant_name>
    <state>OR</state>
    <county>Washington</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.57</lat>
    <lon>-123.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64009</plant_id>
    <plant_name>BristolSolar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.15</lat>
    <lon>-122.79</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64022</plant_id>
    <plant_name>SulusSolar22</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.97</lat>
    <lon>-122.78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64050</plant_id>
    <plant_name>Fort Bragg - Camp Mackall PV BESS System</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>Ameresco Federal Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.029</lat>
    <lon>-79.485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64060</plant_id>
    <plant_name>SELCO Community Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Massachusetts Mun Wholes Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.26564</lat>
    <lon>-71.68807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64101</plant_id>
    <plant_name>Mid-River PA, LLC (ABE4)</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.73998</lat>
    <lon>-75.27774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64112</plant_id>
    <plant_name>Berkley</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Captona Berkley LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.841454</lat>
    <lon>-71.01833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64174</plant_id>
    <plant_name>Big Boy</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.07767</lat>
    <lon>-79.63377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64232</plant_id>
    <plant_name>Hadley 3 Solar (South)</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Hadley 3 Solar, LLC (South)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2024</latest_year>
    <lat>42.355782</lat>
    <lon>-72.5426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64245</plant_id>
    <plant_name>Anderson 5</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.085942</lat>
    <lon>-85.63218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64264</plant_id>
    <plant_name>Las Virgenes</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.1265</lat>
    <lon>-118.704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64267</plant_id>
    <plant_name>Valencia 2</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.0218</lat>
    <lon>-115.5264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64271</plant_id>
    <plant_name>1051 Lucky Solar, LLC</plant_name>
    <state>NC</state>
    <county>Yadkin</county>
    <operator>1051 Lucky Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.148986</lat>
    <lon>-80.81965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64276</plant_id>
    <plant_name>Franklin Milliken</plant_name>
    <state>GA</state>
    <county>Franklin</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.442071</lat>
    <lon>-83.09912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64277</plant_id>
    <plant_name>Greene Durham</plant_name>
    <state>GA</state>
    <county>Greene</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.631459</lat>
    <lon>-83.09349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64280</plant_id>
    <plant_name>Meriwether Jackson</plant_name>
    <state>GA</state>
    <county>Meriwether</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.877496</lat>
    <lon>-84.64437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64281</plant_id>
    <plant_name>Murray Treadwell Farms</plant_name>
    <state>GA</state>
    <county>Murray</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.769747</lat>
    <lon>-84.81328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64285</plant_id>
    <plant_name>Ware Avra I</plant_name>
    <state>GA</state>
    <county>Ware</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.196314</lat>
    <lon>-82.32236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64299</plant_id>
    <plant_name>Roger Williams - Melville at Portsmouth</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>Luminace Solar Rhode Island, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.579508</lat>
    <lon>-71.27308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64308</plant_id>
    <plant_name>Dissigno Healdsburg FPV, LLC</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Palmetto Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.584405</lat>
    <lon>-122.8662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64333</plant_id>
    <plant_name>WED Coventry Seven, LLC</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>WED Coventry Seven, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.697563</lat>
    <lon>-71.72227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64367</plant_id>
    <plant_name>Zuma Solar, LLC</plant_name>
    <state>NC</state>
    <county>Caswell</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.510939</lat>
    <lon>-79.43789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64441</plant_id>
    <plant_name>Valencia 3</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.88567</lat>
    <lon>-115.5377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64572</plant_id>
    <plant_name>Dudley</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AMP MA Dudley</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.054345</lat>
    <lon>-71.97885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64579</plant_id>
    <plant_name>Broadway 2 - UC Riverside</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.97034</lat>
    <lon>-117.331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64580</plant_id>
    <plant_name>Broadway 2 - Tucson Phase II</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.24817</lat>
    <lon>-111.2611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64600</plant_id>
    <plant_name>Prologis L.P</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.725044</lat>
    <lon>-121.5298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64760</plant_id>
    <plant_name>Ocean State BTM</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.938</lat>
    <lon>-71.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64874</plant_id>
    <plant_name>PG Solar 1</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>IMG Energy Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.481959</lat>
    <lon>-80.25307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64906</plant_id>
    <plant_name>Hazel</plant_name>
    <state>MN</state>
    <county>Fillmore</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.78177</lat>
    <lon>-91.94974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64907</plant_id>
    <plant_name>Fountain</plant_name>
    <state>MN</state>
    <county>Fillmore</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.74609</lat>
    <lon>-92.12943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64969</plant_id>
    <plant_name>Barron Solar Array</plant_name>
    <state>WI</state>
    <county>Barron</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.396196</lat>
    <lon>-91.82757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64978</plant_id>
    <plant_name>Bristol Solar One, LLC</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>DG Connecticut III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.69097</lat>
    <lon>-72.97855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64984</plant_id>
    <plant_name>Waterloo Solar (IA)</plant_name>
    <state>IA</state>
    <county>Black Hawk</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.54389</lat>
    <lon>-92.35535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64985</plant_id>
    <plant_name>Johnson County Hills Solar</plant_name>
    <state>IA</state>
    <county>Johnson</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.57232</lat>
    <lon>-91.54302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65087</plant_id>
    <plant_name>Shamrock Solar LLC</plant_name>
    <state>WI</state>
    <county>Jackson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.17659</lat>
    <lon>-90.84654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65088</plant_id>
    <plant_name>Stromland Solar</plant_name>
    <state>WI</state>
    <county>Buffalo</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.19955</lat>
    <lon>-91.80897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65114</plant_id>
    <plant_name>196 Tremont St(CSG)</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>196TRE WHAM8 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.842933</lat>
    <lon>-70.7307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65139</plant_id>
    <plant_name>Woodstock Solar One</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.923166</lat>
    <lon>-71.9614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65155</plant_id>
    <plant_name>ASA DeKalb NY Solar II LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>ASA DeKalb NY Solar II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.488156</lat>
    <lon>-75.24438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65374</plant_id>
    <plant_name>Fredonia (KS)</plant_name>
    <state>KS</state>
    <county>Wilson</county>
    <operator>City of Fredonia - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.547146</lat>
    <lon>-95.81534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65386</plant_id>
    <plant_name>Howard Lane Solar</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.864</lat>
    <lon>-71.618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65441</plant_id>
    <plant_name>USS Itasca Clean Energy Solar LLC</plant_name>
    <state>MN</state>
    <county>Itasca</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>47.21051</lat>
    <lon>-93.51823</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65479</plant_id>
    <plant_name>Green Providence Wind II, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Green Providence Wind II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.786045</lat>
    <lon>-71.38554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65481</plant_id>
    <plant_name>Wilkinson DeFore (Safari Energy)</plant_name>
    <state>GA</state>
    <county>Wilkinson</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.8813</lat>
    <lon>-83.3029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65647</plant_id>
    <plant_name>Croton Solar</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Croton Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.280404</lat>
    <lon>-73.86758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65650</plant_id>
    <plant_name>Brockelman Road Solar 2</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Brockelman Road Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>1.7</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.48392</lat>
    <lon>-71.71081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65653</plant_id>
    <plant_name>TES Rowtier</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.541925</lat>
    <lon>-71.8567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65697</plant_id>
    <plant_name>Walnut Grove Demonstration Plant</plant_name>
    <state>MS</state>
    <county>Leake</county>
    <operator>Mississippi Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>1.5</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.57975</lat>
    <lon>-89.45417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65727</plant_id>
    <plant_name>Statesboro Solar LLC</plant_name>
    <state>GA</state>
    <county>Bulloch</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.468039</lat>
    <lon>-81.80372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65728</plant_id>
    <plant_name>BE Solar LLC</plant_name>
    <state>GA</state>
    <county>Decatur</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>30.91</lat>
    <lon>-84.548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65942</plant_id>
    <plant_name>Grand Casino Hinckley Solar</plant_name>
    <state>MN</state>
    <county>Pine</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>46.006605</lat>
    <lon>-92.90773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65946</plant_id>
    <plant_name>Hecate Energy Upshur Rural LLC</plant_name>
    <state>TX</state>
    <county>Upshur</county>
    <operator>Hecate Energy Upshur Rural LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.843248</lat>
    <lon>-94.73192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65970</plant_id>
    <plant_name>Sheep Creek Community Solar Farm</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Phelan Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.571845</lat>
    <lon>-117.5762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65994</plant_id>
    <plant_name>Polk County GA S1, LLC</plant_name>
    <state>GA</state>
    <county>Polk</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.041911</lat>
    <lon>-85.21392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65995</plant_id>
    <plant_name>Reidsville Renewables, Inc.</plant_name>
    <state>GA</state>
    <county>Tattnall</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.065366</lat>
    <lon>-82.13351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66036</plant_id>
    <plant_name>3104 Batavia Solar</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>3104 Batavia Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.9994</lat>
    <lon>-78.27517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66088</plant_id>
    <plant_name>Putah Creek Solar Farm North</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>Putah Creek Solar Farms LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.524531</lat>
    <lon>-121.9953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66118</plant_id>
    <plant_name>HCE Moran Solar, LLC</plant_name>
    <state>VA</state>
    <county>Prince Edward</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.229858</lat>
    <lon>-78.27129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66165</plant_id>
    <plant_name>Pleasant Street</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.620811</lat>
    <lon>-70.18953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66202</plant_id>
    <plant_name>Old Plank Road Solar Farm, LLC</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>Southeastern Solar Farm Fund, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.3185</lat>
    <lon>-81.88828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66205</plant_id>
    <plant_name>Turnipseed Solar, LLC</plant_name>
    <state>GA</state>
    <county>Douglas</county>
    <operator>Southeastern Solar Farm Fund, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.69915</lat>
    <lon>-84.67891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66330</plant_id>
    <plant_name>Weiser BESS</plant_name>
    <state>ID</state>
    <county>Washington</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.24753</lat>
    <lon>-116.9853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66344</plant_id>
    <plant_name>Bulloch County GA S4 LLC</plant_name>
    <state>GA</state>
    <county>Bulloch</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.388399</lat>
    <lon>-81.82055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66346</plant_id>
    <plant_name>Bulloch County GA S3 LLC</plant_name>
    <state>GA</state>
    <county>Bulloch</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.387793</lat>
    <lon>-81.81603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66350</plant_id>
    <plant_name>Richmond County GA S2 LLC</plant_name>
    <state>GA</state>
    <county>Richmond</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.318438</lat>
    <lon>-82.08294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66353</plant_id>
    <plant_name>Upson County GA S1 LLC</plant_name>
    <state>GA</state>
    <county>Upson</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.93</lat>
    <lon>-84.28</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66354</plant_id>
    <plant_name>Sheridan Solar LLC (CSG)</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.101889</lat>
    <lon>-123.4092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66355</plant_id>
    <plant_name>Wallace Solar LLC (CSG)</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.028153</lat>
    <lon>-123.0969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66376</plant_id>
    <plant_name>Summit Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.22732</lat>
    <lon>-78.03749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66509</plant_id>
    <plant_name>CA Manteca 730 Spreckels Ave</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Catalyze Manteca 730 Spreckels Avenue Microgrid LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.788679</lat>
    <lon>-121.1945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66676</plant_id>
    <plant_name>Kings CSG 3 LLC Community Solar</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.24918</lat>
    <lon>-119.8852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66677</plant_id>
    <plant_name>Visalia CSG LLC</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.30677</lat>
    <lon>-119.24</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66679</plant_id>
    <plant_name>Tulare CSG LLC</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.98738</lat>
    <lon>-119.4804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66723</plant_id>
    <plant_name>Sawtell Solar</plant_name>
    <state>NC</state>
    <county>Henderson</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.380139</lat>
    <lon>-82.37595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66724</plant_id>
    <plant_name>Southwick Solar</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.009321</lat>
    <lon>-79.3677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66750</plant_id>
    <plant_name>Mahany</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.469941</lat>
    <lon>-77.69541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66752</plant_id>
    <plant_name>NY Van Buren II CSG</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>DG Empire Shine, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.1</lat>
    <lon>-76.294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66760</plant_id>
    <plant_name>Lemonweir (Oak 1)</plant_name>
    <state>WI</state>
    <county>Juneau</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.738226</lat>
    <lon>-90.01303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66810</plant_id>
    <plant_name>East Cleveland Road Solar</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>RPCA Solar 7, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.124972</lat>
    <lon>-120.4575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66961</plant_id>
    <plant_name>ME Novel Lighthouse - Penobscot CSG</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Luminace Sunbeam Development Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.000113</lat>
    <lon>-68.45582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66963</plant_id>
    <plant_name>Franklin Solar 1 LLC Community Solar</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.525967</lat>
    <lon>-74.55914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67053</plant_id>
    <plant_name>Harding Solar, LLC</plant_name>
    <state>NC</state>
    <county>Greene</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.384636</lat>
    <lon>-77.61161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67064</plant_id>
    <plant_name>Ports Jersey City Solar</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.734</lat>
    <lon>-74.087</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67121</plant_id>
    <plant_name>Bay Avenue CDG</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.679815</lat>
    <lon>-74.16546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67187</plant_id>
    <plant_name>Paxton BESS 1</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Paxton BESS 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>8.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.291264</lat>
    <lon>-71.94546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67227</plant_id>
    <plant_name>NY Ridgeway I CSG</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>DG Empire Shine, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.281</lat>
    <lon>-78.37</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67240</plant_id>
    <plant_name>Lowndes Cowart</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.812481</lat>
    <lon>-83.2604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67245</plant_id>
    <plant_name>Tift Fletcher</plant_name>
    <state>GA</state>
    <county>Tift</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.493821</lat>
    <lon>-83.49665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67287</plant_id>
    <plant_name>Dos Palos Clean Power</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Dos Palos Clean Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.002643</lat>
    <lon>-120.6382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67396</plant_id>
    <plant_name>Mechanic Street (CSG)</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.6837</lat>
    <lon>-68.0382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67398</plant_id>
    <plant_name>Missile Street (CSG)</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.7057</lat>
    <lon>-68.0441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67405</plant_id>
    <plant_name>Beech Road (CSG)</plant_name>
    <state>MD</state>
    <county>Prince Geroges</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.82294</lat>
    <lon>-76.93471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67408</plant_id>
    <plant_name>Pike Road Solar (NY)</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>RPNY Solar 6, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.96881</lat>
    <lon>-78.21004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67463</plant_id>
    <plant_name>Mineral Gap</plant_name>
    <state>VA</state>
    <county>Wise</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.99716</lat>
    <lon>-82.52662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67577</plant_id>
    <plant_name>Monument Valley</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>LSE Lepus LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>2.2</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.252992</lat>
    <lon>-73.33207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67591</plant_id>
    <plant_name>NV - Nokomis - CHI</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>CHI NV Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.789704</lat>
    <lon>-114.1375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67613</plant_id>
    <plant_name>Barone</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.596415</lat>
    <lon>-74.45664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67709</plant_id>
    <plant_name>CUA West Campus - North (CSG)</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.93526</lat>
    <lon>-77.00252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67866</plant_id>
    <plant_name>Paso Robles - Municipal Airport</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.679378</lat>
    <lon>-120.6359</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67886</plant_id>
    <plant_name>Gunther</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>NineDot Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>12.4</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.86451</lat>
    <lon>-73.83598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67913</plant_id>
    <plant_name>Wonderful Orchards - West Valley</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.658203</lat>
    <lon>-119.973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67921</plant_id>
    <plant_name>Canton GLC Solar, LLC</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Addicus Advisors</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.442985</lat>
    <lon>-70.32001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67943</plant_id>
    <plant_name>Sherburne Solar Holdings, LLC</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.54325</lat>
    <lon>-93.59362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67944</plant_id>
    <plant_name>Sheridan Road Solar Farm</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Addicus Advisors</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.64401</lat>
    <lon>-68.40787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68025</plant_id>
    <plant_name>SL JAMESTOWN ARRAY 1</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>SL Jamestown, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.047778</lat>
    <lon>-79.28278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68095</plant_id>
    <plant_name>SR Benton</plant_name>
    <state>TN</state>
    <county>Benton</county>
    <operator>SR Benton, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.879945</lat>
    <lon>-88.15833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68096</plant_id>
    <plant_name>SR Brownsville</plant_name>
    <state>TN</state>
    <county>Haywood</county>
    <operator>SR Brownsville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.59013</lat>
    <lon>-89.23283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68338</plant_id>
    <plant_name>Verde Light Community Solar</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Verde Light Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.03604</lat>
    <lon>-117.0037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68451</plant_id>
    <plant_name>OR - Solops - SPI 18 - Belvedere</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Belvedere Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.055682</lat>
    <lon>-122.8034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68589</plant_id>
    <plant_name>Community Solar Utica 1, LLC</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>AETS OpCo Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.93422</lat>
    <lon>-119.8619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68597</plant_id>
    <plant_name>Mingoville PV I</plant_name>
    <state>PA</state>
    <county>Centre</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.902</lat>
    <lon>-77.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68602</plant_id>
    <plant_name>Davidson IV</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>SunE B9 Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.740813</lat>
    <lon>-80.28785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68618</plant_id>
    <plant_name>Gordon Thompson</plant_name>
    <state>GA</state>
    <county>Gordon</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.44161</lat>
    <lon>-84.70632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68655</plant_id>
    <plant_name>Russell (MA)</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Sunrise on Blandford Rd. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.16539</lat>
    <lon>-72.853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68682</plant_id>
    <plant_name>Glastonbury Solar One</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.75</lat>
    <lon>-72.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68729</plant_id>
    <plant_name>XNA (NW AR Natnl Airport)</plant_name>
    <state>AR</state>
    <county>Benton</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.263575</lat>
    <lon>-94.30998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68753</plant_id>
    <plant_name>Flying Goose</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.6</lat>
    <lon>-119.5824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68794</plant_id>
    <plant_name>Tracy 18 - SLCVA418</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2026</latest_year>
    <lat>37.753015</lat>
    <lon>-121.3883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68885</plant_id>
    <plant_name>Elam Road Solar, LLC</plant_name>
    <state>VA</state>
    <county>Prince Edward</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.27604</lat>
    <lon>-78.61845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68886</plant_id>
    <plant_name>Sandale Solar, LLC</plant_name>
    <state>VA</state>
    <county>Lancaster</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.67491</lat>
    <lon>-76.41144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68888</plant_id>
    <plant_name>OR - Chapman Creek - Greenkey CSG</plant_name>
    <state>OR</state>
    <county>Josephine</county>
    <operator>Chapman Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.153166</lat>
    <lon>-123.6237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68966</plant_id>
    <plant_name>Windsor Solar One</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.85</lat>
    <lon>-72.65</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69051</plant_id>
    <plant_name>Chaberton Solar Blackburn</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.066233</lat>
    <lon>-75.47778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69067</plant_id>
    <plant_name>Pivot Niagara Solar</plant_name>
    <state>NY</state>
    <county>Niagara</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.132801</lat>
    <lon>-79.03545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69068</plant_id>
    <plant_name>CA - Fresno, City of - SE Surface WTP</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.75</lat>
    <lon>-119.65</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69092</plant_id>
    <plant_name>Arcadia</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.1519</lat>
    <lon>-77.08037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69219</plant_id>
    <plant_name>Wedge NY</plant_name>
    <state>NY</state>
    <county>Chemung</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.206071</lat>
    <lon>-76.77013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69412</plant_id>
    <plant_name>NSF Danby Site 3, LLC</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>NSF Energy Two, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.35308</lat>
    <lon>-76.49364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69425</plant_id>
    <plant_name>NSF Marshall Site 3</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>NSF Marshall Site 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.937</lat>
    <lon>-75.419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69484</plant_id>
    <plant_name>Bancroft (MN)</plant_name>
    <state>MN</state>
    <county>Freeborn</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.689214</lat>
    <lon>-93.38914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69489</plant_id>
    <plant_name>Grand Meadow (PV)</plant_name>
    <state>MN</state>
    <county>Mower</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.659418</lat>
    <lon>-92.57697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69519</plant_id>
    <plant_name>Pilot Rock Solar 2</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Pilot Rock Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.506575</lat>
    <lon>-118.8302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69528</plant_id>
    <plant_name>Pluma - Curry Road North</plant_name>
    <state>NM</state>
    <county>Curry</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.380407</lat>
    <lon>-103.2316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69567</plant_id>
    <plant_name>NL VA - Dry Fork</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.767191</lat>
    <lon>-79.39009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69729</plant_id>
    <plant_name>Stanley Black &amp; Decker</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.055415</lat>
    <lon>-72.5208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69783</plant_id>
    <plant_name>Public Works Generation</plant_name>
    <state>KS</state>
    <county>Pottawatomie</county>
    <operator>City of Wamego - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.196782</lat>
    <lon>-96.29131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69792</plant_id>
    <plant_name>NL DE Taylor CSG</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.578</lat>
    <lon>-75.543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69826</plant_id>
    <plant_name>Ohara CSG 1 LLC</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.48693</lat>
    <lon>-79.87085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69842</plant_id>
    <plant_name>Carneys Point Solar 1 LLC</plant_name>
    <state>NJ</state>
    <county>Salem</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.685579</lat>
    <lon>-75.41956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69856</plant_id>
    <plant_name>Morongo CRS 1</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Morongo Band of Mission Indians</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.55265</lat>
    <lon>-116.476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69921</plant_id>
    <plant_name>USS Clear Creek Solar</plant_name>
    <state>IL</state>
    <county>Cass</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.954</lat>
    <lon>-90.2185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70085</plant_id>
    <plant_name>North Kern Water Storage District</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.5385</lat>
    <lon>-119.2139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70141</plant_id>
    <plant_name>NRS Bethel Solar, LLC</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>SREOG Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.407794</lat>
    <lon>-70.71944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70215</plant_id>
    <plant_name>TJX Engine</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.09048</lat>
    <lon>-75.01434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70226</plant_id>
    <plant_name>2nd &amp; N BESS</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Lincoln Electric System</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>12</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.812617</lat>
    <lon>-96.71879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70314</plant_id>
    <plant_name>Mourning Dove Clean Energy, LLC</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>NineDot Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <battery_mwh>12.4</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.604764</lat>
    <lon>-74.12026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70415</plant_id>
    <plant_name>DE-ECA CS Seaford</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Glenville Hollow Community Energy Initiative LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.674362</lat>
    <lon>-75.61658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70447</plant_id>
    <plant_name>Ember Sun LLC PV</plant_name>
    <state>IL</state>
    <county>McDonough</county>
    <operator>Ember Sun LLC PV</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.489341</lat>
    <lon>-90.69128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70479</plant_id>
    <plant_name>IL2 WI339</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.329659</lat>
    <lon>-87.88253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70482</plant_id>
    <plant_name>Spring Run</plant_name>
    <state>VA</state>
    <county>Hanover</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.657555</lat>
    <lon>-77.23109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70519</plant_id>
    <plant_name>Rangeley</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.981022</lat>
    <lon>-70.6517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70556</plant_id>
    <plant_name>AbbieVie, Inc. - Worcester, MA</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.275164</lat>
    <lon>-71.76986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>479</plant_id>
    <plant_name>Temescal</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>33.8343</lat>
    <lon>-117.4971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>480</plant_id>
    <plant_name>Corona</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>33.85895</lat>
    <lon>-117.6106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>502</plant_id>
    <plant_name>Holly</plant_name>
    <state>CO</state>
    <county>Prowers</county>
    <operator>Town of Holly - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2007</latest_year>
    <lat>38.032717</lat>
    <lon>-102.0737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>751</plant_id>
    <plant_name>Moccasin Low Head Hydro Project</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>City &amp; County of San Francisco - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.816447</lat>
    <lon>-120.312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1123</plant_id>
    <plant_name>Anita</plant_name>
    <state>IA</state>
    <county>Cass</county>
    <operator>City of Anita - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1939</first_year>
    <latest_year>2003</latest_year>
    <lat>41.444224</lat>
    <lon>-94.76647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1180</plant_id>
    <plant_name>Rockford</plant_name>
    <state>IA</state>
    <county>Floyd</county>
    <operator>City of Rockford- (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1999</latest_year>
    <lat>43.0489</lat>
    <lon>-92.9468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7957</plant_id>
    <plant_name>Sediver</plant_name>
    <state>SC</state>
    <county>York</county>
    <operator>Central Electric Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.965278</lat>
    <lon>-81.1872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10155</plant_id>
    <plant_name>Brasfield</plant_name>
    <state>VA</state>
    <county>Chesterfield</county>
    <operator>Appomattox River Associates LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>37.220833</lat>
    <lon>-77.5245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10218</plant_id>
    <plant_name>Warrensburg Hydroelectric</plant_name>
    <state>NY</state>
    <county>Warren</county>
    <operator>Boralex Hydro Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>43.4833</lat>
    <lon>-73.7986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50129</plant_id>
    <plant_name>Indian Valley Dam Hydro Project</plant_name>
    <state>CA</state>
    <county>Lake</county>
    <operator>Yolo County Flood Control WCD</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>39.0788</lat>
    <lon>-122.5356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50636</plant_id>
    <plant_name>Brainerd Public Utilities</plant_name>
    <state>MN</state>
    <county>Crow Wing</county>
    <operator>Brainerd Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1940</latest_year>
    <lat>46.3758</lat>
    <lon>-94.1817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54513</plant_id>
    <plant_name>WestRock (IL)</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>WestRock (IL)</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>41.7697</lat>
    <lon>-88.28</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56129</plant_id>
    <plant_name>Thermal Kem</plant_name>
    <state>SC</state>
    <county>York</county>
    <operator>Central Electric Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.8894</lat>
    <lon>-81.0725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56131</plant_id>
    <plant_name>Valenite</plant_name>
    <state>SC</state>
    <county>Oconee</county>
    <operator>Central Electric Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.65724</lat>
    <lon>-83.03832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56132</plant_id>
    <plant_name>Honea Path</plant_name>
    <state>SC</state>
    <county>Abbeville</county>
    <operator>Central Electric Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>34.44128</lat>
    <lon>-82.3652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57551</plant_id>
    <plant_name>Garland Canal Power Plant</plant_name>
    <state>WY</state>
    <county>Park</county>
    <operator>Shoshone Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>44.7264</lat>
    <lon>-108.8644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57670</plant_id>
    <plant_name>SMUD at Van Conett</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento PV Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.253056</lat>
    <lon>-121.2789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57671</plant_id>
    <plant_name>SMUD at Fleshman</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento PV Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.237778</lat>
    <lon>-121.3375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58231</plant_id>
    <plant_name>Lincoln Financial Field</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>NRG Energy Center Eagles LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.900833</lat>
    <lon>-75.1675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58625</plant_id>
    <plant_name>Santa Rita Jail Hybrid</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>County of Alameda GSA - (CA)</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Other Natural Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2017</latest_year>
    <lat>37.719167</lat>
    <lon>-121.8869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58881</plant_id>
    <plant_name>County College of Morris</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Sunlight General Morris Solar LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.856667</lat>
    <lon>-74.58139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58934</plant_id>
    <plant_name>Integrys MA Solar, LLC - Ashburnham Site</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Integrys MA Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.599444</lat>
    <lon>-71.94194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59620</plant_id>
    <plant_name>South Milford Solar Plant</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>REUT Origination, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.311111</lat>
    <lon>-113.0536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59745</plant_id>
    <plant_name>Leominster (MA)-South Street-R&amp;D</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>South Street Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.606184</lat>
    <lon>-71.17722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60060</plant_id>
    <plant_name>Lindberg FIeld Solar</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Lindberg Field Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>32.729238</lat>
    <lon>-117.2077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60437</plant_id>
    <plant_name>Bernards Solar</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.70266</lat>
    <lon>-74.58158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60843</plant_id>
    <plant_name>River Terminal Development Solar</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>RTC Properties Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>6</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2020</latest_year>
    <lat>40.7278</lat>
    <lon>-74.1142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60855</plant_id>
    <plant_name>Iron Horse Solar I CSG</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Iron Horse Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.582855</lat>
    <lon>-71.24639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61099</plant_id>
    <plant_name>Kihei Solar Farm</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>South Maui Renewable Resources LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>20.7937</lat>
    <lon>-156.4339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61101</plant_id>
    <plant_name>Ku'ia Solar</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Ku'ia Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>20.886013</lat>
    <lon>-156.6579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61249</plant_id>
    <plant_name>Westmont 300A</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.766067</lat>
    <lon>-118.2889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61373</plant_id>
    <plant_name>Kearsarge Bellingham PV</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Kearsarge Bellingham LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.071176</lat>
    <lon>-71.45856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61459</plant_id>
    <plant_name>Georgia Power at Swainsboro</plant_name>
    <state>GA</state>
    <county>Emanuel</county>
    <operator>Luminace Solar Georgia 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.605</lat>
    <lon>-82.321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61553</plant_id>
    <plant_name>Klamath Falls Solar 2 CSG</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.183</lat>
    <lon>-121.764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61594</plant_id>
    <plant_name>Westmont 401</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.762421</lat>
    <lon>-118.2882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61894</plant_id>
    <plant_name>National Raisin</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>National Raisin</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.624512</lat>
    <lon>-119.6731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62906</plant_id>
    <plant_name>Augusta Solar Farm</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.099995</lat>
    <lon>-74.73103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63544</plant_id>
    <plant_name>Fordham University</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Fordham University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>7</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2018</latest_year>
    <lat>40.861278</lat>
    <lon>-73.88742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63556</plant_id>
    <plant_name>Boutillier Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.219</lat>
    <lon>-71.891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64028</plant_id>
    <plant_name>San Diego - EMDF at San Diego</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>California PV Energy 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.590258</lat>
    <lon>-116.9195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64250</plant_id>
    <plant_name>Peru 3</plant_name>
    <state>IN</state>
    <county>Miami</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.755338</lat>
    <lon>-86.10572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64705</plant_id>
    <plant_name>Fairhaven MA 2</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.666</lat>
    <lon>-70.87831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65094</plant_id>
    <plant_name>Jackson Legler Solar 1 LLC</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.06451</lat>
    <lon>-74.35037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65571</plant_id>
    <plant_name>Verizon Hidden Ridge Solar Project</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Verizon Communications</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.87662</lat>
    <lon>-96.95372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65759</plant_id>
    <plant_name>Putnam Erikson 2</plant_name>
    <state>GA</state>
    <county>Putnam</county>
    <operator>SolAmerica Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.276821</lat>
    <lon>-83.29845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65770</plant_id>
    <plant_name>Ventura Solar</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Ventura Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.399199</lat>
    <lon>-118.902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65802</plant_id>
    <plant_name>Limestone CSG 2 LLC</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Limestone CSG 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.929112</lat>
    <lon>-67.8359</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66349</plant_id>
    <plant_name>Green Solar LLC (CSG)</plant_name>
    <state>OR</state>
    <county>Jefferson</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.487289</lat>
    <lon>-121.2497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66351</plant_id>
    <plant_name>Marble Solar LLC (CSG)</plant_name>
    <state>OR</state>
    <county>Linn</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.629783</lat>
    <lon>-123.0213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66378</plant_id>
    <plant_name>Auburn Solar LLC (CSG)</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.392661</lat>
    <lon>-122.3427</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66771</plant_id>
    <plant_name>Marathon Solar Farm II LLC North</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.0832</lat>
    <lon>-75.7351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66817</plant_id>
    <plant_name>Copenhagen Solar</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>NY USLE Copenhagen CR194 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.863103</lat>
    <lon>-75.71931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66832</plant_id>
    <plant_name>Athens Ridge</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.917755</lat>
    <lon>-69.67066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67512</plant_id>
    <plant_name>Lone Oak</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Bravo REC Management LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.270566</lat>
    <lon>-119.5182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67527</plant_id>
    <plant_name>White River Medical Center</plant_name>
    <state>AR</state>
    <county>Jackson</county>
    <operator>Entegrity Solar WRMC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.609774</lat>
    <lon>-91.25704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67529</plant_id>
    <plant_name>Augusta CSG, LLC</plant_name>
    <state>VA</state>
    <county>Augusta</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.100152</lat>
    <lon>-78.96471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67820</plant_id>
    <plant_name>Dixie Creek Dairy Solar</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Bravo REC Management LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.29907</lat>
    <lon>-119.5002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67824</plant_id>
    <plant_name>TJX Phoenix</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.418481</lat>
    <lon>-112.1781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68436</plant_id>
    <plant_name>WPR RE Holdings</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.7832</lat>
    <lon>-119.8652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68609</plant_id>
    <plant_name>Tift Boyd</plant_name>
    <state>GA</state>
    <county>Tift</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>31.5059</lat>
    <lon>-83.5115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68622</plant_id>
    <plant_name>Bulloch Rushing</plant_name>
    <state>GA</state>
    <county>Bulloch</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.403553</lat>
    <lon>-81.74994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68719</plant_id>
    <plant_name>Springdale School District</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.16529</lat>
    <lon>-94.04947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68967</plant_id>
    <plant_name>Sun Pacific - Lerdo</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>JKB Energy</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.499809</lat>
    <lon>-119.1453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69188</plant_id>
    <plant_name>10701 Seymour Ave East 1 CSG</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>10701 Seymour Ave East, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.949124</lat>
    <lon>-87.89545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69284</plant_id>
    <plant_name>NY 262 Libertyville LLC</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>NY 262 Libertyville LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.724601</lat>
    <lon>-74.12949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69730</plant_id>
    <plant_name>Amazon - SAN5</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.568741</lat>
    <lon>-116.9252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70017</plant_id>
    <plant_name>IL - ForeFront CS (Huntley)</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>IL Solar Huntley Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.9</nameplate_mw>
    <summer_mw>2.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.195252</lat>
    <lon>-88.40903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>276</plant_id>
    <plant_name>San Joaquin 2</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>3.2</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>37.203233</lat>
    <lon>-119.4975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>421</plant_id>
    <plant_name>Craig (AK)</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1989</latest_year>
    <lat>55.47691</lat>
    <lon>-133.1487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>504</plant_id>
    <plant_name>Julesburg</plant_name>
    <state>CO</state>
    <county>Sedgwick</county>
    <operator>City of Julesburg - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1945</first_year>
    <latest_year>1964</latest_year>
    <lat>40.9505</lat>
    <lon>-102.2795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>794</plant_id>
    <plant_name>Lewisville</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>City of Garland - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>33.068473</lat>
    <lon>-96.96381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>925</plant_id>
    <plant_name>Hydro Plant No 3</plant_name>
    <state>UT</state>
    <county>Sanpete</county>
    <operator>City of Ephraim - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>39.205623</lat>
    <lon>-111.3344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1190</plant_id>
    <plant_name>Stuart (IA)</plant_name>
    <state>IA</state>
    <county>Guthrie</county>
    <operator>City of Stuart - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1968</latest_year>
    <lat>41.503889</lat>
    <lon>-94.3172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1497</plant_id>
    <plant_name>Messalonskee 2 (Oakland)</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Messalonskee Stream Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>44.548544</lat>
    <lon>-69.7104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1777</plant_id>
    <plant_name>Hemlock Falls</plant_name>
    <state>MI</state>
    <county>Iron</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>46.1311</lat>
    <lon>-88.225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3024</plant_id>
    <plant_name>Eagle Point</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1957</first_year>
    <latest_year>1957</latest_year>
    <lat>42.514575</lat>
    <lon>-122.7571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3581</plant_id>
    <plant_name>Abbott TP 3</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>Guadalupe Blanco River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>29.593951</lat>
    <lon>-98.04073</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6348</plant_id>
    <plant_name>Togiak</plant_name>
    <state>AK</state>
    <county>Dillingham</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>59.059744</lat>
    <lon>-160.3803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6546</plant_id>
    <plant_name>Millville Hydro Station</plant_name>
    <state>WV</state>
    <county>Jefferson</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1939</latest_year>
    <lat>39.273056</lat>
    <lon>-77.78444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7174</plant_id>
    <plant_name>Gwitchyaa Zhee</plant_name>
    <state>AK</state>
    <county>Yukon Koyukuk</county>
    <operator>Gwitchyaa Zhee Utility Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2022</latest_year>
    <lat>66.566287</lat>
    <lon>-145.2531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10152</plant_id>
    <plant_name>Warrior Ridge Hydro</plant_name>
    <state>PA</state>
    <county>Huntingdon</county>
    <operator>American Hydro Power Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>40.540042</lat>
    <lon>-78.03463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10808</plant_id>
    <plant_name>Low Line Rapids</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Lower Lowline LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.47711</lat>
    <lon>-114.3801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50166</plant_id>
    <plant_name>International Paper Woronoco Mill</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1916</latest_year>
    <lat>42.163378</lat>
    <lon>-72.82751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50218</plant_id>
    <plant_name>Woodward Power Plant</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>37.860653</lat>
    <lon>-120.8792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50932</plant_id>
    <plant_name>Des Moines Wastewater Reclamation Fac</plant_name>
    <state>IA</state>
    <county>Polk</county>
    <operator>Des Moines Metro WRF</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.573415</lat>
    <lon>-93.55774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50985</plant_id>
    <plant_name>Solano County Cogen Plant</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Solano County - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1989</first_year>
    <latest_year>2004</latest_year>
    <lat>38.2494</lat>
    <lon>-122.0394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54386</plant_id>
    <plant_name>Little Wood Hydro Project</plant_name>
    <state>ID</state>
    <county>Blaine</county>
    <operator>Littlewood Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.425228</lat>
    <lon>-114.0256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54803</plant_id>
    <plant_name>Plymouth State College Cogeneration</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Plymouth State University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2000</latest_year>
    <lat>43.7644</lat>
    <lon>-71.6881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56035</plant_id>
    <plant_name>Smithfield Packaged Meats Corp (Wilson)</plant_name>
    <state>NC</state>
    <county>WILSON</county>
    <operator>Smithfield Packaged Meats Corp (Wilson)</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.694344</lat>
    <lon>-77.91919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56420</plant_id>
    <plant_name>Renick Run Pumping Station 03-04</plant_name>
    <state>OH</state>
    <county>Franklin</county>
    <operator>City of Columbus - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>39.9294</lat>
    <lon>-83.012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57216</plant_id>
    <plant_name>Crayola Solar Project</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>UGI Energy Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2012</latest_year>
    <lat>40.760545</lat>
    <lon>-75.23845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57672</plant_id>
    <plant_name>Oakdale Renewable Energy Plant</plant_name>
    <state>IA</state>
    <county>Johnson</county>
    <operator>University of Iowa</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.7053</lat>
    <lon>-91.6033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58040</plant_id>
    <plant_name>United Stationers Supply Solar Electric</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>CVI CleanCapital Solar 4 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.320556</lat>
    <lon>-74.50167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58329</plant_id>
    <plant_name>UMMS at Pocomoke</plant_name>
    <state>MD</state>
    <county>Somerset</county>
    <operator>Luminace Solar Maryland II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.098056</lat>
    <lon>-75.61111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58519</plant_id>
    <plant_name>Alethea I</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Syncarpha Alethea I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.000556</lat>
    <lon>-74.735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58523</plant_id>
    <plant_name>Stoltze CoGen1</plant_name>
    <state>MT</state>
    <county>Flathead</county>
    <operator>F H Stoltze Land &amp; Lumber Co</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>48.3877</lat>
    <lon>-114.2409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58921</plant_id>
    <plant_name>Napoleon Biogas</plant_name>
    <state>OH</state>
    <county>Henry</county>
    <operator>CH4 Biogas LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.355556</lat>
    <lon>-84.1025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58942</plant_id>
    <plant_name>Rockville Solar I LLC</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.763056</lat>
    <lon>-86.30111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58959</plant_id>
    <plant_name>Butler Solar Power Project</plant_name>
    <state>MO</state>
    <county>Bates</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.27</lat>
    <lon>-94.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59128</plant_id>
    <plant_name>Acushnet- High Hill</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.714444</lat>
    <lon>-70.99722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59729</plant_id>
    <plant_name>Macon Solar Power Project</plant_name>
    <state>MO</state>
    <county>Macon</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.76</lat>
    <lon>-92.46</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60022</plant_id>
    <plant_name>Oxford</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CVI CleanCapital Solar 6</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.141319</lat>
    <lon>-71.85076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60040</plant_id>
    <plant_name>UI RCP New Haven Fuel Cell</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>United Illuminating Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.288803</lat>
    <lon>-72.89862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60184</plant_id>
    <plant_name>ADS Renewable Energy-Wolf Creek LLC</plant_name>
    <state>GA</state>
    <county>Twiggs</county>
    <operator>ADS Renewable Energy- Wolf Creek, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.7755</lat>
    <lon>-83.4348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60458</plant_id>
    <plant_name>Hardwick-Athol &amp; Eagle Hill</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.308391</lat>
    <lon>-72.18958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60593</plant_id>
    <plant_name>UI RCP Woodbridge FC</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>United Illuminating Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.358035</lat>
    <lon>-73.00781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60704</plant_id>
    <plant_name>Trenton Solar Farm (MO)</plant_name>
    <state>MO</state>
    <county>Grundy</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.1155</lat>
    <lon>-93.6122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60705</plant_id>
    <plant_name>Rolla Solar Farm (MO)</plant_name>
    <state>MO</state>
    <county>Phelps</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.9853</lat>
    <lon>-91.7169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60706</plant_id>
    <plant_name>Waynesville Solar Farm (MO)</plant_name>
    <state>MO</state>
    <county>Pulaski</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.8041</lat>
    <lon>-92.2535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60707</plant_id>
    <plant_name>Marshall Solar Farm (MO)</plant_name>
    <state>MO</state>
    <county>Saline</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.0948</lat>
    <lon>-93.2104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60923</plant_id>
    <plant_name>Clyde Solar Array</plant_name>
    <state>OH</state>
    <county>Sandusky</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.319351</lat>
    <lon>-82.98433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61053</plant_id>
    <plant_name>Greenfield Solar Park</plant_name>
    <state>IN</state>
    <county>Hancock</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.793847</lat>
    <lon>-85.81651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61189</plant_id>
    <plant_name>Shavano Falls Hydro</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>Shavano Falls Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.491966</lat>
    <lon>-108.0023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61751</plant_id>
    <plant_name>Rotor Clip</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>MERIT SI</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.539051</lat>
    <lon>-74.53238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61844</plant_id>
    <plant_name>Brush Solar Center</plant_name>
    <state>OR</state>
    <county>Baker</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.465334</lat>
    <lon>-118.2041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61846</plant_id>
    <plant_name>Tulare BioMAT Fuel Cell</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Central CA Fuel Cell 2, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.187138</lat>
    <lon>-119.3751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62439</plant_id>
    <plant_name>Owens Corning</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.838784</lat>
    <lon>-75.053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63439</plant_id>
    <plant_name>Central CA Fuel Cell 1, LLC</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Cordia</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.18347</lat>
    <lon>-119.3743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63459</plant_id>
    <plant_name>Selective Insurance</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>MaxSolar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2022</latest_year>
    <lat>41.152222</lat>
    <lon>-74.74444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63553</plant_id>
    <plant_name>Richmond University Medical Center</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Richmond University Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1978</first_year>
    <latest_year>2023</latest_year>
    <lat>40.63589</lat>
    <lon>-74.10579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63732</plant_id>
    <plant_name>ESA Buies Creek, LLC</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.41424</lat>
    <lon>-78.71433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64005</plant_id>
    <plant_name>Toyota Long Beach Trigen</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Long Beach Trigen, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.780852</lat>
    <lon>-118.2224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64419</plant_id>
    <plant_name>Elm Street</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>ISM Solar Dighton 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.791718</lat>
    <lon>-71.14182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65528</plant_id>
    <plant_name>CA - Fresno County - Juvenile Hall</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.661113</lat>
    <lon>-119.726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65569</plant_id>
    <plant_name>Gilead Sciences La Verne Rooftop Solar</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Gilead Sciences, Inc. - La Verne</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.09623</lat>
    <lon>-117.7819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65749</plant_id>
    <plant_name>Linkville Solar (CSG)</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Linkville Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.207661</lat>
    <lon>-121.8146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65779</plant_id>
    <plant_name>Hickson Solar, LLC</plant_name>
    <state>SC</state>
    <county>Marlboro</county>
    <operator>Hickson Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.69382</lat>
    <lon>-79.82006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66201</plant_id>
    <plant_name>Niagara Bottling - Bloomfield</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.860396</lat>
    <lon>-72.72289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66614</plant_id>
    <plant_name>OTHERCitizensHospital</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>7</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.812804</lat>
    <lon>-96.97777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66766</plant_id>
    <plant_name>SCH County - (2D) 98 Cheltingham Ave Sch</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.791847</lat>
    <lon>-73.95683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67264</plant_id>
    <plant_name>Jackson Pike WWTP Cogen Engines</plant_name>
    <state>OH</state>
    <county>Franklin</county>
    <operator>City of Columbus - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.911247</lat>
    <lon>-83.01651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67278</plant_id>
    <plant_name>Bishop Ranch - BR 2600</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Camino Ramon BR 2600 Solar Project 2020, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.766308</lat>
    <lon>-121.9617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67407</plant_id>
    <plant_name>Clemons Road Solar</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>RPNY Solar 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.063039</lat>
    <lon>-76.01097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67410</plant_id>
    <plant_name>Exeter Ten (CSG)</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.58008</lat>
    <lon>-71.56706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67523</plant_id>
    <plant_name>Searcy Water II</plant_name>
    <state>AR</state>
    <county>White</county>
    <operator>Entegrity Solar SWU 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.207905</lat>
    <lon>-91.72216</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67526</plant_id>
    <plant_name>UADA</plant_name>
    <state>AR</state>
    <county>Howard</county>
    <operator>Entegrity Solar UA AG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.926582</lat>
    <lon>-93.85887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67707</plant_id>
    <plant_name>CUA West Campus - South (CSG)</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.93526</lat>
    <lon>-77.00252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67842</plant_id>
    <plant_name>ME Fort Fairfield Solar Plant</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>ME Fort Fairfield LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.694517</lat>
    <lon>-67.9695</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68548</plant_id>
    <plant_name>Tipton 2 - (CA)</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <battery_mwh>2.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.050157</lat>
    <lon>-119.3147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68643</plant_id>
    <plant_name>Swaggertown Solar I</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.895595</lat>
    <lon>-73.95846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69087</plant_id>
    <plant_name>Allentown - Ruppsville</plant_name>
    <state>PA</state>
    <county>Lehigh</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.5672</lat>
    <lon>-75.60038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69285</plant_id>
    <plant_name>NY Country Road 67 and Majorana</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>NY Country Road 67 and Majorana</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.35322</lat>
    <lon>-74.02442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69483</plant_id>
    <plant_name>Pivot Solar 40</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.318083</lat>
    <lon>-104.9277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69617</plant_id>
    <plant_name>Rice Lake II</plant_name>
    <state>WI</state>
    <county>Barron</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.525787</lat>
    <lon>-91.75617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69673</plant_id>
    <plant_name>Wyre Wynd Hydroelectric Project</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>41.608806</lat>
    <lon>-71.98498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69719</plant_id>
    <plant_name>Upper Macungie CSG 1 LLC</plant_name>
    <state>PA</state>
    <county>Lehigh</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.591962</lat>
    <lon>-75.61298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69789</plant_id>
    <plant_name>SPG IL Green River CSG</plant_name>
    <state>IL</state>
    <county>Henry</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.558849</lat>
    <lon>-89.9203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70039</plant_id>
    <plant_name>Wonderful Citrus - Delano</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.737307</lat>
    <lon>-119.2384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70086</plant_id>
    <plant_name>Ranch 3461</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.456388</lat>
    <lon>-119.2251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70122</plant_id>
    <plant_name>Yuma Solar</plant_name>
    <state>CO</state>
    <county>Yuma</county>
    <operator>SE Municipal Colorado, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.1224</lat>
    <lon>-102.6997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70332</plant_id>
    <plant_name>ASSC Digester Power Plant</plant_name>
    <state>IA</state>
    <county>Iowa</county>
    <operator>Amana Society Service Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>4</generators>
    <nameplate_mw>2.8</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.81366</lat>
    <lon>-91.98627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>428</plant_id>
    <plant_name>Parker</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Merced Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>37.477838</lat>
    <lon>-120.4445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2598</plant_id>
    <plant_name>Piercefield</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1957</latest_year>
    <lat>44.233419</lat>
    <lon>-74.56622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3341</plant_id>
    <plant_name>Clark (SD)</plant_name>
    <state>SD</state>
    <county>Clark</county>
    <operator>NorthWestern Energy - (SD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>44.876484</lat>
    <lon>-97.7321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3342</plant_id>
    <plant_name>Faulkton</plant_name>
    <state>SD</state>
    <county>Faulk</county>
    <operator>NorthWestern Energy - (SD)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>45.036685</lat>
    <lon>-99.12019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3853</plant_id>
    <plant_name>Crystal Mountain</plant_name>
    <state>WA</state>
    <county>Pierce</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1969</latest_year>
    <lat>46.953468</lat>
    <lon>-121.4752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7039</plant_id>
    <plant_name>Lake (WY)</plant_name>
    <state>WY</state>
    <county>Teton</county>
    <operator>NorthWestern Energy (MT wind/thermal)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>44.415</lat>
    <lon>-110.5739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7487</plant_id>
    <plant_name>NSB Anaktuvuk Pass</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>North Slope Borough Power &amp; Light (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2003</latest_year>
    <lat>68.13795</lat>
    <lon>-151.741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>8100</plant_id>
    <plant_name>Springfield (CO)</plant_name>
    <state>CO</state>
    <county>Baca</county>
    <operator>City of Springfield - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1965</latest_year>
    <lat>37.4028</lat>
    <lon>-102.6217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50060</plant_id>
    <plant_name>Brown Station Road Plant I</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Prince George's County - (MD)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>38.824863</lat>
    <lon>-76.77315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50234</plant_id>
    <plant_name>San Antonio Regional Hospital</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>San Antonio Regional Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2001</latest_year>
    <lat>34.1019</lat>
    <lon>-117.6381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50312</plant_id>
    <plant_name>Pembroke Hydro</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.130362</lat>
    <lon>-71.45363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54261</plant_id>
    <plant_name>Warm Springs Hydro Project</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Sonoma County Water Agency - (CA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>38.722141</lat>
    <lon>-123.0112</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57184</plant_id>
    <plant_name>Orono Hydro Station</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Brookfield Black Bear Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.8803</lat>
    <lon>-68.6647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57214</plant_id>
    <plant_name>Waverly Community Wind Project</plant_name>
    <state>IA</state>
    <county>Bremer</county>
    <operator>Waverly Municipal Elec Utility - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2012</latest_year>
    <lat>42.7317</lat>
    <lon>-92.4711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57367</plant_id>
    <plant_name>Pocono Solar Project</plant_name>
    <state>PA</state>
    <county>Monroe</county>
    <operator>Pocono International Raceway Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.061022</lat>
    <lon>-75.51492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57381</plant_id>
    <plant_name>Linden Solar Farm</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.62</lat>
    <lon>-74.2144</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57931</plant_id>
    <plant_name>Holyoke Solar Cooperative at Mueller</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Holyoke Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.190909</lat>
    <lon>-72.68242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58525</plant_id>
    <plant_name>City of Hayward WWTP</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>City of Hayward (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2014</latest_year>
    <lat>37.633526</lat>
    <lon>-122.1397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58953</plant_id>
    <plant_name>Rockville Solar II, LLC</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.766944</lat>
    <lon>-86.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59432</plant_id>
    <plant_name>Duke Building 87</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Concord New Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.890833</lat>
    <lon>-86.25556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59433</plant_id>
    <plant_name>Duke Building 98</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Concord New Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.904722</lat>
    <lon>-86.26</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59484</plant_id>
    <plant_name>Hadley Solar NG, LLC</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.352085</lat>
    <lon>-72.53885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60267</plant_id>
    <plant_name>Sharon Station</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.182623</lat>
    <lon>-74.539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60861</plant_id>
    <plant_name>Dept of General Services -FTB</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>California PV Energy 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.565</lat>
    <lon>-121.343</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61310</plant_id>
    <plant_name>Crittenden Solar Facility</plant_name>
    <state>KY</state>
    <county>Grant</county>
    <operator>Duke Energy Kentucky Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.751822</lat>
    <lon>-84.61326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61341</plant_id>
    <plant_name>Grafton PV</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.225504</lat>
    <lon>-71.66261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61452</plant_id>
    <plant_name>Waterford Holdco CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Waterford Holdco LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.475467</lat>
    <lon>-93.19859</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61605</plant_id>
    <plant_name>San Luis Valley Solar Array</plant_name>
    <state>CO</state>
    <county>Saguache</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.777</lat>
    <lon>-106.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63257</plant_id>
    <plant_name>Short Hills Mall</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Short Hills Mall</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.7397</lat>
    <lon>-74.3642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63290</plant_id>
    <plant_name>Natick Mall</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Natick Mall</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.3009</lat>
    <lon>-71.3843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63672</plant_id>
    <plant_name>Lakeville Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>C2 MA Lakeville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.865224</lat>
    <lon>-70.95826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64275</plant_id>
    <plant_name>Bulloch Neville Farms</plant_name>
    <state>GA</state>
    <county>Bulloch</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.384398</lat>
    <lon>-81.67292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64282</plant_id>
    <plant_name>Putnam Erickson</plant_name>
    <state>GA</state>
    <county>Putnam</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.317653</lat>
    <lon>-83.39233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64382</plant_id>
    <plant_name>IXYS - Beverly</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>IXYS Integrated Circuits Division, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2019</latest_year>
    <lat>42.579489</lat>
    <lon>-70.91078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64434</plant_id>
    <plant_name>Rounseville Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Rounseville Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.738381</lat>
    <lon>-70.82853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65254</plant_id>
    <plant_name>Chambers 4 - Sacramento SMF1</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.68251</lat>
    <lon>-121.5743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65484</plant_id>
    <plant_name>Western Plains Wind</plant_name>
    <state>KS</state>
    <county>Gove</county>
    <operator>Western Plains Wind, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.122</lat>
    <lon>-100.733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66021</plant_id>
    <plant_name>DRPA Ashland Station Solar Project</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Solar Star River SLB, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.85853</lat>
    <lon>-75.01035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66434</plant_id>
    <plant_name>Monroeville RTO BTM</plant_name>
    <state>OH</state>
    <county>Huron</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.244288</lat>
    <lon>-82.70895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66444</plant_id>
    <plant_name>Woodville RTO BTM</plant_name>
    <state>OH</state>
    <county>Sandusky</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.4587</lat>
    <lon>-83.36901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66448</plant_id>
    <plant_name>Girard (PA) RTO BTM</plant_name>
    <state>PA</state>
    <county>Erie</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.003322</lat>
    <lon>-80.32024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66454</plant_id>
    <plant_name>Hatfield PA BTM</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.275214</lat>
    <lon>-75.28922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66812</plant_id>
    <plant_name>BQ - Psychedelic Site CSG</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.71525</lat>
    <lon>-74.79739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66937</plant_id>
    <plant_name>IMPA Tipton 2 Solar Park</plant_name>
    <state>IN</state>
    <county>Tipton</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.292989</lat>
    <lon>-86.05978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67648</plant_id>
    <plant_name>Rio Vista Solar</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Rio Vista Executive Boat &amp; RV Storage, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.16492</lat>
    <lon>-121.6847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69090</plant_id>
    <plant_name>Hanover Road</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.5315</lat>
    <lon>-79.1477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69113</plant_id>
    <plant_name>Uniqlo Phase 1 Solar Farm</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>53 SP Solar Trust</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.7</lat>
    <lon>-75.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69759</plant_id>
    <plant_name>Tracy Linne</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Pacifico Tracy Linne LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <battery_mwh>2.6</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.692858</lat>
    <lon>-121.4102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70174</plant_id>
    <plant_name>Niagara Bottling Ontario PHI</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>REC Niagara Solar I</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.032202</lat>
    <lon>-117.5969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70262</plant_id>
    <plant_name>4622 Mercedes Dr Solar, LLC</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>SRC Partnership 13, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.477847</lat>
    <lon>-76.22536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70278</plant_id>
    <plant_name>IL - Ameresco - Freeport North</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Freeport Solar North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.7</nameplate_mw>
    <summer_mw>2.7</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.264909</lat>
    <lon>-89.61823</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>365</plant_id>
    <plant_name>Lower Tule River</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1909</first_year>
    <latest_year>1909</latest_year>
    <lat>36.13568</lat>
    <lon>-118.7889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1694</plant_id>
    <plant_name>Allegan Dam</plant_name>
    <state>MI</state>
    <county>Allegan</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1945</latest_year>
    <lat>42.563803</lat>
    <lon>-85.95398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1987</plant_id>
    <plant_name>Lanesboro</plant_name>
    <state>MN</state>
    <county>Fillmore</county>
    <operator>Lanesboro Public Utility Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1923</first_year>
    <latest_year>2004</latest_year>
    <lat>43.720026</lat>
    <lon>-91.97774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2007</plant_id>
    <plant_name>Rochester Hydro</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>Rochester Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>44.212981</lat>
    <lon>-92.48018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4075</plant_id>
    <plant_name>Tomahawk</plant_name>
    <state>WI</state>
    <county>Lincoln</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1938</first_year>
    <latest_year>1938</latest_year>
    <lat>45.4411</lat>
    <lon>-89.7306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6526</plant_id>
    <plant_name>Rainbow Falls Auscble</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>New York State Elec &amp; Gas Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1927</latest_year>
    <lat>44.5236</lat>
    <lon>-73.4617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6532</plant_id>
    <plant_name>Washoe</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Truckee Meadows Water Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1904</first_year>
    <latest_year>1904</latest_year>
    <lat>39.3022</lat>
    <lon>-119.5604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7437</plant_id>
    <plant_name>Galena Electric Utility</plant_name>
    <state>AK</state>
    <county>Yukon Koyukuk</county>
    <operator>Galena Electric Utility</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2022</latest_year>
    <lat>64.74417</lat>
    <lon>-156.8736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7483</plant_id>
    <plant_name>NSB Kaktovik Utility</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>North Slope Borough Power &amp; Light (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>70.125617</lat>
    <lon>-143.619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>9864</plant_id>
    <plant_name>Cabot Holyoke</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>City of Holyoke Gas and Elec Dept - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1893</first_year>
    <latest_year>1939</latest_year>
    <lat>42.2</lat>
    <lon>-72.61</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10140</plant_id>
    <plant_name>Birch Creek Power</plant_name>
    <state>ID</state>
    <county>Clark</county>
    <operator>Birch Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.027444</lat>
    <lon>-112.7194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10323</plant_id>
    <plant_name>Copper Dam Plant</plant_name>
    <state>OR</state>
    <county>Hood River</county>
    <operator>Farmer's Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>45.66523</lat>
    <lon>-121.5238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50176</plant_id>
    <plant_name>Union Falls</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Union Falls Hydro Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.510739</lat>
    <lon>-73.91308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50891</plant_id>
    <plant_name>El Dorado Hydro Elk Creek</plant_name>
    <state>ID</state>
    <county>Idaho</county>
    <operator>Hydroland Omega LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>45.217784</lat>
    <lon>-116.3158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54936</plant_id>
    <plant_name>Richard J Donovan Correctional Facility</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>California Dept of Corrections</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>32.583571</lat>
    <lon>-116.9309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55009</plant_id>
    <plant_name>Montgomery Creek Hydro</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.846806</lat>
    <lon>-121.9564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57390</plant_id>
    <plant_name>Haleon York RDC Solar Facility</plant_name>
    <state>PA</state>
    <county>York</county>
    <operator>Haleon PLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.043856</lat>
    <lon>-76.73547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57588</plant_id>
    <plant_name>Matrix Stults Road Solar Facility</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.3622</lat>
    <lon>-74.4797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57600</plant_id>
    <plant_name>Fishers Island 1</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.268611</lat>
    <lon>-72.01</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57602</plant_id>
    <plant_name>Jewett City 1</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Connecticut Mun Elec Engy Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.6041</lat>
    <lon>-71.9825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58110</plant_id>
    <plant_name>Brookside Newark</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Diamond State Generation Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.668889</lat>
    <lon>-75.71611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58622</plant_id>
    <plant_name>Carter Hydro</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>Northern Colorado Water Conservancy District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.324167</lat>
    <lon>-105.2089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58643</plant_id>
    <plant_name>Rockford Solar Farm</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Rockford Solar Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.175278</lat>
    <lon>-89.08833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58680</plant_id>
    <plant_name>Braley Road 2</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Mass Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.751667</lat>
    <lon>-70.96694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59365</plant_id>
    <plant_name>24 Applegate Solar LLC</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.205833</lat>
    <lon>-74.57972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59861</plant_id>
    <plant_name>Twin Branch PV</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.69</lat>
    <lon>-86.12</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59967</plant_id>
    <plant_name>Pepperidge Farm Bloomfield</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Pepperidge Farm, Inc.- Bloomfield</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2016</latest_year>
    <lat>41.869302</lat>
    <lon>-72.71832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61598</plant_id>
    <plant_name>Tyngsborough Solar</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.669744</lat>
    <lon>-71.44648</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61700</plant_id>
    <plant_name>PowerFin Kingsbery</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>PowerFin ASL 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.265877</lat>
    <lon>-97.68486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62050</plant_id>
    <plant_name>Kingsbrook Jewish Medical Center</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Kingsbrook Jewish Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2019</latest_year>
    <lat>40.659328</lat>
    <lon>-73.93375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62421</plant_id>
    <plant_name>NYP-Hudson Valley Hospital Center</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>NYP-Hudson Valley Hospital Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2018</latest_year>
    <lat>41.286739</lat>
    <lon>-73.8888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62712</plant_id>
    <plant_name>Burlington Coat Factory Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>DG Northeast Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.09283</lat>
    <lon>-74.80769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62941</plant_id>
    <plant_name>DG AMP Rittman Rd</plant_name>
    <state>OH</state>
    <county>Medina</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.000755</lat>
    <lon>-81.75074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63074</plant_id>
    <plant_name>Reedley Community College Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.60563</lat>
    <lon>-119.4577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63195</plant_id>
    <plant_name>Aero Haven Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.819725</lat>
    <lon>-74.8947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63638</plant_id>
    <plant_name>Tracy 210</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Costco Wholesale</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.72201</lat>
    <lon>-121.531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63713</plant_id>
    <plant_name>IIV000 Mt Bethel Fuel Cell</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.63251</lat>
    <lon>-74.50348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64048</plant_id>
    <plant_name>SulusSolar29</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.46</lat>
    <lon>-122.29</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64270</plant_id>
    <plant_name>ESCA-LL-COLTON, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.03925</lat>
    <lon>-117.3606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64384</plant_id>
    <plant_name>Amazon TUS2</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.129416</lat>
    <lon>-110.8389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64429</plant_id>
    <plant_name>Amazon - Stockton - Roof (SCK1) - (CA)</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.911715</lat>
    <lon>-121.1987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64571</plant_id>
    <plant_name>Coody Cochran</plant_name>
    <state>GA</state>
    <county>Bleckley</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.367009</lat>
    <lon>-83.37428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64575</plant_id>
    <plant_name>Mendon</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>BWC Box Pond LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.09749</lat>
    <lon>-71.50187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64583</plant_id>
    <plant_name>Westberry Jesup</plant_name>
    <state>GA</state>
    <county>Wayne</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.602803</lat>
    <lon>-81.93258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65111</plant_id>
    <plant_name>Thunderhead</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Thunderhead Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.75101</lat>
    <lon>-79.78992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65331</plant_id>
    <plant_name>20333 Normandie PV, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>TRITEC Americas</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.84614</lat>
    <lon>-118.3002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65364</plant_id>
    <plant_name>Danell Bros Inc</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Renewable Solar, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.267574</lat>
    <lon>-119.6316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65365</plant_id>
    <plant_name>CA - Ventura Co CCD - Moorpark College</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.299721</lat>
    <lon>-118.8335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65616</plant_id>
    <plant_name>CA - Amazon - SMF6</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.75</lat>
    <lon>-121.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65730</plant_id>
    <plant_name>Rockmart</plant_name>
    <state>GA</state>
    <county>Polk</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.014833</lat>
    <lon>-85.02224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66035</plant_id>
    <plant_name>IGS SBD1</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.038735</lat>
    <lon>-117.3849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66456</plant_id>
    <plant_name>Anheuser Busch - Fairfield</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.235224</lat>
    <lon>-122.0927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66980</plant_id>
    <plant_name>Bartow Davidson</plant_name>
    <state>GA</state>
    <county>Bartow</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.25745</lat>
    <lon>-84.83149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67154</plant_id>
    <plant_name>Mars Hill</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.516899</lat>
    <lon>-67.8833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67273</plant_id>
    <plant_name>Township of Monroe - Williamstown HS</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.682767</lat>
    <lon>-75.01094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67509</plant_id>
    <plant_name>Grossmont College</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.816578</lat>
    <lon>-117.0063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67708</plant_id>
    <plant_name>EDF Saucon Valley</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.581825</lat>
    <lon>-75.35727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68448</plant_id>
    <plant_name>OR - Solops - SPI 18 - Clayfield</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Clayfield Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.262227</lat>
    <lon>-122.3466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68997</plant_id>
    <plant_name>Thermo Fisher Pleasanton</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>TotalEnergies Renewables USA LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <battery_mwh>2.6</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.645164</lat>
    <lon>-121.8842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69020</plant_id>
    <plant_name>Waterford Solar, LLC CSG</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>Waterford Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.061196</lat>
    <lon>-123.5538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69129</plant_id>
    <plant_name>Dudley Landfill Solar LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Dudley Landfill Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <battery_mwh>2.8</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.036241</lat>
    <lon>-71.91281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69243</plant_id>
    <plant_name>REG Mason City Solar</plant_name>
    <state>IA</state>
    <county>Cerro Gordo</county>
    <operator>REG Mason City, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.136174</lat>
    <lon>-93.26386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69441</plant_id>
    <plant_name>Water Lily Solar LLC</plant_name>
    <state>IL</state>
    <county>Kendall</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.485723</lat>
    <lon>-88.26931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69757</plant_id>
    <plant_name>Netflix ABQ System A</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Siemens Industry</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.998</lat>
    <lon>-106.611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70096</plant_id>
    <plant_name>Riverside Community College</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>TotalEnergies Renewables USA LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.6</nameplate_mw>
    <summer_mw>2.6</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.971659</lat>
    <lon>-117.3807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>814</plant_id>
    <plant_name>Clear Lake</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1937</first_year>
    <latest_year>1937</latest_year>
    <lat>42.66701</lat>
    <lon>-114.7801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1141</plant_id>
    <plant_name>Gowrie</plant_name>
    <state>IA</state>
    <county>Webster</county>
    <operator>Gowrie Municipal Utilities - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.282807</lat>
    <lon>-94.28897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1181</plant_id>
    <plant_name>Rock Rapids</plant_name>
    <state>IA</state>
    <county>Lyon</county>
    <operator>Rock Rapids Municipal Utility - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>43.429444</lat>
    <lon>-96.16917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1292</plant_id>
    <plant_name>Jetmore</plant_name>
    <state>KS</state>
    <county>Hodgeman</county>
    <operator>City of Jetmore -(KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.080332</lat>
    <lon>-99.89359</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2253</plant_id>
    <plant_name>Lyons</plant_name>
    <state>NE</state>
    <county>Burt</county>
    <operator>City of Lyons - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1967</latest_year>
    <lat>41.9374</lat>
    <lon>-96.4668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2556</plant_id>
    <plant_name>Eel Weir</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>44.638365</lat>
    <lon>-75.49052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3643</plant_id>
    <plant_name>Upper Beaver</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Beaver City Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1907</first_year>
    <latest_year>1907</latest_year>
    <lat>38.2683</lat>
    <lon>-112.4806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6507</plant_id>
    <plant_name>Drop 2 (WA)</plant_name>
    <state>WA</state>
    <county>Yakima</county>
    <operator>Yakama Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1942</latest_year>
    <lat>46.4492</lat>
    <lon>-120.5342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6513</plant_id>
    <plant_name>Fleish</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Truckee Meadows Water Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1914</latest_year>
    <lat>39.2851</lat>
    <lon>-119.5933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50034</plant_id>
    <plant_name>Valley Falls Hydroelectric Facility</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Albany Engineering Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.9044</lat>
    <lon>-73.5625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50128</plant_id>
    <plant_name>Clear Lake Hydro Project</plant_name>
    <state>CA</state>
    <county>Lake</county>
    <operator>Yolo County Flood Control WCD</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>38.923556</lat>
    <lon>-122.5667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50175</plant_id>
    <plant_name>Emporia</plant_name>
    <state>VA</state>
    <county>Greensville</county>
    <operator>Emporia Hydro Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>36.696</lat>
    <lon>-77.56</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50435</plant_id>
    <plant_name>Sugarloaf Hydro Plant</plant_name>
    <state>CO</state>
    <county>Lake</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>39.252672</lat>
    <lon>-106.3748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54335</plant_id>
    <plant_name>Morton Salt Rittman</plant_name>
    <state>OH</state>
    <county>Wayne</county>
    <operator>Morton Salt Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.9692</lat>
    <lon>-81.7756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54347</plant_id>
    <plant_name>Howard F Curren Advncd Wastewater Plant</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Wastewater Department</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>5</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1989</latest_year>
    <lat>27.9389</lat>
    <lon>-82.4389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55860</plant_id>
    <plant_name>Quinebaug Lower Project</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Quinebaug Associates LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>41.798656</lat>
    <lon>-71.88676</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56873</plant_id>
    <plant_name>SECCRA Community Landfill</plant_name>
    <state>PA</state>
    <county>Chester</county>
    <operator>Southeastern Chester County Refuse Auth</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2010</latest_year>
    <lat>39.8639</lat>
    <lon>-75.8428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57384</plant_id>
    <plant_name>Matrix Buildings A&amp;B (Perth Amboy) Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.534393</lat>
    <lon>-74.27</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57613</plant_id>
    <plant_name>LE Wind Turbine 1</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>Lincoln Electric Company</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.584444</lat>
    <lon>-81.52556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57724</plant_id>
    <plant_name>NJMC Landfill</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.750833</lat>
    <lon>-74.11</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57727</plant_id>
    <plant_name>BlackRock-Matrix</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.3622</lat>
    <lon>-74.4797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57743</plant_id>
    <plant_name>North Palm Springs 1A</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.924167</lat>
    <lon>-116.5933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57880</plant_id>
    <plant_name>Eolos Wind Energy Research Field Station</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Regents of the University of Minnesota</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.728333</lat>
    <lon>-93.04806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57949</plant_id>
    <plant_name>MSC Sebewaing</plant_name>
    <state>MI</state>
    <county>Huron</county>
    <operator>Michigan Sugar Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>BIT</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>2</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>0</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1990</latest_year>
    <lat>43.741111</lat>
    <lon>-83.44722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57990</plant_id>
    <plant_name>Shrewsbury Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.266111</lat>
    <lon>-71.69583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58371</plant_id>
    <plant_name>Gridley Main Two</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.373333</lat>
    <lon>-121.6817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58487</plant_id>
    <plant_name>Granville Solar PV Power Project</plant_name>
    <state>NC</state>
    <county>Granville</county>
    <operator>Southern Power Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.411667</lat>
    <lon>-78.59389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58515</plant_id>
    <plant_name>Chattanooga Metropolitan Airport Solar</plant_name>
    <state>TN</state>
    <county>Hamilton</county>
    <operator>Chattanooga Metropolitan Airport</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2019</latest_year>
    <lat>35.024583</lat>
    <lon>-85.20862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58538</plant_id>
    <plant_name>PCSP3 Airport</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>Carolina Solar Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.288056</lat>
    <lon>-78.98611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58700</plant_id>
    <plant_name>Colleton Solar Farm</plant_name>
    <state>SC</state>
    <county>Colleton</county>
    <operator>TIG Sun Energy I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.913333</lat>
    <lon>-80.6925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58786</plant_id>
    <plant_name>Deer Park</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>CD US Solar MT1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.760833</lat>
    <lon>-73.19389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58906</plant_id>
    <plant_name>Valley Center 1</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.234167</lat>
    <lon>-117.0017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59013</plant_id>
    <plant_name>Scituate PV</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.1775</lat>
    <lon>-70.74056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59032</plant_id>
    <plant_name>EBZ Solar</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.570556</lat>
    <lon>-71.625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59046</plant_id>
    <plant_name>651 Chase Solar NG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.626667</lat>
    <lon>-71.74278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59451</plant_id>
    <plant_name>CBC Solar Energy Gen Fac Phase 2</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>CBC Alternative Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.674444</lat>
    <lon>-78.52611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59597</plant_id>
    <plant_name>Colton Solar One, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Colton Solar One, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.093333</lat>
    <lon>-117.3194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59823</plant_id>
    <plant_name>INDY III</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.722966</lat>
    <lon>-86.31447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59855</plant_id>
    <plant_name>Deer Creek PV</plant_name>
    <state>IN</state>
    <county>Grant</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.51</lat>
    <lon>-85.64</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59866</plant_id>
    <plant_name>Palmer Solar LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Palmer Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.187176</lat>
    <lon>-72.36558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60225</plant_id>
    <plant_name>CMEEC - Bozrah</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.570584</lat>
    <lon>-72.15861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60493</plant_id>
    <plant_name>Rising Paper</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.228622</lat>
    <lon>-73.34446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60586</plant_id>
    <plant_name>Pleasant Valley Solar</plant_name>
    <state>GA</state>
    <county>Walton</county>
    <operator>Walton Electric Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.7368</lat>
    <lon>-83.6971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60746</plant_id>
    <plant_name>Silvi Gibraltar Rock</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>CVI CleanCapital Solar 5 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.450916</lat>
    <lon>-74.71708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60757</plant_id>
    <plant_name>Cedarville CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.802697</lat>
    <lon>-70.54981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60839</plant_id>
    <plant_name>Goya Foods, Inc- Jersey City Solar</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Goya Foods Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.760069</lat>
    <lon>-74.06539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60936</plant_id>
    <plant_name>New Auburn DPC Solar</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.21</lat>
    <lon>-91.4353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60986</plant_id>
    <plant_name>AIS Solar Project</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.501949</lat>
    <lon>-71.73779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61055</plant_id>
    <plant_name>DG AMP Solar Front Royal</plant_name>
    <state>VA</state>
    <county>Warren</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.929</lat>
    <lon>-78.18</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61135</plant_id>
    <plant_name>Lebanon Solar Farm (MO)</plant_name>
    <state>MO</state>
    <county>Laclede</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.667831</lat>
    <lon>-92.67063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61223</plant_id>
    <plant_name>Chillicothe Solar Farm</plant_name>
    <state>MO</state>
    <county>Livingston</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.788769</lat>
    <lon>-93.53683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61237</plant_id>
    <plant_name>433 Purchase Solar NG, LLC</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.809353</lat>
    <lon>-71.19224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61307</plant_id>
    <plant_name>Peterson Road Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Peterson Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.1</lat>
    <lon>-72.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61316</plant_id>
    <plant_name>Higginsville Solar Farm</plant_name>
    <state>MO</state>
    <county>Lafayette</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.002139</lat>
    <lon>-93.72683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61350</plant_id>
    <plant_name>MDFA Devens-Saratoga</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.544134</lat>
    <lon>-71.59881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61377</plant_id>
    <plant_name>Amazon - Patterson PV</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.468888</lat>
    <lon>-121.1663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61450</plant_id>
    <plant_name>Farmington Solar Farm</plant_name>
    <state>MO</state>
    <county>St Francois</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.755333</lat>
    <lon>-90.42774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61566</plant_id>
    <plant_name>El Dorado Springs Solar Farm</plant_name>
    <state>MO</state>
    <county>Cedar</county>
    <operator>Missouri Jnt Muni.Pwr Elec. Ut. Comm.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.858706</lat>
    <lon>-94.00263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61595</plant_id>
    <plant_name>Flambeau Solar Partners</plant_name>
    <state>WI</state>
    <county>Price</county>
    <operator>REC Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.7368</lat>
    <lon>-90.471</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61669</plant_id>
    <plant_name>Scandia Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Scandia CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.28718</lat>
    <lon>-92.8125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61684</plant_id>
    <plant_name>Klawock Power Generation Station</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>55.553197</lat>
    <lon>-133.0854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61815</plant_id>
    <plant_name>Kearsarge Granby</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Kearsarge Granby LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>5</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.222962</lat>
    <lon>-72.50833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62331</plant_id>
    <plant_name>Sol Phoenix</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.85</lat>
    <lon>-76.95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62333</plant_id>
    <plant_name>Polk County Renewables, LLC</plant_name>
    <state>NE</state>
    <county>Polk</county>
    <operator>Polk County Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.165278</lat>
    <lon>-97.57019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62442</plant_id>
    <plant_name>Lake Region Community Hybrid, LLC</plant_name>
    <state>MN</state>
    <county>Otter Tail</county>
    <operator>Lake Region Community Hybrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>46.505052</lat>
    <lon>-96.15728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62471</plant_id>
    <plant_name>Washington St Community Solar Farm #4</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.175</lat>
    <lon>-77.849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62473</plant_id>
    <plant_name>Washington St Community Solar Farm #3</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.172</lat>
    <lon>-77.844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62643</plant_id>
    <plant_name>AZ State University - Tempe Campus Solar</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Arizona State University FDM</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>12</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2025</latest_year>
    <lat>33.424279</lat>
    <lon>-111.9282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62672</plant_id>
    <plant_name>Nautilus Goat Island Solar LLC (CSG)</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.941786</lat>
    <lon>-71.66204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62747</plant_id>
    <plant_name>Matilda Hamilton Fee Hydroelectric Stati</plant_name>
    <state>KY</state>
    <county>Estill</county>
    <operator>Lock 12 Hydro Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.677484</lat>
    <lon>-83.94855</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62767</plant_id>
    <plant_name>Gas City Solar Park</plant_name>
    <state>IN</state>
    <county>Grant</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.481168</lat>
    <lon>-85.57028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62848</plant_id>
    <plant_name>New Lisbon Solar</plant_name>
    <state>WI</state>
    <county>Juneau</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.883</lat>
    <lon>-90.136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62849</plant_id>
    <plant_name>Cumberland Solar</plant_name>
    <state>WI</state>
    <county>Barron</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.511</lat>
    <lon>-92.025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62870</plant_id>
    <plant_name>Gardner - Otter River Road</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Otter River Road Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.603029</lat>
    <lon>-72.03918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62918</plant_id>
    <plant_name>Notre Dame Hydro</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>University of Notre Dame</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.676</lat>
    <lon>-86.2453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63191</plant_id>
    <plant_name>Hopkinton Phase 2</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Vista Solar, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.443293</lat>
    <lon>-71.79113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63262</plant_id>
    <plant_name>Becton Dickinson Ground &amp; Roof Top</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>42.01</lat>
    <lon>-73.335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63393</plant_id>
    <plant_name>Cuming County Renewables, LLC</plant_name>
    <state>NE</state>
    <county>Cuming</county>
    <operator>Cuming County Renewables. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.019972</lat>
    <lon>-96.86183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63493</plant_id>
    <plant_name>PSREC/SIAD Solar</plant_name>
    <state>CA</state>
    <county>Lassen</county>
    <operator>Plumas Sierra Rural Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.15006</lat>
    <lon>-120.1234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63611</plant_id>
    <plant_name>CSU Long Beach</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <battery_mwh>15</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.78383</lat>
    <lon>-118.108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63663</plant_id>
    <plant_name>Mt Hope Solar</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Neighborhood Power Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.12795</lat>
    <lon>-122.6138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63664</plant_id>
    <plant_name>Williams Acres Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Neighborhood Power Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.137</lat>
    <lon>-122.799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63706</plant_id>
    <plant_name>EQX012 Harz Fuel Cell</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.77782</lat>
    <lon>-74.07591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63714</plant_id>
    <plant_name>GEN005 Antibody Fuel Cell</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.21086</lat>
    <lon>-117.299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63953</plant_id>
    <plant_name>Easthampton CSG</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Easthampton Park Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.24781</lat>
    <lon>-72.67984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64130</plant_id>
    <plant_name>REG Juhl Glenville Wind, LLC</plant_name>
    <state>MN</state>
    <county>Freeborn</county>
    <operator>REG Juhl Glenville Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.582</lat>
    <lon>-93.305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64375</plant_id>
    <plant_name>Decorah Battery</plant_name>
    <state>IA</state>
    <county>Winneshiek</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <battery_mwh>2.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.324</lat>
    <lon>-91.793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64565</plant_id>
    <plant_name>Apalachicola</plant_name>
    <state>GA</state>
    <county>Richmond</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.33632</lat>
    <lon>-82.06055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64698</plant_id>
    <plant_name>Blue Prairie Solar, LLC</plant_name>
    <state>WI</state>
    <county>Jackson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.285255</lat>
    <lon>-90.9158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64903</plant_id>
    <plant_name>Cuba 2.5ac, LLC</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Cuba 2.5ac, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.017438</lat>
    <lon>-106.946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65002</plant_id>
    <plant_name>SSI West Riverside Landfill LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.980601</lat>
    <lon>-117.3755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65083</plant_id>
    <plant_name>Halifax Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.99527</lat>
    <lon>-70.84382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65243</plant_id>
    <plant_name>New Rosewood BESS</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.436188</lat>
    <lon>-78.10965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65244</plant_id>
    <plant_name>Queens Creek BESS</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.672452</lat>
    <lon>-77.18804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65248</plant_id>
    <plant_name>Collier BESS</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.204903</lat>
    <lon>-78.89031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65329</plant_id>
    <plant_name>Mount Laurel Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.975579</lat>
    <lon>-74.88872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65527</plant_id>
    <plant_name>CA-Ventura County CCD-Ventura College</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.25</lat>
    <lon>-119.25</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65533</plant_id>
    <plant_name>Augusta</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Maine DG Solar Augusta, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.36124</lat>
    <lon>-69.79636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65745</plant_id>
    <plant_name>Carnes Creek Solar (CSG)</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Carnes Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.075205</lat>
    <lon>-122.9277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65746</plant_id>
    <plant_name>Cosper Creek Solar (CSG)</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>Cosper Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.058</lat>
    <lon>-123.499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65751</plant_id>
    <plant_name>Sesqui-C Solar (CSG)</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>Sesqui-C Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.32543</lat>
    <lon>-123.1769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65768</plant_id>
    <plant_name>Centech Gas Generator</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Town of Shrewsbury - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.255386</lat>
    <lon>-71.69051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65786</plant_id>
    <plant_name>1639 RT 29 Solar 2</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>1639 RT 29 Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.04296</lat>
    <lon>-74.24935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66039</plant_id>
    <plant_name>IGS SBD2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.073555</lat>
    <lon>-117.2814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66368</plant_id>
    <plant_name>NSE Astoria - Skyward</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.418564</lat>
    <lon>-122.2779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66417</plant_id>
    <plant_name>Manheim New England</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Cox Enterprises</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.878118</lat>
    <lon>-71.16354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66571</plant_id>
    <plant_name>BKV-BPP Ponder Solar</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>PPM Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.155767</lat>
    <lon>-97.25464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66827</plant_id>
    <plant_name>FFP - NY Burch CSG</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.32265</lat>
    <lon>-73.46798</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66833</plant_id>
    <plant_name>ME Novel Lighthouse - Huggard Ave Solar</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Luminace Sunbeam Development Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.90965</lat>
    <lon>-67.83835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67000</plant_id>
    <plant_name>Cawelo Water District Solar</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Scooby Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.049</lat>
    <lon>-119.1812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67036</plant_id>
    <plant_name>Davistown-Mercer</plant_name>
    <state>NC</state>
    <county>Edgecombe</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.84423</lat>
    <lon>-77.61267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67037</plant_id>
    <plant_name>Medoc</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.24805</lat>
    <lon>-77.85024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67067</plant_id>
    <plant_name>Edison 0308 Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.53</lat>
    <lon>-74.387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67072</plant_id>
    <plant_name>Small Mouth Bass Solar</plant_name>
    <state>VA</state>
    <county>Rockbridge</county>
    <operator>Small Mouth Bass Solar Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.906257</lat>
    <lon>-79.40387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67082</plant_id>
    <plant_name>SR Franklin, LLC</plant_name>
    <state>KY</state>
    <county>Simpson</county>
    <operator>SR Franklin, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.713497</lat>
    <lon>-86.54697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67087</plant_id>
    <plant_name>THD Quicksilver - MDC Perth Amboy</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>THD NJ Riverview Main Distribution Center Solar Project 2020, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.55</lat>
    <lon>-74.25</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67151</plant_id>
    <plant_name>Spencer Solar MA</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.225</lat>
    <lon>-72.017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67369</plant_id>
    <plant_name>OSG Solar 1 LLC</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.616755</lat>
    <lon>-72.23458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67447</plant_id>
    <plant_name>Pomham Islander (CSG)</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.95397</lat>
    <lon>-71.52153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67479</plant_id>
    <plant_name>Portland SP</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.39101</lat>
    <lon>-79.42755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67802</plant_id>
    <plant_name>French Road Solar</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.637</lat>
    <lon>-68.393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67928</plant_id>
    <plant_name>North Nobleboro Road, LLC</plant_name>
    <state>ME</state>
    <county>Lincoln</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.130682</lat>
    <lon>-69.42925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67946</plant_id>
    <plant_name>Skyway Avenue Solar Farm</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>47.310336</lat>
    <lon>-68.37718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67974</plant_id>
    <plant_name>AES Laubacher Solar CSG</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.227156</lat>
    <lon>-78.22898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68102</plant_id>
    <plant_name>SR Forked Deer</plant_name>
    <state>TN</state>
    <county>Lauderdale</county>
    <operator>SR Forked Deer, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.708522</lat>
    <lon>-89.50989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68220</plant_id>
    <plant_name>North Kern 2</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.4678</lat>
    <lon>-119.1536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68221</plant_id>
    <plant_name>North Kern 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.4691</lat>
    <lon>-119.169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68335</plant_id>
    <plant_name>Fairhaven</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Baltimore Gas &amp; Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <battery_mwh>7.1</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.7538</lat>
    <lon>-76.5894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68445</plant_id>
    <plant_name>OR - Green Key - Gun Club</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>Gun Club Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.267312</lat>
    <lon>-123.0141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68484</plant_id>
    <plant_name>ME - Novel (Lighthouse Ph I) Mars Hill</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Mars Hill Road Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.574069</lat>
    <lon>-67.91107</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68508</plant_id>
    <plant_name>Zena Solar</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>Zena Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.02015</lat>
    <lon>-123.0985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68638</plant_id>
    <plant_name>GSPP 641 Ferris Road West</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.751923</lat>
    <lon>-74.65717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68658</plant_id>
    <plant_name>Westport (MA)</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Sunrise on Drift Rd. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.54002</lat>
    <lon>-71.07402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68806</plant_id>
    <plant_name>Ridgeway 2</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.189134</lat>
    <lon>-77.74272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68887</plant_id>
    <plant_name>PAC Aviation Solar</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>PAC Aviation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.214543</lat>
    <lon>-118.5006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68904</plant_id>
    <plant_name>OR - Green Key - Buckner CSG</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Buckner Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.249161</lat>
    <lon>-122.5572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68908</plant_id>
    <plant_name>Tesoro RV &amp; Boat Storage</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Tesoro RV &amp; Boat Storage</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.776626</lat>
    <lon>-121.1869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68945</plant_id>
    <plant_name>Pivot Solar 37</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.620759</lat>
    <lon>-103.2344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68965</plant_id>
    <plant_name>Pivot Solar NY 5</plant_name>
    <state>NY</state>
    <county>Essex</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.897977</lat>
    <lon>-73.42136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69116</plant_id>
    <plant_name>Lime Bluff 1</plant_name>
    <state>PA</state>
    <county>Lycoming</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.232116</lat>
    <lon>-76.75509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69193</plant_id>
    <plant_name>KaneSolar03 LLC</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.893158</lat>
    <lon>-88.55198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69217</plant_id>
    <plant_name>Thoroman</plant_name>
    <state>IL</state>
    <county>Adams</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.029221</lat>
    <lon>-90.93622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69232</plant_id>
    <plant_name>Sunset Road Solar 4 Community Solar</plant_name>
    <state>IL</state>
    <county>Macoupin</county>
    <operator>Sunset Road Solar 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.150791</lat>
    <lon>-89.768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69485</plant_id>
    <plant_name>Bridge Creek</plant_name>
    <state>WI</state>
    <county>Eau Claire</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.723711</lat>
    <lon>-91.158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69486</plant_id>
    <plant_name>Bright Future</plant_name>
    <state>WI</state>
    <county>St Croix</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.961373</lat>
    <lon>-92.44342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69487</plant_id>
    <plant_name>Douglas (IA)</plant_name>
    <state>IA</state>
    <county>Mitchell</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.357753</lat>
    <lon>-92.59386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69488</plant_id>
    <plant_name>Elk Mound (PV)</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.901566</lat>
    <lon>-91.61363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69490</plant_id>
    <plant_name>Greenfield</plant_name>
    <state>WI</state>
    <county>La Crosse</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.730622</lat>
    <lon>-91.09268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69491</plant_id>
    <plant_name>Hannibal</plant_name>
    <state>WI</state>
    <county>Taylor</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.257985</lat>
    <lon>-90.7749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69492</plant_id>
    <plant_name>Little Cedar</plant_name>
    <state>IA</state>
    <county>Mitchell</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.382652</lat>
    <lon>-92.73294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69493</plant_id>
    <plant_name>Luck</plant_name>
    <state>WI</state>
    <county>Polk</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.612524</lat>
    <lon>-92.48349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69494</plant_id>
    <plant_name>Next Generation</plant_name>
    <state>WI</state>
    <county>St Croix</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.910349</lat>
    <lon>-92.31375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69495</plant_id>
    <plant_name>Viola</plant_name>
    <state>WI</state>
    <county>Burnett</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.825848</lat>
    <lon>-92.26411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69583</plant_id>
    <plant_name>Marvin Composites</plant_name>
    <state>ND</state>
    <county>Cass</county>
    <operator>Marvin Composites</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2024</latest_year>
    <lat>46.89934</lat>
    <lon>-96.85955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69737</plant_id>
    <plant_name>Pacific Aviation</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.214404</lat>
    <lon>-118.5006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69754</plant_id>
    <plant_name>Moores Hill</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>LSE Sculptor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.478998</lat>
    <lon>-74.09117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69835</plant_id>
    <plant_name>Starke Solar LLC (CSG)</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.835227</lat>
    <lon>-74.07352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69840</plant_id>
    <plant_name>CVE US IL Ridge Farm 324 LLC (CSG)</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.902845</lat>
    <lon>-87.69748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69933</plant_id>
    <plant_name>Clark Solar-Longwood</plant_name>
    <state>WI</state>
    <county>Clark</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.928616</lat>
    <lon>-90.65894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69938</plant_id>
    <plant_name>Ringe</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>OneEnergy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.107842</lat>
    <lon>-92.40043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70036</plant_id>
    <plant_name>St. Josephs Wayne</plant_name>
    <state>NJ</state>
    <county>Passaic</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.94705</lat>
    <lon>-74.20321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70161</plant_id>
    <plant_name>Belfast PV, LLC</plant_name>
    <state>ME</state>
    <county>Waldo</county>
    <operator>SREOG ME Credit Seller 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.410726</lat>
    <lon>-69.06319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70266</plant_id>
    <plant_name>Millstadt IL 1, LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>SRC Partnership 16, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.482333</lat>
    <lon>-90.04411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70318</plant_id>
    <plant_name>Sugar Maple Clean Energy LLC</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>NineDot Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <battery_mwh>12.4</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.604789</lat>
    <lon>-74.1205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70413</plant_id>
    <plant_name>Apricus Solar LLC</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>KSI III Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.05854</lat>
    <lon>-123.4982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70484</plant_id>
    <plant_name>St. Josephs Paterson</plant_name>
    <state>NJ</state>
    <county>Passaic</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.5</nameplate_mw>
    <summer_mw>2.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.904145</lat>
    <lon>-74.16469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>586</plant_id>
    <plant_name>East Highline</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Imperial Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>32.699451</lat>
    <lon>-115.2825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1895</plant_id>
    <plant_name>Knife Falls</plant_name>
    <state>MN</state>
    <county>Carlton</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>46.726627</lat>
    <lon>-92.44862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2300</plant_id>
    <plant_name>Sargent</plant_name>
    <state>NE</state>
    <county>Custer</county>
    <operator>City of Sargent - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1954</first_year>
    <latest_year>1968</latest_year>
    <lat>41.641588</lat>
    <lon>-99.3698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3267</plant_id>
    <plant_name>Saluda Dam</plant_name>
    <state>SC</state>
    <county>Greenville</county>
    <operator>Northbrook Carolina Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>34.852224</lat>
    <lon>-82.48396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3583</plant_id>
    <plant_name>H 4</plant_name>
    <state>TX</state>
    <county>Gonzales</county>
    <operator>Guadalupe Blanco River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>29.495193</lat>
    <lon>-97.62495</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3584</plant_id>
    <plant_name>H 5</plant_name>
    <state>TX</state>
    <county>Gonzales</county>
    <operator>Guadalupe Blanco River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>29.4681</lat>
    <lon>-97.4919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3585</plant_id>
    <plant_name>Nolte</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>Guadalupe Blanco River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>29.537565</lat>
    <lon>-97.93211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3586</plant_id>
    <plant_name>TP 4</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>Guadalupe Blanco River Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1932</latest_year>
    <lat>29.548136</lat>
    <lon>-97.99959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3716</plant_id>
    <plant_name>Lower Middlebury</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>44.0249</lat>
    <lon>-73.1768</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4122</plant_id>
    <plant_name>Rapide Croche</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>City of Kaukauna (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1926</latest_year>
    <lat>44.3164</lat>
    <lon>-88.3147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6231</plant_id>
    <plant_name>Apple River</plant_name>
    <state>WI</state>
    <county>St Croix</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1901</first_year>
    <latest_year>1901</latest_year>
    <lat>45.157552</lat>
    <lon>-92.71621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6390</plant_id>
    <plant_name>Tangier</plant_name>
    <state>VA</state>
    <county>Accomack</county>
    <operator>A &amp; N Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>37.8277</lat>
    <lon>-75.9915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6519</plant_id>
    <plant_name>Vergennes 9</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1943</latest_year>
    <lat>44.1664</lat>
    <lon>-73.2575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6531</plant_id>
    <plant_name>Verdi</plant_name>
    <state>NV</state>
    <county>Washoe</county>
    <operator>Truckee Meadows Water Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1911</latest_year>
    <lat>39.3125</lat>
    <lon>-119.585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6702</plant_id>
    <plant_name>Pelican</plant_name>
    <state>AK</state>
    <county>Skagway Hoonah Angoon</county>
    <operator>Pelican Utility</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric; Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2026</latest_year>
    <lat>57.957197</lat>
    <lon>-136.2201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7429</plant_id>
    <plant_name>Edenton Generators</plant_name>
    <state>NC</state>
    <county>Chowan</county>
    <operator>Town of Edenton - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2014</latest_year>
    <lat>36.028611</lat>
    <lon>-76.57194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7486</plant_id>
    <plant_name>NSB Point Lay Utility</plant_name>
    <state>AK</state>
    <county>North Slope</county>
    <operator>North Slope Borough Power &amp; Light (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>69.740833</lat>
    <lon>-163.0058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10181</plant_id>
    <plant_name>Metropolitan Sewerage District</plant_name>
    <state>NC</state>
    <county>Buncombe</county>
    <operator>Metropolitan Sewerage District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>35.6497</lat>
    <lon>-82.5992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10276</plant_id>
    <plant_name>Clement Dam Hydro LLC</plant_name>
    <state>NH</state>
    <county>Belknap</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>43.440538</lat>
    <lon>-71.59598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10848</plant_id>
    <plant_name>Walden</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Hydroland Omega LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>41.55998</lat>
    <lon>-74.19515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50311</plant_id>
    <plant_name>Passaic Valley Water Commission</plant_name>
    <state>NJ</state>
    <county>Passaic</county>
    <operator>Passaic Valley Water Comm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1935</latest_year>
    <lat>40.883345</lat>
    <lon>-74.22999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50566</plant_id>
    <plant_name>Milam Gas Recovery</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>WM Illinois Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1993</latest_year>
    <lat>38.6603</lat>
    <lon>-90.1317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50721</plant_id>
    <plant_name>Tazewell Gas Recovery</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>WM Illinois Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1999</latest_year>
    <lat>40.6817</lat>
    <lon>-89.5167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50832</plant_id>
    <plant_name>Chicopee Hydroelectric Station</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>City of Chicopee - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.159595</lat>
    <lon>-72.58279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54753</plant_id>
    <plant_name>Lateral 10 Ventures</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Lateral 10 Ventures</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>42.647376</lat>
    <lon>-114.8903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54788</plant_id>
    <plant_name>Evanston Township High School</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Evanston Board of Education</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.044038</lat>
    <lon>-87.69956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54818</plant_id>
    <plant_name>191 Peachtree Tower</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>Banyan St./GAP 191 Peachtree Owner, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>33.7583</lat>
    <lon>-84.3869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54845</plant_id>
    <plant_name>Sun Trust Plaza</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>Sun Trust Plaza Associates LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>33.7625</lat>
    <lon>-84.3872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54903</plant_id>
    <plant_name>Adrian Energy Associates LLC</plant_name>
    <state>MI</state>
    <county>Lenawee</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>41.890968</lat>
    <lon>-83.99286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55002</plant_id>
    <plant_name>Murphy-Brown LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Murphy - Brown LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>34.9944</lat>
    <lon>-78.1583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55006</plant_id>
    <plant_name>Nashua Plant</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2016</latest_year>
    <lat>42.73227</lat>
    <lon>-71.52242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56069</plant_id>
    <plant_name>Berlin Landfill Gas</plant_name>
    <state>WI</state>
    <county>Green Lake</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>43.9603</lat>
    <lon>-88.9158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56275</plant_id>
    <plant_name>Helzel &amp; Schwarzhoff 86</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wind Stream Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>35.0925</lat>
    <lon>-118.3952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56278</plant_id>
    <plant_name>Green Valley LFGTE</plant_name>
    <state>KY</state>
    <county>Greenup</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>38.396737</lat>
    <lon>-82.80882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56280</plant_id>
    <plant_name>Hardin County LFGTE</plant_name>
    <state>KY</state>
    <county>Hardin</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>37.7258</lat>
    <lon>-85.7258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56909</plant_id>
    <plant_name>Gap Pacific Distribution Center</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>MN8 Energy LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>36.781606</lat>
    <lon>-119.7069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57249</plant_id>
    <plant_name>North American - Erie Generating Station</plant_name>
    <state>OH</state>
    <county>Erie</county>
    <operator>North American -- Erie, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2014</latest_year>
    <lat>41.3362</lat>
    <lon>-82.602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57750</plant_id>
    <plant_name>Maple Solar</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>NFI Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.4875</lat>
    <lon>-74.98083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58158</plant_id>
    <plant_name>Wesleyan University Cogen 1</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>Wesleyan University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.556389</lat>
    <lon>-72.65389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58893</plant_id>
    <plant_name>Camp Solar Plant</plant_name>
    <state>GA</state>
    <county>Meriwether</county>
    <operator>Axium US Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.964722</lat>
    <lon>-84.54389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58936</plant_id>
    <plant_name>Walpole Solar 2</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Walpole Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.117222</lat>
    <lon>-71.26583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59040</plant_id>
    <plant_name>Ball Mountain Hydro</plant_name>
    <state>VT</state>
    <county>Windham</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>12</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.126944</lat>
    <lon>-72.77611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59437</plant_id>
    <plant_name>Stillwater B</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Brookfield Black Bear Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.912667</lat>
    <lon>-68.68383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59844</plant_id>
    <plant_name>Munich Re Plaza</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Munich Reinsurance America, Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.350341</lat>
    <lon>-74.59268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60908</plant_id>
    <plant_name>Northampton Landfill Solar PV</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Ameresco Glendale Road Solar PV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.293717</lat>
    <lon>-72.71401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61191</plant_id>
    <plant_name>Drop 5 (CO)</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>Drop 5 Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.404377</lat>
    <lon>-107.8102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61371</plant_id>
    <plant_name>Centaurus Solar - MA</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>LSE Centaurus LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.253</lat>
    <lon>-71.426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61726</plant_id>
    <plant_name>Onyx - Pembroke Landfill Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.049906</lat>
    <lon>-70.80242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62409</plant_id>
    <plant_name>Waynesboro Community Solar</plant_name>
    <state>GA</state>
    <county>Burke</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.170593</lat>
    <lon>-81.82394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62994</plant_id>
    <plant_name>Bluewater CDEC 1</plant_name>
    <state>NM</state>
    <county>Cibola</county>
    <operator>Lightsource Renewable Energy Asset Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.24102</lat>
    <lon>-107.9523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63297</plant_id>
    <plant_name>Hobart &amp; William Smith College Gates Rd.</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Dynamic Energy Holdings LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.86228</lat>
    <lon>-77.05058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63477</plant_id>
    <plant_name>Alcalde Solar Array</plant_name>
    <state>NM</state>
    <county>Rio Arriba</county>
    <operator>Jemez Cuba LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.091143</lat>
    <lon>-106.0409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63704</plant_id>
    <plant_name>EQX010 Great Oaks Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.24212</lat>
    <lon>-121.7831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64406</plant_id>
    <plant_name>EMWD - Moreno Valley RWRF</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.868252</lat>
    <lon>-117.2141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64411</plant_id>
    <plant_name>Delanco</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Delanco Coopertown Rd Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.04936</lat>
    <lon>-74.9353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64454</plant_id>
    <plant_name>Merrimack Solar Farm, LLC</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>Merrimack Solar Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.811381</lat>
    <lon>-71.50117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64477</plant_id>
    <plant_name>Suncaster, LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Suncaster, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.504069</lat>
    <lon>-77.96955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64517</plant_id>
    <plant_name>Department of Justice</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.548056</lat>
    <lon>-121.4486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64549</plant_id>
    <plant_name>Smithfield Solar Farm, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Smithfield Solar Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.92237</lat>
    <lon>-71.52037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64687</plant_id>
    <plant_name>Van der Hoek Solar Array/ Dairy</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Maas Energy Works</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.504015</lat>
    <lon>-120.0981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64782</plant_id>
    <plant_name>Kearsarge Fogland</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>Kearsarge Fogland LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.555955</lat>
    <lon>-71.18822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65165</plant_id>
    <plant_name>Ontario Sun</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Azimuth 180 Solar Electric, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.644</lat>
    <lon>-76.156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65238</plant_id>
    <plant_name>Chambers 4 - Eastvale LGB3</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.99848</lat>
    <lon>-117.5529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65252</plant_id>
    <plant_name>Chambers 4 - Riverside LGB6</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.88102</lat>
    <lon>-117.3004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66023</plant_id>
    <plant_name>Grossmont-Cuyamaca-Cuyamaca Col. Solar &amp;</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.7466</lat>
    <lon>-116.9389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66188</plant_id>
    <plant_name>POM Plant 1</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.657094</lat>
    <lon>-119.5857</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66428</plant_id>
    <plant_name>Emerald Kemble, LLC</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Emerald Kemble, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.768436</lat>
    <lon>-74.49874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66436</plant_id>
    <plant_name>USS Cogburn Solar LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.464272</lat>
    <lon>-104.6102</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66485</plant_id>
    <plant_name>Gloucester</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.886</lat>
    <lon>-75.109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66519</plant_id>
    <plant_name>TX Pasadena 10585 Red Bluff Road Solar</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Catalyze Pasadena 10585 Red Bluff Road Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>29.614979</lat>
    <lon>-95.07023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66761</plant_id>
    <plant_name>West Shore Solar LLC</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>West Shore Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.80327</lat>
    <lon>-73.96494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66886</plant_id>
    <plant_name>Elk Street Solar</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Elk Street Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.85</lat>
    <lon>-78.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67069</plant_id>
    <plant_name>IPC 25 Solar</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.739193</lat>
    <lon>-121.5369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67179</plant_id>
    <plant_name>Cabrillo College</plant_name>
    <state>CA</state>
    <county>Santa Cruz</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.987452</lat>
    <lon>-121.9224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67316</plant_id>
    <plant_name>OTHERNFBWA</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>6</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.705627</lat>
    <lon>-95.61913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67750</plant_id>
    <plant_name>Kern Sunset 1886-WD</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.220668</lat>
    <lon>-118.9089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67924</plant_id>
    <plant_name>Plympton Lake Street Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.999164</lat>
    <lon>-70.80022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68064</plant_id>
    <plant_name>CA- US Foods- Livermore</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>EDPRNA DG CA Livermore LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.711625</lat>
    <lon>-121.7085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68161</plant_id>
    <plant_name>Maumee Solar</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.568</lat>
    <lon>-83.695</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68615</plant_id>
    <plant_name>ADP Roseland, NJ</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>ADP Boulevard Solar Project 2021, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.815661</lat>
    <lon>-74.31015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68619</plant_id>
    <plant_name>Polk Cedartown 2</plant_name>
    <state>GA</state>
    <county>Polk</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.046881</lat>
    <lon>-85.2113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68623</plant_id>
    <plant_name>Amazon Goodyear</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.494749</lat>
    <lon>-112.4311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68626</plant_id>
    <plant_name>Gordon Pine Hall</plant_name>
    <state>GA</state>
    <county>Gordon</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.440235</lat>
    <lon>-84.70455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68627</plant_id>
    <plant_name>Chattooga Gore</plant_name>
    <state>GA</state>
    <county>Chattooga</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.497814</lat>
    <lon>-85.45043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68710</plant_id>
    <plant_name>Ozark Solar Park</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.966569</lat>
    <lon>-94.39848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68962</plant_id>
    <plant_name>Pivot Solar NY 4</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.140915</lat>
    <lon>-75.55668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69052</plant_id>
    <plant_name>MDD109-NCBP BLDG 11-Manekin</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.8739</lat>
    <lon>-76.7342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69396</plant_id>
    <plant_name>Chenunda Creek</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.08547</lat>
    <lon>-77.81913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69774</plant_id>
    <plant_name>CBEP Solar 3</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.4</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.590104</lat>
    <lon>-104.9952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>337</plant_id>
    <plant_name>Kaweah 1</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1929</first_year>
    <latest_year>1929</latest_year>
    <lat>36.465066</lat>
    <lon>-118.862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1128</plant_id>
    <plant_name>Brooklyn</plant_name>
    <state>IA</state>
    <county>Poweshiek</county>
    <operator>City of Brooklyn - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.7278</lat>
    <lon>-92.4479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2021</plant_id>
    <plant_name>Westbrook</plant_name>
    <state>MN</state>
    <county>Cottonwood</county>
    <operator>City of Westbrook - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.0399</lat>
    <lon>-95.4429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4068</plant_id>
    <plant_name>Merrill</plant_name>
    <state>WI</state>
    <county>Lincoln</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1984</latest_year>
    <lat>45.1786</lat>
    <lon>-89.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7191</plant_id>
    <plant_name>Tallassee Hydro Project</plant_name>
    <state>GA</state>
    <county>Clarke</county>
    <operator>Tallassee Shoals LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>33.989153</lat>
    <lon>-83.49845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7810</plant_id>
    <plant_name>Argyle</plant_name>
    <state>WI</state>
    <county>Lafayette</county>
    <operator>City of Argyle - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1929</first_year>
    <latest_year>2004</latest_year>
    <lat>42.7019</lat>
    <lon>-89.8697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7922</plant_id>
    <plant_name>Brooklyn City North Plant</plant_name>
    <state>IA</state>
    <county>Poweshiek</county>
    <operator>City of Brooklyn - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.7394</lat>
    <lon>-92.4394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7966</plant_id>
    <plant_name>Iowa Distributed Wind Generation Project</plant_name>
    <state>IA</state>
    <county>Kossuth</county>
    <operator>City of Algona - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>43.034722</lat>
    <lon>-94.14056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>9842</plant_id>
    <plant_name>Newhalem</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>City of Seattle - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1970</first_year>
    <latest_year>1970</latest_year>
    <lat>48.675944</lat>
    <lon>-121.2408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10806</plant_id>
    <plant_name>Crystal Springs</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Crystal Springs Hydro Elec LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>42.622513</lat>
    <lon>-114.5009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52039</plant_id>
    <plant_name>Quail Creek Hydro Plant #1</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>Washington Cnty Wtr Consv Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>37.1854</lat>
    <lon>-113.3583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54385</plant_id>
    <plant_name>Kinneytown New Old</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Hydroland Omega LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1995</latest_year>
    <lat>41.3686</lat>
    <lon>-73.0856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54729</plant_id>
    <plant_name>Taylor Draw Hydroelectric Facility</plant_name>
    <state>CO</state>
    <county>Rio Blanco</county>
    <operator>Rio Blanco Water Conserv Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>40.106269</lat>
    <lon>-108.7112</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56697</plant_id>
    <plant_name>Potholes East Canal 66.0</plant_name>
    <state>WA</state>
    <county>Franklin</county>
    <operator>Columbia Basin Hydropower</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>46.378469</lat>
    <lon>-119.2544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57746</plant_id>
    <plant_name>The City of Vineland at North Vineland</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>Luminace Solar New Jersey, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.505034</lat>
    <lon>-74.9977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57771</plant_id>
    <plant_name>Ameresco Butte County</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Ameresco Butte County LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.674</lat>
    <lon>-121.73</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57805</plant_id>
    <plant_name>William Paterson University</plant_name>
    <state>NJ</state>
    <county>Passaic</county>
    <operator>Nautilus Solar WPU LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.952084</lat>
    <lon>-74.1955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58359</plant_id>
    <plant_name>Corning Pharmaceutical Glass</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>CVI CleanCapital Solar 4 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.496667</lat>
    <lon>-75.01861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58514</plant_id>
    <plant_name>Desert Hot Springs Solar</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.923056</lat>
    <lon>-116.53</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58576</plant_id>
    <plant_name>GSE NM1</plant_name>
    <state>NM</state>
    <county>Chaves</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.3</lat>
    <lon>-104.4</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58654</plant_id>
    <plant_name>Jersey Gardens Phase 2</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>CF Jersey Gardens Owner Two LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.660833</lat>
    <lon>-74.17333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58824</plant_id>
    <plant_name>Sheldon Solar</plant_name>
    <state>VT</state>
    <county>Franklin</county>
    <operator>Excelsior Energy Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.910556</lat>
    <lon>-72.97944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59135</plant_id>
    <plant_name>Ludlow Landfill</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.182222</lat>
    <lon>-72.5075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59744</plant_id>
    <plant_name>Lakeland Electric Co. (FL)-Airport 1</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>SunE W12DG-B, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>27.988523</lat>
    <lon>-82.0473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59750</plant_id>
    <plant_name>Bourne (MA) - Holliston I</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>NVT LICENSES, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.177876</lat>
    <lon>-71.45463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60057</plant_id>
    <plant_name>Steel Bridge Solar, LLC</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>Steel Bridge Solar. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.068</lat>
    <lon>-123.47</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60509</plant_id>
    <plant_name>Valley Center</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.2503</lat>
    <lon>-117.0226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60652</plant_id>
    <plant_name>Dickinson Solar Array</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Great River Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.11444</lat>
    <lon>-93.8138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60730</plant_id>
    <plant_name>Bridgewater Solar CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.964116</lat>
    <lon>-70.97193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60752</plant_id>
    <plant_name>Gloucester Community College Solar</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.780789</lat>
    <lon>-75.12289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60823</plant_id>
    <plant_name>South Sioux City Solar</plant_name>
    <state>NE</state>
    <county>Dakota</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.45847</lat>
    <lon>-96.43969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60912</plant_id>
    <plant_name>Cold River Road Solar</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.5857</lat>
    <lon>-72.952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61348</plant_id>
    <plant_name>Westmont 400A</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.764227</lat>
    <lon>-118.2889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61436</plant_id>
    <plant_name>DG AMP Solar Orrville 3</plant_name>
    <state>OH</state>
    <county>Wayne</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.856428</lat>
    <lon>-81.75946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61539</plant_id>
    <plant_name>GELD Solar Farm</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Ameresco, Inc - GELD</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.262269</lat>
    <lon>-71.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62197</plant_id>
    <plant_name>East Bridgewater Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.059895</lat>
    <lon>-70.98175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62246</plant_id>
    <plant_name>Target Woodland Solar Project</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.682746</lat>
    <lon>-121.7235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62517</plant_id>
    <plant_name>Yellow Mills Rd #1 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.017848</lat>
    <lon>-77.26049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62518</plant_id>
    <plant_name>Yellow Mills Rd #2 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.016419</lat>
    <lon>-77.26091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62519</plant_id>
    <plant_name>Yellow Mills Rd #3 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.015301</lat>
    <lon>-77.26066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62523</plant_id>
    <plant_name>Route 5 &amp; 20 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.899</lat>
    <lon>-77.461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62629</plant_id>
    <plant_name>APG New Chesapeake</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.493704</lat>
    <lon>-76.1467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62776</plant_id>
    <plant_name>Crawfordsville Solar Park 4</plant_name>
    <state>IN</state>
    <county>Montgomery</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.049684</lat>
    <lon>-86.88082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62826</plant_id>
    <plant_name>GSPP Raynham TMLP, LLC CSG</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.930445</lat>
    <lon>-71.06043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62884</plant_id>
    <plant_name>Richmond Hayes Solar</plant_name>
    <state>GA</state>
    <county>Richmond</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.364</lat>
    <lon>-82.022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62885</plant_id>
    <plant_name>Troup RC50</plant_name>
    <state>GA</state>
    <county>Harris</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.895935</lat>
    <lon>-84.84948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62886</plant_id>
    <plant_name>Wilkinson DeFore (Westbound)</plant_name>
    <state>GA</state>
    <county>Wilkinson</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.879593</lat>
    <lon>-83.32099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62900</plant_id>
    <plant_name>Somerville Solar</plant_name>
    <state>TN</state>
    <county>Fayette</county>
    <operator>Somerville Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.22492</lat>
    <lon>-89.35083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62960</plant_id>
    <plant_name>Kimberly-Clark Solar</plant_name>
    <state>GA</state>
    <county>Troup</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33</lat>
    <lon>-85.034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63189</plant_id>
    <plant_name>Bio-Rad</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Vista Solar, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.022486</lat>
    <lon>-122.2737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63418</plant_id>
    <plant_name>DGS Wasco State Prison</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.593903</lat>
    <lon>-119.4072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63510</plant_id>
    <plant_name>Walnut Unified School District Walnut HS</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <battery_mwh>0.5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.02188</lat>
    <lon>-117.8505</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63676</plant_id>
    <plant_name>Spencer Solar CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.260723</lat>
    <lon>-72.0156</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63698</plant_id>
    <plant_name>Galloway Landfill</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.172415</lat>
    <lon>-74.02324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63947</plant_id>
    <plant_name>DGS Valley State Prison</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.10117</lat>
    <lon>-120.1531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63956</plant_id>
    <plant_name>Palmer Creek Solar, LLC</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.18484</lat>
    <lon>-123.1018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63957</plant_id>
    <plant_name>Day Hill Solar, LLC</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.26866</lat>
    <lon>-122.3294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64023</plant_id>
    <plant_name>10 Finderne Avenue Solar, LLC</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.55812</lat>
    <lon>-74.57594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64140</plant_id>
    <plant_name>BWC Stony Brook, LLC Hybrid</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <battery_mwh>1.4</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.6375</lat>
    <lon>-71.4036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64225</plant_id>
    <plant_name>Prosperity Solar Farm CSG</plant_name>
    <state>MO</state>
    <county>Jasper</county>
    <operator>Empire District Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.127139</lat>
    <lon>-94.43369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64279</plant_id>
    <plant_name>Lowndes Tycor Farms</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.688193</lat>
    <lon>-83.16715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64522</plant_id>
    <plant_name>Old Cedar Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.713</lat>
    <lon>-79.788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64607</plant_id>
    <plant_name>MC6 Hydro Facility</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>MC6 Hydro Facility</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.485529</lat>
    <lon>-116.355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65182</plant_id>
    <plant_name>CSP Los Angeles</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.694314</lat>
    <lon>-118.2278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65198</plant_id>
    <plant_name>Medtronic - New Haven</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.33788</lat>
    <lon>-72.87028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65418</plant_id>
    <plant_name>SCS Randolph 012175 Somerset, LLC</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.54009</lat>
    <lon>-74.5588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65507</plant_id>
    <plant_name>Verizon Comms Garage Top Solar Project</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Verizon Communications</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.354492</lat>
    <lon>-121.9315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65681</plant_id>
    <plant_name>Kohler Solar</plant_name>
    <state>WI</state>
    <county>Sheboygan</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.747</lat>
    <lon>-87.76573</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65783</plant_id>
    <plant_name>Wonderful Nursery</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.617738</lat>
    <lon>-119.3924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66473</plant_id>
    <plant_name>LSE Pavo Solar</plant_name>
    <state>NY</state>
    <county>Delaware</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.157714</lat>
    <lon>-75.04511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67048</plant_id>
    <plant_name>Bibb Williams</plant_name>
    <state>GA</state>
    <county>Bibb</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.856937</lat>
    <lon>-83.55016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67097</plant_id>
    <plant_name>Hy-Vee Customer Hosted 2.25MW Solar</plant_name>
    <state>IA</state>
    <county>Lucas</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.035595</lat>
    <lon>-93.33099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67383</plant_id>
    <plant_name>City of Milwaukee Landfill</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.933992</lat>
    <lon>-87.88856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67384</plant_id>
    <plant_name>ATI</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.94489</lat>
    <lon>-87.8599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67386</plant_id>
    <plant_name>Jones Dairy</plant_name>
    <state>WI</state>
    <county>Jefferson</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.919279</lat>
    <lon>-88.84786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67394</plant_id>
    <plant_name>Washington County</plant_name>
    <state>WI</state>
    <county>Washington</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.432593</lat>
    <lon>-88.16057</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67395</plant_id>
    <plant_name>UW Parkside</plant_name>
    <state>WI</state>
    <county>Kenosha</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.647691</lat>
    <lon>-87.85512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67403</plant_id>
    <plant_name>Altamont (NY) (CSG)</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.678742</lat>
    <lon>-73.94719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67430</plant_id>
    <plant_name>Lannon Stone</plant_name>
    <state>WI</state>
    <county>Waukesha</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.106984</lat>
    <lon>-88.22734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67540</plant_id>
    <plant_name>UW Kegonsa Customer Hosted Solar</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.95762</lat>
    <lon>-89.29236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67618</plant_id>
    <plant_name>Eddy</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.203233</lat>
    <lon>-77.20688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67705</plant_id>
    <plant_name>Janesville Community Solar</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.723717</lat>
    <lon>-89.02271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67746</plant_id>
    <plant_name>Highway 43 1887-WD</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.528089</lat>
    <lon>-119.311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68113</plant_id>
    <plant_name>SR Trenton</plant_name>
    <state>TN</state>
    <county>Gibson</county>
    <operator>SR Trenton, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.941786</lat>
    <lon>-88.94845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68434</plant_id>
    <plant_name>Downing Parkway Solar</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Downing Parkway Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.458418</lat>
    <lon>-73.19636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68444</plant_id>
    <plant_name>Antelope Creek</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>Antelope Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.468</lat>
    <lon>-122.833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68463</plant_id>
    <plant_name>Orchard Knob</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>Orchard Knob Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.947</lat>
    <lon>-123.31</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68538</plant_id>
    <plant_name>IL University Park 450 Central Ave</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Catalyze University Park Central Ave Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.453676</lat>
    <lon>-87.75003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68550</plant_id>
    <plant_name>Kelly Creek Solar</plant_name>
    <state>OR</state>
    <county>Josephine</county>
    <operator>Kelly Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.133852</lat>
    <lon>-123.6303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68642</plant_id>
    <plant_name>Randall Road Solar II</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.975947</lat>
    <lon>-73.92719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68755</plant_id>
    <plant_name>USS Cattail Solar</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>USS Cattail Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.854</lat>
    <lon>-90.1171</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68947</plant_id>
    <plant_name>Pivot Solar NY 3</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.485672</lat>
    <lon>-78.49916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68978</plant_id>
    <plant_name>Sunset Ridge Solar (CSG)</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Sunset Ridge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.281127</lat>
    <lon>-121.8124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69039</plant_id>
    <plant_name>Sutter Home Winery Westside</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>REC SHW, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.152145</lat>
    <lon>-121.4022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69334</plant_id>
    <plant_name>Johnson City BESS</plant_name>
    <state>TX</state>
    <county>Blanco</county>
    <operator>Pedernales Electric Coop, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <battery_mwh>4.5</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.300444</lat>
    <lon>-98.39833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69395</plant_id>
    <plant_name>Blue Barns</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.891</lat>
    <lon>-73.886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69443</plant_id>
    <plant_name>Union Solar LLC</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.707921</lat>
    <lon>-74.24851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69555</plant_id>
    <plant_name>Citrine NJ - West Pkwy</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.980949</lat>
    <lon>-74.30712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69563</plant_id>
    <plant_name>Las Positas College</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Chabot Las Positas Community College District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.71076</lat>
    <lon>-121.8001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69656</plant_id>
    <plant_name>950th Sun 2</plant_name>
    <state>IL</state>
    <county>Crawford</county>
    <operator>950th Sun 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.991226</lat>
    <lon>-87.69546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69788</plant_id>
    <plant_name>SPG IL Valley Run CSG</plant_name>
    <state>IL</state>
    <county>Kendall</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.473552</lat>
    <lon>-88.4373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69843</plant_id>
    <plant_name>Wild Cat Solar 22 LLC</plant_name>
    <state>IL</state>
    <county>Union</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.4729</lat>
    <lon>-89.224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70057</plant_id>
    <plant_name>GSPP 9557 E Rd S, LLC</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.880239</lat>
    <lon>-75.54162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70058</plant_id>
    <plant_name>GSPP 9605 E Rd N, LLC</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.877092</lat>
    <lon>-75.53879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70392</plant_id>
    <plant_name>NY - Ameresco - Southeast</plant_name>
    <state>NY</state>
    <county>Putnam</county>
    <operator>Lower Mine Road LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.372161</lat>
    <lon>-73.64334</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70411</plant_id>
    <plant_name>Rodeo Solar LLC (OR)</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>KSI III Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.3</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.114178</lat>
    <lon>-122.635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>788</plant_id>
    <plant_name>East Barnet</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>44.326335</lat>
    <lon>-72.03589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1501</plant_id>
    <plant_name>North Gorham</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Brookfield White Pine Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>43.802517</lat>
    <lon>-70.44992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1773</plant_id>
    <plant_name>Prickett</plant_name>
    <state>MI</state>
    <county>Baraga</county>
    <operator>Upper Peninsula Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>46.7261</lat>
    <lon>-88.6625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1856</plant_id>
    <plant_name>Hydro Plant</plant_name>
    <state>MI</state>
    <county>St Joseph</county>
    <operator>City of Sturgis - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1983</latest_year>
    <lat>41.9711</lat>
    <lon>-85.5381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2358</plant_id>
    <plant_name>Gorham</plant_name>
    <state>NH</state>
    <county>Coos</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1923</latest_year>
    <lat>44.408278</lat>
    <lon>-71.19535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3725</plant_id>
    <plant_name>Silver Lake (VT)</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>43.898584</lat>
    <lon>-73.05313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4043</plant_id>
    <plant_name>Appleton</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1916</first_year>
    <latest_year>1980</latest_year>
    <lat>44.25393</lat>
    <lon>-88.40956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6319</plant_id>
    <plant_name>Hooper Bay</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2018</latest_year>
    <lat>61.530858</lat>
    <lon>-166.1019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6341</plant_id>
    <plant_name>Selawik</plant_name>
    <state>AK</state>
    <county>Northwest Arctic</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2020</latest_year>
    <lat>66.606778</lat>
    <lon>-160.0148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7474</plant_id>
    <plant_name>Upper Sterling</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>City of Rock Falls - (IL)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>41.787115</lat>
    <lon>-89.67753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7548</plant_id>
    <plant_name>Causey</plant_name>
    <state>UT</state>
    <county>Weber</county>
    <operator>Weber Basin Water Conserv Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2021</latest_year>
    <lat>41.297229</lat>
    <lon>-111.5888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7807</plant_id>
    <plant_name>Hamilton Hydro</plant_name>
    <state>OH</state>
    <county>Butler</county>
    <operator>City of Hamilton - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>39.4128</lat>
    <lon>-84.5558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10219</plant_id>
    <plant_name>Middle Falls Hydro</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Boralex Hydro Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>43.098711</lat>
    <lon>-73.52527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10694</plant_id>
    <plant_name>Pepperell Hydro Power Plant</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1920</first_year>
    <latest_year>2006</latest_year>
    <lat>42.668889</lat>
    <lon>-71.57556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50382</plant_id>
    <plant_name>Twin Reservoirs</plant_name>
    <state>WA</state>
    <county>Walla Walla</county>
    <operator>City of Walla Walla - (WA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>46.088333</lat>
    <lon>-118.2547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56194</plant_id>
    <plant_name>Dike City Power Plant</plant_name>
    <state>IA</state>
    <county>Grundy</county>
    <operator>City of Dike - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>42.4622</lat>
    <lon>-92.6264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56546</plant_id>
    <plant_name>Cornelius Delivery No 1</plant_name>
    <state>NC</state>
    <county>Mecklenburg</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.483274</lat>
    <lon>-80.85692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56548</plant_id>
    <plant_name>Drexel Operations Center</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.7481</lat>
    <lon>-81.6072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56549</plant_id>
    <plant_name>Granite Falls Walmart</plant_name>
    <state>NC</state>
    <county>Caldwell</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.7811</lat>
    <lon>-81.3928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56550</plant_id>
    <plant_name>Huntersville Delivery No 2</plant_name>
    <state>NC</state>
    <county>Mecklenburg</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.383222</lat>
    <lon>-80.83288</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56551</plant_id>
    <plant_name>Landis Delivery No 2</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.541982</lat>
    <lon>-80.6123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56552</plant_id>
    <plant_name>Statesville Delivery No 3</plant_name>
    <state>NC</state>
    <county>Iredell</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.7972</lat>
    <lon>-80.8542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56696</plant_id>
    <plant_name>Eltopia Branch Canal 4.6</plant_name>
    <state>WA</state>
    <county>Franklin</county>
    <operator>Columbia Basin Hydropower</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>46.378381</lat>
    <lon>-119.2545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56894</plant_id>
    <plant_name>Ameresco Stafford</plant_name>
    <state>VA</state>
    <county>Stafford</county>
    <operator>AMERESCO Stafford LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.384167</lat>
    <lon>-77.41306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57102</plant_id>
    <plant_name>Whittier LFG Power Plant #1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>J&amp;A-Whittier LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2010</latest_year>
    <lat>33.9716</lat>
    <lon>-118.0481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57343</plant_id>
    <plant_name>Cargill B6 Biofactory</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Pico Energy, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.7167</lat>
    <lon>-114.6167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57365</plant_id>
    <plant_name>Mas Durham Power, LLC</plant_name>
    <state>NC</state>
    <county>Durham</county>
    <operator>Mas Durham Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>36.0311</lat>
    <lon>-78.86</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57481</plant_id>
    <plant_name>Chittenden County Solar Partners</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Chittenden County Solar Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.436111</lat>
    <lon>-73.14528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57636</plant_id>
    <plant_name>Auburn LFG Energy Facility</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>City of Auburn - (NY)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.944093</lat>
    <lon>-76.59394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57698</plant_id>
    <plant_name>Aerojet II</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.6086</lat>
    <lon>-121.1703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58011</plant_id>
    <plant_name>IKEA Savannah 490</plant_name>
    <state>GA</state>
    <county>Chatham</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2021</latest_year>
    <lat>32.177535</lat>
    <lon>-81.17378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58032</plant_id>
    <plant_name>Padelford Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.853333</lat>
    <lon>-71.065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58603</plant_id>
    <plant_name>Greenville Solar Plant</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Evergreen Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.256111</lat>
    <lon>-112.7358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59049</plant_id>
    <plant_name>Whitcomb Solar Farm</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>ERWR Whitcomb Farm Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.485556</lat>
    <lon>-73.13694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59477</plant_id>
    <plant_name>Claire Solar Farm</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Claire Solar Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>3.1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.426111</lat>
    <lon>-73.15639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59755</plant_id>
    <plant_name>Chester Power Partners</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.280929</lat>
    <lon>-72.59757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60074</plant_id>
    <plant_name>North Adams Landfill</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Syncarpha North Adams, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.669072</lat>
    <lon>-73.09204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60111</plant_id>
    <plant_name>Williamsburg Solar LLC VNEM CSG</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.387088</lat>
    <lon>-72.71344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60249</plant_id>
    <plant_name>Silicon Valley Clean Water</plant_name>
    <state>CA</state>
    <county>San Mateo</county>
    <operator>Silicon Valley Clean Water</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2020</latest_year>
    <lat>37.542619</lat>
    <lon>-122.2311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60411</plant_id>
    <plant_name>Coventry Photovoltaic, LLC</plant_name>
    <state>VT</state>
    <county>Orleans</county>
    <operator>Coventry Photovoltaic, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.910152</lat>
    <lon>-72.21975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60428</plant_id>
    <plant_name>CA Dept of Public Health at Richmond</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>California PV Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.92</lat>
    <lon>-122.344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60537</plant_id>
    <plant_name>Limerick Road Solar Farm</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Limerick Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.368889</lat>
    <lon>-73.24708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60848</plant_id>
    <plant_name>Temple Solar Arrays</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>UGI Energy Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.423484</lat>
    <lon>-75.92523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60890</plant_id>
    <plant_name>Warren DPC Solar</plant_name>
    <state>WI</state>
    <county>St Croix</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.95963</lat>
    <lon>-92.5182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61000</plant_id>
    <plant_name>King Mill</plant_name>
    <state>GA</state>
    <county>Richmond</county>
    <operator>Augusta Canal Authority</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1944</first_year>
    <latest_year>1944</latest_year>
    <lat>33.485245</lat>
    <lon>-81.9912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61244</plant_id>
    <plant_name>Shuman Solar</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.114918</lat>
    <lon>-71.06604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61338</plant_id>
    <plant_name>Mill Creek Solar (OR)</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.16964</lat>
    <lon>-123.1363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61340</plant_id>
    <plant_name>Next Generation Solar Farm</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.084824</lat>
    <lon>-73.22665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61349</plant_id>
    <plant_name>Westmont 400B</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.764227</lat>
    <lon>-118.2847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61354</plant_id>
    <plant_name>Princeton Solar Project</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.379736</lat>
    <lon>-74.62569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61515</plant_id>
    <plant_name>DG Camden LLC Holtec</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>DG Camden, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.910969</lat>
    <lon>-75.1186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61827</plant_id>
    <plant_name>Dayton Cutoff Solar</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.17</lat>
    <lon>-123.135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61828</plant_id>
    <plant_name>Valley Creek Solar</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.033</lat>
    <lon>-123.094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61829</plant_id>
    <plant_name>Silverton Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.014</lat>
    <lon>-122.807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61830</plant_id>
    <plant_name>Sheep Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.826</lat>
    <lon>-122.949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61831</plant_id>
    <plant_name>Colton Solar</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.17</lat>
    <lon>-122.473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61832</plant_id>
    <plant_name>Interstate Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.129</lat>
    <lon>-122.899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61835</plant_id>
    <plant_name>Grand Ronde Solar</plant_name>
    <state>OR</state>
    <county>Polk</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.054</lat>
    <lon>-123.61</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62003</plant_id>
    <plant_name>Saint Catherine of Siena Medical Center</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Saint Catherine of Siena Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>5</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1972</first_year>
    <latest_year>2002</latest_year>
    <lat>40.89952</lat>
    <lon>-73.27093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62169</plant_id>
    <plant_name>Boring Solar LLC</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Boring Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.431</lat>
    <lon>-122.285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62170</plant_id>
    <plant_name>Ballston Solar LLC</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>Ballston Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.077</lat>
    <lon>-123.395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62171</plant_id>
    <plant_name>Labish Solar LLC</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Labish Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.023</lat>
    <lon>-122.922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62472</plant_id>
    <plant_name>Washington St Community Solar Farm #1</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.173</lat>
    <lon>-77.846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62627</plant_id>
    <plant_name>Wadesboro 4</plant_name>
    <state>NC</state>
    <county>Anson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.102174</lat>
    <lon>-80.12202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62689</plant_id>
    <plant_name>Hellyer Solar Farm</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>County of Santa Clara - (CA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.286958</lat>
    <lon>-121.8151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62698</plant_id>
    <plant_name>Kaiser East La Palma Ave. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.85098</lat>
    <lon>-117.8453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62728</plant_id>
    <plant_name>MHG Wallingford</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.476875</lat>
    <lon>-72.98269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62824</plant_id>
    <plant_name>GSPP Devens, LLC</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.544219</lat>
    <lon>-71.58597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62834</plant_id>
    <plant_name>Podunk Road CSG</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.46806</lat>
    <lon>-76.65289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63068</plant_id>
    <plant_name>SCCCD - Fresno Community College</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.76655</lat>
    <lon>-119.7986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63206</plant_id>
    <plant_name>Rafael Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Rafael Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.859838</lat>
    <lon>-123.0079</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63207</plant_id>
    <plant_name>Case Creek Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Case Creek Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.172</lat>
    <lon>-122.912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63208</plant_id>
    <plant_name>Kale Patch Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Kale Patch Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.083</lat>
    <lon>-122.904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63212</plant_id>
    <plant_name>Battle Creek Solar</plant_name>
    <state>VT</state>
    <county>Bennington</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.9133</lat>
    <lon>-73.2142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63229</plant_id>
    <plant_name>Manheim New Jersey</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Cox Enterprises</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2013</latest_year>
    <lat>40.11359</lat>
    <lon>-74.70629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63235</plant_id>
    <plant_name>O'Neill Creek Solar</plant_name>
    <state>OR</state>
    <county>Washington</county>
    <operator>O'Neill Creek Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.472</lat>
    <lon>-123.129</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63443</plant_id>
    <plant_name>Thomas Creek Solar</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Neighborhood Power Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.131407</lat>
    <lon>-122.6195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63456</plant_id>
    <plant_name>St Louis Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Neighborhood Power Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.11994</lat>
    <lon>-122.9361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63462</plant_id>
    <plant_name>Pika Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.089244</lat>
    <lon>-122.7705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63464</plant_id>
    <plant_name>Brush Creek Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.984217</lat>
    <lon>-122.8131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63465</plant_id>
    <plant_name>Minke Solar</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.172332</lat>
    <lon>-122.6227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63466</plant_id>
    <plant_name>Drift Creek Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.970572</lat>
    <lon>-122.8035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63467</plant_id>
    <plant_name>Bighorn Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.965702</lat>
    <lon>-122.9542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63486</plant_id>
    <plant_name>D'Arrigo Brothers - Phase 4</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>CalCom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <battery_mwh>0.8</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.616</lat>
    <lon>-121.636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63627</plant_id>
    <plant_name>Scenic Hill Solar IV, LLC</plant_name>
    <state>AR</state>
    <county>Johnson</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.47056</lat>
    <lon>-93.4464</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63699</plant_id>
    <plant_name>AGT000 Stevens Creek Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.32489</lat>
    <lon>-121.9989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64034</plant_id>
    <plant_name>SulusSolar25</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.27</lat>
    <lon>-122.82</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64268</plant_id>
    <plant_name>Lawrence Brook</plant_name>
    <state>VT</state>
    <county>Lamoille</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.51701</lat>
    <lon>-72.62542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64443</plant_id>
    <plant_name>Golden Solar</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.43415</lat>
    <lon>-71.97124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64586</plant_id>
    <plant_name>Polk Cedartown</plant_name>
    <state>GA</state>
    <county>Polk</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.019643</lat>
    <lon>-85.28088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65197</plant_id>
    <plant_name>Medtronic - New Haven 2</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.339715</lat>
    <lon>-72.86503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65228</plant_id>
    <plant_name>Red Prairie Solar</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>TLS Capital, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.087389</lat>
    <lon>-123.4174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65253</plant_id>
    <plant_name>Chambers 4 - Rialto LGB8</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.12937</lat>
    <lon>-117.4055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65352</plant_id>
    <plant_name>MacKinnon Solar</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.5786</lat>
    <lon>-72.9573</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65361</plant_id>
    <plant_name>CalTech - Pasadena Wilson Ave</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.13818</lat>
    <lon>-118.1284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65408</plant_id>
    <plant_name>Gilead Oceanside Solar Project</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Gilead Sciences Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.213138</lat>
    <lon>-117.3042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65523</plant_id>
    <plant_name>CA-DGS-California Men's Colony</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.32554</lat>
    <lon>-120.6935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65563</plant_id>
    <plant_name>Robin NJ</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.19247</lat>
    <lon>-74.56597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65568</plant_id>
    <plant_name>Google Moffett Park Solar Project</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Google, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.405313</lat>
    <lon>-122.0175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65619</plant_id>
    <plant_name>ER Sand Hill</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.60689</lat>
    <lon>-73.18995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65767</plant_id>
    <plant_name>Gustavus</plant_name>
    <state>AK</state>
    <county>Skagway Hoonah Angoon</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2021</latest_year>
    <lat>58.419497</lat>
    <lon>-135.7074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66048</plant_id>
    <plant_name>Middleton Biogas Solar, LLC</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Middleton Biogas Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <battery_mwh>0.4</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.1233</lat>
    <lon>-89.5466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66095</plant_id>
    <plant_name>Cortez Solar 1, LLC</plant_name>
    <state>CO</state>
    <county>Montezuma</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.361706</lat>
    <lon>-108.5247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66275</plant_id>
    <plant_name>Summit - Oswego</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.37</lat>
    <lon>-76.46472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66608</plant_id>
    <plant_name>Craighead Electric Solar One</plant_name>
    <state>AR</state>
    <county>Craighead</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <battery_mwh>7.2</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2020</latest_year>
    <lat>35.922262</lat>
    <lon>-90.56723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66873</plant_id>
    <plant_name>Gray Solar</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.58</lat>
    <lon>-72.95304</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66997</plant_id>
    <plant_name>Monroe Solar</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>Monroe Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.85345</lat>
    <lon>-79.46991</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67031</plant_id>
    <plant_name>NY Hermon 1040 County Rd 21</plant_name>
    <state>NY</state>
    <county>St. Lawrence</county>
    <operator>Solitude Solar Russell County Rd 21 Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.432</lat>
    <lon>-75.21</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67290</plant_id>
    <plant_name>MEVS DOT 109</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>MEVS DOT, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.311409</lat>
    <lon>-69.81117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67382</plant_id>
    <plant_name>Harley-Davison Powertrain Operations</plant_name>
    <state>WI</state>
    <county>Waukesha</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.183349</lat>
    <lon>-88.09723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67612</plant_id>
    <plant_name>Glen Mary 2</plant_name>
    <state>NY</state>
    <county>Tioga</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.106054</lat>
    <lon>-76.29072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68407</plant_id>
    <plant_name>Martinsburg CSG LLC</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.7279</lat>
    <lon>-75.4697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68408</plant_id>
    <plant_name>Newark Solar 1 LLC</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.7296</lat>
    <lon>-74.1467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68922</plant_id>
    <plant_name>AVI Bakersfield</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Anthony Vineyards, Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.076494</lat>
    <lon>-118.9306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69085</plant_id>
    <plant_name>Orefield</plant_name>
    <state>PA</state>
    <county>Lehigh</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.651152</lat>
    <lon>-75.60024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69089</plant_id>
    <plant_name>Angell Road</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.5226</lat>
    <lon>-79.1345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69436</plant_id>
    <plant_name>Prologis Portside 2509 - SLSAV502</plant_name>
    <state>GA</state>
    <county>Chatham</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.122059</lat>
    <lon>-81.17755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69696</plant_id>
    <plant_name>Mount Olive Solar 3 LLC</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.898308</lat>
    <lon>-74.72232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70061</plant_id>
    <plant_name>AEDG CA I, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.698366</lat>
    <lon>-119.8083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70094</plant_id>
    <plant_name>Mid Counties DC 45 - sllax345</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.883541</lat>
    <lon>-118.0164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>296</plant_id>
    <plant_name>Fall Creek</plant_name>
    <state>CA</state>
    <county>Siskiyou</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1910</latest_year>
    <lat>41.985605</lat>
    <lon>-122.3605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1359</plant_id>
    <plant_name>Mother Ann Lee</plant_name>
    <state>KY</state>
    <county>Mercer</county>
    <operator>Lock 7 Hydro Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2008</latest_year>
    <lat>37.8297</lat>
    <lon>-84.7247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2303</plant_id>
    <plant_name>Spalding</plant_name>
    <state>NE</state>
    <county>Greeley</county>
    <operator>Village of Spalding - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1975</latest_year>
    <lat>41.68138</lat>
    <lon>-98.36756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6581</plant_id>
    <plant_name>Silvis</plant_name>
    <state>AK</state>
    <county>Ketchikan Gateway</county>
    <operator>Ketchikan Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1968</first_year>
    <latest_year>1968</latest_year>
    <lat>55.381402</lat>
    <lon>-131.5178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50322</plant_id>
    <plant_name>Site 980 65</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Madera-Chowchilla Power Auth</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>37.056803</lat>
    <lon>-119.8997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50408</plant_id>
    <plant_name>Park Mill</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1988</latest_year>
    <lat>45.1058</lat>
    <lon>-87.6514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50987</plant_id>
    <plant_name>Rock Creek I</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Shorock Hydro Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>42.632483</lat>
    <lon>-114.5388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54322</plant_id>
    <plant_name>Sibley Mill</plant_name>
    <state>GA</state>
    <county>Richmond</county>
    <operator>Augusta Canal Authority</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1946</first_year>
    <latest_year>1946</latest_year>
    <lat>33.487881</lat>
    <lon>-81.99252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54391</plant_id>
    <plant_name>Alice Falls Hydro Project</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>44.519153</lat>
    <lon>-73.46475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54515</plant_id>
    <plant_name>Seven Hills New Hampshire</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>Seven Hills New Hampshire</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.971653</lat>
    <lon>-71.87268</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54712</plant_id>
    <plant_name>Alliant SBD 9201 Norplex</plant_name>
    <state>IA</state>
    <county>Allamakee</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1988</first_year>
    <latest_year>2014</latest_year>
    <lat>43.0906</lat>
    <lon>-91.5542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54885</plant_id>
    <plant_name>Kimberly Mill</plant_name>
    <state>WI</state>
    <county>Outagamie</county>
    <operator>City of Kaukauna (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1926</first_year>
    <latest_year>1927</latest_year>
    <lat>44.2769</lat>
    <lon>-88.3344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55339</plant_id>
    <plant_name>Phoenix Wind Power LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Avangrid Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>33.916667</lat>
    <lon>-116.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55619</plant_id>
    <plant_name>Watchtower Educational Center</plant_name>
    <state>NY</state>
    <county>Putnam</county>
    <operator>Watchtower Bible &amp; Tract Soc-NY</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1993</first_year>
    <latest_year>2000</latest_year>
    <lat>41.498392</lat>
    <lon>-73.57456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56050</plant_id>
    <plant_name>Inner Harbor East Heating</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>Trigen Inner Harbor East, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>39.283677</lat>
    <lon>-76.59941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56827</plant_id>
    <plant_name>Marshall Wind 5 LLC</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Marshall Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>44.3303</lat>
    <lon>-95.8344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56828</plant_id>
    <plant_name>Marshall Wind 6 LLC</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Marshall Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>44.3308</lat>
    <lon>-95.8297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56840</plant_id>
    <plant_name>Marshall Wind 1 LLC</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Marshall Wind Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>44.3253</lat>
    <lon>-95.8142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57067</plant_id>
    <plant_name>Toksook Bay</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2019</latest_year>
    <lat>60.530142</lat>
    <lon>-165.1086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57248</plant_id>
    <plant_name>Welcome Wind Turbine</plant_name>
    <state>MN</state>
    <county>Martin</county>
    <operator>Federated Rural Electric Assn</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.6825</lat>
    <lon>-94.5892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57971</plant_id>
    <plant_name>SF Southeast Cogen Plant</plant_name>
    <state>CA</state>
    <county>San Francisco</county>
    <operator>City &amp; County of San Francisco - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>37.739722</lat>
    <lon>-122.3925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58014</plant_id>
    <plant_name>IKEA Perryville 460</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.560833</lat>
    <lon>-76.05528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58094</plant_id>
    <plant_name>Christmas Tree Shops DC Burlington NJ</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.104167</lat>
    <lon>-74.81278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58381</plant_id>
    <plant_name>Bryan Solar Field</plant_name>
    <state>OH</state>
    <county>Williams</county>
    <operator>City of Bryan - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.476389</lat>
    <lon>-84.58611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59416</plant_id>
    <plant_name>Anaheim Solar Energy Plant</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Anaheim Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.8025</lat>
    <lon>-117.9197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59905</plant_id>
    <plant_name>Merck</plant_name>
    <state>VA</state>
    <county>Rockingham</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.383222</lat>
    <lon>-78.64369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60038</plant_id>
    <plant_name>Owens Corning Headquarters</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>Luminace Solar Holding, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.6447</lat>
    <lon>-83.5364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60573</plant_id>
    <plant_name>HQC Rock River Solar Power Gen Station</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>HQC Rock River Solar Power Generation Station LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.578831</lat>
    <lon>-89.03302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61730</plant_id>
    <plant_name>MA Solar Storage 1 Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Origis Energy USA, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.450729</lat>
    <lon>-71.74263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63368</plant_id>
    <plant_name>GSPP Gilman, LLC</plant_name>
    <state>VT</state>
    <county>Essex</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.414773</lat>
    <lon>-71.71448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63644</plant_id>
    <plant_name>Wyckoff Heights Medical Center</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Wyckoff Heights Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2025</latest_year>
    <lat>40.70412</lat>
    <lon>-73.91773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64584</plant_id>
    <plant_name>Fountain Folkston</plant_name>
    <state>GA</state>
    <county>Charlton</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.916375</lat>
    <lon>-81.96023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64585</plant_id>
    <plant_name>Harris Shiloh</plant_name>
    <state>GA</state>
    <county>Harris</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.797582</lat>
    <lon>-84.69659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64601</plant_id>
    <plant_name>County of San Diego COC Hybrid</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Solar Star California LXXVIII, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.833645</lat>
    <lon>-117.1311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64863</plant_id>
    <plant_name>ER Salvage Yard</plant_name>
    <state>VT</state>
    <county>Lamoille</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.54628</lat>
    <lon>-72.61194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65166</plant_id>
    <plant_name>ER Center Road Solar, LLC</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.50819</lat>
    <lon>-72.34633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65406</plant_id>
    <plant_name>LGE-KU Solar Share Facility Simpsonville</plant_name>
    <state>KY</state>
    <county>Shelby</county>
    <operator>Kentucky Utilities Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.216484</lat>
    <lon>-85.39143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65622</plant_id>
    <plant_name>Absegami</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.48</lat>
    <lon>-74.516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66142</plant_id>
    <plant_name>Kaiser - Harbor City</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.788034</lat>
    <lon>-118.2955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66732</plant_id>
    <plant_name>Lightstar Renewables - Project 1002</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.807744</lat>
    <lon>-73.90351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66966</plant_id>
    <plant_name>Acton-Boxborough Schools BESS</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>MSS Energy Holdings, LLC (d.b.a. Calibrant Energy)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <battery_mwh>4.3</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.479555</lat>
    <lon>-71.45808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67293</plant_id>
    <plant_name>EDF - Liberty NY - Real Term CSG</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>ESNY-RT-ELMSFORD, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.066468</lat>
    <lon>-73.82251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67491</plant_id>
    <plant_name>Mount Dora Solar Farm F</plant_name>
    <state>FL</state>
    <county>Lake</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>28.815358</lat>
    <lon>-81.68239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68749</plant_id>
    <plant_name>Superior Almond Hulling</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Renewable Solar, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.442188</lat>
    <lon>-120.3874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69037</plant_id>
    <plant_name>Riley III - Site 6 Community Solar</plant_name>
    <state>KS</state>
    <county>Riley</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.082862</lat>
    <lon>-96.8228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69210</plant_id>
    <plant_name>Salem Henningsen</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Lineage Logistics Solar PV - Salem OR</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.890515</lat>
    <lon>-122.972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69408</plant_id>
    <plant_name>Burlingame Solar Community Solar</plant_name>
    <state>OR</state>
    <county>Linn</county>
    <operator>Burlingame Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.387836</lat>
    <lon>-123.0126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69833</plant_id>
    <plant_name>Bayonne Solar 2 LLC (CSG)</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.666289</lat>
    <lon>-74.10646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69943</plant_id>
    <plant_name>Sheffield Hewins</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.065782</lat>
    <lon>-73.31773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70143</plant_id>
    <plant_name>RE Sidney Solar, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>SREOG Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.42426</lat>
    <lon>-69.75738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70573</plant_id>
    <plant_name>SU165</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2.1</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.701917</lat>
    <lon>-75.37348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>397</plant_id>
    <plant_name>Franklin (CA)</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>34.103931</lat>
    <lon>-118.4134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>551</plant_id>
    <plant_name>Scotland Dam</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>FirstLight Power Resources Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1937</first_year>
    <latest_year>1937</latest_year>
    <lat>41.6651</lat>
    <lon>-72.1221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1132</plant_id>
    <plant_name>Coggon</plant_name>
    <state>IA</state>
    <county>Linn</county>
    <operator>Coggon Municipal Light Plant - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>42.280827</lat>
    <lon>-91.53271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1177</plant_id>
    <plant_name>Primghar</plant_name>
    <state>IA</state>
    <county>O'Brien</county>
    <operator>City of Primghar - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.08713</lat>
    <lon>-95.62596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1956</plant_id>
    <plant_name>Adrian</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Adrian Public Utilities Comm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>43.63711</lat>
    <lon>-95.93279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1972</plant_id>
    <plant_name>Fairfax</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>City of Fairfax - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.525887</lat>
    <lon>-94.71881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2196</plant_id>
    <plant_name>Old Faithful</plant_name>
    <state>WY</state>
    <county>Teton</county>
    <operator>NorthWestern Energy (MT wind/thermal)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>44.4533</lat>
    <lon>-110.8347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2544</plant_id>
    <plant_name>Belfort</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1903</first_year>
    <latest_year>1918</latest_year>
    <lat>43.9275</lat>
    <lon>-75.3331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2559</plant_id>
    <plant_name>Elmer</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1916</first_year>
    <latest_year>1916</latest_year>
    <lat>43.927536</lat>
    <lon>-75.28832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2564</plant_id>
    <plant_name>Franklin (NY)</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1926</latest_year>
    <lat>44.4372</lat>
    <lon>-73.9725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2591</plant_id>
    <plant_name>Norwood</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>44.7439</lat>
    <lon>-75.0042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2601</plant_id>
    <plant_name>Raymondville</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>1928</first_year>
    <latest_year>1928</latest_year>
    <lat>44.835</lat>
    <lon>-74.9803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2607</plant_id>
    <plant_name>Schuylerville</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1919</latest_year>
    <lat>43.096823</lat>
    <lon>-73.58211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2608</plant_id>
    <plant_name>Sewalls</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>43.9775</lat>
    <lon>-75.8942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2624</plant_id>
    <plant_name>Yaleville</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1940</latest_year>
    <lat>44.7661</lat>
    <lon>-74.9997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3321</plant_id>
    <plant_name>Spillway</plant_name>
    <state>SC</state>
    <county>Berkeley</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1950</latest_year>
    <lat>33.453759</lat>
    <lon>-80.16399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3651</plant_id>
    <plant_name>Granite</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1896</first_year>
    <latest_year>1896</latest_year>
    <lat>40.619173</lat>
    <lon>-111.7821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3714</plant_id>
    <plant_name>Glen</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>43.6367</lat>
    <lon>-72.976</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6283</plant_id>
    <plant_name>Seldovia</plant_name>
    <state>AK</state>
    <county>Kenai Peninsula</county>
    <operator>Homer Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2025</latest_year>
    <lat>59.439542</lat>
    <lon>-151.7134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6299</plant_id>
    <plant_name>Unalakleet</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Unalakleet Valley Elec Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>63.876789</lat>
    <lon>-160.7904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7118</plant_id>
    <plant_name>Cataract (MI)</plant_name>
    <state>MI</state>
    <county>Marquette</county>
    <operator>Cataract Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>46.3156</lat>
    <lon>-87.5128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7463</plant_id>
    <plant_name>Hoonah</plant_name>
    <state>AK</state>
    <county>Skagway Hoonah Angoon</county>
    <operator>Inside Passage Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2012</latest_year>
    <lat>58.106432</lat>
    <lon>-135.4307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7507</plant_id>
    <plant_name>Deadwood Creek</plant_name>
    <state>CA</state>
    <county>Yuba</county>
    <operator>Hydro Sierra Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>39.53</lat>
    <lon>-121.0958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7920</plant_id>
    <plant_name>Traer South</plant_name>
    <state>IA</state>
    <county>Tama</county>
    <operator>City of Traer - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.1925</lat>
    <lon>-92.4747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10128</plant_id>
    <plant_name>Gosselin Hydro Plant</plant_name>
    <state>CA</state>
    <county>Trinity</county>
    <operator>Humboldt Bay Mun Water Dist</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>40.37</lat>
    <lon>-123.4347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10138</plant_id>
    <plant_name>South Dry Creek Hydro</plant_name>
    <state>MT</state>
    <county>Carbon</county>
    <operator>Hydrodynamics Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>45.206341</lat>
    <lon>-109.1652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10408</plant_id>
    <plant_name>Clark University</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Clark University</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.2508</lat>
    <lon>-71.8226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10412</plant_id>
    <plant_name>Kalaheo Hydro</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>BBCP Kauai Operating LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>21.936075</lat>
    <lon>-159.5286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10799</plant_id>
    <plant_name>Pelzer Upper</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>34.642371</lat>
    <lon>-82.45444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10881</plant_id>
    <plant_name>Roaring Creek Water Power</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Shasta Hydroelectric Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>40.882061</lat>
    <lon>-121.9484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50360</plant_id>
    <plant_name>Michell Butte Power Project</plant_name>
    <state>OR</state>
    <county>Malheur</county>
    <operator>Owyhee Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>43.771896</lat>
    <lon>-117.155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50439</plant_id>
    <plant_name>Oconto Falls Lower</plant_name>
    <state>WI</state>
    <county>Oconto</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1971</latest_year>
    <lat>44.8719</lat>
    <lon>-88.1439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54142</plant_id>
    <plant_name>Hillcrest Pump Station</plant_name>
    <state>CO</state>
    <county>Denver</county>
    <operator>Denver City &amp; County of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>39.6419</lat>
    <lon>-104.9138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54341</plant_id>
    <plant_name>Four Mile Hydropower Project</plant_name>
    <state>MI</state>
    <county>Alpena</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2005</latest_year>
    <lat>45.0933</lat>
    <lon>-83.5025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54406</plant_id>
    <plant_name>Capitol Heat and Power</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>State of Wisconsin</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.078512</lat>
    <lon>-89.37726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54573</plant_id>
    <plant_name>Wappinger Falls Hydroelectric</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Windsor Machinery Co Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>41.598395</lat>
    <lon>-73.92204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55824</plant_id>
    <plant_name>MNDOT Standby Generation</plant_name>
    <state>MN</state>
    <county>Ramsey</county>
    <operator>State of Minnesota Department of Administration</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>44.953014</lat>
    <lon>-93.10569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56055</plant_id>
    <plant_name>Hana Substation</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Maui Electric Co Ltd</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>20.765833</lat>
    <lon>-155.9961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56138</plant_id>
    <plant_name>Anderson Erickson</plant_name>
    <state>IA</state>
    <county>Polk</county>
    <operator>Anderson Erickson Dairy</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>41.6014</lat>
    <lon>-93.5765</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56199</plant_id>
    <plant_name>TG Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>TG Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.9897</lat>
    <lon>-96.2236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56200</plant_id>
    <plant_name>CG Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>CG Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.9931</lat>
    <lon>-96.2186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56201</plant_id>
    <plant_name>Bisson Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Bisson Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.984444</lat>
    <lon>-96.21944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56202</plant_id>
    <plant_name>Tofteland Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Tofteland Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.980278</lat>
    <lon>-96.22333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56203</plant_id>
    <plant_name>Westridge Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Westridge Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.988611</lat>
    <lon>-96.21556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56204</plant_id>
    <plant_name>Fey Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Fey Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.0364</lat>
    <lon>-96.0736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56205</plant_id>
    <plant_name>Windcurrent Farms LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Windcurrent Farms LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.0236</lat>
    <lon>-96.0789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56206</plant_id>
    <plant_name>K-Brink Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>K-brink Windfarm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.0197</lat>
    <lon>-96.1183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56207</plant_id>
    <plant_name>DL Windy Acres LLC</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>Brewster</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.651389</lat>
    <lon>-95.36861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56208</plant_id>
    <plant_name>S&amp;P Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>Brewster</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.651389</lat>
    <lon>-95.3825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56209</plant_id>
    <plant_name>Boeve Windfarm LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Boeve Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>44.05</lat>
    <lon>-96.0933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56210</plant_id>
    <plant_name>B&amp;K Energy Systems LLC</plant_name>
    <state>MN</state>
    <county>Jackson</county>
    <operator>Brewster</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>43.651389</lat>
    <lon>-95.3755</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56242</plant_id>
    <plant_name>Kindred School</plant_name>
    <state>ND</state>
    <county>Cass</county>
    <operator>Kindred Public School</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>46.64974</lat>
    <lon>-97.00953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56265</plant_id>
    <plant_name>South Fork</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>55.563333</lat>
    <lon>-132.8911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56288</plant_id>
    <plant_name>Salem Water Plant</plant_name>
    <state>VA</state>
    <county>Salem City</county>
    <operator>City of Salem - (VA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>37.2875</lat>
    <lon>-80.0771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56421</plant_id>
    <plant_name>PS ST-8 Engine No 1</plant_name>
    <state>OH</state>
    <county>Franklin</county>
    <operator>City of Columbus - (OH)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.961419</lat>
    <lon>-83.04907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56423</plant_id>
    <plant_name>Dodge Park Engine No 1</plant_name>
    <state>OH</state>
    <county>Franklin</county>
    <operator>City of Columbus - (OH)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.952367</lat>
    <lon>-83.01443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56504</plant_id>
    <plant_name>Municipal Power Plant</plant_name>
    <state>MI</state>
    <county>Ottawa</county>
    <operator>City of Zeeland - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>42.8129</lat>
    <lon>-86.0335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56598</plant_id>
    <plant_name>Walton Street Substation</plant_name>
    <state>MO</state>
    <county>St Francois</county>
    <operator>City of Farmington - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>37.7881</lat>
    <lon>-90.4336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56704</plant_id>
    <plant_name>Gouldtown</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Northbrook Lyons Falls LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1953</first_year>
    <latest_year>1953</latest_year>
    <lat>43.612619</lat>
    <lon>-75.33907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56888</plant_id>
    <plant_name>Warren County Solar</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.788957</lat>
    <lon>-75.10697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56900</plant_id>
    <plant_name>Atlantic City Convention Center</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Luminace Solar New Jersey, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.3639</lat>
    <lon>-74.4408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56915</plant_id>
    <plant_name>SAS Solar Farm</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>SAS Institute Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2026</latest_year>
    <lat>35.8136</lat>
    <lon>-78.7503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57041</plant_id>
    <plant_name>Vaca Dixon Solar Station</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.4106</lat>
    <lon>-121.9264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57055</plant_id>
    <plant_name>Stebbins</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>63.521047</lat>
    <lon>-162.2863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57066</plant_id>
    <plant_name>Kasigluk</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2017</latest_year>
    <lat>60.8731</lat>
    <lon>-162.5197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57176</plant_id>
    <plant_name>University of Delaware Wind Turbine</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>First State Marine Wind</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.782931</lat>
    <lon>-75.1649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57308</plant_id>
    <plant_name>Maclay Solar Project</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.319722</lat>
    <lon>-118.4308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57362</plant_id>
    <plant_name>Morgantown Solar Park</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>The Hankin Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.152069</lat>
    <lon>-75.86592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57488</plant_id>
    <plant_name>Lebanon Solar</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.675833</lat>
    <lon>-74.91222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57509</plant_id>
    <plant_name>Carson Solar I</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Carson Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>38.7228</lat>
    <lon>-104.7817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57567</plant_id>
    <plant_name>Albuquerque Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>PNM Resources</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.168957</lat>
    <lon>-106.6001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57607</plant_id>
    <plant_name>Ward WTP</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>City Of High Point - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>35.9678</lat>
    <lon>-79.9708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57624</plant_id>
    <plant_name>Norwich WWTP</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>City of Norwich - (CT)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>41.5256</lat>
    <lon>-72.0833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57626</plant_id>
    <plant_name>Foundation ST</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Foundation HA Energy Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>37.714167</lat>
    <lon>-121.5217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57715</plant_id>
    <plant_name>Watkins Manufacturing Co.</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Watkins Manufacturing Corporation</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>33.143847</lat>
    <lon>-117.2369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57747</plant_id>
    <plant_name>FedEx Field Solar Facility</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>NW Stadium Solar Plant</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.907778</lat>
    <lon>-76.86444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57754</plant_id>
    <plant_name>Frederick County LFGTE Facility</plant_name>
    <state>VA</state>
    <county>Frederick</county>
    <operator>Frederick County Virginia</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.140833</lat>
    <lon>-78.0975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57776</plant_id>
    <plant_name>FedEx Woodbridge</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.506358</lat>
    <lon>-74.32352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57838</plant_id>
    <plant_name>Dartmouth II Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.680556</lat>
    <lon>-71.03083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57933</plant_id>
    <plant_name>Solar Star California II LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Solar Star California II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.516389</lat>
    <lon>-121.4753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57934</plant_id>
    <plant_name>Douglas Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.06</lat>
    <lon>-71.73</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58015</plant_id>
    <plant_name>IKEA College Park 411</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2021</latest_year>
    <lat>39.021</lat>
    <lon>-76.926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58052</plant_id>
    <plant_name>Battle Creek Mill</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>RockTenn-Battle Creek Mill</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>42.3221</lat>
    <lon>-85.2043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58073</plant_id>
    <plant_name>SEPV 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.618861</lat>
    <lon>-117.9394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58074</plant_id>
    <plant_name>SEPV 2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.174167</lat>
    <lon>-116.1528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58113</plant_id>
    <plant_name>Foundation RRM</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Foundation CA Fund V Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.917222</lat>
    <lon>-116.815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58123</plant_id>
    <plant_name>Wakefern Food Corp</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.51</lat>
    <lon>-74.32833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58134</plant_id>
    <plant_name>Oberlin Spear Point Solar One</plant_name>
    <state>OH</state>
    <county>Lorain</county>
    <operator>Oberlin College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.302761</lat>
    <lon>-82.22705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58144</plant_id>
    <plant_name>SVEP Solar Project Company</plant_name>
    <state>VT</state>
    <county>Bennington</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.753611</lat>
    <lon>-73.22611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58145</plant_id>
    <plant_name>Williamstown Solar</plant_name>
    <state>VT</state>
    <county>Orange</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.113056</lat>
    <lon>-72.60583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58150</plant_id>
    <plant_name>Black Cap Solar Plant</plant_name>
    <state>OR</state>
    <county>Lake</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.17505</lat>
    <lon>-120.3626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58174</plant_id>
    <plant_name>Wilson Solar (MA)</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.264167</lat>
    <lon>-71.98</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58193</plant_id>
    <plant_name>Bonanza BioEnergy LLC</plant_name>
    <state>KS</state>
    <county>Finney</county>
    <operator>Bonanza BioEnergy LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>37.9586</lat>
    <lon>-100.8361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58204</plant_id>
    <plant_name>Grassland 3&amp;4 Solar Project</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>Yolo County of - (CA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.500278</lat>
    <lon>-121.6942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58217</plant_id>
    <plant_name>Grassland 1&amp;2 Solar Project</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>Yolo County of - (CA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.500278</lat>
    <lon>-121.6942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58360</plant_id>
    <plant_name>Atlantic Coast Freezers Solar Facility</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>CVI CleanCapital Solar 4 LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.519935</lat>
    <lon>-75.02904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58387</plant_id>
    <plant_name>CES Sterling LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.441944</lat>
    <lon>-71.72222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58392</plant_id>
    <plant_name>Flint Creek Hydroelectric LLC</plant_name>
    <state>MT</state>
    <county>Granite</county>
    <operator>Hydrodynamics Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>46.2275</lat>
    <lon>-113.2947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58411</plant_id>
    <plant_name>Orange PV</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.585</lat>
    <lon>-72.29389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58445</plant_id>
    <plant_name>Arrache 4006</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.655</lat>
    <lon>-118.0511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58454</plant_id>
    <plant_name>Watts 3115</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.600833</lat>
    <lon>-117.6422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58479</plant_id>
    <plant_name>SEV NM Phase 2</plant_name>
    <state>NM</state>
    <county>Chaves</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.351111</lat>
    <lon>-104.5069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58529</plant_id>
    <plant_name>Progress Manis I</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>USF Surry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.756389</lat>
    <lon>-79.44722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58531</plant_id>
    <plant_name>North Carolina Solar Bethea I</plant_name>
    <state>NC</state>
    <county>Scotland</county>
    <operator>USF Surry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.704722</lat>
    <lon>-79.52583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58543</plant_id>
    <plant_name>Gilbert Solar Facility I, LLC</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Gilbert Solar Facility I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.355862</lat>
    <lon>-111.8024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58550</plant_id>
    <plant_name>Owens Corning at Bethlehem</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Luminace Solar Holding, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.586944</lat>
    <lon>-73.865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58558</plant_id>
    <plant_name>Onslow Power Producers</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>Cube District Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.7975</lat>
    <lon>-77.54306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58586</plant_id>
    <plant_name>Town of East Bridgewater CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.051111</lat>
    <lon>-70.95583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58617</plant_id>
    <plant_name>Water Reclamation Plant</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>City of Rochester - (MN)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2008</latest_year>
    <lat>44.064722</lat>
    <lon>-92.46917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58631</plant_id>
    <plant_name>Queen Anne's County</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.031667</lat>
    <lon>-76.01639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58699</plant_id>
    <plant_name>ABEC Bidart-Old River LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>ABEC Bidart-Old River LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.169722</lat>
    <lon>-119.1056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58761</plant_id>
    <plant_name>Expressway Solar A</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.582222</lat>
    <lon>-117.3417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58762</plant_id>
    <plant_name>Expressway Solar B</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.583333</lat>
    <lon>-117.3403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58787</plant_id>
    <plant_name>Dennison</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>CD US Solar MT1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.763056</lat>
    <lon>-73.32361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58801</plant_id>
    <plant_name>Arba Solar, LLC</plant_name>
    <state>NC</state>
    <county>Greene</county>
    <operator>Leyline Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.396389</lat>
    <lon>-77.70361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58802</plant_id>
    <plant_name>Franklin Solar, LLC</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>Leyline Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.0975</lat>
    <lon>-78.16778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58803</plant_id>
    <plant_name>Kenansville Solar 2, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.957778</lat>
    <lon>-77.98167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58849</plant_id>
    <plant_name>Castalia Solar</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.0939</lat>
    <lon>-77.78333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58909</plant_id>
    <plant_name>Ramona 1</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.012222</lat>
    <lon>-116.875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58935</plant_id>
    <plant_name>Open View Solar Farm</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Cross Pollination Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.139444</lat>
    <lon>-73.20389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58937</plant_id>
    <plant_name>Gardner Solar 1</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Gardner Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.586389</lat>
    <lon>-72.03083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58964</plant_id>
    <plant_name>Technology Drive Solar</plant_name>
    <state>VT</state>
    <county>Windham</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.876111</lat>
    <lon>-72.56583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58974</plant_id>
    <plant_name>Fairview Farms Solar</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.459722</lat>
    <lon>-72.61028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59015</plant_id>
    <plant_name>Stow PV</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.436944</lat>
    <lon>-71.50611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59018</plant_id>
    <plant_name>East Chicago</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.632222</lat>
    <lon>-87.46917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59019</plant_id>
    <plant_name>Griffith</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.521389</lat>
    <lon>-87.43611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59029</plant_id>
    <plant_name>Rehoboth Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.901667</lat>
    <lon>-71.2425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59039</plant_id>
    <plant_name>Beulaville</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.9</lat>
    <lon>-77.78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59042</plant_id>
    <plant_name>Ellerbe</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.1</lat>
    <lon>-79.73</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59043</plant_id>
    <plant_name>West Davisville Solar</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.603611</lat>
    <lon>-71.47722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59050</plant_id>
    <plant_name>Wallace</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.75813</lat>
    <lon>-77.97173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59051</plant_id>
    <plant_name>Kenansville</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.96</lat>
    <lon>-78.04</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59059</plant_id>
    <plant_name>Raritan ITS</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Janssen Pharmaceutical Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.574444</lat>
    <lon>-74.65417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59090</plant_id>
    <plant_name>Rockland Solar CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.089167</lat>
    <lon>-70.89778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59106</plant_id>
    <plant_name>Snow Hill Solar 2 LLC</plant_name>
    <state>NC</state>
    <county>Greene</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.444167</lat>
    <lon>-77.64944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59114</plant_id>
    <plant_name>Redmon Solar Farm LLC</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.710833</lat>
    <lon>-80.66583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59119</plant_id>
    <plant_name>Warsaw I</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.01</lat>
    <lon>-78.11</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59120</plant_id>
    <plant_name>Warsaw II</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.01</lat>
    <lon>-78.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59125</plant_id>
    <plant_name>Kinston</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.370556</lat>
    <lon>-77.60833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59189</plant_id>
    <plant_name>East Wayne Solar LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.441667</lat>
    <lon>-77.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59190</plant_id>
    <plant_name>Vickers</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.823333</lat>
    <lon>-79.08028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59242</plant_id>
    <plant_name>Beverly</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Integrys MA Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.59</lat>
    <lon>-70.91194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59333</plant_id>
    <plant_name>Faison Solar</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>USF Surry, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.069722</lat>
    <lon>-78.11611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59375</plant_id>
    <plant_name>Rose Hill</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.823889</lat>
    <lon>-77.96972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59376</plant_id>
    <plant_name>Dunn</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.34854</lat>
    <lon>-78.5532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59383</plant_id>
    <plant_name>East Kansas Agri-Energy, LLC</plant_name>
    <state>KS</state>
    <county>Anderson</county>
    <operator>East Kansas Agri-Energy, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>38.2725</lat>
    <lon>-95.24028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59393</plant_id>
    <plant_name>Eubank Landfill Solar Array</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Suncore Photovoltaics, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.049167</lat>
    <lon>-106.53</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59406</plant_id>
    <plant_name>Facile Solar</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>Facile Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.098889</lat>
    <lon>-79.49389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59445</plant_id>
    <plant_name>St. Albans SPEED Project</plant_name>
    <state>VT</state>
    <county>Franklin</county>
    <operator>St. Albans Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>44.787778</lat>
    <lon>-73.08861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59463</plant_id>
    <plant_name>Ayers Village Solar</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.791944</lat>
    <lon>-71.1775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59468</plant_id>
    <plant_name>KS Solar Six LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Kearsarge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.470833</lat>
    <lon>-72.045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59476</plant_id>
    <plant_name>Clarendon Solar Farm</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Clarendon Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.539722</lat>
    <lon>-72.95583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59550</plant_id>
    <plant_name>Putah Creek Solar Farm</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>Solvida Energy Group/Blue Oak Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.521111</lat>
    <lon>-121.9939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59552</plant_id>
    <plant_name>FLS Solar 170, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.6</lat>
    <lon>-78.97</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59553</plant_id>
    <plant_name>Innovative Solar 14, LLC</plant_name>
    <state>NC</state>
    <county>Henderson</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.368889</lat>
    <lon>-82.3575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59554</plant_id>
    <plant_name>Innovative Solar 15, LLC</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.319444</lat>
    <lon>-81.76417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59579</plant_id>
    <plant_name>Franklin Solar 2</plant_name>
    <state>NC</state>
    <county>Franklin</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.126944</lat>
    <lon>-78.1525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59623</plant_id>
    <plant_name>Clarkson Solar</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.671944</lat>
    <lon>-74.94944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59625</plant_id>
    <plant_name>Chicopee River Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.150278</lat>
    <lon>-72.55222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59639</plant_id>
    <plant_name>631-56 Airport Owner, LLC</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>631-56 Airport Owner, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.745556</lat>
    <lon>-71.11722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59705</plant_id>
    <plant_name>Steel Sun</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.812811</lat>
    <lon>-78.84531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59719</plant_id>
    <plant_name>Charlotte Solar LLC VT</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.321972</lat>
    <lon>-73.19761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59727</plant_id>
    <plant_name>Bull Street Plant</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>City of Orangeburg - (SC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>33.489767</lat>
    <lon>-80.87027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59728</plant_id>
    <plant_name>Substation 20 Plant</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>City of Orangeburg - (SC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.440183</lat>
    <lon>-80.8417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59730</plant_id>
    <plant_name>SEPV 18</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.613602</lat>
    <lon>-117.9344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59746</plant_id>
    <plant_name>DSH (CA) - Coalinga State Hospital</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Team-Solar, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.13726</lat>
    <lon>-120.2185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59749</plant_id>
    <plant_name>UMES (MD) - Princess Anne</plant_name>
    <state>MD</state>
    <county>Somerset</county>
    <operator>NVT LICENSES, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.20257</lat>
    <lon>-75.6764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59763</plant_id>
    <plant_name>Robeson County LFG to Energy</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Robeson County Landfill - (NC)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2015</latest_year>
    <lat>34.791</lat>
    <lon>-78.9088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59765</plant_id>
    <plant_name>Stetson Road Solar - Barre I</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Kearsarge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.4029</lat>
    <lon>-72.1027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59770</plant_id>
    <plant_name>IMPA Pendleton Solar Park</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.988564</lat>
    <lon>-85.77086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59777</plant_id>
    <plant_name>RGS-Rutland VNM SREC II Project (MA)</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>TerraForm Solar XVII, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.43177</lat>
    <lon>-71.97819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59822</plant_id>
    <plant_name>201 Sturbridge B</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.109143</lat>
    <lon>-72.17119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59848</plant_id>
    <plant_name>Pikes Peak Solar Garden 1 LLC CSG</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>Pikes Peak Solar Garden 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.7745</lat>
    <lon>-104.7458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59880</plant_id>
    <plant_name>Kings Park Solar I</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.868294</lat>
    <lon>-73.24928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59881</plant_id>
    <plant_name>Kings Park Solar II</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.868294</lat>
    <lon>-73.24928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59908</plant_id>
    <plant_name>Mount Olive Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.18</lat>
    <lon>-78.098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59911</plant_id>
    <plant_name>Philip Morris</plant_name>
    <state>VA</state>
    <county>Chesterfield</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.341838</lat>
    <lon>-77.28703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60004</plant_id>
    <plant_name>Clarkstown Landfill Solar Facility</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Clarkstown Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.100409</lat>
    <lon>-73.95159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60055</plant_id>
    <plant_name>Innovative Solar 16</plant_name>
    <state>NC</state>
    <county>Henderson</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.363863</lat>
    <lon>-82.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60072</plant_id>
    <plant_name>Neisler Street Solar</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Neisler Street Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.289757</lat>
    <lon>-81.56888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60073</plant_id>
    <plant_name>Leominster</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Massachusetts, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.561568</lat>
    <lon>-71.75545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60098</plant_id>
    <plant_name>Onondaga County - Oak Orchard WWTP</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.172719</lat>
    <lon>-76.13012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60101</plant_id>
    <plant_name>Shelby Randolph Road Solar 1, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.309229</lat>
    <lon>-81.58844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60105</plant_id>
    <plant_name>Lafayette Solar I, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.232396</lat>
    <lon>-81.56425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60107</plant_id>
    <plant_name>York Road Solar I, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.222208</lat>
    <lon>-81.3337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60129</plant_id>
    <plant_name>Red Toad 1425 A Powatan Road, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.604208</lat>
    <lon>-78.37088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60134</plant_id>
    <plant_name>Nashville Farms, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.034354</lat>
    <lon>-78.01061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60150</plant_id>
    <plant_name>Cornell Geneva Solar Farm</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.866</lat>
    <lon>-77.031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60182</plant_id>
    <plant_name>Dulles</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.030119</lat>
    <lon>-117.5178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60183</plant_id>
    <plant_name>Freeway Springs</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.892614</lat>
    <lon>-118.0376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60199</plant_id>
    <plant_name>County Home Solar Center, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Heelstone Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.263255</lat>
    <lon>-81.50868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60200</plant_id>
    <plant_name>Laurinburg Solar, LLC (Heelstone)</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.707644</lat>
    <lon>-79.29538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60232</plant_id>
    <plant_name>Onondaga County- Jamesville</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.986644</lat>
    <lon>-76.06422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60251</plant_id>
    <plant_name>IMPA Huntingburg Solar Park</plant_name>
    <state>IN</state>
    <county>Dubois</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.319623</lat>
    <lon>-86.96807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60274</plant_id>
    <plant_name>CED Westfield Solar, LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.175625</lat>
    <lon>-72.75518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60275</plant_id>
    <plant_name>Westside Solar Power PV1</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Westside Assets LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.219</lat>
    <lon>-119.907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60344</plant_id>
    <plant_name>Sudbury Solar</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.833</lat>
    <lon>-73.192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60348</plant_id>
    <plant_name>O'Shea Solar Farm</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.378001</lat>
    <lon>-83.20006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60353</plant_id>
    <plant_name>Cecil County CCVT HS</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>SunE DB42, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.651002</lat>
    <lon>-75.80833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60427</plant_id>
    <plant_name>CoServ Community Solar Station</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>CoServ Electric</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.2706</lat>
    <lon>-96.97917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60431</plant_id>
    <plant_name>Tompkins Cortland Community College</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>SEC LHNY Solar One, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.5025</lat>
    <lon>-76.2865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60442</plant_id>
    <plant_name>Carver MA 1 Community Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.942796</lat>
    <lon>-70.76114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60443</plant_id>
    <plant_name>Wareham MA 1 Community Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.80167</lat>
    <lon>-70.70463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60444</plant_id>
    <plant_name>Glacier Battery Storage</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>Puget Sound Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>4.4</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>48.88804</lat>
    <lon>-121.9462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60454</plant_id>
    <plant_name>Houghton</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.426731</lat>
    <lon>-78.15659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60462</plant_id>
    <plant_name>Onondaga County- Clearwater</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.429317</lat>
    <lon>-76.51572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60492</plant_id>
    <plant_name>Rail Trail</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.243134</lat>
    <lon>-73.36385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60497</plant_id>
    <plant_name>SR Skylark B</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Skylark B, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.579472</lat>
    <lon>-104.8957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60498</plant_id>
    <plant_name>Shirley Water</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.554584</lat>
    <lon>-71.62348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60563</plant_id>
    <plant_name>Flywheel Energy Storage System Microgrid</plant_name>
    <state>AK</state>
    <county>Kodiak Island</county>
    <operator>Kodiak Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Flywheels</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Flywheels</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>57.780114</lat>
    <lon>-152.4438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60567</plant_id>
    <plant_name>Ortega Highway Energy Storage</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>SDGE Batteries</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.562061</lat>
    <lon>-117.5438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60613</plant_id>
    <plant_name>Brookfield Solar 2013 LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CVI CleanCapital Solar 6</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.25609</lat>
    <lon>-72.06788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60629</plant_id>
    <plant_name>Perkins Solar, LLC</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.43741</lat>
    <lon>-78.97198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60633</plant_id>
    <plant_name>Gainey Solar, LLC</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.499</lat>
    <lon>-78.653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60662</plant_id>
    <plant_name>Archdiocese of Baltimore J</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.445</lat>
    <lon>-76.217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60663</plant_id>
    <plant_name>Archdiocese of Baltimore L</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.445</lat>
    <lon>-76.217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60664</plant_id>
    <plant_name>Baltimore City B</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.436</lat>
    <lon>-76.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60665</plant_id>
    <plant_name>Baltimore City D</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.436</lat>
    <lon>-76.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60666</plant_id>
    <plant_name>Baltimore City F</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.436</lat>
    <lon>-76.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60667</plant_id>
    <plant_name>Baltimore City G</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.436</lat>
    <lon>-76.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60668</plant_id>
    <plant_name>City of Havre De Grace C</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.436</lat>
    <lon>-76.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60669</plant_id>
    <plant_name>Sod Run WTP A</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.436</lat>
    <lon>-76.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60677</plant_id>
    <plant_name>Tannery Road Landfill</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Tannery Road Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.239004</lat>
    <lon>-75.53459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60703</plant_id>
    <plant_name>Green City Recovery, LLC</plant_name>
    <state>KY</state>
    <county>Scott</county>
    <operator>Green City Recovery, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2019</latest_year>
    <lat>38.345278</lat>
    <lon>-84.54889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60710</plant_id>
    <plant_name>Stone Hill Solar CSG</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.059104</lat>
    <lon>-71.08916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60736</plant_id>
    <plant_name>Wilmington Solar</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.546281</lat>
    <lon>-71.17528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60738</plant_id>
    <plant_name>Fall River Solar CSG</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.751347</lat>
    <lon>-71.11454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60740</plant_id>
    <plant_name>Pittsgrove Solar</plant_name>
    <state>NJ</state>
    <county>Salem</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.539042</lat>
    <lon>-75.17934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60745</plant_id>
    <plant_name>SEPV Imperial Dixieland East</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.792038</lat>
    <lon>-115.7734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60766</plant_id>
    <plant_name>L'Oreal Monmouth</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.400273</lat>
    <lon>-74.50469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60800</plant_id>
    <plant_name>Catawba Solar LLC</plant_name>
    <state>NC</state>
    <county>Rowan</county>
    <operator>Catawba Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.61</lat>
    <lon>-80.53</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60817</plant_id>
    <plant_name>Sullivan County - Adult Care Solar</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.7966</lat>
    <lon>-74.70808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60818</plant_id>
    <plant_name>Oswego County - Fulton Solar</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.342437</lat>
    <lon>-76.34325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60819</plant_id>
    <plant_name>Jefferson-Lewis BOCES Solar</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.970958</lat>
    <lon>-75.96981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60851</plant_id>
    <plant_name>Curtis Hill Solar CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CCC Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.175</lat>
    <lon>-71.986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60852</plant_id>
    <plant_name>Depot Hill Solar CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CCC Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.153</lat>
    <lon>-71.988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60858</plant_id>
    <plant_name>126 Grove Solar LLC</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.076119</lat>
    <lon>-71.42271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60866</plant_id>
    <plant_name>Bashaw Solar CSG 1, LLC</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Bashaw Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.789327</lat>
    <lon>-70.88003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60879</plant_id>
    <plant_name>Nexamp Peak CSG</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Nexamp Peak, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.562091</lat>
    <lon>-73.28707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60880</plant_id>
    <plant_name>Stafford MS Ground Mount Community Solar</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>Town of Stafford - (CT)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.964</lat>
    <lon>-72.309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60894</plant_id>
    <plant_name>Medford DPC Solar</plant_name>
    <state>WI</state>
    <county>Taylor</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.16305</lat>
    <lon>-90.3729</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60904</plant_id>
    <plant_name>Time Warner Cable - Knowles</plant_name>
    <state>NY</state>
    <county>Steuben</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.337435</lat>
    <lon>-77.37532</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60920</plant_id>
    <plant_name>Viper Solar</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.934886</lat>
    <lon>-78.96216</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60921</plant_id>
    <plant_name>Scarlet Solar</plant_name>
    <state>NC</state>
    <county>Lenoir</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.287803</lat>
    <lon>-77.79506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60922</plant_id>
    <plant_name>Ruskin Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.274</lat>
    <lon>-78.022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60937</plant_id>
    <plant_name>Antlia Community Solar</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Antlia Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.906524</lat>
    <lon>-96.13824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60939</plant_id>
    <plant_name>Centaurus Community Solar</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Centaurus Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.949053</lat>
    <lon>-95.51126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60943</plant_id>
    <plant_name>Spica Community Solar</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Spica Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.936146</lat>
    <lon>-94.8541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60959</plant_id>
    <plant_name>Chocksett Rd Energy Storage Project</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Sterling Municipal Light Department - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>3.9</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.451836</lat>
    <lon>-71.73775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60967</plant_id>
    <plant_name>Onyx - Lamphear Road CSG</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>A2-A Pearl Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.18413</lat>
    <lon>-75.47672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60974</plant_id>
    <plant_name>Glendale Battery Energy Storage System</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Glendale - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.162327</lat>
    <lon>-118.2837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60985</plant_id>
    <plant_name>Elizabethtown Solar</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.152693</lat>
    <lon>-76.5814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60992</plant_id>
    <plant_name>Northern Cardinal Solar</plant_name>
    <state>NC</state>
    <county>Halifax</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.433289</lat>
    <lon>-77.71975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61003</plant_id>
    <plant_name>Musgrave East Solar Farm</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.731496</lat>
    <lon>-76.66367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61009</plant_id>
    <plant_name>Spring Street Solar 1 CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Spring Street Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.942522</lat>
    <lon>-70.7664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61015</plant_id>
    <plant_name>Musgrave West Solar Farm</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.731496</lat>
    <lon>-76.66367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61016</plant_id>
    <plant_name>Stafford St Solar 1 CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Stafford St Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.224044</lat>
    <lon>-71.87065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61030</plant_id>
    <plant_name>Harford Solar Farm</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.448</lat>
    <lon>-76.245</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61043</plant_id>
    <plant_name>Canandaigua Solar Array</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.86887</lat>
    <lon>-77.28456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61096</plant_id>
    <plant_name>Sampson Solar</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.961039</lat>
    <lon>-78.47054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61107</plant_id>
    <plant_name>Vanadium Redox Flow Battery Plant</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>SDGE Batteries</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.682506</lat>
    <lon>-116.9888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61175</plant_id>
    <plant_name>Pegasus Community Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Pegasus Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.495453</lat>
    <lon>-95.12468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61180</plant_id>
    <plant_name>Caelum Community Solar</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>Caelum Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.662006</lat>
    <lon>-93.93678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61192</plant_id>
    <plant_name>IKEA Joliet Rooftop PV System</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.48</lat>
    <lon>-88.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61195</plant_id>
    <plant_name>231 Dixon 74 Solar I, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.244125</lat>
    <lon>-81.43039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61267</plant_id>
    <plant_name>Hurricane Creek Lift Station</plant_name>
    <state>IN</state>
    <county>Johnson</county>
    <operator>Johnson County Rural E M C</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>39.5879</lat>
    <lon>-86.1858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61284</plant_id>
    <plant_name>Lux Solar, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.241145</lat>
    <lon>-81.42943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61289</plant_id>
    <plant_name>River Bend Solar, LLC (MT)</plant_name>
    <state>MT</state>
    <county>Stillwater</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.703779</lat>
    <lon>-109.5652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61297</plant_id>
    <plant_name>Upton Community Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Upton Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.1</lat>
    <lon>-71.7</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61308</plant_id>
    <plant_name>Sampson Road Community Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Sampson Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.1</lat>
    <lon>-72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61311</plant_id>
    <plant_name>Walton 1 Solar Facility</plant_name>
    <state>KY</state>
    <county>Kenton</county>
    <operator>Duke Energy Kentucky Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.85018</lat>
    <lon>-84.59226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61312</plant_id>
    <plant_name>Walton 2 Solar Facility</plant_name>
    <state>KY</state>
    <county>Kenton</county>
    <operator>Duke Energy Kentucky Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.85018</lat>
    <lon>-84.59226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61329</plant_id>
    <plant_name>Delphinus Community Solar</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>Delphinus Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.618565</lat>
    <lon>-94.08876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61333</plant_id>
    <plant_name>Oak Hill Solar Array</plant_name>
    <state>IN</state>
    <county>Vanderburgh</county>
    <operator>Southern Indiana Gas &amp; Elec Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.99</lat>
    <lon>-87.53</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61347</plant_id>
    <plant_name>Long Henry Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.195302</lat>
    <lon>-77.89513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61351</plant_id>
    <plant_name>Bear Creek Solar (NC)</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.540344</lat>
    <lon>-79.44905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61398</plant_id>
    <plant_name>Canis Major Solar Farm</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>LSE Canis Major LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.009</lat>
    <lon>-72.65</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61419</plant_id>
    <plant_name>One Ten Partners PV</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>One Ten Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.615622</lat>
    <lon>-117.9366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61432</plant_id>
    <plant_name>SCE&amp;G Curie CSG</plant_name>
    <state>SC</state>
    <county>Hampton</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.89</lat>
    <lon>-81.106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61461</plant_id>
    <plant_name>North Smithfield Solar Power 1</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.9759</lat>
    <lon>-71.586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61469</plant_id>
    <plant_name>Lichtenthal</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.020053</lat>
    <lon>-78.15818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61470</plant_id>
    <plant_name>Call Farms 1</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.037794</lat>
    <lon>-78.1873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61471</plant_id>
    <plant_name>Call Farms 3</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.023046</lat>
    <lon>-78.17859</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61499</plant_id>
    <plant_name>CED Foster</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.795</lat>
    <lon>-71.787</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61518</plant_id>
    <plant_name>301 Chestnut Solar NG</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.055179</lat>
    <lon>-72.52178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61520</plant_id>
    <plant_name>Rosewood Solar</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.4375</lat>
    <lon>-78.10709</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61534</plant_id>
    <plant_name>Old Caroleen Solar Farm</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.297715</lat>
    <lon>-81.81205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61554</plant_id>
    <plant_name>Comer Solar</plant_name>
    <state>GA</state>
    <county>Madison</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.0942</lat>
    <lon>-83.1439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61575</plant_id>
    <plant_name>Anheuser-Busch Baldwinsville</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.151537</lat>
    <lon>-76.41484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61576</plant_id>
    <plant_name>Columbia University - Johnson Farms</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.379107</lat>
    <lon>-74.2638</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61577</plant_id>
    <plant_name>Time Warner Cable Enterprises - Martino</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.183689</lat>
    <lon>-75.43048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61578</plant_id>
    <plant_name>Columbia University - Minisink</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.293747</lat>
    <lon>-74.55445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61579</plant_id>
    <plant_name>St. Lawrence University - Sutton</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.932397</lat>
    <lon>-75.87226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61590</plant_id>
    <plant_name>DG Foxborough Elm CSG</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>DG Foxborough Elm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.056053</lat>
    <lon>-71.14131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61613</plant_id>
    <plant_name>WED Stilson Solar</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.518751</lat>
    <lon>-71.68646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61635</plant_id>
    <plant_name>DG Tufts Knoll LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>DG Tufts Knoll, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.24325</lat>
    <lon>-71.67233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61719</plant_id>
    <plant_name>CJ Solar I, LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Lisbon West</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.7</lat>
    <lon>-75.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61724</plant_id>
    <plant_name>Onyx - Saratoga Springs Landfill Solar C</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.096874</lat>
    <lon>-73.74486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61764</plant_id>
    <plant_name>Gore Mountain Solar II</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Gore Mountain Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.543378</lat>
    <lon>-73.32307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61765</plant_id>
    <plant_name>HGS Solar I</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>HGS solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.543716</lat>
    <lon>-73.32526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61769</plant_id>
    <plant_name>Syncarpha Hancock I CSG</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Syncarpha Hancock I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.433031</lat>
    <lon>-73.33609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61770</plant_id>
    <plant_name>Syncarpha Hancock II CSG</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Syncarpha Hancock II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.426866</lat>
    <lon>-73.347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61774</plant_id>
    <plant_name>Syncarpha Still River, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Syncarpha Still River, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.42075</lat>
    <lon>-71.64153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61788</plant_id>
    <plant_name>Hilltop Power</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Hilltop Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>43.912882</lat>
    <lon>-96.19322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61834</plant_id>
    <plant_name>Soboba Community Solar Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Soboba Band of Luiseno Indians</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2017</latest_year>
    <lat>33.767061</lat>
    <lon>-116.9059</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61847</plant_id>
    <plant_name>Broadalbin</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.061306</lat>
    <lon>-74.15489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61863</plant_id>
    <plant_name>Duanesburg</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.762173</lat>
    <lon>-74.20155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61881</plant_id>
    <plant_name>Morning View</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.546315</lat>
    <lon>-79.74284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61882</plant_id>
    <plant_name>Copperfield</plant_name>
    <state>NC</state>
    <county>Montgomery</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.340067</lat>
    <lon>-79.99116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61887</plant_id>
    <plant_name>Fort Bliss (DEA EPIC)</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>Ameresco Federal Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.829986</lat>
    <lon>-106.3729</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61888</plant_id>
    <plant_name>Johnstown</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.999179</lat>
    <lon>-74.31479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61899</plant_id>
    <plant_name>Lincoln Ave Solar Project</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.78144</lat>
    <lon>-73.08344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61903</plant_id>
    <plant_name>Sharon Springs</plant_name>
    <state>NY</state>
    <county>Schoharie</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.775105</lat>
    <lon>-74.56715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61904</plant_id>
    <plant_name>Amsterdam North</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.953622</lat>
    <lon>-74.1198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61905</plant_id>
    <plant_name>Amsterdam South</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.948957</lat>
    <lon>-74.12616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61922</plant_id>
    <plant_name>Sunlight Beacon</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>BQ Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.494632</lat>
    <lon>-73.98164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61935</plant_id>
    <plant_name>1634 Solar</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>1634 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.3368</lat>
    <lon>-80.08149</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61936</plant_id>
    <plant_name>Abbot Solar</plant_name>
    <state>SC</state>
    <county>Clarendon</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.678358</lat>
    <lon>-80.24029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61938</plant_id>
    <plant_name>Bani Solar</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>Bani Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.953775</lat>
    <lon>-79.93713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61939</plant_id>
    <plant_name>Blacktip Solar</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.900481</lat>
    <lon>-79.75596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61940</plant_id>
    <plant_name>Bloom Solar</plant_name>
    <state>SC</state>
    <county>Clarendon</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.610454</lat>
    <lon>-80.33661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61941</plant_id>
    <plant_name>Bond Solar</plant_name>
    <state>SC</state>
    <county>Clarendon</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.617189</lat>
    <lon>-80.363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61942</plant_id>
    <plant_name>Gary Solar</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.199094</lat>
    <lon>-80.22168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61943</plant_id>
    <plant_name>Goldenrod Solar</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.962884</lat>
    <lon>-79.56289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61946</plant_id>
    <plant_name>Redwing Solar</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.274414</lat>
    <lon>-79.8875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61947</plant_id>
    <plant_name>River Solar</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.107849</lat>
    <lon>-80.12811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61948</plant_id>
    <plant_name>Sapphire Solar</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.887786</lat>
    <lon>-79.78368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61949</plant_id>
    <plant_name>South Solar</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.995392</lat>
    <lon>-79.60606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61950</plant_id>
    <plant_name>Vincent Solar</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.091583</lat>
    <lon>-80.10831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61951</plant_id>
    <plant_name>Watauga Solar</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.523944</lat>
    <lon>-79.84462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61952</plant_id>
    <plant_name>Whitt Solar</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.721613</lat>
    <lon>-82.52432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61953</plant_id>
    <plant_name>Willis Solar</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.984625</lat>
    <lon>-79.56498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61960</plant_id>
    <plant_name>Atood II</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.030303</lat>
    <lon>-81.80847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62030</plant_id>
    <plant_name>Nautilus Lindstrom Solar (CSG)</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.336131</lat>
    <lon>-92.81397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62034</plant_id>
    <plant_name>Baer Road CSG</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.797</lat>
    <lon>-75.068</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62060</plant_id>
    <plant_name>Hampton MN GRE</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.548799</lat>
    <lon>-93.0205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62063</plant_id>
    <plant_name>Greenfield Solar PV</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.64</lat>
    <lon>-72.58</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62064</plant_id>
    <plant_name>Hinsdale Solar PV</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.44</lat>
    <lon>-73.11</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62065</plant_id>
    <plant_name>Savoy Solar PV</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.56</lat>
    <lon>-73.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62066</plant_id>
    <plant_name>Southampton Solar PV</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.2</lat>
    <lon>-72.71</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62120</plant_id>
    <plant_name>Panda Solar NC 2, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Panda Solar NC 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.4384</lat>
    <lon>-79.0847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62121</plant_id>
    <plant_name>Panda Solar NC 3, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Panda Solar NC 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.631814</lat>
    <lon>-79.09067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62122</plant_id>
    <plant_name>Panda Solar NC 4, LLC</plant_name>
    <state>NC</state>
    <county>Bladen</county>
    <operator>Panda Solar NC 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.519408</lat>
    <lon>-78.52434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62126</plant_id>
    <plant_name>Panda Solar NC 8, LLC</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>Panda Solar NC 8, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.420931</lat>
    <lon>-79.70596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62127</plant_id>
    <plant_name>Panda Solar NC 9, LLC</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Panda Solar NC 9, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.910856</lat>
    <lon>-78.9136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62128</plant_id>
    <plant_name>Panda Solar NC 10, LLC</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Panda Solar NC 10, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.909631</lat>
    <lon>-78.913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62129</plant_id>
    <plant_name>Panda Solar NC 11, LLC</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Panda Solar NC 11, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.908589</lat>
    <lon>-78.91248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62131</plant_id>
    <plant_name>Red Toad 4451 Buffalo Road, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.557397</lat>
    <lon>-78.29734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62146</plant_id>
    <plant_name>Minisink Community Solar 2 LLC</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Minisink Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.319351</lat>
    <lon>-74.51528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62154</plant_id>
    <plant_name>Kelly Bridge Road Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.775422</lat>
    <lon>-74.77646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62156</plant_id>
    <plant_name>Pool Brook Rd Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Otsego</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.542175</lat>
    <lon>-75.08338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62157</plant_id>
    <plant_name>Breesport Road Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Chemung</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.088</lat>
    <lon>-76.713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62158</plant_id>
    <plant_name>Sacket Lake Rd #1 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.38251</lat>
    <lon>-74.43526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62160</plant_id>
    <plant_name>Turner Rd Community Solar Project</plant_name>
    <state>NY</state>
    <county>Chemung</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.09305</lat>
    <lon>-76.67848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62179</plant_id>
    <plant_name>Ashley Solar (SC)</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Ashley Solar (SC)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.268911</lat>
    <lon>-79.87255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62185</plant_id>
    <plant_name>Birch Solar (SC)</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.267992</lat>
    <lon>-79.86858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62186</plant_id>
    <plant_name>Chapman Solar</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.369819</lat>
    <lon>-80.02481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62191</plant_id>
    <plant_name>CNMEC Solar Energy Center</plant_name>
    <state>NM</state>
    <county>Torrance</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.783205</lat>
    <lon>-106.0511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62198</plant_id>
    <plant_name>Griffin Road Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Griffin Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.146633</lat>
    <lon>-72.00438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62203</plant_id>
    <plant_name>Monson Solar, LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Monson Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.098292</lat>
    <lon>-72.29007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62204</plant_id>
    <plant_name>Red Toad 5840 Buffalo Road, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.572873</lat>
    <lon>-78.3023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62216</plant_id>
    <plant_name>Gaines Solar</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Gaines Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.192353</lat>
    <lon>-80.21853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62238</plant_id>
    <plant_name>Marshall Solar</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Marshall Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.371908</lat>
    <lon>-80.02161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62257</plant_id>
    <plant_name>Station 9 Energy Storage System</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Town of Braintree - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>4.2</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.187743</lat>
    <lon>-70.97645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62260</plant_id>
    <plant_name>Trout Creek Solar</plant_name>
    <state>CO</state>
    <county>Chaffee</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.8151</lat>
    <lon>-106.1104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62293</plant_id>
    <plant_name>Pruger Solar II</plant_name>
    <state>SC</state>
    <county>Marion</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.199211</lat>
    <lon>-79.30295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62303</plant_id>
    <plant_name>Mattas Farms</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.893714</lat>
    <lon>-74.21625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62313</plant_id>
    <plant_name>Stamey Solar</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.381056</lat>
    <lon>-80.13433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62315</plant_id>
    <plant_name>Tedder Solar</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Tedder Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.301806</lat>
    <lon>-79.92446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62324</plant_id>
    <plant_name>Dynamic - Walpole</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.133208</lat>
    <lon>-71.27195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62342</plant_id>
    <plant_name>Washington Solar (SC)</plant_name>
    <state>SC</state>
    <county>Marion</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.238081</lat>
    <lon>-79.25195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62344</plant_id>
    <plant_name>Washington Solar II (SC)</plant_name>
    <state>SC</state>
    <county>Marion</county>
    <operator>Washington Solar II (SC)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.238081</lat>
    <lon>-79.25195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62347</plant_id>
    <plant_name>Weaver Solar</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Weaver Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.069422</lat>
    <lon>-80.07847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62352</plant_id>
    <plant_name>Thomas Solar</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.087886</lat>
    <lon>-80.11548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62397</plant_id>
    <plant_name>Runway Solar Farm</plant_name>
    <state>SC</state>
    <county>Horry</county>
    <operator>Runway Solar Farm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.667675</lat>
    <lon>-78.91799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62405</plant_id>
    <plant_name>UMCES Ground Mount</plant_name>
    <state>MD</state>
    <county>Dorchester</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.583064</lat>
    <lon>-76.13475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62451</plant_id>
    <plant_name>Rantoul Solar</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Altorfer Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.286726</lat>
    <lon>-88.1328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62476</plant_id>
    <plant_name>Big Tree Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.766</lat>
    <lon>-78.559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62479</plant_id>
    <plant_name>Woodoak Drive Community Solar Farm CSG</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.594</lat>
    <lon>-75.027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62480</plant_id>
    <plant_name>Burritt Rd Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.275</lat>
    <lon>-77.764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62486</plant_id>
    <plant_name>CMR Solar LLC</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>CMR Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.561847</lat>
    <lon>-74.34591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62498</plant_id>
    <plant_name>Telegraph Rd #2 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.559475</lat>
    <lon>-78.17941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62500</plant_id>
    <plant_name>Route 19 #1 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.534</lat>
    <lon>-78.151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62503</plant_id>
    <plant_name>Winchendon Landfill Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.689687</lat>
    <lon>-72.08567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62504</plant_id>
    <plant_name>Frey Rd #1 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.099866</lat>
    <lon>-77.34513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62525</plant_id>
    <plant_name>Villa Roma Rd #1</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.757083</lat>
    <lon>-74.96096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62526</plant_id>
    <plant_name>Villa Roma Rd #2</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.756217</lat>
    <lon>-74.96119</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62527</plant_id>
    <plant_name>Villa Roma Rd #3 CSG</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.754421</lat>
    <lon>-74.96152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62528</plant_id>
    <plant_name>Villa Roma Rd #4 CSG</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.754435</lat>
    <lon>-74.95863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62530</plant_id>
    <plant_name>Boas Rd #1 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.934274</lat>
    <lon>-73.67238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62531</plant_id>
    <plant_name>Boas Rd #2 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.933177</lat>
    <lon>-73.67122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62532</plant_id>
    <plant_name>Boas Rd #3 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.933525</lat>
    <lon>-73.66933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62533</plant_id>
    <plant_name>Boas Rd #4 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.928987</lat>
    <lon>-73.66651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62539</plant_id>
    <plant_name>HCE Moore I</plant_name>
    <state>NC</state>
    <county>Moore</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.13432</lat>
    <lon>-79.41952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62540</plant_id>
    <plant_name>Three Bridge</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.6705</lat>
    <lon>-79.2001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62556</plant_id>
    <plant_name>Kearsarge Johnstown 2 CSG</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Kearsarge Johnstown 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.064422</lat>
    <lon>-74.36022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62578</plant_id>
    <plant_name>Preferred Freezer San Leandro</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.711995</lat>
    <lon>-122.1507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62586</plant_id>
    <plant_name>DG Florham Park Solar LLC</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>DG Florham Park Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.777783</lat>
    <lon>-74.42724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62601</plant_id>
    <plant_name>Changeup</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.74901</lat>
    <lon>-79.78553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62647</plant_id>
    <plant_name>MBS Textbook Exchange</plant_name>
    <state>MO</state>
    <county>Boone</county>
    <operator>MBS TextBook Exchange LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>38.95718</lat>
    <lon>-92.3776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62704</plant_id>
    <plant_name>Equinix Douglas St. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.9212</lat>
    <lon>-118.3845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62705</plant_id>
    <plant_name>Equinix Maple Ave. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.92542</lat>
    <lon>-118.3946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62709</plant_id>
    <plant_name>Warsaw Solar CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.225457</lat>
    <lon>-93.39953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62720</plant_id>
    <plant_name>Chester Woods Point Solar, LLC CSG</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>Chester Woods Point Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.94843</lat>
    <lon>-76.30044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62721</plant_id>
    <plant_name>Steel Sun 2: 2303-III-9 Hamburg Tpke</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.81849</lat>
    <lon>-78.85538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62722</plant_id>
    <plant_name>Steel Sun 2: 2303-III-4 Hamburg Tpke</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.811146</lat>
    <lon>-78.85422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62723</plant_id>
    <plant_name>Steel Sun 2: 2303-III-2 Hamburg Tpke</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.809003</lat>
    <lon>-78.85337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62754</plant_id>
    <plant_name>San Diego International Airport BESS</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Critical Loop, Inc.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.7338</lat>
    <lon>-117.1933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62759</plant_id>
    <plant_name>Greenville CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.356</lat>
    <lon>-74.622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62760</plant_id>
    <plant_name>Hopkinton CSG</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.203492</lat>
    <lon>-71.53153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62761</plant_id>
    <plant_name>Chester CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.339</lat>
    <lon>-74.288</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62763</plant_id>
    <plant_name>Carver CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.905958</lat>
    <lon>-70.81047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62764</plant_id>
    <plant_name>Westtown CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.345</lat>
    <lon>-74.561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62786</plant_id>
    <plant_name>Thanksgiving Fire Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Sol Systems</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.701</lat>
    <lon>-78.327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62805</plant_id>
    <plant_name>Bloomington Solar I</plant_name>
    <state>UT</state>
    <county>Washington</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.043828</lat>
    <lon>-113.6275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62839</plant_id>
    <plant_name>98th Street Battery Storage Station</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Consolidated Edison Co-NY Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>10</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.679137</lat>
    <lon>-73.84019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62858</plant_id>
    <plant_name>Cashton Solar</plant_name>
    <state>WI</state>
    <county>Monroe</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.737</lat>
    <lon>-90.805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62869</plant_id>
    <plant_name>St. Charles Solar</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.976</lat>
    <lon>-92.032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62874</plant_id>
    <plant_name>Acorn I Energy Storage LLC</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Acorn I Energy Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.196505</lat>
    <lon>-118.9319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62911</plant_id>
    <plant_name>Kearsarge Gill</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Kearsarge Gill LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.671105</lat>
    <lon>-72.47749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62958</plant_id>
    <plant_name>DG Infineum</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>DG Linden New Jersey LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.640209</lat>
    <lon>-74.23488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62981</plant_id>
    <plant_name>East Pulaski BESS</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>National Grid</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>4.2</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.546613</lat>
    <lon>-76.10403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62996</plant_id>
    <plant_name>ESA Four Oaks 2 NC LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.416104</lat>
    <lon>-78.40923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63051</plant_id>
    <plant_name>Hollygrove CSG</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.26034</lat>
    <lon>-76.7217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63052</plant_id>
    <plant_name>Guildlerland CSG</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.727288</lat>
    <lon>-74.00081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63055</plant_id>
    <plant_name>Howland CSG</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.63481</lat>
    <lon>-76.08921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63056</plant_id>
    <plant_name>Gifford CSG</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.82395</lat>
    <lon>-74.07086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63057</plant_id>
    <plant_name>Czub CSG</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.91408</lat>
    <lon>-73.59598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63058</plant_id>
    <plant_name>Mereand CSG</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.96414</lat>
    <lon>-75.98679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63059</plant_id>
    <plant_name>Aegis CSG</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.764688</lat>
    <lon>-77.34388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63072</plant_id>
    <plant_name>BTC2 Solar (CSG)</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.41805</lat>
    <lon>-76.39772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63073</plant_id>
    <plant_name>Mooseheart School Solar</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.8233</lat>
    <lon>-88.3378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63075</plant_id>
    <plant_name>Upper Marlboro 1 CSG</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.789216</lat>
    <lon>-76.80091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63085</plant_id>
    <plant_name>White CSG</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.205804</lat>
    <lon>-76.48045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63086</plant_id>
    <plant_name>Frog Hollow CSG</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.739327</lat>
    <lon>-74.49671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63089</plant_id>
    <plant_name>Gibbons CSG</plant_name>
    <state>MD</state>
    <county>Worcester</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.115402</lat>
    <lon>-75.21486</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63106</plant_id>
    <plant_name>Dover CSG</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.680879</lat>
    <lon>-73.57657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63107</plant_id>
    <plant_name>Howell CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.265258</lat>
    <lon>-74.31298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63108</plant_id>
    <plant_name>Strauss CSG</plant_name>
    <state>NY</state>
    <county>Seneca</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.891451</lat>
    <lon>-76.99392</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63112</plant_id>
    <plant_name>Ellsworth I CSG</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.899313</lat>
    <lon>-73.7098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63161</plant_id>
    <plant_name>AES Tonawanda Solar LLC</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.9971</lat>
    <lon>-78.9017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63204</plant_id>
    <plant_name>Corcoran Irrigation District</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.140764</lat>
    <lon>-119.5669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63237</plant_id>
    <plant_name>Old Court Rd Solar</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>SRC Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.34167</lat>
    <lon>-76.8351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63241</plant_id>
    <plant_name>Limelight Solar II LLC</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Limelight Solar II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.99389</lat>
    <lon>-81.87819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63242</plant_id>
    <plant_name>ATOOD Solar III LLC</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>ATOOD Solar III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.99647</lat>
    <lon>-82.0421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63243</plant_id>
    <plant_name>AGA TAG Solar III LLC</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>AGA TAG Solar III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.99647</lat>
    <lon>-82.0421</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63244</plant_id>
    <plant_name>Sydney Solar</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.7683</lat>
    <lon>-72.0783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63245</plant_id>
    <plant_name>Dickinson Solar (CT)</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.7698</lat>
    <lon>-72.0794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63266</plant_id>
    <plant_name>Penny Hill Solar</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.759</lat>
    <lon>-77.513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63267</plant_id>
    <plant_name>Meeks Solar, LLC</plant_name>
    <state>NC</state>
    <county>Martin</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.815556</lat>
    <lon>-77.29111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63272</plant_id>
    <plant_name>Woodsdale Farm, LLC</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.464</lat>
    <lon>-78.95</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63292</plant_id>
    <plant_name>100 Brook Hill Drive Solar</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Diamond Properties</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.09305</lat>
    <lon>-73.9828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63296</plant_id>
    <plant_name>232 Long Branch 29 Solar I, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.23222</lat>
    <lon>-81.55972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63299</plant_id>
    <plant_name>Harvest Beulaville, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.90389</lat>
    <lon>-77.78417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63323</plant_id>
    <plant_name>Bluefin Origination 1</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>SRC Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.73169</lat>
    <lon>-76.82843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63346</plant_id>
    <plant_name>Cubera Solar, LLC</plant_name>
    <state>NC</state>
    <county>Harnett</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.330022</lat>
    <lon>-78.61009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63371</plant_id>
    <plant_name>Hope Solar Farm LLC</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.726428</lat>
    <lon>-73.60213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63405</plant_id>
    <plant_name>Pearl II</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.981336</lat>
    <lon>-78.29042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63407</plant_id>
    <plant_name>Macedon</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.058633</lat>
    <lon>-77.34604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63408</plant_id>
    <plant_name>Whittier</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.150002</lat>
    <lon>-77.8614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63409</plant_id>
    <plant_name>Williamson</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.1401</lat>
    <lon>-77.0908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63419</plant_id>
    <plant_name>DGS Central California Womens Facility</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.089701</lat>
    <lon>-120.15</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63461</plant_id>
    <plant_name>Bonefish Solar</plant_name>
    <state>SC</state>
    <county>Clarendon</county>
    <operator>PGRP Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.720936</lat>
    <lon>-80.19082</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63496</plant_id>
    <plant_name>Frederick County - Landfill</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.373263</lat>
    <lon>-77.34985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63512</plant_id>
    <plant_name>Wor-Wic Community College - Offsite</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.413274</lat>
    <lon>-75.69012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63523</plant_id>
    <plant_name>Spruce - WCMD - Rubble II</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.62143</lat>
    <lon>-77.82543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63524</plant_id>
    <plant_name>Spruce - WCMD - Rubble I</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.61849</lat>
    <lon>-77.82332</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63525</plant_id>
    <plant_name>Spruce - WCMD - Creek</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.67185</lat>
    <lon>-77.82329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63526</plant_id>
    <plant_name>Spruce - WCMD - Resh I</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.68185</lat>
    <lon>-77.80145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63551</plant_id>
    <plant_name>Samoset Solar</plant_name>
    <state>ME</state>
    <county>Knox</county>
    <operator>Samoset Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.168196</lat>
    <lon>-69.11619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63552</plant_id>
    <plant_name>Woodfields Solar</plant_name>
    <state>SC</state>
    <county>Greenwood</county>
    <operator>PGRP Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.188925</lat>
    <lon>-82.13433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63562</plant_id>
    <plant_name>ISM Solar Dighton 2, LLC CSG</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.816858</lat>
    <lon>-71.16894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63563</plant_id>
    <plant_name>Incom Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.107929</lat>
    <lon>-72.01723</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63588</plant_id>
    <plant_name>Palombo Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.025</lat>
    <lon>-71.599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63605</plant_id>
    <plant_name>ATT North Watney</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Bloom Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.236257</lat>
    <lon>-122.0778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63613</plant_id>
    <plant_name>Downey</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>13</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.919368</lat>
    <lon>-118.1289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63618</plant_id>
    <plant_name>USS Solar Brick</plant_name>
    <state>IL</state>
    <county>Macoupin</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.35009</lat>
    <lon>-89.79322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63620</plant_id>
    <plant_name>USS Goodrich Solar</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.076</lat>
    <lon>-88.06491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63621</plant_id>
    <plant_name>USS Sycamore Solar (CSG)</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.96455</lat>
    <lon>-88.66696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63637</plant_id>
    <plant_name>One Patriot</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Bloom Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.093394</lat>
    <lon>-71.26531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63656</plant_id>
    <plant_name>CED Peoria Solar</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>Bay4 Energy Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.57629</lat>
    <lon>-89.70355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63659</plant_id>
    <plant_name>Bowden Solar LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>38DN Power Fund 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.109156</lat>
    <lon>-72.33813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63669</plant_id>
    <plant_name>St. Mary's Hospital For Children</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>St. Mary's Hospital For Children</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2018</latest_year>
    <lat>40.77698</lat>
    <lon>-73.77045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63675</plant_id>
    <plant_name>MSAP 13</plant_name>
    <state>NY</state>
    <county>Rensselaer</county>
    <operator>MSAP 13, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.698335</lat>
    <lon>-73.67174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63692</plant_id>
    <plant_name>PG Solar, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.167164</lat>
    <lon>-78.01781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63693</plant_id>
    <plant_name>Freight Line Solar, LLC</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.96885</lat>
    <lon>-77.76236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63695</plant_id>
    <plant_name>Holly Swamp Solar, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.662627</lat>
    <lon>-79.13293</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63703</plant_id>
    <plant_name>EQX003 Secaucus Rd Fuel Cell</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.77853</lat>
    <lon>-74.07224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63712</plant_id>
    <plant_name>KSR028 Merced Fuel Cell</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.70649</lat>
    <lon>-122.1647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63720</plant_id>
    <plant_name>Augusta Solar</plant_name>
    <state>SC</state>
    <county>Greenwood</county>
    <operator>Augusta Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.124</lat>
    <lon>-82.13</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63747</plant_id>
    <plant_name>Fogarty CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Fogarty Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.508729</lat>
    <lon>-74.35</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63750</plant_id>
    <plant_name>Bluestone</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Bluestone Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.987467</lat>
    <lon>-74.03019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63751</plant_id>
    <plant_name>Underhill</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Underhill Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.716281</lat>
    <lon>-73.88426</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63752</plant_id>
    <plant_name>Grabinski</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Grabinski Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.578731</lat>
    <lon>-74.17967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63759</plant_id>
    <plant_name>Ballenger Road Solar A</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Ballenger Road Solar A</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.04354</lat>
    <lon>-82.11284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63760</plant_id>
    <plant_name>White Horse Solar A</plant_name>
    <state>SC</state>
    <county>Greenville</county>
    <operator>White Horse Solar A</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.786327</lat>
    <lon>-82.39844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63761</plant_id>
    <plant_name>Soscol Ferry Solar</plant_name>
    <state>CA</state>
    <county>Napa</county>
    <operator>Soscol Ferry Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.237422</lat>
    <lon>-122.2752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63780</plant_id>
    <plant_name>NY- CSG- Johnstown 2</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>NY- CSG- Johnstown 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.04232</lat>
    <lon>-74.37876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63781</plant_id>
    <plant_name>NY- CSG- Livingston 4</plant_name>
    <state>NY</state>
    <county>Livingston</county>
    <operator>NY- CSG- Livingston 4</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.9199</lat>
    <lon>-77.7642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63790</plant_id>
    <plant_name>Illinois PV Fulton 1 CSG</plant_name>
    <state>IL</state>
    <county>Fulton</county>
    <operator>Illinois PV Fulton 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.698522</lat>
    <lon>-89.96794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63800</plant_id>
    <plant_name>NY - CSG - Ellsworth II</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.899691</lat>
    <lon>-73.70747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63823</plant_id>
    <plant_name>CED Beecher Sun Solar</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Bay4 Energy Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.327123</lat>
    <lon>-87.61052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63824</plant_id>
    <plant_name>CED Hilltop Solar</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Bay4 Energy Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.339141</lat>
    <lon>-89.19802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63854</plant_id>
    <plant_name>Medusa NY 1</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Medusa NY 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.466286</lat>
    <lon>-74.09953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63855</plant_id>
    <plant_name>Walden NY 1</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Walden NY 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.552749</lat>
    <lon>-74.14547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63856</plant_id>
    <plant_name>Westtown NY 2</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Westtown NY 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.345455</lat>
    <lon>-74.52377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63857</plant_id>
    <plant_name>Middletown NY 1</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Middletown NY 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.40888</lat>
    <lon>-74.5098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63858</plant_id>
    <plant_name>Westerlo NY 1</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Westerlo NY 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.43822</lat>
    <lon>-74.01589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63945</plant_id>
    <plant_name>Clinton Solar 4 LLC CSG</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Clinton Solar 4 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.59587</lat>
    <lon>-89.2751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63946</plant_id>
    <plant_name>Vermilion Solar 1, LLC CSG</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>Vermilion Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.12437</lat>
    <lon>-87.6292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63948</plant_id>
    <plant_name>CED Spring Creek Solar</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Bay4 Energy Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.108211</lat>
    <lon>-87.72611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63949</plant_id>
    <plant_name>Cortland</plant_name>
    <state>IL</state>
    <county>Dekalb</county>
    <operator>Cortland Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.92219</lat>
    <lon>-88.68876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63951</plant_id>
    <plant_name>Lena</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Lena Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.35681</lat>
    <lon>-89.88398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63952</plant_id>
    <plant_name>Ridge Farm</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>Ridge Farm Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.88821</lat>
    <lon>-87.68593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63954</plant_id>
    <plant_name>Mendota</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Mendota US Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.54863</lat>
    <lon>-89.15986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63958</plant_id>
    <plant_name>SSD Marion 3, LLC</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Thor Solar 1 CEI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.985</lat>
    <lon>-122.938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63959</plant_id>
    <plant_name>SSD Marion 5, LLC</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Thor Solar 1 CEI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.11601</lat>
    <lon>-122.7938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63960</plant_id>
    <plant_name>SSD Marion 6, LLC</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Thor Solar 1 CEI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.254</lat>
    <lon>-122.806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63962</plant_id>
    <plant_name>SSD Clackamas 4, LLC</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Thor Solar 1 CEI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.102</lat>
    <lon>-122.662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63963</plant_id>
    <plant_name>SSD Clackamas 7, LLC</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Thor Solar 1 CEI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.182</lat>
    <lon>-122.591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63964</plant_id>
    <plant_name>SSD Marion 1, LLC</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Thor Solar 1 CEI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.139507</lat>
    <lon>-122.9045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63967</plant_id>
    <plant_name>Charter Durabar at Woodstock</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Luminace Solar Illinois 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.2899</lat>
    <lon>-88.40712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63979</plant_id>
    <plant_name>315 Vinson Road</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Red Toad 315 Vinson Road, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.629398</lat>
    <lon>-78.38589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63989</plant_id>
    <plant_name>Peterman II</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Peterman Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.070396</lat>
    <lon>-87.78887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63990</plant_id>
    <plant_name>Kish CSG</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>Kish Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.215163</lat>
    <lon>-88.92064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63991</plant_id>
    <plant_name>Nostrand</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Nostrand Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.207388</lat>
    <lon>-87.83782</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63992</plant_id>
    <plant_name>Vulcan</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Vulcan Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.10341</lat>
    <lon>-87.97498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64013</plant_id>
    <plant_name>Somonauk Road Solar 1</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Somonauk Road Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.758266</lat>
    <lon>-88.65629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64016</plant_id>
    <plant_name>Edwardsville Solar II</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>Edwardsville Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.814542</lat>
    <lon>-89.9973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64018</plant_id>
    <plant_name>Route 76 Boone Solar 1</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>Route 76 Boone Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.41894</lat>
    <lon>-88.84614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64030</plant_id>
    <plant_name>Kenmare - Sullivan Community College</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.772796</lat>
    <lon>-74.66672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64035</plant_id>
    <plant_name>Powatan Road Solar</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Red Toad Powatan Phase 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.602063</lat>
    <lon>-78.37209</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64041</plant_id>
    <plant_name>Wappinger 9D Solar</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Wappinger 9D Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.56544</lat>
    <lon>-73.93797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64043</plant_id>
    <plant_name>Olney Solar II CSG</plant_name>
    <state>IL</state>
    <county>Richland</county>
    <operator>Olney Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.721601</lat>
    <lon>-88.12679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64058</plant_id>
    <plant_name>2662 Freeport Solar 1 CSG</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>2662 Freeport Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.339696</lat>
    <lon>-89.63272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64059</plant_id>
    <plant_name>Whiteside Solar 1 CSG</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>Whiteside Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.85691</lat>
    <lon>-90.15885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64085</plant_id>
    <plant_name>North Providence</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Captona N.P. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.869826</lat>
    <lon>-71.47649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64100</plant_id>
    <plant_name>Morgan Solar 4, LLC CSG</plant_name>
    <state>IL</state>
    <county>Morgan</county>
    <operator>Morgan Solar 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.61409</lat>
    <lon>-90.22076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64116</plant_id>
    <plant_name>Plainfield Pike</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Captona Plainfield Pike Johnston LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.793111</lat>
    <lon>-71.55348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64120</plant_id>
    <plant_name>Chicopee</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Captona Chicopee LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.181057</lat>
    <lon>-72.51071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64122</plant_id>
    <plant_name>Marlow Solar, LLC CSG</plant_name>
    <state>IL</state>
    <county>Jefferson</county>
    <operator>Marlow Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.315279</lat>
    <lon>-88.75638</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64126</plant_id>
    <plant_name>County Road 16</plant_name>
    <state>NY</state>
    <county>Schuyler</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.3771</lat>
    <lon>-76.9022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64143</plant_id>
    <plant_name>Bloom-Altice Fuel Cell</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.76119</lat>
    <lon>-73.49435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64155</plant_id>
    <plant_name>Bryant Road Solar</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>JSD Flatwood PV-1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.01308</lat>
    <lon>-81.92871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64159</plant_id>
    <plant_name>Morgan Solar 2, LLC CSG</plant_name>
    <state>IL</state>
    <county>Morgan</county>
    <operator>Morgan Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.606529</lat>
    <lon>-90.2271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64179</plant_id>
    <plant_name>IA - City of Ames - Airport Road</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.003</lat>
    <lon>-93.617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64180</plant_id>
    <plant_name>MD - CS - Potomac Edison Co - GA29 TPE</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.59535</lat>
    <lon>-79.3879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64228</plant_id>
    <plant_name>Blue Goose Solar CSG</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>Blue Goose Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.769376</lat>
    <lon>-89.84333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64229</plant_id>
    <plant_name>Iroquois Solar 1B LLC CSG</plant_name>
    <state>IL</state>
    <county>Iroquois</county>
    <operator>Iroquois Solar 1B LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.774047</lat>
    <lon>-87.75437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64243</plant_id>
    <plant_name>Sullivan B Community Solar LLC</plant_name>
    <state>IL</state>
    <county>McDonough</county>
    <operator>Sullivan B Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.469681</lat>
    <lon>-90.64108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64254</plant_id>
    <plant_name>Kent School Road Solar 1</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Kent School Road Solar 1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.312841</lat>
    <lon>-89.90344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64257</plant_id>
    <plant_name>Schulte 2 Community Solar</plant_name>
    <state>IL</state>
    <county>Marshall</county>
    <operator>Schulte 2 Community Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.032235</lat>
    <lon>-89.40522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64269</plant_id>
    <plant_name>Kankakee Solar 4 LLC</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Kankakee Solar 4 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.119258</lat>
    <lon>-87.82652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64302</plant_id>
    <plant_name>Lafayette 2 - McHenry Franks 1</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.251568</lat>
    <lon>-88.59671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64303</plant_id>
    <plant_name>Lafayette 2 - McHenry Franks 2</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.214828</lat>
    <lon>-88.49191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64304</plant_id>
    <plant_name>Lafayette 2 - Kankakee Yonke</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.097265</lat>
    <lon>-87.86929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64328</plant_id>
    <plant_name>AES Griggs Solar, LLC</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>AES Griggs Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.19128</lat>
    <lon>-87.66646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64329</plant_id>
    <plant_name>IGS East Central, LLC</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>SRC Partnership 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.471715</lat>
    <lon>-88.04373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64330</plant_id>
    <plant_name>SV CSG Lily Lake 2 LLC</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>SV CSG Lily Lake 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.954902</lat>
    <lon>-88.47837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64331</plant_id>
    <plant_name>Cedarville Road</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>SRC P9 - Lena Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.37195</lat>
    <lon>-89.80797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64380</plant_id>
    <plant_name>Cascades</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.55879</lat>
    <lon>-74.45646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64409</plant_id>
    <plant_name>Anderson (SC)</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Anderson Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.493707</lat>
    <lon>-82.67614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64410</plant_id>
    <plant_name>Briarwood</plant_name>
    <state>SC</state>
    <county>Greenwood</county>
    <operator>Briarwood Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.08475</lat>
    <lon>-82.10133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64414</plant_id>
    <plant_name>Pontiac</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Pontiac Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.91806</lat>
    <lon>-88.625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64415</plant_id>
    <plant_name>Rockford CSG</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Rockford Baxter Rd Holdco LLC CSG</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.16572</lat>
    <lon>-89.03686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64416</plant_id>
    <plant_name>Sandoval</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Sandoval Holdco, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.589905</lat>
    <lon>-89.14935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64421</plant_id>
    <plant_name>Sunvestment Energy Group NY 63 LLC</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.0447</lat>
    <lon>-76.0419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64439</plant_id>
    <plant_name>Pine Road Solar, LLC CSG</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Pine Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.674386</lat>
    <lon>-88.66445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64451</plant_id>
    <plant_name>Rosemond Solar Community Solar</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.71133</lat>
    <lon>-74.54163</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64456</plant_id>
    <plant_name>13 Mile Solar, LLC</plant_name>
    <state>MI</state>
    <county>Calhoun</county>
    <operator>13 Mile Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.326656</lat>
    <lon>-85.04858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64457</plant_id>
    <plant_name>Captain Solar, LLC</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>Captain Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.100538</lat>
    <lon>-83.78162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64458</plant_id>
    <plant_name>Coldwater Solar, LLC</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>Coldwater Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.093344</lat>
    <lon>-83.77707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64459</plant_id>
    <plant_name>Geddes 1 Solar, LLC</plant_name>
    <state>MI</state>
    <county>Saginaw</county>
    <operator>Geddes 1 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.433775</lat>
    <lon>-84.11866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64460</plant_id>
    <plant_name>Jack Francis Solar, LLC</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>Jack Francis Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.149282</lat>
    <lon>-83.67917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64461</plant_id>
    <plant_name>May Shannon Solar, LLC</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>May Shannon Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.151133</lat>
    <lon>-83.69089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64462</plant_id>
    <plant_name>Stoneheart Solar, LLC</plant_name>
    <state>MI</state>
    <county>Saginaw</county>
    <operator>Stoneheart Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.50677</lat>
    <lon>-83.99659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64463</plant_id>
    <plant_name>Workman Road Solar Farm, LLC</plant_name>
    <state>MI</state>
    <county>Missaukee</county>
    <operator>Workman Road Solar Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.273592</lat>
    <lon>-85.21202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64464</plant_id>
    <plant_name>Clendenin A Community Solar, LLC CSG</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>Clendenin A Community Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.829241</lat>
    <lon>-89.01148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64465</plant_id>
    <plant_name>Kern A Community Solar, LLC CSG</plant_name>
    <state>IL</state>
    <county>Franklin</county>
    <operator>Kern A Community Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.897506</lat>
    <lon>-88.9524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64466</plant_id>
    <plant_name>Lukuc B Community Solar LLC CSG</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>Lukuc B Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.836165</lat>
    <lon>-89.04242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64467</plant_id>
    <plant_name>CSG Mt. Morris 2, LLC</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>CSG Mt. Morris 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.065653</lat>
    <lon>-89.43314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64468</plant_id>
    <plant_name>Tower Road Solar, LLC CSG</plant_name>
    <state>IL</state>
    <county>Dekalb</county>
    <operator>Tower Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.805224</lat>
    <lon>-88.92519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64470</plant_id>
    <plant_name>Interchange Solar, LLC</plant_name>
    <state>MI</state>
    <county>Genesee</county>
    <operator>Interchange Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.099899</lat>
    <lon>-83.771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64472</plant_id>
    <plant_name>Berry Road Solar</plant_name>
    <state>SC</state>
    <county>Greenville</county>
    <operator>RPSC Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.639249</lat>
    <lon>-82.32869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64473</plant_id>
    <plant_name>Norman Solar</plant_name>
    <state>OK</state>
    <county>Cleveland</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.226913</lat>
    <lon>-97.36035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64496</plant_id>
    <plant_name>Hendershot Solar, LLC</plant_name>
    <state>MI</state>
    <county>Lenawee</county>
    <operator>Hendershot Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.982616</lat>
    <lon>-83.88852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64497</plant_id>
    <plant_name>Hazel Solar, LLC</plant_name>
    <state>MI</state>
    <county>Montcalm</county>
    <operator>Hazel Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.402157</lat>
    <lon>-85.4535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64498</plant_id>
    <plant_name>Geddes 2 Solar, LLC</plant_name>
    <state>MI</state>
    <county>Saginaw</county>
    <operator>Geddes 2 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.428036</lat>
    <lon>-84.11933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64499</plant_id>
    <plant_name>Bullhead Solar, LLC</plant_name>
    <state>MI</state>
    <county>Hillsdale</county>
    <operator>Bullhead Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.96019</lat>
    <lon>-84.67383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64500</plant_id>
    <plant_name>Angola Solar, LLC</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>Angola Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.834826</lat>
    <lon>-85.0074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64524</plant_id>
    <plant_name>SoCore Clovis 1</plant_name>
    <state>NM</state>
    <county>Curry</county>
    <operator>SoCore Clovis 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.423035</lat>
    <lon>-103.2541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64562</plant_id>
    <plant_name>Washingtonville(CSG)</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Washingtonville Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.424</lat>
    <lon>-74.167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64570</plant_id>
    <plant_name>Columbia Substation</plant_name>
    <state>GA</state>
    <county>Columbia</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.567718</lat>
    <lon>-82.29907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64574</plant_id>
    <plant_name>Westport Community Solar Garden</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>BWC Bass River LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.68994</lat>
    <lon>-71.09383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64578</plant_id>
    <plant_name>Slate Hill(CSG)</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Slate Hill Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.363</lat>
    <lon>-74.503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64582</plant_id>
    <plant_name>Shawnee - GA</plant_name>
    <state>GA</state>
    <county>Burke</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.107648</lat>
    <lon>-81.98075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64606</plant_id>
    <plant_name>Burns Solar One LLC</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.47653</lat>
    <lon>-76.85446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64608</plant_id>
    <plant_name>Hostetter Solar One, LLC</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.66448</lat>
    <lon>-77.70058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64622</plant_id>
    <plant_name>Diamond H Dairy Power</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Madera DP 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.01618</lat>
    <lon>-120.3728</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64646</plant_id>
    <plant_name>Pittman Solar One LLC</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.68753</lat>
    <lon>-78.108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64647</plant_id>
    <plant_name>Bulldog Solar One, LLC</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.9152</lat>
    <lon>-76.6972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64674</plant_id>
    <plant_name>Van Buren</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Van Buren Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.984045</lat>
    <lon>-78.5275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64675</plant_id>
    <plant_name>Naples</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Naples Casco Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.970601</lat>
    <lon>-70.57696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64681</plant_id>
    <plant_name>Clifton Park Solar 2, LLC</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.84037</lat>
    <lon>-73.83546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64682</plant_id>
    <plant_name>Adams</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Adams Solar SC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.695185</lat>
    <lon>-82.52828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64689</plant_id>
    <plant_name>MD - PR97 (CSG)</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.934666</lat>
    <lon>-76.71482</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64730</plant_id>
    <plant_name>IL17021 Brush Creek I CSG</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>SPG IL Brush Creek I Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.452243</lat>
    <lon>-89.63881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64732</plant_id>
    <plant_name>Segunda II (CSG)</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Segunda Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.117733</lat>
    <lon>-88.86371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64733</plant_id>
    <plant_name>Woodlawn II (CSG)</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Woodlawn Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.392408</lat>
    <lon>-87.59482</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64734</plant_id>
    <plant_name>Dodds (CSG)</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Dodds Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.379459</lat>
    <lon>-89.84296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64735</plant_id>
    <plant_name>Olmstead II CSG</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Olmstead Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.371669</lat>
    <lon>-89.79629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64736</plant_id>
    <plant_name>Wolfcastle</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Beartooth Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.9506</lat>
    <lon>-88.8308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64741</plant_id>
    <plant_name>Morgan Solar 1 CSG</plant_name>
    <state>IL</state>
    <county>Morgan</county>
    <operator>Morgan Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.82245</lat>
    <lon>-90.55519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64742</plant_id>
    <plant_name>Morgan Solar 1b CSG</plant_name>
    <state>IL</state>
    <county>Morgan</county>
    <operator>Morgan Solar 1b LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.82215</lat>
    <lon>-90.55457</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64761</plant_id>
    <plant_name>Patchogue ESS</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>11.9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.783</lat>
    <lon>-73.01634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64779</plant_id>
    <plant_name>IGS Frankfort 2 CSG</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>IGS Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.49563</lat>
    <lon>-87.7876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64783</plant_id>
    <plant_name>Kearsarge East Providence</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Kearsarge East Providence LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.833746</lat>
    <lon>-71.36975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64784</plant_id>
    <plant_name>Long John CSG</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Long John Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.69398</lat>
    <lon>-88.65309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64785</plant_id>
    <plant_name>Woodlawn CSG</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Woodlawn Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.392408</lat>
    <lon>-87.59463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64786</plant_id>
    <plant_name>Hurricane Creek CSG</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>SPG IL Hurricane Creek Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.789506</lat>
    <lon>-89.05871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64787</plant_id>
    <plant_name>Viking Solar CSG</plant_name>
    <state>IL</state>
    <county>Macoupin</county>
    <operator>Viking Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.405457</lat>
    <lon>-89.99571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64788</plant_id>
    <plant_name>Freehold(CSG)</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>Freehold Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.370433</lat>
    <lon>-74.03805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64789</plant_id>
    <plant_name>Moraine CSG</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>Moraine Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.379212</lat>
    <lon>-88.84341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64820</plant_id>
    <plant_name>Broadway Road Solar, LLC</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.457056</lat>
    <lon>-79.09416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64822</plant_id>
    <plant_name>Wyse Fork Solar Farm, LLC</plant_name>
    <state>NC</state>
    <county>Jones</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.21377</lat>
    <lon>-77.50322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64868</plant_id>
    <plant_name>Keeversville Solar CSG</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Keeversville Solar Energy Center LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.25559</lat>
    <lon>-88.21848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64905</plant_id>
    <plant_name>Mt. Morris Solar CSG</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>DG Illinois Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.063506</lat>
    <lon>-89.49618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64914</plant_id>
    <plant_name>Trona Solar III</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Trona Solar III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.804953</lat>
    <lon>-117.3506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64930</plant_id>
    <plant_name>Stockton (MN)</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.04105</lat>
    <lon>-91.7669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64967</plant_id>
    <plant_name>SV Gardner 1 (Lutz) CSG</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>SV CSG Gardner 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.19504</lat>
    <lon>-88.30134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64971</plant_id>
    <plant_name>Pretzel CSG</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Pretzel Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.307119</lat>
    <lon>-89.5981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64972</plant_id>
    <plant_name>Prophet CSG</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>Prophet Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.721815</lat>
    <lon>-89.80473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64973</plant_id>
    <plant_name>Gala (CSG)</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Gala Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.356266</lat>
    <lon>-89.83697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64976</plant_id>
    <plant_name>Spooner Solar Array</plant_name>
    <state>WI</state>
    <county>Washburn</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.919047</lat>
    <lon>-91.86248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64977</plant_id>
    <plant_name>Torrington Solar One, LLC</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>DG Connecticut III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.83019</lat>
    <lon>-73.07802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64979</plant_id>
    <plant_name>Watertown Solar One, LLC</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>DG Connecticut III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.61968</lat>
    <lon>-73.14844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65013</plant_id>
    <plant_name>Marengo Solar</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>DG Illinois Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.25974</lat>
    <lon>-88.63587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65027</plant_id>
    <plant_name>Aero Solar Facility</plant_name>
    <state>KY</state>
    <county>Boone</county>
    <operator>Duke Energy Kentucky Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.03131</lat>
    <lon>-84.65976</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65054</plant_id>
    <plant_name>71 Charlotte Furnace Rd Hybrid(CSG)</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>71CFR WHAM8 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>5.4</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.797106</lat>
    <lon>-70.7416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65071</plant_id>
    <plant_name>Buffalo NY GigaFactory</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Tesla Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.859297</lat>
    <lon>-78.8418</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65104</plant_id>
    <plant_name>CA - DGS RFP - RJ Donovan State Prison</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.582</lat>
    <lon>-116.924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65110</plant_id>
    <plant_name>Ridgeback</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Ridgeback Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.86546</lat>
    <lon>-79.57982</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65130</plant_id>
    <plant_name>City of Bowie</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.904641</lat>
    <lon>-76.68877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65194</plant_id>
    <plant_name>AT&amp;T Middletown</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>Bloom Energy 2009 PPA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.397872</lat>
    <lon>-74.13484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65212</plant_id>
    <plant_name>Altice - Hicksville</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.759984</lat>
    <lon>-73.50419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65213</plant_id>
    <plant_name>Altice - Parsippany</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.845086</lat>
    <lon>-74.42825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65227</plant_id>
    <plant_name>Ameresco Danville Solar, LLC</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.10351</lat>
    <lon>-87.64977</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65229</plant_id>
    <plant_name>OK Produce Fresno Carport</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>OK Produce</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.723488</lat>
    <lon>-119.7744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65232</plant_id>
    <plant_name>Chambers 3 - Lewis County</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.78013</lat>
    <lon>-75.49986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65233</plant_id>
    <plant_name>Chambers 3 - Erie County Alden</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.93284</lat>
    <lon>-78.55716</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65256</plant_id>
    <plant_name>Chambers 4 - San Bernardino SNA7</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.07752</lat>
    <lon>-117.2726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65279</plant_id>
    <plant_name>Fairhaven E</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.642</lat>
    <lon>-72.896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65287</plant_id>
    <plant_name>Barrow Solar</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.03263</lat>
    <lon>-72.50491</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65317</plant_id>
    <plant_name>Springfield Solar</plant_name>
    <state>VA</state>
    <county>Westmoreland</county>
    <operator>Dominion Renewable Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.093</lat>
    <lon>-76.799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65339</plant_id>
    <plant_name>MD - CS - Potomac Edison Co - GA25 TPE (</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.608072</lat>
    <lon>-79.32824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65340</plant_id>
    <plant_name>MD - CS - BGE - PR24 TPE</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.927431</lat>
    <lon>-76.69916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65357</plant_id>
    <plant_name>OER Monarch CSG</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.799594</lat>
    <lon>-76.78948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65358</plant_id>
    <plant_name>OER Patuxent CSG</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.838642</lat>
    <lon>-76.68309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65359</plant_id>
    <plant_name>Shepherds Mill CSG</plant_name>
    <state>MD</state>
    <county>Carroll</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.562305</lat>
    <lon>-77.16177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65383</plant_id>
    <plant_name>Bodega Avenue Solar LLC</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Bodega Avenue Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.26147</lat>
    <lon>-122.7373</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65391</plant_id>
    <plant_name>Beloit Solar LLC</plant_name>
    <state>KS</state>
    <county>Mitchell</county>
    <operator>PPM Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.450445</lat>
    <lon>-98.10475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65415</plant_id>
    <plant_name>SCS Galena 012589 Peoria, LLC</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.765278</lat>
    <lon>-89.56913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65416</plant_id>
    <plant_name>Monroe 009452 SCS Cozad, LLC</plant_name>
    <state>NE</state>
    <county>Dawson</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.872664</lat>
    <lon>-99.97858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65417</plant_id>
    <plant_name>SCS COUNTY 012631 Champaign, LLC</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.07119</lat>
    <lon>-88.23865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65508</plant_id>
    <plant_name>Mendota Rich Dev CSG</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>42nd Road Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.541339</lat>
    <lon>-89.14808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65526</plant_id>
    <plant_name>CA-DGS RFP-Pleasant Valley State Prison</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.130814</lat>
    <lon>-120.2529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65560</plant_id>
    <plant_name>Truck Stop</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>LSE Corona Austrina LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.341063</lat>
    <lon>-73.39668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65586</plant_id>
    <plant_name>Wachusett Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Wachusett Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.48392</lat>
    <lon>-71.71081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65610</plant_id>
    <plant_name>MO32 (CSG)</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>TPE MD MO32 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.119391</lat>
    <lon>-76.95976</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65611</plant_id>
    <plant_name>MO33 CSG</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>TPE MD MO33 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.187812</lat>
    <lon>-77.11986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65620</plant_id>
    <plant_name>100 Lower</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.294</lat>
    <lon>-74.539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65669</plant_id>
    <plant_name>Faunce Corner Community Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Faunce Corner Road Dartmouth Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>3.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.672831</lat>
    <lon>-70.9895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65670</plant_id>
    <plant_name>Ventura</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Ventura Drive Dartmouth Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.668886</lat>
    <lon>-70.99138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65671</plant_id>
    <plant_name>Cattail (CSG)</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>Cattail Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.822595</lat>
    <lon>-90.13117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65716</plant_id>
    <plant_name>Long Plain Solar</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Long Plain Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.4457</lat>
    <lon>-72.59714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65731</plant_id>
    <plant_name>Rockford CS 1</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Rockford CS 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.17606</lat>
    <lon>-89.08479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65732</plant_id>
    <plant_name>Rockford CS 2</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Rockford CS 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.17606</lat>
    <lon>-89.08479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65748</plant_id>
    <plant_name>Kaiser Creek Solar (CSG)</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Kaiser Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.143</lat>
    <lon>-122.609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65752</plant_id>
    <plant_name>East Fishkill CSG</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.571</lat>
    <lon>-73.829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65756</plant_id>
    <plant_name>Rockdale</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.628867</lat>
    <lon>-77.8749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65758</plant_id>
    <plant_name>Ahern Community Solar I, LLC</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>Ahern Community Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.185</lat>
    <lon>-88.231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65774</plant_id>
    <plant_name>Alden Road Harvard Solar 1</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Alden Road Harvard Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.40028</lat>
    <lon>-88.4988</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65775</plant_id>
    <plant_name>Cream Street Solar</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Cream Street Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.75596</lat>
    <lon>-73.87539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65776</plant_id>
    <plant_name>Little Falls Solar</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Little Falls Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.05899</lat>
    <lon>-74.88603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65777</plant_id>
    <plant_name>Little Falls Solar 1</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Little Falls Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.05414</lat>
    <lon>-74.85455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65780</plant_id>
    <plant_name>Ogburn Solar, LLC</plant_name>
    <state>SC</state>
    <county>Chesterfield</county>
    <operator>Ogburn Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.66565</lat>
    <lon>-80.39065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65782</plant_id>
    <plant_name>Magdaline Solar, LLC</plant_name>
    <state>SC</state>
    <county>Lee</county>
    <operator>Magdaline Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.12784</lat>
    <lon>-80.14985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65796</plant_id>
    <plant_name>SV CSG Baileyville 1 LLC</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>SV CSG Baileyville 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.201229</lat>
    <lon>-89.60881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65797</plant_id>
    <plant_name>Elba Solar LLC</plant_name>
    <state>IL</state>
    <county>Knox</county>
    <operator>Elba Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.885483</lat>
    <lon>-90.01671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65799</plant_id>
    <plant_name>SV CSG South Dekalb 1 LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SV CSG South Dekalb 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.893409</lat>
    <lon>-88.77105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65800</plant_id>
    <plant_name>SV CSG South Dekalb 2 LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SV CSG South Dekalb 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.894383</lat>
    <lon>-88.7713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65803</plant_id>
    <plant_name>SV CSG Barrass Farms II LL</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>SV CSG Barrass Farms II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.727245</lat>
    <lon>-88.84904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65815</plant_id>
    <plant_name>NY - Mines Press</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>NY - Mines Press</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>41.27803</lat>
    <lon>-73.86612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65818</plant_id>
    <plant_name>Limelight Solar I, LLC</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Limelight Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.94861</lat>
    <lon>-81.98778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65819</plant_id>
    <plant_name>233 Randolph 74 Solar I, LLC</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>233 Randolph 74 Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.311944</lat>
    <lon>-81.59056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65890</plant_id>
    <plant_name>SV CSG Baileyville 2 LLC</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>SV CSG Baileyville 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.201355</lat>
    <lon>-89.61099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65896</plant_id>
    <plant_name>Gallaudet Uni Community Solar</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>SMS DC CS01B, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.90724</lat>
    <lon>-76.99372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65940</plant_id>
    <plant_name>Shasta College PH2 Solar Project</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>TotalEnergies Distributed Generation, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.62524</lat>
    <lon>-122.314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65982</plant_id>
    <plant_name>KDC Solar TC Little Patuxent WWTP LLC</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.299137</lat>
    <lon>-76.95995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65983</plant_id>
    <plant_name>KDC Solar TC George Howard LLC</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.300067</lat>
    <lon>-76.95713</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65984</plant_id>
    <plant_name>KDC Solar TC Blandair Park LLC</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.300615</lat>
    <lon>-76.96096</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65990</plant_id>
    <plant_name>USS Giveback Solar LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.14347</lat>
    <lon>-104.2534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66031</plant_id>
    <plant_name>IL Sidney Project1</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>IL Sidney Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.0274</lat>
    <lon>-88.04693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66032</plant_id>
    <plant_name>Clay FC</plant_name>
    <state>IL</state>
    <county>Clay</county>
    <operator>Clay FC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.75066</lat>
    <lon>-88.50682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66033</plant_id>
    <plant_name>IL West Hallock Project1</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>IL West Hallock Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.92402</lat>
    <lon>-89.63196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66074</plant_id>
    <plant_name>Marlborough Solar</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Marlborough Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.66398</lat>
    <lon>-73.97007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66076</plant_id>
    <plant_name>Electric Avenue Lunenburg Solar 1</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Electric Avenue Lunenburg Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2022</latest_year>
    <lat>42.58617</lat>
    <lon>-71.75287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66077</plant_id>
    <plant_name>Harbor Road Solar 1</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Harbor Road Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.58967</lat>
    <lon>-73.13016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66082</plant_id>
    <plant_name>OE IL Solar 3</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>OE IL Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.02005</lat>
    <lon>-89.36263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66083</plant_id>
    <plant_name>French Road Solar II</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>French Road Solar II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.06052</lat>
    <lon>-88.5451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66085</plant_id>
    <plant_name>Rockford Solar</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Rockford Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.28525</lat>
    <lon>-89.09937</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66141</plant_id>
    <plant_name>Cortez Solar 3, LLC</plant_name>
    <state>CO</state>
    <county>Montezuma</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.303925</lat>
    <lon>-108.5795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66147</plant_id>
    <plant_name>Smithfield 3</plant_name>
    <state>UT</state>
    <county>Beaver</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.2245</lat>
    <lon>-113.1054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66160</plant_id>
    <plant_name>Friendship I</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.30953</lat>
    <lon>-76.97915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66162</plant_id>
    <plant_name>Friendship II</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.309529</lat>
    <lon>-76.97915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66176</plant_id>
    <plant_name>Landau Solar</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.90066</lat>
    <lon>-74.02777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66177</plant_id>
    <plant_name>Drinkwater Solar</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.014985</lat>
    <lon>-74.6834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66187</plant_id>
    <plant_name>McCarthy Solar</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.401253</lat>
    <lon>-74.17908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66199</plant_id>
    <plant_name>Cairo Solar Farm, LLC</plant_name>
    <state>GA</state>
    <county>Grady</county>
    <operator>Southeastern Solar Farm Fund, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.911286</lat>
    <lon>-84.22888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66200</plant_id>
    <plant_name>Cedar Creek Solar, LLC</plant_name>
    <state>GA</state>
    <county>Barrow</county>
    <operator>Southeastern Solar Farm Fund, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.02783</lat>
    <lon>-83.75747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66210</plant_id>
    <plant_name>Bogart Solar</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.209593</lat>
    <lon>-73.99509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66211</plant_id>
    <plant_name>Brickchurch Solar</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.201698</lat>
    <lon>-76.96808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66213</plant_id>
    <plant_name>Costanza Solar</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.460556</lat>
    <lon>-74.06944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66217</plant_id>
    <plant_name>Donati Solar</plant_name>
    <state>NY</state>
    <county>Seneca</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.944796</lat>
    <lon>-76.79089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66223</plant_id>
    <plant_name>Lockenhurst Pond Solar</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.33695</lat>
    <lon>-74.55504</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66224</plant_id>
    <plant_name>New Beginnings Solar</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.892424</lat>
    <lon>-74.0936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66227</plant_id>
    <plant_name>Reisender Solar</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.743505</lat>
    <lon>-74.51462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66229</plant_id>
    <plant_name>Sangolqui Solar</plant_name>
    <state>NY</state>
    <county>Seneca</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.947327</lat>
    <lon>-76.7856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66246</plant_id>
    <plant_name>Lisbon Street Solar</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>NextGrid Cliffrose, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.061033</lat>
    <lon>-70.1537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66328</plant_id>
    <plant_name>Filer BESS</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.57156</lat>
    <lon>-114.5951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66329</plant_id>
    <plant_name>Melba BESS</plant_name>
    <state>ID</state>
    <county>Canyon</county>
    <operator>Idaho Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.372252</lat>
    <lon>-116.5609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66371</plant_id>
    <plant_name>Edison Farm</plant_name>
    <state>NC</state>
    <county>Rockingham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.51703</lat>
    <lon>-79.70923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66432</plant_id>
    <plant_name>USS Fruita Solar LLC CSG</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.09194</lat>
    <lon>-108.4231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66499</plant_id>
    <plant_name>Federalsburg Energy Storage 1 LLC</plant_name>
    <state>MD</state>
    <county>Caroline</county>
    <operator>Convergent Energy and Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>2.4</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.64022</lat>
    <lon>-75.71107</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66506</plant_id>
    <plant_name>West Tambo Clean Power II</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>West Tambo Clean Power II</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.360955</lat>
    <lon>-120.7194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66507</plant_id>
    <plant_name>Briscoe 1A</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>7th Road Solar 1, LLC (Briscoe 1A)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.207028</lat>
    <lon>-89.03174</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66508</plant_id>
    <plant_name>Briscoe 2A</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>7th Road Solar 2, LLC (Briscoe 2A)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.172704</lat>
    <lon>-89.02877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66520</plant_id>
    <plant_name>TX Sunnyvale 367 Long Creek Road Solar</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Catalyze Sunnyvale 367 Long Creek Road Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>32.77442</lat>
    <lon>-96.56668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66570</plant_id>
    <plant_name>Fredonia Solar (KS)</plant_name>
    <state>KS</state>
    <county>Wilson</county>
    <operator>PPM Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.5473</lat>
    <lon>-95.8177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66648</plant_id>
    <plant_name>Blackwell?s Corner Storage Facility</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Blackwell Test Facility, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>9</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.618402</lat>
    <lon>-119.8407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66652</plant_id>
    <plant_name>KDC Solar CV Ascend One LLC</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>KDC Solar CV Ascend One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.31771</lat>
    <lon>-76.98454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66653</plant_id>
    <plant_name>KDC Solar CV Cedar Lane Park LLC</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>KDC Solar CV Cedar Lane Park LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.314718</lat>
    <lon>-76.97887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66654</plant_id>
    <plant_name>KDC Solar CV Central MD Regional Transit</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>KDC Solar CV Central MD Regional Transit LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.311</lat>
    <lon>-76.978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66655</plant_id>
    <plant_name>KDC Solar CV Animal Control LLC</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>KDC Solar CV Animal Control LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.314718</lat>
    <lon>-76.97887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66656</plant_id>
    <plant_name>KDC Solar CV O'Donnell Property LLC</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>KDC Solar CV O'Donnell Property LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.311</lat>
    <lon>-76.978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66698</plant_id>
    <plant_name>Oxon Run CREF</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Oxon Run Community Renewable Energy Facility</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.821772</lat>
    <lon>-77.00354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66718</plant_id>
    <plant_name>ESA Albemarle NC Solar</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.39606</lat>
    <lon>-80.12365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66845</plant_id>
    <plant_name>Old Bridge Global Landfill CSG</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.446</lat>
    <lon>-74.284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66846</plant_id>
    <plant_name>Jogee Road Solar</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>DG New York CS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.399969</lat>
    <lon>-74.50221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66867</plant_id>
    <plant_name>Cannonball Solar (CSG)</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.5463</lat>
    <lon>-77.4164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66868</plant_id>
    <plant_name>Big Spring Solar (CSG)</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.6301</lat>
    <lon>-77.9099</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66985</plant_id>
    <plant_name>Georgetown (Polk Burnett)</plant_name>
    <state>WI</state>
    <county>Polk</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.476919</lat>
    <lon>-92.36803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66986</plant_id>
    <plant_name>Mule Farm Solar, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.388245</lat>
    <lon>-78.54028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66988</plant_id>
    <plant_name>Ramp Solar, LLC</plant_name>
    <state>NC</state>
    <county>Wayne</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.416437</lat>
    <lon>-77.91875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66989</plant_id>
    <plant_name>Hubble Solar, LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.301189</lat>
    <lon>-78.70961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66995</plant_id>
    <plant_name>Popple Creek (Clark 1)</plant_name>
    <state>WI</state>
    <county>Clark</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.895133</lat>
    <lon>-90.44196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67001</plant_id>
    <plant_name>Sunny Cow Solar, LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.2581</lat>
    <lon>-119.1492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67052</plant_id>
    <plant_name>Whitehall Solar LLC</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.039056</lat>
    <lon>-79.91666</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67054</plant_id>
    <plant_name>Trimbelle (Pierce Pepin)</plant_name>
    <state>WI</state>
    <county>Pierce</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.625156</lat>
    <lon>-92.57574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67065</plant_id>
    <plant_name>Lister Avenue Solar</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.739381</lat>
    <lon>-74.13811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67079</plant_id>
    <plant_name>SR Clarksville, LLC</plant_name>
    <state>TN</state>
    <county>Montgomery</county>
    <operator>SR Clarksville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.523317</lat>
    <lon>-87.31664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67084</plant_id>
    <plant_name>Buckeye Power Inc.</plant_name>
    <state>OH</state>
    <county>Hancock</county>
    <operator>Township Road 215 Solar Project 2021, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.060477</lat>
    <lon>-83.55444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67106</plant_id>
    <plant_name>Gooseberry Solar, LLC</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Reactivate</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.520824</lat>
    <lon>-87.57228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67107</plant_id>
    <plant_name>Monee Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Reactivate</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.383165</lat>
    <lon>-87.7751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67108</plant_id>
    <plant_name>Mulberry Solar, LLC</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>Reactivate</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.729</lat>
    <lon>-90.135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67114</plant_id>
    <plant_name>Torrence Ave Solar 1 LLC</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Reactivate</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.496</lat>
    <lon>-87.56</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67115</plant_id>
    <plant_name>North Cottage Grove Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Reactivate</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.526376</lat>
    <lon>-87.60076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67152</plant_id>
    <plant_name>N Baker Road 2</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.435916</lat>
    <lon>-89.90473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67153</plant_id>
    <plant_name>N Baker Road</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.435913</lat>
    <lon>-89.90352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67162</plant_id>
    <plant_name>Groton BESS 2</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Groton BESS 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>8.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.61566</lat>
    <lon>-71.57778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67180</plant_id>
    <plant_name>Oaks Landfill - ANEM</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.193672</lat>
    <lon>-77.11872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67185</plant_id>
    <plant_name>Groton BESS 1</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Groton BESS 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>8.9</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.609132</lat>
    <lon>-71.53915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67192</plant_id>
    <plant_name>SR White Pine, LLC</plant_name>
    <state>TN</state>
    <county>Jefferson</county>
    <operator>SR White Pine, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.12323</lat>
    <lon>-83.28383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67197</plant_id>
    <plant_name>Surrey Road</plant_name>
    <state>MI</state>
    <county>Clare</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.858529</lat>
    <lon>-84.74891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67198</plant_id>
    <plant_name>N Solon Road (South)</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.461344</lat>
    <lon>-88.27943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67199</plant_id>
    <plant_name>Morey Road</plant_name>
    <state>MI</state>
    <county>Missaukee</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.273299</lat>
    <lon>-85.20803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67200</plant_id>
    <plant_name>Lake City</plant_name>
    <state>MI</state>
    <county>Missaukee</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.289589</lat>
    <lon>-85.21448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67254</plant_id>
    <plant_name>Stockbridge</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.01082</lat>
    <lon>-75.6068</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67255</plant_id>
    <plant_name>Tully 1</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.30302</lat>
    <lon>-88.50709</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67256</plant_id>
    <plant_name>Lobelia 1</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.46209</lat>
    <lon>-88.61188</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67280</plant_id>
    <plant_name>FFP - NY Ruggirello CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Ruggirello Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.564307</lat>
    <lon>-74.13999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67297</plant_id>
    <plant_name>FFP - MD Foxhall</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>FFP MD Freeland Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.683539</lat>
    <lon>-76.73909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67326</plant_id>
    <plant_name>Norcap South</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>LSE Coma Berenices LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.881606</lat>
    <lon>-72.54481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67327</plant_id>
    <plant_name>Norcap North</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>LSE Canes Venatici LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.882487</lat>
    <lon>-72.54369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67334</plant_id>
    <plant_name>Ten Oaks</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.2028</lat>
    <lon>-76.9561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67370</plant_id>
    <plant_name>Seaboard Charlton, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.13792</lat>
    <lon>-71.91592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67372</plant_id>
    <plant_name>Seaboard Sheffield, LLC</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.13675</lat>
    <lon>-73.32518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67392</plant_id>
    <plant_name>Lion One</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.3273</lat>
    <lon>-76.781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67393</plant_id>
    <plant_name>Livingston Crossing (CSG)</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.69686</lat>
    <lon>-76.97816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67397</plant_id>
    <plant_name>Meeting House</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.70381</lat>
    <lon>-75.94323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67404</plant_id>
    <plant_name>Bear One</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.70285</lat>
    <lon>-78.08261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67422</plant_id>
    <plant_name>Powder Hill</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>LSE Delphinus LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.976084</lat>
    <lon>-72.53382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67423</plant_id>
    <plant_name>Platt Hill</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>LSE Pictor LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.900096</lat>
    <lon>-73.10705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67429</plant_id>
    <plant_name>BNRG Norridgewock (CSG)</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.716375</lat>
    <lon>-69.81124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67431</plant_id>
    <plant_name>BNRG North Anson (CSG)</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.851756</lat>
    <lon>-69.91664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67439</plant_id>
    <plant_name>Parker Place</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.3228</lat>
    <lon>-75.5431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67478</plant_id>
    <plant_name>Sand Road</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>LSE Phoenix LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.032202</lat>
    <lon>-73.33416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67481</plant_id>
    <plant_name>NY Lower Road II CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Lower Road II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.338012</lat>
    <lon>-74.48105</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67482</plant_id>
    <plant_name>NY Lower Road III CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Lower Road III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.333041</lat>
    <lon>-74.48451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67486</plant_id>
    <plant_name>Hall Property</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.708361</lat>
    <lon>-76.74585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67506</plant_id>
    <plant_name>Bunce</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>LSE Indus LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.021795</lat>
    <lon>-73.31691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67507</plant_id>
    <plant_name>ACC</plant_name>
    <state>AR</state>
    <county>Howard</county>
    <operator>Entegrity Solar ACC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.926859</lat>
    <lon>-93.86014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67508</plant_id>
    <plant_name>Oaks Landfill CS 1</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.193589</lat>
    <lon>-77.11872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67554</plant_id>
    <plant_name>Cedarville (IL)</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.3676</lat>
    <lon>-89.6329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67614</plant_id>
    <plant_name>Dakota Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.39271</lat>
    <lon>-89.53531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67619</plant_id>
    <plant_name>Janiak</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.409555</lat>
    <lon>-74.58781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67622</plant_id>
    <plant_name>9521 US 14 SOLAR 1, LLC</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.46635</lat>
    <lon>-88.60045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67623</plant_id>
    <plant_name>Lilly Pond Road Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.27654</lat>
    <lon>-88.38677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67624</plant_id>
    <plant_name>Freeport 18th Solar</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.288085</lat>
    <lon>-89.58712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67625</plant_id>
    <plant_name>Goodenow Road West Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.3883</lat>
    <lon>-87.59558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67626</plant_id>
    <plant_name>Trenton East</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.58227</lat>
    <lon>-89.69124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67627</plant_id>
    <plant_name>Trenton West</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.582268</lat>
    <lon>-89.70044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67628</plant_id>
    <plant_name>Trinity Freeport</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.274477</lat>
    <lon>-89.56024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67629</plant_id>
    <plant_name>Cottage Grove North Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.341142</lat>
    <lon>-87.58613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67630</plant_id>
    <plant_name>Cottage Grove South Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.341171</lat>
    <lon>-87.57418</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67633</plant_id>
    <plant_name>Breezewood</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.438673</lat>
    <lon>-88.99117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67681</plant_id>
    <plant_name>Lawrence Solar 1 LLC</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.480175</lat>
    <lon>-88.59916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67682</plant_id>
    <plant_name>Lawrence Solar 2 LLC</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.480175</lat>
    <lon>-88.59916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67684</plant_id>
    <plant_name>SV CSG Bishop 1 LLC</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.79441</lat>
    <lon>-89.04892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67685</plant_id>
    <plant_name>Schmidt CSG 1</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.48756</lat>
    <lon>-89.95162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67687</plant_id>
    <plant_name>SV CSG German Valley 1 LLC</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.215173</lat>
    <lon>-89.48113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67688</plant_id>
    <plant_name>SV CSG Wagner A LLC</plant_name>
    <state>IL</state>
    <county>Randolph</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.161252</lat>
    <lon>-89.70291</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67689</plant_id>
    <plant_name>SV CSG Wagner B LLC</plant_name>
    <state>IL</state>
    <county>Randolph</county>
    <operator>SunVest Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.177396</lat>
    <lon>-89.85388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67690</plant_id>
    <plant_name>Oaks Landfill CS 2</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.193664</lat>
    <lon>-77.1187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67715</plant_id>
    <plant_name>Vermilion Solar II LLC CSG</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.8563</lat>
    <lon>-88.6015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67717</plant_id>
    <plant_name>Triple S Solar I LLC CSG</plant_name>
    <state>IL</state>
    <county>Coles</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.540291</lat>
    <lon>-87.97652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67719</plant_id>
    <plant_name>AES Bend Solar I, LLC CSG</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.336378</lat>
    <lon>-89.08286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67720</plant_id>
    <plant_name>Whiskey Acres</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Solar DG IL 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.877</lat>
    <lon>-88.733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67751</plant_id>
    <plant_name>DG Harlem Solar</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>DG Harlem, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.172941</lat>
    <lon>-89.41336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67753</plant_id>
    <plant_name>Plote Somonauk</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>Solar DG IL 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.674</lat>
    <lon>-88.682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67790</plant_id>
    <plant_name>Abel Solar</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.793</lat>
    <lon>-90.032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67792</plant_id>
    <plant_name>Bunker Hill Solar</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.773</lat>
    <lon>-89.864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67803</plant_id>
    <plant_name>GRE Cambridge Solar</plant_name>
    <state>MN</state>
    <county>Isanti</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.5885</lat>
    <lon>-93.1826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67804</plant_id>
    <plant_name>Harmony Solar Project</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.366</lat>
    <lon>-89.78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67805</plant_id>
    <plant_name>Illinois PV Knox 1B</plant_name>
    <state>IL</state>
    <county>Knox</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.766</lat>
    <lon>-90.008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67806</plant_id>
    <plant_name>Macomb 2A</plant_name>
    <state>IL</state>
    <county>McDonough</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.454</lat>
    <lon>-90.688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67812</plant_id>
    <plant_name>Rockford Plant</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.232</lat>
    <lon>-89.027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67813</plant_id>
    <plant_name>Round Grove 1</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.759</lat>
    <lon>-89.864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67814</plant_id>
    <plant_name>Round Grove 2</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.76</lat>
    <lon>-89.867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67816</plant_id>
    <plant_name>Illinois PV Knox 1A</plant_name>
    <state>IL</state>
    <county>Knox</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.769</lat>
    <lon>-90.008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67822</plant_id>
    <plant_name>Unity Solar Project (IL)</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.369</lat>
    <lon>-89.78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67830</plant_id>
    <plant_name>Jericho Gravel Solar Farm</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.479</lat>
    <lon>-72.96</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67831</plant_id>
    <plant_name>Jericho Landfill Solar Farm</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.448462</lat>
    <lon>-72.97741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67832</plant_id>
    <plant_name>Yorktown 1 Solar</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.768</lat>
    <lon>-89.862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67833</plant_id>
    <plant_name>Yorktown 2 Solar</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.768</lat>
    <lon>-89.859</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67865</plant_id>
    <plant_name>Ellington - 277 Sadds Mill</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.936531</lat>
    <lon>-72.50273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67923</plant_id>
    <plant_name>Houlton Road Solar Farm (CSG)</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.75638</lat>
    <lon>-67.86867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67947</plant_id>
    <plant_name>Ward Solar 1, LLC</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.88779</lat>
    <lon>-70.7462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67980</plant_id>
    <plant_name>Mompano</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Mompano</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.296464</lat>
    <lon>-122.5114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68049</plant_id>
    <plant_name>Marion Solar 4b LLC</plant_name>
    <state>IL</state>
    <county>Marion</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.624571</lat>
    <lon>-89.11444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68050</plant_id>
    <plant_name>Putnam Solar 1</plant_name>
    <state>IL</state>
    <county>Putnam</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.257762</lat>
    <lon>-89.21178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68051</plant_id>
    <plant_name>Putnam Solar 1B</plant_name>
    <state>IL</state>
    <county>Putnam</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.25775</lat>
    <lon>-89.2127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68059</plant_id>
    <plant_name>Kankakee Solar 1</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.215073</lat>
    <lon>-87.91979</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68063</plant_id>
    <plant_name>VA- US Foods- Manassas</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>EDPRNA DG VA Manassas LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.786044</lat>
    <lon>-77.55476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68232</plant_id>
    <plant_name>St. Clair Solar 3</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.62303</lat>
    <lon>-90.08714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68233</plant_id>
    <plant_name>Kankakee Solar 3</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.220911</lat>
    <lon>-87.8814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68301</plant_id>
    <plant_name>Cabin Creek MD</plant_name>
    <state>MD</state>
    <county>Dorchester</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.615</lat>
    <lon>-75.8959</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68327</plant_id>
    <plant_name>CP East Hampton I &amp; II Solar</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.4</lat>
    <lon>-72.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68336</plant_id>
    <plant_name>Sand Prairie Solar</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>DG Sand Prairie, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.437682</lat>
    <lon>-89.69327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68415</plant_id>
    <plant_name>Armstrong 1</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.364842</lat>
    <lon>-88.42436</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68450</plant_id>
    <plant_name>OR - Solops - SPI 18 - Dover</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Dover Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.208889</lat>
    <lon>-122.6758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68469</plant_id>
    <plant_name>Pontiac 1A</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>Solar DG IL 3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.918</lat>
    <lon>-88.619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68489</plant_id>
    <plant_name>IL BEDFORD PARK 7035 W 65TH ST</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Catalyze Bedford Park 7035 W 65th Street Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.772468</lat>
    <lon>-87.79725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68518</plant_id>
    <plant_name>Merced 2 BESS</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>ZGlobal Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>8</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.000929</lat>
    <lon>-120.6648</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68526</plant_id>
    <plant_name>Kama 1 LLC</plant_name>
    <state>CA</state>
    <county>Mendocino</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>1.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.991116</lat>
    <lon>-123.1027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68530</plant_id>
    <plant_name>Agrimony 2</plant_name>
    <state>IL</state>
    <county>Jo Daviess</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.48231</lat>
    <lon>-89.99143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68531</plant_id>
    <plant_name>Agrimony 1</plant_name>
    <state>IL</state>
    <county>Jo Daviess</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.482401</lat>
    <lon>-89.98954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68544</plant_id>
    <plant_name>IL Bedford Park 6901 W 65th St</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Catalyze Bedford Park 6901 W 65th Street Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.772696</lat>
    <lon>-87.79431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68598</plant_id>
    <plant_name>Mingoville PV II</plant_name>
    <state>PA</state>
    <county>Centre</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.902</lat>
    <lon>-77.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68692</plant_id>
    <plant_name>CMS-Coldwater</plant_name>
    <state>KS</state>
    <county>Comanche</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.281355</lat>
    <lon>-99.36441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68701</plant_id>
    <plant_name>NLRED 2MW</plant_name>
    <state>AR</state>
    <county>Pulaski</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.741158</lat>
    <lon>-92.18193</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68779</plant_id>
    <plant_name>MD CDG 001</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>MD CDG 001 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.373488</lat>
    <lon>-79.39764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68780</plant_id>
    <plant_name>MD CDG 002</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>MD CDG 002 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.375049</lat>
    <lon>-79.40399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68781</plant_id>
    <plant_name>ME CDG 004</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>ME CDG 004 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.849454</lat>
    <lon>-68.80057</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68782</plant_id>
    <plant_name>ME CDG 005</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>ME CDG 005 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.842381</lat>
    <lon>-68.70636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68837</plant_id>
    <plant_name>Godinho Dairy Digester</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Aligned Digesters Co., LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.10744</lat>
    <lon>-120.8591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68857</plant_id>
    <plant_name>Richmond Solar</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>DG Richmond, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.441266</lat>
    <lon>-88.30367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68881</plant_id>
    <plant_name>NL IL - Kendall</plant_name>
    <state>IL</state>
    <county>Kendall</county>
    <operator>Newark Road Kendall Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.536831</lat>
    <lon>-88.56694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68893</plant_id>
    <plant_name>USS University Park Solar</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.4685</lat>
    <lon>-87.7396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68918</plant_id>
    <plant_name>SAE Paris IL S1</plant_name>
    <state>IL</state>
    <county>Edgar</county>
    <operator>SolAmerica Energy, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.605645</lat>
    <lon>-87.71992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68919</plant_id>
    <plant_name>Macon County IL S1</plant_name>
    <state>IL</state>
    <county>Macon</county>
    <operator>SolAmerica Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.91707</lat>
    <lon>-88.89615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68920</plant_id>
    <plant_name>Peoria County IL S2</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>SolAmerica Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.622194</lat>
    <lon>-89.67884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68921</plant_id>
    <plant_name>Tazewell County IL S1</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>SolAmerica Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.378299</lat>
    <lon>-89.5225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68942</plant_id>
    <plant_name>Chaberton Solar Catherine</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.316996</lat>
    <lon>-77.00585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68951</plant_id>
    <plant_name>Illinois PV Knox 3A</plant_name>
    <state>IL</state>
    <county>Knox</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.922989</lat>
    <lon>-90.39972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68952</plant_id>
    <plant_name>Illinois PV Knox 3B</plant_name>
    <state>IL</state>
    <county>Knox</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.922989</lat>
    <lon>-90.39972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68955</plant_id>
    <plant_name>Clinton Solar 2</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.506899</lat>
    <lon>-89.14826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68960</plant_id>
    <plant_name>LaSalle Solar 1</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.166034</lat>
    <lon>-88.63338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68961</plant_id>
    <plant_name>Clinton Solar 4b</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.595728</lat>
    <lon>-89.27324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68963</plant_id>
    <plant_name>Clinton Solar 2b</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.506385</lat>
    <lon>-89.14826</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68989</plant_id>
    <plant_name>Chaberton Solar Lime Kiln</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.14942</lat>
    <lon>-76.93162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68990</plant_id>
    <plant_name>Chaberton Solar Matterhorn</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.349558</lat>
    <lon>-76.85848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68992</plant_id>
    <plant_name>TPE MD HO93</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.185645</lat>
    <lon>-76.92383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68999</plant_id>
    <plant_name>N Solon Road (North)</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.461345</lat>
    <lon>-88.27943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69005</plant_id>
    <plant_name>Chaberton Solar Greyrock</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.389578</lat>
    <lon>-75.41813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69007</plant_id>
    <plant_name>TPE MD GA137</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.379117</lat>
    <lon>-79.36778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69008</plant_id>
    <plant_name>TPE MD GA140</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.386859</lat>
    <lon>-79.38745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69009</plant_id>
    <plant_name>Madison Solar (NE)</plant_name>
    <state>NE</state>
    <county>Madison</county>
    <operator>MMPS1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.847718</lat>
    <lon>-97.4452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69011</plant_id>
    <plant_name>CTGB Manson Youth</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>TotalEnergies Renewables USA LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.517746</lat>
    <lon>-72.89777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69013</plant_id>
    <plant_name>CTGB Maloney and Webster</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>TotalEnergies Renewables USA LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.517746</lat>
    <lon>-72.89777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69031</plant_id>
    <plant_name>Nuby Run Solar, LLC</plant_name>
    <state>VA</state>
    <county>Isle of Wight</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>36.884447</lat>
    <lon>-76.69121</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69046</plant_id>
    <plant_name>Grant</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.25282</lat>
    <lon>-88.67917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69047</plant_id>
    <plant_name>Yager</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.66793</lat>
    <lon>-89.90749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69053</plant_id>
    <plant_name>ILL060-Sangamon-Atchison</plant_name>
    <state>IL</state>
    <county>Sangamon</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.849909</lat>
    <lon>-89.29994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69069</plant_id>
    <plant_name>MD - CPG - Ten Oaks</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Solar DG MD Ten Oaks LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.261126</lat>
    <lon>-76.98617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69076</plant_id>
    <plant_name>342 Circuit</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.109444</lat>
    <lon>-70.86583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69093</plant_id>
    <plant_name>Harris (NY)</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.77168</lat>
    <lon>-74.73596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69161</plant_id>
    <plant_name>SV CSG Gander Farms 1 A</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>SV CSG Gander Farms 1 A, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.75086</lat>
    <lon>-89.03886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69163</plant_id>
    <plant_name>10601 Seymour Ave East 2 CSG</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>10601 Seymour Ave East, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.949194</lat>
    <lon>-87.893</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69183</plant_id>
    <plant_name>SAE Ottawa IL</plant_name>
    <state>IL</state>
    <county>Lasalle</county>
    <operator>SolAmerica Energy, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.335883</lat>
    <lon>-88.86978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69201</plant_id>
    <plant_name>KA361</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.267199</lat>
    <lon>-87.77736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69314</plant_id>
    <plant_name>Cenergy IL - Zion CSG</plant_name>
    <state>IL</state>
    <county>Lake</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.46445</lat>
    <lon>-87.84902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69325</plant_id>
    <plant_name>NL IL - Piatt 1 - East CSG</plant_name>
    <state>IL</state>
    <county>Piatt</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.118044</lat>
    <lon>-88.67347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69326</plant_id>
    <plant_name>NL IL - Piatt 2 - West CSG</plant_name>
    <state>IL</state>
    <county>Piatt</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.118044</lat>
    <lon>-88.67347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69376</plant_id>
    <plant_name>Machias PV</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>Machias PV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.40904</lat>
    <lon>-78.49085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69397</plant_id>
    <plant_name>Gougar</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.3864</lat>
    <lon>-87.99722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69420</plant_id>
    <plant_name>NL IL - Kiwi</plant_name>
    <state>IL</state>
    <county>Perry</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.090082</lat>
    <lon>-89.32463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69434</plant_id>
    <plant_name>Gourmet Lane - SLNNJ480</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.52556</lat>
    <lon>-74.36584</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69447</plant_id>
    <plant_name>Bilton Solar</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.034</lat>
    <lon>-72.5051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69518</plant_id>
    <plant_name>Pilot Rock Solar 1</plant_name>
    <state>OR</state>
    <county>Umatilla</county>
    <operator>Pilot Rock Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.505603</lat>
    <lon>-118.8308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69568</plant_id>
    <plant_name>NL MA - Division</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>2.4</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.562832</lat>
    <lon>-71.03095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69581</plant_id>
    <plant_name>MEVS Waterhouse</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>MEVS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.585492</lat>
    <lon>-70.39778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69598</plant_id>
    <plant_name>Trenton East Phase 2</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.582644</lat>
    <lon>-89.6769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69599</plant_id>
    <plant_name>Trenton West Phase 2</plant_name>
    <state>IL</state>
    <county>Clinton</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.582406</lat>
    <lon>-89.70014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69601</plant_id>
    <plant_name>Route 19W</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.99731</lat>
    <lon>-77.98625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69623</plant_id>
    <plant_name>Rose Hill Road Solar 2 - Spafford 2</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>38DN Asset Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.87</lat>
    <lon>-76.34</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69651</plant_id>
    <plant_name>S-Pulaski Solar</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.83108</lat>
    <lon>-87.72158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69652</plant_id>
    <plant_name>Illinois PV Knox 2A</plant_name>
    <state>IL</state>
    <county>Knox</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.931085</lat>
    <lon>-90.33609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69653</plant_id>
    <plant_name>Illinois PV Knox 2B</plant_name>
    <state>IL</state>
    <county>Knox</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.931085</lat>
    <lon>-90.33609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69746</plant_id>
    <plant_name>Brodhead Solar, LLC</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Generate Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.65819</lat>
    <lon>-74.11358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69758</plant_id>
    <plant_name>Netflix ABQ System B</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Siemens Industry</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.998</lat>
    <lon>-106.611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69768</plant_id>
    <plant_name>TPE MD PR232</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.734972</lat>
    <lon>-76.92585</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69769</plant_id>
    <plant_name>TPE MD PR270</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.766085</lat>
    <lon>-76.7368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69801</plant_id>
    <plant_name>Lebanon West Lebanon Solar 1</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Lebanon West Lebanon Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.379</lat>
    <lon>-70.943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69824</plant_id>
    <plant_name>Blackwater Rd Solar</plant_name>
    <state>NH</state>
    <county>Strafford</county>
    <operator>Blackwater Rd Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.24719</lat>
    <lon>-70.8808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69905</plant_id>
    <plant_name>Briscoe Solar 1</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.205</lat>
    <lon>-89.0323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69906</plant_id>
    <plant_name>Briscoe Solar 2</plant_name>
    <state>IL</state>
    <county>LaSalle</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.17274</lat>
    <lon>-89.0263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69907</plant_id>
    <plant_name>Clark Solar 1</plant_name>
    <state>IL</state>
    <county>Mason</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.310751</lat>
    <lon>-89.61232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69908</plant_id>
    <plant_name>Clark Solar 1A</plant_name>
    <state>IL</state>
    <county>Mason</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.310631</lat>
    <lon>-89.61232</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69909</plant_id>
    <plant_name>Crawford 1 Solar</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.82632</lat>
    <lon>-89.41952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69910</plant_id>
    <plant_name>Crawford 1A Solar</plant_name>
    <state>IL</state>
    <county>Lee</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.82591</lat>
    <lon>-89.41433</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69911</plant_id>
    <plant_name>Heinsohn Solar 2</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.1191</lat>
    <lon>-88.8331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69912</plant_id>
    <plant_name>Heinsohn Solar 2A</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.11793</lat>
    <lon>-88.83288</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69913</plant_id>
    <plant_name>Hoppe Nitzberg Solar 1</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.095618</lat>
    <lon>-88.73476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69914</plant_id>
    <plant_name>Hoppe Nitzberg Solar 1A</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.095618</lat>
    <lon>-88.73476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69915</plant_id>
    <plant_name>Engel Solar 1A</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.68467</lat>
    <lon>-88.65312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69916</plant_id>
    <plant_name>Brimfield Solar</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.83063</lat>
    <lon>-89.89085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69920</plant_id>
    <plant_name>Shissler Solar</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.82837</lat>
    <lon>-89.90113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69922</plant_id>
    <plant_name>USS Lowe Solar</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.087893</lat>
    <lon>-87.80954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69923</plant_id>
    <plant_name>USS Vermilion Solar 1 LLC (Vermilion 1)</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.128587</lat>
    <lon>-87.84477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69924</plant_id>
    <plant_name>USS Vermilion Solar 1 LLC (Vermilion 2)</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>SRC Partnership 15 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.128587</lat>
    <lon>-87.84477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69957</plant_id>
    <plant_name>Illinois PV Adams 1A</plant_name>
    <state>IL</state>
    <county>Adams</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.963878</lat>
    <lon>-91.34137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69958</plant_id>
    <plant_name>Illinois PV Adams 1B</plant_name>
    <state>IL</state>
    <county>Adams</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.963878</lat>
    <lon>-91.34137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69959</plant_id>
    <plant_name>Illinois PV Adams 2A</plant_name>
    <state>IL</state>
    <county>Adams</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.98374</lat>
    <lon>-91.36961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69960</plant_id>
    <plant_name>Illinois PV Adams 2B</plant_name>
    <state>IL</state>
    <county>Adams</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.98374</lat>
    <lon>-91.36961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69961</plant_id>
    <plant_name>Illinois PV Peoria 2A</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.685052</lat>
    <lon>-89.74365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69962</plant_id>
    <plant_name>Illinois PV Peoria 2B</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.685052</lat>
    <lon>-89.74365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70015</plant_id>
    <plant_name>IL - ForeFront CS (BBCHS 2) Community Solar</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>IL Solar Bradley Project2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.183983</lat>
    <lon>-87.80649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70016</plant_id>
    <plant_name>IL - ForeFront CS (Brimfield 2)</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>IL Solar Brimfield Project2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.830018</lat>
    <lon>-89.91127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70046</plant_id>
    <plant_name>OER IL - Groundhog</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>42.282505</lat>
    <lon>-88.38802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70066</plant_id>
    <plant_name>Highland Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>SREOG IL Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.736731</lat>
    <lon>-89.7009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70067</plant_id>
    <plant_name>Pearl St Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>SREOG IL Partnership 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.533028</lat>
    <lon>-89.51719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70068</plant_id>
    <plant_name>Clark Solar 2, LLC</plant_name>
    <state>IL</state>
    <county>Mason</county>
    <operator>SREOG IL Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.306858</lat>
    <lon>-89.61064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70069</plant_id>
    <plant_name>Marine Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>SREOG IL Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.7952</lat>
    <lon>-89.78929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70070</plant_id>
    <plant_name>Marine Solar 2, LLC</plant_name>
    <state>IL</state>
    <county>Madison</county>
    <operator>SREOG IL Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.793181</lat>
    <lon>-89.78969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70072</plant_id>
    <plant_name>Cameron Solar, LLC - (IL)</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>SREOG IL Partnership 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.68729</lat>
    <lon>-89.72642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70073</plant_id>
    <plant_name>Galesburg 650 Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>Knox</county>
    <operator>SREOG IL Partnership 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.928617</lat>
    <lon>-90.31957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70150</plant_id>
    <plant_name>Sparland Solar, LLC</plant_name>
    <state>IL</state>
    <county>Marshall</county>
    <operator>SREOG IL Partnership 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.037461</lat>
    <lon>-89.4513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70151</plant_id>
    <plant_name>SV CSG Reifschneider II B, LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>SREOG IL Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.473771</lat>
    <lon>-89.97636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70152</plant_id>
    <plant_name>SV CSG Reifschneider III A, LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>SREOG IL Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.480139</lat>
    <lon>-89.97833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70153</plant_id>
    <plant_name>SV CSG Aldridge A, LLC</plant_name>
    <state>IL</state>
    <county>Lawrence</county>
    <operator>SREOG IL Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.720314</lat>
    <lon>-87.74876</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70154</plant_id>
    <plant_name>SV CSG Aldridge B, LLC</plant_name>
    <state>IL</state>
    <county>Lawrence</county>
    <operator>SREOG IL Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.720287</lat>
    <lon>-87.74671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70156</plant_id>
    <plant_name>SV CSG Reifschneider I B, LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>SREOG IL Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.469645</lat>
    <lon>-89.98752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70157</plant_id>
    <plant_name>SV CSG Reifschneider II A, LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>SREOG IL Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.4745</lat>
    <lon>-89.97784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70158</plant_id>
    <plant_name>Marshfield Solar, LLC</plant_name>
    <state>ME</state>
    <county>Washington</county>
    <operator>SREOG ME Credit Seller 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.724372</lat>
    <lon>-67.47183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70180</plant_id>
    <plant_name>FL Solar D2, LLC</plant_name>
    <state>FL</state>
    <county>Wakulla</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>30.279908</lat>
    <lon>-84.35885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70189</plant_id>
    <plant_name>Maxcy's Mill Solar, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>SREOG Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.292086</lat>
    <lon>-69.57025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70190</plant_id>
    <plant_name>Union Street Solar, LLC</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>SREOG Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.830762</lat>
    <lon>-68.83824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70191</plant_id>
    <plant_name>Waldoboro Solar, LLC</plant_name>
    <state>ME</state>
    <county>Knox</county>
    <operator>SREOG Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.227504</lat>
    <lon>-69.38811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70192</plant_id>
    <plant_name>Crowley Solar, LLC</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>SREOG Partnership 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.075459</lat>
    <lon>-70.11101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70224</plant_id>
    <plant_name>GVEC</plant_name>
    <state>TX</state>
    <county>Guadalupe</county>
    <operator>Onsite Partners Projectco, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.54438</lat>
    <lon>-97.75553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70245</plant_id>
    <plant_name>Boigenzahn Solar 1A, LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.789106</lat>
    <lon>-88.92503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70246</plant_id>
    <plant_name>Engel Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.684137</lat>
    <lon>-88.65048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70247</plant_id>
    <plant_name>Frieders Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.674461</lat>
    <lon>-88.65693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70248</plant_id>
    <plant_name>Irwin Solar, LLC</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.105545</lat>
    <lon>-88.02252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70249</plant_id>
    <plant_name>Manteno Solar 1 LLC</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.241976</lat>
    <lon>-87.8798</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70250</plant_id>
    <plant_name>Moore Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.828347</lat>
    <lon>-88.75377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70251</plant_id>
    <plant_name>Moore Solar 1A, LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.829557</lat>
    <lon>-88.75253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70252</plant_id>
    <plant_name>Poplar Grove Solar 2, LLC</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.373013</lat>
    <lon>-88.85688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70253</plant_id>
    <plant_name>SV CSG Kensington 1 LLC</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.078299</lat>
    <lon>-87.87825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70254</plant_id>
    <plant_name>SV CSG Momence 1 LLC</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.177381</lat>
    <lon>-87.63916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70255</plant_id>
    <plant_name>SV CSG Momence 2 LLC</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.177439</lat>
    <lon>-87.63763</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70265</plant_id>
    <plant_name>Illinois River Solar 2, LLC</plant_name>
    <state>IL</state>
    <county>Marshall</county>
    <operator>SRC Partnership 16, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.134561</lat>
    <lon>-89.36098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70267</plant_id>
    <plant_name>Princeville Solar, LLC</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>SRC Partnership 16, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.935639</lat>
    <lon>-89.76108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70268</plant_id>
    <plant_name>USS St Anne Solar LLC (St. Anne 1)</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>SRC Partnership 16, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.05358</lat>
    <lon>-87.69565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70269</plant_id>
    <plant_name>USS St Anne Solar LLC (St Anne 2)</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>SRC Partnership 16, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.05059</lat>
    <lon>-87.69634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70270</plant_id>
    <plant_name>USS Young Solar LLC (Young 2)</plant_name>
    <state>IL</state>
    <county>Douglas</county>
    <operator>SRC Partnership 16, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.79735</lat>
    <lon>-88.06151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70272</plant_id>
    <plant_name>Swanton MD Mt Zion Rd CDG A4</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Swanton MD Mt Zion Rd CSEGS Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.432526</lat>
    <lon>-79.15109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70273</plant_id>
    <plant_name>Swanton MD Mt Zion Rd CDG A3</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Swanton MD Mt Zion Rd CSEGS Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.432342</lat>
    <lon>-79.1526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70274</plant_id>
    <plant_name>Swanton MD Mt Zion Rd CDG A2</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Swanton MD Mt Zion Rd CSEGS Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.432749</lat>
    <lon>-79.15397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70280</plant_id>
    <plant_name>SV CSG Mt Morris 3 LLC</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.062923</lat>
    <lon>-89.43731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70281</plant_id>
    <plant_name>SV CSG Garden Prairie 2, LLC</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.250085</lat>
    <lon>-88.74869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70282</plant_id>
    <plant_name>SV CSG Garden Prairie 1, LLC</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.25016</lat>
    <lon>-88.74711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70283</plant_id>
    <plant_name>Poplar Grove Solar, LLC</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.373801</lat>
    <lon>-88.85688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70285</plant_id>
    <plant_name>SV CSG Kirkland 2 LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.107786</lat>
    <lon>-88.83944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70286</plant_id>
    <plant_name>SV CSG Kirkland 1 LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.106627</lat>
    <lon>-88.83934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70287</plant_id>
    <plant_name>Heinsohn Solar 1, LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.120242</lat>
    <lon>-88.84219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70288</plant_id>
    <plant_name>Heinsohn Solar 1A, LLC</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.119454</lat>
    <lon>-88.84544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70289</plant_id>
    <plant_name>Cottage Grove Ave Solar 1 LLC</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.514649</lat>
    <lon>-87.59898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70290</plant_id>
    <plant_name>Goodfarm Solar, LLC</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.133299</lat>
    <lon>-88.40966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70291</plant_id>
    <plant_name>SV CSG Gardner 2 LLC</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>SRC Partnership 12, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.195973</lat>
    <lon>-88.3073</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70292</plant_id>
    <plant_name>1150th Sun</plant_name>
    <state>IL</state>
    <county>McDonough</county>
    <operator>1150th Sun, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.444961</lat>
    <lon>-90.63404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70293</plant_id>
    <plant_name>Swanton Coopers ANEM</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Swanton MD Coopers Ln CSEGS Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.427984</lat>
    <lon>-79.16901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70342</plant_id>
    <plant_name>Swanton MD Mt Zion Rd ANEM Solar LLC (CSG)</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>MD - Ameresco - Swanton Mt. Zion ANEM - A1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.433856</lat>
    <lon>-79.15549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70346</plant_id>
    <plant_name>IL-Forefront ComEd-Lena 1</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>IL Solar Lena Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.37034</lat>
    <lon>-89.84222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70347</plant_id>
    <plant_name>IL-Forefront ComEd-Lena 2</plant_name>
    <state>IL</state>
    <county>Stephenson</county>
    <operator>IL Solar Lena Project2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.37034</lat>
    <lon>-89.84222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70348</plant_id>
    <plant_name>IL-Forefront-Ameren- Chillicothe 1</plant_name>
    <state>IL</state>
    <county>Peoria</county>
    <operator>IL Solar Chillicothe Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.922067</lat>
    <lon>-89.52538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70349</plant_id>
    <plant_name>IL-Forefront Ameren- Sidney 1</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>IL Solar Sidney Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.029109</lat>
    <lon>-88.03888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70351</plant_id>
    <plant_name>IL-Forefront Ameren-St. Joseph 1</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>IL Solar St Joseph Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.128464</lat>
    <lon>-88.02022</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70352</plant_id>
    <plant_name>IL-Forefront-Ameren-St. Joseph 2</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>IL Solar St Joseph Project2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.124175</lat>
    <lon>-88.02106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70355</plant_id>
    <plant_name>IL-Forefront ComED-Shabbona</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>IL Solar Shabbona Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.76231</lat>
    <lon>-88.83964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70361</plant_id>
    <plant_name>Swanton MD Coopers CDG A2</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Swanton MD Coopers Ln CSEGS Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.425246</lat>
    <lon>-79.17087</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70362</plant_id>
    <plant_name>Swanton MD Coopers CDG A3</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Swanton MD Coopers Ln CSEGS Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.432342</lat>
    <lon>-79.1526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70363</plant_id>
    <plant_name>Swanton MD Coopers CDG A4</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Swanton MD Coopers Ln CSEGS Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.432526</lat>
    <lon>-79.15108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70383</plant_id>
    <plant_name>1875 West Street Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.183</lat>
    <lon>-119.366</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70390</plant_id>
    <plant_name>IL - Ameresco - Belvidere East</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>Belvidere Landfill Solar 2 East, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.295704</lat>
    <lon>-88.84915</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70417</plant_id>
    <plant_name>MD-CPG Salisbury Airport 2</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Salisbury Air Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.352584</lat>
    <lon>-75.52287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70418</plant_id>
    <plant_name>MD-ECA Salsibury</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Salisbury Solar Initiative LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.375526</lat>
    <lon>-75.62828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70421</plant_id>
    <plant_name>IL -ForeFront CS (Brimfield 1 2) - Brimf</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>IL Solar Brimfield Project 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.830018</lat>
    <lon>-89.90741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70423</plant_id>
    <plant_name>MD - Ameresco - Glen Burnie ANEM</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Glen Burnie Landfill Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.184763</lat>
    <lon>-76.59936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70424</plant_id>
    <plant_name>IL Forefront - Degroot - St Anne</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>IL Solar St. Anne Project1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.051343</lat>
    <lon>-87.70649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70434</plant_id>
    <plant_name>OWC Energy Holdings, LLC</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Headwater Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.851</lat>
    <lon>-120.6334</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70480</plant_id>
    <plant_name>IL2- WI114 Harper</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.47514</lat>
    <lon>-88.02832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70483</plant_id>
    <plant_name>Mountain Point- Sharptown</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.471182</lat>
    <lon>-75.75062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70530</plant_id>
    <plant_name>UE-02601MA, LLC</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Unison Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>42.396994</lat>
    <lon>-71.26721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70540</plant_id>
    <plant_name>Maverick One</plant_name>
    <state>MD</state>
    <county>Carroll</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.66105</lat>
    <lon>-76.87599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70557</plant_id>
    <plant_name>AmericoldCA - Plainville, CT</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.429933</lat>
    <lon>-121.9258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70571</plant_id>
    <plant_name>SU94</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>2</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.86271</lat>
    <lon>-75.4269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>482</plant_id>
    <plant_name>Rio Hondo</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Metropolitan Water District of S CA</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>34.004722</lat>
    <lon>-118.0992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3698</plant_id>
    <plant_name>Wanship</plant_name>
    <state>UT</state>
    <county>Summit</county>
    <operator>Weber Basin Water Conserv Dist</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1958</first_year>
    <latest_year>1958</latest_year>
    <lat>40.7904</lat>
    <lon>-111.4043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3762</plant_id>
    <plant_name>Great Falls (VT)</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>The Town of Lyndon Elec Dept - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1979</latest_year>
    <lat>44.500222</lat>
    <lon>-71.99892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6330</plant_id>
    <plant_name>Noorvik</plant_name>
    <state>AK</state>
    <county>Northwest Arctic</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2024</latest_year>
    <lat>66.834519</lat>
    <lon>-161.0387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6456</plant_id>
    <plant_name>Carver Falls</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>43.6262</lat>
    <lon>-73.3073</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6543</plant_id>
    <plant_name>Dam No. 4 Hydro Station</plant_name>
    <state>WV</state>
    <county>Jefferson</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1909</first_year>
    <latest_year>1991</latest_year>
    <lat>39.493056</lat>
    <lon>-77.82694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10109</plant_id>
    <plant_name>Stevens Mills Dam</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.446107</lat>
    <lon>-71.64465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10286</plant_id>
    <plant_name>Cornell Hydro</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Cornell Renewable</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>42.451922</lat>
    <lon>-76.48509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10809</plant_id>
    <plant_name>Rock Creek II</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Hydroland Omega LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>42.620724</lat>
    <lon>-114.5315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55561</plant_id>
    <plant_name>Tsar Nicholas LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.42</lat>
    <lon>-96.4347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55562</plant_id>
    <plant_name>Sun River LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.4289</lat>
    <lon>-96.4358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55563</plant_id>
    <plant_name>Julia Hills LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.4231</lat>
    <lon>-96.4458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55564</plant_id>
    <plant_name>Jessica Mills LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.4278</lat>
    <lon>-96.43</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55565</plant_id>
    <plant_name>Jack River LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.4233</lat>
    <lon>-96.4411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55566</plant_id>
    <plant_name>Autumn Hills LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.4131</lat>
    <lon>-96.4325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55567</plant_id>
    <plant_name>Winters Spawn LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.2081</lat>
    <lon>-96.1989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55568</plant_id>
    <plant_name>Twin Lake Hills LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>44.2258</lat>
    <lon>-96.2789</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55569</plant_id>
    <plant_name>Spartan Hills LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.2358</lat>
    <lon>-96.2383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55570</plant_id>
    <plant_name>Soliloquoy Ridge LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.2364</lat>
    <lon>-96.2331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55571</plant_id>
    <plant_name>Ruthton Ridge LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.2128</lat>
    <lon>-96.2131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55572</plant_id>
    <plant_name>Hope Creek LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.2275</lat>
    <lon>-96.2192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55573</plant_id>
    <plant_name>Hadley Ridge LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>44.2253</lat>
    <lon>-96.235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55574</plant_id>
    <plant_name>Florence Hills LLC</plant_name>
    <state>MN</state>
    <county>Lincoln</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.2297</lat>
    <lon>-96.225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55576</plant_id>
    <plant_name>Agassiz Beach LLC</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>CHI Operations Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>47.0053</lat>
    <lon>-96.4356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56815</plant_id>
    <plant_name>Denver Int Airport</plant_name>
    <state>CO</state>
    <county>Denver</county>
    <operator>MMA DAS Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.902984</lat>
    <lon>-104.6593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57141</plant_id>
    <plant_name>CO- CSU- Fort Collins</plant_name>
    <state>CO</state>
    <county>LARIMER</county>
    <operator>RV CSU Power LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.591099</lat>
    <lon>-105.1459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57674</plant_id>
    <plant_name>Indian Orchard PV Facility</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Western Massachusetts Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.151389</lat>
    <lon>-72.49889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57726</plant_id>
    <plant_name>Summit Associates</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.5003</lat>
    <lon>-74.3536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57930</plant_id>
    <plant_name>FRB Solar Farm</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>FRB Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.108147</lat>
    <lon>-110.8247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58178</plant_id>
    <plant_name>M. G. Emmett J. Bean Federal Center</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>U.S. General Services Administration</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.853056</lat>
    <lon>-86.01444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58187</plant_id>
    <plant_name>180 Raritan Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>180 Raritan Energy Solutions, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.516111</lat>
    <lon>-74.34</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58210</plant_id>
    <plant_name>NFM Solar Power LLC</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>FirstLight Power Resources, Inc. - MA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.610833</lat>
    <lon>-72.47417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58214</plant_id>
    <plant_name>West Greenwich Solar</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.649444</lat>
    <lon>-71.71</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58248</plant_id>
    <plant_name>Pierce College</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Community College District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.183611</lat>
    <lon>-118.5747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58272</plant_id>
    <plant_name>Easthampton Landfill-City of Easthampton</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.286944</lat>
    <lon>-72.70139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58385</plant_id>
    <plant_name>Northbridge Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.166389</lat>
    <lon>-71.64556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58511</plant_id>
    <plant_name>Delta Wind Farm</plant_name>
    <state>AK</state>
    <county>Southeast Fairbanks</county>
    <operator>Alaska Environmental Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2013</latest_year>
    <lat>64.013889</lat>
    <lon>-145.5967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59115</plant_id>
    <plant_name>Anderson Farm LLC</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.975556</lat>
    <lon>-78.51667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59121</plant_id>
    <plant_name>Acushnet-Braley Road 1</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.751667</lat>
    <lon>-70.97056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59466</plant_id>
    <plant_name>Winchendon Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.659444</lat>
    <lon>-71.99167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59653</plant_id>
    <plant_name>City of Truth or Consequences PV</plant_name>
    <state>NM</state>
    <county>Sierra</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.121111</lat>
    <lon>-107.2878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59670</plant_id>
    <plant_name>Innovative Solar 23</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.259825</lat>
    <lon>-81.41902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59736</plant_id>
    <plant_name>Valentine Wind, LLC</plant_name>
    <state>NE</state>
    <county>Cherry</county>
    <operator>Valentine Wind, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.859103</lat>
    <lon>-100.5924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59741</plant_id>
    <plant_name>Barton Solar Farm</plant_name>
    <state>VT</state>
    <county>Orleans</county>
    <operator>Barton Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.725418</lat>
    <lon>-72.18404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59776</plant_id>
    <plant_name>Heartland Community College</plant_name>
    <state>IL</state>
    <county>McLean</county>
    <operator>Heartland Community College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2024</latest_year>
    <lat>40.537</lat>
    <lon>-89.019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59835</plant_id>
    <plant_name>Newton Grove</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.251628</lat>
    <lon>-78.36744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59839</plant_id>
    <plant_name>Spring Hill Road</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.419036</lat>
    <lon>-72.18065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59867</plant_id>
    <plant_name>Lockheed Martin Solar System</plant_name>
    <state>FL</state>
    <county>Pinellas</county>
    <operator>Lockheed Martin Solar System</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>28.0479</lat>
    <lon>-82.6853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60051</plant_id>
    <plant_name>Innovative Solar 18, LLC</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.378187</lat>
    <lon>-81.79505</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60052</plant_id>
    <plant_name>Innovative Solar 26, LLC</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.70974</lat>
    <lon>-81.41331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60121</plant_id>
    <plant_name>HCE Johnston I, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>HCE Johnston I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.560002</lat>
    <lon>-78.59453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60278</plant_id>
    <plant_name>Southbridge Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.090932</lat>
    <lon>-72.01167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60455</plant_id>
    <plant_name>Oneida - South</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>43.166353</lat>
    <lon>-75.38687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60456</plant_id>
    <plant_name>Oneida - West</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>43.169617</lat>
    <lon>-75.40487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60541</plant_id>
    <plant_name>Wind GEM</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>Wind GEM, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.469985</lat>
    <lon>-94.33936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60547</plant_id>
    <plant_name>GMP Solar - Richmond</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.42691</lat>
    <lon>-73.00849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60878</plant_id>
    <plant_name>Sutton Solar CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Sutton Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.102447</lat>
    <lon>-71.69771</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60979</plant_id>
    <plant_name>CSUF Nutwood Solar</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.87912</lat>
    <lon>-117.8887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60984</plant_id>
    <plant_name>Lindberg Field Solar 2</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Lindberg Field Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.729444</lat>
    <lon>-117.2051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61010</plant_id>
    <plant_name>Bullock Road Solar 1</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Bullock Road Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.728936</lat>
    <lon>-70.99045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61017</plant_id>
    <plant_name>Stafford St 2 Community Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Stafford St Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.224044</lat>
    <lon>-71.87065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61066</plant_id>
    <plant_name>Foundation CDCR LAC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Foundation CA Fund VIII Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.691</lat>
    <lon>-118.221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61067</plant_id>
    <plant_name>Foundation Scheid Vineyards</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Foundation CA Fund VIII Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.274508</lat>
    <lon>-121.1916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61165</plant_id>
    <plant_name>Columbus Solar Project</plant_name>
    <state>NM</state>
    <county>Luna</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.86673</lat>
    <lon>-107.5875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61210</plant_id>
    <plant_name>Finger Lakes Solar I</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Finger Lakes Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.814025</lat>
    <lon>-77.04563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61258</plant_id>
    <plant_name>Innovative Solar 35</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.046394</lat>
    <lon>-77.84806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61259</plant_id>
    <plant_name>Innovative Solar 59</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.094804</lat>
    <lon>-77.97938</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61260</plant_id>
    <plant_name>Innovative Solar 60</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>CD Global Solar Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.092659</lat>
    <lon>-77.99301</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61294</plant_id>
    <plant_name>Farley Road Community Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Farley Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.1</lat>
    <lon>-72</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61299</plant_id>
    <plant_name>Hatfield Renewables Community Solar</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Hatfield Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.3</lat>
    <lon>-72.7</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61359</plant_id>
    <plant_name>IGS Solar I - EWR5</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.582</lat>
    <lon>-74.255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61360</plant_id>
    <plant_name>IGS Solar I - EWR6</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.583</lat>
    <lon>-74.257</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61367</plant_id>
    <plant_name>Smith &amp; Wesson at Springfield MA PV</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Luminace Solar Massachusetts, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.13794</lat>
    <lon>-72.5509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61473</plant_id>
    <plant_name>Hopewell Valley High School Hybrid</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Hopewell Valley High School</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.328005</lat>
    <lon>-74.8049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61551</plant_id>
    <plant_name>Good Samaritan Hospital</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Good Samaritan Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>1980</first_year>
    <latest_year>2012</latest_year>
    <lat>41.111498</lat>
    <lon>-74.1354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61608</plant_id>
    <plant_name>Montgomery County Solar</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Montgomery County Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.113</lat>
    <lon>-77.236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61637</plant_id>
    <plant_name>Denison Solar Array</plant_name>
    <state>OH</state>
    <county>Licking</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.073337</lat>
    <lon>-82.51796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61658</plant_id>
    <plant_name>Cougar Solar, LLC</plant_name>
    <state>NC</state>
    <county>Lee</county>
    <operator>Cougar Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.462405</lat>
    <lon>-79.18065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61818</plant_id>
    <plant_name>DG AMP Solar Brewster</plant_name>
    <state>OH</state>
    <county>Stark</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.702397</lat>
    <lon>-81.58983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61944</plant_id>
    <plant_name>Jessamine Solar</plant_name>
    <state>SC</state>
    <county>Marion</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.230544</lat>
    <lon>-79.39061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61993</plant_id>
    <plant_name>Gavilan Community College Solar Project</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Gavilan District College Solar Project</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <battery_mwh>0.5</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2019</latest_year>
    <lat>37.003832</lat>
    <lon>-121.5936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62096</plant_id>
    <plant_name>Atkinson Solar II</plant_name>
    <state>NC</state>
    <county>Duplin</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.897</lat>
    <lon>-77.792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62097</plant_id>
    <plant_name>Ludlow Site 72 - Conti</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.164561</lat>
    <lon>-72.44625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62196</plant_id>
    <plant_name>Hadley 2 Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Hadley 2 Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.351237</lat>
    <lon>-72.55651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62201</plant_id>
    <plant_name>Dudley Solar CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Dudley Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.0539</lat>
    <lon>-71.9229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62265</plant_id>
    <plant_name>Lee Site 31 Solar</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.296872</lat>
    <lon>-73.2275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62286</plant_id>
    <plant_name>Xebec 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.224041</lat>
    <lon>-118.3929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62550</plant_id>
    <plant_name>Kearsarge GB</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Kearsarge GB LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.192495</lat>
    <lon>-73.40786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62552</plant_id>
    <plant_name>Kearsarge Uxbridge</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Kearsarge Uxbridge LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.103499</lat>
    <lon>-71.59759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62612</plant_id>
    <plant_name>USAA Black Bear Energy</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.313573</lat>
    <lon>-74.4847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62646</plant_id>
    <plant_name>Washburn Road Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.777159</lat>
    <lon>-70.96525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62806</plant_id>
    <plant_name>Shelter Creek Condominiums Solar</plant_name>
    <state>CA</state>
    <county>San Mateo</county>
    <operator>Vista Solar, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.61909</lat>
    <lon>-122.4289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62843</plant_id>
    <plant_name>Garnet Solar (NY)</plant_name>
    <state>NY</state>
    <county>Warren</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.723851</lat>
    <lon>-74.06238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62878</plant_id>
    <plant_name>McCleskey Cotton</plant_name>
    <state>GA</state>
    <county>Terrell</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>31.825063</lat>
    <lon>-84.38558</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62883</plant_id>
    <plant_name>Telfair Thompson</plant_name>
    <state>GA</state>
    <county>Telfair</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.058559</lat>
    <lon>-82.87179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62907</plant_id>
    <plant_name>Hinesburg</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>Viridity Energy Solutions, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <battery_mwh>1.9</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.36115</lat>
    <lon>-73.07076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63069</plant_id>
    <plant_name>Harmony Road Solar</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.164</lat>
    <lon>-88.4625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63298</plant_id>
    <plant_name>Barrette Outdoor Living, Inc.</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Dynamic Energy Holdings LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.4877</lat>
    <lon>-74.60035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63356</plant_id>
    <plant_name>Colonial Pipeline Allentown Chesterfield</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.152302</lat>
    <lon>-74.65775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63390</plant_id>
    <plant_name>Shelby Solar Array</plant_name>
    <state>OH</state>
    <county>Richland</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.896042</lat>
    <lon>-82.6724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63442</plant_id>
    <plant_name>Tickle Creek Solar</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Neighborhood Power Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.375</lat>
    <lon>-122.265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63516</plant_id>
    <plant_name>California City</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.157</lat>
    <lon>-117.981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63527</plant_id>
    <plant_name>Lafayette 2 - Internal Services Dept</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.05</lat>
    <lon>-118.18</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63665</plant_id>
    <plant_name>River Valley Solar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Neighborhood Power Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.128</lat>
    <lon>-122.828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63748</plant_id>
    <plant_name>Mount Hope West</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Mount Hope Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.466974</lat>
    <lon>-74.50942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63749</plant_id>
    <plant_name>Mount Hope East</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Mount Hope Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.467654</lat>
    <lon>-74.50965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63904</plant_id>
    <plant_name>Timonium Fairgrounds</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.447</lat>
    <lon>-76.63</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64170</plant_id>
    <plant_name>BWC Muddy Brook, LLC Hybrid</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <battery_mwh>1.8</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.0966</lat>
    <lon>-71.5054</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64286</plant_id>
    <plant_name>Ware Avra II</plant_name>
    <state>GA</state>
    <county>Ware</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.196314</lat>
    <lon>-82.32236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64306</plant_id>
    <plant_name>TCI Alvar</plant_name>
    <state>LA</state>
    <county>Orleans</county>
    <operator>Entergy New Orleans, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.992222</lat>
    <lon>-90.02861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64610</plant_id>
    <plant_name>Amazon MDW6 Solar Project</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Solar Star Prime 5, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.6721</lat>
    <lon>-88.11549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64642</plant_id>
    <plant_name>P52ES 1755 Henryton Rd Phase 1 LLC CSG</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.32015</lat>
    <lon>-76.92965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64643</plant_id>
    <plant_name>P52ES 1755 Henryton Rd Phase 2 LLC</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.32015</lat>
    <lon>-76.92965</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65005</plant_id>
    <plant_name>Albertsons at Melrose Park</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>ESIL-AL-Melrose, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.916874</lat>
    <lon>-87.85621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65209</plant_id>
    <plant_name>Equinix - Billerica</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.551001</lat>
    <lon>-71.21496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65251</plant_id>
    <plant_name>Chambers 4 - Redland LGB4</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.08041</lat>
    <lon>-117.2014</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65583</plant_id>
    <plant_name>Richlands Solar, LLC</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>Richlands Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.784644</lat>
    <lon>-77.63794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65584</plant_id>
    <plant_name>Cruise Solar, LLC</plant_name>
    <state>NC</state>
    <county>Onslow</county>
    <operator>Cruise Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.69193</lat>
    <lon>-77.54356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65612</plant_id>
    <plant_name>Snowden River CSG</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Snowden River Parkway, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.175364</lat>
    <lon>-76.83737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65617</plant_id>
    <plant_name>BBARWA</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.267795</lat>
    <lon>-116.8154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65690</plant_id>
    <plant_name>Kearsarge Acushnet</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Kearsarge Acushnet LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.715626</lat>
    <lon>-70.9035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65750</plant_id>
    <plant_name>Sandy River Solar (CSG)</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Sandy River Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.431055</lat>
    <lon>-122.2952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65755</plant_id>
    <plant_name>ELP Myer CSG</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.041</lat>
    <lon>-73.978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65757</plant_id>
    <plant_name>ELP Saugerties CSG</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.04</lat>
    <lon>-74.074</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65959</plant_id>
    <plant_name>WMATA - Cheverly Metro (CSG)</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.915643</lat>
    <lon>-76.91737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66022</plant_id>
    <plant_name>Amazon MDW7 Solar Project</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Solar Star Prime 6, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.424123</lat>
    <lon>-87.77283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66078</plant_id>
    <plant_name>Solar Star Urbana Landfill East</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Solar Star Urbana Landfill East, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.12078</lat>
    <lon>-88.17688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66079</plant_id>
    <plant_name>Solar Star Urbana Landfill Central</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Solar Star Urbana Landfill Central, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.12065</lat>
    <lon>-88.17846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66317</plant_id>
    <plant_name>Brimfield</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>WEB Brimfield Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.117417</lat>
    <lon>-72.22347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66427</plant_id>
    <plant_name>Emerald Marshfields, LLC</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Emerald Marshfield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.099331</lat>
    <lon>-70.71459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66517</plant_id>
    <plant_name>TX Houston 7080 Express Lane</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Catalyze Houston Express Lane Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.825138</lat>
    <lon>-95.24706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66582</plant_id>
    <plant_name>North Kingstown Solar LLC</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>North Kingstown Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.543781</lat>
    <lon>-71.44733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66733</plant_id>
    <plant_name>Lost Hills Oilfield</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.65</lat>
    <lon>-119.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66936</plant_id>
    <plant_name>Bryan Floyd</plant_name>
    <state>GA</state>
    <county>Bryan</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.138772</lat>
    <lon>-81.69404</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67246</plant_id>
    <plant_name>Tift Bowen</plant_name>
    <state>GA</state>
    <county>Tift</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.457562</lat>
    <lon>-83.55885</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67387</plant_id>
    <plant_name>Regal Ware</plant_name>
    <state>WI</state>
    <county>Washington</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.435775</lat>
    <lon>-88.17468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67492</plant_id>
    <plant_name>Mount Dora Solar Farm W</plant_name>
    <state>FL</state>
    <county>Lake</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>28.793954</lat>
    <lon>-81.62314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67716</plant_id>
    <plant_name>Vermilion Solar I LLC CSG</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.858134</lat>
    <lon>-88.60202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67718</plant_id>
    <plant_name>AES Bend Solar II, LLC CSG</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.33787</lat>
    <lon>-89.08264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68446</plant_id>
    <plant_name>OR - Green Key - Marquam</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Canyonland Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.082793</lat>
    <lon>-122.6673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68621</plant_id>
    <plant_name>Pierce Eunice</plant_name>
    <state>GA</state>
    <county>Pierce</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>31.25259</lat>
    <lon>-82.30219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68959</plant_id>
    <plant_name>Kankakee Solar 5b</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.138879</lat>
    <lon>-87.83753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69288</plant_id>
    <plant_name>Palm Springs DAC PV</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Palm Springs USD</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <battery_mwh>0.6</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2023</latest_year>
    <lat>33.825324</lat>
    <lon>-116.4847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69564</plant_id>
    <plant_name>Gillespie Street Solar</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Fayetteville Public Works Commission</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.975834</lat>
    <lon>-78.91213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69827</plant_id>
    <plant_name>Mount Laurel Solar 2 LLC CSG</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.96351</lat>
    <lon>-74.90736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70569</plant_id>
    <plant_name>Little Valentine</plant_name>
    <state>MD</state>
    <county>Talbot</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.9</nameplate_mw>
    <summer_mw>1.9</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.88665</lat>
    <lon>-75.99186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>336</plant_id>
    <plant_name>Kaweah 2</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1929</first_year>
    <latest_year>1929</latest_year>
    <lat>36.461326</lat>
    <lon>-118.8799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>678</plant_id>
    <plant_name>W K Sanders</plant_name>
    <state>VT</state>
    <county>Lamoille</county>
    <operator>Village of Morrisville - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>44.625282</lat>
    <lon>-72.53086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>714</plant_id>
    <plant_name>Toadtown</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>39.893491</lat>
    <lon>-121.5934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1037</plant_id>
    <plant_name>Peru (IN)</plant_name>
    <state>IN</state>
    <county>Miami</county>
    <operator>City of Peru - (IN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>40.7551</lat>
    <lon>-86.0575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1135</plant_id>
    <plant_name>Dayton (IA)</plant_name>
    <state>IA</state>
    <county>Webster</county>
    <operator>City of Dayton - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>42.260162</lat>
    <lon>-94.06924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1478</plant_id>
    <plant_name>Stillwater Hydro Station</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>Brookfield Black Bear Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1929</latest_year>
    <lat>44.9094</lat>
    <lon>-68.6833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1500</plant_id>
    <plant_name>Messalonskee 5</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Messalonskee Stream Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1935</latest_year>
    <lat>44.534397</lat>
    <lon>-69.65223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1785</plant_id>
    <plant_name>Way Dam</plant_name>
    <state>MI</state>
    <county>Iron</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>46.1592</lat>
    <lon>-88.2353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1871</plant_id>
    <plant_name>Kleber</plant_name>
    <state>MI</state>
    <county>Cheboygan</county>
    <operator>Tower Kleber Ltd Partnership</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1949</latest_year>
    <lat>45.391984</lat>
    <lon>-84.33326</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1900</plant_id>
    <plant_name>Sylvan</plant_name>
    <state>MN</state>
    <county>Cass</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1915</latest_year>
    <lat>46.305</lat>
    <lon>-94.3775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2746</plant_id>
    <plant_name>Mission</plant_name>
    <state>NC</state>
    <county>Clay</county>
    <operator>Northbrook Carolina Hydro II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1943</latest_year>
    <lat>35.0647</lat>
    <lon>-83.9258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3666</plant_id>
    <plant_name>Brigham City</plant_name>
    <state>UT</state>
    <county>Box Elder</county>
    <operator>Brigham City Corporation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1964</latest_year>
    <lat>41.501619</lat>
    <lon>-111.9935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3764</plant_id>
    <plant_name>Morrisville</plant_name>
    <state>VT</state>
    <county>Lamoille</county>
    <operator>Village of Morrisville - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>44.561831</lat>
    <lon>-72.60237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3868</plant_id>
    <plant_name>Meyers Falls</plant_name>
    <state>WA</state>
    <county>Stevens</county>
    <operator>Hydro Technology Systems Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1915</first_year>
    <latest_year>2006</latest_year>
    <lat>48.5953</lat>
    <lon>-118.0603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6311</plant_id>
    <plant_name>Chevak</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>61.525297</lat>
    <lon>-165.5902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6521</plant_id>
    <plant_name>Lahontan</plant_name>
    <state>NV</state>
    <county>Churchill</county>
    <operator>Truckee-Carson Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1911</first_year>
    <latest_year>1911</latest_year>
    <lat>39.4625</lat>
    <lon>-119.0667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7112</plant_id>
    <plant_name>Centennial</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Metlakatla Power &amp; Light</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>55.121433</lat>
    <lon>-131.5603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7132</plant_id>
    <plant_name>Pine View Dam</plant_name>
    <state>UT</state>
    <county>Weber</county>
    <operator>City of Bountiful - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>41.254331</lat>
    <lon>-111.8485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7603</plant_id>
    <plant_name>Prospect Municipal</plant_name>
    <state>OH</state>
    <county>Marion</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>40.4411</lat>
    <lon>-83.1883</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7780</plant_id>
    <plant_name>Jackson Cntr Peaking</plant_name>
    <state>OH</state>
    <county>Shelby</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1999</first_year>
    <latest_year>1999</latest_year>
    <lat>40.4597</lat>
    <lon>-84.0401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7827</plant_id>
    <plant_name>Shelby North</plant_name>
    <state>OH</state>
    <county>Richland</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.8969</lat>
    <lon>-82.6625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7828</plant_id>
    <plant_name>Shelby South</plant_name>
    <state>OH</state>
    <county>Richland</county>
    <operator>City of Shelby - (OH)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.908889</lat>
    <lon>-82.65333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7853</plant_id>
    <plant_name>West Receiving</plant_name>
    <state>IA</state>
    <county>Crawford</county>
    <operator>City of Denison - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>42.021667</lat>
    <lon>-95.36333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7865</plant_id>
    <plant_name>Earlville</plant_name>
    <state>IA</state>
    <county>Delaware</county>
    <operator>City of Earlville - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>42.4942</lat>
    <lon>-91.2725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10237</plant_id>
    <plant_name>Diana Hydroelectric</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>EONY Generation Limited</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>44.151944</lat>
    <lon>-75.32173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10324</plant_id>
    <plant_name>Peters Drive Plant</plant_name>
    <state>OR</state>
    <county>Hood River</county>
    <operator>Farmer's Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>45.66764</lat>
    <lon>-121.5485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10421</plant_id>
    <plant_name>Dillon Hydro Plant</plant_name>
    <state>CO</state>
    <county>Summit</county>
    <operator>Denver City &amp; County of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>39.6208</lat>
    <lon>-106.0662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10550</plant_id>
    <plant_name>High Shoals Hydro (NC)</plant_name>
    <state>NC</state>
    <county>Lincoln</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1934</first_year>
    <latest_year>1934</latest_year>
    <lat>35.394254</lat>
    <lon>-81.201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10880</plant_id>
    <plant_name>Bidwell Ditch Project</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Mega Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.8014</lat>
    <lon>-121.4481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50126</plant_id>
    <plant_name>Ottauquechee Hydro</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1987</latest_year>
    <lat>43.5933</lat>
    <lon>-72.3506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50337</plant_id>
    <plant_name>Mooseheart Power House</plant_name>
    <state>IL</state>
    <county>Kane</county>
    <operator>Moose International</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>41.8244</lat>
    <lon>-88.3331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50409</plant_id>
    <plant_name>Menominee Mill Marinette</plant_name>
    <state>MI</state>
    <county>Menominee</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1978</latest_year>
    <lat>45.1069</lat>
    <lon>-87.6378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50513</plant_id>
    <plant_name>Stillwater Reservoir Hydro</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Watershed Hydropower Corp</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.897386</lat>
    <lon>-75.04</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54250</plant_id>
    <plant_name>Newman (PA)</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Newman &amp; Co Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1964</first_year>
    <latest_year>1964</latest_year>
    <lat>40.013993</lat>
    <lon>-75.05283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54951</plant_id>
    <plant_name>Monterey One Water</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Monterey One Water</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>36.7056</lat>
    <lon>-121.7714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55052</plant_id>
    <plant_name>Jameson Gas Processing Plant</plant_name>
    <state>TX</state>
    <county>Coke</county>
    <operator>WTG Jameson, L.P.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1981</first_year>
    <latest_year>2017</latest_year>
    <lat>32.05</lat>
    <lon>-100.6917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55160</plant_id>
    <plant_name>MM Tulare Energy</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>MM Tulare Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>36.388</lat>
    <lon>-119.394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55534</plant_id>
    <plant_name>Water Filter Plant #2</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>City of Morganton - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.737748</lat>
    <lon>-81.7278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56059</plant_id>
    <plant_name>High Point, Fairfield</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.924393</lat>
    <lon>-79.99012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56062</plant_id>
    <plant_name>Statesville, Highway 64</plant_name>
    <state>NC</state>
    <county>Iredell</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.798462</lat>
    <lon>-80.94271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56063</plant_id>
    <plant_name>Shelby, Toms Street</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.3036</lat>
    <lon>-81.5225</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56064</plant_id>
    <plant_name>Morganton, Parker Road</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.7208</lat>
    <lon>-81.66243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56067</plant_id>
    <plant_name>Lexington Health Center</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>35.830877</lat>
    <lon>-80.24215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56289</plant_id>
    <plant_name>Salem Street Dept</plant_name>
    <state>VA</state>
    <county>Salem City</county>
    <operator>City of Salem - (VA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>37.2794</lat>
    <lon>-80.0447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56314</plant_id>
    <plant_name>Holcomb Rock</plant_name>
    <state>VA</state>
    <county>Lynchburg City</county>
    <operator>Holcomb Rock Company</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>37.5035</lat>
    <lon>-79.3006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56339</plant_id>
    <plant_name>Albemarle Hospital Unit</plant_name>
    <state>NC</state>
    <county>Stanly</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.3636</lat>
    <lon>-80.1939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56340</plant_id>
    <plant_name>Cherryville City Hall</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.3778</lat>
    <lon>-81.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56341</plant_id>
    <plant_name>Lincolnton High School</plant_name>
    <state>NC</state>
    <county>Lincoln</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.477415</lat>
    <lon>-81.26226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56342</plant_id>
    <plant_name>Maiden Community Center</plant_name>
    <state>NC</state>
    <county>Catawba</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.5772</lat>
    <lon>-81.2081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56343</plant_id>
    <plant_name>Monroe Middle School</plant_name>
    <state>NC</state>
    <county>Union</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>34.973274</lat>
    <lon>-80.54004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56344</plant_id>
    <plant_name>Morganton Station 5</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.729</lat>
    <lon>-81.74808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56345</plant_id>
    <plant_name>Pineville Delivery 2</plant_name>
    <state>NC</state>
    <county>Mecklenburg</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.0767</lat>
    <lon>-80.8816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56364</plant_id>
    <plant_name>Danville Kentuck Road Plant</plant_name>
    <state>VA</state>
    <county>Pittsylvania</county>
    <operator>City of Danville - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>36.66106</lat>
    <lon>-79.2986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56368</plant_id>
    <plant_name>Water Treatment Plant Generators</plant_name>
    <state>VA</state>
    <county>Prince William</county>
    <operator>City of Manassas - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>38.760695</lat>
    <lon>-77.62089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57062</plant_id>
    <plant_name>Gambell</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2022</latest_year>
    <lat>63.777058</lat>
    <lon>-171.7124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57196</plant_id>
    <plant_name>High Point, POLO</plant_name>
    <state>NC</state>
    <county>Guilford</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.97</lat>
    <lon>-79.96</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57345</plant_id>
    <plant_name>Kettle Butte Digester, LLC</plant_name>
    <state>ID</state>
    <county>Jefferson</county>
    <operator>Kettle Butte Digester, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.631944</lat>
    <lon>-112.2797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57465</plant_id>
    <plant_name>Romark PA Solar</plant_name>
    <state>PA</state>
    <county>Luzerne</county>
    <operator>Romark Logistics of PA Inc.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.936111</lat>
    <lon>-76.03889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57608</plant_id>
    <plant_name>Westside WWTP</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>City Of High Point - (NC)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>35.9403</lat>
    <lon>-80.1106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57629</plant_id>
    <plant_name>Gaston Memorial Hospital</plant_name>
    <state>NC</state>
    <county>Gaston</county>
    <operator>City of Gastonia - (NC)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>35.2747</lat>
    <lon>-81.1383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57643</plant_id>
    <plant_name>Vestas Towers America, Inc.</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>CS Wind America, Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.1728</lat>
    <lon>-104.62</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57868</plant_id>
    <plant_name>L'Oreal Piscataway</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2016</latest_year>
    <lat>40.554341</lat>
    <lon>-74.46801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57941</plant_id>
    <plant_name>Town of Uxbridge MA at Commerce Dr</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Luminace Solar Net Metering, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.043889</lat>
    <lon>-71.6175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58096</plant_id>
    <plant_name>Bed Bath &amp; Beyond DC Port Reading NJ</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.568333</lat>
    <lon>-74.2425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58386</plant_id>
    <plant_name>CU Solar Plant</plant_name>
    <state>OH</state>
    <county>Greene</county>
    <operator>CU Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.741944</lat>
    <lon>-83.81694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58541</plant_id>
    <plant_name>SunGen Sharon 1 LLC</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>SunGen Sharon 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.791117</lat>
    <lon>-72.49762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58572</plant_id>
    <plant_name>Lakeland Solar Energy LLC</plant_name>
    <state>GA</state>
    <county>Lanier</county>
    <operator>Invenergy Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>31.026944</lat>
    <lon>-83.055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58624</plant_id>
    <plant_name>Berkshire 1</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>PPS Berkshire Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.114444</lat>
    <lon>-73.40528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58678</plant_id>
    <plant_name>Oswegatchie</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>44.27</lat>
    <lon>-75.19917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58702</plant_id>
    <plant_name>Axio Green LLC</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.576111</lat>
    <lon>-72.61</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58834</plant_id>
    <plant_name>Richland Center Renewable Energy LLC</plant_name>
    <state>WI</state>
    <county>Richland</county>
    <operator>Richland Center Renewable Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>43.314444</lat>
    <lon>-90.37306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58912</plant_id>
    <plant_name>Santa Fe Springs Rooftop Solar BLDG M</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.910833</lat>
    <lon>-118.0444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58980</plant_id>
    <plant_name>Akron WRF</plant_name>
    <state>OH</state>
    <county>Summit</county>
    <operator>City of Akron - (OH)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.153333</lat>
    <lon>-81.56889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59144</plant_id>
    <plant_name>Brighton PV Solar Plant</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Hangar 160 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.9825</lat>
    <lon>-104.9408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59368</plant_id>
    <plant_name>Westborough Solar LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>SunRay Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.263333</lat>
    <lon>-71.60917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59379</plant_id>
    <plant_name>Wapsie Valley Creamery Back Up Generator</plant_name>
    <state>IA</state>
    <county>Buchanan</county>
    <operator>Wapsie Valley Creamery</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.477778</lat>
    <lon>-91.89111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59470</plant_id>
    <plant_name>Cornell Snyder Road Solar Array</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Novis Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.4975</lat>
    <lon>-76.46</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59540</plant_id>
    <plant_name>Rancho Cucamonga Dist #1</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.100278</lat>
    <lon>-117.5528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59922</plant_id>
    <plant_name>South Campus Solar</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>JPMorgan Chase Bank</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2021</latest_year>
    <lat>39.781498</lat>
    <lon>-75.54839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59955</plant_id>
    <plant_name>ESA Smithfield</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.48835</lat>
    <lon>-78.31975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59956</plant_id>
    <plant_name>ESA Selma</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>SRE Utility Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.5262</lat>
    <lon>-78.2898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60230</plant_id>
    <plant_name>Estrella Mountain PV</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.409803</lat>
    <lon>-112.3403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60327</plant_id>
    <plant_name>East Amwell</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.443266</lat>
    <lon>-74.87637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60425</plant_id>
    <plant_name>Skidmore College</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.093682</lat>
    <lon>-73.81132</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60453</plant_id>
    <plant_name>Cummins, Inc</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.08124</lat>
    <lon>-79.36125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60724</plant_id>
    <plant_name>Arapahoe 3 Community Solar Array</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.638358</lat>
    <lon>-104.6742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60726</plant_id>
    <plant_name>Xcel Adams 1 Community Solar Array</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.765479</lat>
    <lon>-104.5886</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60876</plant_id>
    <plant_name>Eastern Iowa Solar</plant_name>
    <state>IA</state>
    <county>Muscatine</county>
    <operator>Central Iowa Power Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.596959</lat>
    <lon>-91.0363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61140</plant_id>
    <plant_name>CF Novel Solar CSG Gardens Two, LLC</plant_name>
    <state>MN</state>
    <county>Faribault</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.845905</lat>
    <lon>-93.83675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61224</plant_id>
    <plant_name>350 Clark Solar, NG, LLC</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.894197</lat>
    <lon>-74.73016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61376</plant_id>
    <plant_name>Cedar Creek PV</plant_name>
    <state>NY</state>
    <county>Nassau</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.64889</lat>
    <lon>-73.50667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61399</plant_id>
    <plant_name>Ashby Duffy CSG Solar Farm</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>LSE Cassiopeia LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.68</lat>
    <lon>-71.83</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61437</plant_id>
    <plant_name>DG AMP Solar Versailles</plant_name>
    <state>OH</state>
    <county>Darke</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.2207</lat>
    <lon>-84.4978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61442</plant_id>
    <plant_name>Foundation California Training Facility</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Foundation CA Fund IX Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.464</lat>
    <lon>-121.382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61443</plant_id>
    <plant_name>Foundation Mann Packing</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Foundation CA Fund IX Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.504</lat>
    <lon>-121.454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61444</plant_id>
    <plant_name>Foundation SaIinas Valley State Prison</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Foundation CA Fund IX Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.474</lat>
    <lon>-121.371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61537</plant_id>
    <plant_name>Weston Landfill Solar</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Ameresco, Inc - Weston</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.374553</lat>
    <lon>-71.2825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61593</plant_id>
    <plant_name>Westmont 301</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.763012</lat>
    <lon>-118.2866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61596</plant_id>
    <plant_name>Citizens Agawam Landfill Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.092988</lat>
    <lon>-72.59721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61604</plant_id>
    <plant_name>Camden CSD Solar Array</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.312306</lat>
    <lon>-75.69526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61644</plant_id>
    <plant_name>August Wind Farm</plant_name>
    <state>IA</state>
    <county>Taylor</county>
    <operator>August Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.764914</lat>
    <lon>-94.47563</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61725</plant_id>
    <plant_name>Madison County</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.028289</lat>
    <lon>-75.70098</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61804</plant_id>
    <plant_name>City of Rochester Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.176918</lat>
    <lon>-77.67851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61805</plant_id>
    <plant_name>DG AMP Solar Piqua Staunton</plant_name>
    <state>OH</state>
    <county>Miami</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.140866</lat>
    <lon>-84.23148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62029</plant_id>
    <plant_name>Enfield Community Solar</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Mecklenburg Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.453307</lat>
    <lon>-76.59481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62088</plant_id>
    <plant_name>Schultz CSG</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.5576</lat>
    <lon>-93.376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62130</plant_id>
    <plant_name>Roseman</plant_name>
    <state>IA</state>
    <county>Cass</county>
    <operator>Roseman Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.370997</lat>
    <lon>-94.75393</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62145</plant_id>
    <plant_name>Minisink Solar 1 LLC</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Minisink Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.321224</lat>
    <lon>-74.51408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62172</plant_id>
    <plant_name>Birch</plant_name>
    <state>IA</state>
    <county>Taylor</county>
    <operator>Birch Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.767636</lat>
    <lon>-94.47438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62199</plant_id>
    <plant_name>Ashby Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Ashby Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.630163</lat>
    <lon>-71.79872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62323</plant_id>
    <plant_name>Macy's MD Joppa Solar Project</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Northstar Macy's Maryland 2015, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.44752</lat>
    <lon>-76.32095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62443</plant_id>
    <plant_name>Westminster</plant_name>
    <state>VT</state>
    <county>Windham</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.0864</lat>
    <lon>-72.4554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62568</plant_id>
    <plant_name>GD West Greenwich Victory I, LLC</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.657866</lat>
    <lon>-71.68748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62613</plant_id>
    <plant_name>CBP Solar</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.266188</lat>
    <lon>-73.94688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63422</plant_id>
    <plant_name>Fresno Sunnyside High School Hybrid</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <battery_mwh>0.3</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.734014</lat>
    <lon>-119.7178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63580</plant_id>
    <plant_name>NYP-Westchester</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>NYPH - Lawrence</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>1964</first_year>
    <latest_year>2015</latest_year>
    <lat>40.94233</lat>
    <lon>-73.83686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63642</plant_id>
    <plant_name>Dunn Road Solar</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Neighborhood Power Corp.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.431</lat>
    <lon>-122.286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63647</plant_id>
    <plant_name>SDM000 Clarkson Fuel Cell</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.65511</lat>
    <lon>-73.94415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63660</plant_id>
    <plant_name>M72 West Solar</plant_name>
    <state>MI</state>
    <county>Leelanau</county>
    <operator>Heritage Sustainable Energy. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.776787</lat>
    <lon>-85.70136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63830</plant_id>
    <plant_name>Conagra Foods at St. Elmo</plant_name>
    <state>IL</state>
    <county>Fayette</county>
    <operator>Luminace Solar Illinois 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.0106</lat>
    <lon>-88.8443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64031</plant_id>
    <plant_name>Fremont CO 1, LLC</plant_name>
    <state>CO</state>
    <county>Fremont</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.46446</lat>
    <lon>-105.2125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64049</plant_id>
    <plant_name>San Diego - NCRC at Vista</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>California PV Energy 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.190283</lat>
    <lon>-117.2556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64332</plant_id>
    <plant_name>Two Dot Wind Broadview East LLC</plant_name>
    <state>MT</state>
    <county>Yellowstone</county>
    <operator>Two Dot Wind Broadview East LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>46.10265</lat>
    <lon>-108.8066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64334</plant_id>
    <plant_name>GD Glocester White Oak I, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>GD Glocester White Oak I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.861544</lat>
    <lon>-71.59624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64362</plant_id>
    <plant_name>SCS American Bottoms 009885 Sauget, LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.591745</lat>
    <lon>-90.18329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64445</plant_id>
    <plant_name>County of Dutchess, NY (Airport)</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.631398</lat>
    <lon>-73.87685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64619</plant_id>
    <plant_name>Kearsarge Upper Union</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Kearsarge Upper Union LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <battery_mwh>3.9</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.050281</lat>
    <lon>-71.39128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64628</plant_id>
    <plant_name>Slidematic at Rockford</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Luminace Solar Illinois 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.206076</lat>
    <lon>-89.07438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64846</plant_id>
    <plant_name>Prairie</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.239244</lat>
    <lon>-118.5836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64975</plant_id>
    <plant_name>Park St</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.596913</lat>
    <lon>-72.97043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65187</plant_id>
    <plant_name>Broadway 3 - UCSB Lot 38</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.41974</lat>
    <lon>-119.8564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65315</plant_id>
    <plant_name>Gas City 2</plant_name>
    <state>IN</state>
    <county>Grant</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.478689</lat>
    <lon>-85.55812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65486</plant_id>
    <plant_name>Love Lane Solar</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.471</lat>
    <lon>-75.218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65609</plant_id>
    <plant_name>Gilcrest Sun CSG</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.293752</lat>
    <lon>-104.8062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65707</plant_id>
    <plant_name>POM Beverage Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.39026</lat>
    <lon>-119.3579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65729</plant_id>
    <plant_name>Brady Solar LLC</plant_name>
    <state>GA</state>
    <county>Sumter</county>
    <operator>Cardinal Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.05569</lat>
    <lon>-84.20261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65747</plant_id>
    <plant_name>Fruitland Creek Solar (CSG)</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Fruitland Creek Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.93013</lat>
    <lon>-122.9375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66395</plant_id>
    <plant_name>Alta Sea</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Signal Street Operating, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.719111</lat>
    <lon>-118.2726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66455</plant_id>
    <plant_name>Yale New Haven - New London</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.336413</lat>
    <lon>-72.10561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66741</plant_id>
    <plant_name>Richmond Hill</plant_name>
    <state>ME</state>
    <county>Sagadahoc</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.091562</lat>
    <lon>-69.79587</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66799</plant_id>
    <plant_name>Bishop Ranch - BR 1-Y</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>4</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <battery_mwh>1.3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.76217</lat>
    <lon>-121.9579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66831</plant_id>
    <plant_name>Harrah's Atlantic City - POI 2 (Self Par</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.384389</lat>
    <lon>-74.42627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66959</plant_id>
    <plant_name>CPA Wilmington 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.82294</lat>
    <lon>-118.2456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66991</plant_id>
    <plant_name>CG PS Portfolio 1, LLC</plant_name>
    <state>GA</state>
    <county>Houston</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>32.40147</lat>
    <lon>-83.56124</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67086</plant_id>
    <plant_name>Spano Solar - Belmar Wall</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>Belmar Gateway Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.15</lat>
    <lon>-74.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67274</plant_id>
    <plant_name>Township of Monroe - Williamstown MS</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.680519</lat>
    <lon>-75.00341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67377</plant_id>
    <plant_name>Douglas Pike Solar, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.97636</lat>
    <lon>-71.61372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67480</plant_id>
    <plant_name>NY Finchville Tpke CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Finchville Tpke LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.449394</lat>
    <lon>-74.55478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67485</plant_id>
    <plant_name>Union Sanitary District Cogen</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Union Sanitary District</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.589632</lat>
    <lon>-122.0907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67517</plant_id>
    <plant_name>El Dorado AR</plant_name>
    <state>AR</state>
    <county>Union</county>
    <operator>Entegrity Solar El Dorado SD, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.212935</lat>
    <lon>-92.62154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67671</plant_id>
    <plant_name>MD BALTIMORE 4851 HOLABIRD AVE</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>PFMD LL Baltimore LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.269522</lat>
    <lon>-76.55351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67699</plant_id>
    <plant_name>Osage City Solar</plant_name>
    <state>KS</state>
    <county>Osage</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.6512</lat>
    <lon>-95.82813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67791</plant_id>
    <plant_name>ABIA Parking Structure</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.2047</lat>
    <lon>-97.6686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67801</plant_id>
    <plant_name>FedEx Hagerstown</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.6385</lat>
    <lon>-77.7923</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67948</plant_id>
    <plant_name>Hampton Substation Energy Storage</plant_name>
    <state>IA</state>
    <county>Franklin</county>
    <operator>Corn Belt Power Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <battery_mwh>9.1</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.6872</lat>
    <lon>-93.2321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67994</plant_id>
    <plant_name>City of Long Beach Airport Lot A &amp; B</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Solar DG CA Long Beach, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>33.81516</lat>
    <lon>-118.1412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68269</plant_id>
    <plant_name>Bob Wiley Detention Center</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.454</lat>
    <lon>-119.312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68409</plant_id>
    <plant_name>VS RXI Mason-Chatsworth, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>TRITEC Americas</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.235</lat>
    <lon>-118.579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68432</plant_id>
    <plant_name>Aegean Drive Solar</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Aegean Drive Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.730637</lat>
    <lon>-71.21228</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68612</plant_id>
    <plant_name>Central San</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>REC CSD, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.005734</lat>
    <lon>-122.0749</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68778</plant_id>
    <plant_name>IL Chicago 2635 S Western Ave. (West)</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Catalyze Chicago S Western Avenue 2 Microgrid, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.844094</lat>
    <lon>-87.68325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69012</plant_id>
    <plant_name>CTGB Osborn</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>TotalEnergies Renewables USA LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.032931</lat>
    <lon>-72.4992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69081</plant_id>
    <plant_name>Crowne Plaza</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.925278</lat>
    <lon>-75.05361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69088</plant_id>
    <plant_name>Cromwell</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.172222</lat>
    <lon>-76.63194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69190</plant_id>
    <plant_name>GreenStruxure BBU004, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <battery_mwh>0.4</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.007486</lat>
    <lon>-118.12</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69273</plant_id>
    <plant_name>Danton XI Solar LLC</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Danton XI Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.720174</lat>
    <lon>-71.21103</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69370</plant_id>
    <plant_name>RP Minnesota Solar</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>RP Minnesota Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.20017</lat>
    <lon>-118.9281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69515</plant_id>
    <plant_name>Mansfield Landfill</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.78</lat>
    <lon>-72.19</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69830</plant_id>
    <plant_name>Hampden CSG 1 LLC</plant_name>
    <state>PA</state>
    <county>Cumberland</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.231468</lat>
    <lon>-77.00201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69953</plant_id>
    <plant_name>DS Containers</plant_name>
    <state>IL</state>
    <county>Dupage</county>
    <operator>DS Containers LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.868181</lat>
    <lon>-88.25994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70087</plant_id>
    <plant_name>Inland Empire</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.711743</lat>
    <lon>-119.4113</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70088</plant_id>
    <plant_name>Rosedale</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.8</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.390541</lat>
    <lon>-119.3654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>987</plant_id>
    <plant_name>Last Chance</plant_name>
    <state>ID</state>
    <county>Caribou</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>42.603349</lat>
    <lon>-111.7053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1143</plant_id>
    <plant_name>Grand Junction</plant_name>
    <state>IA</state>
    <county>Greene</county>
    <operator>City of Grand Junction - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>42.0296</lat>
    <lon>-94.3699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2234</plant_id>
    <plant_name>Deshler</plant_name>
    <state>NE</state>
    <county>Thayer</county>
    <operator>City of Deshler - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1956</first_year>
    <latest_year>1999</latest_year>
    <lat>40.1408</lat>
    <lon>-97.7239</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3710</plant_id>
    <plant_name>Cavendish</plant_name>
    <state>VT</state>
    <county>Windsor</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1907</first_year>
    <latest_year>1907</latest_year>
    <lat>43.381225</lat>
    <lon>-72.59824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4064</plant_id>
    <plant_name>Hat Rapids</plant_name>
    <state>WI</state>
    <county>Oneida</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1984</latest_year>
    <lat>45.5711</lat>
    <lon>-89.4806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6394</plant_id>
    <plant_name>Swift Creek</plant_name>
    <state>WY</state>
    <county>Lincoln</county>
    <operator>Lower Valley Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2010</latest_year>
    <lat>42.728439</lat>
    <lon>-110.9166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7182</plant_id>
    <plant_name>Aniak</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Aniak Light &amp; Power Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1996</first_year>
    <latest_year>2018</latest_year>
    <lat>61.580678</lat>
    <lon>-159.5356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7183</plant_id>
    <plant_name>Newhalen</plant_name>
    <state>AK</state>
    <county>Lake and Peninsula</county>
    <operator>I-N-N Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2012</latest_year>
    <lat>59.899054</lat>
    <lon>-154.6987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10902</plant_id>
    <plant_name>Victory Mills</plant_name>
    <state>NY</state>
    <county>Cayuga</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>42.9197</lat>
    <lon>-76.5477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50093</plant_id>
    <plant_name>Chateaugay High Falls Hydro</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Hydroland Omega LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>44.909915</lat>
    <lon>-74.0858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50103</plant_id>
    <plant_name>China Mill Hydro</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>New Hampshire Hydro Associates</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>43.128712</lat>
    <lon>-71.45987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50354</plant_id>
    <plant_name>Newport Hydro</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.1853</lat>
    <lon>-75.0169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50423</plant_id>
    <plant_name>Cowiche</plant_name>
    <state>WA</state>
    <county>Yakima</county>
    <operator>Yakima-Tieton Irrigation Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>46.692628</lat>
    <lon>-120.7372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56244</plant_id>
    <plant_name>State Auto Insurance</plant_name>
    <state>SD</state>
    <county>Grant</county>
    <operator>SLB Milbank LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>45.220717</lat>
    <lon>-96.61678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56409</plant_id>
    <plant_name>Stahl Wind Energy</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Stahl Wind Energy, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>44.0256</lat>
    <lon>-96.4303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56410</plant_id>
    <plant_name>Carstensen Wind</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Carstensen Wind, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>44.0247</lat>
    <lon>-96.4369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56411</plant_id>
    <plant_name>Northern Lights Wind LLC</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Northern Lights Wind LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>44.015</lat>
    <lon>-96.4367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56412</plant_id>
    <plant_name>Lucky Wind</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Lucky Wind, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>44.0211</lat>
    <lon>-96.4406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56413</plant_id>
    <plant_name>Greenback Energy</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Greenback Energy, LLC (Longroad)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>44.0208</lat>
    <lon>-96.4331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56498</plant_id>
    <plant_name>Mora Drop Hydroelectric Project</plant_name>
    <state>ID</state>
    <county>Ada</county>
    <operator>Boise Project Board of Control</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.460012</lat>
    <lon>-116.4725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56889</plant_id>
    <plant_name>PPL Renewable Energy Merck Solar</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.727386</lat>
    <lon>-74.3783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56968</plant_id>
    <plant_name>Big Top LLC</plant_name>
    <state>OR</state>
    <county>Morrow</county>
    <operator>CR51 Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>45.655</lat>
    <lon>-119.4647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57052</plant_id>
    <plant_name>Savoonga</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2019</latest_year>
    <lat>63.695267</lat>
    <lon>-170.4757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57257</plant_id>
    <plant_name>Iowa Lakes Community College Wind Farm</plant_name>
    <state>IA</state>
    <county>Emmet</county>
    <operator>Iowa Lakes Community College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>43.385347</lat>
    <lon>-94.81566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57341</plant_id>
    <plant_name>Silver Lake Solar Farm</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.494804</lat>
    <lon>-74.39951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57414</plant_id>
    <plant_name>Notus Wind 1</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Notus Clean Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.6083</lat>
    <lon>-70.6089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57732</plant_id>
    <plant_name>UMM Wind Turbine</plant_name>
    <state>MN</state>
    <county>Stevens</county>
    <operator>University of Minnesota Morris Campus</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.5897</lat>
    <lon>-95.87703</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57823</plant_id>
    <plant_name>WCROC Wind Farm</plant_name>
    <state>MN</state>
    <county>Stevens</county>
    <operator>University of Minnesota WCROC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>45.589722</lat>
    <lon>-95.87694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58164</plant_id>
    <plant_name>Slayton Solar</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>43.980278</lat>
    <lon>-95.76722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58183</plant_id>
    <plant_name>Prairie Horizon Agri Energy</plant_name>
    <state>KS</state>
    <county>Phillips</county>
    <operator>Prairie Horizon Agri Energy LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>39.761111</lat>
    <lon>-99.30583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58635</plant_id>
    <plant_name>Museum of Science and Industry</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Museum of Science and Industry</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>41.790556</lat>
    <lon>-87.58278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58653</plant_id>
    <plant_name>Jersey Gardens Phase 1</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.660833</lat>
    <lon>-74.17333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58961</plant_id>
    <plant_name>Oregon University System OIT Klamath Fal</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.254167</lat>
    <lon>-121.785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59055</plant_id>
    <plant_name>Rariton OMP</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Janssen Pharmaceutical Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.574444</lat>
    <lon>-74.64806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59489</plant_id>
    <plant_name>Anthony Wayne Solar #1</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>Toledo Zoological Society</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.627222</lat>
    <lon>-83.57472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60099</plant_id>
    <plant_name>Hewlett-Packard (HP) - Andover, MA</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.624687</lat>
    <lon>-71.18291</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60424</plant_id>
    <plant_name>West Bridgewater AB CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.0253</lat>
    <lon>-71.0336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60477</plant_id>
    <plant_name>Bethlehem - East</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.539006</lat>
    <lon>-73.8243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60842</plant_id>
    <plant_name>Prudential 80 Livingston Roseland Solar</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Prudential Drive Investors, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.815363</lat>
    <lon>-74.30499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60849</plant_id>
    <plant_name>Emmitsburg Solar Arrays</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>UGI Energy Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.69373</lat>
    <lon>-77.31443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60911</plant_id>
    <plant_name>Green Energy Machine</plant_name>
    <state>IA</state>
    <county>Cass</county>
    <operator>Green Energy Machine, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.373</lat>
    <lon>-94.754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60931</plant_id>
    <plant_name>CCC Hastings Wind Turbine</plant_name>
    <state>NE</state>
    <county>Adams</county>
    <operator>CCC Hastings Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.57</lat>
    <lon>-98.334</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61056</plant_id>
    <plant_name>Seward Wind Farm</plant_name>
    <state>NE</state>
    <county>Seward</county>
    <operator>Seward Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.895</lat>
    <lon>-97.1951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61728</plant_id>
    <plant_name>Barrett Farm Solar - Phase I</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>A2-A Pearl Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.946333</lat>
    <lon>-71.8838</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61862</plant_id>
    <plant_name>Dignity - San Martin</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.057181</lat>
    <lon>-115.2721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62027</plant_id>
    <plant_name>Caldwell Wastewater Treatment Plant Hybr</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Caldwell Wastewater Treatment Plant</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.838568</lat>
    <lon>-74.31248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62074</plant_id>
    <plant_name>Bd of Educ of Queen Anne's Cnty, Cnty HS</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.035986</lat>
    <lon>-76.05432</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62152</plant_id>
    <plant_name>IKEA Live Oak Rooftop PV System</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.48</lat>
    <lon>-98.25</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62159</plant_id>
    <plant_name>Sacket Lake Rd #2 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.38251</lat>
    <lon>-74.43526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62545</plant_id>
    <plant_name>Renew Solar ABC Sacramento LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.39945</lat>
    <lon>-121.2932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62614</plant_id>
    <plant_name>Kinder Morgan Fordham</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.542557</lat>
    <lon>-74.23658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62628</plant_id>
    <plant_name>APG Old Bayside</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.498961</lat>
    <lon>-76.14606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62690</plant_id>
    <plant_name>Guadalupe Solar Farm</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>County of Santa Clara - (CA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.269039</lat>
    <lon>-121.8611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62873</plant_id>
    <plant_name>Carolina Poultry Power Farmville</plant_name>
    <state>NC</state>
    <county>Pitt</county>
    <operator>Carolina Poultry Power</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.591719</lat>
    <lon>-77.61451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63079</plant_id>
    <plant_name>Bethlehem Solar</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.601145</lat>
    <lon>-73.88742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63623</plant_id>
    <plant_name>Lafayette 2 - MLK Jr. Hospital (MLK)</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.92</lat>
    <lon>-118.24</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63774</plant_id>
    <plant_name>Mount Kisco Landfill Solar &amp; Storage CSG</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>BQ Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.195478</lat>
    <lon>-73.73606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64162</plant_id>
    <plant_name>Newton Rumford Landfill</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Newton Municipal Solar LLC - Rumford</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.356341</lat>
    <lon>-71.24459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64187</plant_id>
    <plant_name>ZPD-PT Solar Project 2017-021 LLC Hybrid</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>2</summer_mw>
    <battery_mwh>2.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.1</lat>
    <lon>-72.47</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64283</plant_id>
    <plant_name>Terrell Riles Stovall</plant_name>
    <state>GA</state>
    <county>Terrell</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.785503</lat>
    <lon>-84.44841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64379</plant_id>
    <plant_name>Ridgecrest</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.84683</lat>
    <lon>-76.97592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64401</plant_id>
    <plant_name>CSU San Jose State University</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.334</lat>
    <lon>-121.884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64569</plant_id>
    <plant_name>Arnold Cochran</plant_name>
    <state>GA</state>
    <county>Bleckley</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.399366</lat>
    <lon>-83.34378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64860</plant_id>
    <plant_name>Billings Road</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.52344</lat>
    <lon>-72.36986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65210</plant_id>
    <plant_name>Enloe Medical - Chico</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.742597</lat>
    <lon>-121.8497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65960</plant_id>
    <plant_name>WMATA - Naylor Rd. Metro</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.85034</lat>
    <lon>-76.9573</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65961</plant_id>
    <plant_name>WMATA - S. Ave. Carport (East) (CSG)</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.84066</lat>
    <lon>-76.9752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66150</plant_id>
    <plant_name>Equinix - Elmsford</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.071199</lat>
    <lon>-73.81921</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66481</plant_id>
    <plant_name>Union Vale</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.661</lat>
    <lon>-73.742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66798</plant_id>
    <plant_name>Bayer - Whippany, NJ</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.818832</lat>
    <lon>-74.41577</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67371</plant_id>
    <plant_name>Seaboard Oxford, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.110225</lat>
    <lon>-71.89236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67441</plant_id>
    <plant_name>Pivot Solar 9</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.72736</lat>
    <lon>-104.7695</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67446</plant_id>
    <plant_name>Pivot Solar 10</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.72883</lat>
    <lon>-104.7706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67569</plant_id>
    <plant_name>Bourbonnais</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Solar DG IL 5, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.207</lat>
    <lon>-87.925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67793</plant_id>
    <plant_name>Open Sky Ranch Inc</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Bravo REC Management LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.46052</lat>
    <lon>-120.0305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67952</plant_id>
    <plant_name>LPEA Sunnyside Solar 1 Facility</plant_name>
    <state>CO</state>
    <county>La Plata</county>
    <operator>La Plata Electric Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.124087</lat>
    <lon>-107.8602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68467</plant_id>
    <plant_name>Machesney Park</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Solar DG IL 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.376</lat>
    <lon>-89.003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68471</plant_id>
    <plant_name>Open Sky Dairy</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Renewable Solar, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.459935</lat>
    <lon>-120.0298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68795</plant_id>
    <plant_name>IPC 16 - SLCVA516</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.738366</lat>
    <lon>-121.5348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68983</plant_id>
    <plant_name>KP South Sacramento Hospital Solar</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>KP South Sacramento Hospital Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.46</lat>
    <lon>-121.42</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69132</plant_id>
    <plant_name>KP Ontario Vineyard Solar</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>KP Ontario Vineyard O.P. Surgicenter B Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.032177</lat>
    <lon>-117.6088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69853</plant_id>
    <plant_name>West Deptford Solar 2 LLC CSG</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.836134</lat>
    <lon>-75.19251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70576</plant_id>
    <plant_name>Goose Haven</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.45599</lat>
    <lon>-75.65278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70577</plant_id>
    <plant_name>Hanover 2</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.7</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.525722</lat>
    <lon>-76.83519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>172</plant_id>
    <plant_name>Osceola (AR)</plant_name>
    <state>AR</state>
    <county>Mississippi</county>
    <operator>City of Osceola - (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>35.705381</lat>
    <lon>-89.9689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>264</plant_id>
    <plant_name>Phoenix</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1940</latest_year>
    <lat>38.032103</lat>
    <lon>-120.3265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>327</plant_id>
    <plant_name>Bishop Creek 6</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1913</latest_year>
    <lat>37.3499</lat>
    <lon>-118.4628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>394</plant_id>
    <plant_name>Cottonwood</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>2.4</summer_mw>
    <first_year>1908</first_year>
    <latest_year>1909</latest_year>
    <lat>36.443421</lat>
    <lon>-118.0439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>554</plant_id>
    <plant_name>Taftville</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>FirstLight Power Resources Services LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>2</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1949</latest_year>
    <lat>41.5725</lat>
    <lon>-72.0458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>674</plant_id>
    <plant_name>Pilot Butte</plant_name>
    <state>WY</state>
    <county>Fremont</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1929</latest_year>
    <lat>43.219017</lat>
    <lon>-108.7877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1283</plant_id>
    <plant_name>Herington</plant_name>
    <state>KS</state>
    <county>Dickinson</county>
    <operator>City of Herington - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>38.6658</lat>
    <lon>-96.9492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1498</plant_id>
    <plant_name>Messalonskee 3</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Messalonskee Stream Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1918</latest_year>
    <lat>44.569872</lat>
    <lon>-69.68184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1604</plant_id>
    <plant_name>Chemical</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>City of Holyoke Gas and Elec Dept - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1935</first_year>
    <latest_year>1935</latest_year>
    <lat>42.1919</lat>
    <lon>-72.6097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1756</plant_id>
    <plant_name>Saxon Falls</plant_name>
    <state>WI</state>
    <county>Iron</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1913</latest_year>
    <lat>46.5392</lat>
    <lon>-90.3742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1761</plant_id>
    <plant_name>Mottville</plant_name>
    <state>MI</state>
    <county>St Joseph</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>41.8056</lat>
    <lon>-85.7505</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1898</plant_id>
    <plant_name>Pillager</plant_name>
    <state>MN</state>
    <county>Cass</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>46.316033</lat>
    <lon>-94.48494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1899</plant_id>
    <plant_name>Scanlon</plant_name>
    <state>MN</state>
    <county>Carlton</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>46.709126</lat>
    <lon>-92.42173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2235</plant_id>
    <plant_name>Emerson</plant_name>
    <state>NE</state>
    <county>Dixon</county>
    <operator>City of Emerson - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1947</first_year>
    <latest_year>1968</latest_year>
    <lat>42.276</lat>
    <lon>-96.7292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2359</plant_id>
    <plant_name>Hooksett</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>43.101699</lat>
    <lon>-71.46566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3765</plant_id>
    <plant_name>Cadys Falls</plant_name>
    <state>VT</state>
    <county>Lamoille</county>
    <operator>Village of Morrisville - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1947</latest_year>
    <lat>44.577553</lat>
    <lon>-72.61186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3789</plant_id>
    <plant_name>Luray Hydro Station</plant_name>
    <state>VA</state>
    <county>Page</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>38.676667</lat>
    <lon>-78.49889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6508</plant_id>
    <plant_name>Drop 3 (WA)</plant_name>
    <state>WA</state>
    <county>Yakima</county>
    <operator>Yakama Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1932</latest_year>
    <lat>46.423133</lat>
    <lon>-120.56</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6555</plant_id>
    <plant_name>McGrath</plant_name>
    <state>AK</state>
    <county>Yukon Koyukuk</county>
    <operator>McGrath Light &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>62.95699</lat>
    <lon>-155.595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10872</plant_id>
    <plant_name>Kings Falls Hydroelectric</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Silverstreet Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>43.917267</lat>
    <lon>-75.63382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50091</plant_id>
    <plant_name>Sheep Creek Hydro</plant_name>
    <state>WA</state>
    <county>Stevens</county>
    <operator>Sheep Creek Hydro Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>48.947741</lat>
    <lon>-117.7954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50177</plant_id>
    <plant_name>Blackstone/Tupperware</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Blackstone Hydro Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>42.014467</lat>
    <lon>-71.5444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50178</plant_id>
    <plant_name>Halifax (VA)</plant_name>
    <state>VA</state>
    <county>Halifax</county>
    <operator>Banister Hydro LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1915</latest_year>
    <lat>36.7817</lat>
    <lon>-78.9236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50228</plant_id>
    <plant_name>Rocky Brook Hydroelectric</plant_name>
    <state>WA</state>
    <county>Jefferson</county>
    <operator>Rocky Brook Electric Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>0.1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>47.7197</lat>
    <lon>-122.9431</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50315</plant_id>
    <plant_name>Chasm Hydro Partnership</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Ampersand Chasm Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1984</latest_year>
    <lat>44.9318</lat>
    <lon>-74.1125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50421</plant_id>
    <plant_name>Orchard Avenue 1</plant_name>
    <state>WA</state>
    <county>Yakima</county>
    <operator>Yakima-Tieton Irrigation Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>46.596413</lat>
    <lon>-120.6775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50436</plant_id>
    <plant_name>Cascade Dam (MI)</plant_name>
    <state>MI</state>
    <county>Kent</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>42.909408</lat>
    <lon>-85.49888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50437</plant_id>
    <plant_name>French Landing Dam</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>42.214264</lat>
    <lon>-83.44069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50564</plant_id>
    <plant_name>New Milford Gas Recovery</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>41.547671</lat>
    <lon>-73.42524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50938</plant_id>
    <plant_name>Galesville Project</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>Douglas County - (OR)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>42.8489</lat>
    <lon>-123.1778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50972</plant_id>
    <plant_name>Marsh Valley Development</plant_name>
    <state>ID</state>
    <county>Bannock</county>
    <operator>Marsh Valley Development Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>42.625972</lat>
    <lon>-112.1493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52057</plant_id>
    <plant_name>Herkimer</plant_name>
    <state>NY</state>
    <county>Herkimer</county>
    <operator>ECOsponsible LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.033577</lat>
    <lon>-74.98339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54202</plant_id>
    <plant_name>Upper Androscoggin</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Lewiston, City of - (ME)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>44.087963</lat>
    <lon>-70.21237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54539</plant_id>
    <plant_name>Venice Resources Gas Recovery</plant_name>
    <state>MI</state>
    <county>Shiawassee</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.985</lat>
    <lon>-83.9764</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54718</plant_id>
    <plant_name>Alliant SBD 9206 Donaldson</plant_name>
    <state>IA</state>
    <county>Howard</county>
    <operator>Industrial Energy Applications Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.3744</lat>
    <lon>-92.1331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54744</plant_id>
    <plant_name>District 70 Transco Gas Pipe Line</plant_name>
    <state>MS</state>
    <county>Walthall</county>
    <operator>Transcontinental Gas PL Corp</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>All Other</primary_technology>
    <primary_energy_source>WH</primary_energy_source>
    <technologies>All Other</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1951</first_year>
    <latest_year>1951</latest_year>
    <lat>31.24793</lat>
    <lon>-90.19914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55035</plant_id>
    <plant_name>Davenport Water Pollution Control Plant</plant_name>
    <state>IA</state>
    <county>Scott</county>
    <operator>Davenport, City of - (IA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>41.4928</lat>
    <lon>-90.6275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55880</plant_id>
    <plant_name>Sonoma Central Landfill Phase III</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>County of Sonoma Dept of Trnsp</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>38.3017</lat>
    <lon>-122.7489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56022</plant_id>
    <plant_name>Waste Water Plant Generator</plant_name>
    <state>KS</state>
    <county>Cowley</county>
    <operator>City of Winfield - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>37.227778</lat>
    <lon>-96.98972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56231</plant_id>
    <plant_name>Emory Hillandale Hospital</plant_name>
    <state>GA</state>
    <county>DeKalb</county>
    <operator>DeKalb Regional Health System</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>33.7036</lat>
    <lon>-84.1494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56276</plant_id>
    <plant_name>ZCO</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wind Stream Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>35.0772</lat>
    <lon>-118.3811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56496</plant_id>
    <plant_name>Phillips 66 Billings Refinery</plant_name>
    <state>MT</state>
    <county>Yellowstone</county>
    <operator>Phillips 66 Billings Refinery</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>45.7769</lat>
    <lon>-108.4911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56877</plant_id>
    <plant_name>Hall's Warehouse Solar Project</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Sunlight General Solar Fund II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.573708</lat>
    <lon>-74.39441</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56890</plant_id>
    <plant_name>Norther Tier Landfill</plant_name>
    <state>PA</state>
    <county>Bradford</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>41.7792</lat>
    <lon>-76.6258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57024</plant_id>
    <plant_name>Waste Management Northern Oaks LFGTE</plant_name>
    <state>MI</state>
    <county>Clare</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>43.9906</lat>
    <lon>-84.8003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57169</plant_id>
    <plant_name>Waste Management Piedmont LFGTE Project</plant_name>
    <state>NC</state>
    <county>Forsyth</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.193611</lat>
    <lon>-80.04056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57372</plant_id>
    <plant_name>Bellevue Solar Project</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.112222</lat>
    <lon>-123.2347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57393</plant_id>
    <plant_name>Big Sky Dairy Digester</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>DF-AP #1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>42.8656</lat>
    <lon>-114.7914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57408</plant_id>
    <plant_name>Prairie Bluff</plant_name>
    <state>MS</state>
    <county>Chickasaw</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.954444</lat>
    <lon>-88.9925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57436</plant_id>
    <plant_name>Davidson Gas Producers LLC</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>Davidson Gas Producers LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.841299</lat>
    <lon>-80.18346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57438</plant_id>
    <plant_name>Solar Park Gainesville, LLC</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>29.700407</lat>
    <lon>-82.33783</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57473</plant_id>
    <plant_name>Dartmouth Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.715804</lat>
    <lon>-70.97445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57557</plant_id>
    <plant_name>Sunnyvale City of WPCP</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>City of Sunnyvale WPCP - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1997</first_year>
    <latest_year>1997</latest_year>
    <lat>37.4194</lat>
    <lon>-122.0153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57579</plant_id>
    <plant_name>Robert O Schulz Solar Farm</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>South San Joaquin Irr District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2009</latest_year>
    <lat>37.8583</lat>
    <lon>-120.8917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57855</plant_id>
    <plant_name>Ipswich Wind Turbine</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Town of Ipswich - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.716389</lat>
    <lon>-70.84194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57876</plant_id>
    <plant_name>Santa Cruz Energy</plant_name>
    <state>CA</state>
    <county>Santa Cruz</county>
    <operator>Santa Cruz Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.973333</lat>
    <lon>-122.1056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57885</plant_id>
    <plant_name>Wellford Renewable Energy Plant</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Lockhart Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.001194</lat>
    <lon>-82.13028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57903</plant_id>
    <plant_name>SMMPA Methane Energy Facility</plant_name>
    <state>MN</state>
    <county>Kanabec</county>
    <operator>Southern Minnesota Mun P Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>45.847778</lat>
    <lon>-93.35417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57911</plant_id>
    <plant_name>Roseburg LFG</plant_name>
    <state>OR</state>
    <county>Douglas</county>
    <operator>Roseburg LFG Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.186111</lat>
    <lon>-123.3803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58024</plant_id>
    <plant_name>St Joseph Landfill Generating Station</plant_name>
    <state>MO</state>
    <county>Buchanan</county>
    <operator>Evergy Missouri West</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.674444</lat>
    <lon>-94.77611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58061</plant_id>
    <plant_name>Decatur-Morgan Co LFG Recovery Project</plant_name>
    <state>AL</state>
    <county>Morgan</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2011</latest_year>
    <lat>34.623611</lat>
    <lon>-87.10111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58071</plant_id>
    <plant_name>Windwalkers LLC</plant_name>
    <state>IA</state>
    <county>Worth</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.384722</lat>
    <lon>-93.22139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58089</plant_id>
    <plant_name>Roeder Family Wind Farm LLC</plant_name>
    <state>IA</state>
    <county>Worth</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.297222</lat>
    <lon>-93.28333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58250</plant_id>
    <plant_name>Tullytown</plant_name>
    <state>PA</state>
    <county>Bucks</county>
    <operator>WM Renewable Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.151389</lat>
    <lon>-74.78056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58253</plant_id>
    <plant_name>CBS Television City</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Televison City Studios, LLC.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.075</lat>
    <lon>-118.36</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58320</plant_id>
    <plant_name>G2 Energy Hay Rd</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>G2 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.314722</lat>
    <lon>-121.8336</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58407</plant_id>
    <plant_name>Luther College Wind Project</plant_name>
    <state>IA</state>
    <county>Winneshiek</county>
    <operator>Luther College Wind Energy Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.326944</lat>
    <lon>-91.81083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58456</plant_id>
    <plant_name>Cumberland Rose</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>Cumberland Rose Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.226944</lat>
    <lon>-94.43472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58457</plant_id>
    <plant_name>Fontanelle</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>Forward Fontanelle Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.338889</lat>
    <lon>-94.57</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58458</plant_id>
    <plant_name>Greenfield Wind</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>Greenfield Wind Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.29</lat>
    <lon>-94.485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58459</plant_id>
    <plant_name>Meadow Ridge</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>Meadow Ridge Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.39</lat>
    <lon>-94.44583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58460</plant_id>
    <plant_name>Sky Volt</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>Sky Volt, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.29</lat>
    <lon>-94.485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58461</plant_id>
    <plant_name>Wiota</plant_name>
    <state>IA</state>
    <county>Cass</county>
    <operator>Wiota Wind Energy, LLC #1</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.391944</lat>
    <lon>-94.87639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58516</plant_id>
    <plant_name>Union HS at Casa Grande</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Luminace Solar Holding, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.936944</lat>
    <lon>-111.7386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58709</plant_id>
    <plant_name>Phoenix Airport Rental Car Center</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.43042</lat>
    <lon>-112.0448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58995</plant_id>
    <plant_name>St. Olaf Wind Turbine</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>St. Olaf College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>44.462222</lat>
    <lon>-93.19278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59011</plant_id>
    <plant_name>Southbridge Landfill Gas-to-Energy</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Southbridge Recycling and Disposal Park</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.104444</lat>
    <lon>-72.0325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59134</plant_id>
    <plant_name>Easton Landfill</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.010278</lat>
    <lon>-71.09222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59198</plant_id>
    <plant_name>Sterling PV 3</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.6316</lat>
    <lon>-103.1947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59199</plant_id>
    <plant_name>Mesa PV1</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.0672</lat>
    <lon>-108.5091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59331</plant_id>
    <plant_name>Anheuser-Busch #2</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Foundation HA Energy Generation, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.233611</lat>
    <lon>-122.0925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59392</plant_id>
    <plant_name>Blue Ridge Generating</plant_name>
    <state>KY</state>
    <county>Estill</county>
    <operator>North American Biofuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.741111</lat>
    <lon>-83.98889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59439</plant_id>
    <plant_name>COC Surry LFG, LLC</plant_name>
    <state>NC</state>
    <county>Surry</county>
    <operator>Petra Engineering</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.438611</lat>
    <lon>-80.56833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59626</plant_id>
    <plant_name>Chicopee Granby Road Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.158056</lat>
    <lon>-72.59583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59650</plant_id>
    <plant_name>CII Methane Management III LFG Plant</plant_name>
    <state>GA</state>
    <county>Clarke</county>
    <operator>Frontier Operation Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.925556</lat>
    <lon>-83.26389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59704</plant_id>
    <plant_name>Shell New Energies, Junction City</plant_name>
    <state>OR</state>
    <county>Lane</county>
    <operator>Equilon Enterprises LLC d/b/a Shell Oil</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.183526</lat>
    <lon>-123.2005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59711</plant_id>
    <plant_name>CII Methane Management IV, LLC</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>Frontier Operation Services</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.511903</lat>
    <lon>-78.43379</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59769</plant_id>
    <plant_name>TIA Solar</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>27.965797</lat>
    <lon>-82.53282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60005</plant_id>
    <plant_name>Daytona International Speedway Solar</plant_name>
    <state>FL</state>
    <county>Volusia</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>29.17016</lat>
    <lon>-81.06412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60036</plant_id>
    <plant_name>CCBC-Catonsville</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Luminace Solar Holding, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.2525</lat>
    <lon>-76.735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60067</plant_id>
    <plant_name>BWC Swan Pond River CSG</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>BWC Swan Pond River, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.795599</lat>
    <lon>-71.22663</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60089</plant_id>
    <plant_name>Elkton Solar</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>SunE DB27, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.603531</lat>
    <lon>-75.83624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60220</plant_id>
    <plant_name>Zero Waste Energy Development Co LLC</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Zero Waste Energy Development Company LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.4325</lat>
    <lon>-121.9529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60263</plant_id>
    <plant_name>Durham AWTF</plant_name>
    <state>OR</state>
    <county>Washington</county>
    <operator>Clean Water Services</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>45.400524</lat>
    <lon>-122.7658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60365</plant_id>
    <plant_name>Vulcraft Solar</plant_name>
    <state>NY</state>
    <county>Chemung</county>
    <operator>Soltage VUL 1600 Chemung, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.005874</lat>
    <lon>-76.61935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60388</plant_id>
    <plant_name>Morgantown</plant_name>
    <state>PA</state>
    <county>Berks</county>
    <operator>Energy Developments, Inc d/b/a EDL</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.174563</lat>
    <lon>-75.91369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60423</plant_id>
    <plant_name>Fairhaven C CSG</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.66303</lat>
    <lon>-70.86323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60461</plant_id>
    <plant_name>The Clorox Company</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.472128</lat>
    <lon>-76.20134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60463</plant_id>
    <plant_name>Greene County Meter #1</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.294823</lat>
    <lon>-74.00076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60514</plant_id>
    <plant_name>Seminole (GA)</plant_name>
    <state>GA</state>
    <county>Seminole</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>31.065112</lat>
    <lon>-84.9317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60571</plant_id>
    <plant_name>North City - Landfill Gas Engine North</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>City of San Diego - (CA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.877822</lat>
    <lon>-117.1978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60685</plant_id>
    <plant_name>Canyon Del Oro High School Solar</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Luminace Solar Arizona 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.374</lat>
    <lon>-110.974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60798</plant_id>
    <plant_name>South Atlantic Services Solar Farm I</plant_name>
    <state>NC</state>
    <county>New Hanover</county>
    <operator>South Atlantic Services Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.290189</lat>
    <lon>-77.97567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60806</plant_id>
    <plant_name>North Bergen Solar</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.7</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.818</lat>
    <lon>-74.017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60810</plant_id>
    <plant_name>Sabert Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Sabert Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.475477</lat>
    <lon>-74.32093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60816</plant_id>
    <plant_name>Town of Lexington Solar</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Syncarpha Lexington, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.469135</lat>
    <lon>-71.25546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60840</plant_id>
    <plant_name>Goya Foods, Inc- Secaucus Solar</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Goya Foods Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.77312</lat>
    <lon>-74.0774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61438</plant_id>
    <plant_name>DG AMP Solar Jackson Center</plant_name>
    <state>OH</state>
    <county>Shelby</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.444969</lat>
    <lon>-84.04725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61563</plant_id>
    <plant_name>Denver Metro Solar</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Denver Metro Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.759298</lat>
    <lon>-104.6211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61699</plant_id>
    <plant_name>Otarre Solar Park</plant_name>
    <state>SC</state>
    <county>Lexington</county>
    <operator>TIG Sun Energy IV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.9324</lat>
    <lon>-81.0514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61738</plant_id>
    <plant_name>GWCC PV Solar Farm</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>GWCC PV Solar Farm</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.017238</lat>
    <lon>-76.909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62018</plant_id>
    <plant_name>Page Solar</plant_name>
    <state>NC</state>
    <county>Johnston</county>
    <operator>SunStrong Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.533191</lat>
    <lon>-78.63946</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62151</plant_id>
    <plant_name>Clif Bar Bakery of Twin Falls</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Mondelez Global LLC (Twin Falls)</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.540968</lat>
    <lon>-114.4125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62378</plant_id>
    <plant_name>CFW Solar X LLC - Vaughn</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Valta Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.277355</lat>
    <lon>-118.4298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62395</plant_id>
    <plant_name>Bell Bay Solar Farm</plant_name>
    <state>SC</state>
    <county>Horry</county>
    <operator>Bell Bay Solar Farm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.667675</lat>
    <lon>-78.91799</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62468</plant_id>
    <plant_name>Music City Community Solar</plant_name>
    <state>TN</state>
    <county>Davidson</county>
    <operator>Nashville Electric Service</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.248832</lat>
    <lon>-86.74678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62559</plant_id>
    <plant_name>Kearsarge Wilmington</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Kearsarge Wilmington LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.561264</lat>
    <lon>-71.13686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62607</plant_id>
    <plant_name>Bloomfield Municipal Utilities Solar</plant_name>
    <state>IA</state>
    <county>Davis</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.75</lat>
    <lon>-92.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62619</plant_id>
    <plant_name>Rockland Bakery Inc.</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Rockland Bakery Inc.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>41.190589</lat>
    <lon>-74.06511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62667</plant_id>
    <plant_name>Lafayette Horizon Solar CSG LLC</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.981606</lat>
    <lon>-105.0637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62681</plant_id>
    <plant_name>CED Champaign Solar LLC</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.138283</lat>
    <lon>-88.29125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62724</plant_id>
    <plant_name>Homer Street West</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.098128</lat>
    <lon>-78.44229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62725</plant_id>
    <plant_name>Homer Street East</plant_name>
    <state>NY</state>
    <county>Cattaraugus</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.099342</lat>
    <lon>-78.44095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62784</plant_id>
    <plant_name>Franklin Solar Site</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.86832</lat>
    <lon>-74.30652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62810</plant_id>
    <plant_name>RIT Henrietta Solar 1, LLC</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>SolRiver Capital LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.076198</lat>
    <lon>-77.66724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63124</plant_id>
    <plant_name>Syncarpha El Rito</plant_name>
    <state>NM</state>
    <county>Rio Arriba</county>
    <operator>Syncarpha El Rito I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.331724</lat>
    <lon>-106.1901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63125</plant_id>
    <plant_name>Syncarpha Questa</plant_name>
    <state>NM</state>
    <county>Taos</county>
    <operator>Syncarpha Questa I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.810668</lat>
    <lon>-105.5884</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63137</plant_id>
    <plant_name>Tippecanoe Solar Power Plant</plant_name>
    <state>IN</state>
    <county>Tippecanoe</county>
    <operator>Duke Energy Indiana, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.421142</lat>
    <lon>-86.94016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63253</plant_id>
    <plant_name>Francis Scott Key Mall</plant_name>
    <state>MD</state>
    <county>Frederick</county>
    <operator>Francis Scott Key Mall</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.38588</lat>
    <lon>-77.40947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63291</plant_id>
    <plant_name>Grand Prix Solar</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Diamond Properties</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.21125</lat>
    <lon>-73.72252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63420</plant_id>
    <plant_name>Fresno Bullard High School Hybrid</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <battery_mwh>0.4</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.818646</lat>
    <lon>-119.8104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63625</plant_id>
    <plant_name>NYU Langone - Orthopedic</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>NYU Langone - Orthopedic</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2023</latest_year>
    <lat>40.73402</lat>
    <lon>-73.98285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63643</plant_id>
    <plant_name>North Central Bronx Hospital</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>North Central Bronx Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>40.88043</lat>
    <lon>-73.8812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63662</plant_id>
    <plant_name>Montefiore Nyack Hospital</plant_name>
    <state>NY</state>
    <county>Rockland</county>
    <operator>Montefiore Nyack Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>2020</latest_year>
    <lat>41.09098</lat>
    <lon>-73.91824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63716</plant_id>
    <plant_name>KSR053 Cantara Fuel Cell</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.7902</lat>
    <lon>-118.2943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63825</plant_id>
    <plant_name>Lineage Logistics Solar</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>DG Illinois Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.455</lat>
    <lon>-87.752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64021</plant_id>
    <plant_name>Alden Solar CSG LLC</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.45633</lat>
    <lon>-104.5811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64024</plant_id>
    <plant_name>Monte Vista Solar 2 CSG, LLC</plant_name>
    <state>CO</state>
    <county>Rio Grande</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.57176</lat>
    <lon>-106.0999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64111</plant_id>
    <plant_name>A Street 2</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Captona A Street 2 Johnston LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.797544</lat>
    <lon>-71.54593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64265</plant_id>
    <plant_name>Rock Creek 2 CSG</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.39955</lat>
    <lon>-105.9034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64266</plant_id>
    <plant_name>Alamosa Solar South CSG</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.4512</lat>
    <lon>-105.8592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64288</plant_id>
    <plant_name>Renewable Energy Center at BJH</plant_name>
    <state>MO</state>
    <county>St Louis City</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.636459</lat>
    <lon>-90.2582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64391</plant_id>
    <plant_name>Firestone Walker Brewery - Phase 1</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.595877</lat>
    <lon>-120.6943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64398</plant_id>
    <plant_name>EMWD - Sun City RWRF</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.696146</lat>
    <lon>-117.2186</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65095</plant_id>
    <plant_name>Mt Arlington Solar 1 LLC</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.93207</lat>
    <lon>-74.62377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65109</plant_id>
    <plant_name>North Haven Solar One</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>North Haven Solar One, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.376813</lat>
    <lon>-72.83646</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65188</plant_id>
    <plant_name>Broadway 4 - Target Shafter</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.46331</lat>
    <lon>-119.1891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65409</plant_id>
    <plant_name>Gilead Foster City Solar Project</plant_name>
    <state>CA</state>
    <county>San Mateo</county>
    <operator>Gilead Sciences Inc. Foster City</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>0.9</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.568597</lat>
    <lon>-122.278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65413</plant_id>
    <plant_name>SCS West Fairchild 011958 Danville, LLC</plant_name>
    <state>IL</state>
    <county>Vermilion</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.140564</lat>
    <lon>-87.65049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65524</plant_id>
    <plant_name>CA-DGS- RFP-Correctional Training Fac</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.46767</lat>
    <lon>-121.3846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65613</plant_id>
    <plant_name>JB-Tobin 2</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>AES Clean Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.68963</lat>
    <lon>-73.80517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65623</plant_id>
    <plant_name>Cedar Creek (NJ)</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.551</lat>
    <lon>-74.627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66189</plant_id>
    <plant_name>POM Plant 2</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.656664</lat>
    <lon>-119.5922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66429</plant_id>
    <plant_name>Emerald Gardens PKI, LLC</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Emerald Gardens PKI, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.271832</lat>
    <lon>-73.12226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66549</plant_id>
    <plant_name>HEB00063</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.55952</lat>
    <lon>-95.39038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66550</plant_id>
    <plant_name>HEB00069</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>27.694932</lat>
    <lon>-97.26251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66561</plant_id>
    <plant_name>BUC00040</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.787919</lat>
    <lon>-95.79914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66562</plant_id>
    <plant_name>HEB00591</plant_name>
    <state>TX</state>
    <county>Williamson</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.518818</lat>
    <lon>-97.65854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66563</plant_id>
    <plant_name>HEB00092</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>28.851871</lat>
    <lon>-96.99681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66564</plant_id>
    <plant_name>HEB00095</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>27.607476</lat>
    <lon>-99.47387</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66566</plant_id>
    <plant_name>HEBSnackPlant</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.844469</lat>
    <lon>-95.54062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66612</plant_id>
    <plant_name>HEB_CPS00085</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.433657</lat>
    <lon>-98.70345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66743</plant_id>
    <plant_name>Jean Duluth Solar</plant_name>
    <state>MN</state>
    <county>St Louis</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>46.87377</lat>
    <lon>-92.05199</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66770</plant_id>
    <plant_name>THD Baltimore DC - 5830 Project Tiger</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.22355</lat>
    <lon>-76.48349</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66797</plant_id>
    <plant_name>Agriculture Capital - Legacy Packing</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.49466</lat>
    <lon>-119.467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66883</plant_id>
    <plant_name>FreeState Crooked Post Solar I</plant_name>
    <state>KS</state>
    <county>Shawnee</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.993501</lat>
    <lon>-95.81564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67234</plant_id>
    <plant_name>Lara 2 Hybrid</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>ZGlobal Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <battery_mwh>3.7</battery_mwh>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>36.989444</lat>
    <lon>-120.8781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67309</plant_id>
    <plant_name>OTHERBenEKDallas</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.818471</lat>
    <lon>-96.85322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67409</plant_id>
    <plant_name>Alexander Road Solar</plant_name>
    <state>NY</state>
    <county>Genesee</county>
    <operator>RPNY Solar 7, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.973941</lat>
    <lon>-78.20607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67539</plant_id>
    <plant_name>Nortera Customer Hosted Solar</plant_name>
    <state>WI</state>
    <county>Fond du Lac</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.736243</lat>
    <lon>-88.86204</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67557</plant_id>
    <plant_name>Sicklerville Landfill</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.7</lat>
    <lon>-74.98</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67925</plant_id>
    <plant_name>Mariaville Road Elsworth Solar, LLC</plant_name>
    <state>ME</state>
    <county>Hancock</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.583945</lat>
    <lon>-68.44964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68142</plant_id>
    <plant_name>Northlake 3-SLCHI303</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.918532</lat>
    <lon>-87.9093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69080</plant_id>
    <plant_name>Claggett Landing</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.880556</lat>
    <lon>-76.7075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69191</plant_id>
    <plant_name>GreenStruxure REP009, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <battery_mwh>0.4</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.861063</lat>
    <lon>-118.2333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69381</plant_id>
    <plant_name>Kelso Community Solar I</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Kelso Community Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.32652</lat>
    <lon>-76.48507</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69672</plant_id>
    <plant_name>Pawtucket Hydroelectric Project</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>41.87597</lat>
    <lon>-71.384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69928</plant_id>
    <plant_name>Osmond 1</plant_name>
    <state>NE</state>
    <county>Pierce</county>
    <operator>Northeast Power</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.365935</lat>
    <lon>-97.59743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70074</plant_id>
    <plant_name>Hopewell Solar, LLC</plant_name>
    <state>IL</state>
    <county>Marshall</county>
    <operator>SREOG IL Partnership 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.036889</lat>
    <lon>-89.38356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70095</plant_id>
    <plant_name>Perris DC 5 - sline015</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.850185</lat>
    <lon>-117.2322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70125</plant_id>
    <plant_name>Crete Solar</plant_name>
    <state>NE</state>
    <county>Saline</county>
    <operator>SE Municipal Nebraska, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.6852</lat>
    <lon>-96.9641</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70160</plant_id>
    <plant_name>Oxford Solar, LLC</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>SREOG ME Credit Seller 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.6</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.156424</lat>
    <lon>-70.4927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>159</plant_id>
    <plant_name>Lake Creek Dam</plant_name>
    <state>UT</state>
    <county>Wasatch</county>
    <operator>Heber Light &amp; Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>40.493631</lat>
    <lon>-111.3125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>846</plant_id>
    <plant_name>Combie South</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Nevada Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>39.0096</lat>
    <lon>-121.0591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1163</plant_id>
    <plant_name>McGregor</plant_name>
    <state>IA</state>
    <county>Clayton</county>
    <operator>City of McGregor- (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1977</latest_year>
    <lat>43.023733</lat>
    <lon>-91.17493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1516</plant_id>
    <plant_name>Squa Pan Hydro Station</plant_name>
    <state>ME</state>
    <county>Aroostook</county>
    <operator>Algonquin Northern Maine</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1941</first_year>
    <latest_year>1941</latest_year>
    <lat>46.556477</lat>
    <lon>-68.32554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2214</plant_id>
    <plant_name>Ansley</plant_name>
    <state>NE</state>
    <county>Custer</county>
    <operator>City of Ansley - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1969</first_year>
    <latest_year>1976</latest_year>
    <lat>41.289185</lat>
    <lon>-99.38634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2268</plant_id>
    <plant_name>Kearney</plant_name>
    <state>NE</state>
    <county>Buffalo</county>
    <operator>Nebraska Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>40.703511</lat>
    <lon>-99.10075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2305</plant_id>
    <plant_name>Stuart (NE)</plant_name>
    <state>NE</state>
    <county>Holt</county>
    <operator>City of Stuart - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1952</first_year>
    <latest_year>1997</latest_year>
    <lat>42.599377</lat>
    <lon>-99.14371</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2568</plant_id>
    <plant_name>Glenwood Hydro</plant_name>
    <state>NY</state>
    <county>Orleans</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1950</first_year>
    <latest_year>1950</latest_year>
    <lat>43.2358</lat>
    <lon>-78.3906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3709</plant_id>
    <plant_name>Smith (VT)</plant_name>
    <state>VT</state>
    <county>Orange</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>43.9921</lat>
    <lon>-72.1282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4124</plant_id>
    <plant_name>La Farge</plant_name>
    <state>WI</state>
    <county>Vernon</county>
    <operator>La Farge Municipal Electric Co - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>43.577366</lat>
    <lon>-90.64191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6345</plant_id>
    <plant_name>Shishmaref</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1976</first_year>
    <latest_year>2024</latest_year>
    <lat>66.255072</lat>
    <lon>-166.0736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6391</plant_id>
    <plant_name>Smith Island</plant_name>
    <state>MD</state>
    <county>Somerset</county>
    <operator>A &amp; N Electric Coop</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2021</latest_year>
    <lat>37.9955</lat>
    <lon>-76.03888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6393</plant_id>
    <plant_name>Strawberry Creek</plant_name>
    <state>WY</state>
    <county>Lincoln</county>
    <operator>Lower Valley Energy Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1951</latest_year>
    <lat>42.905142</lat>
    <lon>-110.8934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7462</plant_id>
    <plant_name>Angoon</plant_name>
    <state>AK</state>
    <county>Skagway Hoonah Angoon</county>
    <operator>Inside Passage Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2009</latest_year>
    <lat>57.499166</lat>
    <lon>-134.5861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7884</plant_id>
    <plant_name>Dakota Magic</plant_name>
    <state>ND</state>
    <county>Richland</county>
    <operator>Dakota Magic Casino</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2000</latest_year>
    <lat>45.938611</lat>
    <lon>-96.83583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10029</plant_id>
    <plant_name>General Electric Aircraft Engines</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>General Electric Aircraft Engines</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.45</lat>
    <lon>-70.9739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10049</plant_id>
    <plant_name>Little Mac Project</plant_name>
    <state>ID</state>
    <county>Twin Falls</county>
    <operator>Little Mac Power Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>42.629637</lat>
    <lon>-114.6616</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10258</plant_id>
    <plant_name>Haw River Hydro</plant_name>
    <state>NC</state>
    <county>Alamance</county>
    <operator>Haw River Hydro Co</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1982</latest_year>
    <lat>35.9483</lat>
    <lon>-79.3244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10302</plant_id>
    <plant_name>Juniata Locomotive Shop</plant_name>
    <state>PA</state>
    <county>Blair</county>
    <operator>Norfork Southern Corp</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.533299</lat>
    <lon>-78.38413</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10490</plant_id>
    <plant_name>Upper Beaver Falls Project</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.883611</lat>
    <lon>-75.42806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10728</plant_id>
    <plant_name>Barker Lower</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>KEI (Maine) Power Management (III) LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.0867</lat>
    <lon>-70.2297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50089</plant_id>
    <plant_name>Univ of San Francisco Cogen</plant_name>
    <state>CA</state>
    <county>San Francisco</county>
    <operator>University of San Francisco</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>37.77656</lat>
    <lon>-122.4519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50224</plant_id>
    <plant_name>Oxnard Wastewater Treatment Plant</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>City of Oxnard - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>34.140501</lat>
    <lon>-119.1845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50416</plant_id>
    <plant_name>Tannery Island Power</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>43.98</lat>
    <lon>-75.6131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50461</plant_id>
    <plant_name>Cheboygan</plant_name>
    <state>MI</state>
    <county>Cheboygan</county>
    <operator>Great Lakes Tissue Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>45.637537</lat>
    <lon>-84.48139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50936</plant_id>
    <plant_name>Winnebago County Landfill Gas</plant_name>
    <state>WI</state>
    <county>Winnebago</county>
    <operator>Winnebago County - (WI)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2000</first_year>
    <latest_year>2020</latest_year>
    <lat>44.083</lat>
    <lon>-88.5411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54471</plant_id>
    <plant_name>Mascoma Hydro</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>43.63369</lat>
    <lon>-72.31744</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54566</plant_id>
    <plant_name>YKK USA Chestney</plant_name>
    <state>GA</state>
    <county>Bibb</county>
    <operator>YKK USA Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1992</first_year>
    <latest_year>2023</latest_year>
    <lat>32.8061</lat>
    <lon>-83.5456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55684</plant_id>
    <plant_name>Flambeau Crowley Rapids Project</plant_name>
    <state>WI</state>
    <county>Price</county>
    <operator>Zero6 Energy Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1930</first_year>
    <latest_year>1930</latest_year>
    <lat>45.8683</lat>
    <lon>-90.5844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55809</plant_id>
    <plant_name>Kas Brothers Windfarm</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Kas Brothers Windfarm LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2001</latest_year>
    <lat>44.0119</lat>
    <lon>-96.1125</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56313</plant_id>
    <plant_name>Coleman Falls</plant_name>
    <state>VA</state>
    <county>Bedford</county>
    <operator>Holcomb Rock Company</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>37.5035</lat>
    <lon>-79.3006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56922</plant_id>
    <plant_name>WWRF Solar Plant</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>SunE U6 Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>39.522904</lat>
    <lon>-107.8134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57106</plant_id>
    <plant_name>Mesalands Comm College Wind Turbine</plant_name>
    <state>NM</state>
    <county>Quay</county>
    <operator>Mesalands Community College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>35.17</lat>
    <lon>-103.74</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57383</plant_id>
    <plant_name>WEA Texas Bayonne</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.6772</lat>
    <lon>-74.0919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57547</plant_id>
    <plant_name>Winona County Wind LLC</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Winona County Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.1125</lat>
    <lon>-91.92472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57631</plant_id>
    <plant_name>Wolverine</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>Wolverine Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.3931</lat>
    <lon>-94.4447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57632</plant_id>
    <plant_name>Bulldog</plant_name>
    <state>IA</state>
    <county>Adair</county>
    <operator>Bulldog Wind Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.2258</lat>
    <lon>-94.4406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57656</plant_id>
    <plant_name>Temescal Canyon RV, LLC</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Temescal Canyon RV, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.826389</lat>
    <lon>-117.5117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57676</plant_id>
    <plant_name>Silver Lake Solar Photovoltaic Facility</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Western Massachusetts Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.4525</lat>
    <lon>-73.2403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57767</plant_id>
    <plant_name>Brown County Wind Turbine</plant_name>
    <state>IL</state>
    <county>Brown</county>
    <operator>Adams Electric Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.973333</lat>
    <lon>-90.69917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57791</plant_id>
    <plant_name>Foundation AB</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Foundation HA Energy Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.232222</lat>
    <lon>-122.0928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57831</plant_id>
    <plant_name>Heliocentric</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Heliocentric LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.65434</lat>
    <lon>-117.971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57836</plant_id>
    <plant_name>L-8 Solar Project</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>L-8 Solar Project LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.654347</lat>
    <lon>-117.9731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57860</plant_id>
    <plant_name>Industry MetroLink PV 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Industry - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.008661</lat>
    <lon>-117.8456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57904</plant_id>
    <plant_name>San Antonio West Solar Rooftop</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SS San Antonio West LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.965617</lat>
    <lon>-117.6591</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58028</plant_id>
    <plant_name>IKEA Tejon 345</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.975278</lat>
    <lon>-118.9469</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58034</plant_id>
    <plant_name>Nickel 1 Solar Facility</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.647295</lat>
    <lon>-119.7165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58038</plant_id>
    <plant_name>Buffalo Center Wind LLC</plant_name>
    <state>IA</state>
    <county>Mitchell</county>
    <operator>Buffalo Center Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>43.385833</lat>
    <lon>-92.75944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58065</plant_id>
    <plant_name>Charlestown Wind Turbine</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>MWRA Charlestown</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.391389</lat>
    <lon>-71.07083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58085</plant_id>
    <plant_name>PRC-Desoto Intl/PPG Aerospace</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>PRC-Desoto Intl Corp./PPG</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2000</latest_year>
    <lat>34.989722</lat>
    <lon>-118.1506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58095</plant_id>
    <plant_name>Harmon DC Totowa NJ</plant_name>
    <state>NJ</state>
    <county>Passaic</county>
    <operator>Taft Associates c/o Wilson Associates</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.903889</lat>
    <lon>-74.24778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58118</plant_id>
    <plant_name>La Joya Del Sol</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.678611</lat>
    <lon>-119.7975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58289</plant_id>
    <plant_name>Venable Solar 1</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.598889</lat>
    <lon>-114.5717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58290</plant_id>
    <plant_name>Venable Solar 2</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.597222</lat>
    <lon>-114.5717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58354</plant_id>
    <plant_name>Radiance Solar 4</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.665556</lat>
    <lon>-118.2881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58355</plant_id>
    <plant_name>Radiance Solar 5</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.665556</lat>
    <lon>-118.2869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58376</plant_id>
    <plant_name>Oakley Solar Project</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Oakley Solar Project LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.001667</lat>
    <lon>-121.7478</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58379</plant_id>
    <plant_name>Cold Canyon 1</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Toro Energy of California SLO</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.186667</lat>
    <lon>-120.5994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58402</plant_id>
    <plant_name>Solar Star New Jersey NJ LLC</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Solar Star New Jersey VI LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.401528</lat>
    <lon>-74.6697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58414</plant_id>
    <plant_name>NLMU Wind</plant_name>
    <state>IA</state>
    <county>Henry</county>
    <operator>New London Municipal Utilities - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.955</lat>
    <lon>-91.39444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58446</plant_id>
    <plant_name>Arrache 4013</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.650556</lat>
    <lon>-118.0519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58450</plant_id>
    <plant_name>Vinam</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.668889</lat>
    <lon>-118.0614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58451</plant_id>
    <plant_name>Ma</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.695278</lat>
    <lon>-118.0625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58452</plant_id>
    <plant_name>Horn</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.708889</lat>
    <lon>-118.2742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58496</plant_id>
    <plant_name>Lincoln Solar</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.462778</lat>
    <lon>-87.26028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58508</plant_id>
    <plant_name>Bear Creek Solar (Lodi)</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.136389</lat>
    <lon>-121.1489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58509</plant_id>
    <plant_name>Vintner Solar</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.55795</lat>
    <lon>-120.6829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58535</plant_id>
    <plant_name>Pickering Solar</plant_name>
    <state>PA</state>
    <county>Chester</county>
    <operator>Aqua America Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.120556</lat>
    <lon>-75.48806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58561</plant_id>
    <plant_name>Merrimac Solar</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.833056</lat>
    <lon>-70.99194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58578</plant_id>
    <plant_name>Sonora 1</plant_name>
    <state>CA</state>
    <county>Tuolumne</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.889753</lat>
    <lon>-120.5287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58582</plant_id>
    <plant_name>Oltmans SCE at Jurupa</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>California PV Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.05</lat>
    <lon>-117.5961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58607</plant_id>
    <plant_name>One Market Plaza</plant_name>
    <state>CA</state>
    <county>San Francisco</county>
    <operator>Paramount Group Inc</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>37.793333</lat>
    <lon>-122.3942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58609</plant_id>
    <plant_name>Industry Solar Power Generation Station</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.553056</lat>
    <lon>-117.4569</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58610</plant_id>
    <plant_name>Navajo Solar Power Generation Station 1</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.551111</lat>
    <lon>-117.1911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58611</plant_id>
    <plant_name>Powhatan Solar Power Generation Station</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.496944</lat>
    <lon>-117.145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58612</plant_id>
    <plant_name>Otoe Solar Power Generation Station 1 LL</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.545</lat>
    <lon>-117.1919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58656</plant_id>
    <plant_name>Waihonu South Solar</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>ERCAM LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>21.468889</lat>
    <lon>-158.0164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58679</plant_id>
    <plant_name>Upper Newton Falls</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>44.214444</lat>
    <lon>-74.99139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58696</plant_id>
    <plant_name>Nooksack Hydro</plant_name>
    <state>WA</state>
    <county>Whatcom</county>
    <operator>Puget Sound Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>2.8</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1906</latest_year>
    <lat>48.907778</lat>
    <lon>-121.8142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58751</plant_id>
    <plant_name>Rodeo Solar C2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.713333</lat>
    <lon>-118.2894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58752</plant_id>
    <plant_name>Rodeo Solar D2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.713333</lat>
    <lon>-118.2894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58753</plant_id>
    <plant_name>Summer Solar A2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.723056</lat>
    <lon>-118.2897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58754</plant_id>
    <plant_name>Summer Solar B2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.723056</lat>
    <lon>-118.2897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58755</plant_id>
    <plant_name>Summer Solar C2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.723056</lat>
    <lon>-118.2897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58763</plant_id>
    <plant_name>Expressway Solar C2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.584444</lat>
    <lon>-117.3414</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58789</plant_id>
    <plant_name>Riverhead</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>CD US Solar MT1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.826111</lat>
    <lon>-73.23222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58794</plant_id>
    <plant_name>Storrie Lake Solar Project</plant_name>
    <state>NM</state>
    <county>San Miguel</county>
    <operator>MSM Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.656944</lat>
    <lon>-105.1839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58913</plant_id>
    <plant_name>Santa Fe Springs Rooftop Solar BLDG H</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.910833</lat>
    <lon>-118.0444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58920</plant_id>
    <plant_name>2097 Helton Solar Project</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Solarenewal LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.352222</lat>
    <lon>-120.5069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58927</plant_id>
    <plant_name>Story City Wind Project</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Hamilton Wind Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.208056</lat>
    <lon>-93.59944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58932</plant_id>
    <plant_name>Traer Wind Project</plant_name>
    <state>IA</state>
    <county>Tama</county>
    <operator>City of Traer - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.161389</lat>
    <lon>-92.4425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58949</plant_id>
    <plant_name>Cloverdale Solar I</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.773056</lat>
    <lon>-123.0178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58958</plant_id>
    <plant_name>Camelot Wind LLC</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Camelot Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.925278</lat>
    <lon>-70.64</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58978</plant_id>
    <plant_name>Central Valley Ag Power</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Central Valley Ag Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.719722</lat>
    <lon>-120.8986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59028</plant_id>
    <plant_name>Agawam Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.081944</lat>
    <lon>-72.61444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59031</plant_id>
    <plant_name>Route 57 Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.058889</lat>
    <lon>-72.66417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59033</plant_id>
    <plant_name>Whately Solar</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.446111</lat>
    <lon>-72.62361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59060</plant_id>
    <plant_name>Waste Water Treatment Plant</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>City of Pittsfield - (MA)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.41</lat>
    <lon>-73.24</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59077</plant_id>
    <plant_name>Chatham Landfill</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.686111</lat>
    <lon>-70.00611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59094</plant_id>
    <plant_name>Division 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.708333</lat>
    <lon>-118.1306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59122</plant_id>
    <plant_name>Enerparc CA1 LLC</plant_name>
    <state>CA</state>
    <county>San Benito</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.831667</lat>
    <lon>-121.4042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59167</plant_id>
    <plant_name>Lancaster Solar 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.715</lat>
    <lon>-118.095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59169</plant_id>
    <plant_name>Lancaster Solar 2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Boralex US Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.710556</lat>
    <lon>-118.1661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59180</plant_id>
    <plant_name>Marion Solar LNG</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Marion Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.913056</lat>
    <lon>-86.23806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59182</plant_id>
    <plant_name>Hesperia</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.435</lat>
    <lon>-117.3781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59248</plant_id>
    <plant_name>CCMUA</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Camden Solar Center, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.923056</lat>
    <lon>-75.1275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59265</plant_id>
    <plant_name>Merced Solar LLC</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.267778</lat>
    <lon>-120.4844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59267</plant_id>
    <plant_name>Mission Solar LLC</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.267778</lat>
    <lon>-120.4825</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59268</plant_id>
    <plant_name>Hollister Solar LLC</plant_name>
    <state>CA</state>
    <county>San Benito</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.8625</lat>
    <lon>-121.4289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59269</plant_id>
    <plant_name>Victor Mesa Linda B2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.512778</lat>
    <lon>-117.3872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59270</plant_id>
    <plant_name>Victor Mesa Linda C2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.511389</lat>
    <lon>-117.3872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59271</plant_id>
    <plant_name>Victor Mesa Linda D2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.509444</lat>
    <lon>-117.3872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59272</plant_id>
    <plant_name>Victor Mesa Linda E2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.508056</lat>
    <lon>-117.3872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59295</plant_id>
    <plant_name>WED NK Green</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>WED NK Green LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.581667</lat>
    <lon>-71.48667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59297</plant_id>
    <plant_name>Carrier Clinic</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Sunlight General Solar Fund II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.47</lat>
    <lon>-74.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59301</plant_id>
    <plant_name>WED Coventry 1</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>WED Coventry One, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.675833</lat>
    <lon>-71.7075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59305</plant_id>
    <plant_name>WED Coventry 3</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>WED Coventry Three, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.695556</lat>
    <lon>-71.72083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59306</plant_id>
    <plant_name>WED Coventry 4</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>WED Coventry Four, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.686389</lat>
    <lon>-71.72833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59313</plant_id>
    <plant_name>WED Coventry 5</plant_name>
    <state>RI</state>
    <county>Kent</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.659722</lat>
    <lon>-71.69972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59359</plant_id>
    <plant_name>SCE-Snowline-Duncan Road (North)</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.473889</lat>
    <lon>-117.5628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59371</plant_id>
    <plant_name>12 Applegate Solar LLC</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>G&amp;S Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.200278</lat>
    <lon>-74.57611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59377</plant_id>
    <plant_name>South Cary WRF Solar Array</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Town Of Cary - (NC)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.651667</lat>
    <lon>-78.75722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59394</plant_id>
    <plant_name>Grafton Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.199167</lat>
    <lon>-71.67917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59410</plant_id>
    <plant_name>Rudy Solar, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>CD US Solar PO 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.766389</lat>
    <lon>-117.3236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59411</plant_id>
    <plant_name>Mitchell Solar, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>CD US Solar PO 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.765</lat>
    <lon>-117.3236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59421</plant_id>
    <plant_name>SCE-Snowline-White Road (South)</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.413056</lat>
    <lon>-117.4708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59422</plant_id>
    <plant_name>SCE-Snowline-White Road (North)</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.4175</lat>
    <lon>-117.4697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59423</plant_id>
    <plant_name>SCE-Snowline-White Rd (Central)</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.415278</lat>
    <lon>-117.47</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59428</plant_id>
    <plant_name>Baker Creek Hydroelectric</plant_name>
    <state>CA</state>
    <county>Humboldt</county>
    <operator>Baker Station Associates, LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>0</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.526389</lat>
    <lon>-123.7256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59462</plant_id>
    <plant_name>Denver Intl Airport IV Solar</plant_name>
    <state>CO</state>
    <county>Denver</county>
    <operator>Denver Int'l Airport IV Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.902697</lat>
    <lon>-104.6739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59465</plant_id>
    <plant_name>Sullivan Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.655</lat>
    <lon>-70.95639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59536</plant_id>
    <plant_name>Coronus Adelanto West 1</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.548056</lat>
    <lon>-117.4644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59537</plant_id>
    <plant_name>Coronus Adelanto West 2</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.548056</lat>
    <lon>-117.4644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59539</plant_id>
    <plant_name>Park Meridian #1</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.896111</lat>
    <lon>-117.2836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59541</plant_id>
    <plant_name>Terra Francesco</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.039722</lat>
    <lon>-117.6067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59543</plant_id>
    <plant_name>Acton Solar Landfill</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Heliovaas LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.473333</lat>
    <lon>-71.43056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59545</plant_id>
    <plant_name>Springfield Solar LLC</plant_name>
    <state>OH</state>
    <county>Clark</county>
    <operator>Laurel Capital Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.893889</lat>
    <lon>-83.80556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59624</plant_id>
    <plant_name>Twiss Street Solar</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.148333</lat>
    <lon>-72.74806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59682</plant_id>
    <plant_name>Main Street Solar Project</plant_name>
    <state>VT</state>
    <county>Rutland</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.626389</lat>
    <lon>-72.97556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59687</plant_id>
    <plant_name>Sun Harvest Solar NDP1</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.05758</lat>
    <lon>-120.6536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59724</plant_id>
    <plant_name>Scituate Wind</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Scituate Wind LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.175083</lat>
    <lon>-70.72847</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59742</plant_id>
    <plant_name>Sunnyside Ranch Community Solar Array</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>Holy Cross Electric Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.415027</lat>
    <lon>-107.1572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59766</plant_id>
    <plant_name>Barre II Solar Project</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Kearsarge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.362</lat>
    <lon>-72.109</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59768</plant_id>
    <plant_name>Concord Solar Farm</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Kearsarge Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.444</lat>
    <lon>-71.335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59797</plant_id>
    <plant_name>Bayonne MUA- Leitner-Poma Wind Turbine</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>SUEZ North America, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>0.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.652778</lat>
    <lon>-74.11778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59807</plant_id>
    <plant_name>Airport 1 Solar (DIA)</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>39.899455</lat>
    <lon>-104.6748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59942</plant_id>
    <plant_name>Morgan Lancaster 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.6608</lat>
    <lon>-118.0836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59978</plant_id>
    <plant_name>Adapture CA2, LLC</plant_name>
    <state>CA</state>
    <county>Glenn</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.69898</lat>
    <lon>-122.1756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59980</plant_id>
    <plant_name>Mashpee Landfill Solar</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.62996</lat>
    <lon>-70.47785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60046</plant_id>
    <plant_name>Portage Solar</plant_name>
    <state>IN</state>
    <county>Porter</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.5611</lat>
    <lon>-87.1555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60047</plant_id>
    <plant_name>Middlebury Solar</plant_name>
    <state>IN</state>
    <county>Elkhart</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.6972</lat>
    <lon>-85.6875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60050</plant_id>
    <plant_name>Innovative Solar 10</plant_name>
    <state>NC</state>
    <county>Haywood</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.473629</lat>
    <lon>-82.89032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60114</plant_id>
    <plant_name>Oneida County- DPW</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.150761</lat>
    <lon>-75.37126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60126</plant_id>
    <plant_name>Harpster Wind</plant_name>
    <state>OH</state>
    <county>Wyandot</county>
    <operator>Wyandot Wind 17, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.718292</lat>
    <lon>-83.22865</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60142</plant_id>
    <plant_name>Lemoore 1</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.257938</lat>
    <lon>-119.7981</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60229</plant_id>
    <plant_name>Orange County Solar Farm (NY)</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.404879</lat>
    <lon>-74.3595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60277</plant_id>
    <plant_name>Castor Solar</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>ZGlobal Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.211044</lat>
    <lon>-119.3873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60350</plant_id>
    <plant_name>Solar Las Vegas MB 2, LLC</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>NRG Solar Las Vegas MB 2</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.087426</lat>
    <lon>-115.1754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60465</plant_id>
    <plant_name>Chesapeake College</plant_name>
    <state>MD</state>
    <county>Queen Annes</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.953389</lat>
    <lon>-76.08324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60480</plant_id>
    <plant_name>Germantown Solar, LLC</plant_name>
    <state>NC</state>
    <county>Forsyth</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.24634</lat>
    <lon>-80.25463</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60496</plant_id>
    <plant_name>MEBA</plant_name>
    <state>MD</state>
    <county>Talbot</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.772903</lat>
    <lon>-76.13891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60565</plant_id>
    <plant_name>Borrego Springs Energy Storage</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>SDGE Batteries</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>4.5</battery_mwh>
    <first_year>2012</first_year>
    <latest_year>2014</latest_year>
    <lat>33.27011</lat>
    <lon>-116.3496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60640</plant_id>
    <plant_name>Solar Mule, LLC</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Solar Mule, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.557725</lat>
    <lon>-69.67136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60720</plant_id>
    <plant_name>Weld 1 Community Solar Array</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.232146</lat>
    <lon>-104.7919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60722</plant_id>
    <plant_name>Logan 1 Community Solar Array</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.609968</lat>
    <lon>-103.1451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60723</plant_id>
    <plant_name>Conejos 1 Community Solar Array</plant_name>
    <state>CO</state>
    <county>Conejos</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.195886</lat>
    <lon>-105.9824</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60725</plant_id>
    <plant_name>Xcel Adams 2 Community Solar Array</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.784937</lat>
    <lon>-104.5834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60733</plant_id>
    <plant_name>Brickyard Solar</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.189425</lat>
    <lon>-74.15448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60759</plant_id>
    <plant_name>Freeze Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Marina Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.376292</lat>
    <lon>-74.52785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60769</plant_id>
    <plant_name>Lower Cape May HS</plant_name>
    <state>NJ</state>
    <county>Cape May</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.976718</lat>
    <lon>-74.90651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60801</plant_id>
    <plant_name>CEC Solar #1117, LLC</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.284425</lat>
    <lon>-104.524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60895</plant_id>
    <plant_name>Whistling Winds DPC Solar</plant_name>
    <state>WI</state>
    <county>Juneau</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.9721</lat>
    <lon>-90.0719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61002</plant_id>
    <plant_name>WED Portsmouth One, LLC</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.612027</lat>
    <lon>-71.24926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61004</plant_id>
    <plant_name>Whirlpool Corporation - Ottawa Wind Farm</plant_name>
    <state>OH</state>
    <county>Putnam</county>
    <operator>Ottawa Wind 24, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.002764</lat>
    <lon>-84.03374</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61198</plant_id>
    <plant_name>Merck - Upper Gwynedd Solar Array</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>Merck - Upper Gwynedd Solar Array</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.215399</lat>
    <lon>-75.28309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61205</plant_id>
    <plant_name>Bandera Electric Coop PV</plant_name>
    <state>TX</state>
    <county>Real</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.681032</lat>
    <lon>-99.76221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61271</plant_id>
    <plant_name>Biltmore Solar Fields</plant_name>
    <state>NC</state>
    <county>Buncombe</county>
    <operator>The Biltmore Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.561156</lat>
    <lon>-82.58844</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61296</plant_id>
    <plant_name>Theodore Drive Community Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Theodore Drive Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.5</lat>
    <lon>-71.8</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61332</plant_id>
    <plant_name>SR Innovation - NIKE PV</plant_name>
    <state>TN</state>
    <county>Shelby</county>
    <operator>SR Innovation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.300066</lat>
    <lon>-89.96299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61397</plant_id>
    <plant_name>Georgia Power at Jakin GA PV</plant_name>
    <state>GA</state>
    <county>Early</county>
    <operator>Luminace Solar Georgia 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.138</lat>
    <lon>-85.031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61415</plant_id>
    <plant_name>West Boylston Community Shared Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Town of West Boylston - (MA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.331362</lat>
    <lon>-71.77114</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61421</plant_id>
    <plant_name>Madera 1 PV</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>ZGlobal Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.056468</lat>
    <lon>-120.167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61425</plant_id>
    <plant_name>Coyote Ridge Community Solar</plant_name>
    <state>CO</state>
    <county>Larimer</county>
    <operator>Poudre Valley REA, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.500969</lat>
    <lon>-105.1314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61597</plant_id>
    <plant_name>Norton Landfill Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.959582</lat>
    <lon>-71.15052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61612</plant_id>
    <plant_name>WED Kingstown Solar I, LLC - West</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.49175</lat>
    <lon>-71.62458</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61621</plant_id>
    <plant_name>CDCR (CA) - Wasco State Prison</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>SunE Wasco SP Owner, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.60053</lat>
    <lon>-119.4037</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61640</plant_id>
    <plant_name>Texon Hydroelectric Project</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Hitchcock Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>42.221412</lat>
    <lon>-72.85964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61642</plant_id>
    <plant_name>Waterloo Hydroelectric Project</plant_name>
    <state>NY</state>
    <county>Seneca</county>
    <operator>C-S Canal Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1915</first_year>
    <latest_year>1915</latest_year>
    <lat>42.901914</lat>
    <lon>-76.86233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61720</plant_id>
    <plant_name>COU Solar I, LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Lisbon East</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.7</lat>
    <lon>-75.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61734</plant_id>
    <plant_name>Seneca Nation Cattaraugus Wind Turbine</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Seneca Nation</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.5809</lat>
    <lon>-79.1027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61741</plant_id>
    <plant_name>Kingsberry Energy Storage System</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Austin Energy</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>30.266028</lat>
    <lon>-97.68614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61752</plant_id>
    <plant_name>Quincy II Solar Garden</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.638409</lat>
    <lon>-104.6625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61775</plant_id>
    <plant_name>Town of Otis Wind Energy Project</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Town of Otis - (MA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.225765</lat>
    <lon>-73.02576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61900</plant_id>
    <plant_name>Blydenburgh Solar Project</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.815331</lat>
    <lon>-73.18241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61958</plant_id>
    <plant_name>Broadalbin-Perth Solar</plant_name>
    <state>NY</state>
    <county>Montgomery</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.018029</lat>
    <lon>-74.19184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61990</plant_id>
    <plant_name>TAC-Distributed Energy Resource Hybrid</plant_name>
    <state>IL</state>
    <county>Champaign</county>
    <operator>Ameren Illinois</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine; Batteries; Solar Photovoltaic; Onshore Wind Turbine</technologies>
    <generators>4</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>0.5</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.089797</lat>
    <lon>-88.24357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62002</plant_id>
    <plant_name>Brooklyn Hospital Center</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Brooklyn Hospital Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2019</latest_year>
    <lat>40.690544</lat>
    <lon>-73.97793</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62043</plant_id>
    <plant_name>First Baptist Church of Glenarden</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.82</lat>
    <lon>-76.87</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62051</plant_id>
    <plant_name>St Johns Riverside Hospital</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>St Johns Riverside Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1968</first_year>
    <latest_year>2000</latest_year>
    <lat>40.968929</lat>
    <lon>-73.88659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62077</plant_id>
    <plant_name>Blue Shld Of Cal- El Dorado Hlls Mtr B</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>2.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.650627</lat>
    <lon>-121.0741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62119</plant_id>
    <plant_name>University Park Solar</plant_name>
    <state>PA</state>
    <county>Centre</county>
    <operator>SS PA II PSU LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.817019</lat>
    <lon>-77.84412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62125</plant_id>
    <plant_name>Panda Solar NC 7, LLC</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>Panda Solar NC 7 , LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.121181</lat>
    <lon>-78.20546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62148</plant_id>
    <plant_name>Goose Lake MN DPC-GM</plant_name>
    <state>MN</state>
    <county>Freeborn</county>
    <operator>ENGIE Generation North America LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.667563</lat>
    <lon>-93.29402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62224</plant_id>
    <plant_name>Oak Leaf Solar XXVII LLC</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.44</lat>
    <lon>-104.64</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62225</plant_id>
    <plant_name>Hunterdon Health System Solar Project</plant_name>
    <state>NJ</state>
    <county>Hunterdon</county>
    <operator>NJ Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.652</lat>
    <lon>-74.908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62226</plant_id>
    <plant_name>Westminster Renewables, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Westminster Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.583671</lat>
    <lon>-71.89624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62239</plant_id>
    <plant_name>Oak Leaf Solar XXX LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.453381</lat>
    <lon>-105.878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62243</plant_id>
    <plant_name>Oak Leaf Solar XXI (CSG)</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.638</lat>
    <lon>-104.604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62244</plant_id>
    <plant_name>Oak Leaf Solar XXXI LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.145</lat>
    <lon>-108.32</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62245</plant_id>
    <plant_name>Oak Leaf Solar XXV LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.637</lat>
    <lon>-104.529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62251</plant_id>
    <plant_name>Oak Leaf Solar XXXII (CSG)</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.523</lat>
    <lon>-107.815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62252</plant_id>
    <plant_name>Oak Leaf Solar XXII LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.903806</lat>
    <lon>-104.6675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62253</plant_id>
    <plant_name>Oak Leaf Solar XXIV LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.637</lat>
    <lon>-104.561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62254</plant_id>
    <plant_name>Oak Leaf Solar XXVI LLC</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.899959</lat>
    <lon>-104.7345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62255</plant_id>
    <plant_name>Oak Leaf Solar XXVIII LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.237</lat>
    <lon>-104.779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62256</plant_id>
    <plant_name>Oak Leaf Solar XXIII LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.80165</lat>
    <lon>-104.6215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62274</plant_id>
    <plant_name>Liberty HS Solar Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.364408</lat>
    <lon>-119.1275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62319</plant_id>
    <plant_name>Western Sugar Cooperative - Billings</plant_name>
    <state>MT</state>
    <county>Yellowstone</county>
    <operator>Western Sugar Cooperative - Billings</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Conventional Steam Coal</primary_technology>
    <primary_energy_source>SUB</primary_energy_source>
    <technologies>Conventional Steam Coal</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.765346</lat>
    <lon>-108.4992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62321</plant_id>
    <plant_name>Cedar Falls Solar Farm</plant_name>
    <state>IA</state>
    <county>Black Hawk</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.481409</lat>
    <lon>-92.45818</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62325</plant_id>
    <plant_name>46 Meadowlands Parkway</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.78976</lat>
    <lon>-74.07152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62366</plant_id>
    <plant_name>NYP-Lower Manhattan Hospital</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>NYP-Lower Manhattan Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>40.710315</lat>
    <lon>-74.00497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62371</plant_id>
    <plant_name>BWC Harlow Brook</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>BWC Harlow Brook, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.782854</lat>
    <lon>-70.69072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62372</plant_id>
    <plant_name>BWC Pocasset River</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>BWC Pocasset River, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.782181</lat>
    <lon>-70.68773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62456</plant_id>
    <plant_name>Regeneron Tarrytown</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.077952</lat>
    <lon>-73.82065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62549</plant_id>
    <plant_name>Kearsarge Johnstown 1 CSG</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Kearsarge Johnstown 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.066012</lat>
    <lon>-74.36018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62570</plant_id>
    <plant_name>Jiminy Peak Wind QF</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Jiminy Peak Mountain Resort, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>42.543748</lat>
    <lon>-73.29263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62575</plant_id>
    <plant_name>FLEX Gibraltar</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.417288</lat>
    <lon>-121.8941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62616</plant_id>
    <plant_name>CCG Marketing</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.859343</lat>
    <lon>-74.30296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62663</plant_id>
    <plant_name>Gilcrest Solar</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.289366</lat>
    <lon>-104.7836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62664</plant_id>
    <plant_name>Quincy Solar (CO)</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.63838</lat>
    <lon>-104.5626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62718</plant_id>
    <plant_name>Mesa CSG 2 Massicotte</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.044814</lat>
    <lon>-108.4197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62719</plant_id>
    <plant_name>Mesa CSG 1 Murdock</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.108785</lat>
    <lon>-108.6439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62757</plant_id>
    <plant_name>Bridgewater Complex Co-Generation Plant</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Massachusetts Department of Correction</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.931838</lat>
    <lon>-70.95839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62780</plant_id>
    <plant_name>Rappahannock Solar, LLC</plant_name>
    <state>VA</state>
    <county>Lancaster</county>
    <operator>Rappahannock Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.657039</lat>
    <lon>-76.38323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62833</plant_id>
    <plant_name>Hastings Community Solar Farm</plant_name>
    <state>NE</state>
    <county>Adams</county>
    <operator>City of Hastings - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.602</lat>
    <lon>-98.437</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62835</plant_id>
    <plant_name>Acushnet Ball Plant 2</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Acushnet</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.7197</lat>
    <lon>-70.97138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62868</plant_id>
    <plant_name>Elroy Solar</plant_name>
    <state>WI</state>
    <county>Juneau</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.732</lat>
    <lon>-90.025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62881</plant_id>
    <plant_name>Muscogee Public Works</plant_name>
    <state>GA</state>
    <county>Muscogee</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.49375</lat>
    <lon>-84.86133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62902</plant_id>
    <plant_name>Windsor Floating Solar</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>CA ODEVI LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.53917</lat>
    <lon>-122.8151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63041</plant_id>
    <plant_name>Lane Ave Solar LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.2648</lat>
    <lon>-72.0727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63070</plant_id>
    <plant_name>Square Barn Solar</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.164</lat>
    <lon>-88.383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63092</plant_id>
    <plant_name>Riverview Solar</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Highline Services, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.66583</lat>
    <lon>-103.1324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63213</plant_id>
    <plant_name>Sheridan School Corporation Solar</plant_name>
    <state>IN</state>
    <county>Hamilton</county>
    <operator>Johnson Melloh Solutions</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.140278</lat>
    <lon>-86.21528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63254</plant_id>
    <plant_name>Altamonte Mall</plant_name>
    <state>FL</state>
    <county>Seminole</county>
    <operator>Altamonte Mall</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>28.66633</lat>
    <lon>-81.3781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63276</plant_id>
    <plant_name>Mtn. Solar 1</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.777621</lat>
    <lon>-104.5859</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63277</plant_id>
    <plant_name>Mtn. Solar 2</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.766772</lat>
    <lon>-104.5905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63278</plant_id>
    <plant_name>CO LI CSG 1 - Kamerra</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.784879</lat>
    <lon>-104.5834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63379</plant_id>
    <plant_name>Mtn. Solar 3 CSG</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.280904</lat>
    <lon>-103.6191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63404</plant_id>
    <plant_name>Thermo Fisher</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.5737</lat>
    <lon>-74.62947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63428</plant_id>
    <plant_name>IGS CC, LLC</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.936172</lat>
    <lon>-76.96819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63539</plant_id>
    <plant_name>Montefiore Weiler (Einstein) Hospital</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Montefiore Weiler (Einstein) Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>1986</first_year>
    <latest_year>2006</latest_year>
    <lat>40.880375</lat>
    <lon>-73.87908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63581</plant_id>
    <plant_name>Mount Sinai - Brooklyn</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Mount Sinai - Brooklyn</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.61873</lat>
    <lon>-73.94298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63609</plant_id>
    <plant_name>Allergan</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>9</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.67239</lat>
    <lon>-117.8538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63615</plant_id>
    <plant_name>Long Beach Convention Center</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>8.6</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.765236</lat>
    <lon>-118.1894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63626</plant_id>
    <plant_name>IGS FE Trenton, LLC</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.18933</lat>
    <lon>-74.65676</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63702</plant_id>
    <plant_name>EQX002 Secaucus Rd Fuel Cell</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.77536</lat>
    <lon>-74.07034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63715</plant_id>
    <plant_name>SCU000 El Camino Real Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.34994</lat>
    <lon>-121.9406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63928</plant_id>
    <plant_name>Vacaville Hospital</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>KP Vacaville Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.38867</lat>
    <lon>-121.9386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63968</plant_id>
    <plant_name>The GSI Group LLC at Assumption</plant_name>
    <state>IL</state>
    <county>Christian</county>
    <operator>Luminace Solar Illinois 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.51303</lat>
    <lon>-89.03734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63971</plant_id>
    <plant_name>CCUA Solar</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>CCUA Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.415336</lat>
    <lon>-75.23566</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64115</plant_id>
    <plant_name>Carver</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Captona Carver LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.915338</lat>
    <lon>-70.80165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64137</plant_id>
    <plant_name>Kenmare - Mansfield Branch Street</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.015873</lat>
    <lon>-71.20313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64278</plant_id>
    <plant_name>Lowndes IDA</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.835452</lat>
    <lon>-83.22752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64284</plant_id>
    <plant_name>Troup RC50 II</plant_name>
    <state>GA</state>
    <county>Troup</county>
    <operator>Safari Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.898784</lat>
    <lon>-84.89617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64305</plant_id>
    <plant_name>TCI France</plant_name>
    <state>LA</state>
    <county>Orleans</county>
    <operator>Entergy New Orleans, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.984166</lat>
    <lon>-90.02889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64352</plant_id>
    <plant_name>Mtn Solar 6 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.613557</lat>
    <lon>-103.2337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64353</plant_id>
    <plant_name>NSE Camber Solar PS11 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.613557</lat>
    <lon>-103.2337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64355</plant_id>
    <plant_name>NSE Camber BH CSG 2, LLC</plant_name>
    <state>CO</state>
    <county>Crowley</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.209158</lat>
    <lon>-103.7473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64356</plant_id>
    <plant_name>NSE Camber Solar PS13 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Logan</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.619084</lat>
    <lon>-103.1589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64357</plant_id>
    <plant_name>NSE Camber Solar PS6 LLC CSG</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.260736</lat>
    <lon>-104.8242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64358</plant_id>
    <plant_name>NSE Camber Solar PS5 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.250222</lat>
    <lon>-104.8395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64378</plant_id>
    <plant_name>Signature Breads Chelsea</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>JDC 65R Owner, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.393622</lat>
    <lon>-71.04662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64402</plant_id>
    <plant_name>El Dorado County</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.698145</lat>
    <lon>-120.8283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64412</plant_id>
    <plant_name>Gold Mine</plant_name>
    <state>SC</state>
    <county>Greenwood</county>
    <operator>Gold Mine Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.0726</lat>
    <lon>-82.2263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64444</plant_id>
    <plant_name>City of Paris Solar</plant_name>
    <state>AR</state>
    <county>Logan</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.301</lat>
    <lon>-93.734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64446</plant_id>
    <plant_name>Arlington Microgrid</plant_name>
    <state>WA</state>
    <county>Snohomish</county>
    <operator>PUD No 1 of Snohomish County - (WA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>1.4</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2021</latest_year>
    <lat>48.15614</lat>
    <lon>-122.1502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64502</plant_id>
    <plant_name>7448 Candlewood Road</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.16</lat>
    <lon>-76.7</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64629</plant_id>
    <plant_name>JM Huber at Quincy</plant_name>
    <state>IL</state>
    <county>Adams</county>
    <operator>Luminace Solar Illinois 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.859083</lat>
    <lon>-91.39969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64644</plant_id>
    <plant_name>White Marsh Solar</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.4167</lat>
    <lon>-76.403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64648</plant_id>
    <plant_name>Pivot Solar 4 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.228419</lat>
    <lon>-104.777</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64650</plant_id>
    <plant_name>Pivot Solar 14 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.266898</lat>
    <lon>-103.6575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64651</plant_id>
    <plant_name>Pivot Solar 2 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Morgan</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.266898</lat>
    <lon>-103.6575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64653</plant_id>
    <plant_name>Pivot Solar 7 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.523107</lat>
    <lon>-107.8153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64654</plant_id>
    <plant_name>Pivot Solar 3 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.414671</lat>
    <lon>-108.0907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64655</plant_id>
    <plant_name>Pivot Solar 8 LLC (CSG)</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.241166</lat>
    <lon>-104.7714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64700</plant_id>
    <plant_name>El Dorado Solar, LLC</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.637</lat>
    <lon>-121.059</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64718</plant_id>
    <plant_name>Redman North Community Solar</plant_name>
    <state>NY</state>
    <county>Monroe</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.2752</lat>
    <lon>-77.966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64764</plant_id>
    <plant_name>Madison BTM</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>3.1</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.804</lat>
    <lon>-69.841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64790</plant_id>
    <plant_name>OER Checkerspot</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.783572</lat>
    <lon>-76.57415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64862</plant_id>
    <plant_name>Strobus</plant_name>
    <state>WI</state>
    <county>Jackson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.4332</lat>
    <lon>-90.85707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64880</plant_id>
    <plant_name>Venture 1 - 1A CSG</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>UXI CSG Venture 1 8301 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.752297</lat>
    <lon>-104.6674</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64919</plant_id>
    <plant_name>FedEx Chicago Solar Facility</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>DG Illinois Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.753932</lat>
    <lon>-87.78942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64931</plant_id>
    <plant_name>Capital Hill Solar LLC</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.685295</lat>
    <lon>-73.82494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65046</plant_id>
    <plant_name>FedEx Middletown</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>VCP Realty, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.597231</lat>
    <lon>-72.71934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65098</plant_id>
    <plant_name>South Sioux City Energy Storage</plant_name>
    <state>NE</state>
    <county>Dakota</county>
    <operator>DG Nebraska Energy Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.433124</lat>
    <lon>-96.4072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65157</plant_id>
    <plant_name>ASA Gouverneur NY Solar I LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>ASA Gouverneur NY Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.390853</lat>
    <lon>-75.44324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65178</plant_id>
    <plant_name>Mtn. Solar 4 (CSG)</plant_name>
    <state>CO</state>
    <county>Jefferson</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.727586</lat>
    <lon>-105.1131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65184</plant_id>
    <plant_name>Holliston LLC</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.21179</lat>
    <lon>-71.41335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65235</plant_id>
    <plant_name>Venture 2 - 1B</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>UXI CSG Venture 2 8302 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.752244</lat>
    <lon>-104.6651</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65236</plant_id>
    <plant_name>Venture 3 - 1C</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>UXI CSG Venture 3 8303 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.750499</lat>
    <lon>-104.6673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65237</plant_id>
    <plant_name>Venture 4 - 1D</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>UXI CSG Venture 4 8304 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.752334</lat>
    <lon>-104.6673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65255</plant_id>
    <plant_name>Chambers 4 - Eastvale DCA2</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.99347</lat>
    <lon>-117.5539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65277</plant_id>
    <plant_name>Wonderful Huller &amp; Shelling</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.57609</lat>
    <lon>-119.7889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65280</plant_id>
    <plant_name>601 Doremus CDG</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.731966</lat>
    <lon>-74.12049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65289</plant_id>
    <plant_name>5601 Westside CDG</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.77957</lat>
    <lon>-74.04182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65324</plant_id>
    <plant_name>Hollins Ferry CSG</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>ICFTS MD Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.225752</lat>
    <lon>-76.68808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65447</plant_id>
    <plant_name>CA-Ventura Co CCD-Oxnard College Canopy</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.165905</lat>
    <lon>-119.1568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65478</plant_id>
    <plant_name>Green Providence Wind I, LLC</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Green Providence Wind I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.789486</lat>
    <lon>-71.38477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65618</plant_id>
    <plant_name>Gunnison Solar</plant_name>
    <state>UT</state>
    <county>Sanpete</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.16743</lat>
    <lon>-111.801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65706</plant_id>
    <plant_name>POM Juice Solar</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.392479</lat>
    <lon>-119.3511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65791</plant_id>
    <plant_name>Blue Hen Solar</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.18568</lat>
    <lon>-75.68538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65794</plant_id>
    <plant_name>20701 Plummer PV, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Valta Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.243444</lat>
    <lon>-118.5852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65969</plant_id>
    <plant_name>Kankakee 2</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>Kankakee Solar 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.176011</lat>
    <lon>-87.87952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66068</plant_id>
    <plant_name>Maple City</plant_name>
    <state>IA</state>
    <county>Mitchell</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.279547</lat>
    <lon>-92.79127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66094</plant_id>
    <plant_name>Bizer Creek</plant_name>
    <state>NY</state>
    <county>Erie</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.00008</lat>
    <lon>-78.79375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66492</plant_id>
    <plant_name>Henry Miller RD</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Henry Miller Reclamation District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.0543</lat>
    <lon>-120.6352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66536</plant_id>
    <plant_name>CPG - Duke 5300A Holabird</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>Solar DG MD Holabird Broening ACC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.270749</lat>
    <lon>-76.55053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66537</plant_id>
    <plant_name>CPG - Duke 5300B Holabird</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>Solar DG MD Holabird Broening ACC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.270749</lat>
    <lon>-76.55133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66538</plant_id>
    <plant_name>CPG - Duke 5900 Holabird</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>Solar DG MD Holabird AJCFB, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.273131</lat>
    <lon>-76.54599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66539</plant_id>
    <plant_name>CPG - Duke 6000 Holabird</plant_name>
    <state>MD</state>
    <county>Baltimore City</county>
    <operator>Solar DG MD Holabird AJCFB, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.273278</lat>
    <lon>-76.54443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66735</plant_id>
    <plant_name>Kosa</plant_name>
    <state>NY</state>
    <county>Allegany</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.068818</lat>
    <lon>-77.80742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66736</plant_id>
    <plant_name>Oak Leaf - CSG Portfolio (OL 36)</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.6517</lat>
    <lon>-104.5315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66737</plant_id>
    <plant_name>Oak Leaf - CSG Portfolio (OL 37)</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.7854</lat>
    <lon>-104.5913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66738</plant_id>
    <plant_name>Oak Leaf - CSG Portfolio (OL 38)</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.7854</lat>
    <lon>-104.5913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66739</plant_id>
    <plant_name>Oak Leaf - CSG Portfolio (OL 39)</plant_name>
    <state>CO</state>
    <county>Arapahoe</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.65528</lat>
    <lon>-104.5285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66740</plant_id>
    <plant_name>Oak Leaf - CSG Portfolio (OL 44)</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.78308</lat>
    <lon>-104.5839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66753</plant_id>
    <plant_name>Webster Creek (Oak 2)</plant_name>
    <state>WI</state>
    <county>Juneau</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.86351</lat>
    <lon>-90.15579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66796</plant_id>
    <plant_name>ADP Parsippany NJ</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.857536</lat>
    <lon>-74.41258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66800</plant_id>
    <plant_name>Bishop Ranch - BR 8-P</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2025</latest_year>
    <lat>37.76819</lat>
    <lon>-121.9666</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66815</plant_id>
    <plant_name>Dynamic Energy NJ - Ferrero</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.550482</lat>
    <lon>-74.54496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66987</plant_id>
    <plant_name>Bluff Prairie (Vernon)</plant_name>
    <state>WI</state>
    <county>Vernon</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.471699</lat>
    <lon>-91.14056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66993</plant_id>
    <plant_name>Hay River (Dunn 1)</plant_name>
    <state>WI</state>
    <county>Dunn</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.046634</lat>
    <lon>-91.97559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66994</plant_id>
    <plant_name>Walleye (Dunn 2)</plant_name>
    <state>WI</state>
    <county>Dunn</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.971013</lat>
    <lon>-91.80448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67050</plant_id>
    <plant_name>Elizabeth Seaport Bldg A Solar</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.668</lat>
    <lon>-74.167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67057</plant_id>
    <plant_name>Wolf River (Chipewa 1)</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.950456</lat>
    <lon>-90.9643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67070</plant_id>
    <plant_name>Interstate 3 Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.397</lat>
    <lon>-74.45</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67124</plant_id>
    <plant_name>SR Blount, LLC</plant_name>
    <state>TN</state>
    <county>Blount</county>
    <operator>SR Blount, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.76013</lat>
    <lon>-84.00258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67149</plant_id>
    <plant_name>Falmouth 2 Solar</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.611</lat>
    <lon>-70.597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67160</plant_id>
    <plant_name>Springfield Wind</plant_name>
    <state>CO</state>
    <county>Baca</county>
    <operator>Arkansas River Power Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>37.21444</lat>
    <lon>-102.3933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67188</plant_id>
    <plant_name>Paragould Solar Farm</plant_name>
    <state>AR</state>
    <county>Greene</county>
    <operator>Paragould Municipal Utilities (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.025675</lat>
    <lon>-90.48805</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67241</plant_id>
    <plant_name>401 South</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.464</lat>
    <lon>-73.184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67292</plant_id>
    <plant_name>Rutgers Busch Livingston Lot B &amp; C</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Bowser Road Solar Project 2021, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.522282</lat>
    <lon>-74.4726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67330</plant_id>
    <plant_name>Sidney</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.45085</lat>
    <lon>-69.72615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67368</plant_id>
    <plant_name>Middlesex Vo Tech Solar 1 LLC</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.528289</lat>
    <lon>-74.43546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67385</plant_id>
    <plant_name>CREE</plant_name>
    <state>WI</state>
    <county>Racine</county>
    <operator>Wisconsin Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.717439</lat>
    <lon>-87.89871</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67399</plant_id>
    <plant_name>Mustang One</plant_name>
    <state>MD</state>
    <county>Dorchester</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.56654</lat>
    <lon>-76.10953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67464</plant_id>
    <plant_name>1 Commercial</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.115</lat>
    <lon>-71.237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67602</plant_id>
    <plant_name>Zonneveld Oak Grove</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Renewable Solar, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.457362</lat>
    <lon>-119.7636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67670</plant_id>
    <plant_name>MD JESSUP 7950 OCEANO AVE</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>PFMD LL Jessup LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.157496</lat>
    <lon>-76.78725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67714</plant_id>
    <plant_name>IL Rochelle 975 S. Caron Rd</plant_name>
    <state>IL</state>
    <county>Ogle</county>
    <operator>Catalyze Rochelle Wiscold Drive Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.909729</lat>
    <lon>-89.04429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67744</plant_id>
    <plant_name>Dynamic Energy CT STAG</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Milford Pepes Farm Road Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.229412</lat>
    <lon>-73.02354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67760</plant_id>
    <plant_name>All World Solar Facility</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>All World Machinery Supply, Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>42.461976</lat>
    <lon>-88.99879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67794</plant_id>
    <plant_name>City of Atwater NEM</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>37.274</lat>
    <lon>-120.629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67795</plant_id>
    <plant_name>DPC Madison</plant_name>
    <state>IA</state>
    <county>Winneshiek</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.274528</lat>
    <lon>-91.93925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67796</plant_id>
    <plant_name>DPC York</plant_name>
    <state>IL</state>
    <county>Carroll</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.993718</lat>
    <lon>-90.11077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67827</plant_id>
    <plant_name>TJX 2021 DG El Paso DC</plant_name>
    <state>TX</state>
    <county>El Paso</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>31.807733</lat>
    <lon>-106.3378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67967</plant_id>
    <plant_name>Toledo Air National Guard</plant_name>
    <state>OH</state>
    <county>Lucas</county>
    <operator>180th Fighter Wing</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>41.586376</lat>
    <lon>-83.78781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68270</plant_id>
    <plant_name>Civic Center East</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.33</lat>
    <lon>-119.317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68521</plant_id>
    <plant_name>JD Foods - JD Foods</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Sol Systems</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.70185</lat>
    <lon>-119.7459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68522</plant_id>
    <plant_name>Bishop Ranch - BR 8-O</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Executive Parkway BR8-O Solar Project 2020 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.769011</lat>
    <lon>-121.9668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68586</plant_id>
    <plant_name>Stamford Health Tully Health Center</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>Stamford Health Tully Health Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids; Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2023</latest_year>
    <lat>41.064483</lat>
    <lon>-73.5345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68603</plant_id>
    <plant_name>Davidson V</plant_name>
    <state>NC</state>
    <county>Davidson</county>
    <operator>SunE B9 Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.740813</lat>
    <lon>-80.28785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68803</plant_id>
    <plant_name>Westtown School Solar</plant_name>
    <state>PA</state>
    <county>Chester</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.94</lat>
    <lon>-75.534</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68941</plant_id>
    <plant_name>BH CSG 3</plant_name>
    <state>CO</state>
    <county>Otero</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.983521</lat>
    <lon>-103.5762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69073</plant_id>
    <plant_name>20 Bedford</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.952778</lat>
    <lon>-70.97111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69374</plant_id>
    <plant_name>Liverpool Solar Partners</plant_name>
    <state>PA</state>
    <county>Perry</county>
    <operator>Liverpool Solar Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.582768</lat>
    <lon>-76.98408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69378</plant_id>
    <plant_name>RP SCG Texas Solar</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>RP SCG Texas Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>30.427708</lat>
    <lon>-97.74735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69545</plant_id>
    <plant_name>15 Lincoln</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>0.5</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.13199</lat>
    <lon>-71.30249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69738</plant_id>
    <plant_name>BRE - Ritz Carlton Kapalua</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>20.999798</lat>
    <lon>-156.6535</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70038</plant_id>
    <plant_name>Wingmaster</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.695196</lat>
    <lon>-119.4897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70060</plant_id>
    <plant_name>GSPP Worcester Business Center, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.288768</lat>
    <lon>-71.79993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70071</plant_id>
    <plant_name>Schmidt Huser Solar, LLC</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>SREOG IL Partnership 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.558885</lat>
    <lon>-89.5295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70217</plant_id>
    <plant_name>Kroger</plant_name>
    <state>OH</state>
    <county>Licking</county>
    <operator>Onsite Partners Projectco, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.040222</lat>
    <lon>-82.46012</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70275</plant_id>
    <plant_name>Roxbury</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Roxbury Road Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.25137</lat>
    <lon>-77.02746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70298</plant_id>
    <plant_name>Four Seasons LI CSG</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Four Seasons LI CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.78</lat>
    <lon>-73.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70371</plant_id>
    <plant_name>Lerdo East</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.503371</lat>
    <lon>-119.1262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70391</plant_id>
    <plant_name>IL - Ameresco - Belvidere West</plant_name>
    <state>IL</state>
    <county>Boone</county>
    <operator>Belvidere Landfill Solar 2 West, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.296053</lat>
    <lon>-88.85298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70396</plant_id>
    <plant_name>Lincoln Public Schools</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>TotalEnergies Renewables USA LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <battery_mwh>2.2</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.424594</lat>
    <lon>-71.31401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70416</plant_id>
    <plant_name>MD-CPG Salisbury Airport 1</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Salisbury Air Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.352584</lat>
    <lon>-75.52287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70529</plant_id>
    <plant_name>UE-2202PA, LLC</plant_name>
    <state>PA</state>
    <county>Northampton</county>
    <operator>Unison Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>1.5</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.673109</lat>
    <lon>-75.45289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>100</plant_id>
    <plant_name>South Consolidated</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>Salt River Project</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>33.466477</lat>
    <lon>-111.7811</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>215</plant_id>
    <plant_name>Angels</plant_name>
    <state>CA</state>
    <county>Calaveras</county>
    <operator>Utica Water &amp; Power Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1940</latest_year>
    <lat>38.071944</lat>
    <lon>-120.5394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>457</plant_id>
    <plant_name>Bear Valley</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>City of Escondido - (CA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>33.166246</lat>
    <lon>-117.0166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>583</plant_id>
    <plant_name>Tenth Street</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>City of Norwich - (CT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1967</first_year>
    <latest_year>1967</latest_year>
    <lat>41.538955</lat>
    <lon>-72.05094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>626</plant_id>
    <plant_name>Oak Flat</plant_name>
    <state>CA</state>
    <county>Plumas</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>40.07531</lat>
    <lon>-121.1614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1757</plant_id>
    <plant_name>Superior Falls</plant_name>
    <state>MI</state>
    <county>Gogebic</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>46.564601</lat>
    <lon>-90.41615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3253</plant_id>
    <plant_name>Boyds Mill Hydro</plant_name>
    <state>SC</state>
    <county>Greenville</county>
    <operator>Northbrook Carolina Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>34.455514</lat>
    <lon>-82.19934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3675</plant_id>
    <plant_name>Hydro III</plant_name>
    <state>UT</state>
    <county>Cache</county>
    <operator>City of Logan - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>41.746364</lat>
    <lon>-111.746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3753</plant_id>
    <plant_name>West Charleston</plant_name>
    <state>VT</state>
    <county>Orleans</county>
    <operator>Barton Village, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1948</latest_year>
    <lat>44.887379</lat>
    <lon>-72.05536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3790</plant_id>
    <plant_name>Newport Hydro Station</plant_name>
    <state>VA</state>
    <county>Page</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>38.571389</lat>
    <lon>-78.59361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3988</plant_id>
    <plant_name>Thornapple</plant_name>
    <state>WI</state>
    <county>Rusk</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1929</latest_year>
    <lat>45.411139</lat>
    <lon>-91.21828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3995</plant_id>
    <plant_name>Arpin Dam</plant_name>
    <state>WI</state>
    <county>Sawyer</county>
    <operator>Zero6 Energy Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1971</first_year>
    <latest_year>1973</latest_year>
    <lat>45.7517</lat>
    <lon>-91.2028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6314</plant_id>
    <plant_name>Emmonak</plant_name>
    <state>AK</state>
    <county>Kusilvak</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2005</latest_year>
    <lat>62.777694</lat>
    <lon>-164.5315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6438</plant_id>
    <plant_name>Queens Creek</plant_name>
    <state>NC</state>
    <county>Macon</county>
    <operator>Duke Energy Carolinas, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>35.27127</lat>
    <lon>-83.67602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7855</plant_id>
    <plant_name>Moorhead Wind Turbine</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>City of Moorhead - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1999</first_year>
    <latest_year>2001</latest_year>
    <lat>46.895</lat>
    <lon>-96.7347</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10121</plant_id>
    <plant_name>High Shoals Hydro (GA)</plant_name>
    <state>GA</state>
    <county>Morgan</county>
    <operator>High Shoals Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>33.816547</lat>
    <lon>-83.50493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10222</plant_id>
    <plant_name>Tulare Success Power Project</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Lower Tule River Irrgtn Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>36.058635</lat>
    <lon>-118.9241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10519</plant_id>
    <plant_name>Milton Hydro</plant_name>
    <state>NH</state>
    <county>Strafford</county>
    <operator>SFR Hydro Cor</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1987</latest_year>
    <lat>43.403087</lat>
    <lon>-70.98647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10544</plant_id>
    <plant_name>Hailesboro 4 Plant</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1922</first_year>
    <latest_year>1922</latest_year>
    <lat>44.311681</lat>
    <lon>-75.44499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50079</plant_id>
    <plant_name>Goodyear Lake Plant</plant_name>
    <state>NY</state>
    <county>Otsego</county>
    <operator>Hydroland Omega LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1980</first_year>
    <latest_year>1980</latest_year>
    <lat>42.502473</lat>
    <lon>-74.98356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50147</plant_id>
    <plant_name>R E Badger Filtration Plant</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Santa Fe Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>33.051</lat>
    <lon>-117.175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50267</plant_id>
    <plant_name>Redlands Water &amp; Power</plant_name>
    <state>CO</state>
    <county>Mesa</county>
    <operator>Redlands Water &amp; Power Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1931</first_year>
    <latest_year>1931</latest_year>
    <lat>39.067347</lat>
    <lon>-108.5928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50324</plant_id>
    <plant_name>Newfound Hydroelectric</plant_name>
    <state>NH</state>
    <county>Grafton</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>43.59</lat>
    <lon>-71.73295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50433</plant_id>
    <plant_name>Ada Dam</plant_name>
    <state>MI</state>
    <county>Kent</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>42.950642</lat>
    <lon>-85.48594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50700</plant_id>
    <plant_name>Lilliwaup Falls Generating</plant_name>
    <state>WA</state>
    <county>Mason</county>
    <operator>William G. Reed Jr</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>7</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>47.4706</lat>
    <lon>-123.1153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54123</plant_id>
    <plant_name>Mechanic Falls</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>KEI (Maine) Power Management (IV) LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.111236</lat>
    <lon>-70.39067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54418</plant_id>
    <plant_name>Rollinsford</plant_name>
    <state>NH</state>
    <county>Strafford</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1995</latest_year>
    <lat>43.236111</lat>
    <lon>-70.81722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54812</plant_id>
    <plant_name>Mile 28 Water Power Project</plant_name>
    <state>ID</state>
    <county>Jerome</county>
    <operator>Wood Hydro, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>42.740139</lat>
    <lon>-114.1612</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54906</plant_id>
    <plant_name>Georgia Pacific Center</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>GP Center Holdings LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>33.757513</lat>
    <lon>-84.38687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55004</plant_id>
    <plant_name>Thornwood High School</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Thorton Township School Dist</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>41.5839</lat>
    <lon>-87.6047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57064</plant_id>
    <plant_name>Kotlik</plant_name>
    <state>AK</state>
    <county>Kusilvak</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>63.03215</lat>
    <lon>-163.5531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57101</plant_id>
    <plant_name>J&amp;A-Santa Maria II LLC</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>J&amp;A-Santa Maria II LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>34.9494</lat>
    <lon>-120.3803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57646</plant_id>
    <plant_name>McCormick &amp; Co. Inc. at Belcamp</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar Maryland, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.4836</lat>
    <lon>-76.2292</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57733</plant_id>
    <plant_name>Benjamin Moore &amp; Co. Solar</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Luminace Solar New Jersey, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.825556</lat>
    <lon>-74.71472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57799</plant_id>
    <plant_name>ISH Solar Central, LLC</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.2675</lat>
    <lon>-74.27861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57804</plant_id>
    <plant_name>Middlebury College</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Middlebury College Biomass</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Wood/Wood Waste Biomass</primary_technology>
    <primary_energy_source>WDS</primary_energy_source>
    <technologies>Wood/Wood Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1999</latest_year>
    <lat>44.0075</lat>
    <lon>-73.17694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57882</plant_id>
    <plant_name>Baldock Solar Highway</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>45.269444</lat>
    <lon>-122.7717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58013</plant_id>
    <plant_name>IKEA Round Rock 027</plant_name>
    <state>TX</state>
    <county>Williamson</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>30.557044</lat>
    <lon>-97.69029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58057</plant_id>
    <plant_name>Molson Coors Shenandoah Brewery</plant_name>
    <state>VA</state>
    <county>Rockingham</county>
    <operator>Molson Coors Shenandoah Brewery</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.356944</lat>
    <lon>-78.67667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58190</plant_id>
    <plant_name>Thomas M Knott Cogen Facility</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Sentinel Peak Resources California, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2003</latest_year>
    <lat>35.184444</lat>
    <lon>-120.6183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58237</plant_id>
    <plant_name>CCSU Fuel Cell Project</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>New Britain Renewable Energy, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.691944</lat>
    <lon>-72.76111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58397</plant_id>
    <plant_name>Ameresco Johnson Canyon</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Ameresco Johnson Canyon LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.534167</lat>
    <lon>-121.4086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58399</plant_id>
    <plant_name>Synergy Biogas</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>CH4 Biogas LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>42.828889</lat>
    <lon>-78.055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58517</plant_id>
    <plant_name>Vista Grande HS at Casa Grande</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Luminace Solar Holding, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.891389</lat>
    <lon>-111.7131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58890</plant_id>
    <plant_name>Beringer</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.510833</lat>
    <lon>-122.4797</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59323</plant_id>
    <plant_name>Sacramento (SMUD)</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.587222</lat>
    <lon>-121.4578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59370</plant_id>
    <plant_name>4 Applegate Solar LLC</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>G&amp;S Operations LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.196389</lat>
    <lon>-74.58361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59789</plant_id>
    <plant_name>Millbrook School</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.84581</lat>
    <lon>-73.61949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59810</plant_id>
    <plant_name>Dairyland WTE Plant</plant_name>
    <state>WI</state>
    <county>Brown</county>
    <operator>Energy Systems Group LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>44.540115</lat>
    <lon>-87.80559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59858</plant_id>
    <plant_name>Johnston Solar</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Concord New Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.800906</lat>
    <lon>-71.55947</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59877</plant_id>
    <plant_name>Riverside RWQCP Fuel Cell</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Riverside Fuel Cell, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.9617</lat>
    <lon>-117.4559</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59948</plant_id>
    <plant_name>Bakersfield 111</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Bakersfield 111 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.317551</lat>
    <lon>-118.9899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60019</plant_id>
    <plant_name>Greenwood Solar Farm</plant_name>
    <state>MI</state>
    <county>St Clair</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.1056</lat>
    <lon>-82.6964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60112</plant_id>
    <plant_name>Oregon Convention Center</plant_name>
    <state>OR</state>
    <county>Multnomah</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.528457</lat>
    <lon>-122.6632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60227</plant_id>
    <plant_name>BJ's Wholesale Club Inc Dist Center</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.098458</lat>
    <lon>-74.82593</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60371</plant_id>
    <plant_name>Legoland Solar</plant_name>
    <state>FL</state>
    <county>Polk</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>27.986163</lat>
    <lon>-81.69017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60385</plant_id>
    <plant_name>Santa Rita Jail Fuel Cell</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>SRJFC, LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.719166</lat>
    <lon>-121.8869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60644</plant_id>
    <plant_name>West Brookfield Solar, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>CVI CleanCapital Solar 7</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.222798</lat>
    <lon>-72.12953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60708</plant_id>
    <plant_name>Havre de Grace II - E at Perryman</plant_name>
    <state>MD</state>
    <county>Harford</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.436</lat>
    <lon>-76.22</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60802</plant_id>
    <plant_name>ACCC Mays Landing</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.460566</lat>
    <lon>-74.68093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60820</plant_id>
    <plant_name>Montgomery County Correctional Facility</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.237945</lat>
    <lon>-77.29322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61441</plant_id>
    <plant_name>Denver Braswell PV</plant_name>
    <state>GA</state>
    <county>Colquitt</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>31.3</lat>
    <lon>-83.8</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61465</plant_id>
    <plant_name>IGS Solar I - BWI2</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.267</lat>
    <lon>-76.548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61786</plant_id>
    <plant_name>Trinity College Fuel Cell</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.746288</lat>
    <lon>-72.68936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61821</plant_id>
    <plant_name>IKEA Jacksonville Rooftop PV System</plant_name>
    <state>FL</state>
    <county>Duval</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.23</lat>
    <lon>-81.51</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61825</plant_id>
    <plant_name>Dignity - Siena Campus</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.004293</lat>
    <lon>-115.1153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61917</plant_id>
    <plant_name>Kearsarge Oppenheim CSG</plant_name>
    <state>NY</state>
    <county>Fulton</county>
    <operator>Kearsarge Oppenheim LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.060223</lat>
    <lon>-74.73642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61934</plant_id>
    <plant_name>WHA Southbridge Solar Park CSG</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Ecogy Delaware II LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.723644</lat>
    <lon>-75.54598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62093</plant_id>
    <plant_name>East Springfield Solar PV</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.14</lat>
    <lon>-72.55</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62155</plant_id>
    <plant_name>Hospital Rd Community Solar Farm CSG</plant_name>
    <state>NY</state>
    <county>Sullivan</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.774772</lat>
    <lon>-75.03607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62275</plant_id>
    <plant_name>Frontier HS Solar Project</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>MN8 Energy LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.41824</lat>
    <lon>-119.1489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62460</plant_id>
    <plant_name>DESI-2 Battery Storage Facility</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Southern California Edison Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <battery_mwh>3.7</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.7357</lat>
    <lon>-117.9153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62521</plant_id>
    <plant_name>Frey Rd #2 Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>KSI II Consolidated, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.099893</lat>
    <lon>-77.3435</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62598</plant_id>
    <plant_name>Connell East LLC</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Connell East LLC.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.666976</lat>
    <lon>-74.40781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62641</plant_id>
    <plant_name>Morehead Generating Facility</plant_name>
    <state>KY</state>
    <county>Rowan</county>
    <operator>North American Biofuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.191</lat>
    <lon>-83.544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62699</plant_id>
    <plant_name>Kaiser Deer Valley Rd. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.95169</lat>
    <lon>-121.7718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62777</plant_id>
    <plant_name>Ulster County Solar</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.961896</lat>
    <lon>-73.98123</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62879</plant_id>
    <plant_name>Columbia Bryson</plant_name>
    <state>GA</state>
    <county>Columbia</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.429859</lat>
    <lon>-82.196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62882</plant_id>
    <plant_name>Oil Dri 2 Solar</plant_name>
    <state>GA</state>
    <county>Thomas</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.991</lat>
    <lon>-84.066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62887</plant_id>
    <plant_name>Freeman Avenue</plant_name>
    <state>GA</state>
    <county>Sumter</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.182026</lat>
    <lon>-84.14762</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62987</plant_id>
    <plant_name>Grossmont HS Solar Project</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.816542</lat>
    <lon>-116.9996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63215</plant_id>
    <plant_name>USS Dot Com Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.422314</lat>
    <lon>-94.92664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63232</plant_id>
    <plant_name>Brookfield Wire Company</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Dynamic Energy Solutions, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.21694</lat>
    <lon>-72.12208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63355</plant_id>
    <plant_name>Chanel Piscataway Rooftop</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.550342</lat>
    <lon>-74.48297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63366</plant_id>
    <plant_name>435A Bergen Avenue</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.751938</lat>
    <lon>-74.13126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63399</plant_id>
    <plant_name>Galesburg Solar Array</plant_name>
    <state>IL</state>
    <county>Henderson</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.9199</lat>
    <lon>-90.9484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63410</plant_id>
    <plant_name>Bennett</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Solar Planet Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.9352</lat>
    <lon>-77.47107</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63421</plant_id>
    <plant_name>Fresno Hoover High School Hybrid</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <battery_mwh>0.2</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.817816</lat>
    <lon>-119.7707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63438</plant_id>
    <plant_name>UB Fuel Cell</plant_name>
    <state>CT</state>
    <county>Fairfield</county>
    <operator>UB Fuel Cell</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.165036</lat>
    <lon>-73.19606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63514</plant_id>
    <plant_name>Moonlight Packing - Phase 2</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>CalCom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.585794</lat>
    <lon>-119.47</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63775</plant_id>
    <plant_name>Tech Square Microgrid</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Petroleum Liquids; Natural Gas Internal Combustion Engine; Batteries; Other Natural Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <battery_mwh>0.4</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.7756</lat>
    <lon>-84.3899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63888</plant_id>
    <plant_name>ESIL-PFCHICAGO 3, LLC</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.849</lat>
    <lon>-87.669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63899</plant_id>
    <plant_name>Cornillie 2 Community (CSG)</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.45942</lat>
    <lon>-92.89476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64027</plant_id>
    <plant_name>SB Water Reclamation Fuel Cell</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>San Bernardino Fuel Cell, LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.075594</lat>
    <lon>-117.2873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64194</plant_id>
    <plant_name>510 Carnegie Center</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.3147</lat>
    <lon>-74.65551</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64222</plant_id>
    <plant_name>Burt County Solar Hybrid</plant_name>
    <state>NE</state>
    <county>Burt</county>
    <operator>BCSB, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.863778</lat>
    <lon>-96.23217</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64223</plant_id>
    <plant_name>Dodge County Solar Hybrid</plant_name>
    <state>NE</state>
    <county>Dodge</county>
    <operator>BCSB, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.612</lat>
    <lon>-96.752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64435</plant_id>
    <plant_name>Town of Ware - Canadian Tree(CSG)</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>MA CS Ware West, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.263482</lat>
    <lon>-72.29553</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64438</plant_id>
    <plant_name>Vallecitos Water District</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.212535</lat>
    <lon>-117.177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64532</plant_id>
    <plant_name>Norton</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.96829</lat>
    <lon>-71.16544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64604</plant_id>
    <plant_name>MNCPPC Randall Farm</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.831624</lat>
    <lon>-76.80315</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65131</plant_id>
    <plant_name>Fremont - Kato Rd</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2017</latest_year>
    <lat>37.479188</lat>
    <lon>-121.9323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65294</plant_id>
    <plant_name>Indian River Hydro</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>1909</first_year>
    <latest_year>1909</latest_year>
    <lat>42.18656</lat>
    <lon>-72.85025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65498</plant_id>
    <plant_name>Garden 2 Solar Park</plant_name>
    <state>MI</state>
    <county>Delta</county>
    <operator>DTE Sustainable Generation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.797967</lat>
    <lon>-86.53443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65621</plant_id>
    <plant_name>456 Lower</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.311</lat>
    <lon>-74.522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65719</plant_id>
    <plant_name>Griffin Road Solar 2</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Griffin Road Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.14611</lat>
    <lon>-71.99873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66097</plant_id>
    <plant_name>ER Bison Solar CSG</plant_name>
    <state>PA</state>
    <county>Union</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.941757</lat>
    <lon>-76.89355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66140</plant_id>
    <plant_name>PNA Rossford Solar Array</plant_name>
    <state>OH</state>
    <county>Wood</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.614879</lat>
    <lon>-83.55724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66366</plant_id>
    <plant_name>IMPA Middletown Solar Park</plant_name>
    <state>IN</state>
    <county>Henry</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.0652</lat>
    <lon>-85.53668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66415</plant_id>
    <plant_name>IMPA Knightstown Solar Park</plant_name>
    <state>IN</state>
    <county>Henry</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.79603</lat>
    <lon>-85.50854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66729</plant_id>
    <plant_name>(3K) 59 Hetcheltown Rd</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.87657</lat>
    <lon>-73.91048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66806</plant_id>
    <plant_name>Vulcan San Emidio Solar</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Renew Solar VMC LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.049</lat>
    <lon>-119.1812</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66813</plant_id>
    <plant_name>Caesar's Atlantic City - POI 1 (Colosseu</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.355676</lat>
    <lon>-74.43552</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66909</plant_id>
    <plant_name>Fork in the Road Solar</plant_name>
    <state>NY</state>
    <county>Dutchess</county>
    <operator>Fork in the Road Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.95</lat>
    <lon>-73.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66938</plant_id>
    <plant_name>IMPA Veedersburg Solar Park</plant_name>
    <state>IN</state>
    <county>Fountain</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.10936</lat>
    <lon>-87.24235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66948</plant_id>
    <plant_name>VS BC Pacific Gateway, LLC</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>TRITEC Americas</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.85324</lat>
    <lon>-118.2968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67055</plant_id>
    <plant_name>Ogema</plant_name>
    <state>WI</state>
    <county>Price</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.447992</lat>
    <lon>-90.32841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67063</plant_id>
    <plant_name>Ports Newark 8201 Solar</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.691644</lat>
    <lon>-74.19649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67066</plant_id>
    <plant_name>Edison 7205 Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.53</lat>
    <lon>-74.402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67068</plant_id>
    <plant_name>Port Reading 8 Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.565</lat>
    <lon>-74.218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67098</plant_id>
    <plant_name>ISU Customer Hosted 1MW Solar Project</plant_name>
    <state>IA</state>
    <county>Story</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.979194</lat>
    <lon>-93.65625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67272</plant_id>
    <plant_name>The Village at Orchard Ridge (TVOR)</plant_name>
    <state>VA</state>
    <county>Frederick</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.201562</lat>
    <lon>-78.21391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67702</plant_id>
    <plant_name>Creston School Customer Hosted Solar</plant_name>
    <state>IA</state>
    <county>Union</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.073246</lat>
    <lon>-94.37424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67704</plant_id>
    <plant_name>Rock County Customer Hosted Solar</plant_name>
    <state>WI</state>
    <county>Rock</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.72317</lat>
    <lon>-89.02271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67743</plant_id>
    <plant_name>Bishop Ranch BR 1-X</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Bollinger Canyon Road BR 1-X Solar Project 2020</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.759761</lat>
    <lon>-121.956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68131</plant_id>
    <plant_name>Des Plaines 7-SLCHI819</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.018195</lat>
    <lon>-87.9296</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68266</plant_id>
    <plant_name>North Juvenile Detention Center Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <battery_mwh>0.5</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.461</lat>
    <lon>-119.32</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68320</plant_id>
    <plant_name>Blackwell Creek Solar</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>Blackwell Creek Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.404138</lat>
    <lon>-123.0083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68433</plant_id>
    <plant_name>Banner Solar Ironwood</plant_name>
    <state>AZ</state>
    <county>Pinal</county>
    <operator>Imperator Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.213142</lat>
    <lon>-111.5669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68462</plant_id>
    <plant_name>Pine Grove - (OR)</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Pine Grove Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.186</lat>
    <lon>-121.687</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68501</plant_id>
    <plant_name>McFarland Schools Customer Hosted</plant_name>
    <state>WI</state>
    <county>Dane</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>43.02369</lat>
    <lon>-89.26745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68648</plant_id>
    <plant_name>Manlius North</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>CVE US EI4 Manlius North LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.01061</lat>
    <lon>-75.96538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68892</plant_id>
    <plant_name>Airport Commons 7-slbal210</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.182941</lat>
    <lon>-76.70536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69109</plant_id>
    <plant_name>CCBC Essex</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Luminace Solar MC, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.351597</lat>
    <lon>-76.48306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69382</plant_id>
    <plant_name>Kelso Community Solar II</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Kelso Community Solar II LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.32681</lat>
    <lon>-76.48878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69587</plant_id>
    <plant_name>Pekin Community High School</plant_name>
    <state>IL</state>
    <county>Tazewell</county>
    <operator>Pekin Community High School, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.4615</lat>
    <lon>-89.62079</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69619</plant_id>
    <plant_name>Prologis Edison 0503 - SLCNJ005 - Community Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.52988</lat>
    <lon>-74.39846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69734</plant_id>
    <plant_name>Legoland CA Phase I</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.126734</lat>
    <lon>-117.3081</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69836</plant_id>
    <plant_name>West Deptford Solar 1 LLC</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.835</lat>
    <lon>-75.21513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69926</plant_id>
    <plant_name>Trane Pueblo</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Trane US Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.28168</lat>
    <lon>-104.5168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70139</plant_id>
    <plant_name>Twin Lantern Solar Project</plant_name>
    <state>NY</state>
    <county>Madison</county>
    <operator>Twin Lanterns Solar Partner, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.082931</lat>
    <lon>-75.692</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70241</plant_id>
    <plant_name>Brainerd Waste Water Plant</plant_name>
    <state>MN</state>
    <county>Crow Wing</county>
    <operator>Brainerd Solar LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.4</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.338223</lat>
    <lon>-94.22961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1977</plant_id>
    <plant_name>Granite Falls</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>City of Granite Falls - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1986</latest_year>
    <lat>44.811685</lat>
    <lon>-95.53455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2566</plant_id>
    <plant_name>Fulton Hydro</plant_name>
    <state>NY</state>
    <county>Oswego</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>0.2</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1928</latest_year>
    <lat>43.32411</lat>
    <lon>-76.41898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3724</plant_id>
    <plant_name>Salisbury</plant_name>
    <state>VT</state>
    <county>Addison</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>43.8954</lat>
    <lon>-73.1007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3826</plant_id>
    <plant_name>Martinsville</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>City of Martinsville - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1932</first_year>
    <latest_year>1932</latest_year>
    <lat>36.664145</lat>
    <lon>-79.88359</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4071</plant_id>
    <plant_name>Potato Rapids</plant_name>
    <state>WI</state>
    <county>Marinette</county>
    <operator>Wisconsin Public Service Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1926</latest_year>
    <lat>45.1136</lat>
    <lon>-87.7586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6323</plant_id>
    <plant_name>Kiana</plant_name>
    <state>AK</state>
    <county>Northwest Arctic</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1984</first_year>
    <latest_year>2024</latest_year>
    <lat>66.973889</lat>
    <lon>-160.4286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7015</plant_id>
    <plant_name>Unit 4</plant_name>
    <state>UT</state>
    <county>Sanpete</county>
    <operator>City of Mt Pleasant - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>39.544108</lat>
    <lon>-111.4187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7168</plant_id>
    <plant_name>Chester Lake</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Metlakatla Power &amp; Light</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>55.116879</lat>
    <lon>-131.5459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7481</plant_id>
    <plant_name>City Light &amp; Water</plant_name>
    <state>NE</state>
    <county>Webster</county>
    <operator>City of Blue Hill - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>40.327952</lat>
    <lon>-98.45025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10050</plant_id>
    <plant_name>Fourche Creek Wastewater</plant_name>
    <state>AR</state>
    <county>Pulaski</county>
    <operator>Little Rock Water Reclamation Authority</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>34.6968</lat>
    <lon>-92.165</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10162</plant_id>
    <plant_name>Whitewater Hydro Plant</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Desert Water Agency</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>33.934725</lat>
    <lon>-116.6405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10539</plant_id>
    <plant_name>Theresa Plant</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Energen Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1929</latest_year>
    <lat>44.21742</lat>
    <lon>-75.79517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10656</plant_id>
    <plant_name>French Paper Hydro</plant_name>
    <state>MI</state>
    <county>Berrien</county>
    <operator>French Paper Co</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1930</latest_year>
    <lat>41.8203</lat>
    <lon>-86.2592</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10781</plant_id>
    <plant_name>Koyle Ranch Hydroelectric Project</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Koyle Hydro Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>42.945664</lat>
    <lon>-114.7957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50076</plant_id>
    <plant_name>Santa Felicia Dam</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>United Water Conservation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>34.461667</lat>
    <lon>-118.7511</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50704</plant_id>
    <plant_name>Somersworth Lower Great Dam</plant_name>
    <state>NH</state>
    <county>Strafford</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.251111</lat>
    <lon>-70.84083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54283</plant_id>
    <plant_name>Lee Creek Water Treatment Facility</plant_name>
    <state>AR</state>
    <county>Crawford</county>
    <operator>City of Fort Smith - (AR)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>35.484488</lat>
    <lon>-94.39286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54290</plant_id>
    <plant_name>Inforum</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>DCII-250 Williams Street NW, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>33.7533</lat>
    <lon>-84.3889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54308</plant_id>
    <plant_name>Three Forks Water Power Project</plant_name>
    <state>CA</state>
    <county>Trinity</county>
    <operator>Grizzly Mountain Ranch</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>40.199822</lat>
    <lon>-123.5231</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54514</plant_id>
    <plant_name>Blind Canyon Hydro</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>Blind Canyon Aquaranch, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.69984</lat>
    <lon>-114.8226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56422</plant_id>
    <plant_name>ST-1/1A Engine No 1</plant_name>
    <state>OH</state>
    <county>Franklin</county>
    <operator>City of Columbus - (OH)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>39.95</lat>
    <lon>-83.01583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56519</plant_id>
    <plant_name>Salem Electric Department</plant_name>
    <state>VA</state>
    <county>Salem City</county>
    <operator>City of Salem - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>37.2894</lat>
    <lon>-80.07</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56553</plant_id>
    <plant_name>Catawba River Pollution Control</plant_name>
    <state>NC</state>
    <county>Burke</county>
    <operator>City of Morganton - (NC)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>35.7766</lat>
    <lon>-81.6643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56577</plant_id>
    <plant_name>Shane's Wind Machine</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>Shane's Wind Machine LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>44.1508</lat>
    <lon>-96.1361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56580</plant_id>
    <plant_name>Blue Breezes LLC</plant_name>
    <state>MN</state>
    <county>Faribault</county>
    <operator>Midwest Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.6558</lat>
    <lon>-94.1536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56581</plant_id>
    <plant_name>Blue Breezes II LLC</plant_name>
    <state>MN</state>
    <county>Faribault</county>
    <operator>Midwest Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.6558</lat>
    <lon>-94.1564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56586</plant_id>
    <plant_name>Sunset Breeze LLC</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Midwest Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.5811</lat>
    <lon>-95.78</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56587</plant_id>
    <plant_name>Minnesota Breeze LLC</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Midwest Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.5833</lat>
    <lon>-95.7781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56588</plant_id>
    <plant_name>G Flow Wind LLC</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Midwest Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.586111</lat>
    <lon>-95.77611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56589</plant_id>
    <plant_name>Wolf Wind Enterprises LLC</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Midwest Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.581111</lat>
    <lon>-95.77583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56590</plant_id>
    <plant_name>Green Acres Breeze LLC</plant_name>
    <state>MN</state>
    <county>Nobles</county>
    <operator>Midwest Power Partners LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>43.586111</lat>
    <lon>-95.78028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56995</plant_id>
    <plant_name>Georgetown LFGTE</plant_name>
    <state>SC</state>
    <county>Georgetown</county>
    <operator>South Carolina Public Service Authority</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>33.453611</lat>
    <lon>-79.31611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57051</plant_id>
    <plant_name>Noatak</plant_name>
    <state>AK</state>
    <county>Northwest Arctic</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2022</latest_year>
    <lat>67.570931</lat>
    <lon>-162.9657</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57056</plant_id>
    <plant_name>Scammon Bay</plant_name>
    <state>AK</state>
    <county>Kusilvak</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2001</first_year>
    <latest_year>2007</latest_year>
    <lat>61.843036</lat>
    <lon>-165.5815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57057</plant_id>
    <plant_name>Quinhagak</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2023</latest_year>
    <lat>59.747436</lat>
    <lon>-161.9106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57058</plant_id>
    <plant_name>Pilot Station</plant_name>
    <state>AK</state>
    <county>Kusilvak</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2022</latest_year>
    <lat>61.936456</lat>
    <lon>-162.8807</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57363</plant_id>
    <plant_name>510 REPP One</plant_name>
    <state>NC</state>
    <county>Northampton</county>
    <operator>510 REPP One LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.4972</lat>
    <lon>-77.6058</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57574</plant_id>
    <plant_name>ETS Ewing Solar Facility</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.281801</lat>
    <lon>-74.79364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57668</plant_id>
    <plant_name>CASD Solar</plant_name>
    <state>PA</state>
    <county>Cumberland</county>
    <operator>Carlisle Area School District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.2142</lat>
    <lon>-77.2061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57768</plant_id>
    <plant_name>Longwood Gardens</plant_name>
    <state>PA</state>
    <county>Chester</county>
    <operator>Ecogy Pennsylvania Systems LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.866667</lat>
    <lon>-75.66778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57772</plant_id>
    <plant_name>Perdue Bridgeville Photovoltaic</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.757689</lat>
    <lon>-75.60203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57797</plant_id>
    <plant_name>Golden Springs Building D</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.911944</lat>
    <lon>-118.0522</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57864</plant_id>
    <plant_name>Stockton Athletic Center</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>39.488443</lat>
    <lon>-74.53526</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57950</plant_id>
    <plant_name>MSC Croswell</plant_name>
    <state>MI</state>
    <county>Sanilac</county>
    <operator>Michigan Sugar Company</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>0</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>43.266389</lat>
    <lon>-82.61917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58006</plant_id>
    <plant_name>Salt Palace Solar Gen Plant</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>Wasatch View Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.767222</lat>
    <lon>-111.895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58049</plant_id>
    <plant_name>Jordache Enterprises Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Jordache Enterprises</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.55569</lat>
    <lon>-74.40836</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58240</plant_id>
    <plant_name>Kit Carson</plant_name>
    <state>NM</state>
    <county>Taos</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.966667</lat>
    <lon>-105.4381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58277</plant_id>
    <plant_name>Paia Hydroelectric Plant</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Mahi Pono LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>20.8867</lat>
    <lon>-156.3378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58293</plant_id>
    <plant_name>Paradise Valley H.S. PV</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.4</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.6416</lat>
    <lon>-111.9997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58422</plant_id>
    <plant_name>CSU Northridge Plant</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>California State University, Northridge</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2025</latest_year>
    <lat>34.243333</lat>
    <lon>-118.5306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58689</plant_id>
    <plant_name>Blue Sky One</plant_name>
    <state>NM</state>
    <county>Taos</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.907778</lat>
    <lon>-105.9853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58798</plant_id>
    <plant_name>AC Criminal Courts Complex SPE2, LLC</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>AES Distributed Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.4375</lat>
    <lon>-74.69056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58839</plant_id>
    <plant_name>Sudbury Landfill</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Heliovaas LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.363889</lat>
    <lon>-71.385</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58899</plant_id>
    <plant_name>Prosperity Energy Storage Facility Hybri</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>Public Service Co of NM</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <battery_mwh>1.3</battery_mwh>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.001944</lat>
    <lon>-106.6372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58919</plant_id>
    <plant_name>2127 Harris Solar Project</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Solarenewal LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.291667</lat>
    <lon>-121.6697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59130</plant_id>
    <plant_name>CSD 2 - Heritage High</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.921944</lat>
    <lon>-121.7556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59275</plant_id>
    <plant_name>Sterlington Greenworks LLC</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.0675</lat>
    <lon>-72.44028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59277</plant_id>
    <plant_name>Medford WWTP</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.922222</lat>
    <lon>-74.80667</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59364</plant_id>
    <plant_name>Plainfield One Solar LLC</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>SunRay Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.605</lat>
    <lon>-74.43944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59405</plant_id>
    <plant_name>Diamond Valley Solar Project</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.713056</lat>
    <lon>-117.0725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59544</plant_id>
    <plant_name>Parlin Solar LLC</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Laurel Capital Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.456667</lat>
    <lon>-74.32889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59546</plant_id>
    <plant_name>Beaver Solar LLC</plant_name>
    <state>PA</state>
    <county>Beaver</county>
    <operator>Laurel Capital Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.691389</lat>
    <lon>-80.32389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59651</plant_id>
    <plant_name>Forever 21 Retail, Inc.</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Mission Owner LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.071389</lat>
    <lon>-118.1961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59752</plant_id>
    <plant_name>BlueWave Capital - Grafton (SREC II)</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>TerraForm Solar XVII, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.225492</lat>
    <lon>-71.66265</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59798</plant_id>
    <plant_name>Colon PV</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.792694</lat>
    <lon>-118.2524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59873</plant_id>
    <plant_name>Lowell Solar Landfill</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Heliovaas LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.627147</lat>
    <lon>-71.35337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60151</plant_id>
    <plant_name>Building F</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.914356</lat>
    <lon>-118.0502</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60245</plant_id>
    <plant_name>New Stuyahok</plant_name>
    <state>AK</state>
    <county>Dillingham</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2023</latest_year>
    <lat>59.448358</lat>
    <lon>-157.3255</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60473</plant_id>
    <plant_name>Westport MA 1 Community Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.621068</lat>
    <lon>-71.05696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60495</plant_id>
    <plant_name>Little Bay</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.799201</lat>
    <lon>-71.43605</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60542</plant_id>
    <plant_name>158th Fighter Wing Solar Farm</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>158th Fighter Wing</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>44.477705</lat>
    <lon>-73.15341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60605</plant_id>
    <plant_name>CMEEC - Rogers Rd Solar</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.538324</lat>
    <lon>-72.12254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60754</plant_id>
    <plant_name>DDR Shoppers World</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.300745</lat>
    <lon>-71.39623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60771</plant_id>
    <plant_name>Timber Creek HS</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.760172</lat>
    <lon>-75.01479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60821</plant_id>
    <plant_name>Weber State University - Davis Campus PV</plant_name>
    <state>UT</state>
    <county>Davis</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.098957</lat>
    <lon>-111.9822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60919</plant_id>
    <plant_name>Shakopee Met Council WTP</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>Oak Leaf Solar V LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.796611</lat>
    <lon>-93.43697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60954</plant_id>
    <plant_name>VEC Magee Hill Solar</plant_name>
    <state>VT</state>
    <county>Chittenden</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.3682</lat>
    <lon>-73.0608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60955</plant_id>
    <plant_name>Strawberry Point DPC Solar</plant_name>
    <state>IA</state>
    <county>Clayton</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.6786</lat>
    <lon>-91.5452</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61042</plant_id>
    <plant_name>Canandaigua Westbrook Solar Array</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.869086</lat>
    <lon>-77.28446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61104</plant_id>
    <plant_name>Pima Community College - East Campus</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.146142</lat>
    <lon>-110.9906</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61153</plant_id>
    <plant_name>AT&amp;T Holger</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.417638</lat>
    <lon>-121.9445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61154</plant_id>
    <plant_name>AT&amp;T Anaheim</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.836439</lat>
    <lon>-117.9169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61435</plant_id>
    <plant_name>DG AMP Solar Coldwater</plant_name>
    <state>MI</state>
    <county>Branch</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.934117</lat>
    <lon>-84.99724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61439</plant_id>
    <plant_name>Panasonic Carport Solar Hybrid</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.808719</lat>
    <lon>-104.7815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61630</plant_id>
    <plant_name>William G Mennen Sports Solar</plant_name>
    <state>NJ</state>
    <county>Morris</county>
    <operator>Sunlight General Morris Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.814851</lat>
    <lon>-74.47586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61636</plant_id>
    <plant_name>DG Webster LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>DG Webster, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.41389</lat>
    <lon>-71.51356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61688</plant_id>
    <plant_name>North Gooding Main Hydro</plant_name>
    <state>ID</state>
    <county>Gooding</county>
    <operator>North Gooding Main Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.0451</lat>
    <lon>-114.5588</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61698</plant_id>
    <plant_name>Folsom SP and CSP Sacramento</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.687</lat>
    <lon>-121.16</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61718</plant_id>
    <plant_name>Aerolease</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>PCS Energy, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.189857</lat>
    <lon>-118.4514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61878</plant_id>
    <plant_name>John A Logan College Solar</plant_name>
    <state>IL</state>
    <county>Williamson</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.750571</lat>
    <lon>-89.0853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61883</plant_id>
    <plant_name>Hopewell Friends</plant_name>
    <state>NC</state>
    <county>Randolph</county>
    <operator>Cypress Creek Renewables</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.62845</lat>
    <lon>-79.8727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61915</plant_id>
    <plant_name>Bowie State Solar</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.019083</lat>
    <lon>-76.75948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62242</plant_id>
    <plant_name>County of San Diego SBRC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.63266</lat>
    <lon>-117.0778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62452</plant_id>
    <plant_name>St. Joseph Hospital</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>St. Joseph Hospital (NY)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>1960</first_year>
    <latest_year>2024</latest_year>
    <lat>40.928827</lat>
    <lon>-73.89802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62477</plant_id>
    <plant_name>Dryden Rd #2 Community Solar Farm CSG</plant_name>
    <state>NY</state>
    <county>Tompkins</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.487821</lat>
    <lon>-76.31998</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62567</plant_id>
    <plant_name>GD Richmond Buttonwoods I, LLC</plant_name>
    <state>RI</state>
    <county>Washington</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.522911</lat>
    <lon>-71.68409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62732</plant_id>
    <plant_name>Solar Star Palo Alto I, LLC</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>DG 1 Acquisition Co., LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.411011</lat>
    <lon>-122.1489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62876</plant_id>
    <plant_name>Amazon Maryland DCA1</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Westbound Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.222576</lat>
    <lon>-76.46901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62904</plant_id>
    <plant_name>Milhurst Solar</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.254975</lat>
    <lon>-74.38083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63071</plant_id>
    <plant_name>Reed Road Solar</plant_name>
    <state>IL</state>
    <county>McHenry</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.110925</lat>
    <lon>-88.24025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63260</plant_id>
    <plant_name>AC Power</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.049778</lat>
    <lon>-74.93517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63497</plant_id>
    <plant_name>Calabro Airport North Solar Project</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.8224</lat>
    <lon>-72.875</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63531</plant_id>
    <plant_name>Pima Community College NW</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.343491</lat>
    <lon>-111.0279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63617</plant_id>
    <plant_name>SOCCD</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <battery_mwh>7.2</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.676445</lat>
    <lon>-117.7773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63700</plant_id>
    <plant_name>AGT001 Centerville Fuel Cell</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.75787</lat>
    <lon>-75.62208</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63753</plant_id>
    <plant_name>Platteville Solar CSG, LLC</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.22833</lat>
    <lon>-104.7747</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64033</plant_id>
    <plant_name>GreenparkSolar</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.879414</lat>
    <lon>-122.9375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64376</plant_id>
    <plant_name>Tranquillity ID</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Tranquillity Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.648026</lat>
    <lon>-120.2459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64397</plant_id>
    <plant_name>EMWD - San Jacinto RWRF NEM</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.798547</lat>
    <lon>-117.0166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64602</plant_id>
    <plant_name>Kirby Road Solar, LLC</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.77897</lat>
    <lon>-76.9237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64770</plant_id>
    <plant_name>WAL202</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.100353</lat>
    <lon>-96.80071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64791</plant_id>
    <plant_name>WAL462</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.421764</lat>
    <lon>-95.23078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64794</plant_id>
    <plant_name>WAL529</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.372305</lat>
    <lon>-95.00045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64808</plant_id>
    <plant_name>WAL897</plant_name>
    <state>TX</state>
    <county>Pecos</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.896466</lat>
    <lon>-102.9072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64861</plant_id>
    <plant_name>Deer Creek 2</plant_name>
    <state>CA</state>
    <county>El Dorado</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.628</lat>
    <lon>-120.984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64926</plant_id>
    <plant_name>WAL3510</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.545976</lat>
    <lon>-95.23594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64934</plant_id>
    <plant_name>WAL3572</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.557643</lat>
    <lon>-95.3829</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64938</plant_id>
    <plant_name>WAL3777</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.179721</lat>
    <lon>-96.88399</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64952</plant_id>
    <plant_name>WAL5211</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.156306</lat>
    <lon>-96.68269</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64954</plant_id>
    <plant_name>WAL5311</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.216844</lat>
    <lon>-96.7357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64957</plant_id>
    <plant_name>WAL5388</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.470152</lat>
    <lon>-95.08964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64994</plant_id>
    <plant_name>Sacramento Point West Medical Offices</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>KP Sacramento Point West Medical Offices Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.596314</lat>
    <lon>-121.428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65161</plant_id>
    <plant_name>ASA Clayton NY Solar I LLC</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>ASA Clayton NY Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.161761</lat>
    <lon>-76.10899</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65190</plant_id>
    <plant_name>West Village Solar - Array 2 Community S</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>CHF-Davis I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.542747</lat>
    <lon>-121.7766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65216</plant_id>
    <plant_name>Woburn</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.5113</lat>
    <lon>-71.13911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65564</plant_id>
    <plant_name>Calibrant Bakersfield LLC</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Bay4 Energy Services, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.442085</lat>
    <lon>-119.0932</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65804</plant_id>
    <plant_name>Corvias - Fort Riley II</plant_name>
    <state>KS</state>
    <county>Riley</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.08557</lat>
    <lon>-96.81503</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66145</plant_id>
    <plant_name>Life Technologies - Fremont</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>37.487027</lat>
    <lon>-121.9394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66622</plant_id>
    <plant_name>9150 Hermosa Solar GM</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Valta Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.0878</lat>
    <lon>-117.5872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66884</plant_id>
    <plant_name>FreeState Stull Solar I</plant_name>
    <state>KS</state>
    <county>Douglas</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.990075</lat>
    <lon>-95.42761</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66889</plant_id>
    <plant_name>Solops 371 Hoes LLC</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Solops 371 Hoes LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.545856</lat>
    <lon>-74.47386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66992</plant_id>
    <plant_name>CG PS Victoria WWTP, LLC</plant_name>
    <state>TX</state>
    <county>Victoria</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>28.79346</lat>
    <lon>-97.01223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67158</plant_id>
    <plant_name>SR Marion, LLC</plant_name>
    <state>TN</state>
    <county>Sequatchie</county>
    <operator>SR Marion, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.39048</lat>
    <lon>-85.38391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67365</plant_id>
    <plant_name>Tejon Castac Water District Solar</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CTMW Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.0009</lat>
    <lon>-118.8983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67401</plant_id>
    <plant_name>Rutgers Busch Liv (Lot 55, 58, 58A, 58B)</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Bowser Road Solar Project 2021, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.524806</lat>
    <lon>-74.46719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67459</plant_id>
    <plant_name>Sycamore</plant_name>
    <state>OH</state>
    <county>Wyandot</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.946934</lat>
    <lon>-83.16244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67473</plant_id>
    <plant_name>RA Jones Roof Mounted Solar System</plant_name>
    <state>KY</state>
    <county>Kenton</county>
    <operator>RA Jones</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>39.04441</lat>
    <lon>-84.58391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67516</plant_id>
    <plant_name>CSU Sacramento I</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>BluePath Solar Sacramento I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.553</lat>
    <lon>-121.422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67583</plant_id>
    <plant_name>DC Water</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Azimuth 180 Solar Electric, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.91</lat>
    <lon>-76.99</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67868</plant_id>
    <plant_name>Harris Farms Solar Facility</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Harris Farms Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.253184</lat>
    <lon>-120.2293</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67965</plant_id>
    <plant_name>Clinton Schools</plant_name>
    <state>IA</state>
    <county>Clinton</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.82718</lat>
    <lon>-90.22335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68109</plant_id>
    <plant_name>SR Maryville</plant_name>
    <state>TN</state>
    <county>Blount</county>
    <operator>SR Maryville, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.688025</lat>
    <lon>-84.02035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68237</plant_id>
    <plant_name>South Bay Dis Ctr 20-SLLAX512</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.84038</lat>
    <lon>-118.2287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68280</plant_id>
    <plant_name>NCS Paradise LLC</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>New Columbia Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.90639</lat>
    <lon>-76.9514</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68393</plant_id>
    <plant_name>North Stafford HS</plant_name>
    <state>VA</state>
    <county>Stafford</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.467778</lat>
    <lon>-77.45528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68430</plant_id>
    <plant_name>515 Main Saugus</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>515 Main Saugus LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.484401</lat>
    <lon>-71.04513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68440</plant_id>
    <plant_name>Sutter Santa Rosa Solar</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Sutter Santa Rosa Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.494525</lat>
    <lon>-122.752</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68449</plant_id>
    <plant_name>OR -Solops - SPI 18 - Cork</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Cork Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.127552</lat>
    <lon>-122.5574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68532</plant_id>
    <plant_name>Pivot Energy PPA 22</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.347335</lat>
    <lon>-119.3957</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68540</plant_id>
    <plant_name>Bayer Oxnard - Meter# 4719</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Camino del Sol 2 Solar Project 2022, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>34.20337</lat>
    <lon>-119.1394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68605</plant_id>
    <plant_name>Mauna Loa Macadamia Nut</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Macadamia Nut Road Solar Project 2019</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <battery_mwh>1.3</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>19.656851</lat>
    <lon>-155.0087</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68790</plant_id>
    <plant_name>Dominguez - SLLAX512</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.84038</lat>
    <lon>-118.2287</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69112</plant_id>
    <plant_name>Deptford Solar Farm</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>53 SP Solar Trust</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.8161</lat>
    <lon>-75.1282</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69140</plant_id>
    <plant_name>Uniqlo NJ CS Ph 2 CSG</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>Solar DG NJ Building 7, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.695378</lat>
    <lon>-75.16338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69247</plant_id>
    <plant_name>Prologis Meadowlands 9305 - SLNNJ305</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.838076</lat>
    <lon>-74.06259</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69683</plant_id>
    <plant_name>Solvita</plant_name>
    <state>OH</state>
    <county>Montgomery</county>
    <operator>IGS Solar I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.724313</lat>
    <lon>-84.11629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69731</plant_id>
    <plant_name>Bystronic Manufacturing</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.067981</lat>
    <lon>-88.13475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70356</plant_id>
    <plant_name>IL - Forefront Windfree- Shabbona 2</plant_name>
    <state>IL</state>
    <county>DeKalb</county>
    <operator>IL Solar Shabbona Project2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.763231</lat>
    <lon>-88.83964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70394</plant_id>
    <plant_name>San Luis Valley Regional Medical Center</plant_name>
    <state>CO</state>
    <county>Alamosa</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>37.46832</lat>
    <lon>-105.9089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70414</plant_id>
    <plant_name>DE-ECA CS East Evens</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>E Evens Community Energy Initiative LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.3</nameplate_mw>
    <summer_mw>1.3</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.040773</lat>
    <lon>-75.56964</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>472</plant_id>
    <plant_name>Georgetown Hydro</plant_name>
    <state>CO</state>
    <county>Clear Creek</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1906</first_year>
    <latest_year>1908</latest_year>
    <lat>39.6919</lat>
    <lon>-105.6978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1020</plant_id>
    <plant_name>Manti Lower</plant_name>
    <state>UT</state>
    <county>Sanpete</county>
    <operator>City of Manti - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>39.255911</lat>
    <lon>-111.6215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1067</plant_id>
    <plant_name>Iowa Hydro LLC</plant_name>
    <state>IA</state>
    <county>Jackson</county>
    <operator>Zero6 Energy Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>42.069987</lat>
    <lon>-90.69766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1760</plant_id>
    <plant_name>Constantine</plant_name>
    <state>MI</state>
    <county>St Joseph</county>
    <operator>Indiana Michigan Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1929</latest_year>
    <lat>41.8436</lat>
    <lon>-85.6694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1998</plant_id>
    <plant_name>Mountain Lake</plant_name>
    <state>MN</state>
    <county>Cottonwood</county>
    <operator>City of Mountain Lake - (MN)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>43.9405</lat>
    <lon>-94.9434</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3658</plant_id>
    <plant_name>Snake Creek</plant_name>
    <state>UT</state>
    <county>Wasatch</county>
    <operator>Heber Light &amp; Power Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1910</latest_year>
    <lat>40.544942</lat>
    <lon>-111.5029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3704</plant_id>
    <plant_name>Uintah</plant_name>
    <state>UT</state>
    <county>Duchesne</county>
    <operator>Moon Lake Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1940</latest_year>
    <lat>40.538056</lat>
    <lon>-110.0661</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4012</plant_id>
    <plant_name>Trego</plant_name>
    <state>WI</state>
    <county>Washburn</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>45.94794</lat>
    <lon>-91.88837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4018</plant_id>
    <plant_name>Clam River Dam</plant_name>
    <state>WI</state>
    <county>Burnett</county>
    <operator>Zero6 Energy Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1942</first_year>
    <latest_year>1967</latest_year>
    <lat>45.9467</lat>
    <lon>-92.5383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6378</plant_id>
    <plant_name>Dwight</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Central Rivers Power MA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>42.149497</lat>
    <lon>-72.61095</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7042</plant_id>
    <plant_name>Humpback Creek</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Cordova Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>60.612822</lat>
    <lon>-145.6794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7169</plant_id>
    <plant_name>Northway</plant_name>
    <state>AK</state>
    <county>Southeast Fairbanks</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2012</latest_year>
    <lat>62.9617</lat>
    <lon>-141.9372</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7372</plant_id>
    <plant_name>McPhee</plant_name>
    <state>CO</state>
    <county>Montezuma</county>
    <operator>U S Bureau of Reclamation</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>37.57522</lat>
    <lon>-108.574</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10036</plant_id>
    <plant_name>Hillsborough Hosiery</plant_name>
    <state>NH</state>
    <county>Hillsborough</county>
    <operator>Silverstreet Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>43.11391</lat>
    <lon>-71.894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10540</plant_id>
    <plant_name>Diamond Island Plant</plant_name>
    <state>NY</state>
    <county>Jefferson</county>
    <operator>Energen Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1914</latest_year>
    <lat>43.978626</lat>
    <lon>-75.8861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10546</plant_id>
    <plant_name>Beaver Valley Patterson Dam</plant_name>
    <state>PA</state>
    <county>Beaver</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>40.744105</lat>
    <lon>-80.31784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10737</plant_id>
    <plant_name>Sprague Hydro</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Sprague Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>42.50136</lat>
    <lon>-120.9894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50123</plant_id>
    <plant_name>Normanskill Hydro Project</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Watervliet, City of - (NY)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>42.712356</lat>
    <lon>-73.95732</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50223</plant_id>
    <plant_name>Nelson Creek</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Nelson Creek Power Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>41.028893</lat>
    <lon>-121.8924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50285</plant_id>
    <plant_name>Lower Village Water Power Project</plant_name>
    <state>NH</state>
    <county>Sullivan</county>
    <operator>Sugar River Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1995</first_year>
    <latest_year>1995</latest_year>
    <lat>43.374292</lat>
    <lon>-72.3476</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50323</plant_id>
    <plant_name>Marco Ranch</plant_name>
    <state>ID</state>
    <county>Jerome</county>
    <operator>Marco Power Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.636558</lat>
    <lon>-114.5578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50375</plant_id>
    <plant_name>East Portal Generator</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Calleguas Mun Water District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>34.2619</lat>
    <lon>-118.6242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50610</plant_id>
    <plant_name>Saint Johns Health Center</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Saint John's Health Center</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>34.030318</lat>
    <lon>-118.4784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50674</plant_id>
    <plant_name>Municipal Cogen Plant</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Palm Springs, City of - (CA)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.8247</lat>
    <lon>-116.5106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50702</plant_id>
    <plant_name>Salmon Falls</plant_name>
    <state>ME</state>
    <county>York</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>43.226977</lat>
    <lon>-70.81089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50890</plant_id>
    <plant_name>Ivy River Hydro</plant_name>
    <state>NC</state>
    <county>Madison</county>
    <operator>Madison Hydro Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>6</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>35.771627</lat>
    <lon>-82.61827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52049</plant_id>
    <plant_name>Clifton Dam 3 Power Station</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Converse Energy Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1987</latest_year>
    <lat>34.9953</lat>
    <lon>-81.8344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52166</plant_id>
    <plant_name>Collins Facility</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.6</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>42.1569</lat>
    <lon>-72.4227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54342</plant_id>
    <plant_name>Ninth Street Hydropower Project</plant_name>
    <state>MI</state>
    <county>Alpena</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>45.0717</lat>
    <lon>-83.4381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54462</plant_id>
    <plant_name>Graniteville Enterprise Division</plant_name>
    <state>GA</state>
    <county>Richmond</county>
    <operator>Augusta Canal Authority</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>33.477027</lat>
    <lon>-81.98273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54525</plant_id>
    <plant_name>Kankakee Hydro Facility</plant_name>
    <state>IL</state>
    <county>Kankakee</county>
    <operator>City of Kankakee - (IL)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>41.1128</lat>
    <lon>-87.8681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54572</plant_id>
    <plant_name>Lochmere Hydroelectric Plant</plant_name>
    <state>NH</state>
    <county>Belknap</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>4</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>43.473238</lat>
    <lon>-71.53362</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54674</plant_id>
    <plant_name>Ford Hydro LP</plant_name>
    <state>ID</state>
    <county>Clearwater</county>
    <operator>Ford Hydro Ltd Partnership</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>46.383828</lat>
    <lon>-115.9493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54688</plant_id>
    <plant_name>Thundermist Hydro</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>City of Woonsocket - (RI)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>41.99897</lat>
    <lon>-71.51743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54801</plant_id>
    <plant_name>Avalon Hydropower</plant_name>
    <state>NC</state>
    <county>ROCKINGHAM</county>
    <operator>Avalon Hydropower LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1997</first_year>
    <latest_year>2000</latest_year>
    <lat>36.423715</lat>
    <lon>-79.95249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54835</plant_id>
    <plant_name>Evonik Industries AG</plant_name>
    <state>IN</state>
    <county>Tippecanoe</county>
    <operator>Evonik Degussa Corporation</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>40.387242</lat>
    <lon>-86.93914</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54877</plant_id>
    <plant_name>Atlanta Gift Mart LP</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>Atlanta Gift Mart LP</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1991</first_year>
    <latest_year>1991</latest_year>
    <lat>33.7611</lat>
    <lon>-84.3892</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55685</plant_id>
    <plant_name>Flambeau Lower Project</plant_name>
    <state>WI</state>
    <county>Price</county>
    <operator>Zero6 Energy Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>45.913526</lat>
    <lon>-90.44746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56667</plant_id>
    <plant_name>Lanai Solar-Electric Plant</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Lanai Sustainability Research LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>12</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>20.7667</lat>
    <lon>-156.9233</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56862</plant_id>
    <plant_name>Bolthouse S&amp;P and Rowen Farms Solar</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>MMA WBF Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>34.5644</lat>
    <lon>-117.6933</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57063</plant_id>
    <plant_name>Shungnak</plant_name>
    <state>AK</state>
    <county>Northwest Arctic</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1998</latest_year>
    <lat>66.888114</lat>
    <lon>-157.1402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57207</plant_id>
    <plant_name>Thomson Reuters Data Center Bldg ES101</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>CADC MSP01, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>44.8244</lat>
    <lon>-93.1139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57314</plant_id>
    <plant_name>Los Angeles Harbor College</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Community College District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>2.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>33.783102</lat>
    <lon>-118.2849</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57321</plant_id>
    <plant_name>Mayberry Solar LLC</plant_name>
    <state>NC</state>
    <county>Surry</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.476667</lat>
    <lon>-80.60111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57330</plant_id>
    <plant_name>Kent County Wastewater Treatment Solar</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>Kent County Levy Court Dept of Pub Work</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.993056</lat>
    <lon>-75.4375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57392</plant_id>
    <plant_name>UASTP I</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tucson Electric Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>32.096973</lat>
    <lon>-110.8106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57773</plant_id>
    <plant_name>Palo Verde College</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>33.661667</lat>
    <lon>-114.6517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57796</plant_id>
    <plant_name>Golden Springs Building C-1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.914167</lat>
    <lon>-118.0536</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57942</plant_id>
    <plant_name>Town of Norfolk MA at Medway Branch</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Luminace Solar Massachusetts, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.127778</lat>
    <lon>-71.34028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58185</plant_id>
    <plant_name>Amherst College Co Gen</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Amherst College</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>42.371667</lat>
    <lon>-72.51222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58491</plant_id>
    <plant_name>Sandy Cross Solar, LLC</plant_name>
    <state>NC</state>
    <county>Nash</county>
    <operator>Oppidum Renewables USA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.868333</lat>
    <lon>-77.95417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58504</plant_id>
    <plant_name>Livingston Solar Farm</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Rutgers, The State University of NJ</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.523611</lat>
    <lon>-74.43</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58618</plant_id>
    <plant_name>Butler Plaza</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>29.623056</lat>
    <lon>-82.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58822</plant_id>
    <plant_name>Millville City Sewer Auth WTP</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>MN8 Energy LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.376389</lat>
    <lon>-75.03306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58825</plant_id>
    <plant_name>MTHS Co-Gen Buildings</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Maine Township High School Dist 207</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1992</first_year>
    <latest_year>1992</latest_year>
    <lat>42.001944</lat>
    <lon>-87.85222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58889</plant_id>
    <plant_name>ASTI</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>38.761389</lat>
    <lon>-122.9753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58918</plant_id>
    <plant_name>2081 Terzian Solar Project</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Solarenewal LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.67</lat>
    <lon>-119.4158</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59166</plant_id>
    <plant_name>Bridgeport Disposal Solar Farm</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>Bridgeport Disposal LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.7875</lat>
    <lon>-75.35083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59613</plant_id>
    <plant_name>Town of Williamson Landfill PV</plant_name>
    <state>NY</state>
    <county>Wayne</county>
    <operator>MN8 Energy LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>43.244444</lat>
    <lon>-77.17472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59715</plant_id>
    <plant_name>DD Hay Road Solar 23 LLC</plant_name>
    <state>DE</state>
    <county>New Castle</county>
    <operator>Laurel Capital Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.736708</lat>
    <lon>-75.51175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59743</plant_id>
    <plant_name>Chimes West Friendship (Nixon Farms)</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>SunE SEM 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.296749</lat>
    <lon>-76.95741</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59748</plant_id>
    <plant_name>CDCR (CA) - Pleasant Valley State Prison</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Team-Solar, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.137219</lat>
    <lon>-120.2244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59751</plant_id>
    <plant_name>Wilzig Associates, LLC</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>Wilzig Associates, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.825316</lat>
    <lon>-74.09442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59790</plant_id>
    <plant_name>Oregon University System Rabbit Field</plant_name>
    <state>OR</state>
    <county>Benton</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>44.573484</lat>
    <lon>-123.317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59849</plant_id>
    <plant_name>Adams Community Solar Garden LLC</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Adams Community Solar Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.7876</lat>
    <lon>-104.5859</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59850</plant_id>
    <plant_name>Adams Community Solar Garden III LLC</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Adams Community Solar Garden III LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.7867</lat>
    <lon>-104.5877</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60006</plant_id>
    <plant_name>FIU Solar</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>Florida Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>25.770008</lat>
    <lon>-80.36774</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60113</plant_id>
    <plant_name>Jackson Board of Education-Liberty HS</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.092672</lat>
    <lon>-74.262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60119</plant_id>
    <plant_name>Granby Hydro</plant_name>
    <state>CO</state>
    <county>Grand</county>
    <operator>Northern Water Hydropower Enterprise</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.1464</lat>
    <lon>-105.8683</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60153</plant_id>
    <plant_name>Building G</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.912917</lat>
    <lon>-118.0506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60201</plant_id>
    <plant_name>CES Cherry Hill Solar</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.941853</lat>
    <lon>-75.02621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60320</plant_id>
    <plant_name>Jeffco Community Solar Gardens LLC</plant_name>
    <state>CO</state>
    <county>Jefferson</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.859564</lat>
    <lon>-105.1497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60476</plant_id>
    <plant_name>Westport MA 2 Community Solar</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.621068</lat>
    <lon>-71.05696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60625</plant_id>
    <plant_name>Renew Canal 1 CSG LLC</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>NRG Renew Canal 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.766987</lat>
    <lon>-70.52117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60841</plant_id>
    <plant_name>Prudential 55 Livingston Roseland Solar</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>Prudential Drive Investors, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.814586</lat>
    <lon>-74.2971</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60847</plant_id>
    <plant_name>Garrett County - DPU Treatment Plant</plant_name>
    <state>MD</state>
    <county>Garrett</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.505187</lat>
    <lon>-79.39299</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60868</plant_id>
    <plant_name>Timothy Lake Powerhouse</plant_name>
    <state>OR</state>
    <county>Clackamas</county>
    <operator>Portland General Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.370546</lat>
    <lon>-121.7565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61199</plant_id>
    <plant_name>T0588 Phoenix - AZ</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.447225</lat>
    <lon>-112.2177</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61206</plant_id>
    <plant_name>Onyx - Allen Harim</plant_name>
    <state>DE</state>
    <county>Sussex</county>
    <operator>A2-A Pearl Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.717509</lat>
    <lon>-75.28879</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61217</plant_id>
    <plant_name>Head of U Canal Hydro Project</plant_name>
    <state>ID</state>
    <county>Jerome</county>
    <operator>North Side Energy Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.7628</lat>
    <lon>-114.3958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61309</plant_id>
    <plant_name>IKEA Grand Prairie Rooftop PV System</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>IKEA Property Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>32.82</lat>
    <lon>-97.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61389</plant_id>
    <plant_name>Letchworth Solar Project</plant_name>
    <state>NY</state>
    <county>Wyoming</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.618969</lat>
    <lon>-78.17952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61472</plant_id>
    <plant_name>San Luis Solar Garden</plant_name>
    <state>CO</state>
    <county>Conejos</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.068132</lat>
    <lon>-106.0189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61591</plant_id>
    <plant_name>Town of Foxborough - Landfill (SREC II)</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Town of Foxborough - Landfill (SREC II)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.059675</lat>
    <lon>-71.13541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61685</plant_id>
    <plant_name>Slana Generating Station</plant_name>
    <state>AK</state>
    <county>Southeast Fairbanks</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2024</latest_year>
    <lat>62.592756</lat>
    <lon>-143.5889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61800</plant_id>
    <plant_name>DG AMP Solar Smyrna</plant_name>
    <state>DE</state>
    <county>Kent</county>
    <operator>DG AMP Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.279702</lat>
    <lon>-75.62242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61816</plant_id>
    <plant_name>IKEA Oak Creek Rooftop PV System</plant_name>
    <state>WI</state>
    <county>Milwaukee</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.902949</lat>
    <lon>-87.93545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61902</plant_id>
    <plant_name>Holtsville Solar Project</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.797667</lat>
    <lon>-73.03398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62039</plant_id>
    <plant_name>Santa Rosa Junior College Petaluma Solar</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Sonoma County Junior College District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.46905</lat>
    <lon>-122.7219</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62264</plant_id>
    <plant_name>Pittsfield 44 - M&amp;W PV</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.487419</lat>
    <lon>-73.21583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62287</plant_id>
    <plant_name>Francisco St. Solar</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.8482</lat>
    <lon>-118.3055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62396</plant_id>
    <plant_name>Jamison Solar Farm</plant_name>
    <state>SC</state>
    <county>Orangeburg</county>
    <operator>Jamison Solar Farm</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.57398</lat>
    <lon>-80.83711</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62438</plant_id>
    <plant_name>Heller 400M</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Marina Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.4987</lat>
    <lon>-74.3878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62450</plant_id>
    <plant_name>St. Johns Episcopal Hospital</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>St. Johns Episcopal Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2010</latest_year>
    <lat>40.598688</lat>
    <lon>-73.75346</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62520</plant_id>
    <plant_name>State Route 64N Community Solar Farm</plant_name>
    <state>NY</state>
    <county>Ontario</county>
    <operator>Bullrock-NxtGenREA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.915</lat>
    <lon>-77.454</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62576</plant_id>
    <plant_name>MER Queens</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.7345</lat>
    <lon>-73.87094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62611</plant_id>
    <plant_name>PFMG Solar Grossmont Helix LLC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.753281</lat>
    <lon>-117.0352</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62615</plant_id>
    <plant_name>ALDI DC 2</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>ALDI, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.865827</lat>
    <lon>-72.57396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63021</plant_id>
    <plant_name>SCCCD - Clovis Community College</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.885463</lat>
    <lon>-119.7319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63198</plant_id>
    <plant_name>ACCP NJ 1</plant_name>
    <state>NJ</state>
    <county>Sussex</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.92635</lat>
    <lon>-74.67509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63303</plant_id>
    <plant_name>Alticor Inc - Solar Project</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.878585</lat>
    <lon>-117.9961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63376</plant_id>
    <plant_name>Phelan Pinon Hills CSD Solar</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Phelan Pinon Hills Community Services District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.57654</lat>
    <lon>-117.5828</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63391</plant_id>
    <plant_name>City of Rio Rancho WWTP</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Exus New Mexico</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.179889</lat>
    <lon>-106.8066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63498</plant_id>
    <plant_name>Calabro Airport South Solar Project</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Agilitas Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.811524</lat>
    <lon>-72.85705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63536</plant_id>
    <plant_name>Amazon DEN2 Solar Project</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>Solar Star Prime 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.75</lat>
    <lon>-104.75</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63602</plant_id>
    <plant_name>Montefiore-New Rochelle</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Montefiore-New Rochelle</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1971</first_year>
    <latest_year>2006</latest_year>
    <lat>40.91261</lat>
    <lon>-73.78781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63610</plant_id>
    <plant_name>Baker</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>6.3</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.656528</lat>
    <lon>-117.6841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63701</plant_id>
    <plant_name>CST001 McCarthy Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.40553</lat>
    <lon>-121.9168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63758</plant_id>
    <plant_name>Kroger La Habra</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Ralph's Grocery Company</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.922141</lat>
    <lon>-117.9391</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63870</plant_id>
    <plant_name>Camp San Luis Obispo</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.322043</lat>
    <lon>-120.7323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64004</plant_id>
    <plant_name>Interfaith Medical Center</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>Interfaith Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.67855</lat>
    <lon>-73.93742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64025</plant_id>
    <plant_name>101 Carnegie Center Solar, LLC</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.32312</lat>
    <lon>-74.64512</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64040</plant_id>
    <plant_name>Apple Canyon Lake Solar</plant_name>
    <state>IL</state>
    <county>Jo Daviess</county>
    <operator>ACM Solar, LLC.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.436665</lat>
    <lon>-90.17958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64114</plant_id>
    <plant_name>A Street 1</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Captona A Street 1 Johnston LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.797953</lat>
    <lon>-71.54678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64388</plant_id>
    <plant_name>TruStile Doors - Denver</plant_name>
    <state>CO</state>
    <county>Adams</county>
    <operator>SkyHigh 2 Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.825708</lat>
    <lon>-104.9731</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64442</plant_id>
    <plant_name>Mt Pleasant Community Center</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.09999</lat>
    <lon>-73.77155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64663</plant_id>
    <plant_name>WLWPCF Cogeneration Facility</plant_name>
    <state>OR</state>
    <county>Marion</county>
    <operator>City of Salem Public Works - (OR)</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.00812</lat>
    <lon>-123.0529</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64769</plant_id>
    <plant_name>WAL194</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.776274</lat>
    <lon>-94.97446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64771</plant_id>
    <plant_name>WAL266</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.922049</lat>
    <lon>-97.08199</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64772</plant_id>
    <plant_name>WAL284</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.576159</lat>
    <lon>-97.13005</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64773</plant_id>
    <plant_name>WAL407</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.089722</lat>
    <lon>-97.72928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64774</plant_id>
    <plant_name>WAL414</plant_name>
    <state>TX</state>
    <county>Wichita</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.857046</lat>
    <lon>-98.49901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64775</plant_id>
    <plant_name>WAL447</plant_name>
    <state>TX</state>
    <county>Val Verde</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.395822</lat>
    <lon>-100.9011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64776</plant_id>
    <plant_name>WAL452</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.243944</lat>
    <lon>-98.24506</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64777</plant_id>
    <plant_name>WAL456</plant_name>
    <state>TX</state>
    <county>Cameron</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>25.976057</lat>
    <lon>-97.51945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64778</plant_id>
    <plant_name>WAL461</plant_name>
    <state>TX</state>
    <county>Maverick</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>28.702031</lat>
    <lon>-100.4827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64792</plant_id>
    <plant_name>WAL504</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.26514</lat>
    <lon>-94.83295</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64793</plant_id>
    <plant_name>WAL522</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.894458</lat>
    <lon>-95.06497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64795</plant_id>
    <plant_name>WAL536</plant_name>
    <state>TX</state>
    <county>Jones</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.48078</lat>
    <lon>-99.69802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64796</plant_id>
    <plant_name>WAL537</plant_name>
    <state>TX</state>
    <county>Ector</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>31.8957</lat>
    <lon>-102.3325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64797</plant_id>
    <plant_name>WAL546</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.558105</lat>
    <lon>-95.76127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64798</plant_id>
    <plant_name>WAL565</plant_name>
    <state>TX</state>
    <county>Navarro</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.101054</lat>
    <lon>-96.40376</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64799</plant_id>
    <plant_name>WAL602</plant_name>
    <state>TX</state>
    <county>Montgomery</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.12423</lat>
    <lon>-95.45769</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64800</plant_id>
    <plant_name>WAL744</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.995621</lat>
    <lon>-95.17647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64801</plant_id>
    <plant_name>WAL752</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.64662</lat>
    <lon>-95.16143</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64802</plant_id>
    <plant_name>WAL768</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.789117</lat>
    <lon>-95.72223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64803</plant_id>
    <plant_name>WAL772</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.721093</lat>
    <lon>-95.64622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64804</plant_id>
    <plant_name>WAL791</plant_name>
    <state>TX</state>
    <county>Jim Wells</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.769271</lat>
    <lon>-98.04319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64805</plant_id>
    <plant_name>WAL849</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.064779</lat>
    <lon>-95.42945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64806</plant_id>
    <plant_name>WAL872</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.573168</lat>
    <lon>-95.2839</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64807</plant_id>
    <plant_name>WAL896</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.673532</lat>
    <lon>-97.03623</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64809</plant_id>
    <plant_name>WAL940</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.755036</lat>
    <lon>-97.43384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64810</plant_id>
    <plant_name>WAL947</plant_name>
    <state>TX</state>
    <county>Grayson</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.673162</lat>
    <lon>-96.61213</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64812</plant_id>
    <plant_name>WAL972</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.811848</lat>
    <lon>-97.42474</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64813</plant_id>
    <plant_name>WAL1040</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.877618</lat>
    <lon>-95.65148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64814</plant_id>
    <plant_name>WAL1062</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.551973</lat>
    <lon>-95.15913</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64815</plant_id>
    <plant_name>WAL1103</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.998163</lat>
    <lon>-95.4862</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64816</plant_id>
    <plant_name>WAL1232</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.080808</lat>
    <lon>-97.45776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64829</plant_id>
    <plant_name>WAL1272</plant_name>
    <state>TX</state>
    <county>Scurry</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.691018</lat>
    <lon>-100.9179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64883</plant_id>
    <plant_name>WAL1455</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.764483</lat>
    <lon>-97.16926</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64884</plant_id>
    <plant_name>WAL1801</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.668729</lat>
    <lon>-97.13183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64885</plant_id>
    <plant_name>WAL2257</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.853797</lat>
    <lon>-95.50908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64886</plant_id>
    <plant_name>WAL2439</plant_name>
    <state>TX</state>
    <county>Chambers</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.817549</lat>
    <lon>-94.90046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64887</plant_id>
    <plant_name>WAL2667</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.793829</lat>
    <lon>-96.68954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64888</plant_id>
    <plant_name>WAL2724</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.693424</lat>
    <lon>-95.21041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64889</plant_id>
    <plant_name>WAL2883</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.097094</lat>
    <lon>-96.7986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64890</plant_id>
    <plant_name>WAL2980</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.89517</lat>
    <lon>-97.28653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64891</plant_id>
    <plant_name>WAL2993</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.613582</lat>
    <lon>-95.64465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64893</plant_id>
    <plant_name>WAL3224</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.842209</lat>
    <lon>-96.59803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64895</plant_id>
    <plant_name>WAL3226</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.783981</lat>
    <lon>-95.80408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64896</plant_id>
    <plant_name>WAL3284</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.66674</lat>
    <lon>-97.20925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64897</plant_id>
    <plant_name>WAL3285</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.59732</lat>
    <lon>-96.94691</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64898</plant_id>
    <plant_name>WAL3297</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.920574</lat>
    <lon>-95.60263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64899</plant_id>
    <plant_name>WAL3298</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.535168</lat>
    <lon>-95.01882</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64900</plant_id>
    <plant_name>WAL3302</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.679366</lat>
    <lon>-95.5614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64901</plant_id>
    <plant_name>WAL3320</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.260742</lat>
    <lon>-98.31586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64902</plant_id>
    <plant_name>WAL3390</plant_name>
    <state>TX</state>
    <county>Montgomery</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.190279</lat>
    <lon>-95.58949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64922</plant_id>
    <plant_name>WAL3406</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.959048</lat>
    <lon>-96.81664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64923</plant_id>
    <plant_name>WAL3425</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.630428</lat>
    <lon>-95.23743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64924</plant_id>
    <plant_name>WAL3432</plant_name>
    <state>TX</state>
    <county>Dallas</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.592923</lat>
    <lon>-96.87984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64925</plant_id>
    <plant_name>WAL3500</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.80599</lat>
    <lon>-95.1652</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64933</plant_id>
    <plant_name>WAL3518</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.612565</lat>
    <lon>-99.47183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64935</plant_id>
    <plant_name>WAL3584</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.72355</lat>
    <lon>-95.46539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64936</plant_id>
    <plant_name>WAL3631</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.576636</lat>
    <lon>-97.33851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64937</plant_id>
    <plant_name>WAL3773</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.765261</lat>
    <lon>-97.48378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64939</plant_id>
    <plant_name>WAL3827</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.690142</lat>
    <lon>-95.77462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64940</plant_id>
    <plant_name>WAL3886</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.267703</lat>
    <lon>-98.20455</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64942</plant_id>
    <plant_name>WAL4298</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.936325</lat>
    <lon>-95.25261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64943</plant_id>
    <plant_name>WAL4509</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.677829</lat>
    <lon>-97.46773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64944</plant_id>
    <plant_name>WAL4512</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.818196</lat>
    <lon>-95.76796</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64945</plant_id>
    <plant_name>WAL4526</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.829831</lat>
    <lon>-95.37727</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64946</plant_id>
    <plant_name>WAL4538</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.803665</lat>
    <lon>-95.72045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64947</plant_id>
    <plant_name>WAL5045</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.014278</lat>
    <lon>-95.59499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64948</plant_id>
    <plant_name>WAL5080</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>32.847939</lat>
    <lon>-97.18405</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64949</plant_id>
    <plant_name>WAL5091</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.975997</lat>
    <lon>-95.69735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64950</plant_id>
    <plant_name>WAL5116</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>29.664286</lat>
    <lon>-95.0983</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64951</plant_id>
    <plant_name>WAL5165</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>26.191785</lat>
    <lon>-98.12831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64953</plant_id>
    <plant_name>WAL5287</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>30.077307</lat>
    <lon>-95.51277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64955</plant_id>
    <plant_name>WAL5312</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.774643</lat>
    <lon>-97.2918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64956</plant_id>
    <plant_name>WAL5316</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.882111</lat>
    <lon>-97.38759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64958</plant_id>
    <plant_name>WAL5479</plant_name>
    <state>TX</state>
    <county>Travis</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.453115</lat>
    <lon>-97.60604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64959</plant_id>
    <plant_name>WAL5480</plant_name>
    <state>TX</state>
    <county>Williamson</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.53366</lat>
    <lon>-97.61201</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64960</plant_id>
    <plant_name>WAL5612</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.716069</lat>
    <lon>-95.31303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64961</plant_id>
    <plant_name>WAL5713</plant_name>
    <state>TX</state>
    <county>Webb</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>27.610637</lat>
    <lon>-99.46222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64962</plant_id>
    <plant_name>WAL5764</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.967341</lat>
    <lon>-97.41198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64963</plant_id>
    <plant_name>WAL6929</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Walmart Stores Texas, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>31.11497</lat>
    <lon>-97.41444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65026</plant_id>
    <plant_name>HEB00292</plant_name>
    <state>TX</state>
    <county>Matagorda</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>28.982463</lat>
    <lon>-95.95846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65135</plant_id>
    <plant_name>ER Bone Hill Solar, LLC</plant_name>
    <state>VT</state>
    <county>Washington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.1257</lat>
    <lon>-72.65681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65167</plant_id>
    <plant_name>Hudson County Solar</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.72762</lat>
    <lon>-74.10803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65176</plant_id>
    <plant_name>WW-DC Solar 1, LLC</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.82568</lat>
    <lon>-77.00205</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65189</plant_id>
    <plant_name>West Village Solar - Array 1Community So</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>CHF-Davis I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>38.542791</lat>
    <lon>-121.7775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65257</plant_id>
    <plant_name>Lineage MS</plant_name>
    <state>MS</state>
    <county>Rankin</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>32.254379</lat>
    <lon>-90.15538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65261</plant_id>
    <plant_name>HEB00020</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.992502</lat>
    <lon>-95.74444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65262</plant_id>
    <plant_name>HEB00028</plant_name>
    <state>TX</state>
    <county>Galveston</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.466105</lat>
    <lon>-95.09527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65263</plant_id>
    <plant_name>HEB00038</plant_name>
    <state>TX</state>
    <county>Hidalgo</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>26.202647</lat>
    <lon>-98.16467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65264</plant_id>
    <plant_name>HEB00054</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.601653</lat>
    <lon>-95.25024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65265</plant_id>
    <plant_name>HEB00057</plant_name>
    <state>TX</state>
    <county>Nueces</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>27.665051</lat>
    <lon>-97.28064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65266</plant_id>
    <plant_name>HEB00070</plant_name>
    <state>TX</state>
    <county>Taylor</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.433318</lat>
    <lon>-99.75832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65267</plant_id>
    <plant_name>HEB00099</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.995329</lat>
    <lon>-95.5766</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65268</plant_id>
    <plant_name>HEB00109</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>29.786159</lat>
    <lon>-95.5394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65269</plant_id>
    <plant_name>HEB00110</plant_name>
    <state>TX</state>
    <county>Fort Bend</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>29.53658</lat>
    <lon>-95.53628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65274</plant_id>
    <plant_name>HEB00182</plant_name>
    <state>TX</state>
    <county>Bell</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>31.07212</lat>
    <lon>-97.3709</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65615</plant_id>
    <plant_name>CA - Madera USD - Madera South HS</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.95</lat>
    <lon>-120.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65637</plant_id>
    <plant_name>Foster Solar</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Foster Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.84242</lat>
    <lon>-71.71459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66152</plant_id>
    <plant_name>Connecticut College</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.38151</lat>
    <lon>-72.10321</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66159</plant_id>
    <plant_name>Cape Girardeau Renewable Energy Center</plant_name>
    <state>MO</state>
    <county>Cape Girardeau</county>
    <operator>Union Electric Co - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.319686</lat>
    <lon>-89.52597</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66406</plant_id>
    <plant_name>AJMS, LLC</plant_name>
    <state>ID</state>
    <county>Lincoln</county>
    <operator>AJMS, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.962333</lat>
    <lon>-114.5172</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66593</plant_id>
    <plant_name>HEB00048</plant_name>
    <state>TX</state>
    <county>Jefferson</county>
    <operator>Entergy Texas Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>30.106498</lat>
    <lon>-94.17041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66594</plant_id>
    <plant_name>HEB00594</plant_name>
    <state>TX</state>
    <county>Montgomery</county>
    <operator>Entergy Texas Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.178935</lat>
    <lon>-95.5381</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66596</plant_id>
    <plant_name>Praxair</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>29.004862</lat>
    <lon>-95.38843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66619</plant_id>
    <plant_name>Lakeview Battery Storage Facility</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AFTW Storage, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>4.6</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.095124</lat>
    <lon>-119.0659</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66819</plant_id>
    <plant_name>Holly Spring Meadows</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.862089</lat>
    <lon>-76.91249</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66906</plant_id>
    <plant_name>Hammonton-High School Solar</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.657218</lat>
    <lon>-74.80896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66965</plant_id>
    <plant_name>Mayhill Solar LLC Community Solar</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.90192</lat>
    <lon>-74.09369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67073</plant_id>
    <plant_name>Case Vander Eyk, Jr Dairy Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Bravo REC Management LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.972788</lat>
    <lon>-119.3943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67294</plant_id>
    <plant_name>Rutgers Cook Douglass Lot 97 &amp; 98a</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Dudley Road Solar Project 2021, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.479292</lat>
    <lon>-74.43709</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67296</plant_id>
    <plant_name>CVEC Round 4 Brewster Captn Golf Course</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Freemans Way Solar Project 2019, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>0.9</battery_mwh>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.732147</lat>
    <lon>-70.01662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67310</plant_id>
    <plant_name>HEB00055</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.938924</lat>
    <lon>-97.13131</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67311</plant_id>
    <plant_name>HEB00760</plant_name>
    <state>TX</state>
    <county>Brazoria</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>29.487596</lat>
    <lon>-95.40516</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67312</plant_id>
    <plant_name>HEB00776</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>29.803572</lat>
    <lon>-95.76053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67313</plant_id>
    <plant_name>HEB00789</plant_name>
    <state>TX</state>
    <county>Denton</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.155153</lat>
    <lon>-96.84633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67314</plant_id>
    <plant_name>HEB00790</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.055367</lat>
    <lon>-96.79668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67315</plant_id>
    <plant_name>HEB00796</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.116616</lat>
    <lon>-96.65308</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67319</plant_id>
    <plant_name>HEB00769</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.553909</lat>
    <lon>-95.15068</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67381</plant_id>
    <plant_name>OTHERTraditionClearfork</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>32.707171</lat>
    <lon>-97.40833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67433</plant_id>
    <plant_name>HEB00794</plant_name>
    <state>TX</state>
    <county>Collin</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>33.175806</lat>
    <lon>-96.72842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67434</plant_id>
    <plant_name>HEB00767</plant_name>
    <state>TX</state>
    <county>Montgomery</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>30.221151</lat>
    <lon>-95.68197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67514</plant_id>
    <plant_name>City of Green Forest (Carroll)</plant_name>
    <state>AR</state>
    <county>Carroll</county>
    <operator>Entegrity Solar Green Forest, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.367396</lat>
    <lon>-93.54285</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67863</plant_id>
    <plant_name>TWC</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Bravo REC Management LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.122809</lat>
    <lon>-119.4477</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68136</plant_id>
    <plant_name>Franklin Park 3-SLCHI803</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.947302</lat>
    <lon>-87.86092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68150</plant_id>
    <plant_name>Allied Potato</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Renewable Solar, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.259196</lat>
    <lon>-118.8819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68238</plant_id>
    <plant_name>Commerce Distribution Center 4-SLLAX113</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.98049</lat>
    <lon>-118.1582</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68523</plant_id>
    <plant_name>Bishop Ranch - BR 8-Q</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Executive Parkway BR8-Q Solar Project 2020 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.768711</lat>
    <lon>-121.9684</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68524</plant_id>
    <plant_name>Bishop Ranch - BR 15-AA</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Alcosta Boulevard BR 15-AA Solar Project 2020 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.77538</lat>
    <lon>-121.9613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68525</plant_id>
    <plant_name>Bishop Ranch - BR 15-CC</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Alcosta Boulevard BR 15-CC Solar Project 2020, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.773323</lat>
    <lon>-121.9602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68614</plant_id>
    <plant_name>Kern Del Oro</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>REC KDO, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.297931</lat>
    <lon>-118.9809</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68730</plant_id>
    <plant_name>HEB00750</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.56722</lat>
    <lon>-97.1148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68731</plant_id>
    <plant_name>HEB00779</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.682168</lat>
    <lon>-95.35447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68732</plant_id>
    <plant_name>HEB00797</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.817229</lat>
    <lon>-95.80365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68733</plant_id>
    <plant_name>HEB00798</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.957375</lat>
    <lon>-95.20735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68734</plant_id>
    <plant_name>HEB00801</plant_name>
    <state>TX</state>
    <county>Tarrant</county>
    <operator>Generate ER-NG, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>32.914505</lat>
    <lon>-97.30894</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68737</plant_id>
    <plant_name>OTHERTraditionBuffalo</plant_name>
    <state>TX</state>
    <county>Harris</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>29.684609</lat>
    <lon>-95.42708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68784</plant_id>
    <plant_name>NY CDG 010</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>NY CDG 010 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.78035</lat>
    <lon>-73.90148</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68788</plant_id>
    <plant_name>JFC Slauson - SLLAX071</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>33.981421</lat>
    <lon>-118.1361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69064</plant_id>
    <plant_name>NCBP TWELVE, LLC</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>38.8713</lat>
    <lon>-76.7339</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69221</plant_id>
    <plant_name>Edison 0203 Community Solar - SLNNJ203</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.522685</lat>
    <lon>-74.4184</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69438</plant_id>
    <plant_name>Prologis Edison 0405 - SLCNJ405 - Community Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>40.517751</lat>
    <lon>-74.41737</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69736</plant_id>
    <plant_name>New Britain - 142 Deming Rd</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.638123</lat>
    <lon>-72.74504</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69751</plant_id>
    <plant_name>HEB_CPS00793</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>Texas Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>3</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>29.734419</lat>
    <lon>-98.68029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69897</plant_id>
    <plant_name>Midline Commerce Center - SLCNJ006</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.121533</lat>
    <lon>-74.71693</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70111</plant_id>
    <plant_name>Kern Co Sheriff</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>TotalEnergies Renewables USA LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <battery_mwh>1.5</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>35.419727</lat>
    <lon>-119.0479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70525</plant_id>
    <plant_name>UE-00301MD, LLC</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Unison Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.981921</lat>
    <lon>-76.86493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70528</plant_id>
    <plant_name>UE-00801MD, LLC</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>Unison Energy LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.608864</lat>
    <lon>-75.83166</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70558</plant_id>
    <plant_name>BD Biosciences - Milpitas, CA</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.2</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.429933</lat>
    <lon>-121.9258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>903</plant_id>
    <plant_name>Rockton</plant_name>
    <state>IL</state>
    <county>Winnebago</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1929</first_year>
    <latest_year>1929</latest_year>
    <lat>42.4511</lat>
    <lon>-89.0756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2230</plant_id>
    <plant_name>Chappell</plant_name>
    <state>NE</state>
    <county>Deuel</county>
    <operator>City of Chappell - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1982</first_year>
    <latest_year>1982</latest_year>
    <lat>41.092589</lat>
    <lon>-102.4715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3041</plant_id>
    <plant_name>Wallowa Falls</plant_name>
    <state>OR</state>
    <county>Wallowa</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1921</latest_year>
    <lat>45.266702</lat>
    <lon>-117.2127</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3750</plant_id>
    <plant_name>Canaan</plant_name>
    <state>VT</state>
    <county>Essex</county>
    <operator>Central Rivers Power NH, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1927</first_year>
    <latest_year>1927</latest_year>
    <lat>44.999274</lat>
    <lon>-71.53016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4044</plant_id>
    <plant_name>Oconto Falls Upper</plant_name>
    <state>WI</state>
    <county>Oconto</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1918</first_year>
    <latest_year>1924</latest_year>
    <lat>44.8764</lat>
    <lon>-88.1475</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6484</plant_id>
    <plant_name>Bend</plant_name>
    <state>OR</state>
    <county>Deschutes</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1913</first_year>
    <latest_year>1917</latest_year>
    <lat>44.062326</lat>
    <lon>-121.3133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7060</plant_id>
    <plant_name>Sibley No Two</plant_name>
    <state>IA</state>
    <county>Osceola</county>
    <operator>City of Sibley - (IA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>43.396851</lat>
    <lon>-95.74966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7503</plant_id>
    <plant_name>Unalaska Power Module</plant_name>
    <state>AK</state>
    <county>Aleutians West</county>
    <operator>City of Unalaska - (AK)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1993</latest_year>
    <lat>53.863993</lat>
    <lon>-166.5126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7583</plant_id>
    <plant_name>Talcville</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.3083</lat>
    <lon>-75.3083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10708</plant_id>
    <plant_name>Lost Creek I</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Snow Mountain Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>40.7576</lat>
    <lon>-121.4145</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10709</plant_id>
    <plant_name>Ponderosa Bailey Creek</plant_name>
    <state>CA</state>
    <county>Tehama</county>
    <operator>Snow Mountain Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>40.4579</lat>
    <lon>-121.8427</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10853</plant_id>
    <plant_name>Center Falls</plant_name>
    <state>NY</state>
    <county>Washington</county>
    <operator>Hollingworth &amp; Vose Co Center Falls</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1984</latest_year>
    <lat>43.096677</lat>
    <lon>-73.46017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50190</plant_id>
    <plant_name>Domtar Paper Company Rothschild</plant_name>
    <state>WI</state>
    <county>Marathon</county>
    <operator>Domtar Paper Company Rothschild</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1910</first_year>
    <latest_year>1910</latest_year>
    <lat>44.8867</lat>
    <lon>-89.6272</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50539</plant_id>
    <plant_name>Boltonville Hydro Associates</plant_name>
    <state>VT</state>
    <county>Orange</county>
    <operator>Boltonville Hydro Associates</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1984</first_year>
    <latest_year>1989</latest_year>
    <lat>44.1706</lat>
    <lon>-72.0994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54124</plant_id>
    <plant_name>Pittsfield Hydro</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>KEI (Maine) Power Management (II) LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.721371</lat>
    <lon>-69.41199</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54327</plant_id>
    <plant_name>Toyon Power Station</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Toyon Landfill Gas Conversion, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.146253</lat>
    <lon>-118.3049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54816</plant_id>
    <plant_name>Riverwood 100 Building</plant_name>
    <state>GA</state>
    <county>Cobb</county>
    <operator>Highwoods Properties</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>33.8775</lat>
    <lon>-84.4603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57054</plant_id>
    <plant_name>Upper Kalskag</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>61.526858</lat>
    <lon>-160.3481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57059</plant_id>
    <plant_name>Koyuk</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>64.932089</lat>
    <lon>-161.1671</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57060</plant_id>
    <plant_name>Elim</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2003</first_year>
    <latest_year>2024</latest_year>
    <lat>64.616558</lat>
    <lon>-162.2637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57065</plant_id>
    <plant_name>Kivalina</plant_name>
    <state>AK</state>
    <county>Northwest Arctic</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>4</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1977</first_year>
    <latest_year>2023</latest_year>
    <lat>67.726644</lat>
    <lon>-164.5384</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57100</plant_id>
    <plant_name>Santa Maria LFG Power Plant</plant_name>
    <state>CA</state>
    <county>Santa Barbara</county>
    <operator>J&amp;A-Santa Maria LLC</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>34.9537</lat>
    <lon>-120.4142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57313</plant_id>
    <plant_name>Metro Support Services Center Solar</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles County Metropolitan Transportation Authority</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2005</first_year>
    <latest_year>2005</latest_year>
    <lat>34.0578</lat>
    <lon>-118.2297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57460</plant_id>
    <plant_name>Caltech Central</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy 2009 PPA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>11</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>34.1358</lat>
    <lon>-118.1267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57524</plant_id>
    <plant_name>Roger Road WWTP</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>SunE M5C Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>32.2894</lat>
    <lon>-111.0331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57655</plant_id>
    <plant_name>Bakersfield College Solar 01</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Kern Community College District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.411817</lat>
    <lon>-118.9686</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57683</plant_id>
    <plant_name>Staples La Mirada, CA</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>SunE WF3-ST Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>33.881667</lat>
    <lon>-118.0175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57734</plant_id>
    <plant_name>Cherry Hill</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>NFI Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>39.876111</lat>
    <lon>-75.00861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57742</plant_id>
    <plant_name>Vineland Headquarters</plant_name>
    <state>NJ</state>
    <county>Cumberland</county>
    <operator>NFI Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.490271</lat>
    <lon>-75.03739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57809</plant_id>
    <plant_name>Franklin Templeton San Mateo</plant_name>
    <state>CA</state>
    <county>San Mateo</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>37.5425</lat>
    <lon>-122.2928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57824</plant_id>
    <plant_name>Onalaska Campus Landfill Biogas</plant_name>
    <state>WI</state>
    <county>La Crosse</county>
    <operator>Gundersen Lutheran Biogas I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>43.873889</lat>
    <lon>-91.18</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57840</plant_id>
    <plant_name>ISH Solar Hospital SDMC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Kaiser Permanente</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.791667</lat>
    <lon>-117.0953</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57841</plant_id>
    <plant_name>ISH Solar Hospital Downey</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Kaiser Permanente</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.921667</lat>
    <lon>-118.1244</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57893</plant_id>
    <plant_name>Martinsville LFG Generator</plant_name>
    <state>VA</state>
    <county>Henry</county>
    <operator>City of Martinsville - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>36.717222</lat>
    <lon>-79.84528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57895</plant_id>
    <plant_name>Improvement Dst No. 4</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Kern County Water Agency - (CA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>35.402778</lat>
    <lon>-119.0386</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57982</plant_id>
    <plant_name>Meridian Vineyards</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.670278</lat>
    <lon>-120.5669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57992</plant_id>
    <plant_name>Boston Scientific Solar</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.293333</lat>
    <lon>-71.03389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58047</plant_id>
    <plant_name>PPG Monroeville Chemicals Center</plant_name>
    <state>PA</state>
    <county>Allegheny</county>
    <operator>PPG Monroeville Chemicals Center</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1998</first_year>
    <latest_year>2000</latest_year>
    <lat>40.442222</lat>
    <lon>-79.73111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58070</plant_id>
    <plant_name>Mercer Mall</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>FRIT Solar Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.290556</lat>
    <lon>-74.68194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58257</plant_id>
    <plant_name>Upper Pacolet Hydro</plant_name>
    <state>SC</state>
    <county>Spartanburg</county>
    <operator>Lockhart Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.921389</lat>
    <lon>-81.74556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58292</plant_id>
    <plant_name>Jewish Community Center PV</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.603056</lat>
    <lon>-111.9247</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58302</plant_id>
    <plant_name>Life Technologies Carlsbad</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.137222</lat>
    <lon>-117.2869</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58384</plant_id>
    <plant_name>Fargo Drop</plant_name>
    <state>ID</state>
    <county>Canyon</county>
    <operator>Boise Project Board of Control</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>43.625</lat>
    <lon>-116.8997</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58470</plant_id>
    <plant_name>C-Drop Hydro</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>C-Drop</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.165833</lat>
    <lon>-121.685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58524</plant_id>
    <plant_name>Neuse River Solar Farm</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.714444</lat>
    <lon>-78.49889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58708</plant_id>
    <plant_name>Phoenix Airport East Economy Lot</plant_name>
    <state>AZ</state>
    <county>Maricopa</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.4345</lat>
    <lon>-111.9842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59057</plant_id>
    <plant_name>Skillman</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Kenvue Brands LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.574444</lat>
    <lon>-74.64806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59116</plant_id>
    <plant_name>Woodbine Landfill Plant</plant_name>
    <state>NJ</state>
    <county>Cape May</county>
    <operator>Cape May County Municipal - (NJ)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.231111</lat>
    <lon>-74.78083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59131</plant_id>
    <plant_name>Dartmouth Landfill</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.581111</lat>
    <lon>-70.99806</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59136</plant_id>
    <plant_name>Methuen Landfill</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.744722</lat>
    <lon>-71.175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59279</plant_id>
    <plant_name>Life Technologies - Pleasanton</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.643889</lat>
    <lon>-121.8842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59280</plant_id>
    <plant_name>Kellogg's - San Jose</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.356389</lat>
    <lon>-121.8719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59482</plant_id>
    <plant_name>IMPA Tell City Solar Park</plant_name>
    <state>IN</state>
    <county>Perry</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.946111</lat>
    <lon>-86.7375</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59573</plant_id>
    <plant_name>Tisbury Landfill Solar</plant_name>
    <state>MA</state>
    <county>Dukes</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.444722</lat>
    <lon>-70.61306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59802</plant_id>
    <plant_name>Maxim</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.405689</lat>
    <lon>-121.9494</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59803</plant_id>
    <plant_name>Pixar - Emeryville</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.83286</lat>
    <lon>-122.284</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59981</plant_id>
    <plant_name>New Castle Solar RES</plant_name>
    <state>IN</state>
    <county>Henry</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.854126</lat>
    <lon>-85.40342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59982</plant_id>
    <plant_name>Scotland Solar RES</plant_name>
    <state>IN</state>
    <county>Greene</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.9099</lat>
    <lon>-86.9473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59983</plant_id>
    <plant_name>New Haven Solar RES</plant_name>
    <state>IN</state>
    <county>Spencer</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.1941</lat>
    <lon>-86.9889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59984</plant_id>
    <plant_name>Lanesville Solar RES</plant_name>
    <state>IN</state>
    <county>Harrison</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.2717</lat>
    <lon>-85.9864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59985</plant_id>
    <plant_name>Ellettsville Solar RES</plant_name>
    <state>IN</state>
    <county>Monroe</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.25482</lat>
    <lon>-86.6568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59986</plant_id>
    <plant_name>Henryville Solar RES</plant_name>
    <state>IN</state>
    <county>Clark</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.5955</lat>
    <lon>-85.7773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59987</plant_id>
    <plant_name>Spring Mill Solar RES</plant_name>
    <state>IN</state>
    <county>Lawrence</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.709545</lat>
    <lon>-86.46968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59988</plant_id>
    <plant_name>Decatur Co. Solar RES (IN)</plant_name>
    <state>IN</state>
    <county>Decatur</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.337893</lat>
    <lon>-85.5064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59989</plant_id>
    <plant_name>Jackson Co. Solar RES</plant_name>
    <state>IN</state>
    <county>Jackson</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.881719</lat>
    <lon>-86.03297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59990</plant_id>
    <plant_name>Johnson Co. Solar RES</plant_name>
    <state>IN</state>
    <county>Johnson</county>
    <operator>Hoosier Energy R E C, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.518026</lat>
    <lon>-86.06835</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60029</plant_id>
    <plant_name>CES VMT Solar</plant_name>
    <state>MD</state>
    <county>Washington</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.680865</lat>
    <lon>-77.72712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60223</plant_id>
    <plant_name>Equinix San Jose</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.241713</lat>
    <lon>-121.7814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60224</plant_id>
    <plant_name>Intel Santa Clara</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>37.384745</lat>
    <lon>-121.9638</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60243</plant_id>
    <plant_name>Ambler</plant_name>
    <state>AK</state>
    <county>Northwest Arctic</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1990</first_year>
    <latest_year>2020</latest_year>
    <lat>67.08798</lat>
    <lon>-157.8567</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60244</plant_id>
    <plant_name>Marshall</plant_name>
    <state>AK</state>
    <county>Kusilvak</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1994</first_year>
    <latest_year>2010</latest_year>
    <lat>61.878186</lat>
    <lon>-162.0851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60450</plant_id>
    <plant_name>Corcoran</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.102307</lat>
    <lon>-119.5665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60846</plant_id>
    <plant_name>US GSA - Sacramento</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.601354</lat>
    <lon>-121.3979</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60881</plant_id>
    <plant_name>Bernhardt Furniture Solar Farm</plant_name>
    <state>NC</state>
    <county>Caldwell</county>
    <operator>Bernhardt Furniture Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>35.84995</lat>
    <lon>-81.54086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60891</plant_id>
    <plant_name>Liberty Pole DPC Solar</plant_name>
    <state>WI</state>
    <county>Vernon</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.49412</lat>
    <lon>-90.9071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61211</plant_id>
    <plant_name>IKEA Memphis 508</plant_name>
    <state>TN</state>
    <county>Shelby</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>35.189991</lat>
    <lon>-89.7993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61319</plant_id>
    <plant_name>Port of LA Solar FiT Project</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.727977</lat>
    <lon>-118.28</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61358</plant_id>
    <plant_name>IGS Solar I - BWI5</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.27</lat>
    <lon>-76.548</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61619</plant_id>
    <plant_name>CDCR (CA) - Solano State Prison</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>SunE Solano SP Owner, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.32272</lat>
    <lon>-121.9706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61628</plant_id>
    <plant_name>Kilroy Solar</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.936137</lat>
    <lon>-117.2342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61647</plant_id>
    <plant_name>ENO Paterson Solar</plant_name>
    <state>LA</state>
    <county>Orleans</county>
    <operator>Entergy New Orleans, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>30.011409</lat>
    <lon>-90.02397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61744</plant_id>
    <plant_name>L'Oreal Solar - Florence</plant_name>
    <state>KY</state>
    <county>Boone</county>
    <operator>L'Oreal USA Products Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.987696</lat>
    <lon>-84.60817</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61820</plant_id>
    <plant_name>IKEA New Haven Rooftop PV &amp; Fuel Cell</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Other Natural Gas</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2016</latest_year>
    <lat>41.295715</lat>
    <lon>-72.91995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61843</plant_id>
    <plant_name>SeaWorld Aquatica</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.586536</lat>
    <lon>-117.0049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61909</plant_id>
    <plant_name>Parkview Battery</plant_name>
    <state>MI</state>
    <county>Kalamazoo</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.26</lat>
    <lon>-85.64972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62075</plant_id>
    <plant_name>Pima Community College</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>32.166494</lat>
    <lon>-110.8167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62076</plant_id>
    <plant_name>Town of Branford</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.28114</lat>
    <lon>-72.81028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62090</plant_id>
    <plant_name>Sunderland Solar PV</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.429126</lat>
    <lon>-72.53989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62139</plant_id>
    <plant_name>Huneke II CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.297154</lat>
    <lon>-92.74155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62236</plant_id>
    <plant_name>Luz Solar</plant_name>
    <state>SC</state>
    <county>Darlington</county>
    <operator>Luz Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.370203</lat>
    <lon>-80.0273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62266</plant_id>
    <plant_name>Plymouth Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>NSTAR Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.94726</lat>
    <lon>-70.68843</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62569</plant_id>
    <plant_name>Knoxville Battery Energy Storage</plant_name>
    <state>IA</state>
    <county>Marion</county>
    <operator>MidAmerican Energy Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <battery_mwh>4</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.315962</lat>
    <lon>-93.06097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62589</plant_id>
    <plant_name>Montefiore Mount Vernon Hospital</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Montefiore Mount Vernon Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1976</first_year>
    <latest_year>1976</latest_year>
    <lat>40.902825</lat>
    <lon>-73.86874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62741</plant_id>
    <plant_name>Mount Joy Wire</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Mount Joy Wire Corp</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.10846</lat>
    <lon>-76.47673</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62785</plant_id>
    <plant_name>Malone Solar Site</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.870858</lat>
    <lon>-74.30725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62794</plant_id>
    <plant_name>Centerville Solar Park</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.828501</lat>
    <lon>-85.00377</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63023</plant_id>
    <plant_name>Jefferson Torresdale Hospital</plant_name>
    <state>PA</state>
    <county>Philadelphia</county>
    <operator>Jefferson Torresdale Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>40.071128</lat>
    <lon>-74.98306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63256</plant_id>
    <plant_name>Pembroke Lakes Mall</plant_name>
    <state>FL</state>
    <county>Broward</county>
    <operator>Pembroke Lakes Mall</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>26.0106</lat>
    <lon>-80.3046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63289</plant_id>
    <plant_name>White Marsh Mall</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>White Marsh Mall</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.37614</lat>
    <lon>-76.46813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63484</plant_id>
    <plant_name>Gohman Community Solar (CSG)</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.435683</lat>
    <lon>-94.0448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63511</plant_id>
    <plant_name>Mohonasen Central School District</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.767228</lat>
    <lon>-73.95685</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63587</plant_id>
    <plant_name>SR Skylark C</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Skylark C, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.575118</lat>
    <lon>-104.8958</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63648</plant_id>
    <plant_name>NHH003 Clarkson Fuel Cell</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.65653</lat>
    <lon>-73.94278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63654</plant_id>
    <plant_name>Sheriff Road</plant_name>
    <state>MD</state>
    <county>Prince Georges</county>
    <operator>Sheriff Rd Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.911287</lat>
    <lon>-76.89488</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63711</plant_id>
    <plant_name>JSR000 N Mathilda Fuel Cell</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>37.4124</lat>
    <lon>-122.024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63772</plant_id>
    <plant_name>Adirondack Solar</plant_name>
    <state>NY</state>
    <county>Clinton</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.893641</lat>
    <lon>-73.84173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64096</plant_id>
    <plant_name>Samuel Mickle School</plant_name>
    <state>NJ</state>
    <county>Gloucester</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.78736</lat>
    <lon>-75.24615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64195</plant_id>
    <plant_name>701 Carnegie Center</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.32358</lat>
    <lon>-74.64994</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64226</plant_id>
    <plant_name>Curry Solar</plant_name>
    <state>GA</state>
    <county>Tattnall</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>32.038819</lat>
    <lon>-82.14032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64241</plant_id>
    <plant_name>Maryland Bioenergy Center (Jessup)</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Bioenergy DevCo</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.1578</lat>
    <lon>-76.78042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64422</plant_id>
    <plant_name>GSPP Onyx New Brunswick LLC</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>4</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.48071</lat>
    <lon>-74.48185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64509</plant_id>
    <plant_name>South River H4 Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Sampson</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.04247</lat>
    <lon>-78.58698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64513</plant_id>
    <plant_name>Wake RJ3 Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.953947</lat>
    <lon>-78.42402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64523</plant_id>
    <plant_name>Atascadero State Hospital</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>35.463333</lat>
    <lon>-120.634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64692</plant_id>
    <plant_name>Fredonia Solar LLC</plant_name>
    <state>NY</state>
    <county>Chautauqua</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.453047</lat>
    <lon>-79.3408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64918</plant_id>
    <plant_name>NorthropGrummanSolar(Rolling Meadows,IL)</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>DG Illinois Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.09972</lat>
    <lon>-88.03104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65029</plant_id>
    <plant_name>Bissell Solar and Battery Generator</plant_name>
    <state>MI</state>
    <county>Kent</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <battery_mwh>0.5</battery_mwh>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.007</lat>
    <lon>-85.724</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65068</plant_id>
    <plant_name>Walkerton</plant_name>
    <state>IN</state>
    <county>St Joseph</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.455468</lat>
    <lon>-86.48736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65177</plant_id>
    <plant_name>Donaghy-Stockton</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Donaghy Sales Inc.</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.909523</lat>
    <lon>-121.1949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65384</plant_id>
    <plant_name>Rancho Cordova Medical Offices</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>KP Rancho Cordova Medical Offices Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.576571</lat>
    <lon>-121.291</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65468</plant_id>
    <plant_name>Highland Park Borough Solar</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <battery_mwh>2.1</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.4966</lat>
    <lon>-74.41746</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65766</plant_id>
    <plant_name>Dover Dairy</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Renewable Solar, Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>36.415526</lat>
    <lon>-119.5537</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65958</plant_id>
    <plant_name>WMATA - Anacostia CSG</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.86499</lat>
    <lon>-76.99401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66049</plant_id>
    <plant_name>Salvation Army Solar</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>39.95526</lat>
    <lon>-75.10218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66458</plant_id>
    <plant_name>Redlands Community Hospital</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.03625</lat>
    <lon>-117.2062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66730</plant_id>
    <plant_name>Jordan Energy-DFA Middlebury Center Plan</plant_name>
    <state>PA</state>
    <county>Tioga</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.838</lat>
    <lon>-77.2759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67277</plant_id>
    <plant_name>Bishop Ranch - BR 15-DD</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>Alcosta Boulevard BR 15-DD Solar Project 2020, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>3</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>37.7729</lat>
    <lon>-121.9595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67456</plant_id>
    <plant_name>700 Binnewater</plant_name>
    <state>NY</state>
    <county>Ulster</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.849012</lat>
    <lon>-74.08993</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67469</plant_id>
    <plant_name>GSPP NESV, LLC</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.9267</lat>
    <lon>-71.31772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68151</plant_id>
    <plant_name>Mountain View Ind Park 1-sline001</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.050209</lat>
    <lon>-117.4604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68235</plant_id>
    <plant_name>Romeoville 34 - SLCHI234 - BSCHI234</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.597</lat>
    <lon>-88.11</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68265</plant_id>
    <plant_name>South County Detention Center Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.039</lat>
    <lon>-119.061</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68267</plant_id>
    <plant_name>Government Plaza Solar</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.278</lat>
    <lon>-119.317</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68279</plant_id>
    <plant_name>NCS FCPA LLC</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>New Columbia Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.89146</lat>
    <lon>-76.9403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68610</plant_id>
    <plant_name>Whitfield Cooper</plant_name>
    <state>GA</state>
    <county>Whitfield</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>34.952825</lat>
    <lon>-84.94459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68624</plant_id>
    <plant_name>Sutter Home Winery GIR</plant_name>
    <state>CA</state>
    <county>Napa</county>
    <operator>Westbound Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.193407</lat>
    <lon>-122.2604</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68630</plant_id>
    <plant_name>Sutter Home Winery TCC</plant_name>
    <state>CA</state>
    <county>San Luis Obispo</county>
    <operator>REC SHW, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>35.735606</lat>
    <lon>-120.6853</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68791</plant_id>
    <plant_name>Chatsworth Industrial Center 1-SLLAX601</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>34.241957</lat>
    <lon>-118.6029</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68796</plant_id>
    <plant_name>Stockton 6 - SLEBA202</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>37.896708</lat>
    <lon>-121.2602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68882</plant_id>
    <plant_name>SAE Taylorville IL S1</plant_name>
    <state>IL</state>
    <county>Christian</county>
    <operator>SolAmerica Energy, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.528101</lat>
    <lon>-89.32002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69049</plant_id>
    <plant_name>MD - WL Gore - Appleton</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>Solar DG MD Appleton, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.64352</lat>
    <lon>-75.80562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69118</plant_id>
    <plant_name>LL Scranton PA</plant_name>
    <state>PA</state>
    <county>Lackawanna</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.399167</lat>
    <lon>-75.67194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69128</plant_id>
    <plant_name>Chesapeake Beach BESS</plant_name>
    <state>MD</state>
    <county>Calvert</county>
    <operator>Chesapeake Beach BESS LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <battery_mwh>2.3</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.649894</lat>
    <lon>-76.53025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69580</plant_id>
    <plant_name>Lone Wolfe Phase One</plant_name>
    <state>TX</state>
    <county>Mitchell</county>
    <operator>Heritage Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>32.390278</lat>
    <lon>-100.7243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69671</plant_id>
    <plant_name>Glendale Hydroelectric Project</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Relevate Power Management LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>5</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1995</first_year>
    <latest_year>2014</latest_year>
    <lat>42.28013</lat>
    <lon>-73.34945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69712</plant_id>
    <plant_name>San Diego Sockers</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Hero Drive Solar Project 2023, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic; Batteries</technologies>
    <generators>2</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.207588</lat>
    <lon>-117.3147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70209</plant_id>
    <plant_name>Vertiv Solar</plant_name>
    <state>OH</state>
    <county>Delaware</county>
    <operator>Onsite Partners Projectco, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>40.282018</lat>
    <lon>-83.10211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70368</plant_id>
    <plant_name>Ranch 4220</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1.1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.60601</lat>
    <lon>-119.1369</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>162</plant_id>
    <plant_name>Hickman</plant_name>
    <state>CA</state>
    <county>Stanislaus</county>
    <operator>Turlock Irrigation District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>37.621536</lat>
    <lon>-120.7462</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>180</plant_id>
    <plant_name>Volta 2</plant_name>
    <state>CA</state>
    <county>Shasta</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>40.45193</lat>
    <lon>-121.8622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>214</plant_id>
    <plant_name>Alta Powerhouse</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>Pacific Gas &amp; Electric Co.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1902</first_year>
    <latest_year>1902</latest_year>
    <lat>39.215979</lat>
    <lon>-120.8036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>378</plant_id>
    <plant_name>Prairie River</plant_name>
    <state>MN</state>
    <county>Itasca</county>
    <operator>ALLETE, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>1920</first_year>
    <latest_year>1920</latest_year>
    <lat>47.287206</lat>
    <lon>-93.49827</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>495</plant_id>
    <plant_name>Ruxton Park</plant_name>
    <state>CO</state>
    <county>El Paso</county>
    <operator>City of Colorado Springs - (CO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>38.841354</lat>
    <lon>-104.9738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>774</plant_id>
    <plant_name>Waiau Hydro</plant_name>
    <state>HI</state>
    <county>Hawaii</county>
    <operator>Hawaii Electric Light Co Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1928</latest_year>
    <lat>19.7203</lat>
    <lon>-155.1189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>839</plant_id>
    <plant_name>Scott Flat</plant_name>
    <state>CA</state>
    <county>Nevada</county>
    <operator>Nevada Irrigation District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>39.272108</lat>
    <lon>-120.9325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1821</plant_id>
    <plant_name>Crystal Falls</plant_name>
    <state>MI</state>
    <county>Iron</county>
    <operator>City of Crystal Falls - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1954</latest_year>
    <lat>46.106278</lat>
    <lon>-88.33453</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>1943</plant_id>
    <plant_name>Hoot Lake</plant_name>
    <state>MN</state>
    <county>Otter Tail</county>
    <operator>Otter Tail Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1914</first_year>
    <latest_year>1914</latest_year>
    <lat>46.290641</lat>
    <lon>-96.04325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2141</plant_id>
    <plant_name>Macon</plant_name>
    <state>MO</state>
    <county>Macon</county>
    <operator>City of Macon - (MO)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>39.7378</lat>
    <lon>-92.4689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2225</plant_id>
    <plant_name>Campbell Village</plant_name>
    <state>NE</state>
    <county>Franklin</county>
    <operator>Village of Campbell - (NE)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>40.2992</lat>
    <lon>-98.7331</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2573</plant_id>
    <plant_name>Heuvelton</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1924</first_year>
    <latest_year>1924</latest_year>
    <lat>44.6172</lat>
    <lon>-75.4042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2583</plant_id>
    <plant_name>Macomb</plant_name>
    <state>NY</state>
    <county>Franklin</county>
    <operator>Erie Boulevard Hydropower LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1940</first_year>
    <latest_year>1940</latest_year>
    <lat>44.877326</lat>
    <lon>-74.30629</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>2745</plant_id>
    <plant_name>Franklin (NC)</plant_name>
    <state>NC</state>
    <county>Macon</county>
    <operator>Northbrook Carolina Hydro II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1925</first_year>
    <latest_year>1925</latest_year>
    <lat>35.2194</lat>
    <lon>-83.3708</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3035</plant_id>
    <plant_name>Prospect 4</plant_name>
    <state>OR</state>
    <county>Jackson</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>1944</first_year>
    <latest_year>1944</latest_year>
    <lat>42.733073</lat>
    <lon>-122.5151</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3659</plant_id>
    <plant_name>Stairs</plant_name>
    <state>UT</state>
    <county>Salt Lake</county>
    <operator>PacifiCorp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>1912</first_year>
    <latest_year>1912</latest_year>
    <lat>40.6236</lat>
    <lon>-111.7533</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3676</plant_id>
    <plant_name>Manti Upper</plant_name>
    <state>UT</state>
    <county>Sanpete</county>
    <operator>City of Manti - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>39.255911</lat>
    <lon>-111.6215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3688</plant_id>
    <plant_name>Bartholomew</plant_name>
    <state>UT</state>
    <county>Utah</county>
    <operator>City of Springville - (UT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1988</first_year>
    <latest_year>1988</latest_year>
    <lat>40.167136</lat>
    <lon>-111.4995</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3743</plant_id>
    <plant_name>West Danville 15</plant_name>
    <state>VT</state>
    <county>Caledonia</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1917</first_year>
    <latest_year>1917</latest_year>
    <lat>44.4056</lat>
    <lon>-72.1881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3827</plant_id>
    <plant_name>Radford</plant_name>
    <state>VA</state>
    <county>Pulaski</county>
    <operator>City of Radford - (VA)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1934</first_year>
    <latest_year>1934</latest_year>
    <lat>37.078366</lat>
    <lon>-80.57273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>3989</plant_id>
    <plant_name>White River (WI)</plant_name>
    <state>WI</state>
    <county>Ashland</county>
    <operator>Northern States Power Co - Minnesota</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <first_year>1907</first_year>
    <latest_year>1907</latest_year>
    <lat>46.498333</lat>
    <lon>-90.90389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4019</plant_id>
    <plant_name>Danbury Dam</plant_name>
    <state>WI</state>
    <county>Burnett</county>
    <operator>Zero6 Energy Hydro</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1921</first_year>
    <latest_year>1950</latest_year>
    <lat>46</lat>
    <lon>-92.3725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4139</plant_id>
    <plant_name>Viola</plant_name>
    <state>WI</state>
    <county>Richland</county>
    <operator>Village of Viola - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1.8</summer_mw>
    <first_year>2002</first_year>
    <latest_year>2002</latest_year>
    <lat>43.507</lat>
    <lon>-90.669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4147</plant_id>
    <plant_name>Stiles</plant_name>
    <state>WI</state>
    <county>Oconto</county>
    <operator>Oconto Electric Cooperative</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>1949</first_year>
    <latest_year>1949</latest_year>
    <lat>44.8747</lat>
    <lon>-88.1586</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6544</plant_id>
    <plant_name>Dam No. 5 Hydro Station</plant_name>
    <state>WV</state>
    <county>Berkeley</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1919</first_year>
    <latest_year>1919</latest_year>
    <lat>39.605</lat>
    <lon>-77.92306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7051</plant_id>
    <plant_name>Wrightsville Hydro Plant</plant_name>
    <state>VT</state>
    <county>Washington</county>
    <operator>Washington Electric Coop - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>44.309693</lat>
    <lon>-72.57531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7259</plant_id>
    <plant_name>Skookumchuck</plant_name>
    <state>WA</state>
    <county>Thurston</county>
    <operator>TransAlta Centralia Gen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1990</first_year>
    <latest_year>1990</latest_year>
    <lat>46.7844</lat>
    <lon>-122.7197</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7414</plant_id>
    <plant_name>Thorne Bay Plant</plant_name>
    <state>AK</state>
    <county>Prince of Wales Ketchikan</county>
    <operator>Alaska Power and Telephone Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>1993</first_year>
    <latest_year>1996</latest_year>
    <lat>55.68586</lat>
    <lon>-132.5289</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>7878</plant_id>
    <plant_name>Wellington</plant_name>
    <state>OH</state>
    <county>Lorain</county>
    <operator>American Mun Power-Ohio, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1998</first_year>
    <latest_year>1998</latest_year>
    <lat>41.163069</lat>
    <lon>-82.22721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10081</plant_id>
    <plant_name>Strontia Springs Hydro Plant</plant_name>
    <state>CO</state>
    <county>Douglas</county>
    <operator>Denver City &amp; County of - (CO)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>39.4326</lat>
    <lon>-105.1263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10124</plant_id>
    <plant_name>Hollow Dam Power Partnership</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Ampersand Hollow Dam Hydro LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.296453</lat>
    <lon>-75.33614</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10787</plant_id>
    <plant_name>Piedmont Hydro Power Project</plant_name>
    <state>SC</state>
    <county>Greenville</county>
    <operator>Central Rivers Power US, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1989</first_year>
    <latest_year>1989</latest_year>
    <lat>34.702021</lat>
    <lon>-82.4621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>10817</plant_id>
    <plant_name>Port Leyden Hydroelectric Project</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Lyonsdale Hydroelectric Co., Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.583611</lat>
    <lon>-75.33917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50136</plant_id>
    <plant_name>South Oaks Hospital</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>South Oak Hospital</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>5</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>40.6853</lat>
    <lon>-73.4258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50233</plant_id>
    <plant_name>San Dimas Wash Generating Station</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>San Gabriel Valley Mun Wtr Dt</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>34.124171</lat>
    <lon>-117.8051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50688</plant_id>
    <plant_name>Gardiner</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>KEI (Maine) Power Management (III) LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>44.221796</lat>
    <lon>-69.78568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50699</plant_id>
    <plant_name>Pumpkin Hill</plant_name>
    <state>ME</state>
    <county>Penobscot</county>
    <operator>KEI (Maine) Power Management (II) LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>45.1868</lat>
    <lon>-68.4649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>50718</plant_id>
    <plant_name>GeoBon II</plant_name>
    <state>ID</state>
    <county>Lincoln</county>
    <operator>Koosh, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>42.954384</lat>
    <lon>-114.4626</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>51008</plant_id>
    <plant_name>Enterprise Sugar Factory</plant_name>
    <state>LA</state>
    <county>Iberia</county>
    <operator>M.A. Patout &amp; Son Limited, LLC</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>AB</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1981</first_year>
    <latest_year>1981</latest_year>
    <lat>29.903611</lat>
    <lon>-91.72556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52127</plant_id>
    <plant_name>Elk Basin Gasoline Plant</plant_name>
    <state>WY</state>
    <county>Park</county>
    <operator>Contango Oil and Gas</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Other Gases</primary_technology>
    <primary_energy_source>OG</primary_energy_source>
    <technologies>Other Gases</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>1948</first_year>
    <latest_year>1948</latest_year>
    <lat>44.9806</lat>
    <lon>-108.8428</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52155</plant_id>
    <plant_name>Lacomb Irrigation District</plant_name>
    <state>OR</state>
    <county>Linn</county>
    <operator>Lacomb Irrigation Dist</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1986</first_year>
    <latest_year>1986</latest_year>
    <lat>44.597518</lat>
    <lon>-122.6854</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>52171</plant_id>
    <plant_name>Upper Barker</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>KEI (Maine) Power Management (III) LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1987</first_year>
    <latest_year>1987</latest_year>
    <lat>44.08687</lat>
    <lon>-70.22929</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54384</plant_id>
    <plant_name>EHC West Hopkinton</plant_name>
    <state>NH</state>
    <county>Merrimack</county>
    <operator>Green Mountain Power Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1985</first_year>
    <latest_year>1985</latest_year>
    <lat>43.1897</lat>
    <lon>-71.7483</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54691</plant_id>
    <plant_name>Lower Beaver Falls Project</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Eagle Creek Renewable Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1979</first_year>
    <latest_year>1979</latest_year>
    <lat>43.884444</lat>
    <lon>-75.43056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>54878</plant_id>
    <plant_name>Dunn Paper</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>BiOrigin Specialty Products</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>3</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1959</first_year>
    <latest_year>1959</latest_year>
    <lat>44.336358</lat>
    <lon>-75.50274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>55005</plant_id>
    <plant_name>Thornridge High School</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Thorton Township School Dist</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1996</first_year>
    <latest_year>1996</latest_year>
    <lat>41.6225</lat>
    <lon>-87.5978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56125</plant_id>
    <plant_name>Springville Hydroelectric</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>Calleguas Mun Water District</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>34.2253</lat>
    <lon>-119.0858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56245</plant_id>
    <plant_name>Stevens Community Medical Center</plant_name>
    <state>MN</state>
    <county>Stevens</county>
    <operator>Stevens Community Medical Center</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>45.585</lat>
    <lon>-95.9042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56547</plant_id>
    <plant_name>Bostic Delivery No 2</plant_name>
    <state>NC</state>
    <county>Rutherford</county>
    <operator>North Carolina Mun Power Agny #1</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>35.3619</lat>
    <lon>-81.8344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56705</plant_id>
    <plant_name>Kosterville</plant_name>
    <state>NY</state>
    <county>Lewis</county>
    <operator>Northbrook Lyons Falls LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1955</first_year>
    <latest_year>1958</latest_year>
    <lat>43.614218</lat>
    <lon>-75.33271</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56813</plant_id>
    <plant_name>CSU Fresno Solar Project</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>MMA Fresno Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>36.809841</lat>
    <lon>-119.7417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56814</plant_id>
    <plant_name>ELACC Photovoltaic Power Facility</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>MMA LA Power LP</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>34.040278</lat>
    <lon>-118.1481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56875</plant_id>
    <plant_name>Sacramento Soleil LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>EDF Renewable Asset Holdings, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>38.44979</lat>
    <lon>-121.1647</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56932</plant_id>
    <plant_name>Biotech LS 0836</plant_name>
    <state>WA</state>
    <county>Whitman</county>
    <operator>Washington State University</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>46.7331</lat>
    <lon>-117.1583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56938</plant_id>
    <plant_name>SunEdison LV Sutton Plant Site</plant_name>
    <state>NC</state>
    <county>New Hanover</county>
    <operator>SunE NC Progress 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>34.2867</lat>
    <lon>-77.9814</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57004</plant_id>
    <plant_name>SunEdison Walgreens Moreno Valley</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SunE WG113 Moreno Valley LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>33.8672</lat>
    <lon>-117.23</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57005</plant_id>
    <plant_name>Mariani Packing Vacaville Solar</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>SunE U6 Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>38.40008</lat>
    <lon>-121.9637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57006</plant_id>
    <plant_name>Walgreens Woodland Distribution Center</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>SunE WG45 Woodland LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>38.674894</lat>
    <lon>-121.7134</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57007</plant_id>
    <plant_name>SunEdison Ironwood State Prison</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SunE CPA CDC2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>33.567268</lat>
    <lon>-114.918</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57008</plant_id>
    <plant_name>SunEdison Procter &amp; Gamble Oxnard</plant_name>
    <state>CA</state>
    <county>Ventura</county>
    <operator>SunE U6 Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>34.2089</lat>
    <lon>-119.13</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57009</plant_id>
    <plant_name>Kohls San Bernardino Solar Facility</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunE WF3 KHL A Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>34.094695</lat>
    <lon>-117.2668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57010</plant_id>
    <plant_name>SunEdison Anheuser Busch Fairfield</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>SunE M5 Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>38.232108</lat>
    <lon>-122.0927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57011</plant_id>
    <plant_name>Chuckawalla Valley State Prison</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>SunE CPA CDC1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>33.565329</lat>
    <lon>-114.9036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57012</plant_id>
    <plant_name>SunEdison Walmart Apple Valley DC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunE M5 Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>34.5975</lat>
    <lon>-117.2</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57254</plant_id>
    <plant_name>Victor Valley CC CPV Solar</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Victor Valley Community College District</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>34.48017</lat>
    <lon>-117.2579</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57265</plant_id>
    <plant_name>Dorchester Solar Site</plant_name>
    <state>MA</state>
    <county>Suffolk</county>
    <operator>Massachusetts Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>42.300802</lat>
    <lon>-71.04717</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57269</plant_id>
    <plant_name>Haverhill Solar Power Project</plant_name>
    <state>MA</state>
    <county>Essex</county>
    <operator>Massachusetts Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.781056</lat>
    <lon>-71.09256</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57270</plant_id>
    <plant_name>NEDC Solar Site</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Massachusetts Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>42.105237</lat>
    <lon>-71.70298</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57280</plant_id>
    <plant_name>Aqua Ingrams Mill</plant_name>
    <state>PA</state>
    <county>Chester</county>
    <operator>Aqua America Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>39.9647</lat>
    <lon>-75.6578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57309</plant_id>
    <plant_name>Pacific Cruise Ship Terminals Berth 93</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>City of Los Angeles Harbor Department - (CA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>33.7331</lat>
    <lon>-118.2772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57311</plant_id>
    <plant_name>Occidental College Solar Project</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Occidental College</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.1283</lat>
    <lon>-118.2069</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57352</plant_id>
    <plant_name>Trenton Solar Farm</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Public Service Elec &amp; Gas Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.2314</lat>
    <lon>-74.7539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57369</plant_id>
    <plant_name>Questa Solar Facility</plant_name>
    <state>NM</state>
    <county>Taos</county>
    <operator>Chevron Technology Ventures</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.716944</lat>
    <lon>-105.6094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57402</plant_id>
    <plant_name>Taylorsville Solar LLC</plant_name>
    <state>NC</state>
    <county>Alexander</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.909074</lat>
    <lon>-81.1525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57422</plant_id>
    <plant_name>Yolo County Solar Project</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>Yolo County of - (CA)</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.659722</lat>
    <lon>-121.7294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57471</plant_id>
    <plant_name>Murray Hill Solar</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.684444</lat>
    <lon>-74.40444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57494</plant_id>
    <plant_name>Masser Farms Realty Solar</plant_name>
    <state>PA</state>
    <county>Schuylkill</county>
    <operator>Masser Farms Realty Ltd</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.640556</lat>
    <lon>-76.60542</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57506</plant_id>
    <plant_name>FRV SI Transport Solar LP</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>FRV SI Transport Solar, L.P. (Sacremento)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.4869</lat>
    <lon>-121.3911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57525</plant_id>
    <plant_name>Kapaa Photovoltaic Project</plant_name>
    <state>HI</state>
    <county>Kauai</county>
    <operator>Kapaa Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>22.080416</lat>
    <lon>-159.3316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57556</plant_id>
    <plant_name>La Senita</plant_name>
    <state>AZ</state>
    <county>Mohave</county>
    <operator>UNS Electric, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.241675</lat>
    <lon>-114.0046</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57594</plant_id>
    <plant_name>Teichert Materials-Teichert Vernalis</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Foundation HA Energy Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>37.6167</lat>
    <lon>-121.3564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57625</plant_id>
    <plant_name>Bos Dairy, LLC</plant_name>
    <state>IN</state>
    <county>Jasper</county>
    <operator>Bos Dairy, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>41.1153</lat>
    <lon>-87.2328</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57640</plant_id>
    <plant_name>500 Virginia Solar</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>Alliance HP Virginia Drive LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.139167</lat>
    <lon>-75.19167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57652</plant_id>
    <plant_name>Yamhill Solar LLC</plant_name>
    <state>OR</state>
    <county>Yamhill</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>45.108889</lat>
    <lon>-123.2786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57681</plant_id>
    <plant_name>City of Boulder WWTP</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>SunE NLB-2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.048025</lat>
    <lon>-105.1803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57682</plant_id>
    <plant_name>City of Madera WWTP</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>SunE GIL1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.9408</lat>
    <lon>-120.1572</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57753</plant_id>
    <plant_name>SMUD at Lawrence</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Sacramento PV Energy, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.338868</lat>
    <lon>-121.4313</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57792</plant_id>
    <plant_name>Foundation IE</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Foundation HA Energy Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.084722</lat>
    <lon>-117.5294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57827</plant_id>
    <plant_name>Dinuba Wastewater Treatment Plant</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>AES Distributed Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.538056</lat>
    <lon>-119.4264</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57848</plant_id>
    <plant_name>WC Landfill Energy LLC</plant_name>
    <state>NJ</state>
    <county>Warren</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.831012</lat>
    <lon>-75.01578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57850</plant_id>
    <plant_name>Green Acres Solar Facility 2</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>SIT Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.28357</lat>
    <lon>-121.4613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57856</plant_id>
    <plant_name>Univ of California San Diego Solar</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>University of California San Diego</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>32.874379</lat>
    <lon>-117.2389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57870</plant_id>
    <plant_name>Castle Rock Vineyards</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Castle Rock Cooling</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.801111</lat>
    <lon>-119.1106</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57871</plant_id>
    <plant_name>2555 E Olympic Bl</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.026944</lat>
    <lon>-118.2242</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57879</plant_id>
    <plant_name>Perdue Salisbury Photovoltaic</plant_name>
    <state>MD</state>
    <county>Wicomico</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>38.373611</lat>
    <lon>-75.53528</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57951</plant_id>
    <plant_name>Shore Point Solar</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>Shore Point Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.245</lat>
    <lon>-74.24333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58012</plant_id>
    <plant_name>IKEA Tampa 042</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>27.953889</lat>
    <lon>-82.4325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58064</plant_id>
    <plant_name>Laredo Bus Facility Solar Canopies</plant_name>
    <state>GA</state>
    <county>DeKalb</county>
    <operator>MARTA</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.783333</lat>
    <lon>-84.26778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58086</plant_id>
    <plant_name>Intel Folsom</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>38.645119</lat>
    <lon>-121.173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58093</plant_id>
    <plant_name>BBB Corporate Headquarters</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Cushman Wakefield</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.697222</lat>
    <lon>-74.305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58104</plant_id>
    <plant_name>Foundation Superior Farms</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>Foundation CA Fund VI Manager LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.42</lat>
    <lon>-121.8181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58105</plant_id>
    <plant_name>Foundation Wal-Mart Red Bluff</plant_name>
    <state>CA</state>
    <county>Tehama</county>
    <operator>Foundation CA Fund VI Manager LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.111111</lat>
    <lon>-122.1939</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58112</plant_id>
    <plant_name>Foundation Cemex Madison</plant_name>
    <state>CA</state>
    <county>Yolo</county>
    <operator>Foundation CA Fund V Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.692778</lat>
    <lon>-121.9325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58128</plant_id>
    <plant_name>Kaiser Downey</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy 2009 PPA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.919167</lat>
    <lon>-118.1286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58132</plant_id>
    <plant_name>Kaiser Ontario</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Bloom Energy 2009 PPA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>5</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.0325</lat>
    <lon>-117.6089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58232</plant_id>
    <plant_name>Tahquitz High School</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>AES Distributed Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.767222</lat>
    <lon>-117.0175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58239</plant_id>
    <plant_name>Kent County-Kennedyville</plant_name>
    <state>MD</state>
    <county>Kent</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.297222</lat>
    <lon>-75.98222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58241</plant_id>
    <plant_name>Rock Hall</plant_name>
    <state>MD</state>
    <county>Kent</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.144369</lat>
    <lon>-76.23164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58243</plant_id>
    <plant_name>Kent County - Worton Complex</plant_name>
    <state>MD</state>
    <county>Kent</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.280833</lat>
    <lon>-76.09083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58244</plant_id>
    <plant_name>West Valley High School Solar</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>AES Distributed Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>33.719722</lat>
    <lon>-117.0097</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58252</plant_id>
    <plant_name>Alpha Ridge LFG</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>Howard County - Maryland</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.305</lat>
    <lon>-76.90194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58256</plant_id>
    <plant_name>Los Alamos PV Site</plant_name>
    <state>NM</state>
    <county>Los Alamos</county>
    <operator>Los Alamos County - (NM)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.875556</lat>
    <lon>-106.31</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58261</plant_id>
    <plant_name>FAA NorCal TRACON</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Enfinity NorCal 1 FAA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.559533</lat>
    <lon>-121.2576</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58271</plant_id>
    <plant_name>Acushnet Hawes Reed Road</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.662222</lat>
    <lon>-71.0425</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58299</plant_id>
    <plant_name>Xilinx San Jose</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.252778</lat>
    <lon>-121.9342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58305</plant_id>
    <plant_name>PCIP Solar</plant_name>
    <state>NC</state>
    <county>Person</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.3125</lat>
    <lon>-78.9675</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58318</plant_id>
    <plant_name>Farrington Farm</plant_name>
    <state>NC</state>
    <county>Chatham</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>35.832778</lat>
    <lon>-79.025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58370</plant_id>
    <plant_name>Gridley Main</plant_name>
    <state>CA</state>
    <county>Butte</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.373333</lat>
    <lon>-121.6842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58412</plant_id>
    <plant_name>Maynard PV</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.428333</lat>
    <lon>-71.43556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58439</plant_id>
    <plant_name>Collinwood BioEnergy Facility</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>Collinwood BioEnergy</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>41.555556</lat>
    <lon>-81.58917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58443</plant_id>
    <plant_name>Martin Limestone Solar Array</plant_name>
    <state>PA</state>
    <county>Lancaster</county>
    <operator>Sunstream Energy LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.10596</lat>
    <lon>-76.05934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58448</plant_id>
    <plant_name>Nunn</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>CD US Solar MT 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.509167</lat>
    <lon>-117.1544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58481</plant_id>
    <plant_name>CSU Pueblo</plant_name>
    <state>CO</state>
    <county>Pueblo</county>
    <operator>Scale Sustainable I, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2008</first_year>
    <latest_year>2008</latest_year>
    <lat>38.306111</lat>
    <lon>-104.58</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58510</plant_id>
    <plant_name>Kettleman Solar Project</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.12139</lat>
    <lon>-121.1412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58522</plant_id>
    <plant_name>Madera Community Hospital</plant_name>
    <state>CA</state>
    <county>Madera</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.941111</lat>
    <lon>-120.0467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58527</plant_id>
    <plant_name>Crown Cooling Facility</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>Five Crowns Inc</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.967222</lat>
    <lon>-115.5325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58540</plant_id>
    <plant_name>Silver City WWTP PV Project</plant_name>
    <state>NM</state>
    <county>Grant</county>
    <operator>Affordable Solar Silver City, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>32.713889</lat>
    <lon>-108.2481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58547</plant_id>
    <plant_name>SMPA Solar 1 Community Solar</plant_name>
    <state>CO</state>
    <county>Montrose</county>
    <operator>San Miguel Power Assn, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.2725</lat>
    <lon>-108.7856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58581</plant_id>
    <plant_name>Oltmans SCE at Champagne</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>California PV Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>34.043889</lat>
    <lon>-117.5311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58588</plant_id>
    <plant_name>Sue Cleveland High School</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.313333</lat>
    <lon>-106.6578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58589</plant_id>
    <plant_name>Rio Rancho High School</plant_name>
    <state>NM</state>
    <county>Sandoval</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.264444</lat>
    <lon>-106.6678</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58591</plant_id>
    <plant_name>POTB Digester</plant_name>
    <state>OR</state>
    <county>Tillamook</county>
    <operator>Tillamook BioGas, LLC Digester</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>45.414444</lat>
    <lon>-123.8042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58619</plant_id>
    <plant_name>Transamerica Pyramid</plant_name>
    <state>CA</state>
    <county>San Francisco</county>
    <operator>Transamerica Pyramid Properties LLC</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>37.795556</lat>
    <lon>-122.4028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58633</plant_id>
    <plant_name>Monterey Regional Water Pollution Contro</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>36.721111</lat>
    <lon>-121.7878</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58634</plant_id>
    <plant_name>Lancaster Baptist Church</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.695833</lat>
    <lon>-118.0589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58636</plant_id>
    <plant_name>Sacramento Fairbain Water Treatment Plan</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.554802</lat>
    <lon>-121.4168</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58647</plant_id>
    <plant_name>Port Richmond WWT Solar</plant_name>
    <state>NY</state>
    <county>Richmond</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>40.638056</lat>
    <lon>-74.12611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58676</plant_id>
    <plant_name>Pearl City Peninsula Solar Park</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>21.375556</lat>
    <lon>-157.9681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58684</plant_id>
    <plant_name>Kapolei Solar Energy Park</plant_name>
    <state>HI</state>
    <county>Honolulu</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>21.321111</lat>
    <lon>-158.1175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58748</plant_id>
    <plant_name>North Bay Solar 1</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>AES Distributed Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.300556</lat>
    <lon>-121.9664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58749</plant_id>
    <plant_name>Tihonet Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.7875</lat>
    <lon>-70.72333</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58756</plant_id>
    <plant_name>Summer Solar D2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.723056</lat>
    <lon>-118.2897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58788</plant_id>
    <plant_name>North County</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>CD US Solar MT1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.763056</lat>
    <lon>-73.32361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58795</plant_id>
    <plant_name>Hobart Solar, LLC</plant_name>
    <state>IN</state>
    <county>Lake</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.529444</lat>
    <lon>-87.30833</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58796</plant_id>
    <plant_name>Waterloo Solar, LLC</plant_name>
    <state>IN</state>
    <county>DeKalb</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.433889</lat>
    <lon>-85.04389</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58797</plant_id>
    <plant_name>Valparaiso Solar, LLC</plant_name>
    <state>IN</state>
    <county>Porter</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.502222</lat>
    <lon>-87.16111</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58832</plant_id>
    <plant_name>Cogenra - TEP</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.101944</lat>
    <lon>-110.8133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58896</plant_id>
    <plant_name>Patriots Stadium</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>Sunlight General Somerset Solar LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.560556</lat>
    <lon>-74.55139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58929</plant_id>
    <plant_name>Melrose 2</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Melrose Public Utilities</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>45.676389</lat>
    <lon>-94.80194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58954</plant_id>
    <plant_name>Intel Folsom Phase 2</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.643611</lat>
    <lon>-121.1639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58963</plant_id>
    <plant_name>Las Virgenes Municipal Water District</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.136111</lat>
    <lon>-118.7019</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59024</plant_id>
    <plant_name>Euclid Farm, Stamco N-54</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>Case Western Reserve University</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.602222</lat>
    <lon>-81.49694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59058</plant_id>
    <plant_name>Vacaville</plant_name>
    <state>CA</state>
    <county>Solano</county>
    <operator>700Eubanks LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2007</first_year>
    <latest_year>2007</latest_year>
    <lat>38.399444</lat>
    <lon>-121.9603</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59075</plant_id>
    <plant_name>Brewster Landfill</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.745556</lat>
    <lon>-70.10306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59079</plant_id>
    <plant_name>Katama Farm</plant_name>
    <state>MA</state>
    <county>Dukes</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.361111</lat>
    <lon>-70.51694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59080</plant_id>
    <plant_name>Nunnepog</plant_name>
    <state>MA</state>
    <county>Dukes</county>
    <operator>Clean Focus Yield, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.358889</lat>
    <lon>-70.505</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59095</plant_id>
    <plant_name>Division 2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.708333</lat>
    <lon>-118.1306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59096</plant_id>
    <plant_name>Division 3</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.708333</lat>
    <lon>-118.1306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59098</plant_id>
    <plant_name>Kettering Solar 1</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.700278</lat>
    <lon>-118.1236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59099</plant_id>
    <plant_name>Kettering Solar 2</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.700278</lat>
    <lon>-118.1236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59132</plant_id>
    <plant_name>EAFB - North Base</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.9325</lat>
    <lon>-117.9072</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59133</plant_id>
    <plant_name>EAFB - South Base</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>34.917222</lat>
    <lon>-117.9003</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59138</plant_id>
    <plant_name>SDCCD - Miramar</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.906111</lat>
    <lon>-117.1214</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59139</plant_id>
    <plant_name>SDCWA - Twin Oaks</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.21</lat>
    <lon>-117.1706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59181</plant_id>
    <plant_name>AgriReNew</plant_name>
    <state>IA</state>
    <county>Scott</county>
    <operator>AgriReNew</operator>
    <sector>IPP CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>41.691944</lat>
    <lon>-90.86639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59239</plant_id>
    <plant_name>Eagle Springs Solar LLC</plant_name>
    <state>CO</state>
    <county>Garfield</county>
    <operator>Eagle Springs Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.526111</lat>
    <lon>-107.6961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59260</plant_id>
    <plant_name>Hidden View Dairy, LLC</plant_name>
    <state>IN</state>
    <county>Jasper</county>
    <operator>Hidden View Dairy, LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Natural Gas Internal Combustion Engine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Internal Combustion Engine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.032778</lat>
    <lon>-87.0725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59278</plant_id>
    <plant_name>Reeves South</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>NJR Clean Energy Ventures Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.926667</lat>
    <lon>-74.81361</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59283</plant_id>
    <plant_name>California PV Energy at ISD WWTP</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>California PV Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.001111</lat>
    <lon>-121.7039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59324</plant_id>
    <plant_name>MCCo Solar Generating Facility</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>The Medical Center Company</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.516389</lat>
    <lon>-81.59722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59327</plant_id>
    <plant_name>Marlboro Mushrooms Solar Field</plant_name>
    <state>PA</state>
    <county>Chester</county>
    <operator>Marlboro Mushroom</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>39.882778</lat>
    <lon>-75.82944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59328</plant_id>
    <plant_name>Golden Acorn Casino</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Foundation HA Energy Generation, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.702107</lat>
    <lon>-116.3546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59329</plant_id>
    <plant_name>City of Soledad Water Reclamation</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Foundation HA Energy Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.421111</lat>
    <lon>-121.3403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59330</plant_id>
    <plant_name>Taylor Farms</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Foundation HA Energy Generation, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Onshore Wind Turbine</primary_technology>
    <primary_energy_source>WND</primary_energy_source>
    <technologies>Onshore Wind Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>36.505</lat>
    <lon>-121.4517</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59360</plant_id>
    <plant_name>SCE-Snowline-Duncan Road (South)</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.471389</lat>
    <lon>-117.5622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59361</plant_id>
    <plant_name>Browne Solar LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.200833</lat>
    <lon>-72.32222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59362</plant_id>
    <plant_name>Indian Hill Solar LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.200833</lat>
    <lon>-72.32222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59363</plant_id>
    <plant_name>State Street Solar LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>CVI CleanCapital Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.200833</lat>
    <lon>-72.32222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59409</plant_id>
    <plant_name>Madelyn Solar, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>CD US Solar PO 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.768333</lat>
    <lon>-117.3236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59478</plant_id>
    <plant_name>IMPA Richmond Solar Park</plant_name>
    <state>IN</state>
    <county>Wayne</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>39.801111</lat>
    <lon>-84.895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59479</plant_id>
    <plant_name>IMPA Frankton Solar Park</plant_name>
    <state>IN</state>
    <county>Madison</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.216389</lat>
    <lon>-85.77472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59480</plant_id>
    <plant_name>IMPA Rensselaer Solar Park</plant_name>
    <state>IN</state>
    <county>Jasper</county>
    <operator>Indiana Municipal Power Agency</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.946111</lat>
    <lon>-87.13639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59485</plant_id>
    <plant_name>265 Pleasant Solar NG, LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>NuGen Capital Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.581389</lat>
    <lon>-71.76222</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59560</plant_id>
    <plant_name>Springer Solar 1</plant_name>
    <state>NM</state>
    <county>Colfax</county>
    <operator>Springer Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.398056</lat>
    <lon>-104.5942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59598</plant_id>
    <plant_name>Colton Solar Two, LLC</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Colton Solar Two, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>34.042222</lat>
    <lon>-117.3617</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59632</plant_id>
    <plant_name>Midwest Energy Community Solar Array</plant_name>
    <state>KS</state>
    <county>Thomas</county>
    <operator>Midwest Energy Inc - (KS)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.406944</lat>
    <lon>-101.0394</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59703</plant_id>
    <plant_name>Cottonwood Solar, LLC Cottonwood Carport</plant_name>
    <state>CA</state>
    <county>Marin</county>
    <operator>Onward Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>38.129759</lat>
    <lon>-122.5682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59714</plant_id>
    <plant_name>IKEA St. Louis 410</plant_name>
    <state>MO</state>
    <county>St Louis City</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>38.634995</lat>
    <lon>-90.24555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59771</plant_id>
    <plant_name>Jefferson Solar Park</plant_name>
    <state>WI</state>
    <county>Jefferson</county>
    <operator>Concord New Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>43.0146</lat>
    <lon>-88.7992</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59772</plant_id>
    <plant_name>KCP&amp;L SmartGrid Innovation Park</plant_name>
    <state>MO</state>
    <county>Jackson</county>
    <operator>Evergy Metro</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.040263</lat>
    <lon>-94.57122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59788</plant_id>
    <plant_name>Advance Stores Company, Inc</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.015023</lat>
    <lon>-72.51189</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59834</plant_id>
    <plant_name>Indy Grocers</plant_name>
    <state>IN</state>
    <county>Marion</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.737936</lat>
    <lon>-86.23773</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59843</plant_id>
    <plant_name>Georgia Power at Wadley GA</plant_name>
    <state>GA</state>
    <county>Jefferson</county>
    <operator>Luminace Solar Georgia, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.883</lat>
    <lon>-82.41</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59904</plant_id>
    <plant_name>Western Branch High School</plant_name>
    <state>VA</state>
    <county>Chesapeake City</county>
    <operator>Virginia Electric &amp; Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.848105</lat>
    <lon>-76.40714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59916</plant_id>
    <plant_name>SunE- E Philadelphia Ontario</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunEdison LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.03527</lat>
    <lon>-117.5341</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60017</plant_id>
    <plant_name>Domino Farms Solar</plant_name>
    <state>MI</state>
    <county>Washtenaw</county>
    <operator>DTE Electric Company</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.323377</lat>
    <lon>-83.68025</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60032</plant_id>
    <plant_name>SunE Rochester</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>SunE Solar XVI Lessor, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.097728</lat>
    <lon>-117.5445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60096</plant_id>
    <plant_name>Town of Chestertown- Chestertown WWTP</plant_name>
    <state>MD</state>
    <county>Kent</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>39.199453</lat>
    <lon>-76.07669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60097</plant_id>
    <plant_name>Onondaga County - Metro Water Board</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>43.183782</lat>
    <lon>-76.22408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60115</plant_id>
    <plant_name>Town of Halfmoon</plant_name>
    <state>NY</state>
    <county>Saratoga</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.834978</lat>
    <lon>-73.67568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60116</plant_id>
    <plant_name>BJ's Wholesale Club, Inc- Uxbridge</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.019659</lat>
    <lon>-71.60415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60117</plant_id>
    <plant_name>Western Michigan Solar Gardens</plant_name>
    <state>MI</state>
    <county>Kalamazoo</county>
    <operator>Consumers Energy Co - (MI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.2525</lat>
    <lon>-85.64273</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60137</plant_id>
    <plant_name>Glasgow LFGTE</plant_name>
    <state>KY</state>
    <county>Barren</county>
    <operator>East Kentucky Power Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.9874</lat>
    <lon>-85.9575</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60154</plant_id>
    <plant_name>Buidling L</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Golden Springs Development Company LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.912917</lat>
    <lon>-118.0419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60219</plant_id>
    <plant_name>Strata Roof 1</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>Strata Manager, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>38.643527</lat>
    <lon>-121.5055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60228</plant_id>
    <plant_name>Conn Mun Electric Energy Coop</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.538324</lat>
    <lon>-72.12254</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60260</plant_id>
    <plant_name>Brevig Mission</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>3</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2018</latest_year>
    <lat>65.331716</lat>
    <lon>-166.4795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60341</plant_id>
    <plant_name>Wal-Mart Truth or Consequences PV</plant_name>
    <state>NM</state>
    <county>Sierra</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.1526</lat>
    <lon>-107.2498</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60446</plant_id>
    <plant_name>E&amp;B Resources</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>35.534584</lat>
    <lon>-119.06</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60447</plant_id>
    <plant_name>Presbyterian Senior Living Service</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.4476</lat>
    <lon>-76.51632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60448</plant_id>
    <plant_name>Valdosta (Terraform)</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>30.81012</lat>
    <lon>-83.22596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60451</plant_id>
    <plant_name>Brookside</plant_name>
    <state>RI</state>
    <county>Providence</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.987579</lat>
    <lon>-71.58396</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60466</plant_id>
    <plant_name>Waterman Turnout Hydroelectric</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>San Bernardino Valley Mun. Water Dist.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>34.172625</lat>
    <lon>-117.278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60472</plant_id>
    <plant_name>CPS 1 Community Solar</plant_name>
    <state>TX</state>
    <county>Bexar</county>
    <operator>City of San Antonio - (TX)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>29.377966</lat>
    <lon>-98.26922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60478</plant_id>
    <plant_name>Bethlehem - West</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>42.539006</lat>
    <lon>-73.8243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60500</plant_id>
    <plant_name>Westside Avenue</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>40.814092</lat>
    <lon>-74.02133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60501</plant_id>
    <plant_name>Hartz Way</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>40.782829</lat>
    <lon>-74.07278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60512</plant_id>
    <plant_name>Greenville</plant_name>
    <state>GA</state>
    <county>Meriwether</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>33.045801</lat>
    <lon>-84.71443</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60513</plant_id>
    <plant_name>Richland (GA)</plant_name>
    <state>GA</state>
    <county>Stewart</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.088982</lat>
    <lon>-84.66353</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60544</plant_id>
    <plant_name>Tri-County Solar Facility</plant_name>
    <state>GA</state>
    <county>Putnam</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.308113</lat>
    <lon>-83.3896</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60566</plant_id>
    <plant_name>Pala Energy Storage Yard</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>SDGE Batteries</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.35651</lat>
    <lon>-117.1136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60568</plant_id>
    <plant_name>Canyon Crest Academy</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>SDGE Batteries</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>3</battery_mwh>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.95907</lat>
    <lon>-117.1916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60585</plant_id>
    <plant_name>Mount Vernon Solar</plant_name>
    <state>GA</state>
    <county>Walton</county>
    <operator>Walton Electric Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>33.8388</lat>
    <lon>-83.638</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60608</plant_id>
    <plant_name>CMEEC - Navy NE Trident</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.39546</lat>
    <lon>-72.07919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60614</plant_id>
    <plant_name>WYM 1250 Palmer LLC</plant_name>
    <state>MA</state>
    <county>Hampden</county>
    <operator>CVI CleanCapital Solar 6</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>42.151092</lat>
    <lon>-72.26974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60653</plant_id>
    <plant_name>Belchertown</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.259548</lat>
    <lon>-72.40043</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60684</plant_id>
    <plant_name>Amphitheater High School Solar</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>Luminace Solar Arizona 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.269</lat>
    <lon>-110.975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60686</plant_id>
    <plant_name>Pierre Solar</plant_name>
    <state>SD</state>
    <county>Hughes</county>
    <operator>Western Minnesota Mun Pwr Agny</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.388753</lat>
    <lon>-100.307</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60731</plant_id>
    <plant_name>Holliston Solar CSG</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>42.169641</lat>
    <lon>-71.46822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60753</plant_id>
    <plant_name>Shirley Landfill</plant_name>
    <state>MA</state>
    <county>Middlesex</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.54171</lat>
    <lon>-71.67636</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60765</plant_id>
    <plant_name>L'Oreal Franklin</plant_name>
    <state>NJ</state>
    <county>Somerset</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.487906</lat>
    <lon>-74.52137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60776</plant_id>
    <plant_name>Community Foodbank of NJ</plant_name>
    <state>NJ</state>
    <county>Union</county>
    <operator>Community Foodbank of NJ</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.697259</lat>
    <lon>-74.21224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60809</plant_id>
    <plant_name>Summit Water Nexus Mt. Holly, LLC Solar</plant_name>
    <state>NJ</state>
    <county>Burlington</county>
    <operator>Summit Water Nexus, Mount Holly, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>39.987281</lat>
    <lon>-74.80181</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60813</plant_id>
    <plant_name>Cloverdale Solar Center</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Adapture Renewables, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.769581</lat>
    <lon>-123.0207</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60824</plant_id>
    <plant_name>Valley Sanitary District WTP Solar</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.708661</lat>
    <lon>-116.1989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60857</plant_id>
    <plant_name>NES Rutgers Solar</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>NES Rutgers LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.070879</lat>
    <lon>-74.16115</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60860</plant_id>
    <plant_name>VEC Alburgh Array</plant_name>
    <state>VT</state>
    <county>Grand Isle</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.96234</lat>
    <lon>-73.27415</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60887</plant_id>
    <plant_name>Sauk DPC Solar</plant_name>
    <state>WI</state>
    <county>Vernon</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.59591</lat>
    <lon>-90.3226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60888</plant_id>
    <plant_name>Lafayette DPC Solar</plant_name>
    <state>WI</state>
    <county>Chippewa</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.88782</lat>
    <lon>-91.3524</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60889</plant_id>
    <plant_name>Conrath DPC Solar</plant_name>
    <state>WI</state>
    <county>Rusk</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.36614</lat>
    <lon>-91.0482</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60892</plant_id>
    <plant_name>Downsville DPC Solar</plant_name>
    <state>WI</state>
    <county>Dunn</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.81423</lat>
    <lon>-91.8841</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60893</plant_id>
    <plant_name>Mt. Hope DPC Solar</plant_name>
    <state>WI</state>
    <county>Grant</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.97498</lat>
    <lon>-90.8318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60909</plant_id>
    <plant_name>Hartford Landfill Solar EGF</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Materials Innovation Recycling Authority</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>41.7915</lat>
    <lon>-72.6509</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60918</plant_id>
    <plant_name>Verwey-Hanford Dairy Digester #1</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>AlsoEnergy</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.18519</lat>
    <lon>-119.6815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60924</plant_id>
    <plant_name>Ozarks Natural Energy Community Solar</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>Ozarks Electric Coop Corp - (AR)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.164296</lat>
    <lon>-94.08227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60935</plant_id>
    <plant_name>GRE Marshan Solar</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.6922</lat>
    <lon>-92.8169</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60953</plant_id>
    <plant_name>Owens Valley Solar Project 11</plant_name>
    <state>CA</state>
    <county>Inyo</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.275144</lat>
    <lon>-118.0122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60956</plant_id>
    <plant_name>Westar Cities Solar</plant_name>
    <state>KS</state>
    <county>Reno</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>38.0194</lat>
    <lon>-97.9753</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60957</plant_id>
    <plant_name>Sand Lake DPC Solar</plant_name>
    <state>WI</state>
    <county>Polk</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>45.4455</lat>
    <lon>-92.549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>60978</plant_id>
    <plant_name>CSUF State College</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.87912</lat>
    <lon>-117.8887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61018</plant_id>
    <plant_name>Stafford St Solar 3 CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Stafford St Solar 3, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.224044</lat>
    <lon>-71.87065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61025</plant_id>
    <plant_name>Montefiore - Westchester Square</plant_name>
    <state>NY</state>
    <county>Bronx</county>
    <operator>Montefiore-Westchester Square</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1983</first_year>
    <latest_year>1983</latest_year>
    <lat>40.840648</lat>
    <lon>-73.84837</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61115</plant_id>
    <plant_name>Manteca Land PV</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.84013</lat>
    <lon>-121.2162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61116</plant_id>
    <plant_name>Delano Land 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.761217</lat>
    <lon>-119.3444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61118</plant_id>
    <plant_name>Bakersfield Industrial PV 1</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>35.330032</lat>
    <lon>-118.9931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61125</plant_id>
    <plant_name>Nebraska Valley Solar Farm</plant_name>
    <state>VT</state>
    <county>Lamoille</county>
    <operator>Town of Stowe - (VT)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>44.46234</lat>
    <lon>-72.77086</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61163</plant_id>
    <plant_name>Onset East Community Solar Facility</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Kearsarge Onset LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.765761</lat>
    <lon>-70.64448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61164</plant_id>
    <plant_name>Onset West Community Solar Facility</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Kearsarge Onset LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.765761</lat>
    <lon>-70.64448</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61173</plant_id>
    <plant_name>IKEA Miami 327</plant_name>
    <state>FL</state>
    <county>Miami Dade</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>25.7915</lat>
    <lon>-80.3838</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61185</plant_id>
    <plant_name>Pfeffers</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>39.42757</lat>
    <lon>-76.39356</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61187</plant_id>
    <plant_name>Century Drive Solar Farm</plant_name>
    <state>NC</state>
    <county>Wake</county>
    <operator>J.T. Hobby and Son, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>35.837841</lat>
    <lon>-78.6689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61193</plant_id>
    <plant_name>IKEA Las Vegas 462</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.068926</lat>
    <lon>-115.2808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61248</plant_id>
    <plant_name>Glopak Solar PV Power Plant</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>Glopak Corporation</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2012</latest_year>
    <lat>40.575378</lat>
    <lon>-74.39281</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61298</plant_id>
    <plant_name>Pleasantdale Road Community Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Pleasantdale Road Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.322246</lat>
    <lon>-71.98702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61313</plant_id>
    <plant_name>BPU Solar Farm</plant_name>
    <state>KS</state>
    <county>Wyandotte</county>
    <operator>MC Power Companies Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.166436</lat>
    <lon>-94.69689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61408</plant_id>
    <plant_name>Canis Minor Solar Farm</plant_name>
    <state>CT</state>
    <county>Litchfield</county>
    <operator>LSE Canis Minor LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.892997</lat>
    <lon>-72.98595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61429</plant_id>
    <plant_name>Big George PV CSG</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.902312</lat>
    <lon>-70.71613</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61468</plant_id>
    <plant_name>Valdosta Prison</plant_name>
    <state>GA</state>
    <county>Lowndes</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1.2</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>30.9</lat>
    <lon>-83.3</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61501</plant_id>
    <plant_name>ABEC #2 dba West-Star Dairy</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>ABEC #2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.472113</lat>
    <lon>-119.4329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61502</plant_id>
    <plant_name>ABEC #3 dba Lakeview Dairy</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>ABEC #3 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.21426</lat>
    <lon>-119.203</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61503</plant_id>
    <plant_name>ABEC #4 dba CE&amp;S Dairy</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>ABEC #4 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>35.17306</lat>
    <lon>-119.1164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61504</plant_id>
    <plant_name>RJC I CSG</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>RJC I CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.125053</lat>
    <lon>-93.27912</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61505</plant_id>
    <plant_name>Huneke I CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Huneke I CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.726789</lat>
    <lon>-92.66945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61506</plant_id>
    <plant_name>Krause CSG</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.795624</lat>
    <lon>-95.20972</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61516</plant_id>
    <plant_name>School Sisters CSG</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>School Sisters CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.17897</lat>
    <lon>-93.9689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61526</plant_id>
    <plant_name>Antanavica Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.250771</lat>
    <lon>-71.94888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61538</plant_id>
    <plant_name>Braintree Landfill Solar</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Ameresco, Inc - Braintree</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>42.207264</lat>
    <lon>-70.99778</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61568</plant_id>
    <plant_name>The Allen Hospital</plant_name>
    <state>NY</state>
    <county>New York</county>
    <operator>The Allen Hospital</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>40.873268</lat>
    <lon>-73.91297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61570</plant_id>
    <plant_name>Veseli Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Veseli Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.526806</lat>
    <lon>-93.36649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61571</plant_id>
    <plant_name>New Germany Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>New Germany Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.905428</lat>
    <lon>-94.00085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61572</plant_id>
    <plant_name>Lake Waconia Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Lake Waconia Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.874961</lat>
    <lon>-93.81501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61573</plant_id>
    <plant_name>Lake Waconia IV Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Lake Waconia Solar IV LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.874961</lat>
    <lon>-93.81501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61574</plant_id>
    <plant_name>Zumbro Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Zumbro Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.319478</lat>
    <lon>-92.67034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61633</plant_id>
    <plant_name>DG Tufts Science LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>DG Tufts Science, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.237583</lat>
    <lon>-71.68607</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61645</plant_id>
    <plant_name>Altair Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.924981</lat>
    <lon>-93.48583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61651</plant_id>
    <plant_name>Capricornus Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.398742</lat>
    <lon>-94.71743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61670</plant_id>
    <plant_name>RJC II Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>RJC II CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.138851</lat>
    <lon>-93.25715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61671</plant_id>
    <plant_name>Betcher Community Solar Garden</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Betcher CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.392415</lat>
    <lon>-92.59595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61682</plant_id>
    <plant_name>USG 1</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>ZGlobal Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>32.79278</lat>
    <lon>-115.8573</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61683</plant_id>
    <plant_name>USG 2</plant_name>
    <state>CA</state>
    <county>Imperial</county>
    <operator>ZGlobal Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>32.790403</lat>
    <lon>-115.8632</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61686</plant_id>
    <plant_name>Johnson 1 Community Solar</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Johnson I CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.483155</lat>
    <lon>-92.81518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61689</plant_id>
    <plant_name>Grimm Community Solar</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Grimm CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.731404</lat>
    <lon>-94.60934</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61695</plant_id>
    <plant_name>Johnson II Community Solar</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Johnson II CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.491965</lat>
    <lon>-92.85417</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61704</plant_id>
    <plant_name>Aquila Community Solar</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.651056</lat>
    <lon>-95.3401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61705</plant_id>
    <plant_name>Acturus Community Solar</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.283211</lat>
    <lon>-93.95442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61706</plant_id>
    <plant_name>Auriga Community Solar</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.977875</lat>
    <lon>-95.76736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61707</plant_id>
    <plant_name>Canopus Community Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.428308</lat>
    <lon>-94.82325</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61708</plant_id>
    <plant_name>Sagitta Community Solar</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.948328</lat>
    <lon>-95.38619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61709</plant_id>
    <plant_name>Libra Community Solar</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.671231</lat>
    <lon>-95.38851</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61710</plant_id>
    <plant_name>Aquarius Community Solar</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.229142</lat>
    <lon>-95.62011</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61711</plant_id>
    <plant_name>Cassiopeia Community Solar</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.647342</lat>
    <lon>-95.32866</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61712</plant_id>
    <plant_name>Crux Community Solar</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.04006</lat>
    <lon>-92.69318</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61713</plant_id>
    <plant_name>Leo Community Solar</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.978197</lat>
    <lon>-95.85078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61715</plant_id>
    <plant_name>Deneb Community Solar</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.404139</lat>
    <lon>-94.83108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61716</plant_id>
    <plant_name>Kaus Community Solar</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.050383</lat>
    <lon>-92.96137</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61717</plant_id>
    <plant_name>IRE Solar I, LLC</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Scotch Settlement</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.3</lat>
    <lon>-75.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61721</plant_id>
    <plant_name>Baldwin (CA)</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Electrodes</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>6.9</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.669266</lat>
    <lon>-117.6468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61739</plant_id>
    <plant_name>Lockheed Martin RMS Syracuse</plant_name>
    <state>NY</state>
    <county>Onondaga</county>
    <operator>Lockheed Martin RMS Syracuse</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>1.3</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>43.109574</lat>
    <lon>-76.18922</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61771</plant_id>
    <plant_name>Syncarpha Hancock III CSG</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Syncarpha Hancock III, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.428054</lat>
    <lon>-73.33262</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61791</plant_id>
    <plant_name>Stage Gulch Solar</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Stage Gulch Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.216841</lat>
    <lon>-122.5429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61792</plant_id>
    <plant_name>Lavio Solar</plant_name>
    <state>CA</state>
    <county>Sonoma</county>
    <operator>Lavio Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>38.194599</lat>
    <lon>-122.6634</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61793</plant_id>
    <plant_name>Heyer CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Heyer CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.227172</lat>
    <lon>-93.42173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61795</plant_id>
    <plant_name>Pacific Union College BESS</plant_name>
    <state>CA</state>
    <county>Napa</county>
    <operator>ENGIE Storage Services NA LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>38.570028</lat>
    <lon>-122.444</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61798</plant_id>
    <plant_name>Prairie Sky Solar Farm</plant_name>
    <state>KS</state>
    <county>Butler</county>
    <operator>Kansas Electric Power Coop Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.751716</lat>
    <lon>-97.0745</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61819</plant_id>
    <plant_name>IKEA Conshohocken Rooftop PV System</plant_name>
    <state>PA</state>
    <county>Montgomery</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.095176</lat>
    <lon>-75.30637</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61838</plant_id>
    <plant_name>Cleveland Thermal</plant_name>
    <state>OH</state>
    <county>Cuyahoga</county>
    <operator>Corix Cleveland Thermal Generating LP</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Steam Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Steam Turbine</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>41.5094</lat>
    <lon>-81.68227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61923</plant_id>
    <plant_name>ACUA</plant_name>
    <state>NJ</state>
    <county>Atlantic</county>
    <operator>Viridity Energy Solutions, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.381969</lat>
    <lon>-74.44515</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61937</plant_id>
    <plant_name>Ace Solar</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.722882</lat>
    <lon>-82.5258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61945</plant_id>
    <plant_name>Pelzer Solar I</plant_name>
    <state>SC</state>
    <county>Anderson</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.657642</lat>
    <lon>-82.50196</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61977</plant_id>
    <plant_name>Cornillie</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.46013</lat>
    <lon>-92.89609</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61979</plant_id>
    <plant_name>Syncarpha Prinsburg CSG (Ledeboer)</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Prinsburg CSG I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.931794</lat>
    <lon>-95.18842</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61980</plant_id>
    <plant_name>Syncarpha Clara City CSG I (Stamer)</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Clara City CSG I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.955515</lat>
    <lon>-95.35707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61997</plant_id>
    <plant_name>USS Big Lake 1 Solar CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.317071</lat>
    <lon>-93.76493</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61998</plant_id>
    <plant_name>USS Good Solar CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.436226</lat>
    <lon>-92.94066</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>61999</plant_id>
    <plant_name>USS Kasch Solar CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.623423</lat>
    <lon>-94.05927</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62000</plant_id>
    <plant_name>USS Rockpoint Solar CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.439639</lat>
    <lon>-92.92206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62021</plant_id>
    <plant_name>Franklin Solar (CT)</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.656</lat>
    <lon>-72.159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62023</plant_id>
    <plant_name>Wilson Solar (CT)</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.656</lat>
    <lon>-72.16</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62024</plant_id>
    <plant_name>Jefferson Solar (CT)</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.656</lat>
    <lon>-72.162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62025</plant_id>
    <plant_name>Hamilton Solar</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.657</lat>
    <lon>-72.161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62026</plant_id>
    <plant_name>Adams Solar</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.655</lat>
    <lon>-72.161</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62040</plant_id>
    <plant_name>Becker Solar CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.175532</lat>
    <lon>-93.68388</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62042</plant_id>
    <plant_name>USS Solar Rapids CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.590952</lat>
    <lon>-94.13863</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62044</plant_id>
    <plant_name>USS Solar Dawn CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.491799</lat>
    <lon>-92.84171</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62045</plant_id>
    <plant_name>USS Norelius Solar CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.473642</lat>
    <lon>-92.88658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62046</plant_id>
    <plant_name>USS Nillie Corn Solar CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.456657</lat>
    <lon>-92.89758</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62047</plant_id>
    <plant_name>USS JJ Solar CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.636126</lat>
    <lon>-94.05036</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62048</plant_id>
    <plant_name>USS Dubhe Solar CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.492616</lat>
    <lon>-92.90445</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62049</plant_id>
    <plant_name>USS Brockway Solar CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.682305</lat>
    <lon>-94.21133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62053</plant_id>
    <plant_name>Syncarpha Dodge 1 CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Solar Provider Group MN I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.044978</lat>
    <lon>-92.88071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62084</plant_id>
    <plant_name>Becker Solar 2 CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.174612</lat>
    <lon>-93.68409</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62085</plant_id>
    <plant_name>Becker Solar 3 CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.174942</lat>
    <lon>-93.68365</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62086</plant_id>
    <plant_name>Becker Solar 4 CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.175662</lat>
    <lon>-93.67973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62087</plant_id>
    <plant_name>Becker Solar 5 CSG</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.175654</lat>
    <lon>-93.67935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62089</plant_id>
    <plant_name>Panda Solar NC 1, LLC</plant_name>
    <state>NC</state>
    <county>Robeson</county>
    <operator>Panda Solar NC 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.436698</lat>
    <lon>-79.09021</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62123</plant_id>
    <plant_name>Panda Solar NC 5, LLC</plant_name>
    <state>NC</state>
    <county>Cumberland</county>
    <operator>Panda Solar NC 5, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.047153</lat>
    <lon>-78.81048</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62124</plant_id>
    <plant_name>Panda Solar NC 6, LLC</plant_name>
    <state>NC</state>
    <county>Columbus</county>
    <operator>Panda Solar NC 6, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.353586</lat>
    <lon>-78.7874</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62137</plant_id>
    <plant_name>Eichtens II CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>45.396581</lat>
    <lon>-92.78263</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62138</plant_id>
    <plant_name>Barone CSG</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.944513</lat>
    <lon>-94.0739</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62143</plant_id>
    <plant_name>MSC-GreyCloud01 Community Solar</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>MSC-GreyCloud01 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.802017</lat>
    <lon>-92.99688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62144</plant_id>
    <plant_name>MSC-Scandia01 CSG</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>MSC-Scandia01 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.289314</lat>
    <lon>-92.88472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62149</plant_id>
    <plant_name>Syncarpha Eagle Nest</plant_name>
    <state>NM</state>
    <county>Colfax</county>
    <operator>Syncarpha Eagle Nest I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.544166</lat>
    <lon>-105.2772</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62193</plant_id>
    <plant_name>Winegar CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.11283</lat>
    <lon>-93.50726</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62194</plant_id>
    <plant_name>Bolduan CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>43.906161</lat>
    <lon>-93.48935</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62195</plant_id>
    <plant_name>Guse CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.092021</lat>
    <lon>-93.70776</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62228</plant_id>
    <plant_name>Otis Elevator Company Solar</plant_name>
    <state>SC</state>
    <county>Florence</county>
    <operator>Otis Elevator Company</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.23933</lat>
    <lon>-79.79227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62326</plant_id>
    <plant_name>77 Metro Way</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Hartz Solar, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.770516</lat>
    <lon>-74.07224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62335</plant_id>
    <plant_name>USS Centerfield Solar CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.529</lat>
    <lon>-93.348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62336</plant_id>
    <plant_name>USS Webster Solar CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.529</lat>
    <lon>-93.395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62337</plant_id>
    <plant_name>USS Lake Patterson Solar CSG</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.839</lat>
    <lon>-93.888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62339</plant_id>
    <plant_name>USS Kost Trail Solar CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.468</lat>
    <lon>-92.872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62358</plant_id>
    <plant_name>USS King 2 CSG</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.848</lat>
    <lon>-93.846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62359</plant_id>
    <plant_name>USS Eggo Solar CSG</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.72</lat>
    <lon>-93.788</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62360</plant_id>
    <plant_name>USS DVL Solar CSG</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.818</lat>
    <lon>-93.785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62363</plant_id>
    <plant_name>Barre Solar III LLC</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.419331</lat>
    <lon>-72.1139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62370</plant_id>
    <plant_name>BWC Wareham River</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>BWC Wareham River, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.783733</lat>
    <lon>-70.69324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62393</plant_id>
    <plant_name>Atlanta Falcons Solar</plant_name>
    <state>GA</state>
    <county>Fulton</county>
    <operator>Georgia Power Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>3</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2017</latest_year>
    <lat>33.755421</lat>
    <lon>-84.40093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62407</plant_id>
    <plant_name>Anne Arundel County Public Schools</plant_name>
    <state>MD</state>
    <county>Anne Arundel</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>39.13728</lat>
    <lon>-76.49804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62418</plant_id>
    <plant_name>Verwey-Hanford Dairy Digester #2</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Hanford Renewable Energy LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.18519</lat>
    <lon>-119.6815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62419</plant_id>
    <plant_name>Verwey-Hanford Dairy Digester #3</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Hanford Renewable Energy LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.18519</lat>
    <lon>-119.6815</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62441</plant_id>
    <plant_name>Kearny Mesa Storage LLC</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Kearny Mesa Storage LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>1</battery_mwh>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.815256</lat>
    <lon>-117.1261</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62454</plant_id>
    <plant_name>Lakewood Cheddar School</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>40.0709</lat>
    <lon>-74.1808</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62458</plant_id>
    <plant_name>Ratkovich Alhambra</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>34.08145</lat>
    <lon>-118.1519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62535</plant_id>
    <plant_name>MSC-Scott01 LLC</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>MSC-Scott01 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.669475</lat>
    <lon>-93.5042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62536</plant_id>
    <plant_name>MSC-Chisago01 LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>MSC-Chisago01 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.492389</lat>
    <lon>-92.78794</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62537</plant_id>
    <plant_name>MSC-Rice01 LLC CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>MSC-Rice01 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.239015</lat>
    <lon>-93.39266</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62538</plant_id>
    <plant_name>MSC-Chisago02 LLC</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>MSC-Chisago02 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.48776</lat>
    <lon>-92.77549</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62571</plant_id>
    <plant_name>Disney Prospect</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.083387</lat>
    <lon>-118.4338</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62572</plant_id>
    <plant_name>ATT Jericho</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>40.830219</lat>
    <lon>-73.35224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62573</plant_id>
    <plant_name>ATT Kelvin</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.684675</lat>
    <lon>-117.8368</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62574</plant_id>
    <plant_name>ATT Van Nyus</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.196324</lat>
    <lon>-118.4482</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62590</plant_id>
    <plant_name>Wolf Creek Generator</plant_name>
    <state>KS</state>
    <county>Coffey</county>
    <operator>4 Rivers Electric Cooperative, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.27433</lat>
    <lon>-95.68403</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62639</plant_id>
    <plant_name>Manchester Community College East</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.763257</lat>
    <lon>-72.55714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62640</plant_id>
    <plant_name>Manchester Community College North</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.763592</lat>
    <lon>-72.56329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62677</plant_id>
    <plant_name>IKEA Canton Rooftop PV System</plant_name>
    <state>MI</state>
    <county>Wayne</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2016</latest_year>
    <lat>42.32345</lat>
    <lon>-83.42888</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62696</plant_id>
    <plant_name>FastSun 2 CSG</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.531686</lat>
    <lon>-92.9792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62700</plant_id>
    <plant_name>Kaiser Owens Dr. Fuel Cell</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>37.69923</lat>
    <lon>-121.8942</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62710</plant_id>
    <plant_name>Nationals</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Terraform Arcadia</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.874155</lat>
    <lon>-77.00668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62714</plant_id>
    <plant_name>Eyak Service Center BESS</plant_name>
    <state>AK</state>
    <county>Valdez Cordova</county>
    <operator>Cordova Electric Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>0.9</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>60.54047</lat>
    <lon>-145.7408</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62740</plant_id>
    <plant_name>MSC-Empire01, LLC</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>MSC-Empire01, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.67413</lat>
    <lon>-93.11627</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62756</plant_id>
    <plant_name>RC Energy AA LLC Solar Facility</plant_name>
    <state>NM</state>
    <county>Bernalillo</county>
    <operator>RC Energy AA LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.152721</lat>
    <lon>-106.5472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62779</plant_id>
    <plant_name>Novel Martin Solar One LLC (McLeod) CSG</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.90295</lat>
    <lon>-94.02864</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62799</plant_id>
    <plant_name>Winona Solar</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Winona Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.124097</lat>
    <lon>-91.901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62800</plant_id>
    <plant_name>Wabasha Solar</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>Wabasha Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.363109</lat>
    <lon>-92.02167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62830</plant_id>
    <plant_name>GSPP Imholte CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.557945</lat>
    <lon>-94.16324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62901</plant_id>
    <plant_name>Phoenix Contact - CCHP Plant</plant_name>
    <state>PA</state>
    <county>Dauphin</county>
    <operator>Phoenix Contact Services, Inc</operator>
    <sector>Industrial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>40.229379</lat>
    <lon>-76.75007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62910</plant_id>
    <plant_name>MNCPPC Germantown Solar</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>39.149037</lat>
    <lon>-77.31795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62961</plant_id>
    <plant_name>Novel Brooten Solar CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.512612</lat>
    <lon>-95.11354</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62962</plant_id>
    <plant_name>Novel Reber Solar CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.62871</lat>
    <lon>-94.5937</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62963</plant_id>
    <plant_name>Novel Historical Society Solar CSG</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.787705</lat>
    <lon>-95.36049</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62966</plant_id>
    <plant_name>Novel Herber Solar CSG</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.106728</lat>
    <lon>-91.88734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62967</plant_id>
    <plant_name>Novel Herickhoff Solar CSG</plant_name>
    <state>MN</state>
    <county>Douglas</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.847225</lat>
    <lon>-95.14845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62979</plant_id>
    <plant_name>Novel DeCook Solar CSG</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.012841</lat>
    <lon>-92.62699</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62982</plant_id>
    <plant_name>Novel Schmoll Farms Solar CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.97</lat>
    <lon>-92.86</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62983</plant_id>
    <plant_name>Novel Pederson Solar CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.62626</lat>
    <lon>-94.0501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62984</plant_id>
    <plant_name>Novel Jewison Solar CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.21</lat>
    <lon>-93.66</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62985</plant_id>
    <plant_name>Novel Byron Solar CSG</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.01</lat>
    <lon>-92.62</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62986</plant_id>
    <plant_name>Novel Kanewischer Solar CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.05</lat>
    <lon>-93.5</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63004</plant_id>
    <plant_name>Novel Bartel Solar CSG</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.043671</lat>
    <lon>-92.67754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63005</plant_id>
    <plant_name>Novel Haley Solar CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.09</lat>
    <lon>-93.54</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63007</plant_id>
    <plant_name>Novel MNDot Solar CSG</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.94625</lat>
    <lon>-92.81039</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63008</plant_id>
    <plant_name>Novel Winegar Partnership Solar CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.08845</lat>
    <lon>-93.55481</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63009</plant_id>
    <plant_name>Novel Peter Solar CSG</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.196124</lat>
    <lon>-93.60872</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63010</plant_id>
    <plant_name>Novel Benedix Solar CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.111261</lat>
    <lon>-92.74679</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63019</plant_id>
    <plant_name>Green Lake Solar</plant_name>
    <state>MI</state>
    <county>Grand Traverse</county>
    <operator>Heritage Sustainable Energy. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.77666</lat>
    <lon>-85.69227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63020</plant_id>
    <plant_name>TCLP Solar Phase 1</plant_name>
    <state>MI</state>
    <county>Leelanau</county>
    <operator>Heritage Sustainable Energy. LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>44.77666</lat>
    <lon>-85.69227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63033</plant_id>
    <plant_name>FastSun 19 CSG</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.655202</lat>
    <lon>-93.11077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63034</plant_id>
    <plant_name>FastSun 18 CSG</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.865428</lat>
    <lon>-91.32751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63035</plant_id>
    <plant_name>FastSun 13 CSG</plant_name>
    <state>MN</state>
    <county>Douglas</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.841655</lat>
    <lon>-95.14804</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63036</plant_id>
    <plant_name>FastSun 14 CSG</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.178968</lat>
    <lon>-93.86523</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63037</plant_id>
    <plant_name>FastSun 11 CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.300868</lat>
    <lon>-92.73624</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63038</plant_id>
    <plant_name>FastSun 10 CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.291517</lat>
    <lon>-92.71948</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63039</plant_id>
    <plant_name>FastSun 8 CSG</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.260517</lat>
    <lon>-94.29076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63040</plant_id>
    <plant_name>FastSun 9 CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.295395</lat>
    <lon>-92.69565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63042</plant_id>
    <plant_name>FastSun 3 CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.617723</lat>
    <lon>-94.48649</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63043</plant_id>
    <plant_name>FastSun 7 CSG</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.71922</lat>
    <lon>-94.49412</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63045</plant_id>
    <plant_name>FastSun 5 CSG</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.85946</lat>
    <lon>-91.31956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63046</plant_id>
    <plant_name>FastSun 1 CSG</plant_name>
    <state>MN</state>
    <county>Meeker</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.072314</lat>
    <lon>-94.30666</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63116</plant_id>
    <plant_name>Dakota Community Solar One LLC CSG</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.65779</lat>
    <lon>-93.10852</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63117</plant_id>
    <plant_name>Douglas Todd Community Solar One LLC CSG</plant_name>
    <state>MN</state>
    <county>Douglas</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.843344</lat>
    <lon>-95.15002</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63118</plant_id>
    <plant_name>Meeker Community Solar One LLC CSG</plant_name>
    <state>MN</state>
    <county>Meeker</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.07106</lat>
    <lon>-94.30718</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63119</plant_id>
    <plant_name>McLeod Community Solar One LLC CSG</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.7192</lat>
    <lon>-94.49429</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63120</plant_id>
    <plant_name>Nicollet Community Solar One LLC</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.26035</lat>
    <lon>-94.29093</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63121</plant_id>
    <plant_name>Stearns Community Solar One LLC CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.61804</lat>
    <lon>-94.48596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63122</plant_id>
    <plant_name>Sherburne Community Solar One LLC CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.53199</lat>
    <lon>-94.13578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63138</plant_id>
    <plant_name>USS Haven Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.515706</lat>
    <lon>-94.10984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63139</plant_id>
    <plant_name>USS White Cloud LLC CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.52079</lat>
    <lon>-94.13041</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63140</plant_id>
    <plant_name>USS Westeros Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.681452</lat>
    <lon>-93.76821</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63141</plant_id>
    <plant_name>USS Sunrise Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.491496</lat>
    <lon>-92.81382</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63142</plant_id>
    <plant_name>USS Milkweed Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.43538</lat>
    <lon>-94.64286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63143</plant_id>
    <plant_name>USS Greenhouse Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.238655</lat>
    <lon>-92.67075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63144</plant_id>
    <plant_name>USS Mayhew Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.62512</lat>
    <lon>-94.04987</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63145</plant_id>
    <plant_name>USS Cheyenne Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.347008</lat>
    <lon>-92.92234</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63146</plant_id>
    <plant_name>USS Midtown Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.671603</lat>
    <lon>-94.74898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63147</plant_id>
    <plant_name>USS Monarch Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.49896</lat>
    <lon>-95.13979</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63148</plant_id>
    <plant_name>USS Turkey Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Meeker</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.139302</lat>
    <lon>-94.73952</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63151</plant_id>
    <plant_name>USS Solar Sources LLC CSG</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.231914</lat>
    <lon>-92.88561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63152</plant_id>
    <plant_name>USS Christoffer Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.985518</lat>
    <lon>-95.76655</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63153</plant_id>
    <plant_name>USS Buckaroo Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>46.97727</lat>
    <lon>-96.50078</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63154</plant_id>
    <plant_name>USS Horne North Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>47.021803</lat>
    <lon>-96.47996</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63155</plant_id>
    <plant_name>USS Horne South Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>47.00414</lat>
    <lon>-96.50004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63156</plant_id>
    <plant_name>USS JJ Clay Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>47.02945</lat>
    <lon>-96.49989</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63157</plant_id>
    <plant_name>USS Verde Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.427985</lat>
    <lon>-94.93062</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63158</plant_id>
    <plant_name>USS Cougar Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.454726</lat>
    <lon>-94.92642</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63159</plant_id>
    <plant_name>USS Flower Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.269143</lat>
    <lon>-94.20905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63160</plant_id>
    <plant_name>USS All In Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Freeborn</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.83688</lat>
    <lon>-93.38967</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63163</plant_id>
    <plant_name>Tom Sifers Solar</plant_name>
    <state>CO</state>
    <county>Grand</county>
    <operator>Mountain Parks Services, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>39.959166</lat>
    <lon>-105.846</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63164</plant_id>
    <plant_name>Whiskey Hill Solar</plant_name>
    <state>CO</state>
    <county>Jackson</county>
    <operator>Mountain Parks Services, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.8125</lat>
    <lon>-106.2897</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63165</plant_id>
    <plant_name>USS Reindeer Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.643806</lat>
    <lon>-94.04322</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63166</plant_id>
    <plant_name>USS Bush Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.12347</lat>
    <lon>-93.26689</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63167</plant_id>
    <plant_name>USS Hancock Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.7025</lat>
    <lon>-93.7858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63168</plant_id>
    <plant_name>USS Pheasant Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.934706</lat>
    <lon>-95.25133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63169</plant_id>
    <plant_name>USS KVPV Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>46.983191</lat>
    <lon>-96.50065</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63170</plant_id>
    <plant_name>USS Kass Solar LLC</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.22443</lat>
    <lon>-95.68949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63171</plant_id>
    <plant_name>USS Chariot Solar LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.78883</lat>
    <lon>-95.09562</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63174</plant_id>
    <plant_name>Hartmann Project CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Hartmann Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.493595</lat>
    <lon>-94.11344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63175</plant_id>
    <plant_name>E. Goenner Project CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>E. Goenner Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.463956</lat>
    <lon>-94.09101</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63176</plant_id>
    <plant_name>Prawer Project CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Prawer Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.463678</lat>
    <lon>-94.04508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63177</plant_id>
    <plant_name>Schwinghamer Project CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Schwinghamer Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.626942</lat>
    <lon>-94.59608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63178</plant_id>
    <plant_name>STAG St. Paul Project CSG</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>STAG St. Paul Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.885633</lat>
    <lon>-93.02643</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63179</plant_id>
    <plant_name>Linden 01 CSG</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.591619</lat>
    <lon>-93.84539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63182</plant_id>
    <plant_name>Linden 02 CSG</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.591933</lat>
    <lon>-93.84682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63183</plant_id>
    <plant_name>Linden 03 CSG</plant_name>
    <state>MN</state>
    <county>Scott</county>
    <operator>SunShare Management</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.592132</lat>
    <lon>-93.84497</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63200</plant_id>
    <plant_name>Bergenmand Solar Partners, LLC Mahwah</plant_name>
    <state>NJ</state>
    <county>Bergen</county>
    <operator>Vanguard Energy Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>41.079073</lat>
    <lon>-74.15001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63216</plant_id>
    <plant_name>USS B&amp;B Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.413</lat>
    <lon>-95.009</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63218</plant_id>
    <plant_name>USS Water Town Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.19777</lat>
    <lon>-93.58484</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63219</plant_id>
    <plant_name>USS Water Fowl Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.9066</lat>
    <lon>-94.16044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63220</plant_id>
    <plant_name>USS Water City Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.21782</lat>
    <lon>-93.58042</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63221</plant_id>
    <plant_name>USS Steamboat Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.41301</lat>
    <lon>-94.9858</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63239</plant_id>
    <plant_name>Sherman Solar</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.583</lat>
    <lon>-71.902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63240</plant_id>
    <plant_name>Jackson Solar (CT)</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.583</lat>
    <lon>-71.904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63247</plant_id>
    <plant_name>Novel Debra Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.09394</lat>
    <lon>-92.74975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63249</plant_id>
    <plant_name>Novel Wayne Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.102341</lat>
    <lon>-92.74648</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63252</plant_id>
    <plant_name>Cannon Garden Solar</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.24416</lat>
    <lon>-93.26916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63263</plant_id>
    <plant_name>Plainfield Solar 2</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.679</lat>
    <lon>-71.905</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63279</plant_id>
    <plant_name>Barneveld Solar</plant_name>
    <state>NY</state>
    <county>Oneida</county>
    <operator>Citizens Enterprises Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>43.251388</lat>
    <lon>-75.17722</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63304</plant_id>
    <plant_name>Allium Community Solar Garden, LLC</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.399701</lat>
    <lon>-94.72314</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63305</plant_id>
    <plant_name>Aster Community Solar Garden, LLC</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.008221</lat>
    <lon>-95.22945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63307</plant_id>
    <plant_name>Westport Community Solar, LLC</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.939037</lat>
    <lon>-94.90438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63308</plant_id>
    <plant_name>Marigold Community Solar Garden, LLC</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.197311</lat>
    <lon>-93.61527</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63309</plant_id>
    <plant_name>Honeysuckle Solar, LLC</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.907623</lat>
    <lon>-94.02715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63311</plant_id>
    <plant_name>Lantana Solar, LLC</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.646</lat>
    <lon>-95.358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63312</plant_id>
    <plant_name>Hyacinth Solar, LLC</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.474147</lat>
    <lon>-93.19928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63313</plant_id>
    <plant_name>Coral Bells Solar, LLC</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.471</lat>
    <lon>-92.891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63314</plant_id>
    <plant_name>Primrose Solar, LLC</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.205398</lat>
    <lon>-93.9792</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63315</plant_id>
    <plant_name>Kerria Solar, LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.795609</lat>
    <lon>-95.2032</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63317</plant_id>
    <plant_name>Geranium Solar, LLC</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.964569</lat>
    <lon>-95.22951</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63318</plant_id>
    <plant_name>Bellflower Solar, LLC</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.507295</lat>
    <lon>-95.12733</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63319</plant_id>
    <plant_name>Iris Solar, LLC (MN)</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.253592</lat>
    <lon>-94.20969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63336</plant_id>
    <plant_name>Sutton Solar 2, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Sutton Solar 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.10252</lat>
    <lon>-71.69795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63354</plant_id>
    <plant_name>Ticket Network South Windsor</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Earthlight Technologies</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.821518</lat>
    <lon>-72.50738</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63358</plant_id>
    <plant_name>Corbin Russwin Phase 3 Berlin</plant_name>
    <state>CT</state>
    <county>Hartford</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.642322</lat>
    <lon>-72.74091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63361</plant_id>
    <plant_name>Medline Ind. Phase 2 Tracy</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>Powerflex</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.734761</lat>
    <lon>-121.5089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63363</plant_id>
    <plant_name>Niagara Bottling Stockton</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>ClearGen LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>37.894817</lat>
    <lon>-121.2489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63367</plant_id>
    <plant_name>Strandness Garden</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Strandness Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.65727</lat>
    <lon>-95.52985</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63374</plant_id>
    <plant_name>CP Middletown Solar I LLC</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.548826</lat>
    <lon>-72.70688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63375</plant_id>
    <plant_name>CP Middletown Solar II LLC</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>Green Street Power Partners</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.548826</lat>
    <lon>-72.70688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63380</plant_id>
    <plant_name>Goodhue Community Solar One LLC CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.29741</lat>
    <lon>-92.64087</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63394</plant_id>
    <plant_name>Falls Creek Garden</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Falls Creek Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.1757</lat>
    <lon>-93.14274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63395</plant_id>
    <plant_name>Star Garden</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Star Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.65063</lat>
    <lon>-95.53088</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63396</plant_id>
    <plant_name>Buffalo Garden</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Buffalo Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.00036</lat>
    <lon>-93.49681</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63397</plant_id>
    <plant_name>Loon Garden</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Loon Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.08968</lat>
    <lon>-93.55615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63400</plant_id>
    <plant_name>Stearns Solar I</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Stearns Solar I LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.650158</lat>
    <lon>-94.55754</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63401</plant_id>
    <plant_name>Olinda Trail Solar</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Olinda Trail Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.31593</lat>
    <lon>-92.80411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63402</plant_id>
    <plant_name>New Munich Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>New Munich Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.654086</lat>
    <lon>-94.75565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63403</plant_id>
    <plant_name>Clara City Solar</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Clara City Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.94664</lat>
    <lon>-95.35024</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63413</plant_id>
    <plant_name>LTMUA</plant_name>
    <state>NJ</state>
    <county>Cape May</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>39.00776</lat>
    <lon>-74.93556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63417</plant_id>
    <plant_name>Goodhue Community Solar Three LLC CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.29725</lat>
    <lon>-92.74543</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63424</plant_id>
    <plant_name>Straight Garden Solar</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Straight Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.25271</lat>
    <lon>-93.27304</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63425</plant_id>
    <plant_name>Leven Garden Solar</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Leven Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.71693</lat>
    <lon>-95.26357</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63426</plant_id>
    <plant_name>Zumbro Solar Garden</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Zumbro Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.04603</lat>
    <lon>-92.75999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63427</plant_id>
    <plant_name>Mud Garden Solar</plant_name>
    <state>MN</state>
    <county>Sibley</county>
    <operator>Mud Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.54328</lat>
    <lon>-94.2226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63429</plant_id>
    <plant_name>Erin Garden Solar</plant_name>
    <state>MN</state>
    <county>Sibley</county>
    <operator>Erin Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.67524</lat>
    <lon>-94.01007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63430</plant_id>
    <plant_name>Chub Garden Solar</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Chub Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.48595</lat>
    <lon>-93.21279</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63434</plant_id>
    <plant_name>Maston Garden Solar</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Maston Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.04334</lat>
    <lon>-92.69045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63453</plant_id>
    <plant_name>Malmedal Solar Garden</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.65736</lat>
    <lon>-95.51856</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63454</plant_id>
    <plant_name>Wollan Garden Solar</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>45.637121</lat>
    <lon>-95.5309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63455</plant_id>
    <plant_name>RE-VFO LLC</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>RE-VFO LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.353675</lat>
    <lon>-119.4008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63480</plant_id>
    <plant_name>Roberds Garden CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Roberds Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.29946</lat>
    <lon>-93.23909</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63481</plant_id>
    <plant_name>Clear Garden CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Clear Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.035361</lat>
    <lon>-93.49489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63530</plant_id>
    <plant_name>Jersey City DWP</plant_name>
    <state>NJ</state>
    <county>Hudson</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.690025</lat>
    <lon>-74.08743</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63532</plant_id>
    <plant_name>Winona Community Solar One LLC</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.858524</lat>
    <lon>-91.32198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63533</plant_id>
    <plant_name>Goodhue Community Solar Two LLC</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.293907</lat>
    <lon>-92.7236</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63534</plant_id>
    <plant_name>Houston/Winona Community Solar One LLC</plant_name>
    <state>MN</state>
    <county>Houston</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.866327</lat>
    <lon>-91.32235</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63537</plant_id>
    <plant_name>Amazon BDL3 Solar Project</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Solar Star Prime 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>41.45</lat>
    <lon>-72.85</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63542</plant_id>
    <plant_name>Enter Solar</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Arcadia Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.141576</lat>
    <lon>-93.7077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63543</plant_id>
    <plant_name>Lange Solar</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Arcadia Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>44.028216</lat>
    <lon>-92.63908</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63555</plant_id>
    <plant_name>St. Joseph's Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.143586</lat>
    <lon>-71.97211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63557</plant_id>
    <plant_name>Blair Wire Village Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.259</lat>
    <lon>-71.975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63558</plant_id>
    <plant_name>Barton Acres Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.572</lat>
    <lon>-72.164</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63561</plant_id>
    <plant_name>Cherry Valley Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.229961</lat>
    <lon>-71.89155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63564</plant_id>
    <plant_name>JH Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.243</lat>
    <lon>-72.1</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63565</plant_id>
    <plant_name>Woodchuck Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.258218</lat>
    <lon>-71.97519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63569</plant_id>
    <plant_name>Dudley River 3 Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.071255</lat>
    <lon>-71.99822</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63570</plant_id>
    <plant_name>Dudley River 2 Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.07239</lat>
    <lon>-71.99706</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63571</plant_id>
    <plant_name>Dudley River Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.070934</lat>
    <lon>-71.99966</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63572</plant_id>
    <plant_name>Ledeaux Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.241</lat>
    <lon>-72.104</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63573</plant_id>
    <plant_name>Cohasse Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.056</lat>
    <lon>-72.045</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63575</plant_id>
    <plant_name>Thunderbird Generator (Tbird)</plant_name>
    <state>KS</state>
    <county>Lyon</county>
    <operator>4 Rivers Electric Cooperative, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.468931</lat>
    <lon>-96.25358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63576</plant_id>
    <plant_name>FastSun 4 CSG</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.190434</lat>
    <lon>-92.95902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63577</plant_id>
    <plant_name>FastSun 21 CSG</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.498092</lat>
    <lon>-94.11472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63586</plant_id>
    <plant_name>SR Kersey II</plant_name>
    <state>CO</state>
    <county>Weld</county>
    <operator>SR Kersey II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>40.386223</lat>
    <lon>-104.554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63589</plant_id>
    <plant_name>Palombo B Solar, LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>38 Degrees North, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.028</lat>
    <lon>-71.596</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63593</plant_id>
    <plant_name>Brooten CSG1, LLC</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.498798</lat>
    <lon>-95.16223</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63594</plant_id>
    <plant_name>Buffalo Lake CSG1, LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.732611</lat>
    <lon>-94.62303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63595</plant_id>
    <plant_name>Lowry CSG2, LLC</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.669611</lat>
    <lon>-95.51053</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63596</plant_id>
    <plant_name>Paynesville CSG1, LLC</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.401833</lat>
    <lon>-94.72278</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63597</plant_id>
    <plant_name>Plato CSG1, LLC</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.790278</lat>
    <lon>-94.08283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63598</plant_id>
    <plant_name>Sacred Heart CSG1, LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.783167</lat>
    <lon>-95.36108</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63599</plant_id>
    <plant_name>Stewart CSG1, LLC</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.725639</lat>
    <lon>-94.49508</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63606</plant_id>
    <plant_name>ATT Ventura Blvd</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.152191</lat>
    <lon>-118.4561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63612</plant_id>
    <plant_name>DATS</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>6</battery_mwh>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>33.70731</lat>
    <lon>-117.8911</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63614</plant_id>
    <plant_name>LAWRP</plant_name>
    <state>CA</state>
    <county>Orange</county>
    <operator>Hybrid-Electric Building Technologies West Los Angeles 1, LLC</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>5</battery_mwh>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.63778</lat>
    <lon>-117.7138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63629</plant_id>
    <plant_name>Hydra Community Solar Garden, LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.416723</lat>
    <lon>-93.21986</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63649</plant_id>
    <plant_name>NHH004 Winthrop Fuel Cell</plant_name>
    <state>NY</state>
    <county>Kings</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.656847</lat>
    <lon>-73.94666</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63650</plant_id>
    <plant_name>Flodquist Community Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Flodquist Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.489436</lat>
    <lon>-92.85702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63657</plant_id>
    <plant_name>Siems Solar Project CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Siems Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.272392</lat>
    <lon>-92.55696</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63658</plant_id>
    <plant_name>Schueler Community Solar</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Schueler Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.306139</lat>
    <lon>-94.08831</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63678</plant_id>
    <plant_name>Paulson Community (CSG)</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.335686</lat>
    <lon>-93.91702</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63679</plant_id>
    <plant_name>Laurel Village (CSG)</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.083808</lat>
    <lon>-94.17968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63680</plant_id>
    <plant_name>Hertzberg Community (CSG)</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.410876</lat>
    <lon>-94.70206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63682</plant_id>
    <plant_name>Brenda Luhman - CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.291838</lat>
    <lon>-92.72945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63683</plant_id>
    <plant_name>Carlson Community (CSG)</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.483155</lat>
    <lon>-92.81518</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63684</plant_id>
    <plant_name>Hammer Community (CSG)</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.414071</lat>
    <lon>-94.00571</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63697</plant_id>
    <plant_name>Cranberry Solar</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>GWE Cranberry Solar RT, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>41.871955</lat>
    <lon>-70.90779</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63724</plant_id>
    <plant_name>Hayfield Solar I LLC CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.894113</lat>
    <lon>-92.86719</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63725</plant_id>
    <plant_name>Hayfield Solar III LLC CSG</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.919214</lat>
    <lon>-92.86126</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63726</plant_id>
    <plant_name>Pipestone City Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.015972</lat>
    <lon>-96.31751</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63741</plant_id>
    <plant_name>USS Bluff Country Solar CSG</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.111881</lat>
    <lon>-91.84355</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63742</plant_id>
    <plant_name>USS Viceroy Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.49776</lat>
    <lon>-95.16451</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63743</plant_id>
    <plant_name>USS Solar Way LLC CSG</plant_name>
    <state>MN</state>
    <county>Freeborn</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.82563</lat>
    <lon>-93.43378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63744</plant_id>
    <plant_name>USS Hubers Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.45692</lat>
    <lon>-93.12447</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63791</plant_id>
    <plant_name>Sobania Community Solar LLC</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.423567</lat>
    <lon>-94.0211</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63792</plant_id>
    <plant_name>Svihel Community Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>Svihel Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.678</lat>
    <lon>-93.919</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63793</plant_id>
    <plant_name>Studenski Community Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>Studenski Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.63</lat>
    <lon>-94.05</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63794</plant_id>
    <plant_name>Stevens Community Solar LLC</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.661251</lat>
    <lon>-93.94227</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63816</plant_id>
    <plant_name>RJC CSG, LLC</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.125</lat>
    <lon>-93.277</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63817</plant_id>
    <plant_name>Hinterland CSG, LLC</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.416</lat>
    <lon>-94.01</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63819</plant_id>
    <plant_name>Betcher CSG 1, LLC</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.392</lat>
    <lon>-92.595</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63820</plant_id>
    <plant_name>Huneke CSG 1, LLC</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.297</lat>
    <lon>-92.736</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63821</plant_id>
    <plant_name>Huneke CSG 2, LLC</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.263</lat>
    <lon>-92.669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63887</plant_id>
    <plant_name>East Brookfield Main Street Solar LLC CS</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.2323</lat>
    <lon>-72.0294</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63889</plant_id>
    <plant_name>ESIL-PFCHICAGO 2, LLC</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.817</lat>
    <lon>-87.735</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63934</plant_id>
    <plant_name>Severson Garden</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Severson HoldCo LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.00057</lat>
    <lon>-93.49594</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63935</plant_id>
    <plant_name>Marion Garden</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Excelsior Energy Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.25009</lat>
    <lon>-93.27397</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63936</plant_id>
    <plant_name>Silver Lake Garden</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Excelsior Energy Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.00789</lat>
    <lon>-93.49541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63937</plant_id>
    <plant_name>Lyman Garden</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>Excelsior Energy Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.47637</lat>
    <lon>-93.15309</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63938</plant_id>
    <plant_name>Nicollet Garden</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>Excelsior Energy Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.25364</lat>
    <lon>-94.27067</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63939</plant_id>
    <plant_name>Union Garden</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Excelsior Energy Capital</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.46936</lat>
    <lon>-93.13565</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63950</plant_id>
    <plant_name>Erving CSG</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Erving Poplar Mountain Solar 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.603717</lat>
    <lon>-72.47116</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63966</plant_id>
    <plant_name>FastSun12 CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.220125</lat>
    <lon>-93.45697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63987</plant_id>
    <plant_name>Novel Martens Solar LLC(CSG)</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.442361</lat>
    <lon>-94.38725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63993</plant_id>
    <plant_name>FTF-PackingShed</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Family Tree Farms</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>36.546901</lat>
    <lon>-119.4302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63994</plant_id>
    <plant_name>Firebaugh-CCS-PV-1</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Mike Woolf Farming</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>36.734667</lat>
    <lon>-120.6128</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64001</plant_id>
    <plant_name>Camellia Solar, LLC</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Geronimo Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.642745</lat>
    <lon>-95.35327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64011</plant_id>
    <plant_name>Bainbridge Solar</plant_name>
    <state>GA</state>
    <county>Decatur</county>
    <operator>Bainbridge Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>30.967159</lat>
    <lon>-84.62554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64056</plant_id>
    <plant_name>T Luhman CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.282</lat>
    <lon>-92.682</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64099</plant_id>
    <plant_name>Tweite Community Solar LLC</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Tweite Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.025148</lat>
    <lon>-92.67449</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64141</plant_id>
    <plant_name>Still Water Power</plant_name>
    <state>CA</state>
    <county>Kings</county>
    <operator>Still Water Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Waste Biomass</primary_technology>
    <primary_energy_source>OBG</primary_energy_source>
    <technologies>Other Waste Biomass</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.398796</lat>
    <lon>-119.5243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64153</plant_id>
    <plant_name>Novel Novak Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.659361</lat>
    <lon>-93.93175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64154</plant_id>
    <plant_name>Novel Shelly Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.613956</lat>
    <lon>-95.64267</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64184</plant_id>
    <plant_name>ZPD-PT Solar Project 2017-044 LLC CSG</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AES Distributed Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.2782</lat>
    <lon>-72.0071</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64200</plant_id>
    <plant_name>Jack's Solar Garden</plant_name>
    <state>CO</state>
    <county>Boulder</county>
    <operator>Jack's Solar Garden</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>40.122552</lat>
    <lon>-105.1303</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64217</plant_id>
    <plant_name>Blair Solar</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.02956</lat>
    <lon>-72.50324</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64218</plant_id>
    <plant_name>Madison Solar (CT)</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.0305</lat>
    <lon>-72.50395</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64219</plant_id>
    <plant_name>Few Solar</plant_name>
    <state>CT</state>
    <county>Tolland</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>42.03107</lat>
    <lon>-72.50438</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64261</plant_id>
    <plant_name>Forrest City- Prison Site</plant_name>
    <state>AR</state>
    <county>St Francis</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.97953</lat>
    <lon>-90.80602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64262</plant_id>
    <plant_name>Forrest City- Eldridge Road</plant_name>
    <state>AR</state>
    <county>St Francis</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.03789</lat>
    <lon>-90.80707</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64263</plant_id>
    <plant_name>Hot Springs 2020</plant_name>
    <state>AR</state>
    <county>Garland</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.421</lat>
    <lon>-93.19485</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64343</plant_id>
    <plant_name>6685 Santa Barbara Ct</plant_name>
    <state>MD</state>
    <county>Howard</county>
    <operator>6685 Santa Barbara Ct</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.189589</lat>
    <lon>-76.74301</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64364</plant_id>
    <plant_name>SCS Beltway 011754 Rock Falls, LLC</plant_name>
    <state>IL</state>
    <county>Whiteside</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.767012</lat>
    <lon>-89.67033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64370</plant_id>
    <plant_name>Plainfield Solar 1</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.68</lat>
    <lon>-71.901</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64413</plant_id>
    <plant_name>Schull CSG</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Schull CSG LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.91635</lat>
    <lon>-93.93038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64479</plant_id>
    <plant_name>Novel Handeland Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Yellow Medicine</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.782077</lat>
    <lon>-95.78581</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64482</plant_id>
    <plant_name>Novel Stavem Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.66683</lat>
    <lon>-95.40195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64483</plant_id>
    <plant_name>Novel Sunnyfield Farms Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.245884</lat>
    <lon>-92.54621</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64484</plant_id>
    <plant_name>Novel Schroeder Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.804234</lat>
    <lon>-95.2056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64485</plant_id>
    <plant_name>Novel Caroline Solar, LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.472611</lat>
    <lon>-92.89924</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64486</plant_id>
    <plant_name>Novel David Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.000397</lat>
    <lon>-93.50162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64487</plant_id>
    <plant_name>Novel Huneke Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.267319</lat>
    <lon>-92.66487</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64488</plant_id>
    <plant_name>Novel Denzer Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.101108</lat>
    <lon>-91.76288</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64503</plant_id>
    <plant_name>Palmer Community Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Palmer Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.491444</lat>
    <lon>-92.79367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64504</plant_id>
    <plant_name>Medin 2 Community Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Medin 2 Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.479972</lat>
    <lon>-92.77639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64512</plant_id>
    <plant_name>Hamlet Solar Energy Storage</plant_name>
    <state>NC</state>
    <county>Richmond</county>
    <operator>North Carolina El Member Corp</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>1.1</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.846047</lat>
    <lon>-79.73401</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64518</plant_id>
    <plant_name>CA Institute for Women</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>Ecoplexus, Inc</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.949722</lat>
    <lon>-117.6364</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64563</plant_id>
    <plant_name>Novel Stein Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>REA Investments, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.389128</lat>
    <lon>-92.67606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64573</plant_id>
    <plant_name>Joe Jenny</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>AMP MA Joe Jenny</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.10357</lat>
    <lon>-71.81539</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64577</plant_id>
    <plant_name>Minisink CSG</plant_name>
    <state>NY</state>
    <county>Orange</county>
    <operator>Minisink Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.353476</lat>
    <lon>-74.51541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64587</plant_id>
    <plant_name>Dover (MA)</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>BWC Buckmaster Pond LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.22737</lat>
    <lon>-71.24891</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64645</plant_id>
    <plant_name>Mason Solar One LLC</plant_name>
    <state>MD</state>
    <county>Cecil</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>39.69196</lat>
    <lon>-75.91848</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64697</plant_id>
    <plant_name>Swan Garden</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Swan Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.7204</lat>
    <lon>-95.2653</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64706</plant_id>
    <plant_name>Acushnet MA 1</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.697</lat>
    <lon>-70.903</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64707</plant_id>
    <plant_name>Acushnet MA 2 (CSG)</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.70596</lat>
    <lon>-70.88635</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64728</plant_id>
    <plant_name>Novel Froehle Solar LLC</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Novel Froehle Solar HQ LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.467562</lat>
    <lon>-94.39816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64729</plant_id>
    <plant_name>Novel Milbradt Solar LLC</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>Novel Milbradt Solar HQ LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.651132</lat>
    <lon>-95.33955</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64746</plant_id>
    <plant_name>Goldman Sachs Carports Solar</plant_name>
    <state>NY</state>
    <county>Albany</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.76573</lat>
    <lon>-73.75055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64753</plant_id>
    <plant_name>FDX010.0 FedEx Fuel Cell</plant_name>
    <state>CT</state>
    <county>Middlesex</county>
    <operator>2016 ESA Project Company, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.5948</lat>
    <lon>-72.71316</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64821</plant_id>
    <plant_name>FELPS 1 - Calaveras</plant_name>
    <state>TX</state>
    <county>Wilson</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.220361</lat>
    <lon>-98.25087</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64823</plant_id>
    <plant_name>FELPS 2 - Calaveras</plant_name>
    <state>TX</state>
    <county>Wilson</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.220942</lat>
    <lon>-98.25167</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64824</plant_id>
    <plant_name>FELPS 3 - Floresville South</plant_name>
    <state>TX</state>
    <county>Wilson</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.129219</lat>
    <lon>-98.1063</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64825</plant_id>
    <plant_name>FELPS 4 - Floresville South</plant_name>
    <state>TX</state>
    <county>Wilson</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.128666</lat>
    <lon>-98.10704</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64826</plant_id>
    <plant_name>FELPS 5- Floresville South</plant_name>
    <state>TX</state>
    <county>Wilson</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.128151</lat>
    <lon>-98.10734</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64827</plant_id>
    <plant_name>FELPS 6- Floresville West</plant_name>
    <state>TX</state>
    <county>Wilson</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.13398</lat>
    <lon>-98.19335</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64828</plant_id>
    <plant_name>FELPS 7- Floresville West</plant_name>
    <state>TX</state>
    <county>Wilson</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>29.133613</lat>
    <lon>-98.19275</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64836</plant_id>
    <plant_name>Catalina Express</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.749947</lat>
    <lon>-118.2785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64837</plant_id>
    <plant_name>Marina South</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.717993</lat>
    <lon>-118.2756</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64866</plant_id>
    <plant_name>USS Wildcat Solar LLC</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.394128</lat>
    <lon>-92.60628</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64869</plant_id>
    <plant_name>Helen CSG 1 LLC</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.7893</lat>
    <lon>-94.05075</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64870</plant_id>
    <plant_name>USS Quail Solar LLC</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.260208</lat>
    <lon>-93.79173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64871</plant_id>
    <plant_name>USS Danube Solar LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.795592</lat>
    <lon>-95.10302</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64932</plant_id>
    <plant_name>Rushford Village</plant_name>
    <state>MN</state>
    <county>Fillmore</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.8066</lat>
    <lon>-91.79159</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64987</plant_id>
    <plant_name>USS Foley Solar LLC</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>45.68047</lat>
    <lon>-93.9248</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64988</plant_id>
    <plant_name>USS Prokosch Solar LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.772867</lat>
    <lon>-94.91052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64989</plant_id>
    <plant_name>USS Rosebud Solar LLC</plant_name>
    <state>MN</state>
    <county>Redwood</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.472694</lat>
    <lon>-94.92089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64990</plant_id>
    <plant_name>Medin CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.488101</lat>
    <lon>-92.78473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64991</plant_id>
    <plant_name>Johnson CSG 1</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.485222</lat>
    <lon>-92.81564</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64992</plant_id>
    <plant_name>Cornillie Solar CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.459283</lat>
    <lon>-92.89781</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65003</plant_id>
    <plant_name>MN CSG 2019-16 LLC</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>MN CSG 2019-16 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.214681</lat>
    <lon>-93.96006</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65006</plant_id>
    <plant_name>Novel Bo Hu 1 Solar (CSG)</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Novel Bo Hu 1 Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.41552</lat>
    <lon>-93.15442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65024</plant_id>
    <plant_name>Novel Brock Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Yellow Medicine</county>
    <operator>Novel Brock Solar HQ LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.791225</lat>
    <lon>-95.76654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65025</plant_id>
    <plant_name>Novel Swenson Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Novel Swenson Solar HQ LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.492022</lat>
    <lon>-92.86583</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65075</plant_id>
    <plant_name>Everson Garden</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Everson Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.08963</lat>
    <lon>-93.5531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65092</plant_id>
    <plant_name>115 G Fisher</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.877476</lat>
    <lon>-70.83984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65093</plant_id>
    <plant_name>154 D Fisher</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Greenbacker Renewable Energy Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>41.87476</lat>
    <lon>-70.83984</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65152</plant_id>
    <plant_name>Clinton Solar</plant_name>
    <state>CT</state>
    <county>New London</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.5825</lat>
    <lon>-71.9018</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65160</plant_id>
    <plant_name>Lily Garden</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Lily Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.07963</lat>
    <lon>-93.5499</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65168</plant_id>
    <plant_name>Five H Farms Solar Array</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>Maas Energy Works</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1.1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.120446</lat>
    <lon>-120.2928</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65169</plant_id>
    <plant_name>Van der Kooi Dairy Solar Array</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Maas Energy Works</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1.5</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.29169</lat>
    <lon>-120.0224</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65185</plant_id>
    <plant_name>Broadway 3 - Tucson Phase I</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>32.24817</lat>
    <lon>-111.2611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65186</plant_id>
    <plant_name>Broadway 3 - UC Merced 1</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>37.36448</lat>
    <lon>-120.4311</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65191</plant_id>
    <plant_name>University of San Diego</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Bloom Energy 2009 PPA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.771701</lat>
    <lon>-117.1916</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65193</plant_id>
    <plant_name>CalTech - Pasadena (PPA)</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy 2009 PPA</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>34.139368</lat>
    <lon>-118.1215</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65196</plant_id>
    <plant_name>SCC - San Jose</plant_name>
    <state>CA</state>
    <county>Santa Clara</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>37.35106</lat>
    <lon>-121.9055</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65200</plant_id>
    <plant_name>DirecTV - Los Angeles</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.983377</lat>
    <lon>-118.4252</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65204</plant_id>
    <plant_name>AT&amp;T - Redwood City</plant_name>
    <state>CA</state>
    <county>San Mateo</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.480769</lat>
    <lon>-122.2004</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65205</plant_id>
    <plant_name>AT&amp;T - Gardena</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>33.874969</lat>
    <lon>-118.2898</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65206</plant_id>
    <plant_name>AT&amp;T - Hawthorne</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>33.92429</lat>
    <lon>-118.3206</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65208</plant_id>
    <plant_name>AT&amp;T - Hayward</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>37.659879</lat>
    <lon>-122.0969</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65211</plant_id>
    <plant_name>Comcast - Universal City</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>34.137717</lat>
    <lon>-118.3608</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65276</plant_id>
    <plant_name>USS Peach Solar LLC</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.17107</lat>
    <lon>-93.90887</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65353</plant_id>
    <plant_name>McHenry Solar</plant_name>
    <state>CT</state>
    <county>Windham</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.77</lat>
    <lon>-72.0802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65360</plant_id>
    <plant_name>AT&amp;T - San Diego Trade Street</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>32.88758</lat>
    <lon>-117.1668</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65381</plant_id>
    <plant_name>Allie L.L.C. (CSG)</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Allie L.L.C.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.78879</lat>
    <lon>-95.20154</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65399</plant_id>
    <plant_name>Mill Pond Hydro</plant_name>
    <state>NY</state>
    <county>Greene</county>
    <operator>Rivers Electric, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1994</first_year>
    <latest_year>1994</latest_year>
    <lat>42.252975</lat>
    <lon>-73.89795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65411</plant_id>
    <plant_name>Airport 009239 SCS Lexington, LLC</plant_name>
    <state>NE</state>
    <county>Dawson</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.785402</lat>
    <lon>-99.76802</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65414</plant_id>
    <plant_name>SCS Plainfield 011755 Naperville, LLC</plant_name>
    <state>IL</state>
    <county>DuPage</county>
    <operator>Arevon Energy, Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.69963</lat>
    <lon>-88.16644</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65439</plant_id>
    <plant_name>USS Franklin Solar LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.536158</lat>
    <lon>-94.90175</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65440</plant_id>
    <plant_name>USS Catfish Solar LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.535931</lat>
    <lon>-94.90422</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65442</plant_id>
    <plant_name>USS Mesa Solar LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.47093</lat>
    <lon>-95.05092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65443</plant_id>
    <plant_name>USS Wells Creek Solar LLC</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.234</lat>
    <lon>-92.36531</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65444</plant_id>
    <plant_name>USS Verbena Solar LLC</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.725917</lat>
    <lon>-94.49423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65448</plant_id>
    <plant_name>SolarClub 10 LLC</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.273</lat>
    <lon>-93.83</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65449</plant_id>
    <plant_name>SolarClub 15 LLC</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>45.43</lat>
    <lon>-94.026</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65450</plant_id>
    <plant_name>NY - PANYNJ - LaGuardia - Rooftop</plant_name>
    <state>NY</state>
    <county>Queens</county>
    <operator>Forefront Power, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.772982</lat>
    <lon>-73.87472</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65451</plant_id>
    <plant_name>SolarClub 20 LLC</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.368</lat>
    <lon>-92.028</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65452</plant_id>
    <plant_name>SolarClub 23 LLC</plant_name>
    <state>MN</state>
    <county>Houston</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>43.866</lat>
    <lon>-91.323</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65453</plant_id>
    <plant_name>SolarClub 28 LLC</plant_name>
    <state>MN</state>
    <county>Sibley</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.543</lat>
    <lon>-94.226</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65455</plant_id>
    <plant_name>SolarClub 35 LLC</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>44.101</lat>
    <lon>-94.077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65514</plant_id>
    <plant_name>Bear Grove Solar</plant_name>
    <state>MN</state>
    <county>Olmsted</county>
    <operator>Bear Grove Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.12971</lat>
    <lon>-92.58407</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65515</plant_id>
    <plant_name>Dodge Renewables 1</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Dodge Renewables 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.01862</lat>
    <lon>-92.86606</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65516</plant_id>
    <plant_name>Dodge Renewables 2</plant_name>
    <state>MN</state>
    <county>Dodge</county>
    <operator>Dodge Renewables 2, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.02037</lat>
    <lon>-92.86973</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65559</plant_id>
    <plant_name>Nolan</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>LSE Crater LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.238649</lat>
    <lon>-73.36162</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65585</plant_id>
    <plant_name>Whatley Renewables</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Whatley Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.444614</lat>
    <lon>-72.60963</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65595</plant_id>
    <plant_name>Hormel CSG Solar</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>DG Central 1, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.953</lat>
    <lon>-95.697</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65632</plant_id>
    <plant_name>MN CSG 2019-38 DE LLC</plant_name>
    <state>MN</state>
    <county>Le Sueur</county>
    <operator>MN CSG 2019-38 DE LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.316403</lat>
    <lon>-93.89424</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65642</plant_id>
    <plant_name>SR Jackson II</plant_name>
    <state>TN</state>
    <county>Madison</county>
    <operator>SR Jackson II, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.607757</lat>
    <lon>-88.91705</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65659</plant_id>
    <plant_name>ENGIE 2020 ProjectCo-WI1 LLC</plant_name>
    <state>WI</state>
    <county>Fond Du Lac</county>
    <operator>ENGIE 2020 ProjectCo-WI1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.735027</lat>
    <lon>-88.47378</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65691</plant_id>
    <plant_name>KSU Trumbull</plant_name>
    <state>OH</state>
    <county>Trumbull</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>41.27874</lat>
    <lon>-80.83665</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65722</plant_id>
    <plant_name>Webster Solar</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Webster Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.0281</lat>
    <lon>-71.85031</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65771</plant_id>
    <plant_name>Big Bend Agrivoltaics</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.782731</lat>
    <lon>-82.4008</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65772</plant_id>
    <plant_name>Big Bend Floating Solar I</plant_name>
    <state>FL</state>
    <county>Hillsborough</county>
    <operator>Tampa Electric Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>27.78822</lat>
    <lon>-82.39541</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65974</plant_id>
    <plant_name>Timmerman (CSG)</plant_name>
    <state>MN</state>
    <county>Lyon</county>
    <operator>Elora LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.234621</lat>
    <lon>-95.88135</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65986</plant_id>
    <plant_name>USS Golly Gee Solar LLC</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.242089</lat>
    <lon>-93.58142</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65989</plant_id>
    <plant_name>South Garden</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>South Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.949173</lat>
    <lon>-94.07688</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65991</plant_id>
    <plant_name>USS Dressen Family Solar LLC</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.898161</lat>
    <lon>-93.83873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65992</plant_id>
    <plant_name>USS Wolf Solar LLC</plant_name>
    <state>MN</state>
    <county>Yellow Medicine</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.615314</lat>
    <lon>-95.59845</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65993</plant_id>
    <plant_name>USS Wonder Solar LLC</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.45187</lat>
    <lon>-94.53513</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66003</plant_id>
    <plant_name>MP CSG 1 LLC</plant_name>
    <state>MN</state>
    <county>Carlton</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>46.619837</lat>
    <lon>-92.38889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66004</plant_id>
    <plant_name>Titlow Garden LLC CSG</plant_name>
    <state>MN</state>
    <county>Sibley</county>
    <operator>Titlow Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.5434</lat>
    <lon>-94.2229</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66015</plant_id>
    <plant_name>Platt Solar</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Cannon River LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>43.981359</lat>
    <lon>-95.87079</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66016</plant_id>
    <plant_name>Skalbeck Solar</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Cascade Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>44.787094</lat>
    <lon>-95.36881</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66017</plant_id>
    <plant_name>Andresen Solar</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Ballantyne LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.935638</lat>
    <lon>-95.37459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66029</plant_id>
    <plant_name>Courtland CSG LLC</plant_name>
    <state>MN</state>
    <county>Nicollet</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.255814</lat>
    <lon>-94.29286</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66030</plant_id>
    <plant_name>Johnson CSG 2</plant_name>
    <state>MN</state>
    <county>Chisago</county>
    <operator>Madison Energy Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.4895</lat>
    <lon>-92.8501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66084</plant_id>
    <plant_name>Rafterville Solar</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Rafterville Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.13828</lat>
    <lon>-94.73714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66098</plant_id>
    <plant_name>IGS VGT</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.270668</lat>
    <lon>-115.0465</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66099</plant_id>
    <plant_name>IGS LAS1</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Altus Power America Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.967777</lat>
    <lon>-115.1468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66143</plant_id>
    <plant_name>San Diego Community College</plant_name>
    <state>CA</state>
    <county>San Diego</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>32.805901</lat>
    <lon>-117.1677</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66242</plant_id>
    <plant_name>Lake Elsinore Canopies - Lakeside HS</plant_name>
    <state>CA</state>
    <county>Riverside</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.668</lat>
    <lon>-117.383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66433</plant_id>
    <plant_name>USS Fair Park Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.19168</lat>
    <lon>-93.19052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66435</plant_id>
    <plant_name>USS Cosmo Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.47057</lat>
    <lon>-95.06007</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66459</plant_id>
    <plant_name>Taylor Farms - Schilling Place</plant_name>
    <state>CA</state>
    <county>Monterey</county>
    <operator>Bloom Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Other Natural Gas</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Other Natural Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.65388</lat>
    <lon>-121.6237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66468</plant_id>
    <plant_name>Clovis High School</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.817101</lat>
    <lon>-119.6819</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66469</plant_id>
    <plant_name>Clovis East High School</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.799669</lat>
    <lon>-119.6406</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66470</plant_id>
    <plant_name>Clovis North High School</plant_name>
    <state>CA</state>
    <county>Fresno</county>
    <operator>Tesla Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>36.890115</lat>
    <lon>-119.7367</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66477</plant_id>
    <plant_name>USS Martha Solar (CSG)</plant_name>
    <state>MN</state>
    <county>Carver</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.728051</lat>
    <lon>-93.96013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66479</plant_id>
    <plant_name>Pivot Energy Minnesota Solar 10</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.598748</lat>
    <lon>-94.86283</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66480</plant_id>
    <plant_name>Pivot Energy Minnesota Solar 1</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.125941</lat>
    <lon>-93.27715</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66512</plant_id>
    <plant_name>ME Augusta 13 York Farm Rd Solar</plant_name>
    <state>ME</state>
    <county>Kennebec</county>
    <operator>SOL ME Augusta 13 York Farm, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.328818</lat>
    <lon>-69.81961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66554</plant_id>
    <plant_name>Wolverine Solar</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>Wolverine Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.96188</lat>
    <lon>-95.49305</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66587</plant_id>
    <plant_name>Americus</plant_name>
    <state>KS</state>
    <county>Lyon</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.551473</lat>
    <lon>-96.15092</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66588</plant_id>
    <plant_name>Ashley-Chicot Solar</plant_name>
    <state>AR</state>
    <county>Ashley</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>33.250828</lat>
    <lon>-91.92243</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66589</plant_id>
    <plant_name>Berryville School District Solar</plant_name>
    <state>AR</state>
    <county>Carroll</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>36.37342</lat>
    <lon>-93.58618</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66590</plant_id>
    <plant_name>C&amp;L</plant_name>
    <state>AR</state>
    <county>Lincoln</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.075486</lat>
    <lon>-91.82832</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66591</plant_id>
    <plant_name>Cheney Solar</plant_name>
    <state>KS</state>
    <county>Sedgwick</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.623563</lat>
    <lon>-97.71672</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66607</plant_id>
    <plant_name>Clay County Electrical Cooperative</plant_name>
    <state>AR</state>
    <county>Clay</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>36.419308</lat>
    <lon>-90.64251</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66609</plant_id>
    <plant_name>DeGraff Butler Electric</plant_name>
    <state>KS</state>
    <county>Butler</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.985224</lat>
    <lon>-96.86085</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66610</plant_id>
    <plant_name>Farmers Electric Cooperative</plant_name>
    <state>AR</state>
    <county>Jackson</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.629554</lat>
    <lon>-91.23051</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66667</plant_id>
    <plant_name>City of Rosamond (CA)</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.835677</lat>
    <lon>-118.1468</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66763</plant_id>
    <plant_name>SCH County - (1E) 398 Anthony St Schenec</plant_name>
    <state>NY</state>
    <county>Schenectady</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.841167</lat>
    <lon>-73.91645</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66875</plant_id>
    <plant_name>Cenergy - Richards (CSG)</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Luminace Sunbeam Development Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.643308</lat>
    <lon>-69.60757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66877</plant_id>
    <plant_name>Cenergy - Kiger</plant_name>
    <state>ME</state>
    <county>Somerset</county>
    <operator>Luminace Sunbeam Development Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.963419</lat>
    <lon>-69.89179</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66882</plant_id>
    <plant_name>FreeState Kiro Solar I</plant_name>
    <state>KS</state>
    <county>Shawnee</county>
    <operator>Evergy Kansas Central, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.10878</lat>
    <lon>-95.7867</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66957</plant_id>
    <plant_name>CPA 2132 E Dominguez</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>33.83783</lat>
    <lon>-118.2312</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66969</plant_id>
    <plant_name>USS Jayhawk Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.232019</lat>
    <lon>-93.95941</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66970</plant_id>
    <plant_name>USS Maverick Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Blue Earth</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.09963</lat>
    <lon>-94.05358</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66971</plant_id>
    <plant_name>USS Riley Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.983891</lat>
    <lon>-95.71669</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66972</plant_id>
    <plant_name>Spring Prairie Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Clay</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>46.9773</lat>
    <lon>-96.479</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66973</plant_id>
    <plant_name>MN East Regal LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.394755</lat>
    <lon>-94.74221</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66974</plant_id>
    <plant_name>MN Buffalo Lake 212-1 LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.731944</lat>
    <lon>-94.60547</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66975</plant_id>
    <plant_name>MN Buffalo Lake 212-2 LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.734278</lat>
    <lon>-94.62442</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67009</plant_id>
    <plant_name>Preston Garden (CSG)</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Preston Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.535906</lat>
    <lon>-94.91133</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67030</plant_id>
    <plant_name>Elkhorn Dairy</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Bravo REC Management LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2009</first_year>
    <latest_year>2009</latest_year>
    <lat>36.47229</lat>
    <lon>-119.3467</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67062</plant_id>
    <plant_name>Cranbury 0210 Solar</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>40.302</lat>
    <lon>-74.496</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67096</plant_id>
    <plant_name>Fareway Customer Hosted 1 MW Solar</plant_name>
    <state>IA</state>
    <county>Boone</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.063182</lat>
    <lon>-93.85664</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67099</plant_id>
    <plant_name>Perry Customer Hosted 1MW Solar Project</plant_name>
    <state>IA</state>
    <county>Dallas</county>
    <operator>Interstate Power and Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.843474</lat>
    <lon>-94.12034</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67122</plant_id>
    <plant_name>BRIGHT Battery</plant_name>
    <state>NE</state>
    <county>Cass</county>
    <operator>Omaha Public Power District</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>2.4</battery_mwh>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.871407</lat>
    <lon>-96.17904</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67142</plant_id>
    <plant_name>McAllister Landfill</plant_name>
    <state>RI</state>
    <county>Newport</county>
    <operator>Solar Breakers LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.57196</lat>
    <lon>-71.28976</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67210</plant_id>
    <plant_name>Lilly Lane</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>LSE Chamaeleon LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.175439</lat>
    <lon>-71.99714</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67243</plant_id>
    <plant_name>Tom's River (Lowes)</plant_name>
    <state>NJ</state>
    <county>Ocean</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.989</lat>
    <lon>-74.173</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67244</plant_id>
    <plant_name>Minster 3</plant_name>
    <state>OH</state>
    <county>Auglaize</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>40.39</lat>
    <lon>-84.398</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67271</plant_id>
    <plant_name>The Source at White Plains (UBS)</plant_name>
    <state>NY</state>
    <county>Westchester</county>
    <operator>Distributed Solar Development, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.028481</lat>
    <lon>-73.75907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67331</plant_id>
    <plant_name>SolarClub 03</plant_name>
    <state>MN</state>
    <county>Pope</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.642103</lat>
    <lon>-95.53038</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67332</plant_id>
    <plant_name>SolarClub 30 (CSG)</plant_name>
    <state>MN</state>
    <county>Meeker</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.31917</lat>
    <lon>-94.555</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67351</plant_id>
    <plant_name>Park Solar</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.3367</lat>
    <lon>-72.9868</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67367</plant_id>
    <plant_name>Freetown MA 1, LLC</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>41.760554</lat>
    <lon>-70.96785</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67458</plant_id>
    <plant_name>Boyd Soccerplex</plant_name>
    <state>MD</state>
    <county>Montgomery</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.152794</lat>
    <lon>-77.31136</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67460</plant_id>
    <plant_name>Howell (Lowes)</plant_name>
    <state>NJ</state>
    <county>Monmouth</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.13</lat>
    <lon>-74.218</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67461</plant_id>
    <plant_name>Hamilton</plant_name>
    <state>NJ</state>
    <county>Mercer</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.198</lat>
    <lon>-74.633</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67505</plant_id>
    <plant_name>Sturbridge Barn</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>LSE Ara LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.1772</lat>
    <lon>-72.00456</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67515</plant_id>
    <plant_name>Crossett SD</plant_name>
    <state>AR</state>
    <county>Ashley</county>
    <operator>Entegrity Solar Crossett SD, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>33.131191</lat>
    <lon>-91.9411</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67518</plant_id>
    <plant_name>Fayetteville Public Schools (Ozarks)</plant_name>
    <state>AR</state>
    <county>Washington</county>
    <operator>Nabholz Solar FPS Ozarks, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.004934</lat>
    <lon>-94.02052</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67521</plant_id>
    <plant_name>Rivercrest SD</plant_name>
    <state>AR</state>
    <county>Mississippi</county>
    <operator>Entegrity Solar Rivercrest SD, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>35.618068</lat>
    <lon>-90.10492</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67522</plant_id>
    <plant_name>Searcy Water I</plant_name>
    <state>AR</state>
    <county>White</county>
    <operator>Entegrity Solar SWU, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>35.265897</lat>
    <lon>-91.71589</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67524</plant_id>
    <plant_name>Southside SD</plant_name>
    <state>AR</state>
    <county>Pulaski</county>
    <operator>Entegrity Solar Southside SD, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>34.724417</lat>
    <lon>-92.1968</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67546</plant_id>
    <plant_name>USS Golden Spike Solar LLC CSG</plant_name>
    <state>MN</state>
    <county>Benton</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.624209</lat>
    <lon>-94.06363</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67547</plant_id>
    <plant_name>USS Rosewood Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.974692</lat>
    <lon>-95.71466</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67548</plant_id>
    <plant_name>USS Slayton Solar LLC (CSG)</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.981733</lat>
    <lon>-95.76578</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67587</plant_id>
    <plant_name>SV CSG AFTON I</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>SV CSG Afton I, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.943</lat>
    <lon>-92.857</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67588</plant_id>
    <plant_name>DSI Don Solar</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>DSI Don Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.805</lat>
    <lon>-95.2056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67808</plant_id>
    <plant_name>NJ Airport Solar Project A</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.684</lat>
    <lon>-74.191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67809</plant_id>
    <plant_name>NJ Airport Solar Project B</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.684</lat>
    <lon>-74.191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67810</plant_id>
    <plant_name>NJ Airport Solar Project C</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.684</lat>
    <lon>-74.191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67811</plant_id>
    <plant_name>NJ Airport Solar Project D</plant_name>
    <state>NJ</state>
    <county>Essex</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.684</lat>
    <lon>-74.191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67815</plant_id>
    <plant_name>Fond du Lac Community Solar</plant_name>
    <state>WI</state>
    <county>Fond Du Lac</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>43.734</lat>
    <lon>-88.473</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67821</plant_id>
    <plant_name>TJX Tucson</plant_name>
    <state>AZ</state>
    <county>Pima</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>32.125</lat>
    <lon>-110.9139</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67825</plant_id>
    <plant_name>TJX Las Vegas</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.251</lat>
    <lon>-115.0816</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67853</plant_id>
    <plant_name>Delta Electronics Fremont</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Delta Electronics (Americas) Ltd</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2020</latest_year>
    <lat>37.48963</lat>
    <lon>-121.949</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67901</plant_id>
    <plant_name>Oak Leaf Solar XVI Community Solar</plant_name>
    <state>MA</state>
    <county>Berkshire</county>
    <operator>Navisun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>42.421787</lat>
    <lon>-73.2925</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>67958</plant_id>
    <plant_name>DSI Julie Solar</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>DSI Julie Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.467235</lat>
    <lon>-94.39611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68016</plant_id>
    <plant_name>Hollister Wastewater Facility</plant_name>
    <state>CA</state>
    <county>San Benito</county>
    <operator>SunStrong Management, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>36.857193</lat>
    <lon>-121.4459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68046</plant_id>
    <plant_name>Lake Wilson Solar</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Lake Wilson Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.980417</lat>
    <lon>-95.95489</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68047</plant_id>
    <plant_name>Lake Lilian Solar</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>Lake Lilian Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.9368</lat>
    <lon>-94.89192</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68116</plant_id>
    <plant_name>Benz Solar 1</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.342637</lat>
    <lon>-73.0615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68117</plant_id>
    <plant_name>Benz Solar 2</plant_name>
    <state>CT</state>
    <county>New Haven</county>
    <operator>Ecos Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.34357</lat>
    <lon>-73.06077</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68156</plant_id>
    <plant_name>MN CSG 2019-82</plant_name>
    <state>MN</state>
    <county>Kandiyohi</county>
    <operator>MN CSG 2019-82 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.13623</lat>
    <lon>-94.7599</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68157</plant_id>
    <plant_name>MN CSG 2019-60</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>MN CSG 2019-60 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.7328</lat>
    <lon>-94.6044</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68242</plant_id>
    <plant_name>DG Green Arrow</plant_name>
    <state>MN</state>
    <county>Pipestone</county>
    <operator>DG Green Arrow LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.994</lat>
    <lon>-96.3327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68268</plant_id>
    <plant_name>Tulare Akers Professional Center</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>SoCore Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.322</lat>
    <lon>-119.351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68330</plant_id>
    <plant_name>DIVOCSG 2 LLC</plant_name>
    <state>MN</state>
    <county>Wright</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>45.086</lat>
    <lon>-94.183</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68373</plant_id>
    <plant_name>MN CSG 2019-105</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>MN CSG 2019-105 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.3395</lat>
    <lon>-92.00017</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68374</plant_id>
    <plant_name>MN CSG 2019-67</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>MN CSG 2019-67 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.421063</lat>
    <lon>-94.03342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68390</plant_id>
    <plant_name>118 Echo</plant_name>
    <state>MA</state>
    <county>Barnstable</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.655</lat>
    <lon>-70.50306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68391</plant_id>
    <plant_name>3100 Valleyview Drive</plant_name>
    <state>OH</state>
    <county>Franklin</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>39.956944</lat>
    <lon>-83.02917</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68412</plant_id>
    <plant_name>DIVOCSG 13</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>DIVOCSG 13 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.3645</lat>
    <lon>-92.0274</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68435</plant_id>
    <plant_name>Millbury MA #1092</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>Millbury MA #1092 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>42.220922</lat>
    <lon>-71.73</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68437</plant_id>
    <plant_name>Millis MA 1</plant_name>
    <state>MA</state>
    <county>Norfolk</county>
    <operator>Millis MA 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.16</lat>
    <lon>-71.38</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68438</plant_id>
    <plant_name>Rochester MA 2</plant_name>
    <state>MA</state>
    <county>Plymouth</county>
    <operator>Rochester MA 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>41.723658</lat>
    <lon>-70.84047</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68441</plant_id>
    <plant_name>Wendell MA 1</plant_name>
    <state>MA</state>
    <county>Franklin</county>
    <operator>Wendell MA 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>42.56</lat>
    <lon>-72.39902</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68447</plant_id>
    <plant_name>Kuihelani Substation</plant_name>
    <state>HI</state>
    <county>Maui</county>
    <operator>Maui Electric Co Ltd</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>20.86199</lat>
    <lon>-156.4748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68457</plant_id>
    <plant_name>DIVOCSG 14 LLC</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>DIVOCSG 14 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.3396</lat>
    <lon>-91.9974</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68464</plant_id>
    <plant_name>Round Lake</plant_name>
    <state>OR</state>
    <county>Klamath</county>
    <operator>Round Lake Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>42.128</lat>
    <lon>-121.907</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68505</plant_id>
    <plant_name>MN CSG 2019-79</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>MN CSG 2019-79 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.7825</lat>
    <lon>-95.4795</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68506</plant_id>
    <plant_name>MN CSG 2019-22</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>MN CSG 2019-22 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.7951</lat>
    <lon>-95.1001</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68533</plant_id>
    <plant_name>Blue Moon Farms</plant_name>
    <state>CA</state>
    <county>Tulare</county>
    <operator>Bravo REC Management LLC</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>36.028854</lat>
    <lon>-119.4015</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68535</plant_id>
    <plant_name>MN CSG 2019-77</plant_name>
    <state>MN</state>
    <county>Dakota</county>
    <operator>MN CSG 2019-77 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.4735</lat>
    <lon>-93.2187</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68539</plant_id>
    <plant_name>IL Bolingbrook 279 Marquette Dr</plant_name>
    <state>IL</state>
    <county>Will</county>
    <operator>Catalyze Bolingbrook 279 Marquette Drive Microgrid, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.672428</lat>
    <lon>-88.06185</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68573</plant_id>
    <plant_name>Lowe's - 1845 - Chicago Brickyard, IL</plant_name>
    <state>IL</state>
    <county>Cook</county>
    <operator>North Narragansett Avenue Solar Project 2022, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.928181</lat>
    <lon>-87.78931</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68688</plant_id>
    <plant_name>Arkansas Valley</plant_name>
    <state>AR</state>
    <county>Franklin</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.510306</lat>
    <lon>-93.8348</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68689</plant_id>
    <plant_name>BP-Kanza</plant_name>
    <state>KS</state>
    <county>Pratt</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.675278</lat>
    <lon>-98.78258</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68690</plant_id>
    <plant_name>Caney Valley</plant_name>
    <state>KS</state>
    <county>Chautauqua</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>37.120111</lat>
    <lon>-96.21253</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68691</plant_id>
    <plant_name>Centerville (NE)</plant_name>
    <state>NE</state>
    <county>Lancaster</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.656417</lat>
    <lon>-96.74319</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68693</plant_id>
    <plant_name>Deshler Solar</plant_name>
    <state>NE</state>
    <county>Thayer</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.08675</lat>
    <lon>-97.70786</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68694</plant_id>
    <plant_name>Greensburg Solar</plant_name>
    <state>KS</state>
    <county>Kiowa</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.577342</lat>
    <lon>-99.32147</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68695</plant_id>
    <plant_name>Harvey County</plant_name>
    <state>KS</state>
    <county>Harvey</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.042591</lat>
    <lon>-97.20873</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68696</plant_id>
    <plant_name>Huntsville-Ark Valley, KS</plant_name>
    <state>KS</state>
    <county>Reno</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.051013</lat>
    <lon>-98.32622</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68697</plant_id>
    <plant_name>Lindsborg</plant_name>
    <state>KS</state>
    <county>McPherson</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.565818</lat>
    <lon>-97.72459</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68698</plant_id>
    <plant_name>Maize</plant_name>
    <state>KS</state>
    <county>Sedgwick</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.765293</lat>
    <lon>-97.5076</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68699</plant_id>
    <plant_name>Mound</plant_name>
    <state>KS</state>
    <county>Labette</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.157204</lat>
    <lon>-95.44999</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68700</plant_id>
    <plant_name>Munson-DS&amp;O</plant_name>
    <state>KS</state>
    <county>Geary</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.039306</lat>
    <lon>-96.87064</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68703</plant_id>
    <plant_name>Oskaloosa</plant_name>
    <state>KS</state>
    <county>Jefferson</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.147208</lat>
    <lon>-95.32801</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68707</plant_id>
    <plant_name>Greenbush-Heartland</plant_name>
    <state>KS</state>
    <county>Crawford</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.514583</lat>
    <lon>-94.98297</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68709</plant_id>
    <plant_name>North Arkansas Electric Cooperative</plant_name>
    <state>AR</state>
    <county>Fulton</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>36.39081</lat>
    <lon>-91.87759</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68712</plant_id>
    <plant_name>Petit Jean</plant_name>
    <state>AR</state>
    <county>Van Buren</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>35.567708</lat>
    <lon>-92.45698</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68713</plant_id>
    <plant_name>Rich Mountain Electric Cooperative</plant_name>
    <state>AR</state>
    <county>Polk</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>34.585883</lat>
    <lon>-94.20035</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68714</plant_id>
    <plant_name>Ruby-Norris</plant_name>
    <state>NE</state>
    <county>Seward</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>40.82878</lat>
    <lon>-97.0784</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68715</plant_id>
    <plant_name>SAU Tech</plant_name>
    <state>AR</state>
    <county>Ouachita</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>33.781675</lat>
    <lon>-92.69619</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68716</plant_id>
    <plant_name>Solomon-DS&amp;O</plant_name>
    <state>KS</state>
    <county>Dickinson</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>38.849801</lat>
    <lon>-97.37198</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68717</plant_id>
    <plant_name>South Central Electric Cooperative</plant_name>
    <state>AR</state>
    <county>Clark</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.163497</lat>
    <lon>-93.08721</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68718</plant_id>
    <plant_name>Southwest Arkansas Electric</plant_name>
    <state>AR</state>
    <county>Miller</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>33.518301</lat>
    <lon>-94.02775</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68720</plant_id>
    <plant_name>St. George</plant_name>
    <state>KS</state>
    <county>Pottawatomie</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>39.232815</lat>
    <lon>-96.45525</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68721</plant_id>
    <plant_name>St. Paul-Howard Greeley</plant_name>
    <state>NE</state>
    <county>Howard</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.213636</lat>
    <lon>-98.44561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68722</plant_id>
    <plant_name>Star City School District</plant_name>
    <state>AR</state>
    <county>Lincoln</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>33.961183</lat>
    <lon>-91.81056</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68723</plant_id>
    <plant_name>Stromsburg-Polk County</plant_name>
    <state>NE</state>
    <county>Polk</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>41.124756</lat>
    <lon>-97.57945</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68724</plant_id>
    <plant_name>Studebaker</plant_name>
    <state>KS</state>
    <county>Wilson</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.507612</lat>
    <lon>-95.7978</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68725</plant_id>
    <plant_name>Tri County - TenK</plant_name>
    <state>OK</state>
    <county>Texas</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>36.863541</lat>
    <lon>-101.194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68726</plant_id>
    <plant_name>Urbana-Heartland</plant_name>
    <state>KS</state>
    <county>Neosho</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>37.601634</lat>
    <lon>-95.36961</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68728</plant_id>
    <plant_name>Woodruff Electric Cooperative</plant_name>
    <state>AR</state>
    <county>St. Francis</county>
    <operator>Today's Power, Inc.</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>35.039328</lat>
    <lon>-90.82519</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68747</plant_id>
    <plant_name>Oaks HOA</plant_name>
    <state>CA</state>
    <county>Amador</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.291163</lat>
    <lon>-120.9191</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68800</plant_id>
    <plant_name>Franklin CSG 1</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Franklin CSG 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.5393</lat>
    <lon>-94.895</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68808</plant_id>
    <plant_name>Dos Palos Cooperative Gin</plant_name>
    <state>CA</state>
    <county>Merced</county>
    <operator>A2B Development LLC dba Mars Energy Development</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.083909</lat>
    <lon>-120.6344</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68840</plant_id>
    <plant_name>Da Silva Dairy</plant_name>
    <state>CA</state>
    <county>San Joaquin</county>
    <operator>A2B Development LLC dba Mars Energy Development</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.858452</lat>
    <lon>-121.013</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68845</plant_id>
    <plant_name>Bavaria Solar LLC</plant_name>
    <state>MN</state>
    <county>Murray</county>
    <operator>Bavaria Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.975</lat>
    <lon>-95.9091</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>68956</plant_id>
    <plant_name>Marion Solar 2</plant_name>
    <state>IL</state>
    <county>Marion</county>
    <operator>Pivot Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.637126</lat>
    <lon>-89.11153</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69000</plant_id>
    <plant_name>MLH 2</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.70408</lat>
    <lon>-82.29238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69001</plant_id>
    <plant_name>MLH 3</plant_name>
    <state>FL</state>
    <county>Alachua</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>29.70408</lat>
    <lon>-82.29238</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69038</plant_id>
    <plant_name>Riley III - Site 12 Community Solar</plant_name>
    <state>KS</state>
    <county>Riley</county>
    <operator>Onyx Asset Services Group</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.086479</lat>
    <lon>-96.79936</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69048</plant_id>
    <plant_name>MN CSG 2019-113</plant_name>
    <state>MN</state>
    <county>Chippewa</county>
    <operator>MN CSG 2019-113 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.9834</lat>
    <lon>-95.7118</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69075</plant_id>
    <plant_name>376 Nash</plant_name>
    <state>MA</state>
    <county>Bristol</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Batteries</primary_technology>
    <primary_energy_source>MWH</primary_energy_source>
    <technologies>Batteries; Solar Photovoltaic</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <battery_mwh>2</battery_mwh>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>41.665</lat>
    <lon>-70.93611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69082</plant_id>
    <plant_name>Roosevelt Trail</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.855833</lat>
    <lon>-70.45861</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69084</plant_id>
    <plant_name>SP-339 Mechanic Falls</plant_name>
    <state>ME</state>
    <county>Oxford</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>44.105278</lat>
    <lon>-70.36944</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69115</plant_id>
    <plant_name>DIVOCSG 11 - Sherburne</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.404645</lat>
    <lon>-93.96943</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69117</plant_id>
    <plant_name>Lime Bluff 2</plant_name>
    <state>PA</state>
    <county>Lycoming</county>
    <operator>Madison Energy Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.232594</lat>
    <lon>-76.75304</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69124</plant_id>
    <plant_name>BWC Mystic River</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>BWC Mystic River LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.115229</lat>
    <lon>-71.55016</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69125</plant_id>
    <plant_name>BWC Origination 19</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>BWC Origination 19 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.111032</lat>
    <lon>-71.50615</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69126</plant_id>
    <plant_name>BWC Origination 8 LLC Sturbridge 1</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>BWC Origination 8 LLC Sturbridge 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.123325</lat>
    <lon>-72.06027</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69127</plant_id>
    <plant_name>BWC Origination 8 LLC Sturbridge 2</plant_name>
    <state>MA</state>
    <county>Worcester</county>
    <operator>BWC Origination 8 LLC Sturbridge 2 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>42.11888</lat>
    <lon>-72.06975</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69135</plant_id>
    <plant_name>Reston Town Center Solar 1</plant_name>
    <state>VA</state>
    <county>Fairfax</county>
    <operator>Reston Town Center Solar 1 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.959906</lat>
    <lon>-77.35767</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69142</plant_id>
    <plant_name>Novel Stumpf 1 Solar CSG</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Novel Stumpf 1 Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.517319</lat>
    <lon>-92.51089</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69145</plant_id>
    <plant_name>GIUD Solar I</plant_name>
    <state>NE</state>
    <county>Hall</county>
    <operator>Onsite Partners, LLC</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.925157</lat>
    <lon>-98.31439</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69233</plant_id>
    <plant_name>CA- US Foods- Sacramento (McClellan)</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>USF McClellan, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>38.649095</lat>
    <lon>-121.4122</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69248</plant_id>
    <plant_name>Speedway North Bldg 1-sllas701</plant_name>
    <state>NV</state>
    <county>Clark</county>
    <operator>Prologis Logistics Services Incorporated</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>36.201946</lat>
    <lon>-115.1202</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69303</plant_id>
    <plant_name>Enterprise MN - Buscho CSG</plant_name>
    <state>MN</state>
    <county>Steele</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.12187</lat>
    <lon>-93.26694</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69304</plant_id>
    <plant_name>Enterprise MN - Ferche CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.389816</lat>
    <lon>-94.71178</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69307</plant_id>
    <plant_name>Enterprise MN - Hu's on First CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Standard Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.417036</lat>
    <lon>-93.15033</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69630</plant_id>
    <plant_name>USS Man Solar LLC</plant_name>
    <state>IL</state>
    <county>Livingston</county>
    <operator>United States Solar Corporation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.063431</lat>
    <lon>-88.75117</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69632</plant_id>
    <plant_name>Alverno Hydro Plant</plant_name>
    <state>MI</state>
    <county>Cheboygan</county>
    <operator>Energen Renewables, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>2</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>1960</first_year>
    <latest_year>1960</latest_year>
    <lat>45.551817</lat>
    <lon>-84.39501</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69645</plant_id>
    <plant_name>Princeton Solar</plant_name>
    <state>IL</state>
    <county>Bureau</county>
    <operator>Altorfer Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>41.389993</lat>
    <lon>-89.49146</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69646</plant_id>
    <plant_name>Marshall Solar (IL)</plant_name>
    <state>IL</state>
    <county>Clark</county>
    <operator>Altorfer Inc.</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>39.394347</lat>
    <lon>-87.68416</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69682</plant_id>
    <plant_name>Goodling Community Solar</plant_name>
    <state>OR</state>
    <county>Multnomah</county>
    <operator>Bonneville Environmental Foundation (BEF)</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>45.590001</lat>
    <lon>-122.6345</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69693</plant_id>
    <plant_name>Lisbon CSG LLC</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.031012</lat>
    <lon>-70.09402</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69705</plant_id>
    <plant_name>Turner CSG LLC</plant_name>
    <state>ME</state>
    <county>Androscoggin</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.27755</lat>
    <lon>-70.27138</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69707</plant_id>
    <plant_name>USS Weld Solar LLC</plant_name>
    <state>ME</state>
    <county>Franklin</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>44.630025</lat>
    <lon>-70.30748</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69709</plant_id>
    <plant_name>Water Line Solar, LLC</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.823755</lat>
    <lon>-70.23083</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69715</plant_id>
    <plant_name>Boundary Line Solar, LLC</plant_name>
    <state>ME</state>
    <county>Cumberland</county>
    <operator>Dimension Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>43.809056</lat>
    <lon>-70.23504</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69797</plant_id>
    <plant_name>Northern Sun</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Northern Sun LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>44.309422</lat>
    <lon>-93.23834</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>69822</plant_id>
    <plant_name>Holtsville Coast Solar Project</plant_name>
    <state>NY</state>
    <county>Suffolk</county>
    <operator>Coast Energy Holdings, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2025</first_year>
    <latest_year>2025</latest_year>
    <lat>40.797381</lat>
    <lon>-73.03351</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70091</plant_id>
    <plant_name>Blankenship</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.675624</lat>
    <lon>-119.3654</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70155</plant_id>
    <plant_name>SV CSG Reifschneider I A, LLC</plant_name>
    <state>IL</state>
    <county>St Clair</county>
    <operator>SREOG IL Partnership 4, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>38.469758</lat>
    <lon>-89.98602</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70173</plant_id>
    <plant_name>San Francisco Bay Coffee</plant_name>
    <state>CA</state>
    <county>Placer</county>
    <operator>JBR, Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>38.907673</lat>
    <lon>-121.3329</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70208</plant_id>
    <plant_name>PCC Solar Array</plant_name>
    <state>OH</state>
    <county>Wood</county>
    <operator>Onsite Partners Projectco, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.579674</lat>
    <lon>-83.57152</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70213</plant_id>
    <plant_name>City of Superior</plant_name>
    <state>NE</state>
    <county>Nuckolls</county>
    <operator>Onsite Partners Projectco, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>40.01</lat>
    <lon>-98.06</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70243</plant_id>
    <plant_name>Ogdensburg Solar Array</plant_name>
    <state>NY</state>
    <county>St Lawrence</county>
    <operator>Ogdensburg Solar Partners, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2018</first_year>
    <latest_year>2018</latest_year>
    <lat>44.713176</lat>
    <lon>-75.42337</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70358</plant_id>
    <plant_name>VS Hemingford NE Solar LLC</plant_name>
    <state>NE</state>
    <county>Box Butte</county>
    <operator>Valta Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>42.326398</lat>
    <lon>-103.0813</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70369</plant_id>
    <plant_name>Ranch 4260</plant_name>
    <state>CA</state>
    <county>Kern</county>
    <operator>Wonderful Renewable Energy, LLC.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>35.579501</lat>
    <lon>-119.1546</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>70532</plant_id>
    <plant_name>Jacob's Place</plant_name>
    <state>MD</state>
    <county>Baltimore</county>
    <operator>Nautilus Solar Solutions</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>1</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2026</first_year>
    <latest_year>2026</latest_year>
    <lat>39.38811</lat>
    <lon>-76.8342</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>56511</plant_id>
    <plant_name>Pennsauken Landfill</plant_name>
    <state>NJ</state>
    <county>Camden</county>
    <operator>NextEra Renewable Fuels, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2004</first_year>
    <latest_year>2004</latest_year>
    <lat>39.9894</lat>
    <lon>-75.04</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57200</plant_id>
    <plant_name>Shelby Solar Energy Generation Facility</plant_name>
    <state>NC</state>
    <county>Cleveland</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>35.2536</lat>
    <lon>-81.5956</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57461</plant_id>
    <plant_name>Martins Creek Solar NC, LLC</plant_name>
    <state>NC</state>
    <county>Cherokee</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>35.020415</lat>
    <lon>-84.01568</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57677</plant_id>
    <plant_name>Murphy Farm Power, LLC</plant_name>
    <state>NC</state>
    <county>Cherokee</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.999167</lat>
    <lon>-84.15725</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57687</plant_id>
    <plant_name>CS Murphy Point, LLC</plant_name>
    <state>NC</state>
    <county>Cherokee</county>
    <operator>Deriva Energy</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>34.989539</lat>
    <lon>-84.1662</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58168</plant_id>
    <plant_name>Energy Center</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>University of Redlands</operator>
    <sector>Commercial CHP</sector>
    <primary_technology>Natural Gas Fired Combustion Turbine</primary_technology>
    <primary_energy_source>NG</primary_energy_source>
    <technologies>Natural Gas Fired Combustion Turbine</technologies>
    <generators>3</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.063056</lat>
    <lon>-117.1639</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59129</plant_id>
    <plant_name>CSD 2- Freedom High</plant_name>
    <state>CA</state>
    <county>Contra Costa</county>
    <operator>CleanCapital Holdings</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>37.969722</lat>
    <lon>-121.7194</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59652</plant_id>
    <plant_name>Nordhoff Place</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>Los Angeles Department of Water &amp; Power</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2014</first_year>
    <latest_year>2014</latest_year>
    <lat>34.236667</lat>
    <lon>-118.5658</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>62355</plant_id>
    <plant_name>IKEA Norfolk Rooftop PV System</plant_name>
    <state>VA</state>
    <county>Norfolk City</county>
    <operator>IKEA Property Inc</operator>
    <sector>Commercial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>36.875877</lat>
    <lon>-76.20094</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63674</plant_id>
    <plant_name>Dedeaux</plant_name>
    <state>CA</state>
    <county>Los Angeles</county>
    <operator>VS Dedeaux LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>34.013113</lat>
    <lon>-118.2419</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63970</plant_id>
    <plant_name>7185 13th Pl. NW</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>New Columbia Solar</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2019</first_year>
    <latest_year>2019</latest_year>
    <lat>38.977175</lat>
    <lon>-77.03141</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>63986</plant_id>
    <plant_name>Rialto - High School</plant_name>
    <state>CA</state>
    <county>San Bernardino</county>
    <operator>A2-A Pearl Investments LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>34.090318</lat>
    <lon>-117.3556</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64029</plant_id>
    <plant_name>Bauer Solar CSG</plant_name>
    <state>MN</state>
    <county>Stearns</county>
    <operator>Bauer Community Solar LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>45.273478</lat>
    <lon>-94.23195</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64920</plant_id>
    <plant_name>GE-Hitachi Solar - Morris, IL</plant_name>
    <state>IL</state>
    <county>Grundy</county>
    <operator>DG Illinois Solar, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2020</first_year>
    <latest_year>2020</latest_year>
    <lat>41.381481</lat>
    <lon>-88.27241</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65223</plant_id>
    <plant_name>Phare Garden</plant_name>
    <state>MN</state>
    <county>Renville</county>
    <operator>Phare Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.7682</lat>
    <lon>-95.3423</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65497</plant_id>
    <plant_name>Garden 1 Solar Park</plant_name>
    <state>MI</state>
    <county>Delta</county>
    <operator>DTE Sustainable Generation</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2016</first_year>
    <latest_year>2016</latest_year>
    <lat>45.796239</lat>
    <lon>-86.53461</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65680</plant_id>
    <plant_name>City of Sheboygan Solar</plant_name>
    <state>WI</state>
    <county>Sheboygan</county>
    <operator>Wisconsin Power &amp; Light Co</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>43.709143</lat>
    <lon>-87.75538</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66573</plant_id>
    <plant_name>Crane Garden</plant_name>
    <state>MN</state>
    <county>McLeod</county>
    <operator>Crane Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.909</lat>
    <lon>-94.0327</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66576</plant_id>
    <plant_name>Fox Garden</plant_name>
    <state>MN</state>
    <county>Waseca</county>
    <operator>Fox Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>43.975105</lat>
    <lon>-93.49155</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66577</plant_id>
    <plant_name>Pepin Garden</plant_name>
    <state>MN</state>
    <county>Wabasha</county>
    <operator>Pepin Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.3163</lat>
    <lon>-91.9954</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66578</plant_id>
    <plant_name>Pickerel Garden</plant_name>
    <state>MN</state>
    <county>Sherburne</county>
    <operator>Pickerel Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2024</first_year>
    <latest_year>2024</latest_year>
    <lat>45.4295</lat>
    <lon>-94.0237</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66579</plant_id>
    <plant_name>Sturgeon Garden</plant_name>
    <state>MN</state>
    <county>Goodhue</county>
    <operator>Sturgeon Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.3845</lat>
    <lon>-92.5712</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66580</plant_id>
    <plant_name>Winona Garden</plant_name>
    <state>MN</state>
    <county>Winona</county>
    <operator>Winona Garden LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>1</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.10649</lat>
    <lon>-91.92889</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>66977</plant_id>
    <plant_name>MN CSG 2019-24 LLC</plant_name>
    <state>MN</state>
    <county>Washington</county>
    <operator>MN CSG 2019-24 LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.9</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2023</first_year>
    <latest_year>2023</latest_year>
    <lat>44.943279</lat>
    <lon>-92.85742</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57053</plant_id>
    <plant_name>Alakanuk</plant_name>
    <state>AK</state>
    <county>Kusilvak</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2013</first_year>
    <latest_year>2013</latest_year>
    <lat>62.6833</lat>
    <lon>-164.6544</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57128</plant_id>
    <plant_name>G2 Energy Marion LLC</plant_name>
    <state>FL</state>
    <county>Marion</county>
    <operator>G2 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Landfill Gas</primary_technology>
    <primary_energy_source>LFG</primary_energy_source>
    <technologies>Landfill Gas</technologies>
    <generators>1</generators>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>29.122882</lat>
    <lon>-82.05545</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>58485</plant_id>
    <plant_name>Upson Rocky Creek Solar Plant</plant_name>
    <state>GA</state>
    <county>Upson</county>
    <operator>Axium US Solar Holdings LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>32.920833</lat>
    <lon>-84.34306</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59367</plant_id>
    <plant_name>Engelhard Solar LLC</plant_name>
    <state>NJ</state>
    <county>Middlesex</county>
    <operator>SunRay Power LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>40.33</lat>
    <lon>-74.4625</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>64480</plant_id>
    <plant_name>Rice Two Solar CSG</plant_name>
    <state>MN</state>
    <county>Rice</county>
    <operator>Rice Community Solar Two LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>44.22012</lat>
    <lon>-93.45757</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65133</plant_id>
    <plant_name>Benning Road</plant_name>
    <state>DC</state>
    <county>District of Columbia</county>
    <operator>Azimuth 180 Solar Electric, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.8</summer_mw>
    <first_year>2021</first_year>
    <latest_year>2021</latest_year>
    <lat>38.89829</lat>
    <lon>-76.95561</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65153</plant_id>
    <plant_name>UMass PV Lot 49</plant_name>
    <state>MA</state>
    <county>Hampshire</county>
    <operator>RWE Americas, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.8</nameplate_mw>
    <summer_mw>0.9</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>42.393012</lat>
    <lon>-72.52023</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6329</plant_id>
    <plant_name>Mountain Village</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>0.7</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>2010</first_year>
    <latest_year>2010</latest_year>
    <lat>62.085569</lat>
    <lon>-163.7291</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57061</plant_id>
    <plant_name>St. Michael</plant_name>
    <state>AK</state>
    <county>Nome</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>0.7</nameplate_mw>
    <summer_mw>0.7</summer_mw>
    <first_year>2015</first_year>
    <latest_year>2015</latest_year>
    <lat>63.4775</lat>
    <lon>-162.0383</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>474</plant_id>
    <plant_name>Salida</plant_name>
    <state>CO</state>
    <county>Chaffee</county>
    <operator>Public Service Co of Colorado</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>1908</first_year>
    <latest_year>1908</latest_year>
    <lat>38.53419</lat>
    <lon>-106.182</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>59459</plant_id>
    <plant_name>Hickory Ridge Landfill Solar Project</plant_name>
    <state>GA</state>
    <county>DeKalb</county>
    <operator>BFI Waste Systems of GA, LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.6</nameplate_mw>
    <summer_mw>0.6</summer_mw>
    <first_year>2011</first_year>
    <latest_year>2011</latest_year>
    <lat>33.665</lat>
    <lon>-84.33611</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6282</plant_id>
    <plant_name>Port Lions Microgrid</plant_name>
    <state>AK</state>
    <county>Kodiak Island</county>
    <operator>Kodiak Electric Assn Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>0.5</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <first_year>2017</first_year>
    <latest_year>2017</latest_year>
    <lat>57.864775</lat>
    <lon>-152.8554</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>6333</plant_id>
    <plant_name>Nunapitchuk</plant_name>
    <state>AK</state>
    <county>Bethel</county>
    <operator>Alaska Village Elec Coop, Inc</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Petroleum Liquids</primary_technology>
    <primary_energy_source>DFO</primary_energy_source>
    <technologies>Petroleum Liquids</technologies>
    <generators>1</generators>
    <nameplate_mw>0.5</nameplate_mw>
    <summer_mw>0.5</summer_mw>
    <first_year>2006</first_year>
    <latest_year>2006</latest_year>
    <lat>60.89588</lat>
    <lon>-162.4598</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>57806</plant_id>
    <plant_name>RE Dillard 4 LLC</plant_name>
    <state>CA</state>
    <county>Sacramento</county>
    <operator>MN8 Energy LLC</operator>
    <sector>IPP Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.4</nameplate_mw>
    <summer_mw>0.4</summer_mw>
    <first_year>2012</first_year>
    <latest_year>2012</latest_year>
    <lat>38.461944</lat>
    <lon>-121.1803</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>65072</plant_id>
    <plant_name>Fremont CA AutoFactory</plant_name>
    <state>CA</state>
    <county>Alameda</county>
    <operator>Tesla Inc.</operator>
    <sector>Industrial Non-CHP</sector>
    <primary_technology>Solar Photovoltaic</primary_technology>
    <primary_energy_source>SUN</primary_energy_source>
    <technologies>Solar Photovoltaic</technologies>
    <generators>1</generators>
    <nameplate_mw>0.3</nameplate_mw>
    <summer_mw>0.3</summer_mw>
    <first_year>2022</first_year>
    <latest_year>2022</latest_year>
    <lat>37.49254</lat>
    <lon>-121.9446</lon>
    <as_of>2026-09</as_of>
  </row>
  <row>
    <plant_id>4102</plant_id>
    <plant_name>Barron</plant_name>
    <state>WI</state>
    <county>Barron</county>
    <operator>City of Barron - (WI)</operator>
    <sector>Electric Utility</sector>
    <primary_technology>Conventional Hydroelectric</primary_technology>
    <primary_energy_source>WAT</primary_energy_source>
    <technologies>Conventional Hydroelectric</technologies>
    <generators>1</generators>
    <nameplate_mw>0.1</nameplate_mw>
    <summer_mw>0.1</summer_mw>
    <first_year>1923</first_year>
    <latest_year>1923</latest_year>
    <lat>45.40193</lat>
    <lon>-91.84038</lon>
    <as_of>2026-09</as_of>
  </row>
</dataset>
